KSS Global Standard

Supplier Run at Rate Procedure

KSS GLOBAL STANDARD

Supplier Run at Rate Procedure

KSS 702

Document No: 1005108


Author:

Frank Lin

Approved by:

Brian Schantz

Hubert Ross

Dieter Hahn

Mike Rawson
Alexandru Iedu

Jim Scarpa

Rodolfo Ventresca

Christa Kerlin

Document History

Revision:
Release Date
ECP No.
03
07 June 2013

54513

02

Revise Responsible Depar

Procurement

23 June 2009

36121

Revise document to refle

Doc. No: 1005108 Rev. 3 Page 1 pyof printed:11 07Unc-J

(KSS template no. 10338


KSS Global Standard
Supplier Run at Rate Procedure

Rate Forms
Run at Rate to be conduc Run at Rate Documentatio SQA with PPAP
Documentat Revise wording for clari Release as North America
01 13 January 2005 83889A

Corporate 82000913)
Doc. No: 1005108 Rev. 3 Page 2 pyof printed:11 07Unc-J

(KSS template no. 10338


KSS Global Standard

Supplier Run at Rate Procedure

Table of Contents

INTRODUCTION ..................................................................................................................................................

1
PURPOSE ...................................................................................................................................................

2
SCOPE ........................................................................................................................................................

RESPONSIBILITY.......................................................................................................................................

DEFINITIONS / ABBREVIATIONS .............................................................................................................

5
PROCESS MAP ..........................................................................................................................................

5
6
PROCEDURE ..............................................................................................................................................

6.1 PREPARATION FOR RUN AT RATE ............................................................................................

6.1.1 TRIALS MUST BE REPRESENTATIVE .................................. OFMASS PR


7

6.1.2

MATERIALS ........................................................................................................................

6.1.3

SUPPLIER ..........................................................................................................................

6.1.4

QUALITY AND QUANTITY .............................................................................. TARGETS


8

6.1.5

DOCUMENTATION ............................................................................................................

6.1.6

PARTICIPATION ................................................................................................................

8
6.2 PERFORMING THE ............................................................................................... RUNATRATE
9

6.2.1

PRODUCTION ................................................................................................ TRIALRUN


9

RUN AT RATE REVIEW CONTENT........................................ANDDOCUMENTA9

6.2.3

PACKAGING AND..........................................................................................HANDLING

6.2.4
NF ALI . . . . . . . . . ATR LI UN

10

6.3 NOTIFICATION OF RUN .............................................................................. ATRATERESULT


10

6.3.1
PA S . . . . . . . . . . .

10

6.3.2
O PEN . . . . . . . . . . .

10

6.3.3
... .... .......... .... .... .......... .... .... .......... .... .... .......... .... .... .......... .... .... .......... .... .... .......... .... FAIL

11

REFERENCES............................................................................................(RELATEDDOCUMENTS)
11

APPENDICES ..........................................................................................................................................

11

Doc. No: 1005108 Rev. 3 Page 3 pyof printed:11 07

(KSS template no. 103


KSS Global Standard

Supplier Run at Rate Procedure

Introductio
n
Systems
This uirements(KSS
Key )Standardrelat
Rate
Safety Processanyne
Supplier wwhicompone
his PPAP
Run at approval.
number
prior to

Purpose

To ensure the
suppliersss
actualiscapablemanufac
of components that
meet KSSntson
-atgoingquotedqualit
capacity for a
specifiedtyrequperireme
ntsodoftimear KSS
Quality First Supplioner
PMartnual,Approvathe
(PPAP) Manual, and the
mostductionrecentdrawi
nKSS

Scope

This procedure shall


be used by all KSS A
Run at Rate self
assessmentofeachis
PPAPamandle
submission. KSS
shouldforbe
anypreseRunt at Rt
rated CLD 3.

Responsibility

The CLD level for


3.1 SQE

each gpartthe
numberESImee

KSS SQE Dept. shall


participateandtransfe
rin level to the APQP-
Trackertyof.theItSQEi
s D assure each part
number
trackedhasCLDin-l
defined.
KSS SQA Dept. is
SQA

reviewinggularthebasis
APQP

setting up the Run at


yRate.TheparticipRunat
be conducted prior
to,PAPor
Productioinconjun KSS
SQA Dept reserves
erthep roductiightton
Run at Rate of all
partsere
ratdeemedCLDne for
parts rated CLD 1
orTheCLDsupplier2att
notified in advance of
KSS particip

3.3

attentionThersupplierbeingmustpaidinclud
Suppli

etomblyatbottleRaandte,llnewprocewithcksp
facilities or cells. theAllcorrectpocesses
notations made to indicatetobeanyrunproco
to new model / old modelquirementsbuildout.

