Energy Audit
Basics and
principles
Presented by:

MAY 2010 Mr. Hamadi Sayah


International Energy Expert

Centre Molka Escalier N15 El Manar II 2092 TUNIS Tl: 00 216 71 886 177
Fax: 00 216 71 885 010 Site Web: www.cra2e.com E-mail: cra2e@yahoo.fr 1
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

OUTLINES
1. Definition and Objectives of Energy Audit and Management
2. Types of energy audit
3. Methodology of energy audit
4. Preliminary Consultation
5. Measurement Campaigns and Equipment
6. Approach to Energy Balance
7. Definition of an Action Plan
8. Presentation of the Audit Report
9. Audit of Electric System
10. Audit of Heating, Ventilation and Air-conditioning System
11. Conclusion
12. Study of case: Energy Audit of Establishment

2
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Definition and Objectives


of Energy Audit and Management

3
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

WHAT IS AN ENERGY AUDIT?

Energy audits periodic and mandatory constitutes a


strategic element to help companies REDUCE ENERGY
COSTS and MANAGE ENERGY CONSUMPTION to the extent
that it will allow to examine THE STATE OF ENERGY-USING
EQUIPMENT and take necessary MEASURES to replace any
other repair or improvement and reduce energy losses.

4
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

OBJECTIVE OF ENERGY AUDIT?

The primary objective of Energy Audit is to determine ways to


lower operating costs or to reduce energy consumption:
- per unit of product output (industry)
- ft or person (commercial/building)
Energy Audit provides a " bench-marking (Reference point) for
managing energy in the organization and also provides the basis
for planning a more effective use of energy.

5
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

WHAT IS THE ENERGY MANAGEMENT?

- "The judicious and effective use of energy to maximize


profits (minimize costs) and enhance competitive positions
- "The strategy of adjusting and optimizing energy, using
systems and procedures so as to reduce energy requirements
per unit of output while holding constant or reducing total
costs of producing the output from these systems"

6
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

OBJECTIVE OF ENERGY MANAGEMENT?


The objective of Energy Management is to achieve and
maintain optimum energy procurement and utilization,
throughout the organization and:

to optimize specific energy consumption


To minimize energy costs
To minimise environnemental effects.

7
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Audit is the key to a systematic approach for decision


making in the area of energy management.
It attempts to balance the total energy inputs with its use, and
serves to identify all the energy streams in a facility.
It quantifies energy usage according to its discrete functions.

8
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Methodology of Energy Audit

9
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

BASIC AUDIT LEVELS

10
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The scope work of energy Audit :

Analysis of energy situation of building


Calculate specific consumption (BTU/sq ft or BTU/person or
visitor)
Comparison with reference values (national and international)
of similar facilities
Distribution of the energy consumption by custom (usage)
Energy balances (electric and thermal) after measurements
Calculate Energy Using Index
Identification of potential of energy conservation
Definition of ECMs
11
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The energy audit can be divided into for tasks :

Level 1 .
Task 1 . Preliminary audit
Level II.
Task 2. Energy analyses by section
Level III.
Task 3. Campaign of measurement
Task 4. Energy balance of main energy consummer
Task 5. Audit report and actions plan
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Preliminary analysis
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Task 1 - Preliminary audit

14
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

- of the audit.
-Collect of information about building
- Visit of the facility
-Evaluation of energy consumption data to
analyze energy use quantities and
comparison with similar facilities.
-Preliminary estimate of savings potential
and provide a list of low-cost savings
opportunities through improvements in
operational and maintenance practices.

15
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Collect of information about building:


1. Energy consumption by type of energy, by section, by major items of
process equipment, by final - use

2. Areas/ Number of passengers, patients, clients, etc COMMERCIAL

3. Analysis of energy invoice and energy cost

4. Process and material flow diagrams

5. Generation and distribution of compressed air, hot water, cooking


water.
6. Sources of energy supply
7. Potential for fuel substitution, process modifications, and the use of
co-generation systems and tri-generation.
8. Energy Management procedures and energy awareness training
programs within the establishment

16
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Visit of the facility


ONE DAY

to visually inspect each of the energy using systems


to give the Energy Auditor/Engineer an opportunity
to meet the personnel concerned
to familiarize him with the site
to assess the procedures necessary to carry out
the energy audit

17
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

During the visit, Energy Auditor/Engineer should carry out the following
actions:

Analyze the major energy consumption data with the relevant personnel.
Obtain site drawings where available - building layout, steam distribution,
compressed air distribution and electricity distribution etc.
visit of the sites of building accompanied with energy manager

18
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The main objectif of this visit are:

To finalize Energy Audit team


To identify the main energy consuming areas/plant items to be surveyed
during the audit.
To identify any existing instrumentation/ additional metering required.
To decide whether any meters will have to be installed prior to the audit
energy (Electric meters, steam meters, ol or gas meters.
To identify the instrumentation required for carrying out the audit.
To plan with time frame
To collect macro data on plant energy resources, major energy consuming
centers
To create awareness through meetings / program

19
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The first visit for the establishment by experts to:


- Discuss with the site's senior management the tasks of the energy audit.
- Discuss economic guidelines associated with the recommendations
Obtain energy consumption data for the last 3 years (include water).
Obtain mechanical, architectural, heating, cooling, lighting and electrical drawings
specifications for the original building
Obtain a summary description of a building and its sections
Meeting and discuss aspects of the facility with responsible in establishment :
Occupancy schedules
Operation and maintenance practices
Future plans that may have an impact on energy consumption
Visual inspecting of equipments
Take pictures through the building. Including mechanical equipment, lighting, interior
workspaces, common areas and halls, and the exterior including the roof

20
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

General data :

Base year of audit : Year of reference


Annual hours of operation : 8 760 h/year
(AHU, boilers, etc.)

21
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Heating
Climatisation
flow

22
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Electric plan
of AITC

23
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Electric installation of Establishment


- Power transformer MT/BT:
Number of Type Type Compensation
Affectation Total KVA
transformer normal secours KVAR
Transf MT/MT 3 3 000 ----- 9 000 -----
STATION A 2 1 500 400 1900 90
STATION B 4 2 500 600 3 100 150
STATION STELLITE 4 1 800 400 2 200 240
STATION 4 2 930 2 930
SALLE OF MACHINES
TOTAL 17 1 400 19 130 480

Signed Power: 8000 kW

24
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Climatisation of Establishment

The climatisation (heating and cooling) of Establishment is assured by:


Air Handling Unit AHU
Schillers
Boilers
Cooling Tower

25
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

CONVERSION UNITS

1000 kWh = 0,086 TOE


1 thermie = 103 Kcal
1 TOE = 104 thermies
PCI of Natural gas = 9,00 Th/Nm3

26
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

We note that the maximum power drawn does not exceed 7000 kW for every time
slot, while the power is reduced out of 8000 kW. It is recommended to revise the
STEG contract for the decline of the reduced power to 6700 kW divided as follows:

Subscribed power Value kW


Daytime peak 6700
Evening peak 6700
Winter peak 6700
Summer peak 6700
Subscribed reduced power 6700

