Вы находитесь на странице: 1из 29

FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. PONDASI TANGKI SILIWANGI
PROJECT/JOB NAME PONDASI TANGKI SILIWANGI 567 M3
CLIENT NAME PT. UNILEVER SAVOURY
SITE NAME CIKARANG
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME ISO SAMPLE
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
TANK 1 Dia. 8.5 M

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 RING WALL DESIGN
5.3 REQUIRED REINFORCEMENT
5.4 ONE WAY SHEAR FORCE
5.5 TWO WAY SHEAR FORCE
5.6 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318)
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
Horizontal Force for Seismic INTERNATIONAL BUILDING CODE [IBC 2006]
Unit System Input : SI, Output : SI, Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 25.000 N/mm
2
Lean Concrete (Lf'c : compressive strength) 10.000 N/mm
2
Reinforcement (D10 ~ D16 , yield strength) 400.000 N/mm
2
Reinforcement (D19 ~ , yield strength) 400.000 N/mm
3
Rs (Soil unit weight) 17.100 kN/m
3
Rc (Concrete unit weight) 24.000 kN/m
2
Es (Steel Modulus of Elasticity) 200.000 kN/mm
2
Ec (Concrete Modulus of Elasticity) 23.500 kN/mm

- Pile Capacity
Items Value
Pile Name D300
Footing List Dia. 8.5 M
Diameter 300 mm
Length 10 m
Thick 300 mm
Shape Square
Capacity ( Ha , Ua , Va ) 62 , 210 , 700 kN

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 0%
Allowable Increase of Soil (Seismic) 0%
Allowable Increase of Soil (Test) 0%
Allowable Increase of Pile Horizontal (Wind) 0%
Allowable Increase of Pile Horizontal (Seismic) 0%
Allowable Increase of Pile Horizontal (Test) 0%
Allowable Increase of Pile Vertical (Wind) 0%
Allowable Increase of Pile Vertical (Seismic) 0%
Allowable Increase of Pile Vertical (Test) 0%

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 4

Allowable Increase of Pile Uplift (Wind) 0%


Allowable Increase of Pile Uplift (Seismic) 0%
Allowable Increase of Pile Uplift (Test) 0%
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against sliding for the SL1(FS1) 1.5
Friction factor (m) 0.35

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 Empty EMPTY LOAD
3 Operation OPERATION LOAD
4 Test TEST LOAD
5 LL LIVE LOAD
6 Op EQx OPERATING EARTHQUAKE LOAD X
7 WL WIND LOAD

Comb . ID Load Combination for stability


1 1.0 SW + 1.0 Empty
2 1.0 SW + 1.0 Empty + 1.0 Operation
3 1.0 SW + 1.0 LL + 1.0 Empty
4 1.0 SW + .75 LL + 1.0 Empty + .75 Operation
5 1.0 SW + .6 WL + 1.0 Empty
6 1.0 SW + 1.0 Empty + .7 Op EQx
7 1.0 SW + .75 LL + .45 WL + 1.0 Empty + .75 Operation
8 1.0 SW + .75 LL + 1.0 Empty + .75 Operation + .525 Op EQx
10 1.0 SW + 1.0 Empty + 1.0 Test
11 1.0 SW + .75 LL + 1.0 Empty + .75 Test
12 1.0 SW + 1.0 LL + .45 WL + .75 Empty + .75 Test
13 1.0 SW + .75 LL + 1.0 Empty + .75 Test + .525 Op EQx
Comb . ID Load Combination for Reinforcement
15 1.4 SW + 1.4 Empty
16 1.2 SW + .5 LL + 1.2 Empty + 1.6 Operation
17 1.2 SW + 1.6 LL + 1.2 Empty + 1.0 Operation
18 1.2 SW + .5 LL + 1.0 WL + 1.2 Empty + 1.0 Operation
19 1.2 SW + 1.2 Empty + 1.0 Operation + 1.0 Op EQx
20 .9 SW + 1.0 WL + .9 Empty
21 .9 SW + .9 Empty + 1.0 Op EQx
22 1.2 SW + .5 LL + 1.2 Empty + 1.6 Test
23 1.2 SW + 1.6 LL + 1.2 Empty + 1.0 Test
24 1.2 SW + .5 LL + 1.0 WL + 1.2 Empty + 1.0 Test

