HYDROSTATIC TEST PROCEDURE

TUNISIA
- SFAX: Road Mahdia Km 1, N84 Street Mohamed Ikbal, P.O. Box: 89A 3099 Sfax Tunisia, Tel: +216
74232032 / Fax: +216 74234717.
- TUNIS: 13 Street Michael Noaima 2080 Arian Tunisia, Tel: +216 71 820205, Fax: 71 820128.
- GABES: Street Environment Chenini Nahal 6041,Tel / Fax: +216 75229440.
LIBYA: BECA Libya For Inspection, Testing And Analysis, Street 16 off 11 June Road Nearby Ben Zahra
Mosque Souk Al Joumaa Tripoli Libya,Tel / Fax: +218 (0) 213501973.
ABU DHABI: BECA Abu Dhabi, Branch UAE, P.O. Box: 129865 Abu Dhabi UAE, Tel: +971(0) 25102400,
Fax: +971 (0) 25589961. TECHNICAL DEPARTEMENT
GABON: BECA Securale De Gabon, Boulevard Lon MBA Quartier Littoral face central SEEG B.P. N1701 BECA COMPANY
Port Gentil Gabon, Tel / Fax: +241 01569527.
CONGO : Luanda Pointe Noire Congo
Tel : +242069069213 Email:beca.congo@becacompany.com
HYDROSTATIC TEST PROCEDURE PCI-PR-28-02

This document is the property of BECA; no part of it shall be reproduced or transmitted without prior written BECAs authorization.
PCI-PR-28-01 Page 2 of 5 Revision 1
HYDROSTATIC TEST PROCEDURE PCI-PR-28-02

TABLE OF CONTENTS

1. SCOPE .....4
2. PURPOSE ....4
3. REFERENCE CODES & STANDARDS ......4
4. CHECK LIST .....4
5. TEST MEDIA ....4
6. PROCEDURE ...4
7. CLEANING ...5
8. RECORDS ....5
9. SAFETY ....5

Appendix:
APPENDIX-1: Painting DFT inspection Flowchart

This document is the property of BECA; no part of it shall be reproduced or transmitted without prior written BECAs authorization.
PCI-PR-28-01 Page 3 of 5 Revision 1
HYDROSTATIC TEST PROCEDURE PCI-PR-28-02

1. SCOPE

This test procedure shall be carried out to detect the leak in shell weld joints and to observe the
load stabilization of liquid in interval level height.

2. PURPOSE

The purpose of this procedure is providing the guideline and sequential steps for the hydro test /
water fill up test for the tank.

3. REFERENCES CODES & STANDARDS

API 650
OISD 129
PO Tech Specification

4. CHECK LIST

After completion of the erection, welding and NDT the following points shall be checked before
testing.
All the mechanical activities completion in respect of the drawing and HPCL Specification
and code requirements.
Radiography completion including repairs.
The entire NDT test like chalk-diesel test, LPT, RF .Pad pneumatic test, vacuum box test
completion.
Finally mechanical clearance from the Engineer-In-Charge shall be taken before
Hydrotest in approved format

5. TEST MEDIA

Test media shall be in iron free water, which is clean and free of silt i.e.; Portable water

6. PROCEDURE

Proper arrangement shall be carried out for the water filling (pipe connection from the water
resource point and providing valves and NRV wherever required.
markers shall be provided on the shell, 500 mm from the bottom to check tank settlement. Size
shall be 50 X 50 X 6mm angle and 100 mm long. The nos. of setting marker shall be minimum 8 Nos
or as per the approved Drg.
Code : API 650 (7.3.6) Eleven Edition
Settling markers shall be provided at every 300 outside the tank at a height of 500 mm from the top
of annular plate.

This document is the property of BECA; no part of it shall be reproduced or transmitted without prior written BECAs authorization.
PCI-PR-28-01 Page 4 of 5 Revision 1
HYDROSTATIC TEST PROCEDURE PCI-PR-28-02

Setting marker shall be welded and initial level reading shall be taken with respect to the
permanent benchmark using dumpy level / Total station
Shell settlement measurements shall be made after tank erection, prior to hydrotesting
and during water filling at 1000 mm intervals up to maximum filling height of tank.
The levels taken before water filling called as initial level of the tank and shall be record in an
approved format.
The water filling height shall be restricted to the max. Liquid Level or up to the curb angle.
The water filling shall be carried out in four stages (25%, 50%, 75% & 100% of the max liquid
level of the tank)
Any leaks observed in the shell joint during the hydro test shall be noted and repaired with
the water level min. of 300mm below the leak spot.
The repaired shall be carried out as per the procedure and tank test shall be recommenced.
After each stage of filling, a load stabilization period shall be observed as minimum 24
hours max between each stage of filling.
During the stabilization period the settlement reading shall be observed and recorded
jointly with HPCL Engineer-In-Charge through dumpy level only.
Filling rate shall be not exceed 5 meters per day.
After completion of the water filling the water load shall be maintained for 24 hours. After
24 hours the final settlement reading shall be recorded jointly with engineer-In-Charge.
Tank shall be emptied at a maximum water level variation rate of 5 meters per day. Care
shall be taken that top manholes are open during empty operation of conical roof tanks.
If salt water is used then corrosion inhibitor should be sprayed (mixed) prior to filling / after
hydro test the tank should be thoroughly cleaned with sweat water.

7. CLEANING

After draining the water the tank shall be thoroughly cleaned, free from dirt and foreign materials
and shall be dried by air.

8. RECORDS

Records shall be prepared and submitted to Engineer in-charge for approval.

9. SAFETY

All Safety precaution shall be taken during water fill up test.

Note : Permanent B M shall be min. 50Mtr away from Tank shell

This document is the property of BECA; no part of it shall be reproduced or transmitted without prior written BECAs authorization.
PCI-PR-28-01 Page 5 of 5 Revision 1