Вы находитесь на странице: 1из 4

Fosroc Conbextra HF constructive solutions

Dual expansion system for shrinkage compensated,


highly fluid cementitious precision grout

Uses Standards compliance

Conbextra HF is used for free flow precision grouting in a Conbextra HF is suitable for use in contact with potable water.
wide range of heavy duty applications, such as :
Conbextra HF meets or exceeds the test requirements of
Machine base plates ASTM C 1107.

Bridge bearings
Description
Crane rails, Generators, Presses, Milling machines
Conbextra HF is supplied as a ready to use pre-bagged dry
Anchor bolts & rods powder. The addition of a controlled amount of clean water
produces a free-flowing precision grout for gap thicknesses
Column bases
from10 to 125 mm. In addition the low water requirement
Precast elements ensures high early strength and long term durability.

Conbextra HF is a blend of Portland cements, graded fillers


Advantages
and chemical additives which impart controlled expansion in
Unique non-metallic dual expansion system both the plastic and hardened states. The filler grading
compensates for shrinkage in both the plastic and minimises segregation and bleeding over a wide range of
hardened states. application consistencies.
Excellent initial flow and flow retention.
Technical support
High early strength facilitates rapid installation and early
operation of plant. Fosroc offers a comprehensive technical support service to
High ultimate strength and low permeability ensure specifiers, end users and contractors. It is also able to offer
durability of the hardened grout. on-site technical assistance, an AutoCAD facility and
dedicated specification assistance in locations all over the
Hydrogen-free gaseous expansion.
world.
Chloride free.
Suitable for pumping or pouring over a large range of
application consistencies and temperatures.

Figure 1 : Typical specification drawing


Conbextra HF
Fosroc Conbextra HF

Properties The compressive strength of the grout must exceed 50 N/mm2


at 7 days and 65 N/mm2 at 28 days.
The following results were obtained at a water:powder ratio of
0.22 and a temperature of 20C. The storage, handling and placement of the grout must be in
strict accordance with the manufacturers instructions.
Test method for Typical result
Compressive strength
Instructions for use
BS 1881 part 116 1983 : 20 N/mm2 @ 1 day
55 N/mm2 @ 7 days Preparation
68 N/mm2 @ 28 days
Concrete surface
Flow
ASTM C1437-01 : Greater than 150% The substrate surface must be free from oil, grease or any
Setting time loosely adherent material. If the concrete surface is defective
ASTM C191-01a : or has laitance, it must be cut back to a sound base. Bolt
Initial set : 355 minutes @23C holes and fixing pockets must be blown clean of any dirt or
Final set : 415 minutes @23C debris.
Time for expansion
Pre-soaking
Plastic state : Start 15 minutes
Finish initial set For a minimum of 2 hours prior to grouting, the area of cleaned
Hardened state : Start initial set substrste should be flooded with fresh water. Immediately
Finish up to 28 days before grouting takes place, any free water should be removed.
Fresh wet density : Approx. 2200 kg/m3 Particular care should be taken to blow out all bolt holes and
BS 1881:107:1983 pockets.
Modulus of elasticity
Base plate
ASTM C 469-02 : >22,000MPa
Expansion : Upto 2% in accordance It is essential that this is clean and free from oil, grease or
characteristics with ASTM C 940:98a scale. Air pressure relief holes should be provided to allow
venting of any isolated high spots.
Specification
Levelling shims
Supplier specification
If these are to be removed after the grout has hardened, they
Where mentioned on the contract documents, all precision should be treated with a thin layer of grease.
grouting (specify details and areas of application) must be
Formwork
carried out using Conbextra HF manufactured by Fosroc and
used in accordance with the manufacturers data sheet. The formwork should be constructed to be leakproof as
Conbextra HF is a free flowing grout. This can be achieved by
Performance specification
using foam rubber strip or mastic sealant beneath the
All precision grouting (specify details and areas of application) constructed formwork and between joints.
must be carried out with a pre-packaged cement based product,
In some cases it is practical to use a sacrificial semi-dry sand
which is non-metallic and chloride-free.
and cement formwork. The formwork should include outlets
It shall be mixed with clean water to the required consistency for the pre-soaking water.
and not exhibit bleed or segregation.
Unrestrained surface area
A volumetric expansion of up to 2% shall occur while the grout
This must be kept to a minimum. Generally the gap width
is in a plastic state by means of a gaseous, hydrogen-free
between the perimeter formwork and the plate edge should
system. The grout must also be compensated for shrinkage
not exceed 75 mm on the pouring side and 25 mm on the
in the hardened state.
opposite side. There should be no gap at the flank sides.