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 5

25 1.2 SW + 1.2 Empty + 1.0 Test + 1.0 Op EQx

Copyright (c) GS E&C. All Rights Reserved


3/1/2017 Page 6

2. DRAWING REFERENCE DWGS


A01 NO. DWG NO. DWG TITLE

NOTES
* OUTPUT UNIT : mm

01

PONDASI TANGKI SILIWANGI 567 M3 PROJECT

FOUNDATION LOCATION PLAN

ISO SAMPLE

SQUAD CHECK
Dia. 8.5 M

Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN
PONDASI TANGKI SILIWANGI

Copyright (c) GS E&C. All Rights Reserved


3/1/2017 Page 7

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


3/1/2017 Page 8

REFERENCE DWGS
CL FOOTING NO. DWG NO. DWG TITLE
10000
450 500 8100 500 450 TOP BOTTOM

TYP.
50
D16@150

D16@150
5000x2
NOTES
5000x2 D16@150 * PILE
D16@150 21-300 D300
( i = 0, 0 )
( PCD = 8500, 4500 )
FOUNDATION PLAN FOOTING REINF. PLAN * ANCHOR BOLT
1X8-M36 ANC. BOLTS (TYPE TYPE J)
600 PROJ.

CL PED.
* OUTPUT UNIT : mm

9100
751-D1375
TOC EL. + 150
8660 500
150

D19 220 220

45
PONDASI TANGKI SILIWANGI 567 M3 PROJECT
600

LEAN CONC. 50 THK


FOUNDATION DETAIL FOR

SECTION Dia. 8.5 M


PEDESTAL REBAR

SQUAD CHECK
P.)
13 (TY
2-D 50

PROCESS PIPING VESSELS STRUCT. ELEC. INST.


0
50

D19@100

SCALE JOB NO. MICROFILM NO.


PEDESTAL REBAR ARRANGEMENT
REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD
AS SHOWN
PONDASI TANGKI SILIWANGI

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 9

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name Dia. 8.5 M
Ft. Type TANK 1
2
10000 Area 78.540 m
Ft. Thickness 600.00 mm
3
Ft. Volume 47.124 m
f9100 Ft. Weight 1130.976 kN
Outer Soil Height 0.00 mm
3
Soil Volume 0.000 m
Soil Weight 0.000 kN
Buoyancy Not Consider
Self Weight (except Pr.SW) 1130.976 kN

150
600

The Origin coordinate


The Center of Gravity & Pile (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
Dia. 8.5 M All Direct 47.124 m 0.000 m 180.806 kN

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 78.540 m 1130.976 kN 0.000 kN 1311.782 kN

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : kN , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
Dia. 8.5 M 1 CircleWall 9100.000 8100.000 150.000 13.509 180.806 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 10

3.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 Empty EMPTY LOAD
3 Operation OPERATION LOAD
4 Test TEST LOAD
5 LL LIVE LOAD
6 Op EQx OPERATING EARTHQUAKE LOAD X
7 WL WIND LOAD

Unit( kN , kN-m )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -180.81 0 0
2 0 0 -286.96 0 0
3 0 0 -5670 0 0
1 4 0 0 -6000 0 0
Dia. 8.5 M
5 0 0 -62.42 0 0
6 1170.44 351.13 0 5852.17 1755.65
7 98.67 0 0 493.34 0
Footing SW 0.000 0.000 -1130.976 0.000 0.000

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
Dia. 8.5 M 1 0.000 0.000 -286.959 0.000 0.000
2 0.000 0.000 -5956.958 0.000 0.000
1
3 0.000 0.000 -349.378 0.000 0.000
4 0.000 0.000 -4586.273 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 11

