Project : Golar Hilli FLNG

Job ID No. : MCANO0391 - D08004 - 1 - 502, MCANO0391 - D08004 - 1 - 796 and MCANO0391 - D08004 - 1 - 869
DNV Ref. : MOANO0384 / MOENG / D08004 - 1 - J - 103282, MOANO0384 / TIMIL / D08004 - 1 - J - 104715 and
MOANO0384 / MOENG / D08004 - 1 - J - 105118
KSL Ref. : C110 - DNV - 273, C110 - DNV - 403 and C110 - DNV - 443
Date : 23 / 03 / 2017

Drawing No. C110-M418.01 / 0, " SYSTEM DESIGN CALCULATION - BATTERY ROOM " is taken for information, with the following comment :

101393 / Pending
It can not be seen that requirements for ventilation as required by DNV-OS-D201 ( 2013 ) Ch.2 Sec.2 [9.4.5] has been considered.
104688

Vendor Response :
For the New Battery Room for Golar Hilli FLNG Project, the following batteries are installed with 80 pcs. of Powersafe 12V190F, 18
pcs. of Powersafe 12V155F, 36 pcs. of Powersafe 12V62F and 220 pcs. Of Hoppecke 5OPzV 350 battery and which will have
approximate 98 kVAh. ( Vented Batteries : 77 kVAh + Dry Batteries : 21 kVAh )
a. DNV Requirement # 1 : 10 x sum of battery kVAh for vented batteries and 2 x sum of battery kVAh for dry batteries
Based on requirement 1, approximate ventilation rate requirement is 812 CMH ( m3 / hr ).

b. DNV Requirement # 2 : at least 6 air changes per hour


Based on requirement 2, approximate ventilation rate requirement is 580 CMH ( m3 / hr ).

c. Reference to vendor document C110-M418.01, vendor had used client provided data such as equipment heat dissipation of 4,000
watt for final ventilation rate calculation. The final ventilation rate provided for the New Battery Room is 2,900 CMH which is
higher than DNV requirement # 1 and # 2.

Page1of7
Project : Golar Hilli FLNG
Job ID No. : MCANO0391 - D08004 - 1 - 502, MCANO0391 - D08004 - 1 - 796 and MCANO0391 - D08004 - 1 - 869
DNV Ref. : MOANO0384 / MOENG / D08004 - 1 - J - 103282, MOANO0384 / TIMIL / D08004 - 1 - J - 104715 and
MOANO0384 / MOENG / D08004 - 1 - J - 105118
KSL Ref. : C110 - DNV - 273, C110 - DNV - 403 and C110 - DNV - 443
Date : 23 / 03 / 2017

Drawing No. C110-M454.01 / C, " DUCTING & INSTRUMENT DIAGRAM - AFT. STORE AND STEERING GEAR ROOM " is approved in accordance with the
requirements of DNV-OS-D101 and DNV-OS-D202 with the following comment :
102081 / Note that in accordance with DNV-OS-D202, Ch. 2 Sec.2 1.1.3 the function of the safety systems shall be independent of the control Pending
106382 systems. The F&G system and / or ESD shall be capable of directly tripping fans and closing dampers independently from the control
systems. These signals should be indicated on the D&ID as being from the ESD / F&G and not from ICSS. Please revise accordingly.

Vendor Response :
For the Golar Hilli FLNG Project, ICSS will consists of sub-systems such as F&G / ESD, VCS, PCS, etc,. and will provide the
following signals to each ventilation control system ( fan and damper ),
a. VCS / ICSS will gives respective signal to MCC to operate each ventilation system through serial link communication.
b. F&G / ICSS will gives respective signal to MCC to trip each ventilation system through hard-wired communication.
c. F&G / ICSS will gives respective signal to F&G damper's solenoid valve(s) to close through hard-wired communication.
Vendor had update the document accordingly.

Page2of7
Project : Golar Hilli FLNG
Job ID No. : MCANO0391 - D08004 - 1 - 502, MCANO0391 - D08004 - 1 - 796 and MCANO0391 - D08004 - 1 - 869
DNV Ref. : MOANO0384 / MOENG / D08004 - 1 - J - 103282, MOANO0384 / TIMIL / D08004 - 1 - J - 104715 and
MOANO0384 / MOENG / D08004 - 1 - J - 105118
KSL Ref. : C110 - DNV - 273, C110 - DNV - 403 and C110 - DNV - 443
Date : 23 / 03 / 2017

Drawing No. C110-M465.01 / A, " DUCTING & INSTRUMENT DIAGRAM - EMERGENCY GENERATOR ROOM " is approved in accordance with the
requirements of DNV-OS-D101 and DNV-OS-D202 with the following comment :
102081 / Note that in accordance with DNV-OS-D202, Ch. 2, Sec.2 1.1.3 the function of the safety systems shall be independent of the control Pending
106383 systems. The F&G system and / or ESD shall be capable of directly tripping fans and closing dampers independently from the control
systems. These signals should be indicated on the D&ID as being from the ESD / F&G and not from ICSS. Please revise accordingly.

