1. General:
Systems of Sanitation, types of sewage and
sewerage system
JULY
First Sermon of Lord Buddha (8) UHV workshop (10-17) Staff Reporting (20)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
UNIT 1 - INTRODUCTION UNIT 2 - DESIGN METHOD UNIT 3- SIMPLE CONNECTION UNIT 3 - SIMPLE CONECTION CONTINUED UNIT 4 - TENSION
Introduction to Design, Introduction to Plastic Analysis and Design Buckling and Types of connections Bolt Groups MEMBERS
AUGUST
Steel,Mechanical Properties of steel section classificationPhysical, Design Bolted connections Weld Groups / Design of tension
Fatigue, corrosion and Fire in steel Method, Limt State Design Welded connections. UNIT 4 - TENSION MEMBERS members, Lug angles,
(Assginment I) Types of tension members, splices and gusset plates.
Net and effective areas,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
UNIT 5- COMPRESSION MEMBERS UNIT 5 -COMPRESION MEMEBR CONTINUED UNIT 6- FLEXURAL MEMBER UNIT 6- FLEXURAL MEMBER
Eccentrically loaded columns. Lateral stability of beams, CONTINUED
SEPTEMBER
Struts and Columns Capacity Theory, Built up columns, Encased columns. Bending, bearing and shear stresses, Built-up sections,
Effective lengths Web buckling and web crippling. Design of Lateraaly unsupported beams,
Design of axially loaded columns Design of laterally supported Plate Girders including stiffeners,
Term Test I
Blessed Rainy Day (23) connections and curtailment of flange
(1,2,3)
plates.
(Assginment II)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M
UNIT 7 - .ECCENTRIC CONNECTION UNIT 8 - COLUMN BASE AND FOOTING UNIT 8 - COLUMN BASE AND FOOTING
Beam-column connections. Term Test II (9,10,12) Simple bases, gusseted base and column bases. CONTINUED
OCTOBER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
UNIT 9 - TIMBER UNIT 9 - TIMBER STRUCTURES
NOVEMBER
STRUCTURES. CONTINUED
Introduction, Timber Column and Connection/Joints
Timber beams, Birth Anniversary of 4th King (11)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
National Day (17)
DECEMBER
Task Date
All Tutor(s)
Project Coordinator
Seminar Coordinator
Project Coordinator
Seminar Coordinator
HoD
Project Coordinator
Seminar Coordinator
HoD
Seminar Coordinator
Tadashi Takahashi
Project Coordinator
HoD
HoD
HoD
Civil Tutor(s)
All Tutor(s)
All Tutor(s)
HoD
PBE Convenor, PBE Secretary
HoD
Team Leader
Team Leader
HoD
HoD