CONTENTS 1. GENERAL FEATURES OF THE WORK (Memory Informational) 2.

PURPOSE OF PC
MAT 3. DUTIES AND RESPONSIBILITY 4. METHODOLOGY USED TO PREPARE THE PCMAT 5. OVE
RVIEW OF RISK AND PREVENTIVE MEASURES FOR ALL STAGES OF WORK
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
1
5.1-5.2-TERRAPLANGEM AREA / SERVICES AND EQUIPMENT TO SUPPORT AREA OF EXPERIENCE
5.2.1-5.2.2-5.2.3-PROVISIONAL PREMISES MACHINES, TOOLS AND EQUIPMENT FOUNDATION
5.3-5.4-5.5-LOCK STRUCTURE 5.6-5.7-COVER AND FINISH PREMISES 6. EDUCATIONAL PRO
GRAMS 7. SCHEDULE
GENERAL FEATURES OF THE WORK (Memory Informative) Company Name: LAB Germane BRAS
ILEIRO LTDA Address: VP-D MODULE 7 7 / 11 Qd. 13 - DAIA City: Anapolis - Goias C
EP :75.133-600 PHONE / FAX: (0XX62) 310-2000 / 310-2005/2006 CGC: 17.159.229/000
1-76 CIS: 32.670.00169/74 DEGREE OF RISK: 04 CODE OF ACTIVITY: N.45.21-7
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
2
ESTIMATED NUMBER OF EMPLOYEES: 400 DATE OF CONDUCT OF PCMAT: RESPONSIBLE ENGINEE
R AUGUST 1999: RONALDO PAULINE PERIOD OF PERFORMANCE: 2 (TWO YEARS) AREA TO BE M
ADE: 49 500 m2 to be routed HOSPITAL IN CASE OF ACCIDENT: SANTA CASA MUNICIPAL O
R TYPE OF WORK: NUMBER OF VERTICAL AND HORIZONTAL FLOOR: FIRST FLOOR AND THREE T
YPES FLOORING SYSTEM DIG: Conventional, with the aid of machines, using shovels
and backhoe-loaders, mainly for construction of shafts and shoes. FOUNDATIONS: r
oot cuttings will be built. STRUCTURE: It will be mixed using both plain concret
e beams and steel structure. CLOSING: Masonry boards, insulation made of PVC, al
uminum, styrofoam and concrete. COVERAGE: metal tile and cement.
1.0 - BACKGROUND OF THE EXISTENCE OF THE PROGRAM AND ENVIRONMENTAL CONDITIONS OF
LABOR IN THE CONSTRUCTION INDUSTRY: THE PURPOSE PCMAT The program aims to: • En
sure the health and physical integrity of workers;
• Avoid actions or dangerous situations for lack of prevention; • Define tasks,
responsibilities and authority that manages the staff,
perform and verify activities affecting the safety and involved in the productio
n process; • Determine the measures of protection and prevention;
• Do the estimates of risk arising from the implementation process of the work:
• Apply techniques for implementing the full extent possible to reduce these ris
ks.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
3
3. RESPONSIBILITIES AND LIABILITY a) Management of Work: - Comply with and enfor
ce the regulatory standards of the Ordinance No. 3214/78 of the Ministry of Labo
ur, as well as the internal procedures of the Company as the Safety and Occupati
onal Health (PCMAT and PCMSO) - morally and financially support the programs of
Occupational Health and Safety Company (PCMAT and PCMSO) - monitor the results o
f the Work Safety. b) Engineer Job: - To comply with and enforce the requirement
s of regulatory Decree No. 3214/78 of the Ministry of Labour, as well as the int
ernal procedures of the Company. - Require subordinates to the mandatory use of
personal protective equipment. - Instruct your staff to work on standards and sa
fety regulations for each service to be performed. - To abide rigorously establi
shed safety procedures by the Company. - Arrange for correction of situations of
risk involved in their area. - Report the occurrence of accidents or incidents
that occurred in the construction site. - Plan the implementation of tasks in or
der to prevent failures that can cause loss of human, material and / or financia
l. - Disseminate this guide to all employees directly or indirectly involved wit
h the various activities of the construction site, and ensure and enforce compli
ance with the established norm. - Provide whatever is necessary to meet the stan
dards established in this manual. - Request the Department of Safety Training Co
mpany for all employees. c) Masters and Officers: - Require subordinates to the
mandatory use of personal protective equipment. - Instruct your staff to work on
Standards and Security procedures for each service to be performed. - To abide
rigorously established safety procedures by the Company. - Inspect the facilitie
s, equipment and service tools, providing correction of irregular situations.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
4
- Report the occurrence of accidents and incidents, successful in their area, to
the Department of Work Safety. Investigate causes and propose corrective and pr
eventive measures. - Ensure the smooth operation of collective protection device
s. d) Employees: - Use the mandatory personal protective equipment, properly, an
d ensure its conservation. - Perform various tasks, correctly and safely, accord
ing to the recommendations of the Company. - Ensure the proper storage and safek
eeping of equipment and tools. - Eliminate a hazard or failing to communicate to
your boss immediately. - Alert your co-workers about the use of safety equipmen
