WORK PROGRESS in Km

Sl. No Item LHS RHS Total Two lane

1 SG Top #REF! #REF! #REF!


#REF!
2 GSB Laying #VALUE! #VALUE! #VALUE!
#VALUE!
3 WMM 1st Laying #VALUE! #VALUE! #VALUE!
#VALUE!
4 WMM Top Laying #VALUE! #VALUE! #VALUE!
#VALUE!
5 DBM Laying #VALUE! #VALUE! #VALUE!
#VALUE!
6 BC Laying #VALUE! #VALUE! #VALUE!
#VALUE!
7 PQC Laying 0.000 0.000 0

8 Shoulder (Granular) #REF! #REF! #REF!


#REF!
Road length Completed #VALUE! #VALUE! #VALUE!
Contract P

Development and Construction for Four Laning of Babatpur

Weightage in % to
Item
the Contract Price

Road Works including approaches to


minor bridges, underpasses,
overpasses, approaches to Major
Bridges/Structures (including service
roads/slip roads) 27.080%

A (i) - Widening and reconstruction of existing road for Rigid Pavem

(1) Earthwork up to top of sub-grade


4.640%

(2) Granular Work (subbase, base, shoulders)


10.480%

(3) Cement Concrete work

DLC
10.010%

PQC
32.540%

A (ii) - Widening and reconstruction of existing road for Flexible Pa


0.060%
(1) Earthwork up to top of the sub - grade

0.870%
(2) Granular Work (subbase, base, shoulders)

(3) Bituminous work

0.548%
BM

1.871%
DBM
Development and Construction for Four Laning of Babatpur

Weightage in % to
Item
the Contract Price

1.087%
BC

A (iii) - Widening, Reconstruction and repair of 3.750%


Culverts
A (iv) -Widening, Reconstruction and repair of 0.810%
Minor Bridges

C - Service Road/Slip Road

(1) Earthwork up to top of the sub - grade 3.130%

(2) Granular Work (subbase, base, shoulders) 10.780%

(3) Bituminous work

DBM 5.670%

BC 4.160%

D - New Culverts, Minor Bridges, Underpasses, Overpasses on e

1.075%
(1) Culverts

4.950%
(2) Foot over Bridge

1.060%
(3) Pedestrian Overpass

0.720%
(4) Vehicular Underpasses

1.790%
(5) RE Wall for Underpass

3.120%
ROB / RUB

A - Widening and repair of


Development and Construction for Four Laning of Babatpur

Weightage in % to
Item
the Contract Price

(a) RoB

0.710%
(1) Repair and Rehabilitation

5.020%
(2) EarthWork in Old ROB Approaches
Development and Construction for Four Laning of Babatpur

Weightage in % to
Item
the Contract Price

D - New Rail - Road Bridges

a) RoB

22.815%
(1) Foundation

4.962%
(2) Sub-structure

(3) Super-structure (including crash barriers etc. 23.840%


complete)
32.770%
(4) Reinforced Earth

9.883%
(5) Earthwork in New ROB

Structures (Elevated Sections, Reinforced 55.760%


Earth)
55.908%
(1) Foundation

4.790%
(2) Sub-structures

(3) Super-structure (including crash barriers etc. 38.015%


complete)

Segment

0.978%
(4) Reinforced Earth

0.309%
(5) Earthwork

RE Wall Panel S-4

J-6

P-2
Development and Construction for Four Laning of Babatpur

Weightage in % to
Item
the Contract Price

Other Works 14.040%

(i) Road Side Drains 25.570%

(ii) Road signs, markings, Km Stones, boundary


6.060%
stones, safety devices, MS railing etc.

(iii) Project Facilities

(a) Bus Bye & Bus Shelter 0.310%

(b) Truck Lay Bye 1.040%


(c) Overhead Gantry and Others (Overhead
Gantry, Overhead portal, Traffic Aid Post, Vehicle 0.640%
Rescue etc.)
(iv) MS Pipe Railing 3.680%

(v) Horticulture 11.570%

(vi) Junctions Improvement with Speed Table 13.140%

(vii) Protection, Training Work, Drainage


0.530%
arrangement & Diversion Work

(viii) Precast divider, Kerb, Median & Interlocking


15.810%
Concrete Block

(ix) Street Lighting 20.900%


(x) Miscellaneous Items (On Completion of
0.750%
Work)
Development and Construction for Four Laning of Babatpur

