BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

BASEMENT SLAB

Grid F-J,F-G,H-J/1-2,3-7,1-7,17- 34.85'


1 8"c/c 4/8" 5 1 5 34.85 - - - - -
18

2 " 8"c/c 3/8" 5 1 5 33.33 166.65 - - - - 33.33'

3 " 8"c/c 3/8" 5 1 5 31.81 159.05 - - - - 31.81'

4 " 8"c/c 3/8" 5 1 5 30.29 151.45 - - - - 30.29'

5 " 8"c/c 3/8" 5 1 5 28.77 143.85 - - - - 28.77'

6 " 8"c/c 3/8" 5 1 5 27.25 136.25 - - - - 27.25'

7 " 8"c/c 3/8" 5 1 5 25.73 128.65 - - - - 25.73'

8 " 8"c/c 3/8" 5 1 5 24.21 121.05 - - - - 24.21'

9 " 8"c/c 3/8" 5 1 5 22.69 113.45 - - - - 22.69'

10 " 8"c/c 3/8" 5 1 5 21.17 105.85 - - - - 21.17'

11 " 8"c/c 3/8" 5 1 5 19.65 98.25 - - - - 19.65'

12 " 8"c/c 3/8" 5 1 5 18.13 90.65 - - - - 18.13'

13 " 8"c/c 3/8" 5 1 5 16.61 83.05 - - - - 16.61'

14 " 8"c/c 3/8" 5 1 5 15.10 75.50 - - - - 15.10'

15 " 8"c/c 3/8" 5 1 5 13.51 67.55 - - - - 13.51'

16 Grid F-J,G-H/2-3,1-7,16-17 8"c/c 3/8" 3 22 66 34.85 2,300.10 - - - - 34.85'

NUST-EC-CON-A-008,018,019 Page 1 of 8
NUST-EC-CON-ST-001,002,004,005,006,007,011,016,018
BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

0.67' 0.67' Main


17 Grid F-G,H-J/11-16 10"c/c 1/2" 2 1 2 11.17 - 22.34 - - - 9.83' (sunk portion)
0.67'
0.67' Main
18 " 10"c/c 1/2" 2 1 2 10.34 - 20.68 - - - 9.0' (sunk portion)

0.67' 0.67' Main


19 " 10"c/c 1/2" 2 1 2 9.51 - 19.02 - - - 8.17' (sunk portion)

0.67' 0.67' Main


20 " 10"c/c 1/2" 2 1 2 8.68 - 17.36 - - - 7.34' (sunk portion)

0.67' 0.67' Main


21 " 10"c/c 1/2" 2 1 2 7.85 - 15.70 - - - 6.51' (sunk portion)

0.67' 0.67' Main


22 " 10"c/c 1/2" 2 1 2 7.02 - 14.04 - - - 5.68' (sunk portion)

0.67' 0.67' Main


23 " 10"c/c 1/2" 2 1 2 6.19 - 12.38 - - - 4.58' (sunk portion)

0.67' 0.67' Main


24 " 10"c/c 1/2" 2 1 2 5.36 - 10.72 - - - 3.95' (sunk portion)

0.67' 0.67' Main


25 " 10"c/c 1/2" 2 1 2 4.50 - 9.00 - - - 3.19' (sunk portion)

0.67' 0.67' Main


26 " 10"c/c 1/2" 2 1 2 3.70 - 7.40 - - - 2.36' (sunk portion)

0.67' 0.67'
Distribution
27 Grid F-G,H-J/11-16 10"c/c 1/2" 2 1 2 11.17 - 22.34 - - -
9.83' (sunk portion)

0.67' 0.67'
Distribution
28 " 10"c/c 1/2" 2 1 2 10.34 - 20.68 - - -
9.00' (sunk portion)

0.67' 0.67'
Distribution
29 " 10"c/c 1/2" 2 1 2 9.51 - 19.02 - - -
8.17' (sunk portion)

NUST-EC-CON-A-008,018,019 Page 2 of 8
NUST-EC-CON-ST-001,002,004,005,006,007,011,016,018
BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

0.67' 0.67'
Distribution
30 " 10"c/c 1/2" 2 1 2 8.68 - 17.36 - - -
7.34' (sunk portion)