Doc. No: 1005108


Rev. 3 Page 4 pyof
printed:11 07
(KSS template no. 103
KSS Global Standard

Supplier Run at Rate Procedure

Definitions / Abbreviations
CLD Control Level Definition

PPAP Pre Production Approval Process

Process Map
Prepare resources following

> Run at Rate Worksheet,

Necessary

resouces
the listed steps below:

> Supplier Planning Data

Supplier

Trials, Materials, CapacityQuantityRequiremeOperationts, Quality &

for Run at Rate


> KSS required data (section 6.1.5)

Targets, Documentation, and Participation

>

Run at Rate Worksheet


> Written Work Instructions

Trials must be representative of Mass Production:

Related equipments

> Visual Manufacturing Aids

> Facilities, tooling, equipment complete


and parameters

>

> Mass Production Quality Control Plan

Fixtures, gages, controls complete

Supplier

>
Operations>Tool changes and set up instructions and

sheets

last trial runs

Trained Operators same as in Mass> Pr ducti

Line Speed (tact time)

>

Production method mustctionbe the same

Mass
>

Mass Production tool and machine capacities, as

and include the points listed in "Outpu "

quoted
>

All materials used duringss Run at Rate must be ma

Purchasing orders

production materials.ubricants,Including direct material, l


>

Mass Production compatible material

Supplier

cleaning material and any otherOperationssupprt mat rial.

sub suppliers

>

>

Preventive Maintenance Plan


Repair and maintenanceper parts shall be a ailable

preventive maintenance plan

>

Process Flow
Diagram

>

>

Process Control Plan, with Reaction Plan

Supplier must prove Customer's Quality>DFMEACapacity/PFMEA

Capacity requirements

Requirements prior to Run at Rate

>

Master Parts
(if available)

Supplier

>

Requested documents shallOperationsbeavailable>DeptOperator. Instructions

from KSS

>

Controls shall be ateriinplalceuntiltoisolateit> Inspectionincomingm Instructions

has been approved

>

Packaging / Labeling Plan


>

Preventive Maintenance Plan

>

Quality Parts produced must satisfy the approv

SupplierrequirementsQualityandquantityfrom

production drawing and ble)boundary samples (if applica

and quantity target

>workQuantityallowed) Themustratebeoofclearlyreconsecutive-OperationsspecifiedgoodDept..partsQuality(n
This quantity shall betherreached without impacting o
production lines or processes.

Related documents

> The completed SectionsRateAand B of> Suppplier RunPlanning Data & KSS required Data

Worksheet shall be availablete. prior tolistthed Runi sectionatRa

6.1.5

Supplier

Operations Dept.
requested by KSS

> Completed Sections eC atthroughthe F shall>Runbe atavailablRateWorksheet

end of the Run at Rate.


> Supplier operations
> A representative fromentKSSforSQA Dept. shall be pres

Suppliermanager and quality

the entire Run at Rate.

Operations>KSS monitored Run at Rate

KSS SQA

>

The lead supplier representativersQuality

and the supplie


KSS Plant>Supplier monitored Run at Rate

>KSS SQA

Manager shall attend the Run at Rate and approve th

results.
Doc. No: 1005108 Rev. 3 Page 5 pyof printed:11 07

(KSS template no. 103


KSS Global Standard

Supplier Run at Rate Procedure


> Run at Rate

> Run the processes accordinge to the KSS Run at Rat

Worksheet

Sheet

> Supplier Planning

Requirements
>Capacity

Supplier

> Review all

Run at Ratend contentsthenOperationsduring running,Caculation

Data

> Run a Rate Summary Sheet

> KSS Required


record all datas and prionsblemsforaccordingly,

take act

the problems

Supplier Production

> Production

must be continuousSpeed

Mass Production
Operations

Output of the proces constantly recorded

with output contstantly recorded


> Process shall be stoppedof1 afterhour production period

> Countermeasures shall be applied

Output of

> Process shall be repeatediaare until

he >targetCapacitycriterCalculation Sheet of the Run at Rate


Supplier

achieved

Operations

Worksheet.

constantly
> Results must be recordedion on the Capacity Calculat

Sheet of the Run at Rate Worksheet


To verify that supplier'slan, processthe is according to p

following shall be proven:


> Net output from each operation can support quoted

capacity

> Tooling meets the quoted up time requirements


> Any unexpected downtimeingmust be documented includ

Capacity Calculation

the corrective action(s) taken

SupplierSheet of the Run

> Any regular maintenancewedandOperationsotherdowntime is Runrevat Rate Worksheet.

