Вы находитесь на странице: 1из 11

ETAP

Project: Page: 1
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 1 3 5

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 4 0 0 0 0 1 5

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 60.00 Hz

Unit System: English

Project Filename: static and dynamic mtor starti

Output Filename: C:\ETAP 1260\static and dynamic mtor starti\sajjad.lfr


ETAP
Project: Page: 2
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP
Project: Page: 3
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 13.800 1 100.0 0.0

Bus2 4.160 1 100.0 0.0 3.400 2.107 0.850 0.527

Bus3 4.160 1 100.0 0.0 0.397 0.194

Bus5 0.480 1 100.0 0.0 3.400 2.107 0.850 0.527

Bus7 0.480 1 100.0 0.0 0.091 0.039

Total Number of Buses: 5 7.288 4.447 1.700 1.054 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 13.800 Swing 1 100.0 0.0

Bus2 4.160 Voltage Control 1 100.0 0.0 0.000 0.000 0.000

0.000 0.000
ETAP
Project: Page: 4
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 20.000 13.800 4.160 6.50 18.60 0 0 0 0 0 6.5000 Dyn 0.000

T2 3-Phase 20.000 13.800 4.160 6.50 18.60 0 0 0 0 0 6.5000 Dyn 0.000

T3 3-Phase 5.000 4.160 0.480 6.75 12.14 0 0 0 0 0 6.7500 Dyn 0.000

T4 3-Phase 5.000 4.160 0.480 6.75 12.14 0 0 0 0 0 6.7500 Dyn 0.000


ETAP
Project: Page: 5
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 1.74 32.45 32.50

T2 2W XFMR Bus1 Bus3 1.74 32.45 32.50

T3 2W XFMR Bus2 Bus5 11.08 134.54 135.00

T4 2W XFMR Bus3 Bus7 11.08 134.54 135.00

CB4 Tie Breakr Bus7 Bus5


ETAP
Project: Page: 6
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 13.800 100.000 0.0 8.939 5.848 0 0 Bus2 6.010 3.956 301.0 83.5

Bus3 2.929 1.893 145.9 84.0

Bus2 4.160 98.629 -1.1 0 0 4.227 2.620 Bus1 -6.001 -3.788 998.5 84.6

Bus5 1.774 1.168 298.9 83.5

Bus3 4.160 99.339 -0.5 0 0 0.397 0.194 Bus1 -2.927 -1.853 484.0 84.5

Bus7 2.530 1.659 422.7 83.6

Bus5 0.480 96.864 -2.4 0 0 4.198 2.601 Bus2 -1.769 -1.106 2590.2 84.8

Bus7 -2.429 -1.496 3541.9 85.1

Bus7 0.480 96.864 -2.4 0 0 0.091 0.039 Bus3 -2.520 -1.534 3663.3 85.4

Bus5 2.429 1.496 3541.9 85.1


* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: Page: 7
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 13.800 0 0 0 0 0 0 0 0 10.682 83.7 446.9

Bus2 4.160 3.400 2.107 0.827 0.512 0 0 0 0 7.096 84.6 998.5

Bus3 4.160 0.397 0.194 0 0 0 0 0 0 3.464 84.5 484.0

Bus5 0.480 3.400 2.107 0.798 0.494 0 0 0 0 4.938 85.0 6132.1

Bus7 0.480 0.091 0.039 0 0 0 0 0 0 2.950 85.4 3663.3

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 8
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

T1 Transformer 20.000 7.195 36.0 7.096 35.5

T2 Transformer 20.000 3.487 17.4 3.464 17.3

T3 Transformer 5.000 2.124 42.5 2.086 41.7

T4 Transformer 5.000 3.025 60.5 2.950 59.0

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 9
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 6.010 3.956 -6.001 -3.788 9.0 168.0 100.0 98.6 1.37

T2 2.929 1.893 -2.927 -1.853 2.1 39.5 100.0 99.3 0.66

T3 1.774 1.168 -1.769 -1.106 5.1 62.4 98.6 96.9 1.77

T4 2.530 1.659 -2.520 -1.534 10.3 124.8 99.3 96.9 2.48

26.6 394.6
ETAP
Project: Page: 10
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Gen2 Generator Under Power 0.00 MW 0.00 0.0 3-Phase

Gen2 Generator Under Excited 0.00 Mvar 0.00 0.0 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus5 Bus Under Voltage 0.48 kV 0.46 96.9 3-Phase

Bus7 Bus Under Voltage 0.48 kV 0.46 96.9 3-Phase


ETAP
Project: Page: 11
12.6.0H
Location: Date: 02-27-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: static and dynamic mtor starti Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 8.939 5.848 10.682 83.68 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 8.939 5.848 10.682 83.68 Lagging

Total Motor Load: 7.288 4.447 8.537 85.36 Lagging

Total Static Load: 1.624 1.007 1.911 85.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.027 0.395

System Mismatch: 0.000 0.000

Number of Iterations: 1

Вам также может понравиться