CRONOGRAMA VALORIZADO DE AVANCE DE OBRA pag.

1 de 3
OBRA : EDIFICIO MULTIFAMILIAR MI VIVIENDA COSTOS A: NOVIEMBRE 2011
UBICACION: SURQUILLO - LIMA - LIMA
Id Item DESCRIPCION Duracin COSTO DIRECTO (S/.) Detalles Total
mes 1 mes 2 mes 3 mes 4 mes 5 mes 6 mes 7 mes 8 mes 9 mes 10 mes 11
0 EDIFICIO MULTIFAMILIAR "MI VIVIENDA" 246.63 das? S 1,458,838.08 Costo S 7,400.36 S 35,088.96 S 46,045.58 S 26,132.51 S 153,354.09 S 345,967.37 S 384,433.98 S 313,219.82 S 105,934.69 S 41,260.60 S 1,458,838....
1 001 ESTRUCTURAS 195.75 das? S 715,318.72 Costo S 7,400.36 S 35,088.96 S 38,981.96 S 26,132.51 S 119,904.36 S 196,175.93 S 186,545.88 S 105,088.77 S 715,318.72
2 001.01 OBRAS PRELIMINARES 10 das? S 5,541.93 Costo S 1,791.92 S 3,750.02 S 5,541.93
3 001.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA 10 das? S 4,000.00 Costo S 494.38 S 3,505.63 S 4,000.00
4 001.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 3.60 m 1 da? S 1,262.63 Costo S 1,262.63 S 1,262.63
5 001.01.03 TRAZO Y REPLANTEO PRELIMINAR 1 da? S 279.30 Costo S 34.91 S 244.39 S 279.30
6 001.02 MOVIMIENTO DE TIERRAS 105 das? S 32,713.03 Costo S 5,608.44 S 8,748.46 S 1,980.30 S 2,786.75 S 13,589.08 S 32,713.03
7 001.02.01 EXCAVACION MASIVA PARA SEMISOTANO, C/EQ 1 da? S 5,608.44 Costo S 5,608.44 S 5,608.44
8 001.02.02 EXCAVACION PARA CALZADURAS, MANUAL 32 das? S 6,777.55 Costo S 5,692.08 S 1,085.47 S 6,777.55
9 001.02.03 EXCAVACION DE ZANJAS PARA CIMIENTO, MANUAL 18 das? S 3,681.58 Costo S 894.83 S 2,786.75 S 3,681.58
10 001.02.04 EXCAVACION MASIVA PARA CISTERNA, C/EQ 1 da? S 3,056.38 Costo S 3,056.38 S 3,056.38
11 001.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO 10 das? S 3,220.50 Costo S 3,220.50 S 3,220.50
12 001.02.06 ELIMINACION DE MATERIAL EXCEDENTE 6 das? S 10,368.58 Costo S 10,368.58 S 10,368.58
13 001.03 OBRAS DE CONCRETO SIMPLE 71 das? S 39,592.42 Costo S 35,746.45 S 3,845.97 S 39,592.42
14 001.03.01 CONCRETO EN FALSO PISO fc = 100 Kg/cm2 2 das? S 3,845.97 Costo S 3,845.97 S 3,845.97
15 001.03.02 CONCRETO PARA CALZADURA f'c=100 kg/cm2 7 das? S 22,001.65 Costo S 22,001.65 S 22,001.65
16 001.03.03 ENCOFRADO Y DESENCOFRADO DE CALZADURA 12 das? S 13,744.80 Costo S 13,744.80 S 13,744.80
17 001.04 OBRAS DE CONCRETO ARMADO 192.75 das? S 637,471.34 Costo S 22,590.48 S 1,255.21 S 23,345.76 S 102,469.31 S 196,175.93 S 186,545.88 S 105,088.77 S 637,471.34
18 001.04.01 CIMENTACION ARMADA 13 das? S 16,893.27 Costo S 16,893.27 S 16,893.27
19 001.04.01.01 CONCRETO f'c=210 kg/cm2 EN CIMIENTOS 2 das? S 9,419.10 Costo S 9,419.10 S 9,419.10
20 001.04.01.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS 6 das? S 2,500.84 Costo S 2,500.84 S 2,500.84
21 001.04.01.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN CIMIENTOS 5 das? S 4,973.33 Costo S 4,973.33 S 4,973.33
22 001.04.02 COLUMNAS DE CONCRETO 95.38 das? S 86,332.62 Costo S 2,129.97 S 20,140.21 S 26,726.30 S 28,933.30 S 8,402.83 S 86,332.62