0.67' 0.67'
Distribution
31 " 10"c/c 1/2" 2 1 2 7.85 - 15.70 - - -
6.51' (sunk portion)

0.67' 0.67'
Distribution
32 " 10"c/c 1/2" 2 1 2 7.02 - 14.04 - - -
5.68' (sunk portion)

0.67' 0.67'
Distribution
33 " 10"c/c 1/2" 2 1 2 6.19 - 12.38 - - -
4.85' (sunk portion)

0.67' 0.67'
Distribution
34 " 10"c/c 1/2" 2 1 2 5.36 - 10.72 - - -
4.02' (sunk portion)

35 Grid G-H/12-16 8"c/c 3/8" 1 19 19 9.83 186.77 - - - - 9.83' Main

36 " 8"c/c 3/8" 1 15 15 12.37 185.55 - - - - 12.37' Distribution

37 Grid H-J/4-15 10"c/c 3/8" 1 1 1 30.49 30.49 - - - - 30.49' Distribution

38 " 10"c/c 3/8" 1 1 1 32.33 32.33 - - - - 32.33' Distribution

39 " 10"c/c 3/8" 1 1 1 34.17 34.17 - - - - 34.17' Distribution

40 " 10"c/c 3/8" 1 1 1 36.01 36.01 - - - - 36.01' Distribution

41 " 10"c/c 3/8" 1 1 1 37.85 37.85 - - - - 37.85' Distribution

42 " 10"c/c 3/8" 1 1 1 39.69 39.69 - - - - 39.69' Distribution

43 " 10"c/c 3/8" 1 1 1 41.53 41.53 - - - - 41.53' Distribution

44 " 10"c/c 3/8" 1 1 1 43.37 43.37 - - - - 43.37' Distribution

NUST-EC-CON-A-008,018,019 Page 3 of 8
NUST-EC-CON-ST-001,002,004,005,006,007,011,016,018
BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

45 " 10"c/c 3/8" 1 1 1 45.21 45.21 - - - - 45.21' Distribution

46 " 10"c/c 3/8" 1 1 1 47.05 47.05 - - - - 47.05' Distribution

47 " 10"c/c 3/8" 1 1 1 48.89 48.89 - - - - 48.89' Distribution

48 " 10"c/c 3/8" 1 1 1 50.73 50.73 - - - - 50.73' Distribution

49 Grid H-J/4-15 6"c/c 1/2" 1 61 61 10.72 - 653.92 - - - 10.72' Main

10.72' Main
50 " 6"c/c 1/2" 2 1 2 10.72 - 21.44 - - -
(triangle)

10.27' Main
51 " 6"c/c 1/2" 2 1 2 10.27 - 20.54 - - -
(triangle)

9.82' Main
52 " 6"c/c 1/2" 2 1 2 9.82 - 19.64 - - -
(triangle)

9.37' Main
53 " 6"c/c 1/2" 2 1 2 9.37 - 18.74 - - -
(triangle)

8.92' Main
54 " 6"c/c 1/2" 2 1 2 8.92 - 17.84 - - -
(triangle)

8.47' Main
55 " 6"c/c 1/2" 2 1 2 8.47 - 16.94 - - -
(triangle)

8' Main
56 " 6"c/c 1/2" 2 1 2 8.00 - 16.00 - - -
(triangle)

7.57' Main
57 " 6"c/c 1/2" 2 1 2 7.57 - 15.14 - - -
(triangle)

7.12' Main
58 " 6"c/c 1/2" 2 1 2 7.12 - 14.24 - - -
(triangle)

6.67' Main
59 " 6"c/c 1/2" 2 1 2 6.67 - 13.34 - - -
(triangle)

6.22' Main
60 " 6"c/c 1/2" 2 1 2 6.22 - 12.44 - - -
(triangle)

5.77' Main
61 " 6"c/c 1/2" 2 1 2 5.77 - 11.54 - - -
(triangle)

5.32' Main
62 " 6"c/c 1/2" 2 1 2 5.32 - 10.64 - - -
(triangle)
NUST-EC-CON-A-008,018,019 Page 4 of 8
NUST-EC-CON-ST-001,002,004,005,006,007,011,016,018
BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

4.87' Main
63 " 6"c/c 1/2" 2 1 2 4.87 - 9.74 - - -
(triangle)

