INFORME FINAL DEL PROYECTO DE

VENTILACIN.

AREA: VENTILACIN- HIGIENE INDUSTRIAL-


PRODUCTIVIDAD

ELABORADO POR:

1. APAZA CHAMBI, MARIO

2. QUISPE ALI, MARCO ANTONIO

3. SOTO VILLEGAS, FAVIO OSCAR

Inmaculada, 28 de Febrero del 2017.


INDICE

1 INTRODUCCION..............................................................................1

2 OBJETIVOS......................................................................................1

3 PROCEDIMIENTO DE TABAJO..........................................................2

3.1 USO DE HERRAMIENTAS Y EQUIPOS..........................................3

4 DIRECCIONES DEL FLUJO DE AIRE FRESCO EN BM Y RB.................4

4.1 Malla De Medicin En Boca Mina Y Raise Boring.......................4

4.2 Velocidad Promedio De Direccin De Aire Fresco......................5

4.2.1 Hipervnculos de direcciones del flujo de aire fresco..........6

4.2.2 Hipervnculo Lnea Base (Base De Data) (FORMATO


EXCEL)............................................................................................6

5 VELOCIDADES Y COORDENADAS UTM EN CADA PUNTO DE


MONITOREO..........................................................................................7

5.1 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL)..9

6 INVENTARIO DE VENTILADORES AXIALES.....................................10

6.1 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL)10

7 SITUACION DE LOS RAISE BORING PRINCIPALES..........................11

7.1 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL)11

8 BALANCE DEL AIRE PRESENTADO CON FECHA: 11-01-2017........12

8.1 Cuadro de resumen.................................................................12

8.2 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL)12

9 BALANCE DEL AIRE PRESENTADO CON FECHA: 23-01-2017........13

9.1 Cuadro de resumen.................................................................13

9.2 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL)13

10 BALANCE DEL AIRE PRESENTADO CON FECHA: 31-01-2017......14

2
10.1 Cuadro de resumen..............................................................14

10.2 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL)


14

11 BALANCE DEL AIRE PRESENTADO CON FECHA: 20-02-2017......15

11.1 Cuadro de resumen..............................................................15

11.2 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL).


15

12 BALANCE DEL AIRE FINAL FECHA: 28-02-2017..........................16

12.1 Ingreso De Aire Fresco.........................................................16

12.2 Salida De Aire Viciado..........................................................17

12.3 BALANCE DE AFOROS..........................................................17

12.4 Equipos que labora en mina.................................................18

12.5 Personal Que Labora En Mina...............................................19

12.6 Caudal Requerido (Personas y Equipos)...............................19

12.7 Balance Total De Aire...........................................................20

12.7.1 Hipervnculo Lnea Base (Base De Data) (FORMATO


EXCEL). 20

13 CAIDA DE PRESION DE VENTILADORES......................................21

13.1 Tabla De Cada De Presin Aplicando La Frmula De Atkinson.


21

13.2 Factor De Conversin De Acuerdo Al Material De La Manga.


22

13.2.1 Valores De Longitud Equivalente De La Manga..............22

13.2.2 Hipervnculo Lnea Base (Base De Data) (FORMATO


EXCEL). 22

14 VENTILACION EN FRENTES DE TRABAJO....................................23

14.1 Hipervnculos Ventilacin En Frentes de Trabajo..................23

15 CONCLUSIONES..........................................................................24

3
16 RECOMENDACIONES..................................................................25

17 ANEXOS N 01 - FOTOGRAFIAS..................................................26

4
1 INTRODUCCION
Debido a la necesidad de realizar una ptima evaluacin y
levantamiento de lnea base (base de data) de ventilacin, que son
necesarios y fundamentales en el proceso de ventilacin y as evitar
reingenieras que retrasen el tiempo estimado de avances en las
operaciones de mina, este trabajo propone informar detalladamente
con el levantamiento de lnea base .

2 OBJETIVOS.
a. Realizar el levantamiento de lnea base de la situacin actual
en ventilacin de mina.
b. Contar con el caudal necesario tanto en la Ventilacin Principal y
Auxiliar..
c. Proponer las mejoras continuas.

CONSIDERANDO:

CFM: Pies cbicos por minuto (Cubic Feet per minute). Indica el flujo
de aire que pasa por un punto estacionario en un minuto.

m3/s: Metros cbicos por minuto. Indica el flujo de aire, que pasa por
un punto estacionario en un segundo. m3/s = 60 m3/min = 2118.88
CFM.