23 001.04.02.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 92.38 das? S 17,950.99 Costo S 4,768.67 S 5,053.95 S 5,050.05 S 3,078.32 S 17,950.99
24 001.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 93.25 das? S 22,538.52 Costo S 5,545.87 S 6,645.07 S 7,922.84 S 2,424.74 S 22,538.52
25 001.04.02.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN COLUMNAS 94.88 das? S 45,843.11 Costo S 2,129.97 S 9,825.67 S 15,027.28 S 15,960.41 S 2,899.77 S 45,843.11
26 001.04.03 PLACAS DE CONCRETO ARMADO 96.13 das? S 113,495.18 Costo S 2,151.49 S 30,129.93 S 40,535.39 S 33,102.78 S 7,575.59 S 113,495.18
27 001.04.03.01 CONCRETO f 'c=210 kg/cm2 EN PLACAS 79.88 das? S 35,870.74 Costo S 11,892.15 S 13,418.80 S 9,117.62 S 1,442.17 S 35,870.74
28 001.04.03.02 ENCOFRADO Y DESENCOFRADO DE PLACAS 94.13 das? S 41,062.61 Costo S 10,520.33 S 13,187.85 S 11,971.47 S 5,382.96 S 41,062.61
29 001.04.03.03 ACERO CORRUGADO FY=4200 KG/CM2 EN PLACAS 94.38 das? S 36,561.83 Costo S 2,151.49 S 7,717.45 S 13,928.74 S 12,013.69 S 750.46 S 36,561.83
30 001.04.04 MUROS DE CONCRETO ARMADO 99.06 das? S 167,731.43 Costo S 2,171.03 S 38,563.29 S 58,790.01 S 43,083.55 S 25,123.55 S 167,731.43
31 001.04.04.01 CONCRETO f 'c=210 kg/cm2 EN MUROS 92.88 das? S 50,533.69 Costo S 13,453.37 S 23,359.72 S 7,562.46 S 6,158.14 S 50,533.69
32 001.04.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS 97.06 das? S 78,365.25 Costo S 17,318.67 S 21,371.55 S 22,431.63 S 17,243.40 S 78,365.25
33 001.04.04.03 ACERO CORRUGADO FY=4200 KG/CM2 EN MUROS 94.25 das? S 38,832.49 Costo S 2,171.03 S 7,791.25 S 14,058.74 S 13,089.46 S 1,722.01 S 38,832.49
34 001.04.05 VIGAS DE CONCRETO 92.63 das? S 96,819.16 Costo S 6,738.29 S 30,154.98 S 33,144.94 S 26,780.95 S 96,819.16
35 001.04.05.01 CONCRETO f'c=210 kg/cm2 EN VIGAS 88.63 das? S 20,506.58 Costo S 1,598.68 S 5,773.06 S 5,770.13 S 7,364.71 S 20,506.58
36 001.04.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS 90.38 das? S 34,177.08 Costo S 2,263.30 S 11,448.87 S 12,322.87 S 8,142.04 S 34,177.08
37 001.04.05.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN VIGAS 89.88 das? S 42,135.50 Costo S 2,876.31 S 12,933.05 S 15,051.94 S 11,274.20 S 42,135.50
38 001.04.06 RAMPA DE CONCRETO 2 das? S 1,255.21 Costo S 1,255.21 S 1,255.21
39 001.04.06.01 CONCRETO F'C=210 KG/CM2 EN RAMPA 1 da? S 740.96 Costo S 740.96 S 740.96
40 001.04.06.02 ACERO CORRUGADO FY=4200 KG/CM2 EN RAMPA 1 da? S 514.25 Costo S 514.25 S 514.25
41 001.04.07 LOSAS MACIZA DE CONCRETO 91.38 das? S 9,150.40 Costo S 292.37 S 3,094.08 S 4,119.38 S 1,644.57 S 9,150.40
42 001.04.07.01 CONCRETO F'C=210 KG/CM2 EN LOSA MACISA 89.38 das? S 3,611.23 Costo S 114.29 S 1,016.89 S 1,016.20 S 1,463.85 S 3,611.23
43 001.04.07.02 ENCOFRADO Y DESENCOFRADO DE LOSAS MACISAS 76 das? S 2,574.97 Costo S 83.53 S 965.61 S 1,440.68 S 85.15 S 2,574.97
44 001.04.07.03 ACERO CORRUGADO FY=4200 KG/CM2 EN LOSAS MACIZAS 76 das? S 2,964.20 Costo S 94.55 S 1,111.58 S 1,662.50 S 95.57 S 2,964.20
