1. What are the exceptions to requiring leave to appeal to the Supreme Court of Canada?

a. A matter of national importance


b. A first degree murder conviction
c. A contravention of the Charter of Rights and Freedoms
d. All of the above
e. b and c
2. What issues are within the jurisdiction of the Divisional Court?
a. Appeals of interim orders made by a judge
b. Appeals of final orders made by a judge if the order stipulates a payment less than $25,000
c. reviews of decisions made by government tribunals
d. all of the above
e. none of the above
3. Case management Rules are rules with:

m
a. The court system has adopted to expedite cases and eliminate or reduce delays

er as
b. The law society imposes upon lawyers to ensure proper representation of clients

co
c. The police force uses to manage criminal prosecutions

eH w
d. All of the above

o.
e. a and b
rs e
4. If two people want to form a business and wish to try and eliminate personal liability they would:
ou urc
a. Incorporate a provincial corporation
b. Incorporate a federal corporation
c. Set up a partnership
o

d. All of the above


aC s

e. a and b
vi y re

5. Parliamentary Supremacy was completely eliminated by the Constitution Act and the Charter of Rights and
Freedom:
a. True
ed d

b. False
ar stu

6. In which of the following project structures will an Owner be deemed to be the Constructor under the
Occupational Health and Safety Act?
a. Traditional
sh is

b. Construction management
Th

c. Design-build
d. All of the above
e. None of the above
7. An insured party under a property insurance policy will not be covered for the following exposures:
a. Errors in design
b. Faulty workmanship
c. Claims in excess of the policy limit
d. All of the above
e. a and b

https://www.coursehero.com/file/12086029/Part-1-2012/
For questions 8 to 11, assume the following:

An owner contracted with a design-builder for a design and construction of a building. The contract price for design and
construction work was $8,500,000. When the design-builder determined that it had achieved substantial performance it
advised the Owners consultant, who inspected the work and determined that: (a) the work was ready for the purpose
intended and (b) the rectification of known defects and the completion of incomplete items would cost $95,000:

8. What is the Owners consultants responsibility if it is the contract administrator of the design-build agreement?
a. To not show the partiality to either the Owner or the design-builder
b. To certify the substantial performance has been achieved
c. To advise the design-builder that substantial performance has not been achieved
d. a and b
e. b and c
9. When can the owner release the basic holdback to the design-builder?

m
a. 45 days after the design-builder advises the Owners consultant that it has achieved substantial

er as
performance

co
b. 45 days after achieving total performance

eH w
c. 45 days after publication of the certificate of substantial performance

o.
d. 45 days after issuance of the certificate of substantial performance
rs e
e. 30 days after the publication of the certificate of total performance
ou urc
10. When can the Owner release the finishing holdback?
a. 90 days after publication of the certificate of substantial performance
o

b. 45 days after the date of total performance


aC s

c. 45 days after the certificate of total performance is published in the Daily Commercial News
vi y re

d. None of the above

10b. what is the dollar threshold below which the value of defects to be remedied or incomplete work to be
performed must fall before Substantial Performance is achieved:
ed d
ar stu

a. $850,000
b. $100,000 ( 3% of $500,000 + 2% of $500,000 + 1% of rest ($7,500,000))
c. $85,000
sh is

d. $255,000
e. None of the above
Th

10c. has the design-builder achieved Substantial Performance of its contract?

a. Yes
b. No
11. If a subcontractor to the design-builder is owed money and wishes to pursue a construction lien, it must:
a. Register its lien within 45 days after the expiry of the lien
b. Commence a lawsuit within 90 days after expiry of the lien
c. Set the lawsuit down for trial within 2 years after the date of commencement of the lawsuit
d. All of the above
e. a and c

https://www.coursehero.com/file/12086029/Part-1-2012/
12. Which if of the following project structures is most conducive to a fast-tracked project?
a. Traditional
b. Design-build
c. Construction management
d. All of the above
e. b and c
13. Which of the following principles apply to the theory of precedent?
a. A court must follow the decision of a higher court
b. A court must follow the decision of another judge of the same court
c. The decisions of the Supreme Court of Canada must be followed by all courts
d. All of the above
e. a and c
14. If a contractor posts a performance bond as security for performance of its obligations under a contract:

