EHS RISK ASSESSMENT

ACTIVITY: LOADING AND OFFLOADING THE 40 FEET CONTAINER


PACKAGE NUMBER: CG-4705

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control Prob
Cons. Prob. Risk Cons. Risk
.

Activity shall be carried out


by competent supervision.
Supervisor to ensure all work
permits is available prior to
commencement of the task.
Toolbox talk to be held at
site, this will be covered the
method statement and job
safety analysis.
Toolbox talks to be given
prior to start the job.
Working Competent workers to be
without work deployed, supervisor to
PREPARATION permit. ensure work safe system. 4 2 8
Unauthorized Coordination permission has
workers at to be made with main
working area. contractor before start the
work.
Extra care shall be taken
whenever energized
equipment is nearby working
place.
Ensure proper housekeeping
time to time.
Barricade the working area by
using safety cones warning
tape / signboard.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 1 of 6


EHS RISK ASSESSMENT

ACTIVITY: LOADING AND OFFLOADING THE 40 FEET CONTAINER


PACKAGE NUMBER: CG-4705

All workers involved in the


activity must be aware of heat
stress, supervisor to ensure
drinking cold water and
Heat stress. electrolyite are available at 4 2 8
the working area.
Conduct tool box meeting
about heat stress
Shaded area to be provided
All personnel involve in the
activities must wear their
P.P.E.'s at site (hard hat,
appropriate safety glass,
Working without safety shoes, safety harness, 3 2 6
P.P.E.s hand gloves, coverall &
reflective vest etc.).

Note: This is applicable to all


activities.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 2 of 6


EHS RISK ASSESSMENT

ACTIVITY: LOADING AND OFFLOADING THE 40 FEET CONTAINER


PACKAGE NUMBER: CG-4705

Operator must pass third party


competency test for crane
operation and secure
competency certificate.
Operator should attend
induction course for crane
LOADING AND operation.
OFFLOADING Unauthorized Crane must have:
operation of 1. Valid registration from 4 3 12
OF crane RTA to Travel.
CONTAINER 2. Valid certificate of
conformity or through
crane inspection from
approved certification
agencies.
3. Statement of insurance
policy.
Crane must be certified by
approved third party
certification agencies.
Ensure crane has valid SLII
inspection sticker
Mechanical Gears, chains, and belts should
4 3 12
Failure be inspected, certified and
valid colour coded to use.
Avoid overloading of transport
equipment.
Lift load for its specific load limit
or safe working load.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 3 of 6


EHS RISK ASSESSMENT

ACTIVITY: LOADING AND OFFLOADING THE 40 FEET CONTAINER


PACKAGE NUMBER: CG-4705

Use tag lines or tag ropes to


guide the load towards its
destination.
Having no
Supervisor to advice workers
control of the 4 3 12
not to walk, come close or
load
stand under the load.
Assign a certified
rigger/banksman.

Operator can be Only certified rigger/banksman


confused if is authorized to give signal
more than one during lifting operation. 3 3 9
person giving
instruction or
signal.
All workers involve in working at
height must wear their full
body harness and 100% tie off.
Working at Suitable anchorage point must
height. be used for 100% tie off
Use of Barricade the working area by
damaged using safety cones warning 3 3 9
ladder. tape / signboard.
Inspect step ladder before use,
one man should hold the
ladder on the ground while is
in used.
Lifting job to be stopped
Adverse weather or postponed at wind speed of
condition 35kph or more.
(High wind Lifting job to be
4 3 12
velocity, Sand postponed at high velocity
storm etc.) wind resulting to sandstorm or
poor visibility
503406-AD0000-68AF-12303_R01 (2012-01-30) Page 4 of 6
EHS RISK ASSESSMENT

ACTIVITY: LOADING AND OFFLOADING THE 40 FEET CONTAINER


PACKAGE NUMBER: CG-4705

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

Risk assessment compiled by:

Risk Assessor:
SACHIN BABU EHS ADVISOR 09-09-2012

Name Designation Signature Date

Risk assessment approved by :

EHS Department:

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 5 of 6


EHS RISK ASSESSMENT

ACTIVITY: LOADING AND OFFLOADING THE 40 FEET CONTAINER


PACKAGE NUMBER: CG-4705

Construction:

Name Designation Signature Date

Management:

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 6 of 6