MAINTENANCE
MPD PLANNING
ENVELOP
DATA
DOCUMENTATION
SUPPORT
AMTOSS reference
Manufacturer Manufacturer
Manufacturer
Maintenance tasks Technical
Technical
for A320 and publications
Additional tasks data base publications
successive aircraft* data
included for their data base
base
economic
effectiveness
MPD
Maintenance
Planning
Document
* A318, A319, A321, A330, A340, A380
(all Volumes)
To optimise the packaging when the interval does not permit inclusion in a
whole A or C event interval, those tasks are de-escalated to a more frequent
package. In addition as the major event is planned to correspond with the
minor event, some threshold or interval values could be truncated at this
occasion.
The example covers the first 6 YE of utilization corresponding to the first
intermediate heavy check. These examples do not consider the planning of
Sampling tasks.
A320FAM Planning Example c.) based on 2800 - 3500FH/YE and 2.6 FH/FC
iaw MPD R28
A318/A319/A320/A321 MAINTENANCE PLANNING DOCUMENT
A/C Utilisation Data: 2800-3500FH & 2.6 FH/FC EVENTS every 600 FH
RELATED
SAMPLE SAMPLE 100% 100% TO N 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2
TASK NUMBER
THRESHOLD INTERVAL THRESHOLD INTERVAL FLIGHT C 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7
CYCLE
200001-01-1 36 MO X
200001-02-1 72 MO
200002-01-1 36 MO X
200003-01-1 72 MO
200003-02-1 72 MO
200003-03-1 72 MO
212100-01-1 24000 FH *
212100-01-2 24000 FH *
212100-02-1 12 YE *
212141-01-1 5000 FH X X X
212300-01-1 12 YE *
212300-02-1 1000 FH X X X X X X X X X X X X X X X X X X X X X X X X X X X
212600-01-1 600 FH X X X X X X X X X X X X X X X X X X X X X X X X X X X
212600-02-1 20 MO X X X
212600-03-1 6000 FH X X X
212600-04-1 12000 FH X
212600-05-1 24000 FH *
212600-06-1 24000 FH *
212600-07-1 24000 FH *
212600-08-1 20 MO X X X
212600-09-1 40 MO X
212600-10-1 6000 FH X X X
212600-11-1 3600 FH X X X X
212600-12-1 3600 FH X X X X
212641-01-1 6 YE
Maintenance Tasks"Due to nearest 600FH" (iaw MPD Rev.28, based on: 3500 FH/YE, 2.6 FH/FC)
350
300
250
N of Tasks/Tasks MH
200 NUMBER OF
TASKS
NUMBER OF
150 HOURS
100
50
F H F H F H F H F H F H F H FH FH F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H F H
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 00 00 00 00 00 0 0 0 0 0 0 0 0 0 0 00 00 00
60 1 2 1 8 2 4 3 0 3 6 4 2 4 8 5 4 6 0 6 6 7 2 7 8 8 4 9 0 9 6 1 02 1 08 1 14 1 20 1 26 1 32 1 38 1 4 4 1 5 0 1 5 6 1 6 2 1 68 1 74 1 80 1 86 1 92 1 98
600 FH Events
MPDS
MPD PLANNING
DATA
MPDS
MAINTENANCE PLANNING DATA SUPPORT
MPDS
( refer to Customer Service Catalog 2005)
WP available in:
Word/PDF-File
Plg Data
Task on Mag.Support
Struct.Data File(TSDF)
ASCII-File
( CD-ROM)
( CD-ROM)
The OMP lists all scheduled tasks contained in the Planning data
package and provides the planning, preparation and technical
information required to perform them.
Airline Logo
Airline Logo
MPDS
AMM
SUPPORTING
DATA
Job Cards
Job Cards are extracted from the customised Aircraft
Maintenance Manual(AMM) and contain information such
as:
Equipment and Material
Procedure
Illustrations as necessary
According to commercial agreement, Job Cards can be revised in parallel with the AMM
revision cycle.
Job Cards
Job Cards (SA / LR) are linked thru the Amtoss task
number in the OMP to the Customer AMM.
Job Cards
Job Cards
Job Cards