Heavy Rail
Do you have large
infrastructure costs?
Need flexibility?
1999-2003 2004-2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Designs for
30 (.762m)
and 48 (1.22m)
width cars are
now available
Discharge Arrangements
(Cont.)
PLC PLC PLC PLC PLC 5 PLCs located along R-V Route
All 5 programmed the with same code
for all R-V installations
360o Dump Loop
~18 D/S ~18 D/S ~18 D/S ~18 D/S ~18 D/S Total 90 Drive Stations
PLCs PLCs PLCs PLCs PLCs
Each with a PLC
All programmed the with same code
for all R-V installations
GREEN TECHNOLOGY . . .
No diesel particulate emissions
QUICK DEPLOYMENT . . .
Enables rapid mine development compared
to traditional mining methods
QUIET OPERATION. . .
More than 50% quieter than conveyors
LAYOUT FLEXIBILITY. . .
Modular design allows ability to reuse, relocate and extend
the system to follow activity expansion
No mid-life overhauls
- Hub/Wheel bearings and clevis car connections
designed to go 20 year life
- Motors and gear boxes are proven industrial
products designed for heavier and much higher duty
service
OPEX
10-20% of Trucks
80% of Conveyors
CAPEX
Similar to Trucks
50% of Conveyors
Rail-Veyor OPEX
Over 80% lower than
conveyor
Over 90% lower than
trucks
Rail-Veyor provides
significant savings
(over 80%) in
Operating Costs
compared to trucks
Phakisa Mine,
South Africa
1 km haulage distance
Shuttle style operation
15% gradient uphill haul
1 train 432 ft (132m) long
26 Drive Stations (100HP x 2 motors)
Loading Speed 0.25 to 0.45 m/s
Dumping Speed 1.5 m/s
Travel Speed 3 m/s
15,000 RVT hours injury free
Achieved 400-470 ft./week of drift development
2 to 4 times faster than traditional methods!