Академический Документы
Профессиональный Документы
Культура Документы
1. REMOVAL
(a) PRE-REMOVAL MEASURING
(1) Before removal or cutting operations, take measure-
ments in accordance with the dimension diagram. Al-
ways use a puller to straighten a damaged body or
frame.
F10007A
F10008A
F10009A
F10010A
INTRODUCTION IN-11
F10011A
F10012A
F10015A
IN-12 INTRODUCTION
3. INSTALLATION
(a) PRE-WELDING MEASUREMENTS
(1) Always take measurements before installing under-
body or engine components to insure correct assem-
bly. After installation, confirm proper fit.
F10016A
F10017A
F10018A
F10020A
F10019A
INTRODUCTION IN-13
4. ANTI-RUST TREATMENT
(a) BODY SEALER APPLICATION
(1) For water-proofing and anti-corrosion measures, al-
ways apply the body sealer to the body panel seams
and hems of the doors, hoods, etc.
F10021A
F10022A
S Apply the anti-chipping paint after S Apply the anti-chipping paint before
the top coat. the second coat.
Top Coat
Anti-Chipping Paint
Second Coat
Top Coat
Anti-Chipping Paint
Second Coat
Under Coat (ED Primer) Under Coat (ED Primer)
Steel Metal Steel Metal
F10024A