This decline of reduced power generate immediately a gain of 54 400


TND per year without penalty calculated as follows:
Gain = 3,5 X (actual reduced power projected reduced power) x
month per year = 3,5 x(8000 6700) x 12 = 54 400 TND

27
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Distribution of energy consumption by form for


the base year of Audit :

Electricity : 32 004,694 MWh 9 057 TOE


Natural Gas : 242 293 Nm3 218 TOE
28
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Annual Cost of Energy and Water 2 756 306 TND

Eau
19% Natural Gas
2%
528 574 TND
40 621 TND
2 187 110 TND

Electricity
Electricity
79%79%

29
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Cost of TOE:

Electricity TOE = 241,483 TND


330 TND
- Natural Gas TOE = 172,126 TND
230 TND

30
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Passenger number for the base year of audit :


3 449 185 passengers
Specific Energy Consumption by passenger in year of reference :

Energy Value Unit


Electrical energy 9,279 kWh/passenger
Natural gas 0,684 Thermal/passenger
Global 10,074 kWh/passenger

31
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

n Area : 57 448 m
n Volume : 293 356 m3

Specific Energy Consumption by area/volume in year of reference :

Energy Value Unit


Electrical energy 557 kWh/m
109 kWh/m3
Natural gas 37,959 Thermal/m
7,433 Thermal/m3

32
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

establishment values:
Energy Value Unit
Electrical energy 557 kWh/m
Natural gas 38 Thermal/m

Comparison with reference values:


Energy Value Unit
Electrical energy 450 kWh/m
Natural gas 30 Thermal/m

Potential energy saving:


Energy Value Unit
Electrical energy 107 kWh/m
Natural gas 8 Thermal/m
33
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy situation for


the 3 last years of audit

34
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Evolution of passenger number :


Year 1st Years 2nd Years 3rd Years
Number of passenger 3 194 742 3 049 183 3 449 185

35
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Evolution of Global energy balance :

Energy Unit 1st Year 2 nd Year 3rd Year


kWh 33 013 365 31 923 281 32 004 694
Electrical TOE 9 343 9034 9 057
energy % TOE 97,8 97,91 97,46
Nm3 218 109 199 595 242 293
Natural gas TOE 210 193 218
% TOE 2,2 2,09 2,54
Global TOE 9 553 9 227 9 293

36
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

37
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

38
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Evolution of specific consumption:

Energy kWh/m Th/m


1st year 575 36,6
2nd year 556 33,6
3th year 557 37,9

39
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

More Detailed Analysis MONTHLY

PEAK
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

PEAK
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Bonifications

ACEPTABLE
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

43
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use Index by Building Type

44
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

PRELEMINAY ENERGY CONSERVATION MEASURES


Revision of signed power with STEG: save an annual budget of
54 400 Dinars.
Improving the power factor with an optimum of 0.99 would
receive an extra bonus from STEG.
The preliminary inspection of equipments shows an
acceptable level of maintenance, but imbalance in the air-
conditioning compared to racking requested

45
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Task 2 - Energy analyses by


section

46
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP) Preliminary analysis
Detailled analysis

47
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

For the reason of absence of energy metering in the


Establishment, the Level II analysis can not be developed without
the measurement campaign (3rd LEVEL)
We recall that Establishment has only :
A electricity General meter as well as a set of divisional
meters accounting box and consumption of rented premises
A natural gas General counter
A general SONEDE meter and 5 divisional meters for
condensers

48
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Establish the mass and energy balances of different areas


of the establishment and determine their energy
consumption.
- The main areas of the establishment are :
Public "departure" on the 1st floor with easements of
checked baggage, cafes and shops
Public 'arrival in the DRC with the relevant areas and
shops
Bonded zone "start" with police control filter including
boarding rooms and satellite
Bonded zone arrivals area with the baggage, customs
and police control
49
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The thermal and electric balances can provide the Energy


consumption by energy using section :
Building Operation
Lighting Systems
HVAC Systems
HVAC Distribution Systems
Energy Management Control Systems
Building Envelope
Power Systems
Water Heating Systems
Heat Recovery Opportunities
50
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use in Office


Buildings

51
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use in
Schools

52
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use in
Hospitals

53
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use in
Supermarkets

54
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use in
Apartment Buildings

55
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use in
Hotels

56
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Use in
Restaurants

57
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

RESULTS OF PRELEMINARY VISIT

IN COOLING MODE :
After the preliminary visit, we noted following points:

The regulation of the shutters (volets) of recycled air and the new air is
inefficient implying either an excess of new air (to cool) or an excess of
air recycled (partially polluted).
During audited period, the outside climatic conditions were rather
favorable for a march in 100 % of new air.
The AHU N2,3,7,8,11 et 15 were inable to satisfy the conditions of confort
required.
The networks of connection and distribution of Chillers are inefficient

58
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

An important quantity of energy wasted by infiltrations of air gnrs


by opening (15% eletric and frigorific consumption)
The water consumption of supplement of condenser is excessive (Needs
of drainage of suffer contained (teneur en souffre)).

IN HEATING MODE :
The regulation of the shutters of new and recycle air is inefficient
implying either an excess of new air (for heating) OR an absence of new
air (affected confort and sanitary conditions).
The march of the ventilators of resumption(reprise) and blowing
(soufflage) in mode 50 % and 100 % implies a rate of air renewal far
from the optimum.
The management of march of hot water generators is necessary.

59
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Task 3 Campaign of measurement

60
The Lebanese Center for Energy
CRA2E
Proposal of improvement
Hamadi Sayah
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)
solutions
Proposal of improvement solutions

61
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Measurements

DO NOT ESTIMATE WHEN YOU CAN CALCULATE


DO NOT CALCULATE WHEN YOU CAN MEASURE

The capability of the energy auditor and the scope of an audit could be
extended by the use of in place instrumentation and temporary
monitoring equipment.
In-place instrumentation refers to existing utility metering, air-
conditioning control instrumentation and energy management systems
(EMS).
These instruments must be portable, durable, easy to operate and
relatively inexpensive.

62
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The parameters generally monitored during energy audit may include the
following:

Basic Electrical Parameters in AC and DC systems:


-Voltage (V)
- Current (I)
- Power factor
- Active power (kW)
- apparent power (demand) (kVA)
- Reactive power (kVAr)
- Energy consumption (kWh)
-Frequency (Hz)
- Harmonics, etc.

63
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Power transformer
Measuring
Description
instrument
Active power
Reactive power
apparent power
voltage
Electric power
intensity
analyzer
Energy
Power factor
Voltage harmonic 1-50
Intensity harmonic 1-50

64
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Electrical Measuring Instruments:


These are instruments for measuring major
electrical parameters such as kVA, kW, PF,
Hertz, kVAr, Amps and Volts.
In addition some of these instruments also
measure harmonics.
These instruments are applied on-line on
running motors without any need to stop the
motor. Instant measurements can be taken
with hand-held meters, while more advanced
ones facilitates cumulative readings with
print outs at specified intervals.

65
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Parameters of importance other than electrical:

-Temperature and heat flow


- Radiation
- Air and gas flow, liquid flow
- Revolutions per minute (RPM)
- Air velocity, noise and vibration, dust concentration,
-Total Dissolved Solids (TDS), pH
- Moisture content
- Relative humidity
- Flue gas analysis - CO2, O2, CO, SOx, NOx, combustion
efficiency etc.

