EXECUTIVE SUMMARY
Based on the site survey and load analysis, Exergy proposes the following system
installation at JW Marriott Hotel site at Aerocity, New Delhi.
6 Energy Generation in kWhr 71,000 kWhr (units) annually for a 50kW system.
Consultants of India having a sound knowledge in New & Renewable Energy, GoI.
solar technologies, latest trends, regulations and JV Association with Engineers India
finance. They have strong academic qualifications Ltd (EIL) for Solar EPC Contracts.
Further, Exergy boasts of successfully executing several Solar PV Rooftop & Ground
mounted turnkey EPC execution (largest being 200 kW). Our strategic focus has remained
on efficient execution of Solar PV Plants specifically in the range 5kW ~ 200kW. Our
emphasis has been on engineering improvisations, on-site optimizations, web based
efficiency models. We have direct collaboration with IIT Kharagpur for Solar based R&D.
Our Expertise
:H OHYHUDJH RXU LQGXVWU\ NQRZOHGJH DQG WHFKQRORJ\ VWUHQJWK WR SURYLGH FRQFHSW-to-
FRPSOHWLRQ VROXWLRQV IRU \RXU HQHUJ\ UHTXLUHPHQWV XVLQJ 6RODU 3KRWR 9ROWDLF 639
Concentrated Solar Power (CSP) technology. We offer solutions in the following categories:
A. System Definition
Size:
50 kWp Total DC Capacity.
200 nos. 250-watt panels (Webel Solar)
Energy Production:
* Assumptions:
System Description:
The main feature of the proposed system is seamless grid interactive solar energy supply to
the designated lighting load. The system always gives priority to the energy provided by the
Solar module. In combination with a controllable second source (grid supply in our case),
the energy supply remains reliable and available 24 hours a day, all year round. We shall
use the 3-Phase Solar Inverters of Solivia Delta based on its availability.
As per site
8 AC & DC cables Conforming to BOS requirements
Area required:
The Total Area required for the System Installation shall be apx 5,000 sq feet, without any
shades, facing south.
Structural Anchoring:
Panels shall be mounted on galvanized frames inclined at 22 degrees to the south. The
structure is designed in such a manner that module can be replaced easily and in line with
site requirements and it is easy to install and service in future. The frames will be
supported by angle legs of suitable lengths to provide the pre-determined inclination. All
fasteners, nut and bolts are made of Stainless steel - SS 304 5.4.6 PCC. The legs of the
structures made with GI angles are made of fixed and grouted in the PCC foundation
Inverter Installation
Based on the initial site visit, the inverters could possibly be installed on the terrace. This
space provides ample accessibility and good air circulation. The inverter is available in
IP54 housing, however, an enclosed space has to be provided for the same. Actual
installation location and methods will be determined during full design phase.
Electrical
Proposed fire hose shaft will be used for running electrical cables down to the electrical
panel room. A detailed electrical design with single-line diagram and specifications will be
SUHSDUHGGXULQJIXOOGHVLJQSKDVHDIWHUUHFHLYLQJWKH32IRUWKHFOLHQWVDSSURYDO
The following section of the document describes the Solar PV system proposed: This job
involves by means of the enclosed specification, design, manufacture, supply, installation,
commissioning of the Solar PV Systems with 1 year warranty period.
Warranty
1 year faultless operation of the system
The Inverters offered come with a 3 year factory warranty.
All other parts (Electrical only) & Battery will come with a 1 year warranty
The warranty for modules will be as follows:
o 90% performance warranty for first 10 years and 80% after that upto 25
years
o 5 years mechanical warranty
Site-specific considerations will require assistance and cooperation from the client, as
outlined below:
1. Provide access to work site for delivery of equipment and materials prior to and
during project implementation.
2. Provide a suitable and secure space for storage of equipment and materials.
3. Facilitate access of work crew to the work site 7 days a week.
4. Since the civil and electrical work is undergoing on the site, we request the client to
provide labor support.
5. )DFLOLWDWHLQWHUIDFLQJZLWKWKHFOLHQWVUHVLGHQWHQJLQHHULQJVWDIIIRUFRQVXOWDWLRQDV
needed.
6. Separate electrical loads as discussed in Part A (Grid Interfacing) and connect solar
output to building load system.
7. A dedicated emergency load shall be defined which is LED lighting load of 3 floors.
8. All the Statutory clearances, if any, required for the Project.
9. $&FDEOLQJIURPWKH$&'LVWULEXWLRQ%RDUGXSWRWKHORDGVKDOOEHZLWKLQFOLHQWV
scope.
All the Systems, except Inverter, will be installed within 10 to 12 weeks from the date of
UHFHLSWRIDGYDQFHDQGDSSURYDORIWKH6/' All inverters are internationally procured and
are subject to a few delays.
