Вы находитесь на странице: 1из 5

Curriculum Vitae of

MACARIO I. MAGAYON JR.

OBJECTIVE:
I would like to work for your company as a rigger/Offshore Onshore.

SUMMARY OF QUALIFICATION:
We conduct of job safety analysis (J.S.A) Awareness Safety, working in Onshore/Offshore as a Rigger/Roust about my
experience about the operation of the crane lifting are almost 12 years In different kinds of project and construction oil and
gas plant. I have a lot of experience about heavy lifting and erections of materials and hook up installation of jack house,
work of on pipeline, working barge, platforms jack derrick barge, worked in several different countries and nationalities , we
also responsible for maintenance of all rigging equipment and lifting tackle and cleaning and painting to the main deck etc.
especially safety at all the times.

PERSONAL PROFILE:
Position Desired : Rigger
Name : Macario I. Magayon Jr.
Permanent Address : Brgy. Badiang New
Nationality : Filipino
Age : 40 Year Old
Sex : Male
Date of Birth : June 22, 1970
Place of Birth : Sogod Southern Leyte
Religion : Roman Catholic
Civil Status : Married
Dialect Spoken : Tagalog, English, Spanish
Name of Spouse : Anelene M. Magayon
Name of Father : Macario Magayon Sr.
Name of Mother : Belia Magayon
Passport No. : xx-3036800
Issued At : D.F.A. Manila Phil.
Expiry Date : February 17, 2014
SIRB No. : BO758726
Issued At : T.M. Kalaw Ave., Manila Phil.
Expiry Date : July 22, 2014
SRC No. : NCR1571109

PROPESSIONAL WORK EXPERIENCE: (Include all companies and start with present employer)
1. Company : ROYAL OYSTER GROUP (ROG)
Position : Rigger Offshore
Type of Vessel : Jack up Accommodation Barge
Vessel Name : Barge JU-251 Offshore (2234 GRT)
Inclusive Date : July 6, 2011 Feb. 8, 2012
Working Location : Salman-GLP Platform Oil Field Iran

DUTIES AND RESPONSIBILITIES:


Prepared all rigging equipment for lifting materials and provisions, the supply boat already alongside after that start
offloading cargoes we used four legs sling for lifting any containers with four lifting eye, use wire rope for lifting the drill
pipes and drill colar and heavy wall pipes in loading/unloading the equipment from the rig floor. We use Manitowoc Series
model 77-with capacity of 150 tonnes if the crane standby I do some maintenance to the crane and some work on deck.

2. Company : ABOITIZ JEBSEN MARITIME INC.


Position : AB/Rigger Operator
Vessel name : M/V 2GO2 (EX ANNETTES)
Type of Vessel : Container Ships (10878 GRT)
Inclusive Date : December 20, 2010 March 20, 2011
Country : Philippines

DUTIES AND RESPONSIBILITIES:


Prepare of all equipment for lifting from the container cargo from the port area
We use of spreader beam (during loading and discharging of cargo and) crane maintenance at sea repair of machinery
components and also reporting of any accident near accident or incident to the engineer on duty/officer, officer on duty/
especially safety at all the times.

Company : SOGECO S.A. MEGPL. EG. LNG PROJECT


Position : Rigger offshore/onshore
Vessel name : Elevating Platform
Type of Vessel : Marathon Production Platform (14847 GRT)
Inclusive Date : Jan. 15, 2010 May 20, 2010
Country : Punta Europa, Malabo Equatorial Guinea West Africa

DUTIES AND RESPONSIBILITIES:


As a rigger, responsible for make sure about the safety procedure and practices during lifting operations. We
prepared of all rigging equipment for lifting materials and provisions, the supply boat already alongside the platform. Start of
loading and unloading cargos, we use four legs sling for lifting any container etc, they report of any incident or accidents,
abnormal situations and potential hazards to the deck supervisor, roust about participates very actively with the (JSA) job
Safety analysis programs.
WORK EXPERIENCE:

Company : EEI- Corporation


Position : Rigger
Project name : Shell Petro Chemical Expansion Project
Inclusive Date : February 20, 2009 June 30, 2009
Country : Philippines

DUTIES AND RESPONSIBILITIES:

Preparation of rigging tools, sling wire rope, nylon sling shackle, tag-line, chain block, plate clamp and assist the
crane operator and setting of the crane level prior to lifting . After that erection of structural steel box column. I beam gerder
and also piping and heavy wall pipes & pipes spool and installation of mechanical equipment, motor pumps, control valve,
compressor turbine, and generator and also alignment especially safety at all the time.

