ID Task Name Duration Start Finish Predecessors

1 Preperation task 1 day? Sun 16/11/08 Mon 17/11/08


2 Verify Materials 1 day? Sun 16/11/08 Mon 17/11/08
3 start work after evaporation pond is finished 1 day? Sun 16/11/08 Mon 17/11/08
4 start work after 2nd RO Unit is tested 1 day? Sun 16/11/08 Mon 17/11/08
5 MOBILISE FROM ACOSCO GCB WATER TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
6 possible Ladder 1 day? Sun 16/11/08 Mon 17/11/08
7 PROVIDE ROPE 1 day? Sun 16/11/08 Mon 17/11/08
8 PROVIDE LIGHTINIG 1 day? Sun 16/11/08 Mon 17/11/08
9 MOBILISE VACUUM TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
10 MOBILISE CHERRY PICKER 1 day? Sun 16/11/08 Mon 17/11/08
11 RESCUE PLAN ESTABLISHMENT 1 day? Sun 16/11/08 Mon 17/11/08
12 MOBILISE SKIP FOR SAND 1 day? Sun 16/11/08 Mon 17/11/08
13 CHECKS EQUIP'S OPERATIVE PERFOMANCE 1 day? Sun 16/11/08 Mon 17/11/08
14 DOMESTIC WATER TANK 08-T-503-A INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
15 PRE INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
16 SWITCH OFF 08-MOV-5381 AND IT'S BYPASS VALVE OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
17 CLOSE THE INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
18 KEEP THE 503-A OUTLET VALVE OPEN 1 day? Sun 16/11/08 Mon 17/11/08
19 CLOSE THE OUTLET VALVE OF 503-B/C/D 1 day? Sun 16/11/08 Mon 17/11/08
20 EMPTY THE TANK WITHIN THE DOMESTIC WATER SYSTEM 1 day? Sun 16/11/08 Mon 17/11/08
21 OPEN THE OUTLET VALVE OF 503-B/C/D 1 day? Sun 16/11/08 Mon 17/11/08
22 CLOSE THE OUTLET VALVE OF THE TANK 503-A 1 day? Sun 16/11/08 Mon 17/11/08
23 ISOLATION OF THE 503-A INLET 1 day? Sun 16/11/08 Mon 17/11/08
24 ISOLATION OF THE 503-A OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
25 DRAIN THE RESIDUAL BOTTOM WATER WITH HOSES INTO THE RW SKID 1 day? Sun 16/11/08 Mon 17/11/08
26 REMOVE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
27 REMOVE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
28 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
29 EMPTY TOTALLY THE TANK WITH VACUUM TRUCK 1 day? Sun 16/11/08 Mon 17/11/08

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 1
ID Task Name Duration Start Finish Predecessors

30 O2 TESTING 1 day? Sun 16/11/08 Mon 17/11/08


31 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
32 INSTALL LIGHTING 1 day? Sun 16/11/08 Mon 17/11/08
33 INSTALL LADDER INTO THE MANWAY HOLE 1 day? Sun 16/11/08 Mon 17/11/08
34 INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
35 INTERNAL INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
36 POST INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
37 REMOVE LIGHTING AND LADDER 1 day? Sun 16/11/08 Mon 17/11/08
38 REPLACE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
39 REPLACE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
40 REMOVE ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
41 REMOVE ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
42 OPEN THE 503-A INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
43 SWITCH ON 08-MOV-5381 AND IT'S BYPASS VALVE OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
44 OPEN THE 503-A OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
45 FILLING THE TANK WITH DOMESTIC WATER 1 day? Sun 16/11/08 Mon 17/11/08
46 DOMESTIC WATER TANK 08-T-503-B INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
47 PRE INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
48 SWITCH OFF 08-MOV-5383 INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
49 CLOSE THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
50 ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
51 ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
52 EMPTY THE TANK WITHIN THE DOMESTIC WATER SYSTEM 1 day? Sun 16/11/08 Mon 17/11/08
53 DRAIN THE RESIDUAL BOTTOM WATER WITH HOSES INTO THE RW SKID 1 day? Sun 16/11/08 Mon 17/11/08
54 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
55 EMPTY TOTALLY THE TANK WITH VACUUM TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
56 REMOVE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
57 REMOVE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
58 O2 TESTING 1 day? Sun 16/11/08 Mon 17/11/08