HP: Caballaje de fuerza (Horse Power). Potencia desarrollada por el


motor.

Po = presin atmosfrica a nivel del mar = 1 atmosfera = 101325 Pa.

D: = densidad de aire a nivel del mas = 1.225 Kg/m3.


2.1 USO DE HERRAMIENTAS Y EQUIPOS
Induccin correspondiente para el manejo y cuidado de los equipos de

monitoreo: VENTIS MX4, ANEMOMETRO, TERMIGOMETRO, HAZ DUST

IV

Imagen: 1

Imagen: 2

3 DIRECCIONES DEL FLUJO DE AIRE FRESCO EN BM Y


RB.
3.1 Malla De Medicin En Boca Mina Y Raise Boring.
La toma de data para cada Boca Mina y Raise Boring, se realiz
mediante la siguiente malla de distribucin con 5 puntos de radio de
influencia, y con el objetivo de llegar al promedio real segn
levantamiento de lnea base (base de data), cada medicin se realiz
25 veces (Ver las siguientes imgenes).

3.2 Velocidad Promedio De Direccin De Aire Fresco.

CUADRO N01. RESUMEN DE VELOCIDADES PROMEDIO.

CIA Minera Ares


U.M. Inmaculada S.A.C.
VELOCIDADES PROMEDIO DE AIRE FRESCO BM Y RB
rea: Ventilacin - Higiene Industrial - Productividad
VELOCIDADES Etiquetas de
(m/s) columna
Etiquetas de fila P-1 P-2 P-3 P-4 P-5
BOCAMINA
4300 1.412 1.200 1.200 1.271 1.303
4400 2.838 0.963 1.150 1.463 1.244
4500 1.511 1.571 1.808 1.425 1.660
4560 1.103 1.481 1.839 1.667 1.916
SUPERFICIE
RB 10 0.740 0.998 0.800 0.713 0.823
RB 7 0.486 0.844 0.712 0.700 0.300
RB 01 0.186 0.139 0.246 0.210 0.176
1.22 1.39 1.32 1.39
Total general 1.418 7 2 0 4
Nota: El monitoreo en RB-1 se realiz en interior mina.

GRAFICO N 01 DIRECCIONES DE AIRE EN BOCA MINA Y RAISE


BORING
DIRECCIONES DE AIRE FRESCO (m/s)
3.000

2.500

2.000

VELOCIDADES 1.500

1.000

0.500

0.000

3.2.1 Hipervnculo Lnea Base (Base De Data) ( FORMATO

EXCEL)

EXCEL: (DIRECCIONES 41DE AIRE


FRESCO)
4 VELOCIDADES Y COORDENADAS UTM EN CADA
PUNTO DE MONITOREO.
CIA Minera Ares
U.M. Inmaculada S.A.C.
COORDENADAS UTM - PUNTOS DE MONITOREO
rea: Ventilacin - Higiene Industrial - Productividad

VELOCIDA
NIVE PUNTO DE D ALTURA
ITEM LADO LABOR NORTE ESTE
L MONITOREO PROMEDI (m)
O (m/s)
8346531.10
1
RP 8707 BP 4620 SW PM - 1 1.49 4616.780 7 688766.971
8346547.65
2 BP 4620 SW
RP 8707 PM - 2 1.72 4619.532 3 688783.371
8346567.07
3 BP 4620 NE
RP 8707 PM - 3 0.52 4619.766 9 688809.899
4620
8346580.97
4 BP 4620 NE
RP 8707 PM - 4 0.33 4619.581 7 688826.442
8346577.44
5 RP8702
RP 8707 PM - 5 0.82 4618.347 9 688795.048
RP
6
RP 8707 +8707/AVANCE PM - 6 1.20
8346528.83
7
RP 8707 RP (+) 8800 SE PM - 6 1.35 4598.341 2 688771.170
8346527.43
8
4600 RP 8707 BP 4600 NE PM - 7 0.43 4599.939 2 688796.270
8346461.31
9
RP 8707 BP 4600 SW PM - 11 0.82 4600.093 5 688730.955
10 RP 8707 ACC 0004 ACC 0004 1.12
8346583.00
11 RP (+) 8707 PM - 13 4592.057 688769.313
RP 8707 1.20 0
8346536.87
12 BP 4580 SW
RP 8707 PM - 15 0.24 4581.038 9 688807.798
8346618.56
13 4580 RP 8707 BP 4580 NE PM - 16 2.72 4582.978 3 688868.822
8346687.35
14
RP 8707 RP (+) 8828 PM - 17 0.67 4582.717 7 688971.110
8346420.60
15
RP 8707 BP 4580 SW PM - 18 0.13 4581.919 0 688703.209
8346612.00
16
RP 8707 RP 8707 PM - 18 2.16 4575.204 0 688822.688
8346561.00
17
RP 8707 RP 8707 PM - 19 1.96 4557.798 0 688726.750
8346319.50
18 BP 4560 SW
RP 8707 PM - 21 1.25 4562.384 0 688600.625
8346446.00
19 4560 RP 8707 BP 4560 SW PM - 22 1.44 4562.572 0 688729.938
8346510.00
20
RP 8707 RP (+) 8734 PM - 25 0.71 4558.564 0 688735.813
8346669.00
21
RP 8707 BP 6460 NE PM - 68 0.83 4563.393 0 688954.750
8346724.20
22
RP 8707 CA 6712 - RB 11 PM - 74 1.51 4564.833 0 689010.589

