CEBU 2ND DISTRICT CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD
DESIGNED
11
WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)
ENGINEERING OFFICE ALONG SIBONGA-DUMANJUG ROAD HELEN GRACE B. YAP NICOMEDES S. LEONOR, JR. NONATO M. PAYLADO JUBY B. CORDON, CEO ADOR G. CANLAS, CESO IV 19
LAWAAN TALISAY CITY, CEBU CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICER-IN-CHARGE
LEONARD B. ABAO OFFICE OF THE REGIONAL DIRECTOR
ENGINEER II
0.50m
0.05
0.30m
0.30m
0.10
10 PCS @ 0.05m
5@ 0.05 PITCH0.05
DOWELS THE REST @ 0.10m
0.40
0.20
LOP REQUIRED PILE JOINT STRENGTH
DIAMETER AND LENGTH OF REINF.
STEEL DOWELS TO BE AS RECOM-
0.10
RING BAR
0.30m
(SEE NOTE 5b)
RECEIVING HOLES
SHALL BE 20mm 6 CONCRETE SHEET PILE SECTION
LARGER THAN DOWELS
S12 8 NTS
0.03
DRIVEN
PILE
ELEVATION SECTION SIZE (mm) LENGTH (m) BAR SIZE SPAN (m)
SHEET PILE
400 X 500 8 25 67
2 DRIVE PILE SPLICE DETAIL
5.00 m
3
S12 2 S12 8 NOT TO SCALE
BALANCE @100 PITCH
0.003
NOTES
SECTION
0.05 CLR (FRESH WATER TYPE)
1. CONCRETE :
0.30m
0.075CLR (SALT WATER TYPE)
2. REINFORCENMENT :
1.00
5. PILE SPLICE :
WELDED SPIRAL- A. PILES MAY BE SPLICED ONLY IF STRICTLY NECESSARY AND APPROVED BY THE ENGINEER.
1 DRIVE PILE ELEVATION 5 TIE SPLICE DETAIL PILE SPLICES SHALL BE LOCATED AT LEAST 10m BELOW THE EXISTING GROUND LEVEL.
B. PILE SPLICE SHALL DEVELOP 100% AXIAL, AND 50% BENDING OF THE CAPACITY OF
S12 2 NOT TO SCALE NOT TO SCALE THE PILE SECTION WHERE THE SPLICE IS LOCATED.
S12 8
3.00m
(mm)
QTY. BAR SIZE
WHERE:
1-POINT PICK-UP Pall = ALLOWABLE PILE BEARING CAPACITY ( kN)
B 300 x 300 8 28 22 eh = HAMMER EFFICIENCY
ANCHOR BARS
Eh = HAMMER ENERGY RATING (kN-m)
Wr = WEIGHT OF RAM (kN)
5@ 0.05 PITCH
9. TEST PILES
TEST PILES SHALL BE DRIVEN WITH THE SAME HAMMER USED FOR DRIVING REGULAR
0.15
PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.
3. DIMENSIONS ENGINEERING / GEODETIC SURVEYS UNDERTAKEN BY THE DPWH - REGIONAL OFFICE NO. VII IN COORDINATION
WITH THE DPWH CEBU 2ND DISTRICT ENGINEERING OFFICE.
ELEVATIONS AND FINISHED GRADES AS DESCRIBED IN THE ROAD PROFILES ARE RECKONED ALONG
THE CENTERLINE. 12. MISCELLANEOUS STRUCTURE
PROVISIONS OF BATAS PAMBANSA BILANG 344 (ACCESSIBILITY LAW AND ITS IMPLEMENTING RULES AND
6. HORIZONTAL TRANSITIONS REGULATIONS) MUST BE OBSERVED WHENEVER NECESSARY.
THE NECESSARY DRAWINGS CONTAINED IN THE DPWH STANDARD DRAWINGS FOR ROADS AND BRIDGES SHALL
7. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND / OR PROVIDED
AND APPROVED.
RESPECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE REMOVAL OF THEIR HOUSES,
FENCES, ELECTRICAL POLES AND OTHER UTILITIES.
PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC.
THAT MAY OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR
OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE
ANY PORTION OF THE EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF SHALL BE
ON THE ACCOUNT OF THE CONTRACTOR.
RELOCATION OF ANY GROUND UTILITY STRUCTURES SHALL BE SUCH THAT IT WILL NOT CAUSE OBSTRUCTION
NOR CONFLICT TO VEHICULAR AND PEDESTRIAN TRAFFIC MOVEMENT.
PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.
3. DIMENSIONS ENGINEERING / GEODETIC SURVEYS UNDERTAKEN BY THE DPWH - REGIONAL OFFICE NO. VII IN COORDINATION
WITH THE DPWH CEBU 2ND DISTRICT ENGINEERING OFFICE.
ELEVATIONS AND FINISHED GRADES AS DESCRIBED IN THE ROAD PROFILES ARE RECKONED ALONG
THE CENTERLINE. 12. MISCELLANEOUS STRUCTURE
PROVISIONS OF BATAS PAMBANSA BILANG 344 (ACCESSIBILITY LAW AND ITS IMPLEMENTING RULES AND
6. HORIZONTAL TRANSITIONS REGULATIONS) MUST BE OBSERVED WHENEVER NECESSARY.
THE NECESSARY DRAWINGS CONTAINED IN THE DPWH STANDARD DRAWINGS FOR ROADS AND BRIDGES SHALL
7. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND / OR PROVIDED
AND APPROVED.
RESPECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE REMOVAL OF THEIR HOUSES,
FENCES, ELECTRICAL POLES AND OTHER UTILITIES.
PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC.
THAT MAY OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR
OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE
ANY PORTION OF THE EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF SHALL BE
ON THE ACCOUNT OF THE CONTRACTOR.
RELOCATION OF ANY GROUND UTILITY STRUCTURES SHALL BE SUCH THAT IT WILL NOT CAUSE OBSTRUCTION
NOR CONFLICT TO VEHICULAR AND PEDESTRIAN TRAFFIC MOVEMENT.
PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.