Weightage in % to
Item
the Contract Price

Total Amount 4,231,100,000

1. Material at Site

2. Mobilization Advances (10%)

3. Recovery of Mobilization Advances


Contract Price : 4,231,100,000.00

of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+25

FINANCIAL PROGRESS

Up to date
Scope of
Amount Unit Cost per Unit Target uptil
Work
July'2016

Rigid Pavement
53,164,279 9.800 Km 5,424,926 6.550

120,077,941 11.860 Km 10,124,616 5.750

114,692,766 11.860 Km 9,670,554 3.250

372,837,424 11.860 Km 31,436,545 2.050

Flexible Pavement
687,469 1.200 Km 572,891 -

9,968,302 1.400 Km 7,120,216 -

6,278,885 2.650 Km 2,369,390 -

21,437,579 2.650 Km 8,089,652 -


of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+25

FINANCIAL PROGRESS

Up to date
Scope of
Amount Unit Cost per Unit Target uptil
Work
July'2016

12,454,649 2.650 Km 4,699,868 -

42,966,821 21 Nos 2,046,039 19

9,280,833 2 Nos 4,640,417 -

35,862,973 7.700 Km 4,657,529 3.200

123,515,287 7.700 Km 16,040,946 3.100

64,965,833 7.700 Km 8,437,121 2.610

47,664,526 7.700 Km 6,190,198 -

erpasses on existing Road, Realignments, Bypasses:

12,317,155 29 Nos 424,729 8

56,716,203 205.7 Mtr. 275,723 -

12,145,288 2 Nos 6,072,644 -

8,249,630 1 Nos 8,249,630 -

20,509,496 1.400 Km 14,649,640 -


of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+25

FINANCIAL PROGRESS

Up to date
Scope of
Amount Unit Cost per Unit Target uptil
Work
July'2016

937,273 1 Nos 937,273


0.250

6,626,918 0.700 Km 9,467,026


-
of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+25

FINANCIAL PROGRESS

Up to date
Scope of
Amount Unit Cost per Unit Target uptil
Work
July'2016

30,118,155 3 Nos 10,039,385


1.000

6,550,352 3 Nos 2,183,451


-

31,471,260 2 Nos 15,735,630


-

43,259,782 0.700 Km
-

13,046,580 0.700 Km

1,319,015,841 90 Nos 14,655,732


33.500
113,008,619 90 Nos 1,255,651
13.000
896,873,206 89.000 Km 10,077,227
7.000
588,972
No.

23,073,576 0.960 Km 24,034,975


-

7,290,118 0.960 Km
-

Sqm 5,370

Sqm 5,370

Sqm 5,370
of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+25

FINANCIAL PROGRESS

Up to date
Scope of
Amount Unit Cost per Unit Target uptil
Work
July'2016

151,897,675 25.200 Km 6,027,686 3.500

35,999,214 17.250 Km 2,086,911 -

1,841,544 20 Nos 92,077 -

6,178,083 2 Nos 3,089,041 -

3,801,897 7 Nos 543,128 -

21,860,909 2.740 Km 7,978,434 -

68,731,173 11 Km 6,248,288 -

78,057,702 27 Nos 2,891,026 -

3,148,446 1 Comp 3,148,446 -

93,918,742 1 Comp 93,918,742 -

124,155,706 1 Comp 124,155,706 -

4,455,348 1 Comp 4,455,348 -


of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+25

FINANCIAL PROGRESS

Up to date
Scope of
Amount Unit Cost per Unit Target uptil
Work
July'2016

4,231,100,000

% Financial up to date
4,231.10 4,231,100,000.00 4,231.10

m. 280+250) in the State of Uttar Pradesh under EPC Mode.

Date :-26.07.16

Targeted Financial Up to date


Up to date Financial
Progress Uptil 31st Progress 26th
Progress
July'2016 July'2016

35,533,265 3.415 18,526,122

58,216,542 3.305 33,461,856

31,429,301 1.075 10,395,846

64,444,917 - -

- - -

- - -

- - -

- - -
m. 280+250) in the State of Uttar Pradesh under EPC Mode.

Date :-26.07.16

Targeted Financial Up to date


Up to date Financial
Progress Uptil 31st Progress 26th
Progress
July'2016 July'2016

- - -

38,874,741 8.0 16,368,312

- - -

14,904,093 1.640 7,638,348

49,726,933 1.415 22,697,939

22,020,886 1.415 11,938,526

- - -

3,397,832 - -

- - -

- - -

- - -

- - -
m. 280+250) in the State of Uttar Pradesh under EPC Mode.

