1 Structure:
Powder Coated 3x3 8.5 height 2mm with
Nut-Bolt Joint structure. Pillar& Beam by S.14 Sqft. -
swg Pipe
2 Wall Paneling :
FRZS + Cement Board +Channel Holding
Sqft. -
Groove
3 Roofing, Gutter:
CCZS 26 swg Bundle -
4 Window:
Aluminum alloy frame with UPVC Sliding
Sqft. -
& Glass:
5 Ceiling:
Gypsum Board 4mm thikcness with T-channel
Sqft. -
hook
6 Flooring :
PCC Cement Plaster Sqft. -
7 Door:
Aluminum alloy frame With UPVC
Sqft. -
Sliding/Hinge
8 Ground Foundation Base
Cement+ Concrete +Sand 1:2:4 (24x12x12
ground excavation, digging and 6x6x2 post Lot -
foundation
9 Coloring
Weather Coat Sqft. -
10 Electrification
Complete with Conduiting ,Wiring, Installation
Lot -
of Switching and Power Socket & Termination
11 Sanitation
Standard 7 toilets with bathroom 2 Lot 1 -
12 Installation Lot 1 -
13 Supervision Lot 1
14 Design and Layout Lot 1
Vaires if
15 Transportation & Logistics Lot 1
outside valley
Total
In Words: Eihteen lakh sixty thousand . 18,00,000
Amount
Thanking you