45 001.04.08 LOSAS ALIGERADAS 92.75 das? S 96,655.93 Costo S 4,947.23 S 27,679.84 S 34,154.82 S 29,874.05 S 96,655.93
46 001.04.08.01 CONCRETO f'c=210 kg/cm2 EN LOSAS ALIGERADAS 89.38 das? S 17,641.15 Costo S 454.12 S 4,659.71 S 5,553.96 S 6,973.36 S 17,641.15
47 001.04.08.02 ENCOFRADO Y DESENCOFRADO DE LOSAS ALIGERADAS 92.75 das? S 46,704.98 Costo S 2,073.99 S 10,494.55 S 16,386.09 S 17,750.35 S 46,704.98
48 001.04.08.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN LOSAS ALIGERADAS 75.63 das? S 6,154.19 Costo S 320.19 S 1,963.38 S 1,969.98 S 1,900.65 S 6,154.19
49 001.04.08.04 LADRILLO DE ARCILLA HUECO 15X30X30cm 64.13 das? S 26,155.61 Costo S 2,098.93 S 10,562.20 S 10,244.79 S 3,249.69 S 26,155.61
50 001.04.09 ESCALERAS 90.38 das? S 26,547.66 Costo S 1,657.99 S 9,195.33 S 10,007.11 S 5,687.23 S 26,547.66
51 001.04.09.01 CONCRETO F'C=210 KG/CM2 ESCALERAS 89.38 das? S 6,360.51 Costo S 202.57 S 1,791.47 S 1,790.03 S 2,576.44 S 6,360.51
52 001.04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL ESCALERAS 88.88 das? S 4,189.65 Costo S 43.73 S 1,054.33 S 1,870.62 S 1,220.97 S 4,189.65
53 001.04.09.03 ACERO CORRUGADO FY=4200 KG/CM2 EN PLACAS 75.5 das? S 15,997.50 Costo S 1,411.69 S 6,349.53 S 6,346.46 S 1,889.82 S 15,997.50
54 001.04.10 CISTERNA 23 das? S 22,590.48 Costo S 22,590.48 S 22,590.48
55 001.04.10.01 CONCRETO fc=210 Kg/cm2 EN CISTERNA 2 das? S 7,922.34 Costo S 7,922.34 S 7,922.34
56 001.04.10.02 ENCOFRADO Y DESENCOFRADO DE CISTERNA 14 das? S 8,153.40 Costo S 8,153.40 S 8,153.40
57 001.04.10.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN CISTERNA 7 das? S 6,514.74 Costo S 6,514.74 S 6,514.74
58 003 ARQUITECTURA 196.63 das? S 490,153.20 Costo S 1,912.32 S 8,423.03 S 81,789.87 S 130,099.82 S 133,544.97 S 93,122.56 S 41,260.60 S 490,153.20
59 003.01 ALBAILERIA 91.38 das? S 128,226.03 Costo S 8,423.03 S 39,180.37 S 35,526.75 S 36,811.05 S 8,284.83 S 128,226.03
60 003.01.01 MURO DE LADRILLO KK DE ARCILLA - SOGA 9X14X24CM. 1:4 X 1.5 CM 91.38 das? S 121,530.97 Costo S 7,830.08 S 37,230.69 S 33,614.25 S 34,853.93 S 8,002.02 S 121,530.97

61 003.01.02 MURO DE LADRILLO PANDERETA 9X11X23CM. 1:4 X 1.5 CM 89.38 das? S 6,695.06 Costo S 592.95 S 1,949.68 S 1,912.50 S 1,957.12 S 282.81 S 6,695.06
62 003.02 REVESTIMIENTOS 94.75 das? S 78,637.66 Costo S 16,915.66 S 23,861.24 S 20,841.88 S 17,018.88 S 78,637.66
63 003.02.01 TARRAJEO RAYADO PRIMARIO 93 das? S 35,475.98 Costo S 8,835.49 S 10,369.24 S 8,548.03 S 7,723.22 S 35,475.98
64 003.02.02 TARRAJEO EN PLACAS 93 das? S 20,176.29 Costo S 5,463.94 S 5,934.20 S 4,187.54 S 4,590.61 S 20,176.29
65 003.02.03 TARRAJEO DE MUROS DE 10 cm 89.13 das? S 2,477.53 Costo S 253.53 S 389.19 S 610.02 S 1,224.79 S 2,477.53
66 003.02.04 VESTIDURA DE DERRAMES ANCHO=15mm 87.75 das? S 14,131.37 Costo S 1,513.17 S 3,848.86 S 5,289.08 S 3,480.26 S 14,131.37
67 003.02.05 BRUAS DE 1.00CM 56.63 das? S 6,376.49 Costo S 849.53 S 3,319.75 S 2,207.21 S 6,376.49
68 003.03 CIELORRASOS 92.5 das? S 33,113.89 Costo S 6,165.61 S 10,816.93 S 11,863.04 S 4,268.30 S 33,113.89