66
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Luxmeter Manometer Power Electric Analyzer

67
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Hygrometer Combustion Analyzer

68
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Anemometer
Thermography

69
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Combustion Analyzer:
This instrument has in-built chemical cells which
measure various gases such as O2, CO, NOX and
SOX.
Fuel Efficiency Monitor:
This measures oxygen and temperature of the flue
gas. Calorific values of common fuels are fed into
the microprocessor which calculates the
combustion efficiency.

Fyrit:
A hand bellow pump draws the flue gas sample into
the solution inside the fyrite. A chemical reaction
changes the liquid volume revealing the amount of
gas. A separate fyrite can be used for O2 and CO2
measurement.
70
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Contact thermometer:
These are thermocouples which
measures for example flue gas, hot
air, hot water temperatures by
insertion of probe into the stream.
For surface temperature, a leaf type
probe is used with the same
instrument.

71
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Infrared Thermometer:
This is a non-contact type measurement
which when directed at a heat source
directly gives the temperature read out. This
instrument is useful for measuring hot spots
in furnaces, surface temperatures etc.

72
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Speed Measurements:
In any audit exercise speed measurements are critical as thay may change
with frequency, belt slip and loading.
A simple tachometer is a contact type instrument which can be used where
direct access is possible.
More sophisticated and safer ones are non contact instruments such as
stroboscopes.

Tachometer Stroboscope
73
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Leak Detectors:
Ultrasonic instruments are available which can be used
to detect leaks of compressed air and other gases
which are normally not possible to detect with human
abilities.
Lux meters:
Illumination levels are measured with a lux meter.
It consists of a photo cell which senses the light
output, converts to electrical impulses which are
calibrated as lux.

74
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Pitot tube

Pitot Tube and manometer:


Air velocity in ducts can be
measured using a pitot tube and
inclined manometer for further
calculation of flows.

75
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Water flow meter:


This non-contact flow measuring device using Doppler effect / Ultra sonic
principle. There is a transmitter and receiver which are positioned on
opposite sides of the pipe. The meter directly gives the flow. Water and
other
fluid flows can be easily measured with this meter.

76
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Main points of measure


by Equipment

77
Hamadi Sayah
The Lebanese Center for Energy Measures
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)
Temperature (T)
Relative humidity (RH%)
Air Handling Unit Speed (m/s)
Dimensions of the sheath (m)

Fresh air
Air blowing
Ambiance
Air return

Air after Air after


cold hot
battery battery

78
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Resumption
(reprise)

T: T: Air de reprise

C C
RH : RH : New air
% %
V: V: Air neuf
m/s m/s

T:
C
Air de soufflage RH :
Blowing %
(soufflage) HOT COLD V:
WATER WATER m/s
Ts Tec Tsf Tef
cC cC C cC

79
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

AIR HANDELING UNIT EFFICIENCY


RETURN AIR

AIR BLOWER
FRESH AIR

RETURN WATER
HOT WATER

(qab hab qfa hfa qra hra)


h AHU = ----------------------------------------------------------------------

[qhw (Thw Twr) Cp]


The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

qab = air blower flow


qfa = fresh air flow
qra = return air flow
qhw = hot water flow

hab = air blower enthalpie


hfa = fresh air enthalpie
hra = return air enthalpie

Thw = hot water temperture


Twr = water return temperture

Cp = specific heat of the hot water


The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Chiller Description Value Unit


Measure (Evaporator)
Description Value Unit
Chilled water flow m3/h
Evaporator entering water temperature C
Evaporator water temperature output C
Measure (Condenser)
Description Unit
Flow water cooling Tour m3/h
Entering condenser water temperature C
condenser water temperature output C
Electric power compressor KW
Measured electric power KW

82
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

THE EFFICIENCY OF THE


REFRIGERATED PRODUCTION

(Q2 W)
COP cool = --------------------
W
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Q2 = Power condenser = S x v x 1,2 x (Ts - ta) [kW]

S = condenser surface m
v = air speed m/s
Ts = Air temperature at the exit of the condenser C
Ta = Temperature of air inhaled) by the condenser C
1,2 = is the volume heat of the air kJ/(m3.C)

W = The energy absorbed by the compressor only


The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Description Measuring instrument


BOILER Combustion gas
% CO2 Combustion analyser

% O2 Combustion analyser

CO ppm Combustion analyser

Temperature Combustion analyser


Flow Pitot tube
Combustion air
Flow Anemometer
Temperature Thermometer
Relative humidity Hygrometer
Dimensions Meter
Boiler feed water
Flow Flowmeter
Temperature Thermometer
Hot water boiler output
Temperature Thermometer
85
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

BOILER EFFICIENCY
Lrc
Lfg

Lu
Qfuel

hComb = 100 - % losses due to dry flue gas (Lfg) - %


Unbured losses (Lu) - % Losses by radiation and
convection (Lrc)
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

(Lfg) % = k (Tfg Ta) / % CO2


kfuel = 0,62
kgas = 0,47
Kpropane = 0,5

(Lu) % = b % CO / (%CO + % CO2)


bfuel = 52
bgas = 35
bpropane = 43

(Lrc) % = 1 200 S (Tp Ta) / Pb


S = surface of the boiler
Tp = average wall temperature of the boiler
Ta = ambient temperature
Pb = Power rated boiler
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The campaign of measures is done in two periods:


Summer season : in hot season (use of cold for conditioning)
Wintry season : in cold season (use of hot water for heating)

88
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The use of in-place utility metering and temporary


monitoring equipment in energy auditing can yield
valuable information about the building systems such as:
Energy signature and end-use consumption analysis
Discovery and identification of ECMs
Quantification of energy use and misuse
Establishing bounds for potential energy reduction, and Data
acquisition for further calculation and analysis

89
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Existing information

Existing instrumentation such as utility meter readings, and energy


billings could be used to establish energy consumption patterns for the
building.
The regularity of consumption pattern is an indicator that no significant
change in consumption occurred prior to the audit.
This can also be used to check the validity of projections based on
extrapolated short-term monitored data.

90
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

By Measurements its possible to:


- Quantify energy uses and losses through a more detailed review
and analysis of equipment, systems, and operational
characteristics.

- Measurement and testing to quantify energy use and efficiency


of various systems.

- Standard energy engineering calculations are used to analyze


efficiencies and calculate energy and costs savings based on
improvements and changes to each system.

91
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Task 4 Energy balance of main


energy consumer

92
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

An estimate for annual consumption is extrapolated from the typical week


consumption profile.
Regularity of the weekly consumption profile means that the annual
consumption could be estimated with confidence and the value used to
cross check with the annual energy bills.

93
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

94
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

95
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Computer Simulation
Detail use of energy by function and a more comprehensive evaluation of
energy use patterns.
Develop a computer simulation of building systems that will account for
weather and other variables and predict year-round energy use.
Build a base for comparison that is consistent with the actual energy
consumption of the facility.
Make changes to improve efficiency of various systems and measure the
effects compared to the baseline.