Date :-26.07.16

Targeted Financial Up to date


Up to date Financial
Progress Uptil 31st Progress 26th
Progress
July'2016 July'2016

-
234,318 -

-
- -
m. 280+250) in the State of Uttar Pradesh under EPC Mode.

Date :-26.07.16

Targeted Financial Up to date


Up to date Financial
Progress Uptil 31st Progress 26th
Progress
July'2016 July'2016

-
10,039,385 -

-
- -

-
- -

-
- -

490,967,022 51.150 749,636,295

16,323,463 30.000 37,669,530

70,540,589 - -

2.000 1,177,944

-
- -

-
- -
2,193.200
11,777,484

102.520
550,532

76.032
408,292
m. 280+250) in the State of Uttar Pradesh under EPC Mode.

Date :-26.07.16

Targeted Financial Up to date


Up to date Financial
Progress Uptil 31st Progress 26th
Progress
July'2016 July'2016

21,096,901 3.646 21,978,149

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -
m. 280+250) in the State of Uttar Pradesh under EPC Mode.

Date :-26.07.16

Targeted Financial Up to date


Up to date Financial
Progress Uptil 31st Progress 26th
Progress
July'2016 July'2016

927,750,188 944,225,174

80,000,000.00

423,110,000.00

-23,265,000.00

Total Amount (Financial) 1,424,070,174.10

21.927% 33.657%
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

Physical Progress for the Month ending 27th Sep' 2016

A (i) Widening & Reconstruction of existing road for Rigid Pavement

Scope Weighted WORK PROGRESS in Km


Sl. No Item % Completed Physical progress % Remarks
in KM in % LHS RHS Total

1 Earthwork up to top of Sub-grade 10.500 1.257 3.220 3.610 3.415 32.524% 0.409%

2 GSB Laying 11.860 2.838 3.050 3.560 3.305 27.867% 0.791%

3 DLC Laying 11.860 2.711 2.150 - 1.075 9.064% 0.25%

4 PQC Laying 11.860 8.812 - - - 0.000% 0.00%

Road length Completed 11.860

B) Structural Works

HP. Culverts: Ch.267+151,


Ch.267+245,ch.270+291 ,ch. 266+685,ch.275+437
,272+573 (06)Completed. Ch.275+080,
274+419,276+742,in Progress
1 CD Works New/ Reconstruction 21 1.016 8.00 8.00 8.00 38.095% 0.39% Box Culverts: Ch. 264+072 ,
264+638,265+406,267+839,267+716 (04 no (one
side completed)

C) Service Road/Slip Road

1 Earthwork up to top of Sub-grade 7.700 0.848 1.610 1.670 1.640 21.299% 0.18%

2 GSB Laying 7.700 1.460 1.610 1.670 1.640 21.299% 0.31%

4 WMM 7.700 1.460 1.250 1.580 1.415 18.377% 0.27%

5 DBM Laying 7.700 1.535 1.250 1.580 1.415 18.377% 0.28%

6 BC Laying 7.700 1.127 - - - 0.000% 0.00%

Road length Completed

Structures (Elevated Sections, Reinforced Earth)


1 Grade Separated Structure

Piling for P29-P48, P59- A2. (51.833 Group /311


1) Foundation 90 31.174 51.150 51.150 56.833% 17.72% no)completed,P27,28 IN Progress Pile Caps are
Completed for P34-P43,P44-P48,P60- A2(44 nos)

Pier shaft 12 No(P39,P41,P42,P46, P47,P63-P65,


2) Sub - Structure 90 2.671 30.0 30.0 33.333% 0.89% P77). Pier cap -24 (P62,P66 -P76,P78-A2)

3) Super structure 89 21.197 0.018 0.018 0.020% 0.0043% 25 no Segment casted(3M)

4) Re Wall 4599.88 0.545 3272.250 3272.250 71.138% 0.39% 4363 sqm., consider 75% of rate

Other Works

(iii) (i) Road Side Drains 25.2 3.590 3.646 14.469% 0.52% 3321 RM slab,379 RM wall & 110 RM up To raft

Physical Progress Up to Date (27th Sep' 2016) 22.393% 94.748


Physical Progress till last Month (31st Aug16) 20.502% 86.744
Physical Progress during the Month 1.892% 8.004
Material stock value 2.516% 10.647
Mob advance 8.629% 36.511
Net Value Financial 33.539% 141.905
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