Conbextra HF- Page 2 of 4


Fosroc Conbextra HF

Mixing Maximum flow distance at 20C


Max. flow distance in mm
For best results a mechanically powered grout mixer should
Grout Gap depth 100 mm 250 mm
be used. For quantities up to 60 kg a slow speed drill fitted with
consistency mm head head
a Fosroc Mixing Paddle (MR3) should be used. Larger quantities
will require a high shear vane mixer. Do not use a colloidal Flowable : 10 360 1200
impeller mixer. 20 950 2600
30 1500 3000
It is essential that machine mixing capacity and labour availability
40 2200 3000+
is adequate to enable the grouting operation to be carried out
50 3000 3000+
continuously. This may require the use of a holding tank with
provision for gentle agitation to maintain fluidity. Fluid : 10 900 2500
20 1900 3000
Consistency of mixed grout
30 3000 3000+
To achieve the consistencies the amount of clean water 40 3000+ 3000+
that is added to a 25 kg bag at 20C is:
Placing
Figure 2: Typical hopper system
At 25C, place the grout within 15 minutes of mixing to gain the
Flowable : 5 litres for 25kg bag full benefit of the expansion process.
Fluid : 5.5 litres for 25kg bag
Conbextra HF can be placed in thicknesses up to 125 mm in a
The selected water content should be accurately measured single pour.
into the mixer. Slowly add the total contents of the Conbextra HF
Any bolt pockets must be grouted prior to grouting between the
bag, mix continuously for 5 minutes, ensuring a smooth, even
substrate and the base plate.
consistency is obtained.
Continuous grout flow is essential. Sufficient grout must be
available prior to starting and the time taken to pour a batch
must be regulated to the time taken to prepare the next one.

The mixed grout should be poured only from one side of the
void to eliminate the entrapment of air or surplus pre-soaking
water. This is best achieved by pouring the grout across the
shortest distance of travel. The grout head must be maintained
at all times so that a continuous grout front is achieved.

Where large volumes have to be placed Conbextra HF may be


pumped. A heavy duty diaphragm pump is recommended for
this purpose. Screw feed and piston pumps may also be
suitable.

Curing

On completion of the grouting operation, exposed areas should


be thoroughly cured. This should be done by the use of Concure
curing membrane, or continuous application of water and/or
wet hessian.

Cleaning

Conbextra HF should be removed from tools and equipment


with clean water immediately after use. Cured material can be
removed mechanically, or with Fosroc Acid Etch*.

Conbextra HF - Page 3 of 4
Fosroc Conbextra HF

Sampling procedure Estimating

Cementitious grouts cannot be tested as concrete. Special Supply


sampling procedure are required. Refer to your local Fosroc Conbextra HF : 25 kg bags
office for further details.
Yield
High temperature working Flowable : 13.75 litres / 25 kg
Fluid : 14.25 litres / 25 kg
It is suggested that, for temperatures above 35C, the following
guidelines are adopted as good working practice: Note: Allowance should be made for wastage when
estimating quantities required.
(i) Store unmixed material in a cool (preferably temperature
controlled) environment, avoiding exposure to direct
Storage
sunlight.
Conbextra HF has a shelf life of 12 months if kept in a dry
(ii) Keep equipment cool, arranging shade protection if
store in sealed bags. If stored in high temperature and high
necessary. It is especially important to keep cool those
humidity locations the shelf life will be reduced.
surfaces of the equipment which will come into direct
contact with the material itself.
Precautions
(iii) Try to eliminate application during the hottest times of the
Health and safety
day and in direct sunlight.
Conbextra HF is alkaline and should not come into contact
(iv) Make sufficient material, plant and labour available to
with skin and eyes. Avoid inhalation of dust during mixing.
ensure that application is a continuous process.
Gloves, goggles and dust mask should be worn.
(v) Water (below 20C) should be used for mixing the grout
If contact with skin occurs, wash with water. Splashes to eyes
prior to placement
should be washed immediately with plenty of clean water
and medical advice sought.
Limitations
Fire
- In general, grouts should not be placed in any unrestrained
situation, i.e. base plate plinths, etc. Failure to comply Conbextra HF is non-flammable.
may lead to crack development in the grout. However they
can be used for bolt pockets. In doubt, please consult
your local Fosroc offices for more details.

* Denotes the trademark of Fosroc International Limited



See separate data sheet

Important note
Fosroc products are guaranteed against defective materials and manufacture and are sold subject to its standard Conditions for
the Supply of Goods and Service. All Fosroc datasheets are updated on a regular basis. It is the users responsibility to
obtain the latest version.

Head Office
telephone: (+9714) 2039699 fax: (+9714) 2859649 email: agf@fosroc.com
Al Gurg Fosroc LLC
Regional offices
Post Box 657, Dubai Abu Dhabi, Al Gurg Fosroc telephone: 673 1779 fax: 673 1449 email: abudhabi@fosroc.com
United Arab Emirates Bahrain, YBA Kanoo telephone: 17738200 fax: 17732828 email: bahrain@fosroc.com
Kuwait, Boodai telephone: 4817618 fax: 4832124 email: kuwait@fosroc.com

www.fosroc.com
Oman, Al Amana telephone: 24815080 fax: 24817554 email: oman@fosroc.com
Qatar, Tadmur telephone: 4432365 fax: 4419517 email: qatar@fosroc.com

UAE/0329/11/I

Вам также может понравиться