Because of the time involved in collecting detailed equipment information,


operational data, and setting up an accurate computer model, this is the most
expensive level of energy audit but may be warranted if the facility or systems
are more complex in nature.

96
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Evaluation of energy consumption by equipment


in summer season

97
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

q Air Handling unit


% Air
Air neuf Air reprise Air mlange Air soufflage Air ambiant Bilan thermique Bilan thermique eau
neuf
N m3/h T(C) m3/h T(C) m3/h T(C) % m3//h T(C) HR T(C) HR % 1000Kg/h KW Debit T'entre T sortie
AC1 -- -- 21381 23 21381 23,0 0 21381 16,5 73 20,5 54 69,77 81 41,98 7 8,1

AC2 Bis 18144 22 13190 22,8 31334 22,5 57,9 31334 17,6 73 23,0 53 73,6 85,7 94,94 6,6 7,4
AC2 33000 23,1 26030 24,6 59067 23,8 55,9 59067 18,5 74 24,9 58 114,24 133 57,48 6,9 8,9
AC3 35510 22,5 36547 24,3 72058 23,4 49,3 72058 18,8 75 24,8 57 83,9 97 61,9 6,6 8,4
AC4 19958 23,7 25402 23,8 45360 23,4 44,0 45360 20 68 23,8 55 60,23 70 61,79 7,3 8,3
AC5 -- -- 49896 23,9 49896 23,9 0,0 49896 19,1 72 22,9 51 63,97 74 61,79 6,6 7,6
AC6 -- -- 48190 23 48190 23,0 0,0 48190 18,5 72 22,7 64 76,41 89 93,99 7,6 8,4
AC7 -- -- 40487 23,5 40487 18,3 0,0 40487 18,3 74 24,6 58 82,48 96 56,62 7,5 9
AC8 -- -- 42915 23,2 42915 23,2 0,0 42915 19 74 24,4 59 56 66 74,25 7 7,8
AC9 -- -- -- -- 15256 23,0 0,0 15256 17 72 20,4 61.0 44,02 51 42,39 7,5 8,5
AC10 -- -- 34900 23,3 34900 23,3 0,0 34900 16,6 72 23,3 52.0 90,31 105 77,4 7,5 8,7
AC11 15368 23 55457 23 70825 23 21,7 70825 17,1 74 24,9 56 155,23 180 77,4 7,5 10
AC12 25920 23 6912 23 32832 23 78,9 32832 21 63 23,1 50.0 11 13 57 7,5 7,7
AC13 -- -- 15552 23,5 15552 23,5 0,0 15552 17,3 70 22,3 51.0 50,22 58 34,5 7,5 9
AC15 -- -- 22957 23,2 22957 23,2 0,0 22957 17,6 68 25,3 55 67,12 78 41,9 7,4 9
AC16 22560 23,3 -- -- 22560 23,3 100,0 22560 16,5 70 20,8 58 81.41 95 41,98 7,5 9,4
AC17 28464 23,5 -- -- 28464 23,5 100,0 28464 17,8 73 NR NR 70,79 82 41,9 7 8,7
98
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

% Air
Air neuf Air reprise Air mlange Air soufflage Air ambiant Bilan thermique
N neuf Bilan thermique eau
m3/h T(C) m3/h T(C) m3/h T(C) % m3//h T(C) HR T(C) HR % 1000Kg/h KW Debit T'entre T sortie
AC18 -- -- 14165 24,5 14165 24,5 0,0 14165 13,5 74 21,9 53 87,3 101 41,9 7,4 9,5
AC19 -- -- 16740 23 16740 23,5 0,0 16740 19,1 71 NR NR 31,27 36 41,98 7,5 8,2
AC22 8528 23,6 14026 23,4 22554 23,5 37,8 22554 17 73 22,2 52 68,63 80 53.22 7 8,3
AC24 11250 26,2 18779 25,7 30029 25,9 37,5 30029 21,3 68 25,8 59 65,44 76 53,6 8 9,2
AC25 A -- -- -- -- 38330 23,5 0,0 38330 17,5 74 23,1 58 99,93 116 65,41 7,5 9,3
AC25 B -- -- -- -- 45000 23,5 0,0 45000 17,4 73 23,2 59 117,06 136 56.41 7,3 9,4
AC25 C -- -- 31519 24.2 31519 24,2 0,0 31519 17,8 74 23,0 52 89,54 104 46,2 6 7,9
AC26 -- -- 57879 23 57879 23 0,0 57879 18,5 70 22,7 57 99,14 115 54.6 7 8,8
AC27 -- -- 38264 23,5 38260 23,5 0,0 38264 20 70 23,9 54 78,16 91 27,86 7,3 10,1
AC28 -- -- 41250 23,5 41250 23,5 0,0 41250 20,9 71 24,1 61 16,4 19 35,38 7,5 8
AC29 13323 21,7 17885 23,7 31208 22,8 42,7 31208 19,9 70 22,9 52 16,09 19 32,44 7 7,5
AC30 39593 23,0 11775 23 51368 23 77,1 51368 19,2 75 22,9 54 36,51 42 31,54 7 8,2
AC31 8482 22,5 15380 23,8 23860 23,3 35,5 23862 21 60 21,8 50 15,06 17 31,6 7 7,5
AC32 43740 23,0 -- -- 43740 23 100,0 43740 19,5 72 22,0 59 43,01 50 34,6 7.5 8,7
AC33 6420 22,6 18220 23,2 24640 23 26,1 24640 19,2 70 23,1 58 30,04 35 36.96 7.5 8,3
AC34 70056 23,3 -- -- 70056 23,3 100,0 70056 20,3 70 23,0 55 49,91 58 36,9 7 8,4
AC35 10289 22,8 14818 23,1 25107 23 41,0 25107 20,2 71 24,1 49 20,91 24 34,6 7 7,6
AC36 12999 22,4 9078 23,5 22077 23 58,9 22077 18,9 76 23,3 56 35,81 42 36,38 7 8
ACX -- -- -- -- 78000 23,5 0,0 78000 18 76 NR NR 150,74 175 79,98 7,5 9,7
99
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Global analysis flows between blown and needs

Comparison between measures of ambient air in different areas of the


establishment and conditions sought confort in September 2007 when the
outside is 22 C as follows:

Temprature = 22C
Hygromtrie = 50 % HR

CTA shows that AC2, AC3, AC7, AC8, AC11 and AC15 are not currently
developing the cooling power needed.

100
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

This is due either :

Consigne value
The location of temperature sensors
The lack of cooling capacity of CTA
On the importance of lighting (light intensity) with a warming of the
atmosphere.

101
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Analysis of fresh air

Given that the audited period (end September 2007) is the end of the
summer and early fall, the outside air is at a temperature of days of
the order of 22 C and 55% HR

The analysis of measured data shows respectively:

- The total absence of the provision of fresh air for 18 CTA yet its
temperature is generally lower than that of air again.
- The fresh air enters partially into the mixture before the battery
level remaining 18 CTA.

