Progress
AGL & NAVAIDs
Results Analisys Structural engineers Geotechnical engineers
engineers
Settlements [cm] NL Mxico (TASANA) NL
No. of Part of Min tezontle
Ground Max.
structures Element NAVAIDs Dimensions [m] Type of foundation below foundation Long term (20 Short term Coordinators:
improvement Settlement Coordinator: Vctor Daz Coordinator: Ruud Steenbakkers
(types) package? [m] years) (vehicle load) Peter Vorage
allowable .
Surface Movement Radar (SMR) and Primary & secondary Improved / 169 Friction piles 0.30 Data provided Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Yes 19.50 x 19.50 x 5.50 0.3 approx 7 cm - 10 Pre-design Quantifications
surveillance Radar (PSR/SSR) Unimproved x 15 m (12-01-17) solution model memo drawings capacity
Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Wind Direction Indicator (WDI) Yes 3.00 x 3.00 x 0.30 Unimproved Shallow 0.3 4.98 - 10 Quantifications
(12-01-17) (Erick) solution model (Erick) memo drawings capacity
Horizontal Horizontal
Data provided Structural Seismic loads Vertical Horizontal Material
1 Foundation around wind cone Yes - Unimproved Shallow - - - 10 Quantifications pressures due to pressures due
(12-01-17) drawings at ground springs springs weight
ground to vehicle
Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Equipment shelter Yes 6.00 x 4.00 x 0.30 Unimproved Shallow 0.3 8.61 - 10 Quantifications
(12-01-17) (Erick) solution model (Erick) memo drawings capacity
Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Automated weather observing system (AWOS) Yes 3.50 x 3.50 x 0.30 Improved Shallow 0.3 9.95 - 10 Quantifications
(12-01-17) (Erick) solution model (Erick) memo drawings capacity
9 Friction piles Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Instrument Landing System - Glide path antenna (ILS) Yes 6.00 x 5.00 x 0.30 Improved 0.3 0.46 - 3 Quantifications
0.50 x 15 m (12-01-17) (Erick) solution model (Erick) memo drawings capacity
20 Friction piles Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Instrument Landing System - Localizer (ILS) Yes 46.0 x 4.24 x 0.30 Improved 0.3 0.52 - 3 Quantifications
0.50 x 15 m (12-01-17) (Erick) solution model (Erick) memo drawings capacity
5 Friction piles Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Low level Windshare alert system (LLWAS) Yes 3.00 x 3.00 x 0.35 Unimproved 1 0.77 - 10 Quantifications
0.50 x 10 m (12-01-17) (Erick) solution model (Erick) memo drawings capacity
Horizontal Horizontal Horizontal
Vertical Horizontal Material
Ground Based Augmentation System - Reference receiver (GBAS) 5 Friction piles Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing pressures due to pressures due pressures due
1 Yes 3.00 x 3.00 x 0.30 Improved 0.5 0.4 - 10 Quantifications springs springs weight
0.50 x 10 m (12-01-17) (Erick) solution model (Erick) memo drawings capacity ground to vehicle to vehicle
5 Friction piles Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Ground Based Augmentation System - VDB antenna (GBAS) No 3.00 x 3.00 x 0.30 0.3 0.45 - 10 Quantifications
0.50 x 10 m (12-01-17) (Erick) solution model (Erick) memo drawings capacity
39 Friction piles Data provided Pre-design Structural-geotechnical Mathematical Calculations Structural Load bearing
1 Doppler VHF Omnidirectional (DVOR) No Unimproved 0.5 - 10 Quantifications
0.50 x 15 m (12-01-17) (Erick) solution model (Erick) memo drawings capacity
Not started
On going (10%)
On going (40%)
Finished
Data
Element
Number of
Dimensions [m]
structures
Settlements NL Mxico
Structural-geotechnical
Pre-design (RWYs 2 Mathematical model
- 15 Standarization solution
& 3)
Structural-geotechnical
Pre-design (RWYs 2 Mathematical model
- 15 Standarization solution
& 3)
Structural-geotechnical
Pre-design (RWYs 2 Mathematical model
- 15 Standarization solution
& 3)
Structural-geotechnical
Pre-design (RWYs 2 Mathematical model
- 15 Standarization solution
& 3)
Structural-geotechnical
Pre-design (RWYs 2 Mathematical model
- 15 Standarization solution
& 3)
Structural-geotechnical
Pre-design (RWYs 2 Mathematical model
- 15 Standarization solution
& 3)
Structural-geotechnical
Pre-design (RWYs 2 Mathematical model
- 15 Standarization solution
& 3)
Structural-geotechnical
- 3 Standarization Pre-design Mathematical model
solution
Structural engineers Geotechnical engineers
Mxico NL
Horizontal
Calculations memo Load bearing capacity (RWYs
(RWYs 2 & 3)
Structural Drawings Quantities
2 & 3) pressures due
to vehicle Vertical
Calculations memo Load bearing capacity (RWYs springs
Structural Drawings Quantities
(RWYs 2 & 3) 2 & 3)
Geotechnical
Quantities (RWYs 2 Load bearing capacity (RWYs