t and the practice of safety. - Comply with the guidelines given during training
. d) Department of Security Company: - Monitor and control programs for the prev
ention of occupational accidents as well as assess the results. - Promote the or
ganization of awareness activities, education and guidance of the company's huma
n resources, with respect to accident prevention. - Keep records of accidents. -
Analysing the accident, investigating their causes and propose corrective measu
res. - Specify protective equipment. - Analyze the risks of accidents and sugges
t preventive measures and / or corrective. - Train workers about the risks invol
ved in the construction site through the service order. - METHODOLOGY USED TO PR
EPARE THE PCMAT PCMAT This was guided by the NR-18 and NR-9, were raised the ris
k of accidents (NR-18), physical (NR-9), chemicals (NR-9), biological (NR- 9) an
d ergonomic (NR-17), were later collected and described the EPI's, EPC's, safe p
rocedures and training for the proper performance of activities described in eac
h phase of the work. Information about the conditions of buildings in the date o
f preparation of the program:
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
5
Water Supply: The potable water supply is via jet inclined troughs, which are in
stalled on the ground floor. Services performed: In gathering information for th
e preparation of PCMAT, the work is in the process of excavation. Services that
are running and to be performed: Clean and services topography Temporary pre
mises (administrative office, restrooms, locker room, local dining and keeper);
Services mechanized and manual excavations; Excavation of pipe open . Stru
cture; Masonry; prumadas hydraulic / electric and telephone; Plastering
internal and external hydro-sanitary installations, electric and telephone. Fr
ames. Plastering and against the basement floor; Floor covering; tiles, ta
bleware , Paintings; Gypsum; Gardening; facade coating and other finish
ing services. PPE (Personal Protective Equipment) provided
Workers: Helmet-(general use) Gloves (rubber and chips) Se
at belt type paratrooper and abdominal, rubber boots, safety boots, safety goggl
es ; Uniform, facial protector, hearing protector; breather against dust and oth
er possible; Glove vaqueta.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
6
4.1.5 - Functions available in the bed (at the beginning of program implementati
on): SERVICE (COMPANY) Engineer Master-builder Safety Tech
nician job Bricklayer Carpenter Electrician Plumber Servant Owner Operators mach
inery (mixer) FUNCTIONS (Contractors) Fireman (hydro-sanitary plumber) Pai
nter Scraper (granitina)
4.1.6 - noisy machines existing in the bed: Machinery / Equipment / Tools noisy
mixer Vibrator Maquita (machine to cut ceramic and stone) Electric Drill Pistol
valsiva soil compactor Sierra circular room housing construction sites General P
urpose General Purpose General Purpose Use general construction site constructio
n site
METHODOLOGY USED TO PREPARE THE PCMAT PCMAT This was guided by the NR-18 and NR-
9, were raised the risk of accidents (NR-18), physical (NR-9), chemicals (NR-9),
biological (NR-9 ) and ergonomic (NR-17), were later collected and described th
e EPI's, EPC's, safe procedures and training for the proper performance of activ
ities described in each phase of the work. The ENTERPRISE:
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
7
OVERVIEW OF RISK AND PREVENTIVE MEASURES FOR ALL STAGES OF THE WORK TERRAPLANGEM
Descriptions of the risks and prevention of this step are listed in the company
PCMAT CONFORTI TERRAPLANGEM AND CONSTRUCTION LTD, as contract signed on 07/12/1
999.
AREA / SERVICES AND EQUIPMENT TO SUPPORT AREA OF EXPERIENCE-(Lay-Out)
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
8
A-Bathrooms / Showers / Locker Room. A 1-Characteristics of the closed toilet wa
lls in brick masonry and ceramic maderit; cement floor rustic; Coverage - tile a
sbestos Natural and artificial lighting; Lavatories have: four toilets, a sink,
5 showers (hot) the Urinal vessels are installed in individual compartments and
equipped with doors, all rooms have container with lid for storage of used paper
, toilet paper is available to users in the bathroom, daily cleaning is performe
d.
Characteristics of Showers: smooth cement floor, the showers are equipped with h
ot and cold water; are electrically grounded; door has door towel and soap, clea
ning is performed daily.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
9
Dressing Room Features: Closing in maderit; cement floor rustic; has wood cabine
ts tered in padlock Bank of wood; Support for footwear; lighting and natural ven
tilation and Artif
1 - Restrooms / Dressing
EPI
DRESSING ROOM
DRESSING ROOM
DRESSING ROOM
DRESSING ROOM
DRESSING ROOM
Teuta Labortories BRASILEIRO LTDA VPVESTIÁRIO 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁ
POLIS -
Occupational Safety Ltd.
