SOAK PIT 1
TABLE OF CONTENTS
2.0.0 CONSIDERATIONS................................................................................................2
5.0.0 CALCULATION....................................................................................................... 3
6.0.0 SUMMARY.............................................................................................................. 4
/var/www/apps/conversion/tmp/scratch_6/348516397.doc UR / EL
23/12/03
Project Subject Doc. No. Rev Section
SOAK PIT 2
1. To size 1 no. Soak pit for 4 nos. GTs of capacity 50 MVA each.
2. To size one no. Soak pit for 1 GT of capacity 50 MVA and 2 Power Transformers
of capacity 31 MVA each.
3. To size one no. Soak pit for 2 Tie Transformers of capacity 37.5MVA each.
2.0.0 CONSIDERATIONS
3 nos. soak pits have been considered in the transformer yard. The capacity of each
soak pit is calculated taking the largest transformer oil capacity.
Soak pit 3 (to be located near the tie Tie Trafo yard suitably):
Rating of Tie transformer is assumed as follows:
Rating : 37.5 MVA
Oil capacity : 29000 litres.( As per BHEL Recommendation )
Soak pit volume shall be 125 % of the oil volume of the largest transformer.
/var/www/apps/conversion/tmp/scratch_6/348516397.doc UR / EL
23/12/03
Project Subject Doc. No. Rev Section
SOAK PIT 3
5.0.0 CALCULATION
H1
Soak pit 1: 1
If the drain pipe (150-mm dia.) from the transformers individual oil pits are to be
connected to the soak pit with a slope of 1 in 100.
= 0.65 metre
For a volume of 22.5 cubic meter, assuming length as 4.5 m and breadth as 3.5 m
H2 = 22.5/(4.5 *3.5)
= 1.43 metre.
Total height of soak pit = H 1 + H2
= 0.65 + 1.43
= 2.08 metre
Dimension of Soak pit 1 (L * B * H) is 4.5m * 3.5m * 2.08 m
Soak pit 2:
If the drain pipe (150-mm dia.) from the transformers individual oil pits are to be
connected to the soak pit with a slope of 1 in 100.
/var/www/apps/conversion/tmp/scratch_6/348516397.doc UR / EL
23/12/03
Project Subject Doc. No. Rev Section
SOAK PIT 4
= 0.65 metre
For a volume of 22.5 cubic meter, assuming length as 4.5 m and breadth as 3.5 m
H2 = 22.5/(4.5 *3.5)
= 1.43 metre.
Total height of soak pit = H 1 + H2
= 0.65 + 1.43
= 2.08 metre
Dimension of Soak pit 1 (L * B * H) is 4.5m * 3.5m * 2.08 m
Soak pit 3:
If the drain pipe (150-mm dia.) from the transformers individual oil pits are to be
connected to the soak pit with a slope of 1 in 100.
= 0.23 metre
For a volume of 36,250 cubic meter, assuming length as 5 m and breadth as 4.75 m
H2 = 36.250/(5x4.75)
= 1.53 metre.
Total height of soak pit = H 1 + H2
= 0.23 + 1.53
= 1.76 metre
Dimension of Soak pit 2 (L * B * H) is 5m * 4.75m * 1.76m
6.0.0 SUMMARY
/var/www/apps/conversion/tmp/scratch_6/348516397.doc UR / EL