5 59.201 0.000 -286.959 296.004 0.000


6 819.305 245.791 -286.959 4096.521 1228.956
7 44.401 0.000 -4586.273 222.003 0.000
8 614.478 184.343 -4586.273 3072.391 921.717
10 0.000 0.000 -6286.958 0.000 0.000
11 0.000 0.000 -4833.773 0.000 0.000
12 44.401 0.000 -4777.639 222.003 0.000
13 614.478 184.343 -4833.773 3072.391 921.717
15 0.000 0.000 -401.742 0.000 0.000
16 0.000 0.000 -9447.561 0.000 0.000
17 0.000 0.000 -6114.222 0.000 0.000
18 98.668 0.000 -6045.560 493.339 0.000
19 1170.435 351.130 -6014.351 5852.173 1755.652
20 98.668 0.000 -258.263 493.339 0.000
21 1170.435 351.130 -258.263 5852.173 1755.652
22 0.000 0.000 -9975.561 0.000 0.000
23 0.000 0.000 -6444.222 0.000 0.000
24 98.668 0.000 -6375.560 493.339 0.000
25 1170.435 351.130 -6344.351 5852.173 1755.652

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
1 0.000 0.000 -467.765 0.000 0.000
2 0.000 0.000 -6137.765 0.000 0.000
3 0.000 0.000 -530.184 0.000 0.000
4 0.000 0.000 -4767.080 0.000 0.000
5 59.201 0.000 -467.765 296.004 44.401
6 819.305 245.791 -467.765 3912.177 1843.435
7 44.401 0.000 -4767.080 222.003 33.300
8 614.478 184.343 -4767.080 2934.133 1382.576
10 0.000 0.000 -6467.765 0.000 0.000
11 0.000 0.000 -5014.580 0.000 0.000
12 44.401 0.000 -4958.445 222.003 33.300
Dia. 8.5 M 1 13 614.478 184.343 -5014.580 2934.133 1382.576
15 0.000 0.000 -654.871 0.000 0.000
16 0.000 0.000 -9664.528 0.000 0.000
17 0.000 0.000 -6331.189 0.000 0.000
18 98.668 0.000 -6262.528 493.339 74.001
19 1170.435 351.130 -6231.318 5588.825 2633.478
20 98.668 0.000 -420.988 493.339 74.001
21 1170.435 351.130 -420.988 5588.825 2633.478
22 0.000 0.000 -10192.530 0.000 0.000
23 0.000 0.000 -6661.189 0.000 0.000
24 98.668 0.000 -6592.528 493.339 74.001
25 1170.435 351.130 -6561.318 5588.825 2633.478

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 12

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
1 0.000 0.000 -1598.741 -0.001 0.000 5000.0 , 5000.0
2 0.000 0.000 -7268.741 -0.001 0.000 5000.0 , 5000.0
3 0.000 0.000 -1661.161 -0.001 0.000 5000.0 , 5000.0
4 0.000 0.000 -5898.056 -0.001 0.000 5000.0 , 5000.0
5 59.201 0.000 -1598.741 296.003 44.401 5000.0 , 5000.0
6 819.305 245.791 -1598.741 3912.177 1843.435 5000.0 , 5000.0
Dia. 8.5 M p
7 44.401 0.000 -5898.056 222.002 33.301 5000.0 , 5000.0
8 614.478 184.343 -5898.056 2934.132 1382.576 5000.0 , 5000.0
10 0.000 0.000 -7598.741 -0.001 0.000 5000.0 , 5000.0
11 0.000 0.000 -6145.556 -0.001 0.000 5000.0 , 5000.0
12 44.401 0.000 -6089.421 222.002 33.301 5000.0 , 5000.0
13 614.478 184.343 -6145.556 2934.132 1382.576 5000.0 , 5000.0

Load Combination of Ultimate Condition


p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Na L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
15 0.000 0.000 -654.871 0.000 0.000 5000.0 , 5000.0
16 0.000 0.000 -9664.528 0.000 0.000 5000.0 , 5000.0
17 0.000 0.000 -6331.189 0.000 0.000 5000.0 , 5000.0
18 98.668 0.000 -6262.528 493.339 74.001 5000.0 , 5000.0
19 1170.435 351.130 -6231.318 5588.825 2633.478 5000.0 , 5000.0
Dia. 8.5 M p S1 20 98.668 0.000 -420.988 493.339 74.001 5000.0 , 5000.0
21 1170.435 351.130 -420.988 5588.825 2633.478 5000.0 , 5000.0
22 0.000 0.000 -10192.530 0.000 0.000 5000.0 , 5000.0
23 0.000 0.000 -6661.189 0.000 0.000 5000.0 , 5000.0
24 98.668 0.000 -6592.528 493.339 74.001 5000.0 , 5000.0
25 1170.435 351.130 -6561.318 5588.825 2633.478 5000.0 , 5000.0

