Вы находитесь на странице: 1из 2

QUESTION: 1

Select the statements below that are accurate characteristics of EWM storage bin
master data. There are 3 correct answers to this question. Response:
A. They are identified by a 10 character bin coordinate.
B. They are identified by an 18 character bin coordinate.
C. The bin coordinate must be unique within the warehouse.
D. Bins can have geo-coordinates that the EWM system can use to compute travel
distances.
E. The bin coordinate must be unique within the storage type.
Answer: B, C, D
QUESTION: 2
EWM 5.0 can be used with the following releases: Choose the correct answer(s).
Response:
A. From SAP R/3 4.6C forward with Service Pack 06.
B. Only ECC 6.0 and beyond.
C. Only SAP ECC 5.0 and beyond.
D. From SAP R/3 3.0F forward with Service Pack 06.
Answer: A
QUESTION: 3
The following are structural elements that must be defined in customizing to set up
an EWM warehouse. There are 3 correct answers to this question. Response:
A. Warehouse Number
B. StorageBin
C. Storage Type
D. StorageSection
E. Picking Area
Answer: A, C, D
QUESTION: 4
The document header information is defined in the EWM system by a combination
of what two codes? There are 2 correct answers to this question. Response:
A. Item category
B. Document type
C. Schedule line category
D. Document category
E. Status profile
Answer: B, D
QUESTION: 5
Which sentence is not correct w.r.t Planned shipment Please choose the correct
answer. Response:
A. They can still change with regard to type and size, for example, due to a
subsequent delivery split in Extended Warehouse Management
B. Then you create a freight document and assign the planned shipments.
C. In EWM a freight document, which groups the planned shipments and
automatically creates a TU and/or a vehicle.
D. Planned shipment can never replaced by a final shipment
Answer: D
QUESTION: 6
Which of the following is not part of Warehouse Structural Elements? Please choose
the correct answer Response:
A. Storage type
B. Storage bin
C. Activity area
D. Yard
Answer: D
QUESTION: 7
Which of the following are putaway strategies in EWM? There are 4 correct answers
to this question. Response:
A. FIFO
B. Nextemptybin
C. Pallet
D. Open storage
E. Bulk
F. Manual
Answer: B, C, E, F
QUESTION: 8
Which standard process is supported in the SAP Extended Warehouse Management
(SAP EWM) radio frequency (RF) framework? There are 2 correct answers to this
question. Response:
A. Delivery creation
B. Goods issue posting
C. Warehouse order confirmation
D. Deconsolidation
Answer: C, D
QUESTION: 9
A work center in EWM is represented by what organizational unit? Choose the
correct answer(s). Response:
A. Storage Section
B. Storage Type
C. Activity Area
D. StorageBin
Answer: B
QUESTION: 10
What organizational unit is the Supply Chain Unit assigned? Choose the correct
answer(s). Response:
A. Storage Type
B. Plant
C. EWM Warehouse Number
D. Activity Area
Answer: C

Вам также может понравиться