Rate Worksheet.

and recorded in the Run at Rate Worksheet


> All line changeovers,thifn theany, can be performed wi

quoted Tooling Capacity Requirements


> Monitor the use and effectivenessixtures, of all checking

gages and controls per Process Control Plan.

> Workability, safety andpartergonomicof

issues shall be
the review.

>

In-Process and Final Shipment Packaging shall be

Supplier

reviewed for preservationomicsof

quality
and ergon

>

Op rations

Packaging and Handling Specs

>Packing materials

The suppliers methodthemust

effectively

eliminate

potential for process errors or mixed stock


Capacity caculation!
An additional trial shallhalf bea shiftconducted for

at least

Supplier

Operations

Additional Trial

OK

to establish consistencyct levelsofoutput. and confirm reje


> Capacity

"

Send the notification plantofRunSQA,OperationsRateresult to KSS

Sheet

Supplier/SQA

SQA

will verify the Run at RateKSS Plant SQA


> Run at Rate

Summary Sheet
Capacity

Run at Rate result willationbe judgOperationsdbyCapacity C cul

Supplier/SQASheet
Sheet
KSS Plant

SQA

Run at Rate results

Capacity

some minor non-conformances to the requirements wer


#

found that need to be corrected.

Run at Rate Worksheet including Corrective

SupplierSheet

Operations

Actions

Corrective Action shallt Ratebedefined in the KSS Run a


Worksheet.

Run at Rate

Once the Corrective Actionpleted,Plan is successfully com

verification will be ncedone by Operationsthesupplier and evide


Supplier/SQAincluding

Completed

Corrective Action Plan

Actions

provided to KSS SQA Dept. KSS Plant SQA


In most cases another Run at Rate is not required

Fail indicates a serioust non-conformance exists tha

Capacity Caculation

requires significant ectaction. by the supplier to corr

Run at Rate Worksheet including Corrective


SupplierSheet

An additional Run at Rate willOperationsberequired

Actions

Corrective Actions shallat Ratebedefined in the KSS Run

Worksheet.
Completed Corrective

Once the Corrective Actionpleted,Plan is successfully com

"

the KSS SQA Dept. will scheduleo a new Run at Rate t

Supplier

KSS SQA

New

Run at Rate
Action Plan

verify the successful iveimplementationaction

of the correct

plan

SQA
All Run at Rate Requirements were met

RunKSSat SQARate

Passed

Doc. No: 1005108 Rev.


3

Page
6 pyof printed:11 07
(KSS template no. 103
KSS Global Standard

Supplier Run at Rate Procedure

Procedure

Preparation for Run at Rate

Trials must be representative of Mass Production

Facilities, tooling,eteand. equipm

All process checkings shallfixtures,bec functional and in placesual.


aids,Operato available.

Operators must be trawillnedbeandusem Mass Production. The trialfrom


shall

Production method mustctionbetheands include:

Written Work Instructions


Visual Manufacturing Aids
Mass Production Quality Contr
Tool changes and set up instr
Mass Production line speed (t

Mass Production toolquotedandmach

Materials
All materials used duringproductionRat Ram This does not
only includeelllubricantsdirectm material and any
otherdsupportmaintenancmate shall be available per
Preventive M

Supplier

Prior to the Run at Rate,rmhistheabilitysuppl


customers quality capacitytionofrequirethesu
manufacturing processes ghsh allRunbe atac
conducted by the suppliersted. inAllChaptdoc shall be
available fromd duringthesuppliethe Controls shall be
in placerial untiltoisolait approved.

Doc. No: 1005108 Rev. 3 Page 7 pyof printed:11 07

(KSS template no. 103


KSS Global Standard

Supplier Run at Rate Procedure

6.1.4 Quality and Quantity Targets

Quality Parts producedproductionmstsatisdr boundary


samples (if applicable). Quantity The rate ofe
-consecutiveworkallowe satisfy KSS mass
productionstbevolumeclearl specified. This
quantityimpactingshall othebe production lines or
processes.

6.1.5 Documentation

At the time of the RunenatationRate,shalthe available:

a) Process Flow Diagram


b) Process Control Plan, with React c) DFMEA / PFMEA

d) Master Part(s) (if available) e) Operator Instructions

f) Inspection Instructions g) Packaging / Labeling Plan

h) Preventive Maintenance Plan Note: The


completed sectionsrRun atA andRat
Worksheet shall be avateilable. pr Completed
sections C throughatthe F end of the Run at
Rate.