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 13

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Bi-Axial)
4.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz SMy X SMx Y
a. Vertical - Bi Axial : R =
Np S Xi2 S Yi2
- Ru = Rmax
- Uf = Min[ 0 , Rmin ]
- Ru < Va -> OK
(SHxi + SHyi )
2 2

b. Horizontal - Hmax = < Ha -> OK


Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift

4.1.2 Check of Vertical & Uplift Reaction


SXi (m ) SYi (m )
2 2 2 2
Ft.Name Np(EA) Fl (mm) Fw (mm)
Dia. 8.5 M 21 10000 10000 128.63 128.62

Unit( kN )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
1 D300 76.131 76.131 76.131 0 700 210 OK
2 D300 346.131 346.13 346.131 0 700 210 OK
3 D300 79.103 79.103 79.103 0 700 210 OK
4 D300 280.86 280.86 280.86 0 700 210 OK
5 D300 85.911 66.35 85.911 0 700 210 OK
6 D300 218.533 -66.272 218.533 -66.272 700 210 OK
Dia. 8.5 M
7 D300 288.195 273.524 288.195 0 700 210 OK
8 D300 387.661 174.058 387.661 0 700 210 OK
10 D300 361.845 361.845 361.845 0 700 210 OK
11 D300 292.646 292.645 292.646 0 700 210 OK
12 D300 297.308 282.637 297.308 0 700 210 OK
13 D300 399.447 185.844 399.447 0 700 210 OK

4.1.3 Check Of Horizontal Reaction


Ft.Name L.Comb. Pile Hmax (kN) Ha (kN) Result
1 D300 0 62 OK
2 D300 0 62 OK
3 D300 0 62 OK
Dia. 8.5 M 4 D300 0 62 OK
5 D300 2.819 62 OK
6 D300 40.732 62 OK
7 D300 2.114 62 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 14

8 D300 30.549 62 OK
10 D300 0 62 OK
11 D300 0 62 OK
12 D300 2.114 62 OK
13 D300 30.549 62 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 15

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , kN , kN-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw SFz SM SQ
Dia. 8.5 M p 15 10000.00 10000.00 654.871 0.00 654.871
16 10000.00 10000.00 9664.528 0.00 9664.528
17 10000.00 10000.00 6331.189 0.00 6331.189
18 10000.00 10000.00 6262.528 74.00 6262.528
19 10000.00 10000.00 6231.318 2633.48 6231.318
S1 X 20 10000.00 10000.00 420.988 74.00 420.988
21 10000.00 10000.00 420.988 2633.48 420.988
22 10000.00 10000.00 10192.530 0.00 10192.530
23 10000.00 10000.00 6661.189 0.00 6661.189
24 10000.00 10000.00 6592.528 74.00 6592.528
25 10000.00 10000.00 6561.318 2633.48 6561.318
15 10000.00 10000.00 654.871 0.000 654.871
16 10000.00 10000.00 9664.528 0.000 9664.528
17 10000.00 10000.00 6331.189 0.000 6331.189
18 10000.00 10000.00 6262.528 493.339 6262.528
19 10000.00 10000.00 6231.318 5588.825 6231.318
S1 Y 20 10000.00 10000.00 420.988 493.339 420.988
21 10000.00 10000.00 420.988 5588.825 420.988
22 10000.00 10000.00 10192.530 0.000 10192.530
23 10000.00 10000.00 6661.189 0.000 6661.189
24 10000.00 10000.00 6592.528 493.339 6592.528
25 10000.00 10000.00 6561.318 5588.825 6561.318

