Вы находитесь на странице: 1из 2

TABLE OF CONTENTS

Title page
Approval Sheet
Summary
Acknowledgement
Chapter I Introduction
1.1 Objective
1.2 Significance of the Training
1.3 Scope and Limitation
Chapter II Company Profile
2.1 History
2.2 Company Purpose
2.3 Company Vision
2.4 Company Core Values
2.5 Businesses
Chapter III Technical Description
2.5 Production Engineering Department

ORGANIZATIONAL
2.5.1 TECHNICAL FACILITIES MANAGEMENT

DIVISION (TFMD)

a. MP2

b. EMS

c. CCMS

d. LSES
2.5.2 STUDIO OPERATIONS DIVISION (STOD)

a. Video Control Room

-switcher

-ccu

-vtr

-PROMPTER

-CHARACTER GENERATOR

b. Audio Control Room

-mixer

-mic/lapel
-power amplifiers

-compellor

-speaker

c. Lighting Control Room


2.5.3 NEWS VAN OPERATIONS DIVISION (NVOD)

a. IP

1. DMNG

2. live u ( for booster)

3. BGAN

b. Satellite

c. Microwave
2.5.4 ELECTRONIC FIELD PRODUCTION DIVISION

(EFPD)

-ob van
CHAPTER IV. TRAINING ACTIVITIES
-SEMINARS
LECTURES
OBSERVE ACTUAL STUDIO OPERATIONS
OBSERVE ACTUAL NEWS VAN OPERATIONS
FAMILIARIZE EQUIPMENT USED
CHAPTER V. IMPACT AND RECOMMENDATIONS
5.1 IMPACT OF THE TRAINING
5.2 PROBLEMS ENCOUNTERED
5.3 BENEFITS
5.4 RECOMMENDATIONS
LIST OF ABBREVIATION
DEFINITION OF TERMS
APPENDICES

vi

Вам также может понравиться