m
a. The surety will make sure the obligations are fulfilled if the contractor fails to perform

er as
b. If the surety has to pay any monies under the bond it will be able to sue the contractor for

co
reimbursement of those monies

eH w
c. The issuance of the bond will impact the contractors line of credit with its bank

o.
d. All of the above
e. a and b above rs e
ou urc
15. if two business partners choose a corporation as their business organization, can each of them be:
a. a shareholder of the corporation
o

b. a director of the corporation


aC s

c. an employee of the corporation


vi y re

d. all of the above


e. a and b above
16. a typical lawsuit includes the following steps:
ed d

a. Issuance of a statement of claim


ar stu

b. Issuance of a statement of defence


c. Documentary and oral discoveries
d. All of the above
sh is

e. a and b
Th

17. a party who commences a lawsuit, loses that lawsuit at trial and then commences an appeal will at various
stages of the lawsuit be referred to as:
a. plaintiff and appellant
b. defendant and appellant
c. plaintiff and respondent
d. defendant and respondent
e. none of the above

18. Piercing the corporate veil means that:

(a) A director of a corporation may be personally sued for the actions of the corporation
(b) A shareholder of a corporation may be personally sued for the actions of the corporation
(c) An employee of a corporation may be personally sued for the actions of the corporation
https://www.coursehero.com/file/12086029/Part-1-2012/
(d) All of the above
(e) (a) and (b) above

19. An agreement between two parties may require that a dispute be:

(a) Arbitrated as opposed to litigated


(b) That the decision of the arbitrator(s) be final and binding
(c) That the parties will share the administrative cost of any arbitration
(d) All of the above
(e) (a) and (c) above

20. If an owner retains a designer to produce a set of drawings and that owner wishes to be able to use the drawings to
make future modifications to the building it must:

(a) Have the copyright in the drawings assigned to it


(b) Have a license granted to it to make such use of the drawings
(c) Have the moral rights of the designer waived

m
(d) (a) and (c) or (b) and (c)

er as
(e) (a), (b) and (c) above

co
eH w
21. Where an expert engineer is called to testify at a trial of an engineer who has been accused of negligence:

o.
(a) it is the judges duty to select the expert
rs e
(b) the judge must abide by the experts opinion on engineering matters
ou urc
(c) (a) and (b)
(d) the expert witness may express his or her opinions
o

22. According to the law of negligence, an engineer who prepares and delivers to a client a report which contains a
aC s

negligent misstatement:
vi y re

(a) may be protected by a disclaimer in the report


(b) may be protected by the terms of the engineers contract with the client
ed d

(c) both of the above


ar stu

(d) will be liable even if no damages result

23. Under product liability law, the ultimate consumer of a product:


sh is

(a) is owed a duty of care by the manufacturer of the product


Th

(b) is owed a duty of care by the seller of the product


(c) is entitled to sue for injuries caused by the product even if the consumer did not
purchase the product
(d) all of the above

24. The law of negligence imposes duties:

(a) on professional engineers, only


(b) on professional persons, only
(c) on professional persons and corporations, only
(d) on all persons, generally

25. ln a trial of an engineer who has been accused of negligence, the applicable standard of care is:

https://www.coursehero.com/file/12086029/Part-1-2012/
(a) the standard which would be used by a reasonable engineer
(b) the subjective standard
(c) the standard contained in provincial regulations of common law provinces
(d) none of the above

26. Slander and defamation:


(a) are the same as fraud
(b) are torts
(c) both of the above
(d) are the same thing
27. The Donoghue vs. Stevenson case establishes that:
(a) reliance on professional skill and judgment can give rise to a duty of care
(b) a disclaimer will protect a professional from liability for negligent advice
(c) engineers may be liable for economic loss
(d) none of the above
28. The Hedley Byrne vs. Heller case is important to engineers because it establishes that:
(a) professionals may be liable for negligent advice

m
(b) reliance on professional skill and judgment can give rise to a duty of care

er as
(c) a disclaimer may protect a professional from liability for negligent advice

co
(d) all of the above

eH w
29. A defendant who is concurrently liable in tort and contract:

o.
(a) is liable to more than one plaintiff at the same time
rs e
(b) is liable under tort and contract at the same time
ou urc
(c) has limited liability under the new Limitations Act, 2002
(d) none of the above
30. If Defendant A and Defendant B are concurrent tortfeasors:
o