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 16

5.1.2 Design Parameters


Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing

2
Unit(N/mm ,mm)
f(Flexure) f(Shear) f'c fy1 fy2 f_cl f_clt fp_clb
0.9 0.85 25.00 400.00 400.00 50.0 50.0 150.0

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 17

5.2 RING WALL DESIGN


5.2.1 Ring Wall Formula
Definitions,
W : Weight of tank shell plus the tributary weight
of a cone roof per feet of circumference (kN/m)
N : Thickness of tank shell plate
BPT : Bottom Plate Thickness
D : Tank diameter
f : Angle of internal friction of soil
H : Height of tank (Height of liquid)
h : Height of ring wall
h1,h2 : Filling material height of ring wall
gs1,gs2 : Unit weight of soil under tank (kN/m3)
gs1 h1 + gs2 h2
gs =
h1 + h2
3
q = Unit weight of tank fluid (kN/m )
gc = Unit weight of concrete (kN/m3)
F = Radial outward force on ringwall
T = Axial tension in ring
Ko = Rest Earth Pressure Coefficient

Minimum required thickness of ringwall


The center-to-center diameter of ring wall is equal to the nominal tank diameter.
The tank diameter is 4572mm or more
If above assumptions are not applicable, an alternate foundation type shall be used.
EmptyLoad - Bottom Plate Weight
W= (kN/m)
p tank diameter
3
Bottom Plate Weight = 76.98(kN/m ) Bottom Plate Thickness Bottom Plate Area
2 W
t.cal =
q H - 2 h (gc - gs)
t.min = Minimum wall thickness = 12 in
t.used = User input wall thickness (mm)

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
T of Project No. : PONDASI TANGKI SILIWA..
q
a Foundation Client : PT. UNILEVER S... Page 18
n

h1
H Horizontal reinforcement of ringwall
gkPu
s1 2

Pu1 = ko ( h1 + h2 ) q H Pu2 = 1/2 ko gs1 h1


2 Pu1 F

h2
Pu3 = ko gs1 h1 * h2 Pu4 = 1/2 ko gs2 h2
2
Pu3 Pu4 gs2

F = Pu1 + Pu2 + Pu3 + Pu4


T = 1/2 F D , the F(horizontal force) causes a hoop tension in the ring wall
T
Req'd As = Load Factor , f = 0.9
f fy
t
Req'd As must not be less than that required for temperature
& shrinkage reinforcement.
fac : Shrinkage And Temperature Factor T
Reinforcement is more than 60000 psi and D10 ~ D16...............fac = 0.002

D
else case......................................................................................fac = 0.0025 F
As.Min = factors (By Design Code) ringwall cross section area
Req'd As = Required steel area to resist entire axial tension T

Vertical reinforcement of ringwall


Mu = Load Factor ( Pu1 1/2 ( h1 + h2 ) + Pu2 (1/3 h1 + h2 ) + Pu3 1/2 h2 + Pu4 1/3 h2 )
200 3 fck
Selected As = Max ( fac b h , r.req b d , Min ( 1.333 r.req b d , Max ( bd, bd)))
fy fy
fac : Shrinkage And Temperature Factor
Reinforcement is more than 60000 psi and D10 ~ D16...............fac = 0.0012
else case......................................................................................fac = 0.0015
Mu 0.85 f'c 2Rn
Rn =
fbd2
, f = 0.9 , r.req =
fy ( 1- 1-
0.85f'c )
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
If Selected As < Using As < Asmax , then OK!!
When Fdn type is block, Selected As = fac b h

5.2.2 Check of Minimum required Thickness & Reinforcement of ringwall


Footing Name : Dia. 8.5 M GroupType : Tank_1
Input Data
2 2 3
Dia (mm ) h (mm ) Hor. Bar Ver. Bar Hor. fy (N/mm ) Ver. fy (N/mm ) rc (kN/m ) Ko Load F.
10000.00 600.00 D13 @ 150 mm D19 @ 100 mm 400.00 400.00 24.00 0.500 0

Input Equipment Data


gs1 (kN/m ) gs2 (kN/m )
3 3 3
Dia (mm ) H (mm ) N (mm ) BPT (mm ) h1 (m ) h2 (m ) q (kN/m )
8600 4000.00 10.00 1.00 0.100 0.200 1.10 1.20 1.00

Result of Thickness
W (kN/m ) t.Cal (mm ) t.Min (mm ) t.Used (mm ) Result
3.08 -2160.94 304.80 500.00 OK

Result of Hooptension
2 2 2
F (kN/m ) T (kN ) Tu (kN ) As.req (mm ) As.Min (mm ) As.Used (mm ) Result
0.626 2.691 0.000 0.000 187.500 506.707 OK