102
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

In another aspect, by comparing the flow of fresh air compared to the hygienic needs
(25 m3/h/pax), we note the following:
N CTA New Air : need (m3/h) Measure (m3/h) Measure/needs
AC01 3500 0 0
AC02 11975 33000 2,76
AC02 BIS 19575 18144 0,93
AC03 11000 35510 3,23
AC12 20425 25920 1,27
AC13 12075 0 0,00
AC15 11950 0 0,00
AC22 11775 8528 0.72
AC24 5750 11250 1,96
AC27 7850 0 0,00
AC18 5000 0 0,00
AC04 3100 19958 6,44
AC05 1475 0 0,00
AC06 10750 0 0,00
AC07 10250 0 0,00
AC08 2050 0 0,00
AC10 2625 0 0,00
AC11 8100 15368 1,90 103
ACX 0 0 0
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

N CTA New Air : need (m3/h) Measure (m3/h) Measure/needs


AC25A&B 26950 0 0,00
AC25C 9100 0 0,00
AC26 9250 0 0,00
AC9 650 0 0,00
AC17 1250 28464 22,77
AC19 5250 0 0,00
SATELLITE
AC28 2500 0 0,00
AC29 5250 13323 2,54
AC30 5250 39593 7,54
AC31 5250 8482 1,62
AC32 5250 43740 8,33
AC33 5250 6420 1,22
AC34 5400 70056 12.97
AC35 2500 10289 4,12
AC36 1000 13000 13,00
total 249 325 401 045 1,609

104
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Recommendation
The regulation of aspects of entry of fresh air must be improved.
We recommend that:

Implementation of probes % CO2 sensors in each service area, such


information come into the logic circuit controlling the phase of fresh air.
Levels for opening strands (volets) of fresh air and recirculated air will
depend on the respective rates of CO2, the temperature of fresh air and the
temperature and humidity of air recycled.
Setting vouchers of fresh air by ensuring a minimum flow of air regardless
of the occupation and season through mechanical stops which closed for a
minimum of air (10 to 15% ).

105
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

CALCULATION OF CHILLER

106
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Description Value unit


Characteristic
Cooling capacity 1938 KW
COP theory 5,34
Evaporator exit temperature 30 C
Electrical power installed 373 KW
Electrical power absorbed 363 KW
Chilled water flow 330 m3/h
Cooling water flow 334 m3/h
Thermal balance of Evaporator
Description Value unit
Chilled water flow 334 m3/h
Evaporator entering water temperature 9,3 C
Evaporator water temperature output 7 C
766 th/h
Energy exchange 889 KW
Thermal balance of condenser
Description Value unit
Flow water cooling Tower 330 m3/h
Entering condenser water temperature 27.9 C
condenser water temperature output 30,76 C
942 th/h
Cooling Energy 1094 KW 107
Absorbed Power 205 KW
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

We observe the following:

- The group was operating at only 45.1% of its capacity to


weather external lenient evidenced by a low temperature gradient
between the entry and exit of water ice.

- The call of the power is 217 kW or a load factor of 59.78%


(nominal power of 363 kW) corresponding to a COP of 4.03.

108
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

SECTION % Frigorific COP % Electyricity

SMA 45,1 4,03 59,78


DES 50,3 3,42 72,4
Satellite 43,3 2,78 46
Average 47,94 3,49 64,46

We observe, during the audited period, that overall the groups of water ice
are exploited to the tune of 47.94% have gone to 64.46% of the nominal
power.

Also, we observe that groups with (satellite) have a better ratio of power
consumption during operation at about 50%.

109
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

CALCULATION OF COOLING TOWER

110
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Valeur
Dsignation Unity
Unit N1 Unit N2
OUTPUT
HR 100 97 %
Output T of Tower C 26,7 26,7 C
H2O fraction input 22,24 21,55 g/Kg air sec
Wet Air humide density 1,159 1,16 Kg/m3
Wet Air humide Enthalpy 83,6 82,8 Kj/Kg
INPUT
Flow 56757 59786 m3/h
HR 52,1 51 %
Input Tof tower C 27,2 27 C
H2O fraction input 11,74 11,35 g/Kg air sec
Wet Air humide density 1,164 1,16 Kg/m3
Wet Air humide Enthalpy 57,32 56,1 Kj/Kg
Massic flow Dry Air sec 65348 68923 Kg/h
111
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Thermal balance and massique (applied to the air)


Exchanged Thermal power 477 511 KW
Quantity of evaporated water 0,69 0,70 m3/h

Quantity of water purged of bottom 0,69 0,70 m3/h

Quantity of water of supplement 1,38 1,41 m3/h

Total supplement of the tower 2,78 m3/h

Total power Exchanged by the tower 988 KW

112
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Assessment of global climate establishment

We recall at this level the surfaces and volumes of spaces


constituting establishment and their assignments machinery room.

Machinery room Surfaces ( m) Volumes (m3)


S.M.A 26 175 130 875
DSE 22 690 124 795
Satellite 7 958 35 811
Other 625 1 875
TOTAL 57 448 293 356

113
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The results of air conditioning consumption during the day audited are respectively:

SECTION Wf/m2 Frigories/m2 h W lec/m2 Wf/m3 Frigories/m3 h W/m3


SMA 33,4 28,76 8,29 6,68 5,75 1,66
DSE 84,4 72,69 24,68 15,34 13,21 4,49
Satellite 38,4 33,12 13,82 8,54 7,36 3,07
Autres - - - - - -
TOTAL 53,87 46,40 15,44 10,55 9,09 3,02

For an optimal ratio of 70 Wf/m corresponding to local public attendance average for non-
smokers, we observe that :

- The AHU provide standards of comfort above the needs.


- The station SMA, expanding 45.1% of its capacity, has a ratio of 33.4 Wf/m, to below the
level of comfort. This confirms the failure of CTA 2,3,7 and 8.
114
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy balance of power transformer

115
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Called Power
Transformer Power KVA Rate %
KVA
Transformer terminal S/SB 400 140 35
Transformer of secour S/SB 1000 450 45
Transformer of air conditioning SAT 1000 214 21
Transformer of secour SAT 400 38 9
Transfo Normal 1&2 SAT 800 415 52
Normal transformer S/SA 1500 1202 80
Transformer of secour S/SA 400 236 59
Transformer of air conditioning
DSE 2000 1032 52
Transformer of eclairageDSE 300 182 61

We note that a total of 7 800 KVA installed and the call in power
during the days audited, processors are responsible for overall
height of only 50.11% for a nominal 65%. 116
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy consumption By station


Consumption/hour Consumption/day
Dsignation %
(Kwh) (Kwh)
Under station B 1 513 36 312 39
Station SATELLITE 367 8 808 9
Under station A 1 161 27 864 30
Station room of machines 834 20 016 21
TOTAL 3 875 93 000 100

117
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Consumption by use


ACTIVE POWER KW
AFFECTATION S/S A SATEL S/SB SM TOTAL %
AHU 79,7 96,4 108,4 284,5 7,3
LIGHTING 922 95,5 674 158 1849,5 47,7
CHILLERS 471,5 152,9 199,7 659,4 1483,5 38,3
Batteries de
5,6 19 2,6 27,2 0,7
compensation
BOILERS 17 17 0,4
OTHERS 34 3,1 176,4 213,5 5,5
TOTAL 1512,8 366,9 1161,1 834,4 3875,2 100,0

We note that lighting accounts for 47.7% of the active power drawn with 1 followed by
849.5 KW stations production of ice water with 38.3% and 1 483.5 KW.

