IOCL / BHEL PANIPAT DESIGN CALCULATION -

4xFr. 6B GT COGEN PLANT FOR 4-38121-**** A Sheet No.

SOAK PIT 1

TABLE OF CONTENTS

1.0.0 PROBLEM STATEMENT........................................................................................2

2.0.0 CONSIDERATIONS................................................................................................2

3.0.0 DESIGN DATA........................................................................................................ 2

4.0.0 DESIGN CRITERIA................................................................................................. 2

5.0.0 CALCULATION....................................................................................................... 3

6.0.0 SUMMARY.............................................................................................................. 4

/var/www/apps/conversion/tmp/scratch_6/348516397.doc UR / EL
23/12/03
Project Subject Doc. No. Rev Section

IOCL / BHEL PANIPAT DESIGN CALCULATION -

4xFr. 6B GT COGEN PLANT FOR 4-38121-**** A Sheet No.

SOAK PIT 2

1.0.0 PROBLEM STATEMENT

1. To size 1 no. Soak pit for 4 nos. GTs of capacity 50 MVA each.
2. To size one no. Soak pit for 1 GT of capacity 50 MVA and 2 Power Transformers
of capacity 31 MVA each.
3. To size one no. Soak pit for 2 Tie Transformers of capacity 37.5MVA each.

2.0.0 CONSIDERATIONS

3 nos. soak pits have been considered in the transformer yard. The capacity of each
soak pit is calculated taking the largest transformer oil capacity.

3.0.0 DESIGN DATA

Soak pit 1 (Located on the western side of s/s28 Building):

Rating of Generator transformer is assumed as follows:


Rating : 50 MVA
Oil capacity: 18000 litres.( As per BHEL Recommendation )

Soak pit 2 (Located on the Eastern side of s/s28 Building):

Rating of Generator transformer is assumed as follows:


Rating : 50 MVA
Oil capacity : 18000 litres.( As per BHEL Recommendation )

Rating of Power Transformer is assumed as follows:


Rating : 31 MVA
Oil capacity: 12500 litres .( As per BHEL Recommendation )

Soak pit 3 (to be located near the tie Tie Trafo yard suitably):
Rating of Tie transformer is assumed as follows:
Rating : 37.5 MVA
Oil capacity : 29000 litres.( As per BHEL Recommendation )

4.0.0 DESIGN CRITERIA

Soak pit volume shall be 125 % of the oil volume of the largest transformer.

/var/www/apps/conversion/tmp/scratch_6/348516397.doc UR / EL
23/12/03
Project Subject Doc. No. Rev Section

IOCL / BHEL PANIPAT DESIGN CALCULATION -

4xFr. 6B GT COGEN PLANT FOR 4-38121-**** A Sheet No.

SOAK PIT 3

5.0.0 CALCULATION
H1
Soak pit 1: 1

Soak pit volume = 1.25 * 18000 H2


= 22500 litres

If the drain pipe (150-mm dia.) from the transformers individual oil pits are to be
connected to the soak pit with a slope of 1 in 100.

H1 = 0.15 + (1/100)*50, where 50 is the distance of


soak pit from the transformer oil pit

= 0.65 metre

For a volume of 22.5 cubic meter, assuming length as 4.5 m and breadth as 3.5 m

H2 = 22.5/(4.5 *3.5)
= 1.43 metre.
Total height of soak pit = H 1 + H2
= 0.65 + 1.43
= 2.08 metre
Dimension of Soak pit 1 (L * B * H) is 4.5m * 3.5m * 2.08 m

Soak pit 2:

Soak pit volume = 1.25 * 18000 H2


= 22500 litres

If the drain pipe (150-mm dia.) from the transformers individual oil pits are to be
connected to the soak pit with a slope of 1 in 100.

H1 = 0.15 + (1/100)*50, where 50 is the distance of


soak pit from the transformer oil pit

/var/www/apps/conversion/tmp/scratch_6/348516397.doc UR / EL
23/12/03
Project Subject Doc. No. Rev Section

IOCL / BHEL PANIPAT DESIGN CALCULATION -

4xFr. 6B GT COGEN PLANT FOR 4-38121-**** A Sheet No.

SOAK PIT 4

= 0.65 metre

For a volume of 22.5 cubic meter, assuming length as 4.5 m and breadth as 3.5 m

H2 = 22.5/(4.5 *3.5)
= 1.43 metre.
Total height of soak pit = H 1 + H2
= 0.65 + 1.43
= 2.08 metre
Dimension of Soak pit 1 (L * B * H) is 4.5m * 3.5m * 2.08 m

Soak pit 3:

Soak pit volume = 1.25 * 29000


= 36,250 litres

If the drain pipe (150-mm dia.) from the transformers individual oil pits are to be
connected to the soak pit with a slope of 1 in 100.

H1 = 0.15 + (1/100)*8, where 8 is the distance of soak


pit from the transformer oil pit

= 0.23 metre

For a volume of 36,250 cubic meter, assuming length as 5 m and breadth as 4.75 m

H2 = 36.250/(5x4.75)
= 1.53 metre.
Total height of soak pit = H 1 + H2
= 0.23 + 1.53
= 1.76 metre
Dimension of Soak pit 2 (L * B * H) is 5m * 4.75m * 1.76m

6.0.0 SUMMARY

Soak pit sizes are thus calculated.