Vendor Response :
For the Golar Hilli FLNG Project, ICSS will consists of sub-systems such as F&G / ESD, VCS, PCS, etc,. and will provide the
following signals to each ventilation control system ( fan and damper ),
a. VCS / ICSS will gives respective signal to ventilation system control panel ( 97-EC-003 ) to operate ventilation fan
( 97-GK-010 ) through hard-wired communication.
b. F&G / ICSS will gives respective signal to ventilation system control panel ( 97-EC-003 ) to trip ventilation fan
( 97-GK-010 ) through hard-wired communication.
c. F&G / ICSS will gives respective signal to F&G damper interface panel ( 97-IB-7500 ) to close the dampers
( 97-GE-1409 & 97-GE-1410 ) through hard-wired communication.
Vendor had update the document accordingly.

102083 / On sheet 2, it is stated that the fire dampers are to close on failure of signals power ( air ) supply. The schematic on sheet 7 shows the Pending
106383 dampers to be open on loss of air supply. Please correct the schematic.
Vendor Response :
For the Golar Hilli FLNG Project, the dampers provided for emergency generator are fail to open. Instrument air supply is always
availavle ( from normal instrument system & emergency back up bottle system ) and the following conditions of pneumatic dampers
will be applied :-
a. Dampers will be in opened position when loss of electrical power ( 24 VDC ) supply to solenoid valve,
b. Dampers will be in opened position when loss of instrumentic air supply to damper's actuator.
b. Dampers will be able to close on both normal and emergency situation.
Vendor had update the document accordingly.

Page3of7
Project : Golar Hilli FLNG
Job ID No. : MCANO0391 - D08004 - 1 - 502, MCANO0391 - D08004 - 1 - 796 and MCANO0391 - D08004 - 1 - 869
DNV Ref. : MOANO0384 / MOENG / D08004 - 1 - J - 103282, MOANO0384 / TIMIL / D08004 - 1 - J - 104715 and
MOANO0384 / MOENG / D08004 - 1 - J - 105118
KSL Ref. : C110 - DNV - 273, C110 - DNV - 403 and C110 - DNV - 443
Date : 23 / 03 / 2017

Drawing No. C110-M466.01 / 0, " PNEUMATIC AND ELECTRIC DAMPER CONTROL DIAGRAM - HVAC SYSTEM " is approved in accordance with the
requirements of DNV-OS-D202, with the following comment :
102023 / Please provide environmental data for all instrumentation components as per DNV-OS-D202, Ch. 2, Sec.4, Table B1. Pending
106384
Vendor Response :
The document C110-M421.01 / 0 had submitted to DNV and it is used for information. It mentioned engineering datas of dampers.
Also, vendor had purchased theese pneumatic damper and electric operated damper from Wozair ( Asia ) Pte Ltd which will have DNV
type approval certificate ( F-21132 ). Please see attached for certificate of dampers.

102084 / Signals of these schematics are shown as to / from ICSS. Please revise to show signals that are to / from F&G system, in particular to Pending
106384 show that damper closure signals are from the F&G system.

Vendor Response :
For the Golar Hilli FLNG Project, ICSS will consists of sub-systems such as F&G / ESD, VCS, PCS, etc,. and will provide the
following signals for operation of dampers,
a. F&G / ICSS will give respective signals to F&G damper's solenoid valve(s) to close the damper through hard-wired
communication.
b. F&G / ICSS will give respective signals to F&G damper interface panel ( 97-IB-7500 ) to close the dampers
( all electric actuated type dampers ) through hard-wired communication.
Vendor had update the document accordingly.

Page4of7
Project : Golar Hilli FLNG
Job ID No. : MCANO0391 - D08004 - 1 - 502, MCANO0391 - D08004 - 1 - 796 and MCANO0391 - D08004 - 1 - 869
DNV Ref. : MOANO0384 / MOENG / D08004 - 1 - J - 103282, MOANO0384 / TIMIL / D08004 - 1 - J - 104715 and
MOANO0384 / MOENG / D08004 - 1 - J - 105118
KSL Ref. : C110 - DNV - 273, C110 - DNV - 403 and C110 - DNV - 443
Date : 23 / 03 / 2017

102085 / Several schematic show two-way manual valves with a note " Use pneumatic hand valve to shutdown damper ". A two-way valve will Pending
106384 lock in the air pressure and the damper will remain open until the air leaks away. In order to close the damper these valves must be
changed to 3-way such that the damper actuator is vented to atmosphere. Please revise.