6.1.6 Participation

KSS Monitored

A representative from KSSforSQAtheDepten. Rate. No portion of


thermedRun wiathouR personnel present.

An exemption may be grantedssrunsif thefor days and


therefore the completeitnessed proin In this case, KSS SQA
shalldocumentatnsur provided by the supplierent.
KSStheirSQAo participation, and includeintothetheirsupp
documentation.
Supplier Monitored

The lead supplier representativectmanager isor appointee.


In addition,agertheor suppldesi attend the Run at Rate and
approve Note: Equipment suppliersay beandasked/or

participate.
Doc. No: 1005108 Rev. 3 Page 8 pyof printed:11 07

(KSS template no. 103


KSS Global Standard

Supplier Run at Rate Procedure

KSS will inform the suppliLDervelin ofadve component


and as a resultheRunof atheRatepa

Performing the Run at Rate

Production Trial Run

During each individualntinuoustrial, produatma production


speeds with nstantlytheoutputreco If it becomes clear
that,hetheprocesstarget stopped after a productionur.
Countermeperiod improve the
performanceocessshallrepeatebeap the target criteria
forved .theTheprocessresul recorded on the Capacityun
CalculatioRateWo Note: All parts
manufacturedbeuseddurinfor
production shipment, implyingngesor ot tuning have
occurred. ovReworkedbyK SQA prior of being
shippedction. to K

6.2.2 Run at Rate Review Content and Documentation

The Run at Rate is a ofverificationthesuppliet


manufacturing process meetroncustomer-goingq
and at the quoted tooledthatcapacitythesupp.
process is to plan requires:
a)
Net output from eachd operationcapacity c
b)
Tooling meets the quoted up time
c)
Any unexpected downtimedingmustthebeco
action taken
d) Any regular maintenanceviwedandandother
in the Run at Rate Worksheet
e)
All line changeovers,ith inf theany,quoca
Capacity Requirements
f)
Monitor the use andg effectivenesfixtures,g
controls per Process Control Plan

g)
Workability, safetye andpartergonomiofthe
6.2.3 Packaging and Handling

In-process and final shvipmewentd forpackapr of part


quality and erghodnomicsforin. -prTh final shipping
packagingely andelimihanatedli potential for process
errors or mix
Doc. No: 1005108 Rev. 3 Page 9 pyof printed:11 07

(KSS template no. 103


KSS Global Standard

Supplier Run at Rate Procedure

6.2.4 Final Trial Run

Once the targets for quantityatRateandpartq been achieved,


an additionaledfor attrialleas and a minimum number
ofsistency300units,of confirm reject levels process(these
trialscapab Note: All parts manufacturedbeuseddurinfor

production shipments providedngesor ot tuning have


occurred. ovReworkedbyK SQA prior of being
shippedction. to K

Notification of Run at Rate Result

When the trial is completed,alltheareasu KSS Run at


Rate Worksheetl.be Thisincluddo the PPAP
documentation andt. submittewithin working days of the
Runate canRatehavedat three results: pass; open or
fail.

6.3.1 Pass

Pass indicates that allreRunmetat. RateThe demonstrated


the capabilityeettheto qualiprod requirements at quoteda
ctuapalcitymanufa(ne process matches the
ManufacturingAllkey pra characteristics were
monitoredequirementsand. systems were documented
tationandpracticwas and updated.

6.3.2 Open

Open indicates that sometheminorrequiremnon-were found


that need tothisbe correctearethat output meets volume
requiremenacity;thatsbu systems have minor
deficmaienciesntenance(e.s lacking, lack of
errorequateproofing,operatoin instructions /
visualomplete,aids,operatominor in meeting customer's
ongoing. quali Corrective Action shallt
beRatedefinedWorksh Once the Corrective
Actionpleted,Planverifis be done by the supplierS andSQA
evidencDepart In most cases another Run at Rate i

Doc. No: 1005108 Rev. 3 Page 10opyof printed:11 0

(KSS template no. 103


KSS Global Standard

Supplier Run at Rate Procedure

Fail

Fail indicates a serioust requiresnon-conforsi action by


the supplierun toat corrRate ctwil. Corrective Action
shallt beRatedefinedWorksh Once the Corrective
Actionpleted,Plantheis K Dept. will schedule a
newsuccessfulRunat Ra implementation of the
Corrective Ac

References (Related Documents)

KSS Run at Rate Worksheet (Document#


KSS Early Supplier Involvementent#1012767)(ESI)

Quality First Supplier Manual(Docume


AIAG PPAP Process Manual

Appendices

None
Doc. No: 1005108 Rev. 3 Page 11opyof printed:11 0