UP TO DATE PROGRESS OF ROAD WORK (Main Carriageway) 31.0


TOTAL
SL. WORK DONE IN
ITEM FROM TO SIDE LENGTH LENGTH IN
NO. THE MONTH
Mtr.
1 SG TOP 263+000 263+040 RHS 40 6-Apr-16
263+040 263+260 RHS 220 15-Mar-16
263+260 263+500 RHS 240 3-Mar-16
263+500 263+610 RHS 110 4-Mar-16
263+610 263+700 RHS 90 3-Mar-16
263+700 263+840 RHS 140 28-Mar-16
263+840 264+000 RHS 160 3-Apr-16
264+000 264+100 RHS 100 19-Jun-16
264+100 264+250 RHS 150 22-Mar-16
264+800 265+020 RHS 220 10-Mar-16
265+020 265+260 RHS 240 11-Mar-16
265+260 265+410 RHS 150 12-Mar-16
265+410 265+650 RHS 240 6-Mar-16
265+650 265+840 RHS 190 28-Apr-16
265+840 265+900 RHS 60 5-May-16
265+900 265+940 RHS 40 5-May-16
265+940 266+100 RHS 160 7-May-16
266+100 266+180 RHS 80 22-May-16
266+850 267+050 RHS 200 12-Feb-16
267+050 267+310 RHS 260 3-Feb-16
267+310 267+600 RHS 290 5-Feb-16
267+600 267+700 RHS 100 4-Feb-16
267+700 267+830 RHS 130 23-Apr-16

263+000 263+130 LHS 130.0 14.07.16


263+130 263+230 LHS 100.0 14.06.16
263+230 263+310 LHS 80.0 04.06.16
263+310 263+450 LHS 140.0 09.05.16
263+450 263+720 LHS 270.0 13.05.16
263+720 263+900 LHS 180.0 14.05.16
263+900 263+950 LHS 50.0 22.05.16
264+400 264+530 LHS 130.0 05.08.16
264+840 264+930 LHS 90.0 25.07.16
264+950 265+100 LHS 150.0 08.06.16
265+100 265+250 LHS 150.0 10.06.16
265+250 265+380 LHS 130.0 24.06.16
265+440 265+590 LHS 150.0 25.06.16
265+950 266+140 LHS 190.0 29.06.16
266+880 267+050 LHS 170.0 06.04.16
267+050 267+250 LHS 200.0 09.04.16
267+250 267+450 LHS 200.0 13.04.16
267+450 267+600 LHS 150.0 18.04.16
267+600 267+660 LHS 60.0 19.04.16
267+660 267+730 LHS 70.0 26.05.16
272+000 272+240 LHS 240.0 12.06.16
272+320 272+510 LHS 190.0 01.06.16
6830.000
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL
SL. WORK DONE IN
ITEM FROM TO SIDE LENGTH LENGTH IN
NO. THE MONTH
Mtr.
2 GSB 263+000 263+040 RHS 40.0 14.04.16
LAYING 263+040 263+700 RHS 660.0 19.03.16
263+700 264+000 RHS 300.0 14.04.16
264+000 264+250 RHS 250.0 30.06.16
264+800 265+020 RHS 220.0 18.03.16
265+020 265+260 RHS 240.0 18.03.16
265+260 265+410 RHS 150.0 18.03.16
265+410 265+650 RHS 240.0 19.03.16
265+650 265+900 RHS 250.0 09.05.16
265+940 266+100 RHS 160.0 20.05.16
266+100 266+170 RHS 70.0 07.06.16
266+850 267+050 RHS 200.0 19.03.16
267+050 267+150 RHS 100.0 12.02.16
267+150 267+300 RHS 150.0 30.01.16
267+300 267+600 RHS 300.0 10.02.16
267+600 267+700 RHS 100.0 08.02.16
267+700 267+830 RHS 130.0 26.04.16