23 4540 8346605.50
RP 8707 RP 8707 PM - 26 1.43 4540.858 0 688830.000
8346850.66
24
RP 8707 BP 4540 NE PM - 27 1.17 4549.236 5 689099.669
8346735.18
25
RP 8707 BP 4540 NE PM - 29 1.30 4548.242 6 689012.306
8346438.56
26 BP 4540 SW
RP 8707 PM - 31 1.32 4544.281 1 688725.024
27 RP 8707 RP 8808 PM - 34 0.45 4545.785 8346555.00 688820.688
0
8346631.00
28
RP 8707 RP 8707 PM - 35 1.61 4537.576 0 688803.313
8346220.32
29 4500
BP 4500 PM - 36 5.81 4517.123 0 688504.524
8346425.14
30 BP 4500
BP 4500 PM - 38 3.39 4525.646 0 688722.542
8346444.03
31 BP 4500
BP 4500 PM - 39 2.66 4525.633 4 688742.771
8346503.08
32 BP 4500
BP 4500 PM - 40 2.65 4525.225 3 688796.624
8346548.46
33 4500 BP 4500 RP (-) 8741 PM - 44 1.90 4533.760 4 688790.770
8346551.00
34
BP 4500 BP 4500 PM - 45 2.53 4527.257 0 688845.833
8346666.43
35
BP 4500 BP 9006 A PM - 46 1.46 4529.457 1 688920.268
8346769.40
36
BP 4500 BP 9006 B PM - 48 1.32 4529.975 2 688997.608
8346786.83
37
BP 4500 BP 4500 PM - 53 0.47 4530.571 4 689067.057

VAN

VIENE.

CIA Minera Ares


U.M. Inmaculada S.A.C.
COORDENADAS UTM - PUNTOS DE MONITOREO
rea: Ventilacin - Higiene Industrial - Productividad

VELOCID
NIVE PUNTO DE AD ALTURA
ITEM LADO LABOR NORTE ESTE
L MONITOREO PROMEDI (m)
O (m/s)
4468.85 8346870.72
38 RP (-) 9234
RP -9234 PM - 78 0.53 2 8 689277.759
4490.46 8346877.38
39 RP (-) 9234
RP -9234 PM - 79 0.99 6 1 689140.457
4480
4515.66 8346943.89
40
RP -9234 BP 6460 NE PM - 52 0.34 3 0 689317.079
4517.67 8347167.88
41
RP -9234 BP 6460 NE PM - 80 0.12 1 0 689575.087
PM - 04 4507.26 8346392.16
42
RP -8741 RP 8649 SW Lugar83 0.47 9 5 688656.035
4505.99 8346342.53
43
RP -8741 CAM 6307 NW PM - 01 0.72 6 2 688659.814
4480
4506.63 8346457.55
44
RP -8741 BP 6460 SW PM - 02 0.51 8 0 688777.383
4509.05 8346621.97
45
RP -8741 VE 8955 SE PM - 03 0.72 5 3 688924.204
4484.94 8346439.25
46
RP -8741 BP 6450 SW PM - 83 0.03 9 4 688764.767
4482.41 8346511.92
47
RP -8741 CX 6520 SE PM - 88 0.51 9 7 688783.214
4460
4485.25 8346490.28
48
RP -8741 BP 6450 NE PM - 85 0.68 6 2 688834.446
SN 6450 - 4488.32
49
RP -8741 V.4NE PM - 86 0.04 3 834651.323 688987.479