10
B-Site Dining: B.1-site dining features: - Closing on screen Naylon - Covering a
sbestos tile - tables and wooden benches - Sinks, liquid soap and paper towel -
Container with lid for waste Fig . 2 - Canteen
KITCHEN
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
11
KITCHEN
C-C.1 Management - Characteristics Walls enclosed in brick masonry and ceramic m
aderit; cement floor rustic; Coverage - tile asbestos Natural and artificial lig
hting;
Fig.3 - Administration
EPI
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
12
DIGGING / FOUNDATIONS a) Description of Activities: The excavations will work wi
th the hand (shovel, pick, spade, etc. ..) and mechanical (backhoe). b) No. of e
mployees exposed at this stage: 47 c) Risk, causes and preventive measures more
frequently in this phase of work: RISKS Detachment Earth Excavation MAIN CAUSES
of Formation of excessive loads on the edge of slopes and ditches by the accum
ulation of materials; excessive verticality of the excavation, shoring without
realizing; Fall of shoring or any of its elements; açãop destructive erosio
n caused by water; Vibrations on the edge of the excavation caused by vehicles
, machinery and equipment, etc.. PREVENTIVE MEASURES Deposit materials excavat
ion at a distance more than half the depth of the trench or telude; The unstab
le slopes of more than 1.25 m in depth should have guaranteed stability by propp
ing, shoring and Resizing monitorálo periodically; cover thickness or sealin
g of slopes; places where there is need for approximation of machinery, equipm
ent or vehicles should have shoring or increase the angle of the slope.
13
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
RISKS shocks, resulting in trampling people grabbing machines.
and work by
MAIN CAUSES Start maneuvers abruptly; Lack of signage in the workplace; St
ay improper people in the zone of action of the machinery; Lack of protection
on moving parts of machines; Lack of visibility of the machine operator. Lac
k of maintenance of the machine.
PREVENTIVE MEASURES Drive carefully and proactively avoiding dangerous and abr
upt maneuvers; Flag workplaces with signposts and warning and guide motorists;
should only be allowed access to the work of excavation of people committed a
nd trained; All moving parts of machinery and earth moving equipment should be
protected from the contact persons; The machine operator must not carry dirt
or material, in order to prevent their visibility; To conduct regular preventi
ve and corrective maintenance on machines.
Fall of people.
Protection Slips caused by the edges of dirt, etc..; Slabs with guardaAusênc
ia signaling wooden bodies, ground in open pits or metal screens or even ditches
foundation. lateral closing (masonry); The plot and the work should be mmanti
dos organized, clean and desempedidos; Stairs shall be sized according to the
flow of workers, be equipped with devices to prevent their
14
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
RISKS
MAIN CAUSES
PREVENTIVE MEASURES shoring and equipped with stairs antiskid Flag through guard
rails, ribbons, flags, ropes or easels, ditches, slopes, shafts and holes.
5.4-STRUCTURE a) Description of Activities: basically consists of the following
phases: shape, shoring, steel frames, concrete and deface. b) No. of employees e
xposed at this stage: 40 c) Risk, causes and preventive measures more frequently
in this phase of work: RISKS MAIN CAUSES PREVENTIVE MEASURES Contact Handli
ng products In both cases the substances in chemical without the worker must b
e contreto structure. use of equipment using personal protective equipment, indi
vidual protection, The same situation as gloves, goggles provides employment s
ecurity oversight of toxic substances, or face shield, PVC apron or flammable, c
orrosives. hose, boots and raincoats
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
15
half-face mask. Also, provide the location of ventilation. Download electric
al insulation inadequate; Isolate properly m / Aquinas used Cables and condu
ctors in the seams by carpenters. bad state of conservation and keep the lead, r
unning cables in remote Not respecting a state of perfect security to conserva
tion, compared to the equivalent of the electrical lines overhead or insulated c
onductors; groundwater; Networks High Voltage Protection deficient, they sho
uld be installed against electrical contacts to avoid indirect contacts of machi
nery and motor vehicle accidents, equipment. equipment and people in movement;
The structures and housings of electrical equipment must be electrically ground
ed.
COVER: It's conjutno of work to equip the building to protect horizontal or incl
ined, to isolate the structure from the outside for his last slab. CAUSE MAJOR R
ISKS PREVENTIVE MEASURES
Priate Lack of collective protection Placing guardrails to protect workers
and appropriate wood, fabric or metal materials perimeter edges of the entire p
eriphery of the borated coverage; roof slab, slab Lack of Use of scaffolding
use in all coverage. scaffolding. work outside the coverage. Its design, struct
ure and fixation should be performed by a legally qualified.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
16
Fall to Lack of handrails, walkways Installation of walkways and along the
platforms and the platforms, built and coverage, work both of execution, kept i
n perfect both as repair and condition and workers, storage, security; as lack o
f equipment Use equipment materials. individual protection individual protec
tion in work performance, appropriate conservation and restoration needs, and ri
sks; Lack of placement Guanches Installation of hooks for attachment. fixing c
ables, guides, belts and seat belt. Falls Accumulations of materials or Or
ganization, order and material and any type of load in cleaning work. local work
ers are not appropriate. The estrutrua fixation should es through In restist
ir restoration work at least three of the lack of proof of coverage times the ef
fort. resistance of formant requested. support. In the Courts and restoratio
n work Use of equipment burn for lack of personal protective adquado s (solder
) protective equipment appropriate to the risks, such in the individual. as capa
cdte glasses of workers. safety gloves, zest, waterproof boots, etc..