263+000 263+130 LHS 130.0 16.07.16


263+130 263+310 LHS 180.0 23.06.16
263+310 263+450 LHS 140.0 15.05.16
263+450 263+720 LHS 270.0 18.05.16
263+720 263+900 LHS 180.0 07.06.16
264+000 264+200 LHS 200.0 30.06.16
264+400 264+530 LHS 130.0 13.08.16
264+960 265+100 LHS 140.0 13.06.16
265+100 265+240 LHS 140.0 24.06.16
265+240 265+380 LHS 140.0 25.06.16
265+440 265+580 LHS 140.0 29.06.16
266+880 267+050 LHS 170.0 20.04.16
267+050 267+250 LHS 200.0 21.04.16
267+250 267+450 LHS 200.0 22.04.16
267+450 267+650 LHS 200.0 27.04.16
267+650 267+720 LHS 70.0 30.05.16
272+000 272+240 LHS 240.0 16.06.16
272+320 272+500 LHS 180.0 14.06.16
6610.000
3 DLC
263+000 263+070 LHS 70.0 5-Sep-16
263+070 263+100 LHS 30.0 29-Aug-16
263+100 263+190 LHS 90.0 23-Jul-16
263+190 263+240 LHS 50.0 18-Jul-16
263+240 263+340 LHS 100.0 17-Jul-16
263+340 263+500 LHS 160.0 10-Jun-16
263+500 263+600 LHS 100.0 11-Jun-16
263+600 263+800 LHS 200.0 22-Jun-16
263+800 263+880 LHS 80.0 24-Jun-16
264+970 265+110 LHS 140.0 25-Jun-16
265+110 265+200 LHS 90.0 26-Jun-16
265+200 265+360 LHS 160.0 28-Jun-16
265+440 265+510 LHS 70.0 30-Jun-16
265+510 265+570 LHS 60.0 16-Jul-16
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL
SL. WORK DONE IN
ITEM FROM TO SIDE LENGTH LENGTH IN
NO. THE MONTH
Mtr.
266+880 266+950 LHS 70.0 1-Jun-16
266+950 267+150 LHS 200.0 30-May-16
267+150 267+250 LHS 100.0 19-May-16
267+250 267+350 LHS 100.0 29-Apr-16
267+350 267+470 LHS 120.0 8-May-16
267+470 267+630 LHS 160.0 16-May-16
2150.000
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

31.08.2016
TOTAL B/S
LENGTH IN REMARKS
Mtr.

3415.000 MCW
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL B/S
LENGTH IN REMARKS
Mtr.

3305.000 MCW
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL B/S
LENGTH IN REMARKS
Mtr.

1075.000 MCW
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

UP TO DATE PROGRESS OF ROAD WORK (Service Road) 3


TOTAL
SL. WORK DONE
ITEM FROM TO SIDE LENGTH LENGTH IN
NO. IN THE MONTH
Mtr.
1 SG TOP 269+610 269+700 RHS 90 19-Sep-16
269+700 269+970 RHS 270 17-Jun-16
269+970 270+280 RHS 310 6-Jun-16
270+580 270+750 RHS 170 9-May-16
270+750 270+910 RHS 160 10-May-16
270+910 271+100 RHS 190 27-Feb-16
271+100 271+230 RHS 130 18-Feb-16
271+230 271+260 RHS 30 13-Mar-16
271+260 271+530 RHS 270 4-Jan-16
271+530 271+580 RHS 50 10-Jan-16

269+640 269+700 LHS 60 19-Sep-16


269+700 269+750 LHS 50 31-Aug-16
269+750 269+900 LHS 150 6-Aug-16
269+900 270+000 LHS 100 29-May-16
270+000 270+180 LHS 180 28-May-16
270+180 270+260 LHS 80 2-Jun-16
270+580 270+660 LHS 80 9-Apr-16
270+660 270+760 LHS 100 9-Apr-16
270+760 270+900 LHS 140 14-Apr-16
270+900 271+050 LHS 150 17-Mar-16
271+050 271+070 LHS 20 18-Mar-16
271+070 271+100 LHS 30 28-Mar-16
271+100 271+280 LHS 180 7-Jan-16
271+280 271+350 LHS 70 22-Jan-16
271+350 271+520 LHS 170 5-Jan-16
271+520 271+570 LHS 50 10-Jan-16
3280.000
2 269+610 269+700 RHS 90 19-Sep-16
269+700 269+970 RHS 270 19-Jun-16
269+970 270+240 RHS 270 7-Jun-16
270+240 270+280 RHS 40 11-Jun-16
270+580 270+750 RHS 170 10-May-16
270+750 270+910 RHS 160 11-May-16
270+910 271+100 RHS 190 1-Mar-16
271+100 271+230 RHS 130 25-Feb-16
271+230 271+260 RHS 30 13-Mar-16
271+260 271+530 RHS 270 5-Jan-16
271+530 271+580 RHS 50 11-Jan-16