Calculations memo Structural drawings solution
& 3) 2 & 3)
(RWYs 2 & 3)
cal engineers
NL
uud Steenbakkers
Horizontal Material
springs weight
Legend of colors according to status
Not started
In progress (40%)
Progress
Results Analisys Drainage engineers Electrical engineers Structural engineers Geotechnical engineers
Geotechnical
3; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12-
Preload, No-preload Shallow 8.85 5.84 10 2.75 1 Mathematical model Calculations memo Structural Drawings Quantities solution
3.25 (depth + foundation) 12-2016) (02-01-17) 2016)
1.2 x 1.2 m (inner); (02-01-17)
1.6 x 1.6 m (outer) Geotechnical
4.5; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12-
Preload, No-preload Shallow 8.30 5.81 10 3.26 4 Mathematical model Calculations memo Structural Drawings Quantities solution
4.75 (depth + foundation) 12-2016) (02-01-17) 2016)
(02-01-17)
Geotechnical
2.00; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12-
Preload, No-preload Shallow 7.54 4.05 10 1.85 Mathematical model Calculations memo Structural Drawings Quantities solution
2.30 (depth + foundation) 12-2016) (02-01-17) 2016)
(02-01-17)
89
Geotechnical
3.25; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12-
Preload, No-preload Shallow 8.70 3.87 10 2.31 Mathematical model Calculations memo Structural Drawings Quantities solution
3.55 (depth + foundation) 12-2016) (02-01-17) 2016)
(02-01-17)
8 Standard pits Data provided Standarization
Geotechnical
4.75; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12-
2.25 x 2.25 m (inner); 2.85 x 2.85 m (outer) Preload, No-preload Shallow 9.13 3.90 10 3.56 162 Mathematical model Calculations memo Structural Drawings Quantities solution
5.05 (depth + foundation) 12-2016) (02-01-17) 2016)
(02-01-17)
Geotechnical Vehicle loads
5.5; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12- Volumetric weight of Horizontal earth Seismic earth Modulus of subgrade reaction Upwards water
Preload, No-preload Shallow 8.91 3.88 10 5.06 2 Mathematical model Calculations memo Structural Drawings Quantities solution (horizontal and Freatic level depth Allowable
Drainage 5.8 (depth + foundation) 12-2016) (02-01-17) 2016) materials pressures pressures (vertical and horizontal) pressure (formula
(02-01-17) vertical) settlements
(19-12-17) (19-12-17) (19-12-17) (19-12-17) at geo-note)
(19-12-17)
Geotechnical
6.5; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12-
Preload, No-preload Shallow 9.20 3.90 10 5.81 3 Mathematical model Calculations memo Structural Drawings Quantities solution
6.8 (depth + foundation) 12-2016) (02-01-17) 2016)
(02-01-17)
Geotechnical
3.8; Pre-design (22- Structural-geotechnical solution Load bearing capacity (24-12-
2.7 x 2.7 m (inner); 3.30 x 3.30 m (outer) Preload, No-preload Shallow 7.90 2.97 10 3.1 41 Mathematical model Calculations memo Structural Drawings Quantities solution
4.10 (depth + foundation) 12-2016) (02-01-17) 2016)
(02-01-17)
Geotechnical
Quantities (RWYs 2 Load bearing capacity (RWYs
Earthing pit Preload, No-preload Shallow 10 Standarization Pre-design Structural-geotechnical solution Mathematical model Calculations memo Structural drawings solution
& 3) 2 & 3)
(RWYs 2 & 3)
Geotechnical
0.745 (inner); 0.895 Quantities (RWYs 2 Load bearing capacity (RWYs
AGL Preload Standarization Pre-design Structural-geotechnical solution Mathematical model Calculations memo Structural drawings
& 3) 2 & 3)
solution
(below foundation) (RWYs 2 & 3)
Preload
Geotechnical
0.75 x 0.75 m (inner); 0.905 (inner); 1.055 Quantities (RWYs 2 Load bearing capacity (RWYs
AGL/NAVAIDs pits Preload Standarization Pre-design Structural-geotechnical solution Mathematical model Calculations memo Structural drawings
& 3) 2 & 3)
solution
1.05x1.05 m (outer) (below foundation) (RWYs 2 & 3)
Geotechnical
No-preload (foundation 1.85 x 0.905 (inner); 1.055 Quantities (RWYs 2 Load bearing capacity (RWYs
No preload Standarization Pre-design Structural-geotechnical solution Mathematical model Calculations memo Structural drawings
& 3) 2 & 3)
solution
1.85 m) (below foundation) (RWYs 2 & 3)
Geotechnical
Quantities (RWYs 2 Load bearing capacity (RWYs
Communications Shallow 5 Standarization Pre-design Structural-geotechnical solution Mathematical model Calculations memo Structural drawings solution
& 3) 2 & 3)
Pit (CM) 2x 110 9.942 8.908 (RWYs 2 & 3)
Geotechnical
Quantities (RWYs 2 Load bearing capacity (RWYs
Fence Fence foundation No-preload Shallow Pre-design Structural-geotechnical solution Mathematical model Calculations memo Structural drawings solution
& 3) 2 & 3)
(RWYs 2 & 3)