CLOSING AND MASONRY:
Are a set of work to isolate estrutrua outside (roof, locks, walls, etc..) As we
ll as the realization of the interior layout, according to the use of the buildi
ng (walls, coatings embedded, etc.).
RISKS spending of materials already in place, or being placed. MAIN CAUSES OF PR
EVENTIVE MEASURES
Employment anchor or secure the stability of the wall materials incorrectly,
or locks, or by doing work in the days and avoid anchoring the work of rainy. l
aying of masonry outside on days of high rainfall. Protection of jobs. The j
obs of the lower decks, must be protected with covers, for example, the winch li
ft cargo. However, the materials falling from higher ground will be trimmed by t
he construction of platforms and 17
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
Entel building. Falls from heights of people in work outer covering. Lack of c
ollective protection The peripheries of slab should be at the perimeter of the
work; protected in time for assembly or storage platforms and screens to preven
t improper scaffolding. falling bricks, tools and equipment to lower levels. F
alls The formant large pieces of scaffolding should be fixed for the supply of c
onstruction through scaffold materials for the mooring, in order to resist the e
xternal coating. efforts that will be subject. People with problems in parts
of larger sizes balance (vertigo, nausea, should be tied and hoisted to etc.)..
external scaffolding so as to meet all requirements Direct contact with safet
y lines. It should not be allowed to air power without protection. work below th
e ANDIMA at the time of supply. disorder and lack of cleanliness in the access
of temporary work. Lack of adequate collective protection on the ramps and st
airs. Placement interim steps. inadequate stairs
CLOSING AND MASONRY - continued
RISKS Falls at heights of people in work outer covering (continued)
MAIN CAUSES
PREVENTIVE MEASURES Ensure the safety distance between the external scaffoldin
g and electric power grids. The ramp of stairs and walkways should be construc
ted interim and kept in perfect condition, with side shields type cage. The ex
tension and the interim steps of the stairs should be uniform, ranging from bein
g 0:25, 0:30 m.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
18
Explosions and fire.
Storage Container Arnazenar solvents and adhesives in solvents and glues, cl
osely covered the areas with good ventilation heat sources. and away from heat.
Acne
Direct contact with products Use protective equipment or chemicals that can
affect adquado to risk, such as gloves, skin. COTRA dust respirators, aprons, bo
ots and waterproof clothing Lack of information on buying them. products that
are used, their hazards and measures Check the toxicity of products prevention
. used for checking your label and basic preventive measures in case of accident
s. If the label does not present these data, consulting literature or contact th
e manufacturer.
FACILITIES AND FINISHING: It is the working set of functionality designed to equ
ip the building under construction. RISKS Lightning CAUSES MAJOR PREVENTIVE ME
ASURES
Lack of double insulated tools Use only with electric power tools double ins
ulated. portable. The electric interim temporary electrical installations mu
st be performed by staff at work in poor conditions and supervision of qualified
conservation done. by professional legalmene enabled, following all the require
ments that ensure the isolation of electrical contact with people. Lack scaffo
lding work, existing protections. prloteções in the scaffolding should be prot
ected and platform with guard rails and openings as well as floors and walls mus
t be adequately protected collective in vain.
Fall at heights of people.
must be laid on the ground floor and Employment top of ladders or be provide
d with Labortories Teuta BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁP
OLIS -
Occupational Safety Ltd.
19
deteriorated.
devices that slip.
prevent
the
its
They should be provided with steps slip resistant floor and propped up on. Exp
losions and Container solvents open the containers must be fire, near sour
ces of heat. stored in isolated places, burns. appropriate, marked and access
Store products are only allowed to people and flammable fuels without duly autho
rized.€ventilation and lighting. The equipment of electric welding or oxyacety
lene welding Equipameto must be in perfect estdo of deteriorated. conservation
and maintenance. Workplace Keep in disorder sites and lack of cleanliness.
organized and clean. work
FACILITIES AND FINISH - Continued CAUSES MAJOR RISKS PREVENTIVE MEASURES
Cut and Do not use equipment Use of equipment wounds in individual protect
ion. personal protection needed for hands and feet risks. and no glasses in bo
th signal transmission as poisoning When the areas under the interdict. placed
conveniently. placement of windows or protect against falling materials. After
setting, mark conspicuously.