Result of Vertical Reinforcement


2 2 2
b(mm) d(mm) F(kN) Mu(kN-m) As.Used (mm ) As.Selected (mm ) As.Max (mm ) Result
1.00 1.45 0.33 0.00 873.32 114.30 2727.99 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 19

5.3 REQUIRED REINFORCEMENT


5.3.1 Reinforcement Formula
- Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2
As = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used.................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5 As4 ---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 = bd
fy
3 fck
As5 = bd
fy
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.9 , r.req =
fy
1- 1- (
0.85fck )
5.3.2 Check of Footing Reinforcement
Footing Name : Dia. 8.5 M GroupType : Tank_1
- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm)
2
As (mm )
15 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
15 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
16 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
16 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
S1 17 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
17 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
18 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
18 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
19 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 20

19 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070


20 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
20 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
21 top 2.03 - D16 @ 150 0.968 0.305 542.050 403.070
21 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
22 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
22 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
23 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
23 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
24 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
24 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070
25 top 2.03 - D16 @ 150 5.000 0.305 542.050 403.070
25 botom 2.03 - D16 @ 150 9.032 0.305 442.050 403.070

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


15 top - - -
15 bottom 1.146 0.021 0.0001
16 top - - -
16 bottom 16.916 0.316 0.0008
17 top - - -
17 bottom 11.082 0.207 0.0005
18 top - - -
18 bottom 11.052 0.206 0.0005
19 top - - -
19 bottom 14.105 0.263 0.0007
20 top - - -
S1
20 bottom 0.827 0.015 0.0000
21 top 2.462 0.031 0.0001
21 bottom 3.935 0.073 0.0002
22 top - - -
22 bottom 17.841 0.333 0.0008
23 top - - -
23 bottom 11.660 0.218 0.0005
24 top - - -
24 bottom 11.629 0.217 0.0005
25 top - - -
25 bottom 14.683 0.274 0.0007

Sec.Nam L.Comb.
2
As1(mm ) As2(mm )
2
As3(mm )
2
As4(mm )
2
As5(mm )
2
Asmax(mm )
2

15 top 164.592 - - 569.565 514.452 3357.258


S1 15 bottom 164.592 7.205 9.604 464.489 419.544 2737.895
16 top 164.592 - - 569.565 514.452 3357.258

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 21

16 bottom 164.592 107.099 142.763 464.489 419.544 2737.895


17 top 164.592 - - 569.565 514.452 3357.258
17 bottom 164.592 69.980 93.283 464.489 419.544 2737.895
18 top 164.592 - - 569.565 514.452 3357.258
18 bottom 164.592 69.789 93.029 464.489 419.544 2737.895
19 top 164.592 - - 569.565 514.452 3357.258
19 bottom 164.592 89.189 118.889 464.489 419.544 2737.895
20 top 164.592 - - 569.565 514.452 3357.258
20 bottom 164.592 5.199 6.930 464.489 419.544 2737.895
21 top 164.592 12.626 16.830 569.565 514.452 3357.258
21 bottom 164.592 24.770 33.018 464.489 419.544 2737.895
22 top 164.592 - - 569.565 514.452 3357.258
22 bottom 164.592 113.002 150.632 464.489 419.544 2737.895
23 top 164.592 - - 569.565 514.452 3357.258
23 bottom 164.592 73.649 98.174 464.489 419.544 2737.895
24 top 164.592 - - 569.565 514.452 3357.258
24 bottom 164.592 73.452 97.911 464.489 419.544 2737.895
25 top 164.592 - - 569.565 514.452 3357.258
25 bottom 164.592 92.868 123.793 464.489 419.544 2737.895

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
15 top 403.070 164.592 OK
15 bottom 403.070 164.592 OK
16 top 403.070 164.592 OK
16 bottom 403.070 164.592 OK
17 top 403.070 164.592 OK
17 bottom 403.070 164.592 OK
18 top 403.070 164.592 OK
18 bottom 403.070 164.592 OK
19 top 403.070 164.592 OK
19 bottom 403.070 164.592 OK
S1 20 top 403.070 164.592 OK
20 bottom 403.070 164.592 OK
21 top 403.070 164.592 OK
21 bottom 403.070 164.592 OK
22 top 403.070 164.592 OK
22 bottom 403.070 164.592 OK
23 top 403.070 164.592 OK
23 bottom 403.070 164.592 OK
24 top 403.070 164.592 OK
24 bottom 403.070 164.592 OK
25 top 403.070 164.592 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 22

