Вы находитесь на странице: 1из 1

JOB HAZARD ANALYSIS

Before work begins, identify potential hazards and use and appropriate method to minimize

exposure risk to all workers

Listed below is a hazard analysis according to job to be done on the project:


POTENTIAL
JOB PERFORMED TASK STEPS RISK LEVEL CONTROLS FOLLOW UP
HAZARDS

Use low impact


Impact from
Med shovel, Foreman
digging
Rotate Workers
Excavation Earth Digging Slip (due to rain or
Use of signage,
exposure to high
Low Additional Foreman
amount of water on
manpower
excavated area)
Use safety harness
Fall High Foreman
Erection of
Scaffolds Readily available
Hand Injuries Low First-Aider
first-aid kit
Erection and
Use of safety Foreman
Dismantling of Fall High
harness
Scaffolds and Other
Working Platforms Dismantling of
Ensure signage
Scaffolds
are in place and Supervisor
Impact from falling
clear to workers
debris High
and public
Make sure main
power must be
Electrocution High turned off when Leadman
Temporary Electrical installation is
Wire Installation
Connections/Installation ongoing
Make sure fire
Fire High extinguishers are Foreman
readily available
Use safety harness
High
Pouring of
Fall Leadman
Concrete Readily available
Low
Use of Scaffolds and first-aid kit
Other Temporary Ensure the area
Working Platforms where plastering is
Plastering on Impact from falling
Med done must be Leadman
Walls debris
secured with safety
net
Use safety harness
Plastering on
Fall High Foreman
Walls Readily available
Working at unprotected first-aid kit
elevated working Ensure the area
platforms or surfaces where plastering is
Impact from fallig
Piling of CHB wall Med done must be Supervisor
debris
secured with safety
net