Вы находитесь на странице: 1из 1

7) ) Indicate trip Circuit supervision provision in

the trip circuit.


8) Indicate Protection trip signal circuit also
9) Taikai to confirm that interlocking of
1) Auto reclose signal circuit shall also be breaker operations with isolators and earth
indicated in the closing circuit switch will be taken care in bay control
14)Following indication shall also be available on Local panel and
unit(Intelligent electronic device) panel. Also
2) Master trip reset interlocking remote location
inform where the Interposing relay for remote'
shall be included in the Closing CB in remote or Local
operation of CB (Opening and closing) will
circuit. CB ON, OFF and Trip
be located (in CB control cubicle or bay
CB Healthy
control unit panel) ?
10) Indicate Protection trip due to pole TC-1 Healthy
discrepancy protection TC-2 healthy
Closing coil healthy
3) Give Provision CB in test position
for future closing CB in service position
interlock in Control supply-1 healthy
closing circuit Control supply-2 healthy
path 13)What is WSK? Add AC control supply healthy
description. CB spring charged
SF-6 pressure Low Indications
4) Duplicate DC
supply shall be
available for the
control circuit with
auto changeover
facility in case any
DC supply fails
20)What is Heater Spring
alarm?
5) DC supply
voltage shall
match with 21)Indicate the data
available DC 11) What
supply at PGCB is the
substation 19)Explain all these Alarms
purpose
of JS?
15)AC supply: 3phase 400V
6) Breaker shall be with SF6 AC, 1phase 230V AC
as arc extinction medium 12)What is the purpose of CK in
tripping circuit
16)Include following details in the title block 18)Breaker shall be
25) Taikai to clarify whether 1)drawing no. 22)Selector Switch in 23)Selector Switch in Local
with SF6 as arc
'Antitrip relay' is the 'Anti- 2)revision no. remote position position
extinction medium
Pumping relay'. If yes 3) issue date
rename it as 'Anti-pumping 4) Design check, approved details
relay'.
17)Include Complete Project details as
follows
Kushiara Power Company Limited
163MW Combined Power Project
24)Rename 'core' Fenchuganj, Bangladesh
as 'Coil'

Вам также может понравиться