269+640 269+700 LHS 60 19-Sep-16


269+700 269+860 LHS 160 31-Aug-16
269+860 269+920 LHS 60
269+920 270+180 LHS 260 1-Jun-16
270+180 270+260 LHS 80 3-Jun-16
270+580 270+660 LHS 80 10.05.16
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL
SL. WORK DONE
ITEM FROM TO SIDE LENGTH LENGTH IN
NO. IN THE MONTH
Mtr.
270+660 270+900 LHS 240 13.04.16
270+900 271+070 LHS 170 21-Mar-16
271+070 271+100 LHS 30 29-Mar-16
271+100 271+280 LHS 180 7-Jan-16
271+280 271+350 LHS 70 22-Jan-16
271+350 271+520 LHS 170 6-Jan-16
271+520 271+570 LHS 50 11-Jan-16
3280.000
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL
SL. WORK DONE
ITEM FROM TO SIDE LENGTH LENGTH IN
NO. IN THE MONTH
Mtr.
3 WMM
LAYING 269+700 269+800 RHS 100 27.06.16

269+800 269+970 RHS 170 28.06.16

269+970 270+240 RHS 270 8.06.16

270+240 270+280 RHS 40 11.06.16


270+580 270+750 RHS 170 11-May-16
270+750 270+910 RHS 160
270+910 271+230 RHS 320 7-Mar-16
271+230 271+260 RHS 30 14-Mar-16
271+260 271+530 RHS 270 9-Jan-16
271+530 271+580 RHS 50 12-Jan-16

269+860 269+920 LHS 60


269+920 270+260 LHS 340 4-Jun-16
270+660 270+900 LHS 240
270+900 271+070 LHS 170 22-Mar-16
271+070 271+100 LHS 30 30-Mar-16
271+100 271+260 LHS 160 14-Jan-16
271+260 271+350 LHS 90 28-Jan-16
271+350 271+520 LHS 170 10-Jan-16
271+520 271+570 LHS 50 12-Jan-16
2890.000
4 DBM
LAYING 269+700 269+970 RHS 270
269+970 270+280 RHS 310 12-Jan-16
270+580 270+750 RHS 170 14-May-16
270+750 270+910 RHS 160
270+910 271+230 RHS 320 12-Mar-16
271+230 271+270 RHS 40 16-Mar-16
271+270 271+580 RHS 310 22-Jan-16

269+870 269+920 LHS 50


269+920 270+260 LHS 340 6-Jun-16
270+660 270+900 LHS 240 18-Apr-16
270+900 271+070 LHS 170 27-Mar-16
271+070 271+100 LHS 30 2-Apr-16
271+100 271+360 LHS 260 29-Jan-16
271+360 271+570 LHS 210 22-Jan-16

2880.000
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

31.08.2016
TOTAL B/S
LENGTH IN REMARKS
Mtr.

1640.000 Service Road


Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL B/S
LENGTH IN REMARKS
Mtr.

1640.000 Service Road


Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km.
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

TOTAL B/S
LENGTH IN REMARKS
Mtr.

1445.000 Service Road

55mm 4.00 Width

55mm 4.00 Width


55mm 4.00 Width
55mm 4.00 Width
55mm 4.00 Width

55mm 4.00 Width


55mm 4.00 Width
55mm 4.00 Width
55mm 4.00 Width
55mm 4.00 Width
55mm 4.00 Width

1440.000 Service Road


SL. NO. RFI No. Dated Description of Item Chainage side Length Remarks
1 HW/BB/2087 13-Jul-15 Clearing & Grubbing Checking 317+760 318+880 LHS 1120 Inspected by AE
2 HW/BB/2088 13-Jul-15 Excavation upto SG Bottom Layer 317+760 318+880 LHS 1120
3 HW/BB/2151 R1 16-Jul-15 SG Bottom Layer & Fdd Checking After L&R 318+100 318+880 LHS 780 Inspected by AE
4 HW/BB/2152 R1 16-Jul-15 SG Top Layer Level & FDD Checking 318+100 318+880 LHS 780 Inspected by AE
5 HW/BB/2212 R5 23-Jul-15 GSB Top Layer Level & FDD Checking 318+100 318+880 LHS 780
6 HW/BB/2307 23-Jul-15 EarthWork in Excavation 318+000 319+000 RHS 1000
7 HW/BB/2316 23-Jul-15 WMM 1st Layer & FDD Checking 318+480 318+880 LHS 400
8 HW/BB/2353 R1 25-Jul-15 SG Bottom Layer & Fdd Checking After L&R 318+500 319+000 RHS 500
9 HW/BB/2425 R4 1-Aug-15 SG Top Layer Level & FDD Checking 318+500 319+000 RHS 500 Inspected by AE
10 HW/BB/2486 R1 3-Aug-15 GSB Top Layer Level & FDD Checking 318+500 319+000 RHS 500
11 HW/BB/2670 8-Aug-15 Clearing & Grubbing Checking 318+880 319+000 LHS 120
12 HW/BB/2671 8-Aug-15 EarthWork in Excavation 318+880 319+000 LHS 120
13 HW/BB/2672 8-Aug-15 SG Bottom Layer & Fdd Checking After L&R 318+880 319+000 LHS 120
14 HW/BB/2685 9-Aug-15 SG Top Layer Level & FDD Checking 318+880 319+000 LHS 120
15 HW/BB/2689 9-Aug-15 GSB Top Layer Level & FDD Checking 318+880 319+000 LHS 120
Sl.
Details Scope
No.