50 4440 4468.05 8346610.21


RP -8741 BP 6440 NE PM - 91 0.09 6 8 688959.498
51 RP -8741 BP 6440 SW PM - 92 1.57 4468.46 8346533.81 688883.272
7 2
4464.61 8346593.62
52
RP -8741 RP 6590 NW PM - 93 0.61 4 4 688904.966
4449.60 8346360.81
53
RP -8741 BP 6430 SW PM - 01 0.42 9 1 688721.898
4447.89 8346489.42
54 4420 RP -8741 BP 6430 NE PM - 02 0.39 1 7 688860.878
4451.47 8346627.08
55
RP -8741 BP 6430 NE PM - 03 0.57 7 9 688992.152
4409.14 8347841.75
56
RP -8741 BOCAMINA PM - 73 3.49 7 9 688545.278
4428.70 8346451.60
57
RP -8741 RP 8741 (-) PM - 110 1.58 2 8 688691.320
4424.66 8346404.06
58
RP -8741 RP 6420 SE PM - 99 0.17 3 3 688680.247
4400
4428.96 8346315.46
59
RP -8741 BP 6420 SW PM - 100 0.37 3 5 688690.091
4428.80 8346379.33
60
RP -8741 BP 6420 SW PM - 101 0.75 4 7 688743.536
4432.43 8346581.11
61
RP -8741 BP 6420 SW PM - 102 1.07 3 8 688955.005
4440.49 8346891.94
62 0.03
RP -9234 BP 6420 NE PM - 01 3 0 689366.124
4400
4441.56 8347006.12
63 0.02
RP -9234 BP 6420 NE PM - 02 0 3 689464.481
4422.14 8346874.17
64 BP 6370 NE PM - 04 689365.928
RP -9234 0.22 8 7
8346837.71
65 4375 RP -9234 BP 6370 NE PM - 116
0.24 4414.62 3 689293.79
8346818.49
66 PM - 117 4414.14 689246.783
RP -9234 RP 9234 (-) 0.17 4
4410.42 8346449.46
67
RP -8741 XC 6458 SE PM - 111 0.51 3 3 688770.385
4410.32 8346388.01
68
4375 RP -8741 BP 6370 SW PM - 112 0.49 7 5 688767.625
4411.44 8346436.03
69
RP -8741 BP 6370 NE PM - 113 0.47 3 4 688816.260
70 RP -8741 BP 6370 SW PM - 117 0.22
4400.12 8346491.04
71
RP -8741 RP 8741 (-) PM - 01 0.75 6 4 688825.149
4392.94 8346517.68
72 4360 RP -8741 CX 6566 NW PM - 02 0.47 8 1 688880.303
4396.20 8346525.32
73
RP -8741 BP 6360 NE PM - 03 0.44 3 7 688918.202
4406.79 8346813.82
74
RP -9234 BP 6360 NE PM - 01 0.87 3 5 689289.611
4398.78 8346770.37
75 4360 RP -9234 BP 6360 SW PM - 01 0.65 1 6 689182.285
4384.11 8346780.76
76
RP -9234 RP 8741 (-) PM - 120 0.92 1 9 689258.120

VAN

VIENE.

CIA Minera Ares


U.M. Inmaculada S.A.C.
COORDENADAS UTM - PUNTOS DE MONITOREO
rea: Ventilacin - Higiene Industrial - Productividad
VELOCIDA
NIVE PUNTO DE D ALTURA
ITEM LADO LABOR NORTE ESTE
L MONITOREO PROMEDI (m)
O (m/s)
8346882.09
77
RP -9234 BP 6350 NE PM-03 0.09 4383.935 8 689385.514
78 RP -9234 BP 6350 SW PM - 09 0.29
4345 8346798.64
79
RP -9234 BP 6350 NE PM-121 0.22 4385.421 3 689301.954
8346704.09
80
RP -9234 BP 6350 SW PM-04 0.58 4379.45 2 689121.934
8346787.06
81
RP -9234 BYP 6340 NE PM-01 0.51 4369.796 2 689316.231
4330
8346871.23
82
RP -9234 BYP 6340 NE PM-02 0.19 4366.176 1 689397.270
8346728.56
83
RP -8741 BYP 6340 SW PM-01 0.20 4357.199 7 689186.937
4330
8346670.18
84
RP -8741 BYP 6340 SW PM-02 0.21 4360.06 8 689113.850
8346762.25
85
RP -9234 BP 6330 NE PM-128 1.70 4346.462 6 689295.361
8346781.18
86 4315 RP -9234 BP 6330 NE PM-01 0.08 4346.932 0 689330.457
8346819.64
87
RP -9234 BP 6330 NE PM-02 0.09 4347.809 6 689394.199
8346730.01
88
RP -8741 BP 6330 SW PM-01 0.11 4340.356 9 699210.564
4315
8346690.03
89
RP -8741 BP 6330 SW PM-02 0.07 4343.020 2 689143.709
8347398.21
90
RP -9234 BOCAMINA PM - 54 3.49 4302.010 0 686323.123
8346418.40
91
RP -9234 CA 8783 SE PM - 56 0.21 4316.731 8 688754.613
8346421.00
92
RP -9234 BP 8783 PM - 58 0.28 4318.513 0 688815.563
8346449.50
93
RP -9234 CA 8839 PM - 59 0.97 4318.331 0 688835.563