118
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

REACTIVE POWER (KVAR)


AFFECTATION S/S A SATEL S/SB SM TOTAL %
AHU 57,9 84 89,6 231,5 8,4
LIGHTING 322,8 69,3 410 89,5 891,6 32,3
CHILLERS 198,1 102,4 409,3 536,7 1246,5 45,1
Batteries de
36,9 200,4 37,5 274,8 9,9
compensation
BOILERS 14,5 14,5 0,5
OTHERS 23,3 8,9 73,1 105,3 3,8
TOTAL 639 465 1019,5 640,7 2764,2 100,0

In against part, we observe that CHILLERS generate reactive power kVAR 1 246.5
representing 45.1% of the total reagent indicating that electric motors are operated GEG
limited mode (rate infrequent use) involving assets of over a generation and a strong back
current (reactive) on the circuit.

119
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Tension and POWER FACTOR average


AFFECTATION S/S A SATEL S/SB SM TOTAL
Cosinus 0,92 0,62 0,75 0,79 0,81
Tension(Volt) 355,3 357,5 343,4 382,2 351,8

Lighting

AFFECTATION S/S A SATEL S/SB SM TOTAL


Cosinus 0,94 0,81 0,85 0,87 0,90
Tension (Volt) 360,6 359,9 376,0 389,7 366,6

Chillers
AFFECTATION S/S A SATEL S/SB SM TOTAL
Cosinus 0,92 0,83 0,44 0,78 0,77
Tension(Volt) 357,5 398,1 318,4 381,4 349,0

120
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

AMPERAGE
AFFECTATION S/S A SATEL S/SB SM TOTAL %
AHU 156,6 184,4 211,5 552,5 7,1
LIGHTING 1564,1 189,3 1211,5 269 3233,9 41,4
CHILLERS 825,9 266,9 825,9 1287 3205,7 41,0
Batteries de compensation 57,3 299,9 59,8 417 5,3
BOILERS 33
33 0,4
OTHERS 65 16,1 288,9 370 4,7
TOTAL 2668.9 956,6 2597,6 1589 7812,1 100
Again, we see that the lighting and CHILLERS appeal to 82.4% of the
intensity.

121
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Compensation batteries

Tension Active Power similar Ractive Power


POSITION Current (A) Cos
(V) Power (KW) (KVA) (KVAR)
S/S B 366 57,3 5,6 0,15 37,3 36,9
401 123 6,48 0,08 81,0 80,7
SATELLITE 391 57,9 3,5 0,09 38,4 38,3
390 119 9,01 0,11 81,9 81,4
S/S A 388 59,8 2,63 0,07 37,6 37,5

We find that the batteries are inserted in good condition.


However, the battery under the S / SB beginning to show signs of
degradation whose cosine was around 0.15 against a 0.07 nominal
practice.

122
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Wintry season

The 2nd compaign of measurement took place in January, when the


outside temperature was about 16 C with relative humidity averaging
30% (dry but cold atmosphere).

123
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Combustion efficiency generators HOT WATER

124
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The measurements in the boiler combustion are concerned, analysis of


smoke, losses by convection and radiation, temperatures and natural gas
consumption.
HOT WATER GENERATOR
DESIGNATION Unity Value
Puissance Calorifique Heat capacity th/h 1500
Temperature smokes C 104
Temperature air combustive C 17,5
Percentage O2 % 3,4
Percentage CO2 % 9,9
Percentage CO ppm 0
Losses by heat
Sensitive of smokes
% 4,11

Rendement de Combustion % 95,9


Losses by convection and brilliance % 1,0
Thermal return % 94,9
Coefficient of excess of air(sight 1,19
125
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Energy Conservation Measures


ECMs for Establishment

126
The Lebanese Center for Energy Hamadi Sayah
CRA2E SAVING SAVING INVESTMENT
ECM
Conservation DESCRIPTION
ProjectEtude, Contrle
(LCECP) et Pilotage PAYBACK
TOE/YEAR TND/YEAR EN DT

IMPLEMENTATION OF AN ENERGY
1 MANAGEMENT SYSTEM
232 55700 120 000 2Y2M

INTER CONNECTION OF DISTRIBUTION


2 NETWORKS OF CHILLERS FOR THE AIR 65,9 15 923 65 000 4Y 1M
CONDITIONING

IMPROVMENT OF FLOW AND


3 RETURN OF BLOWING
329,8 79 640 230 000 2 Y 11 M

4 IMPROVMENT OF THE FRESH AIR FLOW 183,4 36 000 100 000 2Y9M
REDUCING INFILTRATION
5 AND AIR CURRENTS
302,6 96 235 270 000 2 Y 11 M

IMPROVEMENT OF THE ELECTRICAL


6 NETWORK LIGHTING CONSUMPTION
458 110 721 200 000 1Y 10 M

ASSISTANCE TECHNIQUE ET
7 ACCOMPAGNEMENT POUR LA MISE EN - - 40 000 -
PLACE DES ACTIONS RETENUES

TOTAL 1 571 ,7 394 219 1 025 000 2Y7M


127
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Audit of Electrical System

128
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The electrical consumption in most commercial


facilities can easily account for 50 to 75% of the total
utility costs. Because of this, special attention must be
paid to evaluating electrical consuming equipment and
systems within the facility

129
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

At a minimum, several weeks of data in 15-minute


intervals should be taken with a recording meter. The
measurements may have to be taken both in the cooling
and heating season.

Most electric utilities either have this data available for


their customers or can provide this service at a nominal
charge.

130
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Electrical system audit

131
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

1 LIGHTING SYSTEM AUDIT

To perform the lighting audit, the following steps are


required:
1. Assess what you have
2. Evaluate Lighting Levels and Lighting Quality
3. Estimate Electrical Consumption
4. Calculate Energy Savings

132
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

1. Assess what you have:


Room Classificationoffice, warehouse, storage, etc.
Room Characteristicsheight, width, length, color and condition of
surfaces.
Fixture Characteristicslamp type, number of fixtures, condition of
luminaries, methods of control, fixture mounting height, ballast and
lamp wattage.

133
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

2. Evaluate Lighting Levels and Lighting Quality

Measure foot-candles using light meter.


Sketch luminaire types and layout in room or area.
Check for excessive glare and contrast.
Talk to users about lighting levels, controls, and quality.
Compare foot-candle measurements to
recommendations for the task performed.

134
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

3. Estimate Electrical Consumption

Calculate Total Watts (watts/fixture number of


fixtures/1000 = Existing kW)
Calculate Power Density (kW 1000/square foot = watts/
square foot)
Compare Existing Power Density to Code of Design
Guidelines
Estimate of Annual Hours of Use
Estimate Annual Lighting Energy Cost (Existing kW annual
hours $/kWh = $/year)
135
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

4. Calculate Energy Savings

Determine new total kW after retrofit.


Determine change in annual operating hours if lighting
controls are changed.
Calculate energy savings (kW beforekW after) hours of
operation = kWh
Calculate energy cost savings (kWh $/kWh = annual cost
savings)

136
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

2 ELECTRICAL SYSTEM DISTRIBUTION AUDIT

The inefficient operation of electrical distribution systems stems


mainly from a low power factor. Power factor correction is cost-
effective when utility penalties are imposed.

Low power factors can be improved with power factor correction


devices, harmonic filters and high-efficiency motors.

Additional energy can be saved by installing energy-efficient


transformers and replacing existing motors with small and/or higher
efficiency motors, or by installing variable-speed motor drives.

137
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

To compute the total volt ampere load it is necessary to analyze the


power triangle indicated below:

138
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The standard power rating of a motor is referred to as a horsepower.


In order to relate the motor horsepower to a kilowatt (kW) multiply the
horsepower by Conversion Factor and divide by the motor efficiency.
Motor efficiencies and power factors vary with load.

139
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

3 Motor inventory and loads


A second method to improve the plant or building power factor is to use
energy efficient motors.

Energy efficient motors are available from manufacturers such as


Magnetic.

Energy efficient motors are approximately 30 percent more expensive


than their standard counterpart.

Based on the energy cost it can be determined if the added investment is


justified

140
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The Heating, Ventilation and


Air-conditioning Audit

141
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

THE VENTILATION AUDIT

Two savings are derived from this change, namely:


Brake horsepower of fan motor is reduced.
Reduced heat loss during heating season.
142
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

THE TEMPERATURE AUDIT

143
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

THE THUMIDITY AUDIT


Desired relative humidity requirements are achieved by vaporizing water into
the dry ventilating air.
Approximately 1000 Btus are required to vaporize each pound of water.
To save energy, humidification systems should not be used during unoccupied
hours.
Most humidification systems are used to maintain the comfort and health of
occupants, to prevent cracking of wood, and to preserve materials. In lieu of
specific standards it is suggested that 20% relative humidity be maintained in
all spaces occupied more than four hours per day
If static shocks or complaints arise, increase the humidity levels in 5%
increments until the appropriate level for each area is determined.

144
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

ENERGY RECOVERY SYSTEMS

The HVAC Energy Audit should analyze opportunities for recovering


energy.
To recover heat from exhausts, several devices can be used
including the heat wheel, air-to-air heat exchanger, heat pipe and
coil run-around cycle.

145
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Heat Wheels
Heat wheels are motor-driven devices packed with heat-absorbing
material such as a ceramic. As the device turns by means of a
motor, heat is transferred from one duct to another.

146
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Air-to-air Heat Exchanger

The air-to-air heat exchanger consists of an open-ended steel box


which is compartmentalized into multiple narrow channels. Each
passage carries exhaust air alternating with make-up air. Energy is
transmitted by means of conduction through the walls.

147
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Heat Pipes
A heat pipe is installed through adjacent walls of inlet and outlet ducts; it
consists of a short length of copper tubing sealed at both ends.
Inside is a porous cylindrical wick and a charge of refrigerant. Its
operation is based on a temperature difference between the ends of the
pipe, which causes the liquid in the wick to migrate to the warmer end to
evaporate and absorb heat. When the refrigerant vapor returns through
the hollow center of the wick to the cooler end, it gives up heat,
condenses, and the cycle is repeated.

148
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Task 4 Audit report


and actions plan

149
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The audit report will include a description of energy inputs and product
outputs by major department or by major processing function, and will
evaluate the efficiency of each step of the manufacturing process.

Means of improving these efficiencies will be listed, and at least a


preliminary assessment of the cost of the improvements will be made to
indicate the expected payback on any capital investment needed. The audit
report should conclude with specific recommendations for detailed
engineering studies and feasibility analyses, which must then be performed
to justify the implementation of those conservation measures that require
investments.

150
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

CONTENT OF DETAILED ENERGY REPORT


Executive Summary
Energy audit options and recommendations
I. Building Information
General plant details and descriptions
Energy audit team
Component of production cost (Energy, manpower, others)
Major energy use and areas
II. Energy Situation
Energy Accounting information for the last 3 years
Charts and graphs (developed analysis)
Consumption patterns of the facility
Facility benchmarks, energy use indices, and comparisons with similar
building 151
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

III. Production Process Description (industry)


Brief description of manufacturing process
Process flow diagram and major unit operations
Major raw material inputs, quantity and costs

IV. Energy and utility system description


List of utilities
Brief description of each utility
Electricity
Hot water/steam
Compressed air
Chilled water
Cooling water
152
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

V. Energy Efficiency
Specific energy consumption
Boiler efficiency assessment
Cooling water system performance assessment
Heating system performance
Refrigeration system performance
Compressed air system performance
Electric motor load analysis
Lighting system
VI. Energy Conservation Options and Recommendations
List of options in items of No cost,Medium cost and High investment cost, annual
energy and cost saving, and payback
Implementation plan for Energy saving measures/Projects

153
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

VII. Operation and Maintenance Measures (O&Ms)


Operational and maintenance issues observed during the site visit.
Description of specific low-cost operational and maintenance items that require
attention.
Items that will reduce energy consumption and costs, address existing problems,
or improve practices that will help prolong equipment life of systems not being
retrofit.
Cost and savings estimates of O&M recommendations.

IV. ANNEXURE
List of energy audit worksheets
List of instrumentations
List of vendors and other technical details

154
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Typical energy
auditing measures

155
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Low High cost


No- cost measures
cost measures measures

Replace tungsten
Switch off lights in unoccupied Upgrade lighting
lamps with compact
areas and where natural system(eg to high-
fluorescents.
daylight is sufficient. frequency
Improve switching
Keep light fittings and diffusers fluorescent).
oflights to gain more
Lighting clean.
flexibility and control.
Fit reflectors to
On expiry replace 38 mm fluorescents.
Replace tungsten
fluorescent tubes with 26 mm. Microprocessor-
halogen with
Maintain existing lighting based lighting
discharge lamps.
controls, e.g. photocells. controls.
Fit simple controls.

156
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Low High cost


No- cost measures
cost measures measures

Replace electric
Fit simple controls to
space heating with
Avoid use of portable electric electrical heating
fossil fuel if
heaters. systems for space
Heating Check controls of any electrical heating or hot water
appropriate/possible.
Replace on-peak
heating. (eg timers on
convectors with off-
immersion heaters).
peak storage heaters.

157
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Low High cost


No- cost measures
cost measures measures

Set controls so that air


conditioning and heating
Variable-speed drives
are not fighting each other. Fit tamper-proof
for larger fan and
Ventilation Keep doors and windows controls.
pump motors with
closed when air- Fit time controls.
and air conditioning is used. Use of free cooling.
variable loads.
Conditioning Upgrade controls (eg
Use blinds to reduce load Speed control of
better zoning).
on air-conditioning. pumps and fans.
Heat recovery.
Keep system clean and well
maintained (e.g. filters).

158
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Low High cost


No- cost measures
cost measures measures

Switch on only when Fit high-efficiency


Fit two-speed motor
needed. motors.
Motors/ control.
Switch off when not Fit variable speed
drives Automatic controls on
needed. drives where
motors/drives.
Check existing controls. appropriate.