Proyect Profesional 2010 (Microsoft Corporation - Version 14.0.5128.5000)


CRONOGRAMA VALORIZADO DE AVANCE DE OBRA pag. 2 de 3
OBRA : EDIFICIO MULTIFAMILIAR MI VIVIENDA COSTOS A: NOVIEMBRE 2011
UBICACION: SURQUILLO - LIMA - LIMA
Id Item DESCRIPCION Duracin COSTO DIRECTO (S/.) Detalles Total
mes 1 mes 2 mes 3 mes 4 mes 5 mes 6 mes 7 mes 8 mes 9 mes 10 mes 11
69 003.03.01 TARRAJEO EN CIELO RASO CON MEZCLA C:A 1:5 CON CINTA DE 1.5CM 92.5 das? S 33,113.89 Costo S 6,165.61 S 10,816.93 S 11,863.04 S 4,268.30 S 33,113.89

70 003.04 PISOS Y PAVIMENTOS 90.25 das? S 84,858.30 Costo S 15,620.87 S 22,566.01 S 24,179.84 S 22,491.58 S 84,858.30
71 003.04.01 PISO DE CEMENTO COLOREADO Y BRUADO DE 2" 2 das? S 3,892.62 Costo S 3,892.62 S 3,892.62
72 003.04.02 PISO LAMINADO DE MADERA EN DORMITORIOS 90 das? S 32,972.08 Costo S 5,500.62 S 10,849.70 S 10,833.87 S 5,787.89 S 32,972.08
73 003.04.03 PISO CERAMICO 40 x 40 COLOR - ALTO TRANSITO 90.25 das? S 36,852.30 Costo S 5,588.46 S 10,739.66 S 12,319.80 S 8,204.38 S 36,852.30
74 003.04.04 PISO CERAMICO 20 x 20 COLOR 89.38 das? S 3,356.06 Costo S 639.17 S 976.65 S 1,026.17 S 714.07 S 3,356.06
75 003.04.05 PISO DE CEMENTO COLOREADO Y BRUADO DE 2" EN TERRAZAS 2 das? S 3,892.62 Costo S 3,892.62 S 3,892.62
76 003.04.06 PISO DE CEMENTO COLOREADO Y BRUADO DE 2" EN AREAS COMUNES 2 das? S 3,892.62 Costo S 3,892.62 S 3,892.62
77 003.05 ZOCALOS 89.63 das? S 11,811.34Costo S 1,013.84 S 3,424.47 S 3,546.43 S 3,826.59 S 11,811.34
78 003.05.01 ENCHAPE DE COCINA PARED 89.63 das? S 5,760.75 Costo S 474.38 S 1,721.40 S 1,779.87 S 1,785.10 S 5,760.75
79 003.05.02 CONTRAZOCALOS DE CERAMICOS 89.5 das? S 6,050.59 Costo S 539.46 S 1,703.07 S 1,766.56 S 2,041.49 S 6,050.59
80 003.06 CARPINTERIA DE MADERA 24 das? S 31,835.80 Costo S 663.25 S 31,172.55 S 31,835.80
81 003.06.01 PUERTA GLOBAL (DE MADERA TABLEROS REBAJADOS DE 4.5 mm DE 24 das? S 31,835.80 Costo S 663.25 S 31,172.55 S 31,835.80
CEDRO)
82 003.07 CARPINTERIA METALICA 178.63 das? S 7,394.74 Costo S 1,912.32 S 490.05 S 4,992.37 S 7,394.74
83 003.07.01 BARANDA DE ACERO 6 das? S 3,491.53 Costo S 290.96 S 3,200.57 S 3,491.53
84 003.07.02 ESCALERA GATO 2 das? S 1,912.32 Costo S 1,912.32 S 1,912.32
85 003.07.03 CARPINTERIA DE ALUMINIO 5 das? S 1,990.89 Costo S 199.09 S 1,791.80 S 1,990.89
86 003.08 VIDRIOS, CRISTALES Y SIMILARES 88.25 das? S 87,600.41 Costo S 260.07 S 26,440.10 S 28,643.19 S 27,161.36 S 5,095.68 S 87,600.41
87 003.08.01 CRISTAL TEMPLADO VENTANAS 88.25 das? S 51,901.60 Costo S 153.16 S 15,664.40 S 16,972.05 S 16,093.54 S 3,018.44 S 51,901.60
88 003.08.02 CRISTAL TEMPLADO MAMPARAS 88.25 das? S 35,698.81 Costo S 106.91 S 10,775.70 S 11,671.14 S 11,067.82 S 2,077.24 S 35,698.81
89 003.09 PINTURA 89.63 das? S 26,675.03 Costo S 2,633.45 S 7,464.32 S 7,659.54 S 8,917.72 S 26,675.03
90 003.09.01 PINTURA LATEX EN PAREDES, PLACAS Y CIELO RASO 89.63 das? S 26,675.03 Costo S 2,633.45 S 7,464.32 S 7,659.54 S 8,917.72 S 26,675.03