LIFTING MACHINES: The machines considered here are the winch and lift work. RISK
S Falls objects CAUSES MAJOR PREVENTIVE MEASURES
State faulty cables and SWR should not have the same lack of control. amendm
ents or broken legs that may compromise their Improper use of hooks mechanical
integrity. Should be no safety lock. checked periodically by the maintenance ar
ea. The hooks must be equipped with 20
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
Security lock for transporting materials. Maintenance "Grasping elements sus
tentantes inadequate. Contact electric. the steel cable support must be regu
larly maintained and any changes noted in books Maintenance operations of its
own. belts, gear and equipment operation. To ensure a good grounding Deficie
ncy run through the proper maintenance of all electrical components. Do not re
spect the safety distance from power lines. Landing adequately guinho tower an
d lift work and any transport equipment for lifting must be away from the grid i
n accordance with guidance from the local utility.
6.0-POWER PLANTS: There are two distinct electrical installations: the building
site and construction of permanent wiring. Because it is a work of medium size,
there is a danger of over running repairs to be an electrician at the same time
and the risk of energizing a circuit maintenance is great. Should be used in thi
s case as a safety device, locks (as far as the electricians are working on the
circuit) to prevent the closure of the key before any service is terminated. Eac
h electrician will be responsible for removing your lock key so finish your work
piece. Other recommendations for safe electrical installations on the building
site: - The use of decorative objects such as metal bracelets and chains - The s
witchboards shall be in locations easily accessible and visible - Keys should be
shielded, should close up and should not be used to directly connect equipment
- All electrical equipment must be connected through buttonhole - The wires and
cables must be extended in places that do not hinder the passage of people, mach
ines and materials - The wires and cables should be fixed in insulating material
, - They should not have findings Amendments - The connection to the network equ
ipment must be done through plug-taken;
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
21
-
The lighting circuits shall be connected to the network through armored keys and
fixed in insulating material; lamps in traffic areas shall be protected against
shocks; Lighting slabs running must be done through reflectors set on easels. W
iring damaged or many amendments should be immediately replaced; All electrical
equipment must be grounded and the electrician should always check the grounding
and isolation of equipment that are used in wet locations such as compactors an
d vibrators; Flag all places where there risks of electrical contacts; In the ge
neral framework should be identified breakers of support facilities, lighting ga
ntry, machine and equipment (mixer, circular saw, saw policorte and others); dis
tribution network in support facilities must be protected by conduit PVC.
7.0-MACHINERY AND EQUIPMENT: Machinery and electrical equipment must be grounded
properly.€All operators of machinery and equipment should receive specific trai
ning and guidance on how to proceed to avoid the risks. 7.1 Circular Saw: Only t
o be operated by qualified employee, identified and with the appropriate Persona
l Protective Equipment-PPE (helmet, safety shoes, face shield and hearing protec
tor type shell). A circular saw used in the construction site must meet the foll
owing characteristics: self-protective hood adjustable bench made resistant shee
t metal or wood collector box of sawdust; Key command (start / stop) button type
installed on the bench, electrical wiring protected conduits; Motor casing elec
trically grounded; be located in a covered, well lit, has in its vicinity PQS fi
re extinguisher (dry chemical) 4kg; The site must be kept clean, free from sawdu
st and stumps of wood.
22
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
Note: - Install near the circular saw a plaque with the name of the skilled oper
ator, according to the model below: WARNING CIRCULAR SAW ONLY may be operated by
skilled workers with appropriate PPE (hearing protection and face shield) 7.2 M
ixer The mixer shall meet the following minimum requirements: - Key command (sta
rting and stopping the engine) installed in the mixer itself so as to allow easy
access to the operator - electrical installation done with proper gauge wires,
embedded and protected by conduit - All metal parts as the motor housing body an
d the mixer must be electrically grounded in order to avoid possible electric sh
ock to the operator - be located in a covered, well ventilated and lighted; - be
washed daily and be oiled at least weekly by the operator, according to use. Lu
bricate gears, cables and rails. - On-site and easily visible, must be affixed a
plaque with the name of the qualified operator model below: WARNING DO NOT ALLO
W THE RESIDENCE OF PERSONS NOT AUTHORIZED ON THIS SITE. THIS EQUIPMENT MAY ONLY
be operated by the SR.: _______________________________________________ ________
_ PERSON RESPONSIBLE FOR CLEANING AND LUBRICATION mixer; _______________________
________________________ __________
7.5 - Miscellaneous Tools:
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
23
The warehouse must have properly all the tools needed to stage the work. Before
his departure to be checked flawless performance should not be allowed gambiarra
s, especially in electric cables. Should be periodically inspected the heads of
Mortise, cables and miscellaneous tools geared for non-use tools for purposes ot
her than those intended. Special attention to the gun mounting. Should be checke
d especially the nipple shield. The operator must must use noise-canceling and b
e subject to ongoing assessment of audiometry by the medical service company.