Vendor Response :
Vendor will be designed to use 3 way hand valve as additional safety device that will install outside the damper at convenience
location to operator. The vendor had provided factory installed quick exhaust valve ( item no. 5 ) on each damper that mounted close to
damper's actuator. Vendor had update the document accordingly.

Pneumatic Schematic ( Typical )

Page5of7
Project : Golar Hilli FLNG
Job ID No. : MCANO0391 - D08004 - 1 - 502, MCANO0391 - D08004 - 1 - 796 and MCANO0391 - D08004 - 1 - 869
DNV Ref. : MOANO0384 / MOENG / D08004 - 1 - J - 103282, MOANO0384 / TIMIL / D08004 - 1 - J - 104715 and
MOANO0384 / MOENG / D08004 - 1 - J - 105118
KSL Ref. : C110 - DNV - 273, C110 - DNV - 403 and C110 - DNV - 443
Date : 23 / 03 / 2017

Drawing No. C110-M457.01 / B, " DUCTING & INSTRUMENT DIAGRAM - ENGINE ROOM AND MACHINERY AREA " is approved in accordance with the
requirements of DNV-OS-A101, DNV-OS-D301 and SOLAS II-2/C/9, with the following comment :
102192 / The ventilation inlet to Supply Fan Rooms ( Stbd Fwd. & Aft. and Port Fwd. & Aft. ) are not provided with fire dampers at the main Pending
106572 boundary. The comment also relates to ventilation outlets without menas for closing at the main boundary. The comment also relates to
ventilation outlets without menas for closing at the main boundary.
-
It is questioned if this is aligned with the fire protection plan, ref. " Structural Fire Protection Plan, Doc. No. C110-H504.01, Rev.
4 " and note for asterisk in table which states that vent intakes shall be made tight to prevent passage of flame and smoke.

- It is questioned how the fan rooms will be isolated or de-energized upon ESD High Level.
To be clarified.
Refer also DNV-OS-D301 ( 2013 ) Ch.2 Sec.1 [2.3.8], [2.4] and DNV-OS-A101 ( 2013 ) Ch.2 Sec.7 Figure 7-1.

Vendor Response :
For the Golar Hilli FLNG Project, the existing ventilation system for engine room and machinery spaces area have been upfraded by
adding the following pneumatic operated dampers at ventilation inlet to Supply Fan Rooms ( Stbd Fwd. & Aft. and Port Fwd. & Aft. )
and exhaust air outlets at funnels as follows :-
a. Damper 97-GE-6003 is provided at air inlet of supply air fan 97-GK-6003 inside the Fan Room Port. Aft.
Damper 97-GE-6005 is provided at air inlet of supply air fan 97-GK-6005 and damper 97-GE-6007 is provided at air outlet of
supply air fan 97-GK-6007 respectively inside the Fan Room Port. Fwd.

b. Damper 97-GE-6004 is provided at air inlet of supply air fan 97-GK-6004 inside the Fan Room Stbd. Aft.
Damper 97-GE-6006 is provided at air inlet of supply air fan 97-GK-6006 and damper 97-GE-6008 is provided at air outlet of
supply air fan 97-GK-6008 respectively inside the Fan Room Stbd. Fwd.

c.
And also, damper 97-GE-6002 and 6012 is provided at exhaust air outlets from Engine Room and Machinery Spaces (Stbd.) and
damper 97-GE-6001 and 6011 is provided at exhaust air outlets from Engine Room and Machinery Spaces (Port).

Page6of7
Project : Golar Hilli FLNG
Job ID No. : MCANO0391 - D08004 - 1 - 502, MCANO0391 - D08004 - 1 - 796 and MCANO0391 - D08004 - 1 - 869
DNV Ref. : MOANO0384 / MOENG / D08004 - 1 - J - 103282, MOANO0384 / TIMIL / D08004 - 1 - J - 104715 and
MOANO0384 / MOENG / D08004 - 1 - J - 105118
KSL Ref. : C110 - DNV - 273, C110 - DNV - 403 and C110 - DNV - 443
Date : 23 / 03 / 2017

The entire engine room and machinery space will be isolated from atmosphere ( open deck ) by closing above mentioned
pneumatic operated dampers.
For the Golar Hilli FLNG Project, ICSS will consists of sub-systems such as F&G / ESD, VCS, PCS, etc,.
F&G / ICSS will give respective signals to F&G damper's solenoid valve(s) to close the damper through hard-wired
communication.