MARINE ENGINEERING PRACTICE
TIME ALLOWED - 3 HOURS
Instructions
1. Question No.1 is compulsory
2. Answer any SIX questions.
3. All questions carry equal marks.
4. Neatness in handwriting and clarity in expression carries weightage
5. Illustration of an answer with clear sketches ? diagrams carries weightage
6. All unused pages of answer script must be cancelled out by two lines (X) across the page.

Q1. What is understood by risk on board ship? As a 2nd engineer discuss various methods for hazard identification and assessment of
risk available on board.
2012/SR12 2013/SR11 2014/SR03 2015/SR02 2015/SR08 2016/SR09 2016/SR12

Q2. Under CSM bottom end bearing of a large 2stroke slow speed engine is due for survey A. As 2nd eng explain the procedure involved
in complete inspection of a bottom end bearing; B. List the precaution to be taken; C. Indicate the reasons for possible defects which
could be encountered and state how they may be rectified; D. What test are carried out on completion of survey and reassembly.
2009/SR8 2007/SR3 2010/SR1 2012/SR1 2012/SR12 2013/SR1 2013/SR10 2013/SR11 2014/SR01 2014/SR03
2014/SR11 2014/SR12 2015/SR01 2015/SR03 2015/SR06 2015/SR08 2016/SR02 2016/SR06 2016/SR11 2016/SR12

Q3. A. State the circumstances owing to which it may be necessary to renew a cylinder liner; B. Explain how the liner is removed; C.
Explain how a new liner is fitted; D. State the important checks to be made after fitting.
2010/SR1 2005/SR2 2012/SR1 2012/SR12 2013/SR1 2013/SR8 2013/SR10 2013/SR11 2014/SR01
2014/SR03 2014/SR11 2014/SR12 2015/SR01 2015/SR08 2015/SR11 2016/SR06 2016/SR12

Q4. Describe the procedure to be under taken when upon a routing schedule for changing fuel injector on a main engine it is found that
the injector body is seized and cannot be removed using conventional means.

2007/SR1 2011/SR12 2012/SR1 2012/SR12 2013/SR1 2013/SR6 2013/SR8 2013/SR12 2015/SR01


2015/SR06 2015/SR08 2016/SR07 2016/SR09 2016/SR11 2016/SR12

Q5. Explain how EACH of the following hull defects should be dealt with;
A. A cracked weld; B. A severe indentation in way of a frame; C. Surfaces suffering from general corrosion although the extent of wastage
does not warrant plate replacement; D. A bilge head fractured at the forward end.
2007/SR3 2012/SR1 2012/SR2 2012/SR12 2013/SR6 2014/SR01 2014/SR03 2014/SR12 2015/SR01
2015/SR08 2015/SR15 2016/SR02 2016/SR06 2016/SR09 2016/SR12

Q6. A. With the aid of a simple sketch, explain the "trouble spots" in a basic air-conditioning unit.
B. With reference to your sketch, explain the following:- i. How the problem of increase in humidity on cooled air is overcome; ii. How
discomfort caused by the excessive drying effect of heated air is overcome.
2007/SR3 2012/SR1 2012/SR2 2012/SR12 2014/SR03 2014/SR12 2015/SR08 2016/SR09 2016/SR12

Q7. With respect to hydraulic Ram steering gears


A. What emergency locking device can be used in order to speedily bring the steering gear to rest? State one reason the best angular
position to lock the steering gear.
B. Use a simple sketch to show where the Jumping (top) and wear down (bottom) rudder carrier ring clearances can be measured.
Indicate what clearances you would expect with a new steering gear
C. State the consequences of the wear down clearances being reduced to less than zero.
2011/SR4 2010/SR4 2010/SR3 2010/SR2 2012/SR1 2014/SR01 2014/SR03 2014/SR4 2014/SR12
2015/SR01 2015/SR08 2016/SR02 2016/SR06 2016/SR12
WWW.DIESELSHIP.COM
WWW.DIESELSHIP.COM 2

Q8: Write short note on the followings A. Metal locking; B.TIG and MIG welding; C. Erasing; D. Soldering
2007/SR8 2012/SR11 2014/SR02 2014/SR03 2014/SR12 2015/SR08 2016/SR02 2016/SR03 2016/SR06
2016/SR09 2016/SR10 2016/SR12

Q9. A. With reference to the insulation testing of marine electrical plant: - I. State the reasons for insulation testing; II. State the
precautions to be observed when testing intrinsically safe equipment.
B. Describe the overhaul of d.c. motor which has been subjected to excessively damp condition or flooding with seawater

2008/SR9 2008/SR4 2008/SR3 2008/SR2 2007/SR9 2007/SR 2007/SR4 2007/SR2 2006/SR8 2011/SR4
7
2010/SR9 2011/SR6 2008/SR7 2007/SR1 06-07/EM 2005/SR 2005/SR9 2011/SR1 2012/SR4 2012/SR1
1 2 0
2012/SR1 2014/SR0 2014/SR0 2014/SR1 2015/SR0 2015/SR 2015/SR0 2016/SR0 2016/SR0 2016/SR1
1 2 3 2 3 7 8 2 3 0
2016/SR1
2

Note : If you are looking for answers prepared in organized manner with clear drawings please visit our website by CLICKING HERE