Leveling of pits due to difference of settlements between construction of pit and pavement Look for a solution Structural drawings
- - - - -
package (Mijail) (06-05-2016) (06-05-2016)
Progress
5.00 to 5.70 (below Data provided Mathematical Load bearing capacity 05-07-
Tipo 3 y 8. Cuerpo A 6.15 x 3.60 (outer) Vacuum, Preload 0.96 10 Standarization Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 13.386 (100% design) model 2016
Data provided Mathematical Load bearing capacity 05-07-
Tipo 3 y 8. Cuerpo B 3.50 x 3.50 (outer) 2.30 (below foundation) Vacuum, Preload 2.002 10 Standarization Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
26.305 (100% design) model 2016
760 mm (for prestressed 1.50 x 1.50 (inner); 2.0 x 2.0 Data provided Mathematical Load bearing capacity 06-07-
1 2.60 (below foundation) Vacuum, Preload, Transition 3 Standarization Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
pipe) (outer) (100% design) model 2016
2.7 x 2.7 (inner) + 0.30 wall 3.30 to 4.60 (below Data provided Mathematical
Vacuum, Preload Standarization Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
thickness= foundation) (100% design) model
25.886 4.18 3
Data provided Mathematical
2.8 to 3.55 Vacuum, Preload Standarization Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
16.458 4.862 3 (100% design) model
2.25 x 2.25
Apron pits Data provided Mathematical
3 Fire stop (with wall) 3.55 to 4.00 Vacuum, Preload Standarization Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
10.458 4.862 3 (100% design) model
Data provided Mathematical
2.7 x 2.7 3.30 to 4.60 Vacuum, Preload Standarization Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
25.886 4.18 3 (100% design) model
Mathematical
Data provided Pre-design (RWY's 2 Structural-geotechnical solution Calculations memo Structural drawings Quantifications (RWY's
1 AGL edge light (elevated lights) 3 model (RWY's 2 & Load bearing capacity
(100% design) & 3) (RWY's 2 & 3) (RWY's 2 & 3) (RWY's 2 & 3) 2 & 3)
3)
Mathematical
Data provided Pre-design (RWY's 2 Structural-geotechnical solution Calculations memo Structural drawings Quantifications (RWY's
1 AGL Earthing pit (for AGL, NAVAIDs and floodlight) 3
(100% design) & 3) (RWY's 2 & 3)
model (RWY's 2 &
(RWY's 2 & 3) (RWY's 2 & 3) 2 & 3)
Load bearing capacity
3)
Mathematical
Pre-design (RWY's 2 Structural-geotechnical solution Calculations memo Structural drawings Quantifications (RWY's
1 "Meeting point" signs To be defined To be defined Transition 3 Data provided model (RWY's 2 & Load bearing capacity
& 3) (RWY's 2 & 3) (RWY's 2 & 3) (RWY's 2 & 3) 2 & 3)
3)
Mathematical
1 Visual Docking Guidance System (VDGS) Transition, Preload, Vacuum 3 Data provided Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
model
1.9 (inner); 2.20 (below Data provided Mathematical Load bearing capacity (01-
PA1 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 8.143 2.533 10 (02-2016) model 09-2016)
3.00 x 2.1 (inner); 3.60x2.70 2.1 (inner); 2.40 (below Data provided Mathematical Load bearing capacity (01-
PA4 (outer) Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 8.143 2.533 10 (02-2016) model 09-2016)
Data provided Mathematical
PA7 2.3 (inner); 2.60 (outer) Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
8.143 2.533 10 (02-2016) model
1.9 (inner); 2.20 (below Data provided Mathematical Load bearing capacity (02-
PA2 Transition (no preload) Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 8.143 2.533 3 (02-2016) model 09-2016)
2.1 x 2.1 (inner); 2.7x2.7 2.1 (inner); 2.40 (below Data provided Mathematical Load bearing capacity (02-
PA5 (outer) Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 8.143 2.533 10 (02-2016) model 09-2016)
2.3 (inner); 2.60 (below Data provided Mathematical
PA8 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 8.143 2.533 10 (02-2016) model
1.9 (inner); 2.20 (below Data provided Mathematical
PB1 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
2.1 x 2.4 (inner); 3.00x2.7 foundation) 8.143 10 (02-2016) model
(outer) 2.1 (inner); 2.40 (below Data provided Mathematical
PB4 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 10 (02-2016) model
1.9 (inner); 2.20 (below Data provided Mathematical
16 Low voltage (LV) 150 & 110 mm PB2 foundation)
Vacuum, Preload
8.143 10 (02-2016)
Pre-design Structural-geotechnical solution
model
Calculations memo Structural drawings Quantifications Load bearing capacity
2.1 x 1.5 (inner); 2.7x2.1 1.9 (inner); 2.20 (below Data provided Mathematical
PB3 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
(outer) foundation) 8.143 10 (02-2016) model
2.1 (inner); 2.40 (below Data provided Mathematical
