SYSTEM RECORD OF COMPLETION
This form isto be completed by the system installation contractor at the time of system acceptance and approval
1 shall be permitted to modify this form as needed to provide a more complete and/or clear record.
Insert N/A in all unused lines
Attach additional sheets, data, o calculations as necessary to provide a complete record.
Form Completion Date: _16/1/2017 Supplemental Pages Attached:
1. PROPERTY INFORMATION
Name of property: _ALKHOR ACCOMMODATION G+3 floor Bulding 1
‘Address: _UM BERKA, Doha, Qatar
Description of property: _Residentil Building
[Name of property representative: _ KHALID CEMENT COMPLEX WLL,
Address: _Doha, Qatar
Phone: _ 55502441 Fax: Esmail
2. INSTALLATION, SERVICE, TESTING, AND MONITORING INFORMATION
Installation contractor: _Al Roda Engineering Co.
‘Adiress:_Room 4, 2nd floor Al Soquery Bldg. Bin Oman, Doha. Qatar
Phone: _ 55501162 Fax: E-mail: _slrawde_eng@yahoo.com
Service organization: _Al Roda Engineering Co.
‘Address: _Room 4, 2nd floor, Ai Soquery Bldg, Bin Omran, Doha, Qatar
Phone: _44510543 Fax: _ 44681731 E-mail
‘Testing organization: _Al Roda Engineering Co.
‘Address: _Room 4, 2nd floor Al Soquery Bldg., Bin Omran, Doha, Qatar
Phone: _ 44510543 Fax: _ 44681731 E-mail
Effective date for test and inspection contract: _400 days after hand over
Monitoring organization: _QEPCO
‘Address: _Doha, Qatar
Phone: _68087085 Fax: E-mail:
Account number: Phone line 1 Phone line 2
Means of ansmission:
Entity to which alarms are retransmitted: Phone:
3. DOCUMENTATION
On-site location ofthe required record documents and site-specific software: available
4. DESCRIPTION OF SYSTEM OR SERVICE
This isa: Newsystem _[] Modification to existing system Permit number:
NFPA 72 edition: _yes.
4.1 Control Unit
Manufacturer: _ZENER SECURITY Model number: _ZAP 150-2
4.2 Software and Firmware
Fimware revision number:
43 Alarm Verification 1B This system does not incorporate alarm verifiation,
NIA ‘Alarm verification set for _N/A seconds‘SYSTEM RECORD OF COMPLETION (continued)
5. SYSTEM POWER
5.1 Control Unit
Sd Primary Power
Input voltage of control panel: _L-N 240Vols, Soha Control panel amps: _13 amps
Overcurrent protection: Type: _fuse Amps: 10
Branch circuit disconnecting means location: _cicut breaker st DB-GF Number: _13
5.1.2 Secondary Power
Type of secondary power: _2 nos sealed type 12VDC
Location, ifremote from the plant: N/A
EN cae aE BSE END aca a ee
Calculated capacity of secondary pouer to drive the system:
In standby mode (hours): _24 hours In alarm mode (minutes:
8.2 Control Unit
1B This system does not have power extender panels
G1 Power extender panels are listed on supplementary sheet A
CIRCUITS AND PATHWAYS.
Pathway Type Dual Media Pathway Class: ‘Survivability Level
‘Signaling Line
Device Power
Initiating Deviee
‘Notification Appliance
Other (specif
7. REMOTE ANNUNCIATORS
Type Location
8. INITIATING DEVICES
‘Addressable or
Type Quantity Conventional __|_Alarm or Supervisory | Sensing Technology
‘Manual Pull Stations 10 ‘Addressable ‘Alarm
‘Smoke Detectors 24 ‘Addressable ‘Alarm
Duct Smoke Detectors NA. ‘Addressable NA
Heat Detectors 5 ‘Addressable ‘Alarm
Gas Detectors NIA NIA NIA
Waterflow Switches @ ‘Addressable ‘Alarm
“Tamper SwitchesSYSTEM RECORD OF COMPLETION (continued)
9. NOTIFICATION APPLIANCES
Type Quantity Description
Audible
Visible
Combination Audible and Visible | 14 HORN STROBE
10. SYSTEM CONTROL FUNCTIONS
Type Quantity
Hold-Open Door Releasing Devices NIA
HVAC Shutdown NIA
FireSmoke Dampers NA
Door Unlocking NIA
Elevator Recall NIA
Elevator Shunt Trip 2
11. INTERCONNECTED SYSTEMS
C1 This system does not have interconnected systems,
1B Imerconnected systems are listed on supplementary sheet fre
pump, .
levator
12. CERTIFICATION AND APPROVALS
12.1 System Installation Contractor
‘This system as specified herein has been installed according to all NFPA standards cited herein.
Signed: Printed name: _Eowin Talape: Date:
Organization: _Al Roda Engineering Co. Title: _Fire Alarm Engineer Phone: _ 70490501
12.2 System Operational Test
ing to all NEPA standards cited herein,
Printed name: _Edwin Talape Date:
ng Co. Title; _Fite Alarm Engineer Phone: _70490801
Signed:
Organization: _Al
123 Acceptance Test
Date and time of acceptance test: _15/01/207 at 10:00 am.
AED 0 PT
Installing contractor representative: _ Engr. Edwin Talape
Testing contractor representative: _Engr. Edwin Talape
Property representative: _ENG: RIFA
AH representative: