SOCIEDAD MINERA CERRO VERDE

Project: Cerro Verde Production Unit Expansion


Project No.: A6CV

TRANSMITTAL FORM

To: Marta Cabanillas / Lady Diaz TDC Transmittal N: A6CV-PDDM-T-2109


cc: Jerry Pessah Date: January 16th, 2014
From: Frank Chen / Maria del Pilar Wong Contract: A6CV-00-K171

Location: Arequipa Reference: K171-TR-0001

Subject: K171 GyM // K171 - AREA 1 PRIMARY CRUSHING & CONVEYING (CSMP) // Documentos revisados por SMI

For your information, the following documents are available in POL:


Cantidad/
tem Documento No. / Document No. Rev. Descripcin/Description Archivo/File Tipo/Type
Quantity

QUALITY ASSURANCE AND CONTROL


1 K171-C2-PCC-05-01 A Electrnico A 1
PLAN

10

11

12

13

A= Proceed E= Issued for Review and Comments


B= Proceed/change as noted and resubmit F= Issued for Approval
C= Do not proceed/change as noted and resubmit G= Issued for Construction
D= Information Only H= As-Built
Q= Quality is below standart/ correct and resubmit I= Others (RFI Response)
S= Superceded Observations:
V= Drawing is voided and no longer required

The review by SMI whit or whithout comments, shall not relieve Contractor of any obligations or requirements under the contract not be construed as an authorization of or
consent to any deviation from the contract. Any financial or schedule consequences resulting from comments made by SMI must be brought to attention of Fluor withing the
Period of time stated in the contract, and will be subject to the changes article of part III of the Contract.
Atentamente,

Received By:

(Print Name)

Milton Lpez P.
Maria del Pilar Wong
Project Document and Data Management Lead - Site Date: