Вы находитесь на странице: 1из 5

PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.

Republic of the Philippines JAMES LAURENCE L. REYES


ENGINEER II

CEBU 2ND DISTRICT CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD
DESIGNED
11
WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)
ENGINEERING OFFICE ALONG SIBONGA-DUMANJUG ROAD HELEN GRACE B. YAP NICOMEDES S. LEONOR, JR. NONATO M. PAYLADO JUBY B. CORDON, CEO ADOR G. CANLAS, CESO IV 19
LAWAAN TALISAY CITY, CEBU CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICER-IN-CHARGE
LEONARD B. ABAO OFFICE OF THE REGIONAL DIRECTOR
ENGINEER II
0.50m

0.50m 0.50m 0.50m

0.05
0.30m
0.30m

0.10
10 PCS @ 0.05m

5@ 0.05 PITCH0.05
DOWELS THE REST @ 0.10m

0.40

0.20
LOP REQUIRED PILE JOINT STRENGTH
DIAMETER AND LENGTH OF REINF.
STEEL DOWELS TO BE AS RECOM-

EPOXY RESIN IN ORDER TO DEVE-


MENDED BY MANUFACTURER OF

0.10
RING BAR

PILE CUT-OFF LENGTH


EPOXY RESIN
BONDING MORTAR
0.08

0.30m
(SEE NOTE 5b)
RECEIVING HOLES
SHALL BE 20mm 6 CONCRETE SHEET PILE SECTION
LARGER THAN DOWELS
S12 8 NTS

0.03
DRIVEN
PILE

LONG'L REINF CONCRETE SHEET PILE SCHEDULE

ELEVATION SECTION SIZE (mm) LENGTH (m) BAR SIZE SPAN (m)
SHEET PILE
400 X 500 8 25 67
2 DRIVE PILE SPLICE DETAIL

5.00 m
3
S12 2 S12 8 NOT TO SCALE
BALANCE @100 PITCH

A. IN DRIVING OF CONCRETE SHEET PILES WITH THE TOTAL LENGTH OF 8.00 m,


0.005
THE PENETRATING DEPTH OF PILES SHOULD BE 6.00 m AND 2.00 m MUST BE EXPOSED.
0.003
0.30m
20x20 CHAMFER
TYPICAL
ESTIMATED PILE LENGTH

0.003

NOTES
SECTION
0.05 CLR (FRESH WATER TYPE)

1. CONCRETE :

0.30m
0.075CLR (SALT WATER TYPE)

CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF CLASS AA CONCRETE.


WITH 27.6 MPa CYLINDER STRENGTH AND 19.0mm MAXIMUM AGGREGATE SIZE.

2. REINFORCENMENT :
1.00

0.12 A. ALL REINFORCING STEEL SHALL BE DEFORMED BARS COMFORMING TO ASSHTO


M31 (ASTM A615) GRADE 40.
WELD LENGTH
B. SPLICES OF ADJACENT LONGITUDINAL STEEL SHALL BE STAGGERRED 100 BAR

C. SPIRAL-TIES SHALL BE WELDED AT SPLICES.


0.05 CLR (FRESH WATER TYPE)
0.075 CLR (SALT WATER TYPE)
A. PILE HEADS SHALL BE PROTECTED FROM DIRECT IMPACT OF THE HAMMER BY
5@ 0.05 PITCH

CUSHION BLOCKS CONSISTING OF SEVERAL BLOCKS OF WOOD OR OF OTHER 0.40m x 0.50m


SECTION APPROVED MATERIALS.
3 B. PILES SHALL BE DRIVEN TO A DEPTH THAT WILL PRODUCE THE REQUIRED ALLOWABLE
NTS 150 BEARING CAPACITY.
S12 8
LAP LENGTH
7 CONCRETE SHEET PILE ELEVATION
0.05

4. PILE FOUNDATION DESIGN:


S12 8 NOT TO SCALE
A. IN PILE-BENT PIERS, PILE LENGTHS SHALL BE DETERMINED BY THE ENGINEER/
CONSULTANT BASED ON THE ALLOWABLE PILE BEARING CAPACITY SPECIFIED BELOW.
ELEVATION B. IN COLUMN-BENT PIERS, THE NUMBER, LOCATION AND LENGTH OF PILES SHALL BE
0.20 x 0.20 DETERMINED BY THE ENGINEER/CONSULTANT BASED ON THE LOADING INFORMATION
GIVEN IN THE PIER DETAILS.