WORK EXPERIENCE:

Company : GROUP FIVE INTERNATIONAL LTD. (PTY)


Position : RIGGER /Scaffolding
Project name : TENKE FUNGURUME MINING PROJECT
Inclusive Date : Feb. 15, 2008 January 16, 2009
Country : Democratic Republic of Congo, South Africa

DUTIES AND RESPONSIBILITIES:

Preparation of material loading and unloading of P.Spool and Structural materials and deliver at lay down yard area.
After that erect or structural steel box column, H beam, ruffter, and angular brussing and also erection of thickener, column,
pipe brussing. After that sag plate and steel plate, also alignment, after that erection of cylinder tank for leach tank for leach
tank erection plate schedule 16MM and big size diameter, after that install mechanical piping work, gate valve, control
valve, compressor and pump and vessels especially safety at all time.

WORK EXPERIENCE:

Company : EEI- Al RUSHAID CONST. CO. LTD. (JOINT VENTURE)


Position : RIGGER
Project name : ESTERN PETROCHEMICAL PROJECT (SHARQ) ETHYLENE
Inclusive Date : May 8, 2006 Nov. 20, 2007
Country : Jubail K.S.A (Kingdom of Saudi Arabia)
DUTIES AND RESPOSIBILITIES:

Preparation of materials, after that erection of structural steel pipe rack and erect, column girdle and rafter trusses,
angular and, installation of pipe spool and straight run pipes for the common pipe rack area and battery limit cold box and
compressor area erection and assists fit-up of the pipe large bore pipe, prior in connection of vessel through cold box and also
preparation for Commissioning hydro testing and install blinding system and alignment of the pipe of the pipe as required in
accordance with the safety system of working.

WORK EXPERIENCE:

Company : BECHTEL INTERNATIONAL INC.


Position : RIGGER
Project name : TRAIN 1 EG, LNG, PROJECT
Inclusive Date : September 22, 2005 March 24, 2006
Country : Malabo Equatorial Guinea West Africa
DUTIES AND RESPONSIBILITIES:

Prepare all equipment for lifting materials , and erection of structural steel pipe rack and piping and heavy wall pipes,
installation mechanical motor pumps, compressor, control valve , also erection of heavy left column vessels, drum vessels and
exchanger assist of erection of turbine generator and also alignment assemble and dismantle of crawler crane such as
Manitowoc series crane 800 tons, safety at all the time.

WORK EXPERIENCE:

Company : ALYUSR TOWNSEND & BOTTUM QATAR CO. LTD.


Position : RIGGER
Project name : QATAR PETROLEUM PLANT, DUKHAN OIL FIELD
Inclusive Date : July 14, 2004 August 2, 2005
Country : Doha State of Qatar

DUTIES AND RESPOSIBILITIES:

Preparation of all rigging tools, after that safety first & toolbox meeting, used the barricades tape, attending shut
down schedule including A1 Qatar-Petroleum Plant, Dukhan Field, preparation prior in blinding of the system and erection of
the structural & mechanical to replace all damage valve and pipe spools, after that open man way tray prior inspection and
repair if necessary to ensure that the bolts and gaskets are correct and good quality and work permits system, especially safety
at all time.

WORK EXPERIENCE:

Company : LINDE LINARCO CONT. LTD.


Position : RIGGER
Project name : TITANIUM TETRACHLORIDE PRODUCTION FACILITIES PROJECT
Inclusive Date : August 01, 2003- Feb. 20, 2004
Country : Riyadh Saudi Arabia Sabic Project

DUTIES AND RESPOSIBILITIES:

Erection and installation of structural & mechanical of different pipe spool as per isometric drawing, field, erection of
spools and straight run pipes, erection and assist fit-up for the common pipe rack area, flare generator house and area storage
tank farm, execute some revision of other lines with the consent of immediate superior with or without revision plans, if
required erection of standard pipe support including Commissioning some punch list works. Responsible for the house
keeping of the unit area within the working perimeter, especially safety all the time.

Company : SAMSUNG SAUDI ARABIA CO. LTD.


Position : RIGGER
Project name : SPC. PHD / POLYPROPYLENE PROJECT
Inclusive Date : Sept. 02, 2002 July 31, 2003
Country : AL Jubai Industrial City K.S.A.
DUTIES AND RESPOSIBILITIES:

First, safety toolbox meeting, every morning after that preparation of the rigging tools, for erection & setting the
crane level prior to lifting, structural & mechanical erection of pipe rack column H beam, girdle, rafter angular brussing,
erection and installation of mechanical equipment, vessel and install heavy wall & pipe spool and rundom pipe, battery limit
coldbox and compressor area erection of reactor and control valve and gate valve and etc. after that ( Furnace Department )
safety all the time.

Company : PEOPLES ASIA PACIFIC CONSTRUCTION CORP.