PB6 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
foundation) 10 (02-2016) model
Pits - Apron
systems & AGL 2.4 x 1.7 (inner); 3.00x2.3 1.7 (inner);2.00 (below Data provided Mathematical
PC1 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
(outer) foundation) 8.143 2.533 10 (02-2016) model
1.5 x 1.7 (inner); 2.1x2.3 1.7 (inner);2.00 (below Data provided Mathematical
PC2 y PC3 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
(outer) foundation) 8.143 2.533 10 (02-2016) model
0.7x1.4 (inner); 1.20x1.90 1 (inner); 1.25 (below Data provided Mathematical
PD1 y PD2 y PD3 Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
(outer) foundation) 10.727 8.955 3 (02-2016) model
0.75x0.75 (inner); 1.05x1.05 1 (inner);1.15 (below Data provided Mathematical
PK Transition (no preload) Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
(outer) foundation) 9.942 8.908 3 (02-2016) model
Data provided (17- Mathematical
M1 1.4 x 1.6 (inner) 1.80 (inner) Vacuum, Preload To be defined To be defined Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
3 01-17) model
Data provided (17- Mathematical
M2 2.0 x 1.6 (inner) 1.80 (inner) Vacuum, Preload To be defined To be defined Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
3 01-17) model
Data provided (16- Mathematical
C1 1.00 x 1.40 (inner) 1.50 (inner) Vacuum, Preload To be defined To be defined Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
3 02-17) model
0.7x1.4 (inner); 1.20x1.90 1 (inner); 1.25 (below Mathematical
1 Power socket Vacuum, Preload Data provided Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
(outer) foundation) 3 model
0.75 x 0.75 (inner); 1.05x1.05 1.00 (inner); 1.20 (below Data provided Mathematical
1 COM (CM) 2110mm Vacuum, Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
(outer) foundation) 9.942 8.908 3 (100% design) model
0.745 (inner); 0.895 (below Data provided Mathematical
Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
foundation) (100% design) model
Preload
0.75 x 0.75 m (inner); 0.905 (inner); 1.055 (below Data provided Mathematical
3 AGL/NAVAIDs pits Preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications
1.05x1.05 m (outer) foundation) (100% design) model
No-preload (foundation 1.85 0.905 (inner); 1.055 (below Data provided Mathematical
No preload Pre-design Structural-geotechnical solution Calculations memo Structural drawings Quantifications Load bearing capacity
x 1.85 m) foundation) (100% design) model
Leveling of pits due to difference of settlements between Look for a solution (Mijail) Structural drawings (06-
- - - - -
construction of pit and pavement package (06-05-2016) 05-2016)
Progress
AGL & NAVAIDs
Drainage engineers Structural engineers Geotechnical engineers
engineers
Elements Settlements (cm) NL NL Mxico Mxico (TASANA) NL
No. of
structures Coordinators:
Ground Coordinator: Coordinator:
(types) Element Dimensions [m] Depth [m] Long term Short term Peter Vorage / Coordinator: Vctor Daz Coordinator: Ruud Steenbakkers
improvement Wolter Tijssen Carlos Daz
Deerns
In progress (80%)
Finished
Critical elements due to current status
Data not needed from this team
Progress
Drainage engineers Electrical engineers Telecom engineers Structural engineers Geotechnical engineers Data
To-do-list
Elements
NL Mxico
Mexico Mxico Mxico
NL Mxico Drawings
Load of design Min. Tezontle
Number of Pipe diameter Kind of
(Given by under
structures Coordinator: Wolter Coordinator: Hctor Coordinator: Jara Coordinator: Hctor (mm) foundation
Dimensions [m] Depth [m] Coordinator: Carlos Daz Coordinator: Vctor Daz Coordinaror: Ruud Steenbakkers Concepto No. Drawing No. SACMAG-NACO) foundation [m]
Tijssen Lpez Sanchez Valverde
Pre-design (04-04- Structural-geotechnical Mathematical model (Mijail) Calculations memo (06-05- Structural Drawings (Rafael) (06- Quantifications (06- Load bearing capacity (07-04-
3; 3.25 (depth + foundation)
1.2 x 1.2 (inner); 1.7 x 1.7 2016) solution 21-04-2016 21-04-2016 2016) 05-2016) 05-2016) 2016) 610 (external
Tow tractor
(external) Pre-design (04-04- Structural-geotechnical Mathematical model (Miajil) Calculations memo (06-05- Structural Drawings (Rafael) (06- Quantifications (06- Load bearing capacity (07-04- size)
4.5; 4.75 (depth + foundation)
2016) solution 20-04-2016 20-04-2016 2016) 05-2016) 05-2016) 2016)
Pre-design (04-04- Structural-geotechnical Mathematical model (Mijail) Calculations memo (06-05- Structural Drawings (Miguel) (06- Quantifications (06- Load bearing capacity (07-04-
3.25; 3.55 (depth + foundation)
2016) solution 25-04-2016 2016) 05-2016) 05-2016) 2016)