91 005 INSTALACIONES ELECTRICAS 101.13 das? S 180,200.86 Costo S 14,301.45 S 51,758.91 S 51,163.85 S 57,055.24 S 5,921.37 S 180,200.84
92 005.01 SALIDA PARA CENTRO DE LUZ 90 das? S 38,983.42 Costo S 2,906.07 S 12,217.99 S 11,649.21 S 12,210.13 S 38,983.42
93 005.01.01 SALIDA DE TECHO EN CENTRO, TIPO FLUORESENTE 77 das? S 2,032.94 Costo S 183.52 S 674.90 S 728.45 S 446.07 S 2,032.94
94 005.01.02 SALIDA DE TECHO EN CENTRO, NORMAL TIPO EMERGENCIA 90 das? S 33,465.32 Costo S 2,722.55 S 10,358.11 S 9,594.46 S 10,790.19 S 33,465.32
95 005.01.03 SALIDA DE PARED (BRAQUETES) CON PVC 76.38 das? S 3,485.16 Costo S 1,184.98 S 1,326.30 S 973.87 S 3,485.16
96 005.02 SALIDA PARA INTERRUPTOR DE LUZ 89.38 das? S 2,381.27 Costo S 492.06 S 828.80 S 777.15 S 283.25 S 2,381.27
97 005.02.01 INTERRUPTOR UNIPOLAR SIMPLE 89.38 das? S 1,664.40 Costo S 342.22 S 580.62 S 543.28 S 198.28 S 1,664.40
98 005.02.02 INTERRUPTOR DE CONMUTACION 89.38 das? S 716.87 Costo S 149.84 S 248.18 S 233.87 S 84.97 S 716.87
99 005.03 SALIDA PARA TOMACORRIENTES 90.13 das? S 29,118.52 Costo S 7,661.85 S 8,777.63 S 9,682.39 S 2,996.65 S 29,118.52
100 005.03.01 TOMACORRIENTE BIPOLAR DOBLE CONTOMA A TIERRA 15A -220v 90.13 das? S 27,478.04 Costo S 7,270.37 S 8,247.35 S 9,149.67 S 2,810.65 S 27,478.04
101 005.03.02 TOMACORRIENTE BIPOLAR DOBLE PARA LAVADORA 89.38 das? S 1,640.48 Costo S 391.48 S 530.28 S 532.72 S 186.00 S 1,640.48
102 005.04 SALIDA DE FUERZA 1 da? S 425.88 Costo S 425.87 S 425.87
103 005.04.01 SALIDA DE FUERZA PARA COCINA CON PVC 1 da? S 425.88 Costo S 425.87 S 425.87
104 005.05 CAJA DE PASE 87.13 das? S 7,839.96 Costo S 656.07 S 2,432.27 S 2,326.78 S 2,424.83 S 7,839.95
105 005.05.01 CAJA DE PASE DE 100 X 100X50 87.13 das? S 310.31 Costo S 27.94 S 90.53 S 89.00 S 102.85 S 310.31
106 005.05.02 CAJA DE PASE DE 300 X 300X150 87.13 das? S 2,347.52 Costo S 193.49 S 735.19 S 700.02 S 718.82 S 2,347.52
107 005.05.03 CAJA DE PASE OCTOGONAL 87.13 das? S 588.38 Costo S 54.36 S 167.74 S 166.68 S 199.60 S 588.38
108 005.05.04 CAJA DE PASE DE 400x400x150 TIPO H 87.13 das? S 1,713.46 Costo S 139.58 S 541.24 S 513.40 S 519.23 S 1,713.46
109 005.05.05 CAJA DE PASE DE 200x200x100 TIPO E 86.81 das? S 363.37 Costo S 32.26 S 112.12 S 108.63 S 110.35 S 363.36
110 005.05.06 CAJA DE PASE DE 650x350x150 TIPO J 87.13 das? S 2,516.92 Costo S 208.44 S 785.45 S 749.05 S 773.98 S 2,516.92
111 005.06 SISTEMA PUESTA A TIERRA 1 da? S 1,023.70 Costo S 1,023.70 S 1,023.70
112 005.06.01 SISTEMA DE PUESTA A TIERRA (INC. POZOS Y CABLES DESNUDOS 1 da? S 1,023.70 Costo S 1,023.70 S 1,023.70
70mm2)
113 005.07 PRUEBAS ELECTRICAS 1 da? S 2,500.00 Costo S 2,500.00 S 2,500.00
114 005.07.01 PRUEBAS DE AISLAMIENTO Y CONTINUIDAD 1 da? S 2,500.00 Costo S 2,500.00 S 2,500.00
115 005.08 SISTEMA DE COMUNICACIONES 90.5 das? S 9,573.89 Costo S 609.13 S 3,341.18 S 2,802.83 S 2,420.20 S 400.56 S 9,573.89
116 005.08.01 SALIDA PARA INTERCOMUNICADORES 90.5 das? S 2,410.19 Costo S 194.33 S 698.22 S 685.70 S 700.73 S 131.22 S 2,410.19
