Вы находитесь на странице: 1из 3

APEC Booster Pumped R.O.

SYSTEM: Installation
Addendum

How to install your RO-PUMP system:

The steps for installing your Booster Pumped RO system are the same as for
installing the non-pumped systems.

Please follow instructions in the Installation Manual from Pages 1 11.

When you get to Step 6: Connecting the System Use this Addendum
for Summary of Tubing Connections. (Skip Manual page 12 Summary
of Tubing Connections). Once tubing connections are completed, proceed to
page 14 Details on Tubing Connections.

COPY RIGHT APEC, 2000 1 free drinking water.com


Step 6: Connecting The System

Summary of Tubing Connections

There are 4 connections:


Point A to X: Connect RO to COLD water supply Red tubing.
th
Point G to Y: Connect product water from 5 -stage filters to tank Yellow tubing *.
th
Point H to Z: Connect product water from 5 -stage output to dispensing faucet Clear tubing.
Drain line to W: Connect waste water from 4th stage membrane to the drain pipe Black tubing.

* Note: The Yellow tubing is a 2-way line. Product water enters and leaves the tank via this same
line.

Fig 10

Plug in Power after you have installed your system:


The Transformer and the Pump each has a plastic connector piece. Join these
2 pieces together to connect the Transformer to the pump. Connect the Pumps
Transformer into an electrical outlet. This will activate the Booster Pump on your
system.

COPY RIGHT APEC, 2000 2 free drinking water.com


Fittings Type: All the fittings on the Booster-Pumped RO head are Quick-Connect type fittings.
To connect and remove tubing from ports, please see the diagrams below.

To connect: Simply push the tubing into the Quick-Connect fitting tightly. NO inserts,
sleeve, or nuts are needed to secure the connection. No Teflon tape!

To disconnect: Push in and hold down on the collet ring around the base of the fitting, then
pull out tubing.

COPY RIGHT APEC, 2000 3 free drinking water.com

Вам также может понравиться