2.25 x 2.25 (inner); 2.85 x 2.85 Pre-design (04-04- Structural-geotechnical Mathematical model (Erick) Calculations memo (06-05- Structural Drawings (Miguel) (06- Quantifications (06- Load bearing capacity (07-04- 910 (external o First Wolter to provide new update with overview pit
4.75; 5.05 (depth + foundation)
(external) 2016) solution 20-04-2016 20-04-2016 2016) 05-2016) 05-2016) 2016) size) sizes (width, length and depth) after finalizing drainage
Pre-design (25-04- Structural-geotechnical Mathematical model (Juan Calculations memo (06-05- Quantifications (06- Load bearing capacity 26-04- lay-out
5.5; 5.80 (depth + foundation) Structural Drawings (06-05-2016) o Adjust details of pit shafts (now outer dimension is
2016) solution 27-04-2016 Luis) 27-04-2016 2016) 05-2016) 2016
1.2m instead of inner)
Pre-design (04-04- Structural-geotechnical Mathematical model (Mijail) Calculations memo (06-05- Structural Drawings (Miguel) (06- Quantifications (06- Load bearing capacity (07-04- o Critical look to current standardisation
3.8; 4.10 (depth + foundation)
2016) solution 21-04-2016 25-04-2016 2016) 05-2016) 05-2016) 2016) o Structural calculations, discussion about the split of
big pits. Determine the pipe distances and connection in
2.7 x 2.7 (inner); 3.3 x 3.3 Pre-design (04-04- Structural-geotechnical Mathematical model (Erick) Calculations memo (06-05- Structural Drawings (Miguel) (06- Quantifications (06- Load bearing capacity (07-04- 1070 (external between in the pits
Standard pits - 5.3; 5.60 (depth + foundation) Data provided (25- Standarization (29-03-2016) . Standarize again the pits with incoming invert
14 (external) 2016) solution 20-04-2016 20-04-2016 2016) 05-2016) 05-2016) 2016) 16 size)
Drainage 03-2016) level difference
Pre-design (25-04- Structural-geotechnical Mathematical model (Juan Calculations memo (06-05- Quantifications (06- Load bearing capacity 26-04- BH 92 TPL XXXXX 001 to 006. Details on BH 92
6; 6.30 (depth + foundation) Structural Drawings (06-05-2016)
2016) solution 27-04-2016 Luis) 27-04-2016 2016) 05-2016) 2016 TPL XXXXX 028 and 029 Aircraft
Pre-design (04-04- Structural-geotechnical Mathematical model (Juan Calculations memo (06-05- Structural Drawings (Celeste) Quantifications (06- Load bearing capacity (07-04-
3.8; 4.15 (depth + foundation) Limit of long term
2016) solution Luis) 27-04-2016 2016) (06-05-2016) 05-2016) 2016)
5.0 x 2.7 (inner); 5.6 x 3.3 settlements - 1520 (external
(external) 2nd Review of Seismic Vertical springs - size)
Pre-design (04-04- Structural-geotechnical Mathematical model (Juan Calculations memo (06-05- Structural Drawings (Celeste) Quantifications (06- Load bearing capacity (07-04- Horizontal pressures Freatic level at (Confirmed to
5.3; 5.60 (depth + foundation) Horizontal pressures due to calculations given on Aircraft braking preloaded and not Horizontal springs Weigth of material
2016) solution (20-04-2016) Luis) (20-04-2016) 2016) (06-05-2016) 05-2016) 2016) due to ground (07-04- different areas of structural team,
vehicles (06-04-2016) 100%design (19.04- (06-04-2016) preloaded areas (11-04-2016) (05-04-2016)
2016) airport (06-04-2016) Pending on writting
Pre-design (04-04- Structural-geotechnical Mathematical model (Erick) Calculations memo (06-05- Structural Drawings (Rafael) (06- Quantifications (06- Load bearing capacity (07-04- 2016) (07-04-2016)
3.8; 4.15 (depth + foundation) it down) 22 -04-
2016) solution 21-04-2016 2016) 05-2016) 05-2016) 2016) 2016 2x1520 and
1x1520 (external
Pre-design (04-04- Structural-geotechnical Mathematical model (Erick) Calculations memo (06-05- Structural Drawings (Rafael) (06- Quantifications (06- Load bearing capacity (07-04- size)
7.5 x 2.7 (inner); 8.1 x 3.3 5.3; 5.60 (depth + foundation)
2016) solution (18-04-2016) 2016) 05-2016) 05-2016) 2016)
(external)
3x1520 and
Pre-design (25-04- Structural-geotechnical Mathematical model (Erick) Calculations memo (06-05- Quantifications (06- Load bearing capacity 26-04-
6.2; 6.50 (depth + foundation) Structural Drawings (06-05-2016) 1x1520 (external
2016) solution 27-04-2016 27-04-2016 2016) 05-2016) 2016
size)
Slotted drain type 2 - Data provided (100% Standarization (for Pre-design (7-04- Structural-geotechnical Mathematical model (Cesia) Calculations memo (06-05- Structural Drawings (Celeste) Quantifications (06- Load bearing capacity (18-04- BH 92 TPL XXXXX 027. Location on BH 92 TPL o First Wolter to provide an overview/proposal to
2.0 x 6.0 (external size) 1 16 Aircraft
Drainage design) packages 2&3) 2016) solution (20-04-2016) 21-04-2016 2016) (06-05-2016) 05-2016) 2016) XXXXX 001 to 006 standardize these pits.