117 005.08.02 SALIDA PARA ANTENA DE TELEVISION CON PVC 90.13 das? S 3,260.46 Costo S 195.46 S 1,240.00 S 988.86 S 783.95 S 52.19 S 3,260.46
118 005.08.03 SALIDA PARA SIRENA DE LUZ alarma c/incendio 90.13 das? S 3,725.82 Costo S 219.34 S 1,402.96 S 1,128.27 S 913.34 S 61.91 S 3,725.82
119 005.08.04 SALIDA PARA PULSEADOR DE SIRENA 1 da? S 177.42 Costo S 22.18 S 155.24 S 177.42
120 005.09 CONDUCTOS Y CANALIZACION 90.63 das? S 44,385.00 Costo S 5,206.49 S 13,324.00 S 13,067.17 S 12,787.33 S 44,385.00
121 005.09.01 TUBERIA DE PVC - SEL 90.63 das? S 44,385.00 Costo S 5,206.49 S 13,324.00 S 13,067.17 S 12,787.33 S 44,385.00
122 005.10 CABLES ALIMENTADORES 89.88 das? S 35,101.67 Costo S 4,923.69 S 9,482.13 S 9,733.97 S 9,146.85 S 1,815.04 S 35,101.67
123 005.10.01 CABLE 1x25mm2 2 das? S 1,406.88 Costo S 1,406.88 S 1,406.88
124 005.10.02 CABLE 1x16mm2 2 das? S 771.84 Costo S 771.84 S 771.84
125 005.10.03 CABLE 1x10mm2 DE TABLERO GENERAL A SUB TABLERO 88.25 das? S 9,689.24 Costo S 810.05 S 3,175.73 S 3,094.68 S 2,414.38 S 194.40 S 9,689.24
126 005.10.04 CABLE 1x6mm2 88.25 das? S 3,366.00 Costo S 260.02 S 991.87 S 968.85 S 996.47 S 148.79 S 3,366.00
127 005.10.05 CABLE ELECTRICO TW AWG # 12- 4mm2 89.88 das? S 12,865.71 Costo S 1,367.45 S 3,843.05 S 3,794.52 S 3,005.82 S 854.88 S 12,865.71
128 005.10.06 CABLE ELECTRICO TW AWG-MCM # 14 -2.5 mm2 89.38 das? S 7,002.00 Costo S 307.45 S 1,471.48 S 1,875.92 S 2,730.18 S 616.97 S 7,002.00
129 005.11 TABLEROS 71.75 das? S 8,867.55 Costo S 2,807.43 S 1,977.46 S 4,082.66 S 8,867.55
130 005.11.01 TABLERO GENERAL TSG - 42 POLOS 1 da? S 541.29 Costo S 541.29 S 541.29
131 005.11.02 TABLERO GENERAL T.A.C.I - 18 POLOS 1 da? S 462.57 Costo S 462.57 S 462.57
132 005.11.03 TABLERO TD-101 AL 102 - 18 POLOS 2 das? S 925.14 Costo S 925.14 S 925.14
133 005.11.04 TABLERO TD-201 AL 602 - 18 POLOS 64.75 das? S 4,625.70 Costo S 1,882.29 S 1,977.46 S 765.95 S 4,625.70
134 005.11.05 TABLERO TD-701 AL 702 - 18 POLOS 2 das? S 925.14 Costo S 925.14 S 925.14
135 005.11.06 TABLERO STB 1 da? S 462.57 Costo S 462.57 S 462.57
136 005.11.07 TABLERO ST 1 da? S 462.57 Costo S 462.57 S 462.57

Proyect Profesional 2010 (Microsoft Corporation - Version 14.0.5128.5000)


CRONOGRAMA VALORIZADO DE AVANCE DE OBRA pag. 3 de 3
OBRA : EDIFICIO MULTIFAMILIAR MI VIVIENDA COSTOS A: NOVIEMBRE 2011
UBICACION: SURQUILLO - LIMA - LIMA
Id Item DESCRIPCION Duracin COSTO DIRECTO (S/.) Detalles Total
mes 1 mes 2 mes 3 mes 4 mes 5 mes 6 mes 7 mes 8 mes 9 mes 10 mes 11
137 005.11.08 TABLERO STD-A 1 da? S 462.57 Costo S 462.57 S 462.57
138 007 INSTALACIONES SANITARIAS 168.13 das? S 73,165.30 Costo S 5,151.30 S 10,725.25 S 16,242.66 S 16,624.43 S 17,530.84 S 6,890.76 S 73,165.30
139 007.01 SISTEMA DE DESAGUE 168.13 das? S 73,165.30 Costo S 5,151.30 S 10,725.25 S 16,242.66 S 16,624.43 S 17,530.84 S 6,890.76 S 73,165.30
140 007.01.01 MOVIMIENTO DE TIERRAS 3 das? S 634.05 Costo S 634.05 S 634.05
