DESCRIPTION
ELEMENT NR. 1
SUBSTRUCTURE
Clear site to remove grasses, bush, shrubs and grubbing up their root including disposal
Excavate over site average 150mm deep to remove vegetable top soil
Excavate trench for foundation commencing from stripped level maximum depth not exceeding 1.00mm
Bed of approved Laterite filling well rammed and consolidated in layers to make up level (average depth of 600mm)
200mm Bed of approved hardcore filling with and including 40mm sand blinding spread and levelled and consolidated
CONCRETE WORK
Reinforced In-Situ Concrete (1:2:4-20mm aggregate) filled into formwork and packed around reinforcement (both
measured separately ) in:
Column bases
Columns over 0.05 but not exceeding 0.10 square metre sectional area
150mm slab
Steps
COLLECTION
BAR REINFORCEMENT
High yield reinforcement to B.S. 4449 described including bends, hooks, tying wire, distance blocks or ordinary spacers.
FABRIC REINFORCEMENT
BRC mesh fabric reinforcement to B.S 1221 with 150mm end and sides laps laid on concrete slab well lapped at joint
and intersection. (measured net with no allowance made for laps
FORMWORK
BLOCKWORK
Hollow Sandcrete blockwork in cement mortar (1:6) filled solid with lean concrete 91:4:8) mix in:
150mm Wall
One layer 500mm guage polythene damp proof membrane laid on hardcore
Allow a provisional sum of 5,000.00 for additional work in substructure to be expended as directed by project engineer
To collection
COLLECTION
apprved corrugated 'zinc roofing sheets laid to slope with double corrugation side lap and fixed to hardwood purling at
700mm centres with and including galvanised drive screws and felt washers in accordance with manufacturer's printed
instructions (measured net: no allowance made for laps)
Timber carcasses
75 x 50mm purling
50 x 50mm Noggings
300 x 25mm fascia board
ELEMENT NR. 6
WALLS
Lintel
150mm Wall
WALLS - Carried to Summary
ELEMENT NR. 7
DOORS AND WINDOWS
DOOR
METAL DOOR
Supply and fix purpose made Metal Door (Imported) complete with frame and architraves and all necessary ironmongery
fixed to Blockwork and concrete work.
Size 750 x 2100mm
WINDOW
Aluminium Windows
Supply and fix the following Standard powder coated 'Tower Aluminium' window complete with frame, 5mm sand
blasted glass and locking handle fixed to concrete and block works
Burglar Proofing
Fabricate and fix mild steel burglary proof to window executed complete to Architect's later detail
PROTECTION
Allow PC Sum of N..... For electrical installation to be executed directed by Electrical Engineer with
design
BUILDERS WORKS
Allow for all necessary cutting, chases, mortice and forming holes through structure of building and grouting up and
making good in cement mortar in connection with Electrical installation
MECHANICAL INSTALLATION
BUILDERS WORKS
Allow for all necessary cutting, chases, mortice and forming holes through structure of building and grouting up and
making good in cement mortar in connection with Mechanical Installation
CEILING FINISHES
INTERNAL WORKS
WALL FINISHES
12mm cement and sand (1:4) rendering on wall (INTERNAL and EXTERNAL)
6mm thick white glazed ceramic wall tiles fixed to screeded backing (measured net with approved adhesive) on
Wall
FLOOR FINISHES
TILE WORK
8mm vitrified floor tiles laid on screeded bed (measured net) including grouting joints in white cement mortar on:
ditto skirting
Prepare and apply POP screeding and coat of TEXTURE FINISHEDof approved paint
Rendered soffit
SUBSTRUCTURE
WALL
ELECTRICAL INSTALLATION
MECHANICAL INSTALLATION
MAIN BUILDING
TO GENERAL SUMMARY
QTY UNIT RATE AMOUNT
m2 75 -
23 m2 80 1,840.00
7 m3 650 4,550.00
1 m3 650 650.00
6 m3 200 1,160.00
1 m3 300 300.00
16 m2 60 960.00
10 m3 1,700 17,000.00
- m2 900 -
16 m2 50 800.00
3 m2 900 2,700.00
2 m3 23,500 37,600.00
0 m3 24,000 10,800.00
0 m3 24,000 4,800.00
2 m3 24,000 48,000.00
- m3 24,000 -
131,160.00
2 kg 235 470.00
2 kg 235 470.00
- kg 235 -
- m2 650 -
3 m2 1,300 3,900.00
23 m 195 4,485.00
- m 195 -
27 m2 2,400 64,800.00
23 m2 150 3,450.00
sum 5,000.00
item
82,575.00
131,160.00
82,575.00
213,735.00
1 m2 50,000 25,000.00
31 m 380 11,780.00
- m 380 -
- m 380 -
17 m 380 6,460.00
62 m 250 15,500.00
- m 380 -
m 120 -
- m 430 -
item
58,740.00
1 m3 24,000 16,800.00
4 kg 235 940.00
9 m2 1,300 11,700.00
78 m2 2,400 187,200.00
216,640.00
6 Nr 15,000 90,000.00
6 No 7,125 42,750.00
6 m2 2,000 12,000.00
144,750.00
sum 30,000.00
Sum
sum
item
30,000.00
sum 90,000.00
Sum
sum
item
86,690.00
86 M2 600 51,600.00
1 M2 600 600.00
1 M2 600 720.00
44 M2 2,200 96,800.00
8 m2 600 4,800.00
23 M2 2,400 55,200.00
23 m2 500 11,500.00
9 m 75 675.00
item
221,895.00
1 M2 500 500.00
86 M2 300 25,800.00
1 M 150 150.00
1 M2 500 500.00
1 M 500 600.00
item
27,550.00
213,735.00
58,740.00
216,640.00
144,750.00
30,000.00
86,690.00
221,895.00
27,550.00
1,000,000.00