1
3.9 x 2.85 (external Data provided Standarization (13-04- Pre-design (13-04- Structural-geotechnical Mathematical model (Cesia) Calculations memo (06-05- Structural Drawings (Celeste) Quantifications (06- Load bearing capacity (13-04-
3.1
dimensions) (1-04 & 05-04) 2016) 2016) solution (20-04-2016) 21-04-2016 2016) (06-05-2016) 05-2016) 2016)
Overflow pits -
2 CF&R truck
Drainage
o Structural calculations to determine materials +
4.85 x 2.85 (external Data provided Standarization (13-04- Pre-design (13-04- Structural-geotechnical Mathematical model (Cesia) Calculations memo (06-05- Structural Drawings (Celeste) Quantifications (06- Load bearing capacity (13-04-
3.1 16 BH 92 TPL XXXXX 018 y 019 reference to different strength classes (100% design
dimensions) (1-04 & 05-04) 2016) 2016) solution (21-04-2016) 25-04-2016 2016) (06-05-2016) 05-2016) 2016)
contains already division in different locations)
Quantifications (09- Calculation (05-05- Update Specifications Update Drawings (in NL)
Open excavation Specification? Drawings?
Trenching for pipes 05-2016) Proposal of different kind of 2016) (Camilo) (09-05-2016) (21-04-2016)
-
and pits - Drainage trenching (19-04-2016)
Quantifications (09- Calculation (05-05- Update Specifications Update Drawings (in NL)
Sheet piles Specification? Drawings? -
05-2016) 2016) (Camilo) (09-05-2016) (21-04-2016)
Leveling of pits due to difference of settlements between construction of Look for a solution (Mijail)
Structural drawings (06-05-2016)
pit and pavement packege (06-05-2016)
NAVAIDS
Dreinage
Dreinage
Localizacin de los fosos de Clasificacin de la (aircraft) Cargas acorde con FAA requirements for
transformadores cubierta segn EN 124 structures
EN 124-2 is applicable to
COVERS gully tops and manhole
tops made of flake
graphite cast iron and/or
spheroidal graphite cast
iron whether in
combination with concrete
or not, with a clear
opening up to and
including 1 000 mm for
covering gullies,
manholes and inspection
chambers for installation
within areas subjected to
pedestrian and/or
vehicular traffic. It is
applicable to manhole
tops and gully tops for use
in - areas which can only
be used by pedestrians
and pedal cyclists (at
least class A 15), -
pedestrian areas and
comparable areas, car
parks or car parking decks
TRANSFORMER PITS / (at least class B 125), -
PULL HOLES the area of kerbside
channels of roads which,
when measured from the
kerb edge, extends a
maximum of 0,5 m into
the carriageway and a
maximum of 0,2 m into
the pedestrian area (at
least class C 250), -
Frames coversofand
carriageways roads grates
shall conform
(including to one of
pedestrian
the following
streets), hard shoulders
requirements:
and parking areas, [Specfor 33all49
00.00
types of Storn
roadDrainage
vehicles (at
Structures]
least class D 400), - areas
1. Gray iron
imposing castings
high wheel shall
meet
loads,thee.g.requirements
docks, aircraft of
ASTM A 48, (at
pavements Class least30B and
class
35B.
E 600), - areas imposing
2. Malleablehigh
particularly iron wheel
castings
shall
loads,meet the
e.g. aircraft
requirements
pavements (class of ASTM A
F 900).
47.
This European Standard is
3.
notSteel castings
applicable in shall
isolation
meet
but onlytheinrequirements
combination of
ASTM
with EN A 27.
