Вы находитесь на странице: 1из 1

Index 389

Five-step process unabsorbed overhead, 332 Labor laws, federal, 13538


International, 4 underabsorption of, 33234 affirmative action programs, 138
United States, 4 Americans with Disabilities Act, 137
Five-step project initiation process, 45 Identification of photographs, 6971 equal employment opportunity laws,
Float (slack), 214, 226, 231, 232, 235 i-j numbers, 230, 230f, 232, 234f 13537
who owns it, 227 Impact costs, 30910 labor-management relations laws, 135
Flow charts Implied warranty, 307 National Apprenticeship Act, 137
change order procedure, 321f Information, request for (RFI), 8385, 84f wage and hour laws, 137
closeout procedure, 364f Initiating a Change Order, Request workers compensation, 138
five-step process, 4f for, 317 Labor relations
hazardous waste contingency plan, 136f Inspection administration of union contract, 139
Issue management, 79f of equipment, 43 collective bargaining, 139
logic flowchart for risk decisions, 165 philosophy of, 24647 construction unions, 13839
nonconforming work or test results, 189f plan, development of, 4243 contractor-employee relationship, 139
progress payment flow diagram, 261f punch list, 36063 prejob labor agreements, 13940
risk decisions, logic flow chart for, 165f safety, 4142 Labor standards review records, 6566
Force account, 26770, 34647 Inspection, directing the contractors work, Landline telephone, 3536
cost plus, 267 2329, 3002 Laws affecting construction, 13140
day work (FIDIC), 114, 267 case study, 2526 Leadership in Energy and Environmental
equipment, 269 Inspections and tests Design (LEED), 93
equipment list, 26970 covering work before, 244 Liability insurance, 17980
force account payment, 270 giving notice of, 244 automobile, 180
labor, 269 instructions to field personnel, 24647 automobile medical payments, 180
labor list, 270 providing materials for, 244 automobile physical damage, 180
materials, 269 time of, 244 completed operations, builders risk, 180
as a payment method, 26869 who pays for, 244 comprehensive general, 17980
subcontractor markup, 270 Inspection and testing manual, 47, 188 contractual or assumed liability, 180
U.S. Corps of Engineers, 267 Inspector, 15, 3650, 52 independent contractors, protective
See also Day work responsibility and authority, 2129 liability, 180
Format of specifications, 10118 why needed, 2223 personal injury, 180
3-part section format, 105f Instructions to bidders, 100 premises-operations, 180
AASHTO format, 1067 Instructions to field personnel, 24647 umbrella excess liability, 180
APWA format, 107 Insurance, 193, 17980 Liability sharing, See Risk allocation and
Caltrans format, 106 liability, 17980 liability sharing
CSI format, 105, 107f, 108, 121, 122 property, 18081 Liens, waivers of, 27577, 373
CSI Masterformat, 102f, 104f submittal of evidence of, 181 Life expectancy of electronic storage, 55
division/section concept, CSI, 103 workers comp, 138 Limited authority, 22
DOT, 1067 Intermittent inspection, documentation of Public agency, 132
FHWA format, 1067 of, 59 Line-of-balance charts, 21113
FIDIC international format, 11314 International Building Code, 129 Lines of authority, 2122
international construction contracts, International Conference of Building actual authority, 21
11315 Officials (ICBO), 129 agency relationship, 22
state highway formats, 1057 plumbing code, 129 apparent authority, 21
technical provisions, 1056, 108 Uniform Building Code, 128 delegation of authority, 22
Uniform Mechanical Code, 129 guidelines for, 22
General conditions of contract, 11213, International construction contracts, Liquidated damages, 456, 282, 35760
11718, 11921, 319f 11315 computation of, 35859
supplementary, 12021 International Federation of Consulting FHWA table of, 106
General contractor, See Contractor, Engineers (FIDIC), 23, 100, validity of, 35859
general (prime) 113, 114 Washington DOT formula, 271, 274
General Services Administration (GSA), 11f International terms, 4, 11314 Litigation, project records in
recommending BIM, 93 Investigation of field problems, 5961, as first line of defense, 347
Greenbook, 107, 115 60f, 61f litigation process, 347
Guaranty (warranty), 3078 noncompliance, 299300, 300f planning strategy, 347
Guide specifications, 110, 124, 215 proceed, 4, 197203, 202f, 203f prelitigation use of, 347
Invoicing, electronic, 77f Logbook, See Diary (logbook)
Hazardous waste, 135 Issue management, electronic, 79f Logic loops, 22526
Heavy construction specifications, 105 Long-lead procurement, 11, 205, 214, 297
Home office overhead, 33236 Jet Propulsion Laboratories (JPL), 114
computation methods, flaws in use of, Job site, photo Management, construction, 511,
33436 complex connection, 92 1517, 18, 20
Eichleay Formula for, 33234 Jury instructions-civil, negligence, 342 Management reporting, electronic, 856

Вам также может понравиться