DISEO DE ZAPATA COMBINADA

DATOS:

Columna 1: 0.50 m x 0.50 m


Columna 2: 0.70 m x 0.50 m
Col. 1 Tipo: Exterior
Col. 2 Tipo: Central

S/C = kg/cm2 = 0.00 Tn/m2


m = 1800 kg/m3 = 1.80 Tn/m2
t = 1.20 kg/cm2 = 12.00 Tn/m2
hf = 1.50 m
ln = 5.65 m

CARGAS DE SERVICIO: CARGAS ULTIMAS:

Ps1 = 130.00 Tn PU1 = 197.00 Tn


Ps2 = 220.00 Tn PU2 = 329.00 Tn
MS1 = 25.00 Tn-m MU1 = 38.00 Tn-m
MS2 = 60.00 Tn-m MU2 = 91.50 Tn-m

REACCIN NETA DEL SUELO:

qsn = 9.30 Tn/m2

DIMENSIONAMIENTO EN LA PLANTA DE CIMENTACIN:

X0 = 4.42 m lz = 8.84 m

REA DE LA ZAPATA:

Azc = 37.63 m2 b= 4.26 m

REDONDEANDO POR EXCESO:

lz = 8.90 m
b= 4.30 m

USAR : lz x b = 8.90 m x

REACCIN DEL TERRENO:

Wnu = 13.744 Tn/m2


Wnu = 1.374 kg/cm2
DIMENSIONAMIENTO DE LA ALTURA "hzc" DE LA ZAPATA COMBINADA:

hzc = 0.73 m
hzc = 0.80 m
hzc (usar) = 0.80 m Aumentar : 0.00 m
d= 0.70 m

DISEO EN LA DIRECCIN LONGITUDINAL:

qnu = 59.10 Tn/m2

V mx (+) = 164.25 Tn M mx (+) = 39.85 Tn-m


V mx (-) = 205.12 Tn M mx (-) = 316.12 Tn-m

X= 3.47 m
Y= 2.78 m

VERIFICACIN POR CORTANTE DIRECTO:

CORTANTE ACTUANTE: Vu mx = 102.19 Tn

CORTANTE RESISTENTE: Vc = 196.50 Tn

VERIFICACIN POR PUNZONAMIENTO:

COLUMNA EXTERIOR: C1

CORTANTE ACTUANTE: Vu = 182.98 Tn

CORTANTE RESISTENTE:

b0 = 2.90 m Vc = 265.05 Tn
COLUMNA INTERIOR: C2

CORTANTE ACTUANTE: Vu = 302.06 Tn

CORTANTE RESISTENTE:

b0 = 5.20 m Vc = 475.26 Tn

DISEO POR FLEXIN:

DIRECCIN LONGITUDINAL:

MOMENTO NEGATIVO:

M mx(-) = 316.12 Tn-m

CLCULO DEL ACERO:

Tomando: a = d/5 = 14.00 cm

As = 132.75 cm2 => a= 3.51 cm


As = 122.54 cm2 => a= 3.24 cm
As = 122.30 cm2 => a= 3.23 cm
As = 122.30 cm2 => a= 3.23 cm
As = 122.30 cm2 => a= 3.23 cm

Asmn = 54.18 cm2

USAR : 24 1 ''

MOMENTO POSITIVO:

M mx(+) = 39.85 Tn-m

CLCULO DEL ACERO:

Tomando: a = d/5 = 14.00 cm

As = 16.73 cm2 => a= 0.44 cm


As = 15.11 cm2 => a= 0.40 cm
As = 15.10 cm2 => a= 0.40 cm
As = 15.10 cm2 => a= 0.40 cm
As = 15.10 cm2 => a= 0.40 cm

Asmn = 54.18 cm2


USAR : 12 1 ''

DIRECCIN TRANSVERSAL:

ANCHO INFLUYENTE:

ZAPATA 1: b1 = 0.85 m
ZAPATA 2: b2 = 1.20 m

ZAPATA EXTERIOR:

lv1 = 1.900 m
qnu1 = 45.81 Tn/m

M mx = 120.69 Tn-m

CLCULO DEL ACERO:

Tomando: a = d/5 = 14.00 cm

As = 50.68 cm2 => a= 14.03 cm


As = 50.69 cm2 => a= 14.03 cm
As = 50.70 cm2 => a= 14.03 cm
As = 50.70 cm2 => a= 14.03 cm
As = 50.70 cm2 => a= 14.03 cm

Asmn = 10.71 cm2

USAR : 18 3/4 ''


ZAPATA INTERIOR:

lv2 = 1.800 m
qnu2 = 76.51 Tn/m

M mx = 215.45 Tn-m

CLCULO DEL ACERO:

Tomando: a = d/5 = 14.00 cm

As = 90.47 cm2 => a= 17.74 cm


As = 93.24 cm2 => a= 18.28 cm
As = 93.65 cm2 => a= 18.36 cm
As = 93.72 cm2 => a= 18.38 cm
As = 93.73 cm2 => a= 18.38 cm

Asmn = 15.12 cm2

USAR : 20 1 ''

ACERO DE MONTAJE SUPERIOR:

p = 1 '' mont = 1/2 ''


Smx = 0.91 m Smn = 0.40 m

USAR : 22 1/2 ''

ACERO DE MONTAJE INFERIOR:

p = 1 '' mont = 1/2 ''


Smx = 0.91 m Smn = 0.40 m

USAR : 10 1/2 ''


DE ZAPATA COMBINADA

PD1 = 80.00 Tn Columna :


PL1 = 50.00 Tn f'c = 210 kg/cm2
PD2 = 150.00 Tn
PL2 = 70.00 Tn Zapata :
MD1 = 15.00 Tn-m f'c = 210 kg/cm2
ML1 = 10.00 Tn-m
MD2 = 35.00 Tn-m Acero :
ML2 = 25.00 Tn-m fy = 4200 kg/cm2

lv = 1.99 m

4.30 m
Pu1, Mu1 Pu2, Mu2

qnu

=> Cumple por Cortante

=> Cumple por Punzonamiento


=> Cumple por Punzonamiento