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 2
ID Task Name Duration Start Finish Predecessors

59 INSTALL LIGHTING 1 day? Sun 16/11/08 Mon 17/11/08


60 INSTALL LADDER INTO THE MANWAY HOLE 1 day? Sun 16/11/08 Mon 17/11/08
61 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
62 INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
63 INTERNAL INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
64 POST INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
65 REMOVE LIGHTING AND LADDER 1 day? Sun 16/11/08 Mon 17/11/08
66 REPLACE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
67 REPLACE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
68 REMOVE ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
69 REMOVE ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
70 SWITCH ON 08-MOV-5383 INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
71 FILLING THE TANK WITH DOMESTIC WATER 1 day? Sun 16/11/08 Mon 17/11/08
72 OPEN THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
73 DOMESTIC WATER TANK 08-T-503-C INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
74 PRE INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
75 SWITCH OFF 08-MOV-5385 INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
76 CLOSE THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
77 ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
78 ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
79 EMPTY THE TANK WITHIN THE DOMESTIC WATER SYSTEM 1 day? Sun 16/11/08 Mon 17/11/08
80 DRAIN THE RESIDUAL BOTTOM WATER WITH HOSES INTO THE RW SKID 1 day? Sun 16/11/08 Mon 17/11/08
81 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
82 EMPTY TOTALLY THE TANK WITH VACUUM TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
83 REMOVE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
84 REMOVE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
85 O2 TESTING 1 day? Sun 16/11/08 Mon 17/11/08
86 INSTALL LIGHTING 1 day? Sun 16/11/08 Mon 17/11/08
87 INSTALL LADDER INTO THE MANWAY HOLE 1 day? Sun 16/11/08 Mon 17/11/08

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 3
ID Task Name Duration Start Finish Predecessors

88 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
89 INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
90 INTERNAL INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
91 POST INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
92 REMOVE LIGHTING AND LADDER 1 day? Sun 16/11/08 Mon 17/11/08
93 REPLACE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
94 REPLACE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
95 REMOVE ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
96 REMOVE ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
97 SWITCH ON 08-MOV-5385 INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
98 FILLING THE TANK WITH DOMESTIC WATER 1 day? Sun 16/11/08 Mon 17/11/08
99 OPEN THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
100 DOMESTIC WATER TANK 08-T-503-D INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
101 PRE INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
102 SWITCH OFF 08-MOV-5387 INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
103 CLOSE THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
104 ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
105 ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
106 EMPTY THE TANK WITHIN THE DOMESTIC WATER SYSTEM 1 day? Sun 16/11/08 Mon 17/11/08
107 DRAIN THE RESIDUAL BOTTOM WATER WITH HOSES INTO THE RW SKID 1 day? Sun 16/11/08 Mon 17/11/08
108 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
109 EMPTY TOTALLY THE TANK WITH VACUUM TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
110 REMOVE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
111 REMOVE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
112 O2 TESTING 1 day? Sun 16/11/08 Mon 17/11/08
113 INSTALL LIGHTING 1 day? Sun 16/11/08 Mon 17/11/08
114 INSTALL LADDER INTO THE MANWAY HOLE 1 day? Sun 16/11/08 Mon 17/11/08
115 INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
116 INTERNAL INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 4
ID Task Name Duration Start Finish Predecessors