4.42' Main
64 " 6"c/c 1/2" 2 1 2 4.42 - 8.84 - - -
(triangle)

3.97' Main
65 " 6"c/c 1/2" 2 1 2 3.97 - 7.94 - - -
(triangle)

66 Grid G-H/7-12 6"c/c 1/2" 1 26 26 31.50 - 819.00 - - - 31.5' Distribution

67 Grid G-H/7-12 8"c/c 1/2" 1 45 45 14.25 - 641.25 - - - 14.28' Main

15' Distribution
68 Grid D-G/8-11 8"c/c 3/8" 1 17 17 15.00 255.00 - - - -
(Portion# 1)

13' Main
69 Grid D-G/8-11 6"c/c 1/2" 1 36 36 13.00 - 468.00 - - -
(Portion# 1)

8.5' Main
70 Grid F-G/8-9,10-11 6"c/c 3/8" 2 5 10 8.50 85.00 - - - -
(Portion# 2)

6.5' Main
71 " 6"c/c 3/8" 2 5 10 6.50 65.00 - - - -
(Portion# 2)

11.25' Main
72 Grid C-G/5-9,10-14 6"c/c 3/8" 2 15 30 11.25 337.50 - - - -
(Portion# 3)

18.5' Distribution
73 " 6"c/c 3/8" 2 20 40 18.50 740.00 - - - -
(Portion# 3)

5.83' Main
74 Grid C-G/4-5,14-15 8"c/c 3/8" 2 7 14 5.83 81.62 - - - -
(Portion 4)

5.67' Main
75 Grid C-D/4-9,10-15 6"c/c 3/8" 2 24 48 5.67 272.16 - - - -
(Portion 5)

13.34' Distribution
76 " 6"c/c 3/8" 2 8 16 13.34 213.44 - - - -
(Portion 5)

4.67' Main
77 Grid B-C/5-7,12-14 9"c/c 3/8" 2 7 14 4.67 65.38 - - - -
(Portion 6)

5.5' Distribution
78 " 9"c/c 3/8" 2 7 14 5.50 77.00 - - - -
(Portion 6)

10.25' Main
79 Grid C-D/9-10 6"c/c 1/2" 1 12 12 10.25 - 123.00 - - -
(Portion 7)

6.58' Distribution
80 " 6"c/c 3/8" 2 8 16 6.58 105.28 - - - -
(Portion 7)
NUST-EC-CON-A-008,018,019 Page 5 of 8
NUST-EC-CON-ST-001,002,004,005,006,007,011,016,018
BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

81 Grid A-C/7-9,10-12 6"c/c 3/8" 2 34 68 10.67 725.56 - - - - 10.67' Main

82 " 9"c/c 3/8" 2 13 26 18.32 476.32 - - - - 18.32' Distribution

83 Grid A-C/9-10 9"c/c 3/8" 1 14 14 18.32 256.48 - - - - 18.32' Main

84 " 6"c/c 3/8" 1 34 34 11.00 374.00 - - - - 7.57'


11' Distribution

85 Top Extra Bars

Grid F,F-G,G-H,H-J,J/ 3.17'


86 10"c/c 3/8" 10 16 160 3.75 600.00 - - - .58' on edge beams
1,1-2,2-3,16-17,17-18,18

87 Grid F-G/3-8 10"c/c 1/2" 1 16 16 3.75 - 60.00 - - - 3.17' on edge beams


.58'

88 Grid G-H/8,11 8"c/c 1/2" 2 19 38 14.00 - 532.00 - - - 14' on edge beams

89 Grid H-J/4-8 10"c/c 3/8" 1 16 16 5.58 89.28 - - - - 5.58' on edge beams

3.75'
3.17'
90 Grid H-J/11-15 10"c/c 1/2" 1 16 16 3.84 - 61.44 - - - 3.17' .25'
.67' on edge beams

91 Grid G,G-H,H/2-3,2,3,16-17,16,17 10"c/c 1/2" 8 18 144 9.00 - 1,296.00 - - - 9' on middle beams

Grid F-G,G,H,H-J/2,1-2,3,3-8 9'