1 Plan and Profile


17.250 Km
(From Km. 263+000 to Km. 277+000)
3
Hume Pipe Culverts 13 Nos

4
Box Culverts 6 Nos.

5
Minor Bridges 1 No.

6
Hume Pipe Culverts at Junction Locations 29 Nos.

7 Vechicular Under Pass


(1 No.)
Pedestrian Under Pass
(2 Nos.)
Foot Over Bridges
8
( 6 Nos.)
9 Grade Separator Structure

Foundation (Pile and Pile Cap)

Substructure (Pier/Abutment Shaft)

Superstructure

10 Railway over Bridge


GAD

Foundation
Reviewed by Balance to be
AE submitted

14.000 Km 3.250 Km

11 Nos. 2 Nos.

6 Nos.

1 No.

29 Nos.

Yet to submit

Yet to submit

58 Nos. Yet to
32 Nos. Found in Submit
Order

21 Nos. Found in 69 Nos. Yet to


Order Submit

GAD Found in Structural details yet


Order to Submit

Submitted to Railway Authority


Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (
263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

Target Vs. Achived as per Work programme


Monthly Target ( Achieved Short fall
Sl. Month
Cr.) (Cr.) (Cr.)
1 Jan'16 1.067 0.67 -0.397
2 Feb'16 5.493 4.46 -1.033
3 Mar'16 12.98 9.8 -3.18
4 April'16 14.27 13.27 -1
Up to 15th
5 May'16 15.578 6.27
May'2016
6 Total 49.388 34.47
aning of Babatpur - Varanasi section of NH - 56 (From Km.
n the State of Uttar Pradesh under EPC Mode.

ved as per Work programme


Comu. Short
Fall (Cr.)
-0.397
-1.43
-4.61
-5.61

-5.61
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

Physical Progress for the Month ending 09th June 2016

A (i) Widening & Reconstruction of existing road for Rigid Pavement

Scope Weighted WORK PROGRESS in Km


Sl. No Item % Completed Physical progress % Remarks
in KM in % LHS RHS Total

1 Earthwork up to top of Sub-grade 10.500 1.257 2.310 3.840 3.075 29.286% 0.368%

2 GSB Laying 11.860 2.838 1.510 3.870 2.690 22.681% 0.644%

3 DLC Laying 11.860 2.711 2.150 - 1.075 9.064% 0.25%

4 PQC Laying 11.860 8.812 - - - 0.000% 0.00%

Road length Completed 11.860

C) Service Road/Slip Road

Scope Weighted WORK PROGRESS in Km


Sl. No Item % Completed Physical progress % Remarks
in KM in % LHS RHS Total

1 Earthwork up to top of Sub-grade 7.700 0.848 1.350 1.310 1.330 17.273% 0.15%

2 GSB Laying 7.700 1.460 1.330 1.580 1.455 18.896% 0.28%

4 WMM 7.700 1.460 1.250 1.000 1.125 14.610% 0.21%

5 DBM Laying 7.700 1.535 1.250 1.000 1.125 14.610% 0.22%

6 BC Laying 7.700 1.127 - - - 0.000% 0.00%

Road length Completed 7.7

B) Structural Works

Scope Weighted WORK PROGRESS in Nos


Sl. No Item % Completed Physical Progress Remarks
in Nos in % LHS RHS Total

HP. Culverts: Ch.267+151, Ch.267+245,ch.270+291 ,ch.275+437

Completed. Ch.275+080, 274+419,276+742,in Progress


Box Culverts: Ch. 264+072 , 265+406,267+839,267+716
1 CD Works New/ Reconstruction 21 1.016 5 23.810% 0.24%