25 bottom 403.070 164.592 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

15 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070


15 botom 2.03 - D16 @ 150 9.032 0.305 426.150 403.070
16 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
16 botom 2.03 - D16 @ 150 9.032 0.305 426.150 403.070
17 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
17 botom 2.03 - D16 @ 150 9.032 0.305 426.150 403.070
18 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
18 botom 2.03 - D16 @ 150 0.968 0.305 426.150 403.070
19 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
19 botom 2.03 - D16 @ 150 0.968 0.305 426.150 403.070
20 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
S1
20 botom 2.03 - D16 @ 150 0.968 0.305 426.150 403.070
21 top 2.03 - D16 @ 150 9.032 0.305 526.150 403.070
21 botom 2.03 - D16 @ 150 0.968 0.305 426.150 403.070
22 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
22 botom 2.03 - D16 @ 150 9.032 0.305 426.150 403.070
23 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
23 botom 2.03 - D16 @ 150 9.032 0.305 426.150 403.070
24 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
24 botom 2.03 - D16 @ 150 0.968 0.305 426.150 403.070
25 top 2.03 - D16 @ 150 5.000 0.305 526.150 403.070
25 botom 2.03 - D16 @ 150 0.968 0.305 426.150 403.070

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


15 top - - -
15 bottom 1.146 0.023 0.0001
16 top - - -
16 bottom 16.916 0.340 0.0009
17 top - - -
17 bottom 11.082 0.222 0.0006
18 top - - -
S1
18 bottom 11.561 0.232 0.0006
19 top - - -
19 bottom 17.695 0.355 0.0009
20 top - - -
20 bottom 1.336 0.027 0.0001
21 top 6.051 0.080 0.0002
21 bottom 7.525 0.151 0.0004

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 23

22 top - - -
22 bottom 17.841 0.358 0.0009
23 top - - -
23 bottom 11.660 0.234 0.0006
24 top - - -
24 bottom 12.138 0.244 0.0006
25 top - - -
25 bottom 18.273 0.367 0.0009

Sec.Nam L.Comb.
2
As1(mm ) As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

15 top 164.592 - - 552.858 499.362 3258.779


15 bottom 164.592 7.474 9.963 447.782 404.453 2639.416
16 top 164.592 - - 552.858 499.362 3258.779
16 bottom 164.592 111.159 148.175 447.782 404.453 2639.416
17 top 164.592 - - 552.858 499.362 3258.779
17 bottom 164.592 72.618 96.800 447.782 404.453 2639.416
18 top 164.592 - - 552.858 499.362 3258.779
18 bottom 164.592 75.774 101.007 447.782 404.453 2639.416
19 top 164.592 - - 552.858 499.362 3258.779
19 bottom 164.592 116.322 155.057 447.782 404.453 2639.416
20 top 164.592 - - 552.858 499.362 3258.779
S1
20 bottom 164.592 8.714 11.616 447.782 404.453 2639.416
21 top 164.592 32.006 42.664 552.858 499.362 3258.779
21 bottom 164.592 49.226 65.618 447.782 404.453 2639.416
22 top 164.592 - - 552.858 499.362 3258.779
22 bottom 164.592 117.290 156.348 447.782 404.453 2639.416
23 top 164.592 - - 552.858 499.362 3258.779
23 bottom 164.592 76.427 101.877 447.782 404.453 2639.416
24 top 164.592 - - 552.858 499.362 3258.779
24 bottom 164.592 79.578 106.078 447.782 404.453 2639.416
25 top 164.592 - - 552.858 499.362 3258.779
25 bottom 164.592 120.155 160.167 447.782 404.453 2639.416

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
15 top 403.070 164.592 OK
15 bottom 403.070 164.592 OK
16 top 403.070 164.592 OK
16 bottom 403.070 164.592 OK
S1
17 top 403.070 164.592 OK
17 bottom 403.070 164.592 OK
18 top 403.070 164.592 OK
18 bottom 403.070 164.592 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 24