OVERVIEW OF RISK
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
24
8.0 OVERVIEW OF RISKS Many fatal accidents occur in the construction industry, e
vents are often higher than in other industries because, first, to be the indust
ry that employs more people in Brazil, and secondly, because the conditions exec
ution of work are still very uncertain, adding to the little information and tra
ining given to workers. During the construction process stand out clearly the va
rious stages of greater or lesser importance, generating a number of risks that
could create accidents. The following are the most common risks during the const
ruction process, the main causes and preventive measures in the stages have not
yet been implemented (Structure and various finishing services)
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
25
9.0 - SIGNS: 9.1 - External: The execution of external services (outside the bou
ndaries of the plot, especially in the street) should be suitably marked with sa
whorses, cones and ribbon zebra (see figure below). 3 - easel
1.30 m 0.30 m
1.00m black
yellow
9.2 internally: All work must be marked with warning signs and pictograms. These
road signs will be divided into: the danger signs, warning and warning. The con
struction site should be flagged in order to: a) indicate the locations of suppo
rt that make up the construction site, b) indicate the outputs through text or a
rrows;
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
26
c) Maintain communication by signs, posters or similar d) warning against the da
nger of accidental contact or drive with moving parts of machinery and equipment
; e) warn against the risk of falls; f) warn about the use of PPE; g) warn about
the isolation of the areas of transport and movement of materials by crane, hoi
st or crane; h) identify accessions, circulation of vehicles and equipment in th
e work: i) identify locations of toxic, corrosive, flammable, explosive and radi
oactive. LOCAL FIXATION OF POSTERS: POSTER DESIGN Compulsory Breathing Mask LOCA
L RECOMMENDED Near the mixer, burning lime, enclosure closed painting or placing
of carpet (glue), cut brick or ceramic Entry Work (next time clock), the counte
r of the warehouse and other locations at the discretion of the company. Next to
the circular saw, policorte, gun brooch (air), cement mixer and the machine ver
y noisy (makita, finca pin, sander, concrete vibrating table and others) Close t
o local closing with masonry, concrete, loading and unloading of materials, prep
aration hardware, washing tablets, waterproofing. In places with high humidity,
foundation, concrete, burning lime, mortar preparation. Next Equipment type: Cir
cular sawing of policorte, makita, or pedestals around services with Mortise, ro
ughcast, plaster, plaster walls and ceiling, concrete, washing tablets, and othe
r company's discretion. Put on a pedestal near the edges of the slab running, di
splay and disseminate within the rocker assembly services for the tower elevator
s and others.
27
Compulsory use of helmet
Use Protector Headset
Mandatory use of gloves
Mandatory Use of Boots
Compulsory use of safety goggles or face shield
Mandatory Use Security
of
Belt
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
Put the trash in the Trash
In place of meals, in the locker room, warehouse, room and master engineer.
in the
First Aid Care! Falling Objects
Put it in first aid or medical clinic. Place at sites of projection of the facad
e (right below the cafeteria or fixed in its discretion). Electrical distributio
n boxes and local energized. At the discretion of the company.
Beware! No Smoking in Local Electricity
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
28
PROGRAMME AND ENVIRONMENTAL CONDITIONS OF LABOR IN THE CONSTRUCTION INDUSTRY
10 - SPECIFICATION OF PROTECTIVE EQUIPMENT - PPE BY FUNCTION: The Personal Prote
ctive Equipment form together a resource widely used for worker safety in the ex
ercise of their functions. Assume, therefore, the role of great responsibility i
n maintaining the employee against the most varied risks to which is subject in
the workplace. The PPE is used in most cases, when general resources are not app
licable or not available for the neutralization of risks that endanger the safet
y and occupational health. The use of PPE is mandatory for all company employees
and subcontractors firms.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
29
The LAB Germane BRASILEIRO LTDA. is bound to make, available to employees all PP
E necessary to preserve the physical integrity thereof; All PPE supplied must ha
ve CA. 10.1 Employer's Obligations The EPI:
a) acquire the right type of employee activity, b) provide the employee with PPE
only Certificate of Approval (CA), c) train the worker on its proper use, d) be
made compulsory to wear, and) replace it, immediately when damaged or lost, f)
be responsible for its cleaning and regular maintenance, g) notify the Ministry
of Labour any irregularities observed in the EPI h) provide you free of charge t
o its employees.
10.2-Duties of employees as to the EPI:
a) use it only for its intended purpose, b) be responsible for the custody and m
aintenance of PPE which is given, c) notify her employer of any change in the EP
I it unfit for its
use. 10.3 Form Control EPI: It is for the employer maintain a record of providin
g PPE for each employee. This note is a legal document and proof of the company
for providing the PPE to the workers, thus€any employee who is transferred to ot
her work must be accompanied by this form. If the employee is fired or resign, i
t is important that this statement be filed in your documents folder. In the sta
tement should contain: name of employee, role, PPE provided, the withdrawal date
, delivery date, signature and signature of the official responsible for the del
ivery of equipment (see attached model). 10.4 The Maintenance of PPE Personal Pr
otective Equipment (PPE) should be carefully selected for each function. The equ
ipment used must have good quality and ensure effective protection in accidents.
