1.1CDE i) The shear capacity of #14 19 mm screw (s/s A70) is 2.98 KN.
ii) We attached herewith the updated the calculation. #14 19 mm
screws (s/s, A70) are used for connecting the c channel and to the vertical Alum. Post. iii) We attached here with the updated calculation which includes the c channel calculation and the updated calculation for M10 anchor between 100 100 6 mm angle and existing RC wall.
b) Detail 02
we attached here with the updated calculation for the c channel