94
4300 8346499.50
RP -9234 CA 8897 PM - 61 0.03 4320.194 0 688888.938
95 RP -9234 BP 4300 NE PM - 62 0.10 4323.377 834662.500 689081.188
8346686.57
96
RP -9234 BP 4300 NE PM - 63 0.06 4324.204 1 689151.066
8346722.67
97
RP -9234 CA 9190 PM - 64 0.05 4324.117 8 689178.058
83466646.3
98
RP -9234 BP 4300 SW PM - 65 0.11 4323.845 45 689150.123
8346717.32
99
RP -8741 BP 4500 SW PM - 69 0.17 4324.756 6 689227.697
8347072.14
100 4300 RP -8741 BP 4500 SW PM - 67 0.11 4330.078 0 689606.949
8347134.51
101
RP -8741 BP 4500 SW PM - 68 0.15 4330.555 7 689663.896
Nota: se incluye los PMs nuevos segn los avances de produccin - Mina.

4.1 Hipervnculo Lnea Base (Base De Data) (FORMATO

EXCEL)
EXCEL: (VELOCIDADES Y
COORDENADAS UTM)

5 INVENTARIO DE VENTILADORES AXIALES.

U.M. Inmaculada CIA Minera Ares S.A.C.


INVENTARIO DE VENTILADORES
rea: Ventilacin - Higiene Industrial - Productividad

UBICACIN
COORDENADAS UTM
NIVE DEL CODIG CAPACIDA POTENCI
N RAMPA PULGAD
L VENTILAD O D (CFM) A (HP) ALTUR
AS NORTE ESTE
OR A
RP(-)870 4659.6 8346535.4 688778.4
4620
1 RB7 7 V30-2 30000 32.00 75.00 60 80 05
RP(-)870 4598.7 8346526.2 688778.2
4600
2 RB7 7 - 30000 32.00 75.00 60 13 80
RP(-)870
3 RB7 7 V 30-7 30000 32.00 75.00
4580
RP(-)870 4581.8 8346663.0 688932.0
4 CA8932 7 V5-2 5000 25.00 7.50 11 19 90
RP(-)870 4562.3 8346319.5 688600.6
5 4560 BP 4560 NE 7 V5-3 5000 32.00 75.00 84 00 25
RP(-)874 4507.6 8346496.3 688812.7
4480
6 RB7 1 V50-1 50000 45.00 125.00 87 97 91
RP(-)874 4483.2 8346506.6 688793.0
7 RB7 1 V30-8 30000 32.00 75.00 07 41 78
4460
RP(-)874 V30- 4490.5 8346741.8 689054.7
8 CH6650 1 10 30000 32.00 75.00 56 10 04
RP(-)874 4469.4 8346481.7 688829.1
9 RB7 1 V50-5 50000 45.00 125.00 57 24 48
RP (-)
4440
10 CH 6853 9234 V50-5 50000 45.00 125.00
RP(-)874 4470.9 8346735.0 689059.1
11 CH6650 1 - 30000 35.00 75.00 72 12 49
RP(-)874
12 CH6650 1 20000 32.00 40.00
RP(-)874
13 CA6309 1 30000 32.00 75.00
RP(-)874 4446.9 8346509.8 688808.4
4420
14 RB7 1 50000 45.00 125.00 10 95 75
RB12/Tj RP(-)923
15 9180 4 V50-3 50000 45.00 125.00
RP(-)923 V30-
16 RC 15 4 11 30000 32.00 75.00
RP(-)874 4430.5 8346476.7 688833.0
4400
17 RB7 1 V50-7 50000 45.00 125.00 98 91 67
RP(-)874 4399.6 8346489.2 688816.6
4375
18 RB7 1 V40-1 40000 32.00 100.00 96 58 50
RP(-)923
4360
19 CH6853NE 4 V30-5 50000 32.00 75.00
RP(-)874
4345
20 CH6853NE 1 V50-2 50000 45.00 125.00
RP(-)874
21 CH6650 1 V20-1 30000 32.00 75.00
4330
RP(-)923
22 CA6631NW 4 V30-3 30000 32.00 75.00
23 CH6650 V30-7 30000 32.00 75.00
4315 RP(-)923
24 CH 6853NE 4 V30-6 30000 32.00 75.00
25 4300 CA7031 V30-4 30000 32.00 75.00
26 CA6320NW V30-4 40000 32.00 75.00
Nota: Estandarizar todos los ventiladores segn corresponda.

