Design the combined rectangular footing shown below using the assumptions given.
18 ft
DL=80k DL=130k
LL=175k Rp=932k LL=200k
Column #1 Column #2
D=5'
f
q'
x=
X = Rq=932k
Rq=932k
18" 24"
B
18" 24"
18'-0"
PL PLAN
R X = P1X1 + P2X2
L = 2 X = 2(11ft) = 22 feet
Note: Rounding the 10.8 to 11 will prevent the closure of the moment diagram, but this
acceptable with hand calculations. A computer program is better.
Use B = 5 4 in constructions
k
Finally q(soil reaction) = qo B = 7.97 ft 2 x 5.31 ft
k
q = 42.3 ft
along L
Step 3. Draw the shear V and moment M diagrams.
P=410
1 kips P=522
2 kips
24inx24in
18inx18in
q'=42.3 k/ft
341 k 383.1 k
+31.7 k
0.13 k
+
8.70'
+ Shear diagram
_
9.30'
_
-138.9k
+225.7 k-ft
+ + Moment diagram
-1646 k-ft
Step 4. Determine the footing depth D.
col.#1 col.#2
18"+d 24"+d
18"+d/2 24"+d
d
Wide beam shear
V
But also the shear stress vc in concrete is vc =
Bd
Bdvc = 341k (42.3d)k(d)
V 308.4 k
vc = = = 10.6 ksf 4 ( f ' c ) for
diagonal tension shear
( perim)d (10.2' )(2.86' )
4(0.85) 3500
201 psi
29 ksf O.K.
V 334 k
vc = = = 6.0 ksf 4 ( f ' c ) ksf
( perim)d (19.4' )( 2.86' )
a M
As(d - )= f B
2 y
As f y As (50ksi )1
But a = = = 1.40 As
0.85 f ' c b
0.85(3.5ksi )12"
As (34.3 0.70As) = ( 1646 k ft )(12/ft)/(0.9)(50)(5.31) = As = 2.5 in2/ft width
As 2.5 in 2 200
For balanced steel = = = 0.006 f
db (34.3" )(12" ) y
As 2.5 in 2 200 200
= = = 0.006 f = 50,000
db (34.3" )(12" ) y
alsopmax = 0.016
in 2
Totals = 2.5 in2 x B = 2.5 (5.31 ft) = 13.3 in2 of steel
ft
3"
6" typ.
5' 5.31' = B
3"
L = 22 ft