117 POST INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08


118 REMOVE LIGHTING AND LADDER 1 day? Sun 16/11/08 Mon 17/11/08
119 REPLACE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
120 REPLACE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
121 REMOVE ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
122 REMOVE ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
123 SWITCH ON 08-MOV-5387 INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
124 FILLING THE TANK WITH DOMESTIC WATER 1 day? Sun 16/11/08 Mon 17/11/08
125 OPEN THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
126 FIRE WATER TANK 08-T-604 INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08
127 PRE INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
128 SWITCH OFF 08-MOV-6001 1 day? Sun 16/11/08 Mon 17/11/08
129 ISOLATE TANK FROM FROM RELIEF VALVES 1 day? Sun 16/11/08 Mon 17/11/08
130 ISOLATE TANK FROM FIRE WATER PUMP PACKAGE RETURN 1 day? Sun 16/11/08 Mon 17/11/08
131 BYPASS FIRE WATER PUMP PACKAGE RETURN TO DOMESTIQUE WATER TANKS 1 day? Sun 16/11/08 Mon 17/11/08
132 EMPTY THE TANK WITHIN THE FIRE WATER SYSTEM BY MAKING A FIRE SYSTEM TEST 1 day? Sun 16/11/08 Mon 17/11/08
133 BYPASS FIRE WATER TANK BY DOMESTIC WATER TANK 503-D 1 day? Sun 16/11/08 Mon 17/11/08
134 CLOSE THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
135 ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
136 ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
137 DRAIN THE RESIDUAL BOTTOM WATER WITH HOSES INTO THE RW SKID 1 day? Sun 16/11/08 Mon 17/11/08
138 REMOVE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
139 REMOVE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
140 CLEAN THE INSPECTION AREA WITH WASH TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
141 EMPTY TOTALLY THE TANK WITH VACUUM TRUCK 1 day? Sun 16/11/08 Mon 17/11/08
142 O2 TESTING 1 day? Sun 16/11/08 Mon 17/11/08
143 INSTALL LIGHTING 1 day? Sun 16/11/08 Mon 17/11/08
144 INSTALL LADDER INTO THE MANWAY HOLE 1 day? Sun 16/11/08 Mon 17/11/08
145 INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 5
ID Task Name Duration Start Finish Predecessors

146 INTERNAL INSPECTION 1 day? Sun 16/11/08 Mon 17/11/08


147 POST INSPECTION WORK 1 day? Sun 16/11/08 Mon 17/11/08
148 REMOVE LIGHTING AND LADDER 1 day? Sun 16/11/08 Mon 17/11/08
149 REPLACE SHELL MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
150 REPLACE ROOF MANWAY 1 day? Sun 16/11/08 Mon 17/11/08
151 REMOVE ISOLATION OF THE INLET 1 day? Sun 16/11/08 Mon 17/11/08
152 REMOVE ISOLATION OF THE OUTLET 1 day? Sun 16/11/08 Mon 17/11/08
153 OPEN THE OUTLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
154 REMOVE ISOLATION FROM RELIEF VALVES PIPE 1 day? Sun 16/11/08 Mon 17/11/08
155 REMOVE ISOLATION OF FIRE WATER PUMP PACKAGE RETURN 1 day? Sun 16/11/08 Mon 17/11/08
156 REMOVE BYPASS BETWEEN FIRE WATER PUMP PACKAGE RETURN AND FIRE WATER TANK 1 day? Sun 16/11/08 Mon 17/11/08
157 REMOVE BYPASS BETWEEN FIRE WATER TANK AND DOMESTIC WATER TANK 503-D 1 day? Sun 16/11/08 Mon 17/11/08
158 SWITCH ON 08-MOV-6001 INLET VALVE 1 day? Sun 16/11/08 Mon 17/11/08
159 FILLING THE TANK WITH FRESH WATER 1 day? Sun 16/11/08 Mon 17/11/08
160 1 day? Sun 16/11/08 Mon 17/11/08
161 1 day? Sun 16/11/08 Mon 17/11/08

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 6
Resource Names 17 Nov '08
F S S M T

MAINTENANCE

MAINTENANCE

MAINTENANCE
MAINTENANCE

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 7
Resource Names 17 Nov '08
F S S M T

INSPECTORS

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 8
Resource Names 17 Nov '08
F S S M T

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 9
Resource Names 17 Nov '08
F S S M T

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 10
Resource Names 17 Nov '08
F S S M T

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 11
Resource Names 17 Nov '08
F S S M T

Task Rolled Up Task External Tasks

Progress Rolled Up Milestone Project Summary


Project: e151 repair plan
Date: Wed 23/12/09
Milestone Rolled Up Progress Group By Summary

Summary Split Deadline

Page 12