19 top 403.070 164.592 OK


19 bottom 403.070 164.592 OK
20 top 403.070 164.592 OK
20 bottom 403.070 164.592 OK
21 top 403.070 164.592 OK
21 bottom 403.070 164.592 OK
22 top 403.070 164.592 OK
22 bottom 403.070 164.592 OK
23 top 403.070 164.592 OK
23 bottom 403.070 164.592 OK
24 top 403.070 164.592 OK
24 bottom 403.070 164.592 OK
25 top 403.070 164.592 OK
25 bottom 403.070 164.592 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 25

5.4 ONE WAY SHEAR FORCE


5.4.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.85 2 fck B'w d (eq 11-3)
- Vu <= f Vc , then OK!!

5.4.2 Check of One-Way Shear


Footing Name : Dia. 8.5 M GroupType : Tank_1 PileType : True

Unit : mm
10000
750

9250

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
15 9250 442 304.8 95.097 1.801 OK
16 9250 442 304.8 95.097 26.576 OK
17 9250 442 304.8 95.097 17.41 OK
18 9250 442 304.8 95.097 17.362 OK
19 9250 442 304.8 95.097 22.16 OK
S1 20 9250 442 304.8 95.097 1.299 OK
21 9250 442 304.8 95.097 6.183 OK
22 9250 442 304.8 95.097 28.028 OK
23 9250 442 304.8 95.097 18.318 OK
24 9250 442 304.8 95.097 18.27 OK
25 9250 442 304.8 95.097 23.068 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
15 9250 426.1 304.8 91.676 1.801 OK
16 9250 426.1 304.8 91.676 26.576 OK
S1
17 9250 426.1 304.8 91.676 17.41 OK
18 750 426.1 304.8 91.676 18.162 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 26

19 750 426.1 304.8 91.676 27.799 OK


20 750 426.1 304.8 91.676 2.099 OK
21 750 426.1 304.8 91.676 11.822 OK
22 9250 426.1 304.8 91.676 28.028 OK
23 9250 426.1 304.8 91.676 18.318 OK
24 750 426.1 304.8 91.676 19.07 OK
25 750 426.1 304.8 91.676 28.707 OK

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 27

5.5 TWO WAY SHEAR FORCE


5.5.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.85 2 (1 + 2/b c) fck bo d (eq 11-33) <- Vc1
(b) f Vc2 = 0.85 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.85 4 fck bo d (eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.5.2 Check of Two-WayShear

7.140 107 mm
2
Ft.Name Dia. 8.5 M Punching Area

10000 Pr.Name 1 Pile effect 0 / 21

Shape CircleWall f Vc1 28047.130 kN

L.Comb. 25 f Vc2 12107.410 kN

Pl 9100 mm f Vc3 18698.090 kN

Pw 9100 mm f Vc 12107.410 kN
1
bo / d 29965.21 / 442.05 mm Vu 0.000 kN

bc / as 1 / 40 Result OK

5.6 PILE PUNCHING SHEAR FORCE


5.6.1 Pile Punching Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.85 2 (1 + 2/bc) fck bo d (eq 11-33) <- Vc1
(b) f Vc2 = 0.85 2 (1 + as d / 2 b o) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.85 4 fck bo d (eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
b o = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved


3/1/2017

Project Na. : PONDASI TANGKI


SILIWANG.. Calculation Sheet
of Project No. : PONDASI TANGKI SILIWA..

Foundation Client : PT. UNILEVER S... Page 28

5.6.2 Check of Pile Punching Shear


2
Ft.Name Dia. 8.5 M Punching Area 550638.200 mm

10000 Pile No. 8 bc / as 1 / 40

Shape Square f Vc1 2778.205 kN


1
2 12

3 13 11 L.Comb. 25 f Vc2 3684.430 kN


14 20

4 15 21 19 10 PileName D300 f Vc3 1852.137 kN


16 18
5 17 9 Diameter 300mm f Vc 1852.137 kN
6 8
7
bo 2968.2mm Vu 580.503 kN

d 442.05mm Result OK