5. PILE SPLICE :
WELDED SPIRAL- A. PILES MAY BE SPLICED ONLY IF STRICTLY NECESSARY AND APPROVED BY THE ENGINEER.
1 DRIVE PILE ELEVATION 5 TIE SPLICE DETAIL PILE SPLICES SHALL BE LOCATED AT LEAST 10m BELOW THE EXISTING GROUND LEVEL.
B. PILE SPLICE SHALL DEVELOP 100% AXIAL, AND 50% BENDING OF THE CAPACITY OF
S12 2 NOT TO SCALE NOT TO SCALE THE PILE SECTION WHERE THE SPLICE IS LOCATED.
S12 8

6. ALLOWABLE PILE BEARING CAPACITY : 500 kN PER PILE


7. MINIMUM HAMMER ENERGY RATING = 55 kN-m
0.30L 0.70L
8. BASIS FOR COMPUTING ALLOWABLE PILE BEARING CAPACITY:
DRIVE PILE SCHEDULE FULL WELD
167 eh Eh Wr + 0.16 Wp
Pall= S + 2.54 Wr + Wp
LONGITUDINAL REINF
SIZE LENGTH
L TYPE (m)

3.00m
(mm)
QTY. BAR SIZE
WHERE:
1-POINT PICK-UP Pall = ALLOWABLE PILE BEARING CAPACITY ( kN)
B 300 x 300 8 28 22 eh = HAMMER EFFICIENCY
ANCHOR BARS
Eh = HAMMER ENERGY RATING (kN-m)
Wr = WEIGHT OF RAM (kN)
5@ 0.05 PITCH

B 300 x 300 2 28 15 Wp = WEIGHT OF PILE AND OTHER DRIVEN WEIGHTS (kN)


0.21L 0.58L 0.21L S = AVERAGE PENETRATION PER BLOW FOR THE LAST
FULL WELD 150mm OF DRIVING (mm)
0.05

9. TEST PILES
TEST PILES SHALL BE DRIVEN WITH THE SAME HAMMER USED FOR DRIVING REGULAR
0.15

L PILES AND MAY BE PART OF FOUNDATION IF APPROVED BY THE ENGINEER.

BENT PL 10. PICK-UP POINTS :


100X100X12X300 LONG 2-POINT PICK-UP
PICK-UP POINTS SHALL BE MARKED ON ALL PILES AND ALL LIFTING SHALL BE
8 CONCRETE SHEET PILE TIP FOR HARD DRIVING
DONE AT THESE POINTS. S12 8 NOT TO SCALE
THE USE OF SPECIAL EMBEDDED OR ATTACHED LIFTING DEVICES SHALL BE
4 DRIVE PILE TIP FOR HARD DRIVING SUBJECT TO THE APPROVAL OF THE ENGINEER.

S12 8 NOT TO SCALE

PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.

Republic of the Philippines JAMES LAURENCE L. REYES


ENGINEER II
CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD TYPICAL PRECAST CONCRETE 12
CEBU 2ND DISTRICT WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)
DRIVE PILE AND SHEET PILE DETAILS DESIGNED
ENGINEERING OFFICE ALONG SIBONGA-DUMANJUG ROAD HELEN GRACE B. YAP NICOMEDES S. LEONOR, JR. NONATO M. PAYLADO JUBY B. CORDON, CEO ADOR G. CANLAS, CESO IV 19
LAWAAN, TALISAY CITY, CEBU CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICER-IN-CHARGE
LEONARD B. ABAO OFFICE OF THE REGIONAL DIRECTOR
ENGINEER II
GENERAL NOTES
( HIGHWAY COMPONENT )
1. CONSTRUCTION SPECIFICATIONS
8. ROAD CONNECTIONS AND PRIVATE ENTRANCES
ALL WORKS SHALL COMPLY WITH THE DPWH STANDARDS SPECIFICATIONS FOR HIGHWAYS, BRIDGES,
VOLUME II, 2004 EDITION; INCLUDING OTHER SPECIFICALLY PREPARED FOR THIS PROJECT. ROAD CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE PLANS OR
AS DIRECTED BY THE ENGINEERS IN SUCH A MANNER AS TO INSURE PROPER CONNECTION AND RIDING
QUALITY.

2. PROJECT CONTROLS AND REFERENCES


9. DRAINAGE STRUCTURES
HORIZONTAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTIONS
ARE AS SHOWN ON THE PLANS.
EXACT LOCATIONS, OUTFALLS, SLOPES, INVERT ELEVATIONS AND LEVEL OF THE DRAINAGE STRUCTURES
SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE ENGINEER. MINOR ADJUSTMENTS MAYBE MADE AT
VERTICAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTION HIS DIRECTION TO SUIT ACTUAL FIELD CONDITIONS.
ARE AS SHOWN ON THE SAME DRAWINGS.
10.DESIGN DATA / REFERENCES

3. DIMENSIONS ENGINEERING / GEODETIC SURVEYS UNDERTAKEN BY THE DPWH - REGIONAL OFFICE NO. VII IN COORDINATION
WITH THE DPWH CEBU 2ND DISTRICT ENGINEERING OFFICE.