Position : RIGGER
Project name : AC HYDRO POWER PLANT, BAKUN BENGUET PROJECT
Inclusive Date : June 12, 1999 Feb. 15, 2002
Country : Philippines

DUTIES AND RESPOSIBILITIES:

Preparation hauling and lifting of material from the yard, structural erection of steel column H beam, girder trusses
and all structural, mechanical pipe tank and installation also of pipe the big size diameter of copier dam pipe and install-wipe-
achydro power plant, after that install anchor riles, also I beam bridge and turbine house of bakun hydro power plant,
especially safety at all times.

Company : STEEL CENTRE PHILIPPINES INC.


Position : RIGGER, ERECTOR
Project name : PETRO CHEMICAL PLANT PROJECT
Inclusive Date : April 08, 1997 March 12, 1999
Country : Philippines, Bataan

DUTIES AND RESPOSIBILITIES:

Install of anchor bolt setting also alignment after that I continue the erection of column girder I beam, ruffter and
trusses all structural commercial Bldg. industrial plant, erection of pipe rack, and also pipe spool battery limit, install of pipe
support area, erection pump, compressor, valve control valve gate valve area after that install of routing piping work around
the furnace, especially safety all times.

Company : PIDCO STRUCTURES INTERNATIONAL, INC.


Position : RIGGER
Project name : COMMERCIAL BUILDING & IND. PALNT PROJECT
Inclusive Date : March 04, 1996 Feb. 07, 1997
Country : Philippines

DUTIES AND RESPONSIBILITIES

Preparation of rigging tools, sling shackle, tag-line, chain block for erection. After that assist the crane operator bye
means of spotting and proper location and also perform the international hands signals to the crane operator prior to erection
of structural steel building and also install of tower crane and erection column I beam girder, rafter and pipe trusses all
member, structural, install of cooling tower, erection of galvanizing, column H beam, girder, trusses and brassing and also
erection of mechanical, safety at all times.

Company : AL_YUSR TOWNSEND & BOTTUM CO. LTD


Position : RIGGER
Project name : IBN SINA NMC NATIONAL METHANOL & NIGC PLANT
Inclusive date : Oct. 15, 1993-June 27, 1995
Country : Jubail Kingdom of Saudi Arabia

DUTIES AND RESPONSIBILITIES:


Preparation of materials loading or unloading of pipe spool and structural from the yard erection and
Installation of pipe inside the pipe rack as per punch scheduled of list fabrication, erection and routing
Of the piping work around the furnace, erection of the panel board and also installation of convention
Steam drums, pipe work, down comers and riser pipes, and assist of fit up and lifting of the pipe, and also erection
turbine compressor and pump valve, control valve, especially safety at all the times.

ATTENDED SEMINARS & TRAINING CERTIFICATE COURSE.

National Assessment Certificate (NAC)


Proficiency in Survival Crafts and Rescue Boats (PSCRB)
Rating Forming part of Navigation Watch Keeping
ISM Code Familiarization
Ship Security Awareness
Hazard Recognition Training
Personal Survival Technique
Fire Prevention and Fire Fighting
Personal Safety and Social Responsibility
Sea Survival Practical Training
Hydrogen Sulphide Breathing Apparatus (H2S) Practical Training

CERTIFICATE: RIGGING SLINGING/TRAINING SEMINARS ATTENDED

1. Fahss Trans Vaal Training Rigging & Safe Lifting Practice


Congo South Africa February 21, 2008/Cert. NO. 111530
2. Fahss T.U.V. Rigging Natl Inspection Technical Testing Co. LTD.
K.S.A.Dated No. Issued: Sept 18, 2007/Cert No: 20063147
3. Fahss Executive Technical Consultants Trade Test Center
Phils. Dated No. Issued: August 20,2005/Cert No:05081328
4. Fahss Velosi Certification LLC. Certify Rigging/ Slinging
Doha State of Qatar Dated Issued: Nov. 20, 2004/Cert, No: AYT/04128-VQ
5. Hydrogen Sulphide Breathing Apparatus (H2S) Practical Training
Qatar Dated Issued: September 22, 2004/Cert No: 16 of 4668, Dukhan Oil Field
6. Certificate of Safety Recognition
K.S.A Dated Issued: Jan 06, 2003/Cert No: 00023(SAUDI POLYPROPYLENE COMPANY)
EDUCATIONAL BACKGROUND:

Graduated Vocational Education: Building Wiring Electricity 1995 1996


Graduated Secondary Education: Las Nieves National High School 1985 1989
Graduated Elementary Education: Mahay Elementary School 1977 1984

SKILLS AND KNOWLEDGE:

CRANE OPERATOR/ MOBILE AND TOWER CRANE

I hereby that the above information are true and correct to the best of my knowledge and belief.

MACARIO I. MAGAYON JR.


Applicant

Вам также может понравиться