124-1 and gives
4. Structural
guidance for steel for
combinations
grates and framesmade
of covers/grating shall of
conform
cast iron to theframes
with
requirements
according to EN of 124-3,
ASTM AEN
283,
124-4, Grade D. or EN
EN 124-5
5. Ductile
124-6. Thisiron castings
European
shall conform
Standard is not toapplicable
the
requirements
to: - cover fillingsof ASTM A
installed
536.
on site, e.g. concrete,
6.
1- Austempered
paving
AGL pitblocks,
in the ductile
etc.;
full -
Baring Capacity iron castings
concave
pavement shallfor
gratings
under theclass
conform
D 400
AGL to theis in
pitinstalled
there 2 meter
requirements
carriageways
Tezontle ASTM
of roads
available- what A is
or
897.
hardload
the shoulders
baring and capacity
concave
at gratings
the bottom of the for AGL
classes F 900 and E 600; -
pit.
gratings/covers
2 AGL pit in the asshoulder
part of
prefabricated
pavement drainage
under the
channels
AGL according
pit there to EN
is 1,5 meter
1433; - floor
Tezontle andisroof
what the load
gullies capacity
baring in buildings at the which
are specified
bottom of theinAGL EN pit.
1253
(all
3 parts);
AGL pit and
in the - surface
road
boxes
construction under the
AGL pit there is 0,4 meter
Tezontle what is the load
baring capacity at the
bottom of the AGL pit.
Legend of colors according to priorities
Likely out of TASANA scope but it has not been confirmed Status at day: 18-0
Geotechnical engineers.
Floodlights (same foundation that Low level windshare alert load bearing capacity of foundation
Input Structural engineers
system) + Piles calculation
AGL
Signs Input Structural engineers Load bearing capacity
Approach light - low lights Input Structural engineers Load bearing capacity
approach light - with mast Input Structural engineers Load bearing capacity
Foundation around wind cone Input Structural engineers Load bearing capacity
Automated weather observing system (AWOS) Input Structural engineers Load bearing capacity
windprofiler
Temperature/humidity profiler
Runway Visual Range (RVR) * Input Structural engineers Load bearing capacity *
Near Field Monitor - for Localizer (NFM) * Input Structural engineers Load bearing capacity *
NAVAIDS
Near Field Monitor - for Glide path antenna (NFM) * Input Structural engineers Load bearing capacity *
Far Field Monitor - for DVOR * Input Structural engineers Load bearing capacity *
Canopy Sanitary waste disposal & potable water intake stations Input Structural engineers
Slotted drain (cast in situ) Input Structural engineers Load bearing capacity
Pumping station
Drainage
Gravity system
Strength of pipes
Legend of colors according to status
Finished
To be delivered on 18th March
In progress
Not started
Status at day: 18-03-2016
Progress
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick) Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick) Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Mijail) Drawings
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick)
(90%)
Drawings
Geotechnical solution Pre-design (Mijail) Structural-geotechnical solution Mathematical model (Mijail)
(90%)
Drawings
Geotechnical solution Pre-design (Mijail) Structural-geotechnical solution Mathematical model (Mijail)
(90%)
Drawings
Geotechnical solution Pre-design (Mijail) Structural-geotechnical solution Mathematical model (Mijail)
(90%)
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick)
(90%)
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model
(90%)
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick) Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick) Drawings
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Mijail)
(90%)
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Mijail)
(90%)
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick)
(90%)
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick)
(90%)
Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick)
(90%)
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick) Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick) Drawings
Geotechnical solution Structural-geotechnical solution Mathematical model Drawings
Pre-design (Erick)
Geotechnical solution Structural-geotechnical solution Mathematical model Drawings
Geotechnical solution Pre-design (Erick) Structural-geotechnical solution Mathematical model (Erick) Drawings
Drawings
(90%)
Finished
In progress
Not started
Data
Same piles
No drawing foundation for
Calculations memo Quantifications (Aprons & LLWAS, VDB GBAS,
Taxiways) Reference GBAS &
Floodlights
Concepto 1
Calculations memo (90%) Quantifications CX 27 DTL XXXXXX 018 2.0 Shallow foundation
Piles and
Calculations memo Quantifications CAD drawings no 106 3
foundation
Piles and
Calculations memo Quantifications CAD drawings no 110