141 007.01.01.01 TRAZO Y REPLANTEO LINEAL 1 da? S 66.15 Costo S 66.15 S 66.15
142 007.01.01.02 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 3 das? S 567.90 Costo S 567.90 S 567.90
143 007.01.02 RELLENOS 4 das? S 1,067.34 Costo S 1,067.34 S 1,067.34
144 007.01.02.01 CAMA DE ARENA 1 da? S 386.55 Costo S 386.55 S 386.55
145 007.01.02.02 RELLENO CON MATERIAL PROPIO COMPACTADO POR CAPAS E= 0.20 2 das? S 628.20 Costo S 628.20 S 628.20
M, EN ZANJA
146 007.01.02.03 REFINE Y NIVELACION EN TERRENO NORMAL 1 da? S 41.04 Costo S 41.04 S 41.04
147 007.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE, MANUAL 1 da? S 11.55 Costo S 11.55 S 11.55
148 007.01.03 RED COLECTORAS DE DESAGE 94 das? S 15,590.35 Costo S 4,949.10 S 3,612.18 S 3,362.20 S 3,666.87 S 15,590.35
149 007.01.03.01 TUBERIA DE PVC SAL 6" 1 da? S 2,992.60 Costo S 2,992.60 S 2,992.60
150 007.01.03.02 TUBERIA DE PVC SAL 4" 76.63 das? S 2,942.94 Costo S 166.28 S 1,207.23 S 873.22 S 696.21 S 2,942.94
151 007.01.03.03 TUBERIA DE PVC SAL 3" 1 da? S 512.25 Costo S 512.25 S 512.25
152 007.01.03.04 TUBERIA DE PVC SAL 2" 90 das? S 8,774.24 Costo S 909.65 S 2,404.95 S 2,488.98 S 2,970.66 S 8,774.24
153 007.01.03.05 CAJA DE REGISTRO DE CONCRETO 12" X 24" C/TAPA CONCRETO 1 da? S 368.32 Costo S 368.32 S 368.32
154 007.01.04 ACCESORIOS 146 das? S 5,453.88 Costo S 150.00 S 359.92 S 1,604.79 S 1,459.50 S 1,847.20 S 32.45 S 5,453.88
155 007.01.04.01 REGISTROS DE BRONCE DE 2" 89.25 das? S 1,881.11 Costo S 92.38 S 498.85 S 490.19 S 799.69 S 1,881.11
156 007.01.04.02 REGISTROS DE BRONCE DE 3" 1 da? S 64.37 Costo S 64.37 S 64.37
157 007.01.04.03 REGISTROS DE BRONCE DE 4" 89.38 das? S 576.72 Costo S 39.05 S 177.99 S 169.19 S 190.48 S 576.72
158 007.01.04.04 SUMIDEROS DE BONCE DE 2" 89 das? S 2,651.88 Costo S 164.12 S 927.95 S 800.12 S 759.68 S 2,651.88
159 007.01.04.05 SOMBRERO VENTILACION PVC DE 2" 1 da? S 129.80 Costo S 97.35 S 32.45 S 129.80
160 007.01.04.06 BRIDA ROMPRE AGUA 2" 1 da? S 150.00 Costo S 150.00 S 150.00
161 007.01.05 CONEXIONES 1 da? S 500.00 Costo S 500.00 S 500.00
162 007.01.05.01 CONEXIN A RED EXISTENTE 1 da? S 500.00 Costo S 500.00 S 500.00
163 007.02 SISTEMA DE AGUA FRIA 168.13 das? S 49,919.68 Costo S 5,001.30 S 3,714.84 S 11,025.69 S 11,802.73 S 12,016.77 S 6,358.31 S 49,919.68
164 007.02.01 MOVIMIENTO DE TIERRAS 4 das? S 155.26 Costo S 155.26 S 155.26
165 007.02.01.01 TRAZO Y REPLANTEO LINEAL 1 da? S 14.70 Costo S 14.70 S 14.70
166 007.02.01.02 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 1 da? S 15.33 Costo S 15.33 S 15.33
167 007.02.01.03 CAMA DE ARENA 1 da? S 85.90 Costo S 85.90 S 85.90
168 007.02.01.04 RELLENO CON MATERIAL PROPIO COMPACTADO POR CAPAS E= 1 da? S 24.43 Costo S 24.43 S 24.43
0.20 M, EN ZANJA
169 007.02.01.05 REFINE Y NIVELACION EN TERRENO NORMAL 1 da? S 9.12 Costo S 9.12 S 9.12
170 007.02.01.06 ELIMINACION DE MATERIAL EXCEDENTE 1 da? S 5.78 Costo S 5.78 S 5.78
171 007.02.02 TUBERAS EMPOTRADA DE AGUA FRA 93.38 das? S 12,503.56 Costo S 1,436.58 S 3,679.64 S 3,794.96 S 3,592.36 S 12,503.56