(a) Defendant A and Defendant B are equally liable


(b) Defendant A and Defendant B are vicariously liable
aC s

(c) (a) and (b)


vi y re

(d) Defendant A and Defendant B both committed a tort


31. An employee engineer would not be liable for negligence if he or she:
(a) was not licensed by the PEO
ed d

(b) tried his or her best


(c) did what a reasonable engineer would have done in all the circumstances
ar stu

(d) was inexperienced


32. lf a plaintiff is successful in a tort claim, the plaintiff will recover:
(a) damages for unforeseeable losses
sh is

(b) damages for physical loss but never damages for economic loss
(c) damages that are remote
Th

(d) damages for physical loss and possibly damages for economic loss
33. If a plaintiff is successful in a tort claim, the damages are intended to:
(a) put the plaintiff in the position in which he or she would have been had the tort not occurred
(b) put the plaintiff and the defendant in the position in which they would have been had the tort not occurred
(c) compensate the defendant
(d) punish the defendant
34. According to the law of negligence, an engineer performing services owes a duty of care to:
(a) anyone whom the engineer knows is relying on the engineer
(b) only the person who is responsible for paying the engineer
(c) anyone whom a reasonable engineer would be expected to know is relying on the engineer
(d) (a) and (c)

35. According to the law of tort, the engineering standard of care:


(a) is a subjective standard
https://www.coursehero.com/file/12086029/Part-1-2012/
(b) is an objective standard
(c) is a reasonable standard
(d) (b) and (c)
36. According to tort law, assuming a traditional project structure, the engineer owes a duty to:
(a) the owner
(b) the contractor
(c) the owner and the contractor
(d) the PEO
37. Vicarious liability means that:
(a) the employer is responsible
(b) the employee is not responsible
(c) the employee is responsible
(d) (a) and (c)

38. The new Limitations Act, 2002:


(a) places a dollar limit on an engineers liability
(b) places a time limit on an engineer's liability

m
(c) places a limit on the type of liability of an engineer

er as
(d) places a limit on the degree of inspection expected from engineers

co
39. In a civil trial:

eH w
(a) the plaintiff has the burden of proof
(b) the defendant has the burden of proof

o.
rs e
(c) the case must be proved beyond a reasonable doubt
ou urc
(d) the case must be proved beyond the shadow of a doubt
40. If an engineer prepares a design, the negligence standard of care means that:
(a) the engineer's design must have no flaws
(b) the engineers design must be reasonable
o

(c) the engineer must pay for any failure of the design
aC s

(d) the engineer must comply with PEO's Code of Ethics


vi y re

41. Which of the following are necessary elements of an enforceable contract?


(a) an irrevocable offer made and accepted
(b) capacity and mutual intent
(c) a promise and estoppel
ed d

(d) both (a) and (b)


ar stu

(e) All of the above.


42. Which of the following statements are true?
(a) An offer must always be in writing to be capable of acceptance.
sh is

(b) Acceptance of an offer may be communicated by mail or by fax.


(c) Irrevocable offers cannot be revoked if made in writing.
Th

(d) Both (b) and (c).


(e) All of the above.

43. Which of the following statements are true?


(a) Consideration can simply be the exchange of $1.00 between two parties to a contract.
(b) Most offers are revocable even if stated to be irrevocable unless special formalities are followed.
(c) Quantum meruit is the legal principle applied by courts to determine whether a limitation of liability clause is
enforceable. -> False
(d) Both (a) and (b).
(e) All of the above.
44. Which of following statements are false?
(a) Letters of intent are always enforceable, ->False
(b) The Statute of Frauds requires all contracts to be in writing. ->False (Not ALL Contracts)
(c) All corporations have the same capacity to enter into contracts as a natural person. ->True
https://www.coursehero.com/file/12086029/Part-1-2012/
(d) Both (a) and (b).
(e) All of the above.