92 10"c/c 1/2" 12 1 12 9.00 - 108.00 - - - in triangle portion
,17,17-18

93 " 10"c/c 1/2" 12 1 12 8.65 - 103.80 - - - 8.65' in triangle portion

8.32'
94 " 10"c/c 1/2" 12 1 12 8.32 - 99.84 - - - in triangle portion

8'
95 " 10"c/c 1/2" 12 1 12 8.00 - 96.00 - - - in triangle portion

7.63'
96 " 10"c/c 1/2" 12 1 12 7.63 - 91.56 - - - in triangle portion

NUST-EC-CON-A-008,018,019 Page 6 of 8
NUST-EC-CON-ST-001,002,004,005,006,007,011,016,018
BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

6.96'
97 " 10"c/c 1/2" 12 1 12 6.96 - 83.52 - - - in triangle portion

6.61'
98 " 10"c/c 1/2" 12 1 12 6.61 - 79.32 - - - in triangle portion

6.27'
99 " 10"c/c 1/2" 12 1 12 6.27 - 75.24 - - - in triangle portion

5.93'
100 " 10"c/c 1/2" 12 1 12 5.93 - 71.16 - - - in triangle portion

5.59'
6.5'
101 " 10"c/c 1/2" 12 1 12 5.59 - 67.08 - - - ' in triangle portion

5.25'
102 " 10"c/c 1/2" 12 1 12 5.25 - 63.00 - - - in triangle portion

3.84' on beams at sunk


103 Geid F-G,G,H,H-J/16,12-16 10"c/c 1/2" 4 12 48 4.52 - 216.96 - - - .67' portion
3.75'
3'
104 Grid J/4-15 10"c/c 3/8" 1 52 52 3.58 186.16 - - - - 3.17' .25'
.58' beam at front

105 Grid G,H/8-11 6"c/c 1/2" 2 60 120 9.34 - 1,120.80 - - - 9.34' at 7" thick slab

curve beam
106 Grid F-G/8-9,10-11 6"c/c 1/2" 2 12 24 2.60 - 62.40 - - - 1.93' interior side
.67'
Portion # 2

2.5' .67' curve beam


107 " 6"c/c 1/2" 2 10 20 3.13 - 62.60 - - - inclined side
Portion # 2

2.5' beam
.67'
108 " 6"c/c 1/2" 2 8 16 3.13 - 50.08 - - - bottom side
Portion # 2

3.6' inclined beam


109 Grid D-G/8-9.10-11 6"c/c 1/2" 2 20 40 4.32 - 172.80 - - .67'
- Portion # 1

inclined beam
110 Grid C-G/4-9,10-15 10"c/c 1/2" 2 13 26 4.75 - 123.50 - - - 4.75' interior
portion # 3
NUST-EC-CON-A-008,018,019 Page 7 of 8
NUST-EC-CON-ST-001,002,004,005,006,007,011,016,018
BAR BENDING SCHEDULE

NO OF NO PER TOTAL LENGTH

Sr # LOCATION SPACING DIA TOTAL NO CUT LENGTH SHAPE REMARKS


UNIT UNIT 3/8'' 1/2'' 5/8'' 3/4'' 1''

3.09' inclined beam


.67'
111 = 6"c/c 1/2" 2 17 34 3.76 - 127.84 - - - upper
portion # 3

3.09' inclined beam


112 = 6"c/c 1/2" 2 13 26 3.76 - 97.76 - - - .67' lower
portion # 3

1.71'
.58' straight beam
113 Grid B-C/4-7,12-15 10"c/c 3/8" 2 8 16 2.29 36.64 - - - -
portion # 6

4.75'
1.71' .25'
.58' curve beam
114 = 10"c/c 3/8" 2 8 16 2.29 36.64 - - - -
portion # 6

3.75'
3.09'
115 Grid A-C/7,12 10"c/c 3/8" 2 20 40 3.67 146.80 - - - - .25'
.58'

116 Grid A-C/9,10 8"c/c 1/2" 2 25 50 7.58 - 379.00 - - - 7.58'

3.75'
4.96'
117 Grid A,C/7-12 10"c/c 3/8" 2 37 74 5.55 410.70 - - - - .25'
.58'

Prepared by -------------------------- TOTAL LENGTH 10,026.25 8,143.75 - - -


TOTAL WEIGHT (kgs)
0.170 0.303 0.474 0.680 1.211
Approved by..

Checked by--------------------------- KG, PER RFT


1,704.46 2,467.56 - - - 4,172.02