1 ORDER FINALISAION
SITE ACTIVITIES
2 SITE SURVEY
PV ARRAY SITE
3
PREPARATION
BUILDING OF CONTROL
4
ROOM
SUPPLY
5 PV MODULES
6 SUPPORT STRUCTURES
AND JUNCTION BOX
INTERCONNECTING
7
CABLES
PCU & PROTECTIVE
8
DEVICES
INSTALLATION
9 PV ARRAY
10 WIRING & CABLING
PCU INCL LOAD
11
TERMINATION
12 COMMISSIONING
Rs.113.5/Watt
Lumpsum Execution Cost: Rs. 120/Watt (Taxes
whereExtra)
- Material Cost is Rs. 104.5/Watt (Applicable for Sales Tax)
- Installation Service Charges are Rs. 9/Watt (Applicable for
Service Tax)
For the past five years Dr. Kapur has been working in
alternative energy: he founded a solar Photo-Voltaic
%DODQFHRI6\VWHPFRPSDQ\DQGVROGWKHWHFKQRORJ\WRD
leading US based company. He continues to advise VCs
and Solar manufacturers on this topic.
Dr. Kapur has deep professional connections into the SPV industry in the US, with affiliations in
large established organizations, as well as cutting edge start-ups. These affiliations span SPV
panel, balance of system, energy storage, policy financing, policy and permitting experts and
H[WHQG LQWR DFDGHPLF DQG IHGHUDO RUJDQL]DWLRQV +H LV D PHPEHU RI (QYLURQPHQWDO
(QWUHSUHQHXUV DQ LQIOXHQWLDO DGYRFDF\ JURXS WKDW KDV SOD\HG D OHDGLQJ UROH LQ WKH SDVVDJH RI
RPS and other sustainable energy and energy efficiency legislation in California and Colorado.
He is working with Solar Power Development Partners, a SPV consultancy, on a multi gigawatt
project for deployment of a fleet of SPV farms in the continental USA. Dr. Kapur follows solar
energy and related industries, with interests at the intersection of technology and policy.
Dr. Kapur is an alumnus of IIT Kanpur, Rice University, and the University of Texas at Austin.
3URELUKDV DXWKRUHGBreakthrough Solar initiatives WKDW KDV EHHQ UHFRJQL]HGE\ PDQ\ LQGXVW
leaders as ground-breaking ideas for disruptively scaling solar based energy generation. Aft
extensive research, he has also co-DXWKRUHG Global Leadership through Breakthroug
Sustainable Energy Initiatives: Will India forge a breakthrough like the Cell Phon
Revolution? He has been invited to be keynote speaker at many energy center inauguration
seminars and R&D conclaves alongside globally recognized industry icons.
In the United States, Probir is on the TiE SIG-SEI Committee and has chaired PAN-,,7V5HQHZDE
Energy Forum. Probir has been invited to speak at several events including Denver Chamber
Commerce, 8QLYHUVLW\ RI 'HQYHU ([HFXWLYH 0%$ SURJUDP :RPHQV 9LVLRQ )RXQGDWLRQ /HH +HF
+DUULVRQ 6(, 6RDULQJ2SSV HWF +H ZDV LQYLWHG WR 3UHVLGHQW 2EDPDV LQYLWDWLRQ-only Stimulus-B
signing event and was written up in ColoradoBiz magazine as one of the industU\V OHDGLQJ WKRXJ
leaders.
He co-founded B2K Corp Pvt. Ltd, a technical support services company that was referenced in Thom
)ULHGPDQV 7KH :RUOG LV )ODW 3ULRU WR WKLV 3URELU ZRUNHG DV DQ DGYLVRU WR WKH &22&(2 I
StorageTek, where he did ground breaking transformation work in Creating Core Competencies
identifying Strategic New Markets for the company. Probir started his career with Thermax Pvt. Ltd
premier energy solutions company. Probir has over twenty five years of relevant experience throu
his work with high tech companies in the US and India.
Probir has a B.Tech from IIT in Chemical Engineering and an MBA from University of Denver. H
has attended Executive Management Programs in IIMA, Wharton, Stanford, Caltech and is active
involved with several alumni and professional associations in the Rocky Mountain Region.
Education: Education: B.Tech. & M.Tech. (Dual Degree) in Computer Science & Engineering
from IIT Kharagpur (2008) with a minor in Economics, Exchange Student in Stanford
Universiy; and author of a Patent.
Mr. Tarun K. Rathore holds PGDM degree from IIM Bangalore, and BTech
degree in Aerospace Engineering from IIT Kharagpur. He has had two year
strong techno-managerial experience at ANSYS Fluent India Private Limited,
known for its leadership in the simulation industry. He was responsible for the
development of TGRID, software designed to cater the needs of Power Sector.
Education: B.Tech. in Aerospace Engineering from IIT Kharagpur (2006) and PGDM from IIM
Bangalore
Normally the solar panel is connected with the grid. When grid fails, inverter controlled normally closed
(ON) switch S1 and normally open (OFF) switch S2 will open & close resp. PEPL-LSPL VentureofConfidential
On restoration supply
reverse action will take place. Proposal Number: PEPL/DEL/164
APPENDIX B: SOLAR ENERGY SIMULATION, DELHI