45. Which of the following statements are false?


(a) A minor does not have the capacity to enter into any types contracts. -> False
(b) Penalty clauses are enforceable under contract law.->False
(c) The case of Canwest Exploration v. Letain is one of the leading cases in Canada dealing with the concept of
equitable estoppel. -> True
(d) Both (a) and (b).
(e) None of the above.
46. Which of the following statements are correct? (Check this after)
(a) Equitable estoppel is a legal principle applied to ensure that one party to a contract does not take advantage
of the other partys mistake. -> False
(b) The case of Hunter v. Syncude is a leading case dealing with fundamental breach of contractT
(c) A limitation of liability clause which limits one partys liability to $1.00 is not enforceable.
(d) Both (b) and (c).
(e) None of the above.

m
47. Which of the following statements are correct?

er as
(a) Mediation is an alternative dispute resolution mechanism.

co
(b) The decisions of an arbitrator are always final and binding. (Not True) (Depending on what says on contract,

eH w
could be non-binding as well)
(c) The Arbitration Act (Ontario) provides for certain rights to have decisions of an arbitrator appealed to a court

o.
of law.
rs e
ou urc
(d) The use of dispute resolution boards is an illegal method of dealing with disputes. -> False
(e) Both (a) and (c).
48. Which of the following will affect the enforceability of a contract?
(a) The contract requires that all disputes must be resolved using mediation before using arbitration or the
o

courts.
aC s

(b) One of the parties to the contract is a minor and the contract is not for a necessity of life.
vi y re

(c) The acceptance of the offer was communicated by mail.


(d) The contract is for the sale of land, but is not in writing.
(e) Both (b) and (d).
ed d

49. Which of the following statements are correct?


ar stu

(a) Three types of misrepresentation include innocent misrepresentation, negligent misrepresentation and
irrefutable misrepresentation. (Theres no such thing as irrefutable, but theres fraudlent)
(b) An engineering company providing services under a contract with an owner can only be liable for breach of
sh is

contract. (Liable under Tort as well)


(c) An engineer retained by a contractor on a design-build project to prepare construction drawings for a
Th

construction project owes a duty of care to the owner of the project.


(d) Both (a) and (c).
(e) None of the above.
50. Which of the following statements are false?
(a) If one party makes an innocent misrepresentation, the other party has the right to sue for damages.
(b) Contra proferentum is the legal principle whereby a court will interpret an ambiguous clause in favour of the
party that drafted the clause. -> False (In favour of Party who didnt write the contract)
(c) A stipulated price contract contains unit prices and the final contract price is determined by the actual
number of units to complete the work. -> False
(d) A guaranteed maximum price contract is a hybrid between a fixed price contract and a stipulated price
contract. (Need to Check this online)
(e) All of the above.

https://www.coursehero.com/file/12086029/Part-1-2012/
The following fact situation applies to questions 51 to 54:
Wise Guys Inc. ("WGI") issues a call for tenders for a contract to build a new head office to three bidders: Buildem Co.
("BC"), Offices-R-Us ("ORU") and ABC Brothers Inc. ("ABC"). The call for tenders contains the following statement: The
lowest of any tender not necessarily accepted. The tender documents required each bidder to submit a bid deposit in
the form of a letter of credit or certified cheque for 10% of the bid price. The tender instructions stated that the WGI will
automatically reject any non-compliant bids.
BC submitted the lowest bid of $10,00,000.00, but prior to bid closing, it advised the WGI that it had made a mistake in
its bid by failing to add GST and that the actual price should have been $10,700,000.00. ORU submitted a bid of
$l0,500,000.00, but fails to submit a letter of credit or certified cheque for $10,500,000.00 as required by the terms of
the tender documents. ABC submits a bid of $11,000,000.00 plain and simple. After much deliberation, WGI decides to
select ORU as the winning bidder and entered into a construction contract with ORU.