5.1 Hipervnculo Lnea Base (Base De Data) (FORMATO

EXCEL)

EXCEL: (INVENTARIO DE
VENTILADORES)

5.2 Hipervnculo Lnea Base (Base De Data) (FORMATO

EXCEL)

EXCEL: (RAISE BORING 6, 7, 8, 9, 10,


11.)

6 BALANCE DEL AIRE PRESENTADO CON FECHA: 11-


01-2017.

6.1 Cuadro de resumen.

U.M. Inmaculada CIA Minera Ares S.A.C.

BALANCE DE AIRE 11-01-2017


rea: Ventilacin - Higiene Industrial - Productividad

CFM

CAUDAL DE INGRESO
1036556.97
CAUDAL DE SALIDA
1055029.53
DESBALANCE 1.7509%

6.2 Hipervnculo Lnea Base (Base De Data) (FORMATO


EXCEL)

EXCEL: (BALANCE DE AIRE 11-01-2017)

7 BALANCE DEL AIRE PRESENTADO CON FECHA: 23-


01-2017.

7.1 Cuadro de resumen.

U.M. Inmaculada CIA Minera Ares S.A.C.

BALANCE DE AIRE 23-01-2017

rea: Ventilacin - Higiene Industrial Productividad

CFM

CAUDAL DE INGRESO
664979.68
CAUDAL DE SALIDA
662659.33
DESBALANCE
-0.3502%
7.2 Hipervnculo Lnea Base (Base De Data) (FORMATO

EXCEL)

EXCEL: (BALANCE DE AIRE 23-01-2017)

8 BALANCE DEL AIRE PRESENTADO CON FECHA: 31-


01-2017.

8.1 Cuadro de resumen.

U.M. Inmaculada CIA Minera Ares S.A.C.

BALANCE DE AIRE 31-01-2017


rea: Ventilacin - Higiene Industrial - Productividad

CFM

CAUDAL DE INGRESO 602252.26


CAUDAL DE SALIDA 697706.05
DESBALANCE 13.6811%
8.2 Hipervnculo Lnea Base (Base De Data) (FORMATO

EXCEL)

EXCEL: (BALANCE DE AIRE 31-01-2017)

9 BALANCE DEL AIRE PRESENTADO CON FECHA: 20-


02-2017.

9.1 Cuadro de resumen.

U.M. Inmaculada CIA Minera Ares S.A.C.

BALANCE DE AIRE 20-02-2017


rea: Ventilacin - Higiene Industrial - Productividad

CFM

CAUDAL DE INGRESO 716542.61


CAUDAL DE SALIDA 691099.43
DESBALANCE 3.5508%

9.2 Hipervnculo Lnea Base (Base De Data) (FORMATO

EXCEL).

EXCEL: (BALANCE DE AIRE 20-02-2017)


Prom. Prom. Prom. de Prom. de 10
VELOCIDAD
NIVEL LABOR de de AREA Velocidad CAUDAL (m/min) CAUDAL (CFM)
(m/min) B
ANCHO ALTO (m2) (m/s)

4300 BOCAMINA 4300 4.65 4.62 19.69 3.45 207.29 4082.14 144156.54

4.50 4.51 18.60 3.44 206.20 3836.17 135470.65


4400 BOCAMINA 4400
4.63 4.58 19.44 5.32 319.46 6209.81 219293.21
4500 BOCAMINA 4500
4.31 3.64 14.38 1.70 101.71 1808.23 63855.85
4560 Superficie
3.00 3.00 7.07 3.16 189.74 1341.22 47363.71
RB10 Superficie
4.67 4.53 19.39 0.81 48.39 938.38 33137.97
RB1 Superficie
1.50 1.50 1.77 5.81 348.75 616.29 21763.61
RB7 Superficie
1421.55 18832.24 665041.57
TOTAL

ALANCE DEL AIRE FINAL FECHA: 28-02-2017.