LINEAR MEASUREMENTS OF STRUCTURES IN DETAILED DRAWINGS ARE IN MILLIMETERS WHILE


DISTANCES AND ELEVATIONS ARE IN METERS. 1. ROAD ENGINEERING SURVEY WAS UNDERTAKEN ON OCTOBER 2012

2. GEOTECHNICAL INVESTIGATIONS AND REPORTS WAS UNDERTAKEN BY ADVANCED GEOTECHNICAL INC.


4. STATIONING AND THE MQCHD OF THE DPWH 7TH REGIONAL OFFICE

11. ROAD SIGNAGES / PAVEMENTS MARKINGS


STATIONINGS ARE RECKONED FROM THE KILOMETERS POST ALONG THE EXISTING SIBONGA- DUMANJUG ROAD, SIBONGA, CEBU.

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS TO BE USED IN THE PROJECT SHALL BE IN


ACCORDANCE WITH THE DPWH - DEPARTMENT ORDER NO. 202, SERIES OF 1992 BEARING THE SUBJECT "USE OF
5. ELEVATIONS AND GRADES REFLECTORIZED THERMOLPASTIC PAVEMENT MARKINGS."

ELEVATIONS AND FINISHED GRADES AS DESCRIBED IN THE ROAD PROFILES ARE RECKONED ALONG
THE CENTERLINE. 12. MISCELLANEOUS STRUCTURE

PROVISIONS OF BATAS PAMBANSA BILANG 344 (ACCESSIBILITY LAW AND ITS IMPLEMENTING RULES AND
6. HORIZONTAL TRANSITIONS REGULATIONS) MUST BE OBSERVED WHENEVER NECESSARY.

HORIZONTAL TRANSITIONS FOR ROADWAY TAPERINGS / WIDENINGS SHALL BE APPLIED AS SHOWN


ON THE PLANS.
13. STANDARD DRAWINGS

THE NECESSARY DRAWINGS CONTAINED IN THE DPWH STANDARD DRAWINGS FOR ROADS AND BRIDGES SHALL
7. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND / OR PROVIDED
AND APPROVED.
RESPECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE REMOVAL OF THEIR HOUSES,
FENCES, ELECTRICAL POLES AND OTHER UTILITIES.

PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC.
THAT MAY OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR
OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE
ANY PORTION OF THE EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF SHALL BE
ON THE ACCOUNT OF THE CONTRACTOR.

RELOCATION OF ANY GROUND UTILITY STRUCTURES SHALL BE SUCH THAT IT WILL NOT CAUSE OBSTRUCTION
NOR CONFLICT TO VEHICULAR AND PEDESTRIAN TRAFFIC MOVEMENT.

PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.

Republic of the Philippines JAMES LAURENCE L. REYES


ENGINEER II
CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD 14
CEBU 2ND DISTRICT WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB) GENERAL NOTES DESIGNED
ENGINEERING OFFICE ALONG SIBONGA-DUMANJUG ROAD HELEN GRACE B. YAP NICOMEDES S. LEONOR, JR. NONATO M. PAYLADO JUBY B. CORDON, CEO ADOR G. CANLAS, CESO IV 19
LAWAAN TALISAY CITY, CEBU ( HIGHWAY COMPONENT ) CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICER-IN-CHARGE
LEONARD B. ABAO OFFICE OF THE REGIONAL DIRECTOR
ENGINEER II
GENERAL NOTES
( HIGHWAY COMPONENT )
1. CONSTRUCTION SPECIFICATIONS
8. ROAD CONNECTIONS AND PRIVATE ENTRANCES
ALL WORKS SHALL COMPLY WITH THE DPWH STANDARDS SPECIFICATIONS FOR HIGHWAYS, BRIDGES,
VOLUME II, 2004 EDITION; INCLUDING OTHER SPECIFICALLY PREPARED FOR THIS PROJECT. ROAD CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE PLANS OR
AS DIRECTED BY THE ENGINEERS IN SUCH A MANNER AS TO INSURE PROPER CONNECTION AND RIDING
QUALITY.

2. PROJECT CONTROLS AND REFERENCES


9. DRAINAGE STRUCTURES
HORIZONTAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTIONS
ARE AS SHOWN ON THE PLANS.
EXACT LOCATIONS, OUTFALLS, SLOPES, INVERT ELEVATIONS AND LEVEL OF THE DRAINAGE STRUCTURES
SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE ENGINEER. MINOR ADJUSTMENTS MAYBE MADE AT
VERTICAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTION HIS DIRECTION TO SUIT ACTUAL FIELD CONDITIONS.
ARE AS SHOWN ON THE SAME DRAWINGS.
10.DESIGN DATA / REFERENCES

3. DIMENSIONS ENGINEERING / GEODETIC SURVEYS UNDERTAKEN BY THE DPWH - REGIONAL OFFICE NO. VII IN COORDINATION
WITH THE DPWH CEBU 2ND DISTRICT ENGINEERING OFFICE.