51. Which of the following is a true statement?

m
(a) WGI was entitled to ignore BCs mistake in its bid and all else being equal, accept BCs original bid.

er as
(b) WGI was entitled to waive the irregularity (i.e., the failure to deliver the bid deposit) in ORUs bid.

co
(c) WGI was required to award the contract to the lowest compliant bidder.

eH w
(d) All of the above.
(e) Both (a) and (c).

o.
rs e
52. WGI owed a duty of good faith to which of the following contractors?
ou urc
(a) Both BC and ORU
(b) ORU
(c) ABC
(d) None of the bidders.
o

(e) To all three bidders.


aC s
vi y re

53. Which of the following statements are correct?


(a) The old approach to tendering disputes was based on the court decision of Belle River which applied the legal
doctrine of mistake.
(b) The new approach to tendering disputes is based on the court decision of Ron Engineering which applied the
ed d

Contract A / Contract B approach.


ar stu

(c) The Supreme Court of Canada in the MJB Enterprises decision established that an owner owes a duty of good
faith to all contractors submitting a compliant bid.
(d) Both (a) and (b).
sh is

(e) All of the above.


54. Which of the following statements would be correct?
Th

(a) By accepting ORUs bid, WGI was in breach of Contract A. -> TRUE
(b) ABC could sue WGI for breach of Contract A.
(c) There were two Contract As which came into existence, one between WGI and ORU and one between WGI
and ABC.
(d) None of the above.
(e) Both (a) and (b).

55. Which of the following statements are true?


(a) Two types of duress are threatened violence and undue influence. ->True
(b) Courts always adopt a strict construction approach to contract interpretation.
(c) Courts will always look to extraneous evidence when interpreting the terms of a contract.
(d) Both (a) and (c).
(e) None of the above.

https://www.coursehero.com/file/12086029/Part-1-2012/
56. Which of the following statements are false?
(a) Courts will imply a term into a contract when necessary to give the contract business efficacy. ->True
(b) The parole evidence rule applies to documents or happenings prior to, or contemporaneously with the
making of the contract. ->True
(c) Specific performance is a remedy which is always available to a non-defaulting party where there has been a
breach of contract. -> False (Its not always available, only for exceptional cases)
(d) The legal principle of frustration requires that performance of the contract becomes impossible and not just
more expensive. -> True
(e) None of the above.

57. As general legal principles, in the event of a breach of contract, which of the following are true statements?
(a) The non-defaulting party is required to increase its damages as much as possible.
(b) The non-defaulting party may in certain circumstance be entitled to terminate the contract.
(c) The defaulting party may be required to compensate the non-defaulting party for its indirect or
consequential damages suffered as a result of the breach of contract.
(d) Both (b) and (c).
(e) All of the above.

m
er as
58. Which of the following statements are true?

co
(a) A party to a contract may be considered to have repudiated a contract if that party announces by its words or

eH w
actions that it has no intention of completing the contract.
(b) The innocent party may elect to accept the other partys repudiation or continue with the contract (if

o.
possible).
rs e
ou urc
(c) In the case of a repudiation, the damages are calculated for the date of signing the contract.
(d) Both (a) and (b).
(e) All of the above.
o

59. Which of the following statements are true?


aC s

(a) The breach of a fundamental term or condition of a contract will entitle the non- defaulting party to
vi y re

terminate the contract.


(b) Some of the remedies which may be available to a non-defaulting party in the event of a breach of contract
include: termination, specific performance and frustration.
(c) Liquidated damages clauses are enforceable if they are a genuine preestimate of damages.
ed d

(d) Both (a) and (c)


ar stu

(e) All of the above.

60. Which if the following statements are true?


sh is

(a) Arbitration agreements usually specify how the arbitrators will be chosen, what rules and procedures will be
used and timing of the arbitration process.
Th

(b) Engineers may be concurrently liable for breach of contract and for negligence. (Tort)
(c) In administering the terms of a construction contract, an engineer may be required to make decisions
affecting the rights of the owner and the contractor.
(d) Both (a) and (b)
(e) All of the above.