I Mobilization / Demobilization LS
Total I
III Construction
A Influent Line
1 Pipe Jacking Trenchlist
1600 mm HDPE L= 158m
1 Excavation cum
2 Backfilling / Compaction cum
3 Disposal cum
4 Sandbedding / Pipezone cum
5 Pipelaying
1600mm HDPE x 11.8m(JFE Supplied) pc
Butt Fussion Machine jointing jt
Butt Fussion Machine and Technincians (JFE Supplied)
6 Marker Tapes (JFE Supplied) m
7 Trench Protection sqm
8 Testing Miscellaneous Test and others lot
1 Excavation cum
2 Backfilling / Compaction cum
3 Disposal cum
4 Lean Concrete 17 Mpa cum
5 Concrete 24 Mpa cum
6 Rebars kgs
7 Formworks sqm
8 Trench Protection sqm
1 Excavation cum
2 Backfilling / Compaction cum
3 Disposal cum
4 Lean Concrete 17 Mpa cum
5 Concrete 24 Mpa cum
6 Rebars kgs
7 Formworks sqm
8 Ladder Rungs 20mm SUS 304 (JFE Supplied) pc
9 DI manhole Frame and Cover H20 Landing
600mm x 600mm (JFE Supplied) pc
Trench Protection sqm
Testing Miscellaneous Test and others lot
Total III
32,310,000.00 81
3,644,541.00 9.11
835,276.50 2.09
2,399,232.80 6.00
39,189,050.30
91
Project : Paranaque WRF1
Location : Brgy. San Dionisio, Paranaque City
Scope of Works for Trenchlist Pipe Laying Influent Line 1600mm HDPE
3 Steel casing m
4 HDPE Insertion m
Total
july
1 2 3
Qty weighted % Duration
94 11.51 2 5.75 5.75
5.75 11.50
403.00 49.33 2.00 24.6634
24.6634
160.00 19.58 9.00
817.00 100.00
24.6634
august september
4 1 2 3 4 1 2 3
24.6634
49.3268
2.18 2.18 2.18 2.18 2.18 2.18 2.18
2.18 4.36 6.54 8.72 10.90 13.08 15.26
2.18 2.18
17.44 19.62
9.791922 9.791922
9.791922 19.58384
5.75 11.50
july august september
3 4 1 2 3 4 1 2
24.6634 24.6634
9.791922 9.791922