10.1 Ingreso De Aire Fresco
10.2 Salida De Aire Viciado

Prom. Prom.
Prom. Prom. de
de de VELOCIDA CAUDAL CAUDAL
NIVEL LABOR de Velocidad
ANCH AREA D (m/min) (m/min) (CFM)
ALTO (m/s)
O (m2)
RB11 Superficie 3.00 3.00 7.07 19.49 1169.58 8267.32 291952.19

RB9 Superficie 3.00 3.00 7.07 19.77 1186.08 8383.93 296070.13

RB6 Superficie 2.00 2.00 3.14 12.08 724.65 2276.55 80394.17

TOTAL 3080.31 18927.80 668416.49

10.3 BALANCE DE AFOROS

CFM

CAUDAL DE INGRESO 665041.57

CAUDAL DE SALIDA 668416.49

DESBALANCE 0.5049%
10.4 Equipos que labora en mina.

10.4.1 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL).

EXCEL: (BALANCE DE AIRE 28-02-2017)

11 CAIDA DE PRESION DE VENTILADORES


11.1 Tabla De Cada De Presin Aplicando La Frmula De Atkinson.

CALCULO DE CAIDA DE PRESION DE VENTILADORES

rea: Ventilacin - Higiene Industrial - Productividad

CAIDA DE
UBICACIN
CAPACIDAD PERIMETRO AREA DENSIDAD LONGITUD PRESION
N NIVEL DEL RAMPA (PULGADAS
(CFM) (m) (m2) (Kg/m3) (m) (pulg.Vapor
VENTILADOR )
Agua)
1 4620 RB7 RP(-)8707 30000 32.00 2.55 0.52 0.75 112.30 9.91
2 4600 RB7 RP(-)8707 30000 32.00 2.55 0.52 0.76 454.40 31.76
3 4580 CA8934 RP(-)8707 5000 25.00 1.99 0.32 0.76 98.10 0.70
4 RB7 RP(-)8707 30000 32.00 2.55 0.52 0.76 120.00 7.94
4560
5 BP4560 RP(-)8707 30000 32.00 2.55 0.52 0.76 114.00 7.72
6 4480 RB7 RP(-)8741 50000 45.00 3.59 1.03 0.77 381.00 8.55
7 RB7 RP(-)8741 30000 32.00 2.55 0.52 0.77 663.00 25.96
4460
8 CH6650 RP(-)8741 30000 32.00 2.55 0.52 0.77 328.40 22.14
9 4440 RB7 RP(-)8741 50000 45.00 3.59 1.03 0.77 593.00 13.60
10 CH6650 RP(-)8741 30000 32.00 2.55 0.52 0.77 210.00 10.87
11 4400 RB7 RP(-)8741 50000 45.00 3.59 1.03 0.78 154.00 4.92
12 RB7 RP(-)9234 50000 45.00 3.59 1.03 0.77 151.20 5.53
13 RB12/Tj 9180 RP(-)8741 20000 32.00 2.55 0.52 0.77 325.00 8.24
4420
14 CH6650 RP(-)8741 20000 32.00 2.55 0.52 0.77 180.00 5.81
15 CA6309 RP(-)8741 30000 32.00 2.55 0.52 0.77 135.00 9.16
16 4375 Tj 9190 RP(-)9234 20000 32.00 2.55 0.52 0.78 148.68 7.11
17 RB7 RP(-)8741 40000 32.00 2.55 0.52 0.78 651.00 38.89

VAN

VIENE.

18 4360 CH6853NE RP(-)9234 30000 32.00 2.55 0.52 0.78 198.54 8.05
19 CH6650SW RP(-)8741 30000 32.00 2.55 0.52 0.78 116.41 5.70
20 4345 CH6853NE RP(-)8741 50000 45.00 3.59 1.03 0.78 798.84 14.32
21 4330 CA6631NW RP(-)9234 30000 32.00 2.55 0.52 0.78 877.80 27.66
22 CH6655 RP(-)8741 20000 32.00 2.55 0.52 0.78 210.00 4.79
23 4315 CH6650 RP(-)9234 30000 32.00 2.55 0.52 0.79 230.00 14.41
24 CA6621NW RP(-)9234 30000 32.00 2.55 0.52 0.79 112.56 12.72
25 4300 CA7031 RP(-)9234 30000 32.00 2.55 0.52 0.79 300.00 15.42
26 CA6621NW RP(-)9234 30000 32.00 2.55 0.52 0.79 633.36 22.17