foundation
Piles and
Calculations memo Quantifications
foundation
(Antenna mounted
on the equipment
Quantifications shelter or on the
DVOR - not own
(Antenna mounted on the
equipment shelter or on the foundation)
DVOR - not own foundation)
CX 27 DTL XXXXXX
Calculations memo (75%) Quantifications 2, 3, Aprons shallow foundation
001/002/004/005/008 2.0
Concepto 3.1
Quantifications 2, 3
Same that AGL Pits
Different
settlement
between pump
station and gravity
dranaige system
Concepto 16 before pump
station
Settlement of
crossing pipes at
runways and
taxiways and
check that do not
float
ta
General data
(1.00X1.50), (1.00X4.00),
0.2
(1.00X5.50)
0.3
30 x 0.30 0.5
3.00 x 3.00 x 0.30 2
1.85 x 1.85 x 1.07 (tipo 16) and 1 m (pavement type 15) & 0.4 m
1.05 x 1.05 x 1.07 (typo 16)
-
3.25 m;
3.55 (depth +
3.3 x 2.25 m foundation)
(inner);
3.9 x 2.85
(outer) 4.75 m;
Overflow pits 5.05 (depth +
foundation)
4.25 x 2.25 m
5.50 m;
(inner);
5.85 (depth +
4.95 x 2.95
foundation)
(outer)
1.2 x 1.2 m
3.50 m;
(inner);
3.75 (depth +
1.6 x 1.6 m
foundation)
(outer)
Apron Pits
2.25 x 2.25 m
4.00 m;
(inner);
4.30 (depth +
2.85 x 2.85 m
foundation)
(outer)
15 x 10 m
3.50 m;
Oil water (inner);
3.80 (depth +
separator 15.60 x 10.60 m
foundation)
(outer)
6.88 3.29 10.00 2.05 No. New depth 15
No. We had 5 cm
less of wall
9.85 3.17 10.00 4.85 3
thickness and new
depth
No. We had 5 cm
7.63 3.81 3.1 more of wall 2
thickness
No. New
-4.40 -0.02 3.8 1
dimensions
Structural-
Pre-design (22-12- Mathematical Structural Load bearing
geotechnical Calculations memo Quantities
2016) model Drawings capacity
solution
Structural-
Pre-design (22-12- Mathematical Structural Load bearing
geotechnical Calculations memo Quantities
2016) model Drawings capacity
solution
Structural-
Pre-design (22-12- Mathematical Structural Load bearing
geotechnical Calculations memo Quantities
2016) model Drawings capacity
solution
Structural-
Pre-design (22-12- Mathematical Structural Load bearing
geotechnical Calculations memo Quantities
2016) model Drawings capacity
solution
Structural-
Pre-design (22-12- Mathematical Structural Load bearing
geotechnical Calculations memo Quantities
2016) model Drawings capacity
solution
Structural-
Pre-design (22-12- Mathematical Structural Load bearing
geotechnical Calculations memo Quantities
2016) model Drawings capacity
solution
Geotechnical
solution
Geotechnical
solution
Geotechnical
solution
Geotechnical
solution
Geotechnical
solution
Geotechnical
solution
Elements Settlements (cm)
No. of
structures Ground
Dimensions
(types) Element Depth [m] improvemen Long term
[m]
t
Sewage station
AGL Substation
CREI
? Fuel pits
AGL &
NAVAIDs Drainage engineers Structura
engineers
Settlements (cm) NL NL Mxico Mxico (TASANA)
Coordinator
Coordinator:
s: Peter Coordinator:
Short term Wolter Coordinator: Vctor Daz
Vorage / Carlos Daz
Tijssen
Deerns
Structural-
Mathematical Calculations
Data provided Pre-design geotechnical
model memo
solution
Structural-
Mathematical Calculations
Data provided Pre-design geotechnical
model memo
solution
Structural-
Mathematical Calculations
Data provided Pre-design geotechnical
model memo
solution
Structural-
Mathematical Calculations
Data provided Pre-design geotechnical
model memo
solution
Structural-
Mathematical Calculations
Data provided Pre-design geotechnical
model memo
solution
Data provided
Structural-
Mathematical Calculations
Pre-design geotechnical
(100% model memo
solution
design)
Structural-
Data provided Mathematical Calculations
Pre-design geotechnical
model memo
solution
Structural-
Data provided Mathematical Calculations
Pre-design geotechnical
model memo
solution
Structural-
Data provided Mathematical Calculations
Pre-design geotechnical
model memo
solution
Structural-
Data provided Mathematical Calculations
Pre-design geotechnical
model memo
solution
Structural-
Data provided Mathematical Calculations
Pre-design geotechnical
model memo
solution
Structural-
Data provided Mathematical Calculations
Pre-design geotechnical
model memo
solution
3.184
1.609
1.617
be delivered after 8th May due to priorities for packages 2 & 3
Progress
Structural engineers
Structural Quantification
drawings s
Structural Quantification
drawings s
Structural Quantification
drawings s
Structural Quantification
drawings s
Structural Quantification
drawings s
Structural-
Calculations Structural Quantification
Pre-design geotechnical
memo drawings s
solution
Reference Drawings
NL Mexico
(latest vesion)
Ing. Concepto
Coordinator: Ruud Steenbakkers
Valverde No.
All geotech
data
All geotech
data
All geotech
data
All geotech
data
All geotech
data
All geotech
parameters
for fuel pits
Data
Reference Drawings
(latest vesion) Min.
Tezontle
Load of
under
Drawing No. design
foundation
[m]