For storage of PPE (held by employees), the most common procedures at construct
ion sites should be as follows: EPI
Occupational Safety Ltd.
Conservation procedures
30
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Safety Footwear Rubber Boot Helmet Goggles Protective goggles face of jamb scrap
ings gloves latex gloves nitrile gloves scrapes Seat Belt.
They must be polished to wash them weekly, according to the need Wash weekly (if
badly scratched you can retrieve it through mass polisher and silicone). Wash a
nd dry with clean cloth to avoid scratching the lens. Skip damp cloth to avoid s
cratching the acrylic. It must be kept separate from other materials. Skip damp
cloth to avoid scratching the acrylic. It must be kept separate from other mater
ials. should avoid contact with water. Should not be dried in the sun, just wash
or mop. Should be washed after use. Avoid contact with water. Do not throw away
the gloves, when one is damaged. What's left can be used with another. Check th
e buckles for adjustment, the carabiner and especially the conditions of the lan
yard (tail), which must not have loose threads that compromises their resistance
. After use, clean and store in a dry place. Each type of shield has its correct
form of conservation. In general the protectors should be cleaned daily. Check
the perfect seal on the face, filters and valves. After use clean the part and s
tore in a dry place.
Respiratory protective
Noise-canceling
10.5 Value of PPE by Function:
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
31
EPI FUNCTIONS
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Administration of Work (Engineer, Technician Building, Master-builder, caregiver
s, etc.. Protector Shield Facial Facial Mask / Goggles Welding Goggles Shield He
adset against impact goggles gloves PVC Gloves Latex gloves, rubber boots scrape
Seat Belt Apron scrapes Respirator Dust Mask with filter X X Helmet Safety Foot
wear Work Clothes * Any necessary X
Occupational Safety Ltd.
32
Storekeeper Tiles Pointing Owner Carpenter Electrician Plumber Posted miter Asse
mbly Team winch Team Team concreting scaffolds plasterers mixer drivers Operator
Operator Winch Operator Machine Operator policorte Pastilheiro Mason Painter Se
rvant Welder Glaziers
(X) (X)
(X) (X) (X) (X)
(X) (X) (X) (X) (X) X (X) X
X X (X) X X
(X)
(X)
(X) (X)
X X X X X
X X X X X X X X X X X X X X X X X X X X X X
* * X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X
(X) X
(X)
X X X X X
(X)
(X)
X
(X) X
X
(X) X X X
(X) X X X X X (X) (X) (X) X
(X)
(X) X
X (X)
X X X X X (X) X X X X X X
(X) X
(X)
X (X)
X (X) X (X) (X) (X) (X) X (X) (X) EPI THE SAME TEAM WORK XX (X)
(X) (X)
Legend: X - equipment that should be used throughout the workday (x) - equipment
that should be used in certain activities * - at the discretion of the company.
11 - COLLECTIVE PROTECTION: These are actions, equipment or elements that serve
as a barrier between the danger and the workers. Are all security measures take
n in a work to protect one or more persons. 11.1 - Recommendations for the Order
and cleaning at construction site: a) Offices Administration of the work (Engin
eers, Trainee, Technician Building, Master of Works, Pointer, etc..): - Preferab
ly, should have vision for the building site works - should be well lighted, ven
tilated, clean and tidy - In the scorer's room should be a list of emergency cal
ls and a first aid kit.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
33
b) Ordinance: - Must be close to the access door staff and be large enough to ma
intain a stock of helmets,€to be provided to visitors - The doorman should not a
llow the entry of people in work without wearing helmets. c) Warehouse - The war
ehouse should be built, preferably, separate offices, but in its vicinity and be
kept clean and tidy. - Must be close to entrances and be located so as to allow
easy distribution of materials from construction sites - must be equipped with
CO2 extinguisher 6 kg d) Other places of work: - The construction site must repo
rt to organized , clean and clear, especially on routes, passage and staircase.
- The rubble and any remains of materials should be regularly collected and remo
ved. On his removal should be taken special care to avoid excessive dust and pos
sible risks. - When there is difference in level, removing debris or scrap mater
ials shall be performed by mechanical equipment or closed troughs. - It is prohi
bited to burn garbage or other material within the construction site. - It is pr
ohibited to keep trash and debris accumulated in inappropriate places or exposed
the construction site.
11.2 - Collective Protection Equipment (CPE) a) Protection of the stairs: The ha
ndrails on stairs should follow the model below - Fig 4. Basically will be built
with rafters and battens vertically estroncados following the slope of the stai
rs.
Fig 4 - (handrail on the stairs):
prop timber 7x7cm Labortories Teuta BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADR
A 13 - ANÁPOLIS -
Occupational Safety Ltd.
34
0.70 cm
1.20 m Cunha wooden grip.
b) Protection of openings in slabs: the closures of openings in slabs should be
made using wooden lid on the floor or bodyguard, as fig (5 and 6) 5 - Protection
of openings in slabs and ventilation shafts:
Closing a gap in the flagstones.