159
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Low High cost


No- cost measures
cost measures measures

Repair
Avoid use of cookers for
broken/damaged Where possible select
space heating.
hinges or seals on gas in preference to
Use appliances appropriate
Catering cookers, electricity for new
to task.
equipment refrigerators, cold equipment.
Switch on only when
stores. Choose energy-
necessary.
Keep equipment clean efficient models.
Switch off after use.
and well maintained.

160
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Low High cost


No- cost measures
cost measures measures

Switch on equipment only Choose energy-


Fit simple time
when needed. efficient versions at
Office controls. (e.g. timers
Switch off after use. replacement.
equipment on drinks machines,
Activate auto-shut down on Link equipment to
copiers)
PCs, copy machines, etc. BEMS control.

161
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Low High cost


No- cost measures
cost measures measures

Upgrade
Identify and mend
compressors and
leaks.
Appropriate usage. controls.
Compressed Simple controls to
Reduce delivery pressure. Heat recovery.
air reflect time use.
Isolate areas not in use. Appropriate air
Upgrade existing
quality treatment.
controls.
Rationalise system.

162
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Definition of an Action Plan

163
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Classification of Energy Conservation Measures

Based on energy audit and analyses of the plant, a number of potential


energy saving projects may be identified. These may be classified into
three categories:

1. Low cost - high return;


2. Medium cost - medium return;
3. High cost - high return

164
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

-Normally the low cost - high return projects receive priority.

-Other projects have to be analyzed, engineered and budgeted for


implementation in a phased manner.

-Projects relating to energy cascading and process changes almost always


involve high costs coupled with high returns, and may require careful scrutiny
before funds can be committed.

- These projects are generally complex and may require long lead times
before they can be implemented.

165
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Table of priority of ECM

166
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Example of ECM classified by PAYBACK :


Immediate Short term Long Term
Investment < 3 years Investment > 3 years
Wasting Regulation system Insulation (Walls, facades)
Behavior VEV Replace boilers
Simple regulation Lighting Renewable energy
Energy recuperation Cogeneration
More than 20% energy
5 to 10% energy 10 to 20% energy saving
saving saving

167
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Building Envelope
1. Install double glazing
2. Infill glazing
3. Solar film for glazing
4. Weatherstrip/caulk windows
5. Install insulated doors
6. Weatherstrip doors
7. Insulate roof (rigid)
8. Insulate ceiling (batt/blow)
9. Insulate wall
10. Insulate floor
11. Lower ceiling
12. Vestibule entry
168
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

HVAC
A. Boilers

1. Replace Boilers
2. Upgrade existing boiler
3. Replace Burners
4. Fuel switch
5. Reduce steam distribution Pressure
6. Tune up boiler
7. Insulate shell and piping
8. Replace/repair condensate system

169
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

9. Replace/repair steam traps


10. Install boiler flue damper
11. Preheat boiler feed water
12. Preheat combustion air
13. Time clock w/low temperature override
14. Zone controller
15. Boiler reset control

170
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

B. Furnace/U.V./Roof Top

1. Install high efficiency Unit


2. Recondition units
3. Replace inefficient burners
4. Install electronic ignition
5. Install auto flue damper
6. Fuel switch

C. Heat Pumps

1. Repair
2. Replace
3. Install economizer cycle
171
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

D. Cooling Systems

1. Upgrade inefficient chillers


2. Install variable speed chiller motor
3. Add head pressure Control
4. Install strainer cycle to chillers
5. Utilize evap. Cooling
6. Install cooling tower stage control
7. Upgrade cooling tower
8. Install local air conditioners
9. Install economizer cycles
172
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

E. Controls

1. Install an EMCS
2. Install optimum start/stop
3. Install night setback
4. Install load shedding
5. Install system optimizing Capture
6. Install warm up cycle
7. Install deck temperature reset

173
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

F. Vent/Dist/Term. Equipment

1. Convert to VAV
2. Reduce outside air %
3. Adjust ventilation rates
4. Install auto. Dampers
5. Reduce air stratification
6. Insulate pipes and/or ducts
7. Modify zoning
8. Reduce/eliminate Heat to h-ways
9. Reduce/eliminate Air to unoccuped Areas
10. Rebuild/replace steam traps

174
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

G. Domestic Hot Water

1. Install flow restrictors


2. Install auto-off faucets
3. Decentralize hot water heating
4. Insulate piping and tank
5. Install summer heater
6. Lower temp. and install boosters
7. Install instant Domestic Hot Water heaters
8. Domestic Hot Water pump/tank timers

175
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Lighting
1. Incandescence To Fluorescent/High Intensity Discharge
2. Convert Mercury to Metal Halide /High Pressure Sodium
3. Install efficient Ballasts and lamps
4. Lower fixtures
5. Delamp and disconnect Ballasts
6. Install occupation Sensors
7. Install local switches
8. Exit light replacement
9. Install photocell exterior
10. Timer control exterior

176
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Electric Equipment
1. De-energize equipment not used
2. Reduce loads when not required
3. Improve power factor
4. Convert to efficient Motors
5. Install variable speed motors
6. Replace oversized motors

Meters Numbered
1. Gas
2. Electric
177
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Following picture shows by using modern lighting system up to 85%


energy saving can be achieve.

178
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

179
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Installation of Thermostatic valves:


Energy saving available depends on how well the radiators are balanced at
present.
Installing thermostatic radiator valves provides good control for individual
radiators in a room.

Up to 20% savings can be achieved by adding radiator


thermostats to your existing heating system. 180
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Building Energy Management System(BEMS)

181
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Using Variable Speed Drive(VSD): the goal of a variable-speed drive (VSD)


is to modulate motor speed to reduce power demand and generate energy
savings. Drive options constantly change, and how you match motor and
drive affects system efficiency.

The payback period of a VSD averages 1824 months

182
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Installation of energy efficient windows:

Windows provide views, daylights, ventilation, and solar heating in the winter.
Unfortunately, they can also account for 10% to 25% of your heating bill.
Selecting windows that are gas filled with low emissivity (low-e) coatings on
the glass can significantly reduce heat loss.

183
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

Insulation of the envelope: A good insulating system includes a combination


of products and construction techniques that protect a building from outside
hot or cold temperatures, protect it against air leaks, and control moisture..

184
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

CONCLUSION

185
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The implementation of a structured energy audit offers numerous


benefits to the enterprises including:

Improved energetic efficiency;


Reduced energy bills;
Reduced environmental impact;
Reduced maintenance costs;
Improvement of working conditions and safety;
Greater organizational involvement and competency concerning
energy issues.

186
The Lebanese Center for Energy Hamadi Sayah
CRA2E
Conservation ProjectEtude, Contrle et Pilotage
(LCECP)

The main condition for the success of the energy audit is the
commitment of the top management.

In addition to the evident and immediate benefits of the energy audit,


there are also other success factors which can motivate the top
management to implement energy efficiency measures:

the need to gain competitiveness by reducing production costs;


the increase of energy prices;
the opportunity represented by the diffusion of new and more
efficient technologies;
new legislation and regulations that incentive energy saving
interventions.

187