11.2 Factor De Conversin De Acuerdo Al Material De La Manga.


Factor k kg/m3 (x10-10 lbf
Ducto forzado /bolsa
min2 /ft4 )
Ducto ligero 0.003 -16.2
11.2.1 Valores De Longitud Equivalente De La Manga

ANGULOS SUPLEMENTARIOS METROS


CODO DE 45 23.00
CODO DE 90 82.00
CODO DE 135 162.00

11.2.2 Hipervnculo Lnea Base (Base De Data) (FORMATO EXCEL).

EXCEL: (CAIDA DE PRESIN EN


12 VENTILACION EN FRENTES DE TRABAJO.
U.M. Inmaculada CIA Minera Ares S.A.C.
MONITOREO EN FRENTES DE TRABAJO
rea: Ventilacin - Higiene Industrial - Productividad

NIVEL V. (m/s) T. ( C) H. R.(%) O2. ( %)


4620
8707
RP - (+)8702 0.11 12.533 75.03 20.10
RP - (+)8707 0.16 12.533 75.03 20.10
4600
8707
AC - 001NE 0.08 14.989 60.40 20.10
AC - 001NW 0.08 13.389 67.37 20.10
ACC - 04NW 0.15 14.089 62.76 20.10
V 06 0.12 11.100 81.16 20.10
VE 03 0.15 17.478 70.93 20.10
4580
8707
BP 4580 0.13 12.744 70.43 20.10
V 05 0.11 12.678 72.11 20.10
4480
8741
BP - 6460 AVANCE 0.07 14.889 74.42 20.10
V 06 0.16 14.389 80.01 20.10
4460
8741
V 03 0.33 17.622 66.84 20.10
V 05 0.06 16.544 76.28 20.10
V 06 0.95 17.222 74.91 20.10
V - 07 NE 0.07 15.267 76.06 20.10
V - 07 SW 0.42 19.450 71.33 20.10
4420
-9234
TJ 9180 0.19 15.867 76.27 20.60
4400
-9234
TJ 9190 0.20 14.756 74.24 20.60
9234
V - 6302 SW 0.11 12.856 89.43 20.60
V - 6302 NE 0.11 12.856 89.43 20.60
4360
-8741
V-6725 0.12 19.256 78.97 20.90
V-6667 SW 0.12 17.483 83.89 20.90
V-6667 NE 0.13 17.483 83.89 20.90
V-6596 SW 0.14 17.305 82.92 20.90
V- 6596 NE 0.13 17.300 82.87 20.90
V-6515 0.18 13.581 82.54 20.90
4345
-9234
V-6424 0.13 16.606 76.47 20.90
V-7072 0.07 15.700 79.97 20.90
Total general 0.17 15.300 76.22 20.41
Nota: La instalacin de servicios debe ser acorde a los avances de produccin -
Mina.
12.1 Hipervnculos Ventilacin En Frentes de Trabajo.

EXCEL: (VENTILACIN EN FRENTES DE


TRABAJO)
13 CONCLUSIONES

El caudal de aire con el que se cuenta interior mina no es el


adecuado y, a su vez, suficiente para cumplir con el
requerimiento de caudal por cantidad de personas y equipos
que se encuentran en mina. Por lo cual se aprecia en los
resultados constante dficit y una cobertura de mximo 75% de
aire.

La cada de presin mxima es de 40 pulg de vapor H2O. Est


depende en mayor porcentaje de la longitud de manga y la
longitud equivalente generada por tipos de choques comunes y
en menor cantidad del dimetro y caudal del ventilador
respectivo. (ver hipervnculos anexados)

14 RECOMENDACIONES.
Se recomienda incluir nuevos puntos de monitoreo para tener

un mejor registro de datos de la ventilacin.


Se debe de realizar mensualmente un control de los

ventiladores para tener un mejor seguimiento de dichos

equipos.
Arreglar las mangas cortadas o rasgadas para que no haya

posteriores problemas con el balance general de la ventilacin.

15 ANEXOS N 01 - FOTOGRAFIAS

Imagen N 01

Imagen N 02
Imagen N 03

Imagen N 04

Imagen N 05
Imagen N 06