Protection platform in tough wood
Opening in the concrete slab.
6 - Guard-body on the floor:
Wood slats 10 x 2.5 cm
50cm 20cm
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
wood 7x7 cm.
Occupational Safety Ltd.
prop of
35
Footer wood 20 x 2.5 cm
Where there is danger of falling materials shall be placed between the screen op
enings of the crossbars. c) Protecting the Periphery of the building: Masonry or
closing the periphery of the slabs should be performed soon after the deface of
the slab immediately above. If this is done, it is necessary to install fall pr
otection for workers and projection of materials throughout the periphery of the
building.
7 - Closing the periphery of the slab with wooden guardrails and screen:
2m
2m
1.20 m 70 cm
Slab 20 cm Labortories Teuta BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 -
ANÁPOLIS -
Occupational Safety Ltd.
36
Bodyguard - Traverse top height of 1.20 m; - Traverse intermediate height of 0.7
0 cm - Footer height of 0.20m - Vain between the indents closed with wire mesh o
r other material resistance and equivalent feature.
12) TRAINING PROGRAM AND LECTURES PREVENCION This program should be implemented
with the support of company management, because it generates a security policy t
o be observed by all individuals in the organization, clearly delineating respon
sibilities and ensuring adequate resources. Each individual has a personal respo
nsibility in the prevention, generating a combined effort of security. For a sec
urity program to be effective they must be held as a team. An important componen
t of the Safety Program is the training program which addresses the issue of pre
vention of accidents and occupational diseases. 12.1 - Training Program: 1 - Int
egration of security for newly admitted;
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
37
2 - Security Dialogue 3 - Lecture sponsored by SESMT 4 - Courses: Prevention and
Fire Fighting, First Aid, among others; 5 - Course for components of CIPA, 6 -
SIPAT. 12.1.1 - Roadmap for Integration of security for newly admitted: Under it
em 28.2 of NR-18, the admission training hours must have at least 6 (six) hours,
be provided within the work schedule before the employee starts his activities.
Basic roadmap for integrating security for newly admitted: Presentation of the
members of SESMT (if any in the company) and CIPA; Organization, housekeeping, d
ining, bathroom, locker room, workplace and tools; Exposure of the risk area, Re
spect co-workers and the construction site signage (posters, signs, guardrails a
nd other protections exist);€Mandatory use of protective equipment - PPE (safety
belt, safety boots, helmet and others); clarify rules on corporate security (pr
ohibited work without uniform, drunk, etc.)..
At the conclusion of the course, the employee must sign the appropriate term or
form with the following: "Given the above, declare to be aware of the risks to w
hich I am subject and have received the guidelines described above, in order to
avoid any damage to my physical integrity and mental and my co-workers (see temp
late attached) 12.2 - Lectures sponsored by SESMT: Promote lectures periodically
at the work site for employees, with themes that aim to prevent accidents arisi
ng from work performed or to be performed. - - - - - - - - - Suggested Topics: S
afety in Construction; The PPE (use, maintenance and custody); The EPCs; Lifting
weights; Prevention and Fire Fighting; AIDS Basic Concepts of Hygiene, Occupati
onal Diseases Construction, Interpersonal Relations, etc..
38
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
Note: The company will make the annual schedule of training courses and lectures
and attach to this program.
13 - EVALUATION OF PCMAT The program should be monitored in the following stages
:
1) Monthly: The sector responsible for security of the company should make visit
s
routine in the fields, raising their conditions and monitoring the implementatio
n of this program. Irregularities should be described in reports and contain dea
dlines for implementing the measures. 2) Semester: Program actions will be evalu
ated every six months in order to make the necessary corrections adequacy proble
ms encountered during implementation. Note Copies of inspection reports must be
filed in its own folder "folder of documents for implementation and monitoring o
f PCMAT"
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
39
14 - FINAL CONSIDERATIONS PCMAT should be kept in work available to the regional
body of the Ministry of Labour - MTb and its implementation is the responsibili
ty of the employer. The environmental risks identified in the workplace (constru
ction site) and security conditions that do not meet the Regulatory Standards ar
e listed in the attached spreadsheets. According to the emergence of new risks,
new sheets to be compiled and appended to this document, being an activity of th
e responsibility of the person designated by the employer to monitor the impleme
ntation of the program at the worksite. The environmental risks were raised thro
ugh a survey conducted throughout the construction site, with the accompaniment
of Work Safety Technician of the company.
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
40
After the recognition and identification of environmental risk assessment were t
he noise levels of machinery and equipment on the plot. The values are listed in
the evaluation report of noise. As to the other agents were given some recommen
dations so that they can be controlled or eliminated and the risk assessment wil
l be made later if there is a need
Teuta Labortories BRASILEIRO LTDA, VP 7d MÓDULO7/11 DAIA QUADRA 13 - ANÁPOLIS -
Occupational Safety Ltd.
41