LINEAR MEASUREMENTS OF STRUCTURES IN DETAILED DRAWINGS ARE IN MILLIMETERS WHILE


DISTANCES AND ELEVATIONS ARE IN METERS. 1. ROAD ENGINEERING SURVEY WAS UNDERTAKEN ON OCTOBER 2012

2. GEOTECHNICAL INVESTIGATIONS AND REPORTS WAS UNDERTAKEN BY ADVANCED GEOTECHNICAL INC.


4. STATIONING AND THE MQCHD OF THE DPWH 7TH REGIONAL OFFICE

11. ROAD SIGNAGES / PAVEMENTS MARKINGS


STATIONINGS ARE RECKONED FROM THE KILOMETERS POST ALONG THE EXISTING SIBONGA- DUMANJUG ROAD, SIBONGA, CEBU.

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS TO BE USED IN THE PROJECT SHALL BE IN


ACCORDANCE WITH THE DPWH - DEPARTMENT ORDER NO. 202, SERIES OF 1992 BEARING THE SUBJECT "USE OF
5. ELEVATIONS AND GRADES REFLECTORIZED THERMOLPASTIC PAVEMENT MARKINGS."

ELEVATIONS AND FINISHED GRADES AS DESCRIBED IN THE ROAD PROFILES ARE RECKONED ALONG
THE CENTERLINE. 12. MISCELLANEOUS STRUCTURE

PROVISIONS OF BATAS PAMBANSA BILANG 344 (ACCESSIBILITY LAW AND ITS IMPLEMENTING RULES AND
6. HORIZONTAL TRANSITIONS REGULATIONS) MUST BE OBSERVED WHENEVER NECESSARY.

HORIZONTAL TRANSITIONS FOR ROADWAY TAPERINGS / WIDENINGS SHALL BE APPLIED AS SHOWN


ON THE PLANS.
13. STANDARD DRAWINGS

THE NECESSARY DRAWINGS CONTAINED IN THE DPWH STANDARD DRAWINGS FOR ROADS AND BRIDGES SHALL
7. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND / OR PROVIDED
AND APPROVED.
RESPECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE REMOVAL OF THEIR HOUSES,
FENCES, ELECTRICAL POLES AND OTHER UTILITIES.

PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC.
THAT MAY OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR
OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE
ANY PORTION OF THE EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF SHALL BE
ON THE ACCOUNT OF THE CONTRACTOR.

RELOCATION OF ANY GROUND UTILITY STRUCTURES SHALL BE SUCH THAT IT WILL NOT CAUSE OBSTRUCTION
NOR CONFLICT TO VEHICULAR AND PEDESTRIAN TRAFFIC MOVEMENT.

PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.

Republic of the Philippines JAMES LAURENCE L. REYES


ENGINEER II
CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD 14
CEBU 2ND DISTRICT WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB) GENERAL NOTES DESIGNED
ENGINEERING OFFICE ALONG SIBONGA-DUMANJUG ROAD HELEN GRACE B. YAP NICOMEDES S. LEONOR, JR. NONATO M. PAYLADO JUBY B. CORDON, CEO ADOR G. CANLAS, CESO IV 19
LAWAAN TALISAY CITY, CEBU ( HIGHWAY COMPONENT ) CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICER-IN-CHARGE
LEONARD B. ABAO OFFICE OF THE REGIONAL DIRECTOR
ENGINEER II
PROJECT TITLE / LOCATION SHEET CONTENTS SURVEYED CHECKED SUBMITTED REVIEWED RECOMMENDING APPROVAL APPROVED SHEET No.

Republic of the Philippines JAMES LAURENCE L. REYES


ENGINEER II
CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD TYPICAL ROADWAY SECTION 15
CEBU 2ND DISTRICT WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB) SLOPE PROTECTION AT ABUTMENT DESIGNED
ENGINEERING OFFICE ALONG SIBONGA-DUMANJUG ROAD HELEN GRACE B. YAP NICOMEDES S. LEONOR, JR. NONATO M. PAYLADO JUBY B. CORDON, CEO ADOR G. CANLAS, CESO IV 19
LAWAAN TALISAY CITY, CEBU AND DRAIN DETAIL CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICER-IN-CHARGE
LEONARD B. ABAO OFFICE OF THE REGIONAL DIRECTOR
ENGINEER II

Вам также может понравиться