Вы находитесь на странице: 1из 1

Comment Response Sheet (CRS) Lift-Dock Project Page 1/1

Comment Response Sheet (CRS)


Document/Drawing Title/Description RFQ for Navigation Aid System
LD100-ELE-RFQ-1406
Document (s)/Drawing (s) No. Rev. A

Response Date 22/12/2016 Rev A

Drawing Status

AME2 COMMENTS

No. Section in document AME2 COMMENTS ODS RESPONSES STATUS

Please replace ABS Guide for Building and


1 Section 3 Classing Mobile Offshore Units - 2008 (updated Comment incorporated
to Jan. 2016)
Please include the masthead light must be
2 Section 8.4 Comment incorporated
located at least 1 metre above the sidelights
Please include - The wiring must be installed in
accordance with a recognised wiring code and
3 Section 8.8
the circuit should be fitted with a fuse or circuit
Comment incorporated
breaker.
Marking has included: Each navigation light
should be marked with the manufacturers name
or symbol, and designation of type; different
4 Section 11 Comment incorporated
applications according to COLREG, and
delimitation angles; production and certificate
number.

Originator, ODS
Date Signature Reviewed by, AME2 (Project Owner) Date Signature
(Engineering Consultant)
Sharan Satheesh/ Kaustabha
22/12/2016 SS/KD Eason Lim 22/12/2016 EL
Das

CRS No:CRS-LD100-ELE-RFQ-1406 Rev A

Вам также может понравиться