172 007.02.02.01 TUBERIA PVC CLASE 10- 1 1/2" 1 da? S 723.10 Costo S 723.10 S 723.10
173 007.02.02.02 TUBERIA PVC CLASE 10- 1" 87.13 das? S 2,933.10 Costo S 204.33 S 918.79 S 874.75 S 935.22 S 2,933.10
174 007.02.02.03 TUBERIA PVC CLASE-10 3/4" 87.13 das? S 1,920.00 Costo S 136.40 S 591.43 S 567.30 S 624.86 S 1,920.00
175 007.02.02.04 TUBERIA PVC CLASE -10 1/2" 87.38 das? S 6,927.36 Costo S 372.75 S 2,169.42 S 2,352.91 S 2,032.28 S 6,927.36
176 007.02.03 SALIDAS DE AGUA FRA 89.88 das? S 8,437.20 Costo S 1,124.04 S 2,903.60 S 2,569.30 S 1,840.25 S 8,437.20
177 007.02.03.01 SALIDA DE AGUA FRIA PVC 1/2" 89.88 das? S 8,437.20 Costo S 1,124.04 S 2,903.60 S 2,569.30 S 1,840.25 S 8,437.20
178 007.02.04 VLVULAS (INCLUYE 02 UNIONES UNIVERSALES) 155.13 das? S 7,484.94 Costo S 110.00 S 122.13 S 567.75 S 1,259.93 S 1,807.44 S 3,617.68 S 7,484.94
179 007.02.04.01 VALVULA DE COMPUERTA (INCLUYE 02 UNIONES UNIVERSALES) 78 das? S 978.00 Costo S 148.40 S 331.98 S 369.01 S 128.61 S 978.00
DE 1"
180 007.02.04.02 VALVULA DE COMPUERTA (INCLUYE 02 UNIONES UNIVERSALES) 78.25 das? S 1,165.60 Costo S 176.54 S 395.33 S 439.67 S 154.05 S 1,165.60
DE 1/2"
181 007.02.04.03 VALVULA DE COMPUERTA (INCLUYE 02 UNIONES UNIVERSALES) 79.63 das? S 1,609.21 Costo S 242.81 S 532.62 S 592.51 S 241.27 S 1,609.21
DE 3/4"
182 007.02.04.04 VLVULA CHECK DE 1/2 2 das? S 110.00 Costo S 110.00 S 110.00
183 007.02.04.05 GRIFO RIEGO 1/2" 1 da? S 122.13 Costo S 122.13 S 122.13
184 007.02.04.06 CALENTADOR DE AGUA 14 das? S 3,500.00 Costo S 406.25 S 3,093.75 S 3,500.00
185 007.03 SISTEMA DE AGUA CALIENTE 162.13 das? S 21,338.72 Costo S 4,891.30 S 876.83 S 3,874.70 S 4,178.54 S 4,776.72 S 2,740.63 S 21,338.72
186 007.03.01 TUBERAS EMPOTRADA DE AGUA CALIENTE 87.13 das? S 4,391.90 Costo S 282.80 S 1,352.41 S 1,297.43 S 1,459.26 S 4,391.90
187 007.03.01.01 TUBERIA CPVC C-10 3/4" 87.13 das? S 4,391.90 Costo S 282.80 S 1,352.41 S 1,297.43 S 1,459.26 S 4,391.90
188 007.03.02 SALIDA DE AGUA CALIENTE 89.63 das? S 8,255.52 Costo S 594.03 S 2,522.29 S 2,881.11 S 2,258.08 S 8,255.52
189 007.03.02.01 SALIDA DE AGUA CALIENTE CPVC 1/2" 89.63 das? S 8,255.52 Costo S 594.03 S 2,522.29 S 2,881.11 S 2,258.08 S 8,255.52
190 007.03.03 CISTERNA 10 das? S 2,500.00 Costo S 2,500.00 S 2,500.00
191 007.03.03.01 EQUIPAMIENTO DE CISTERNA 10 das? S 2,500.00 Costo S 2,500.00 S 2,500.00
192 007.03.04 TUBERIAS DE IMPULSION 3 das? S 2,391.30 Costo S 2,391.30 S 2,391.30
193 007.03.04.01 TUBERIA PVC CLASE 10- 11/4" 3 das? S 2,391.30 Costo S 2,391.30 S 2,391.30
194 007.04 INSTALACIN DE APARATOS SANITARIOS 8.75 das? S 3,800.00 Costo S 1,059.38 S 2,740.63 S 3,800.00
195 007.04.01 INSTALACIN DE INODORO Y ACSESORIOS 8 das? S 1,550.00 Costo S 460.16 S 1,089.84 S 1,550.00
196 007.04.02 INSTALACIN DE LAVATORIOS DE BAO 8 das? S 1,550.00 Costo S 314.84 S 1,235.16 S 1,550.00
197 007.04.03 INSTALACIN DE LAVADERO EN COCINA 4 das? S 700.00 Costo S 284.38 S 415.63 S 700.00