Structures (Elevated Sections, Reinforced Earth)

Scope Weighted WORK PROGRESS in Nos


Sl. No Item % Completed Physical Progress Remarks
in Nos in % Nos Total

1 Grade Separated Structure

Piling for P-60, P-61, P-62, P-63, P-64, P-65,


P-66, P-67, P-68, P-69, P-70, P-71, P-72, P-
73, P-74, P-75, P-76, P-78, P-79,P-80, P-81,P-
1) Foundation 90 31.174 27.8 27.8 30.889% 9.63% 82, P-83, P-84, P-85, P-86, P-87, P-88 & A2.
Pile Caps are Completed for P-72, P73,P-74, P-
75, P-76,P-78, P-79, P-80, P-81,P-82, P-83, P-
84, P-85, P-86, P-87, P-88 & A2(17 nos)

P-82, P-83, P-84, P-85 & P-86 (Completed up


2) Sub - Structure 90 2.671 1.5 1.5 1.667% 0.04%
to 1st lift)

Super-structure (including crash


3)
barriers etc. complete)

4) Reinforced Earth

5) Earthwork

Other Works

Scope Weighted WORK PROGRESS in Km


Sl. No Item % Completed Physical progress % Remarks
in KM in % LHS RHS Total

(iii) (i) Road Side Drains 25.2 3.590 0.85 0 0.85 3.373% 0.12% In between Km 275+000 to Km. 276+000 LHS

Physical Progress Up to Date (09th June 2016) 12.154%


Physical Progress till last Month (30th May'16) 11.254%
Physical Progress during the Month 0.900%
Development and Construction for Four Laning of Babatpur - Varanasi section of NH - 56 (From Km. 263+000 to Km. 280+250) in the State of

PROGRESS MONITORING STATEMENT AS ON 31st Aug'2016

Monthly Target / Achievement / Short fall & Excess Cummulative Target / Achievemen

SL. Month Target Achievement Short fall / Excess Target Achievement

in Cr in % in Cr in % in Cr in % in Cr in % in Cr

1 Jan-16 1.07 0.3% 1.53 0% 0.46 0.109% 1.07 0.3% 1.53


2 Feb-16 5.49 1.3% 5.19 1.23% -0.31 -0.073% 6.56 1.6% 6.71
3 Mar-16 12.99 3.1% 9.31 2.20% -3.68 -0.869% 19.55 4.6% 16.02
4 Apr-16 14.27 3.4% 16.77 3.96% 2.50 0.591% 33.82 8.0% 32.79
5 May-16 15.58 3.7% 14.82 3.50% -0.76 -0.179% 49.39 11.7% 47.616
6 Jun-16 20.75 4.9% 15.05 3.56% -5.70 -1.348% 70.15 16.58% 62.666
7 Jul-16 22.98 5.4% 12.33 2.91% -10.66 -2.519% 93.13 22.0% 74.991
8 Aug-16 20.76 4.9% 11.73 2.77% -9.03 -2.134% 113.89 26.9% 86.722
9 Sep-16 25.84 6.1% 139.74 33.0%
10 Oct-16 31.84 7.5% 171.58 40.6%
11 Nov-16 33.02 7.8% 204.60 48.4%
12 Dec-16 31.46 7.4% 236.06 55.8%
13 Jan-17 33.84 8.0% 269.90 63.8%
14 Feb-17 33.67 8.0% 303.57 71.7%
15 Mar-17 26.70 6.3% 330.27 78.1%
16 Apr-17 19.19 4.5% 349.46 82.6%
17 May-17 20.56 4.9% 370.03 87.5%
18 Jun-17 18.38 4.3% 388.41 91.8%
19 Jul-17 18.37 4.3% 406.78 96.1%
20 Aug-17 11.84 2.8% 418.61 98.9%
21 Sep-17 4.50 1.1% 423.11 100.0%
Overall 423.11 100% 86.722
NH - 56 (From Km. 263+000 to Km. 280+250) in the State of Uttar Pradesh under EPC Mode.

G STATEMENT AS ON 31st Aug'2016

Cummulative Target / Achievement / Short fall & Excess

Achievement Short fall / Excess

in % in Cr in %

0% 0.460 0.11%
1.59% 0.153 0.04%
3.79% -3.524 -0.83%
7.75% -1.022 -0.24%
11.25% -1.779 -0.42%
14.811% -7.482 -1.77%
17.724% -18.142 -4.29%
20.496% -27.172 -6.42%
20.5% -27.17 -6.42%