EXTRACTIONPLANTPT.

PERTASAMTANGAS
MAINTENANCEREPORT
16February2017
I.SKGX
No. Equipment RH Activities Status Remark
1 FeedGasMeteringPackage VisualCheck Good
2 LeanGasMeteringPackage VisualCheck Good
3 FuelGasMeteringPackage VisualCheck Good OnprogressapprovalbyMigas
4 InletSlugCatcher VisualCheck Good
5 CondensateDegasserVessel VisualCheck Good

II.GASTURBINECOMPRESSORS&FACILITIES
No. Equipment RH Activities Status Remark
1 FeedGasSuctionScrubbersA/B/C VisualCheck Good
A=29647 PMLubeoilfancoolerGTCFeedA/B,Regreasebearing A=Running
2 FeedGasCompressorsA/B Good
B=29026 motor&bearingfan(completed). B=Running

3 FeedGasComp.Disch.CoolersA/B/C VisualCheck Good


4 FeedGasDisch.ScrubbersA/B/C VisualCheck Good
5 CommonSpareCompressorC C=21213 VisualCheck Good C=Standby

A=27200 1.PMCheck2000Hoursofelectricmotor01EM2101
A=Running
A1/A2/B1/B2
6 LeanGasCompressorsA/B Good B=Running
2.WeeklyCheckVibrationdischargeFinfancoolers3.Check
B=27660
lubeoilcoolerfanGTCLean

7 LeanGasComp.Disch.CoolersA/B VisualCheck Good

III.GASDEHYDRATIONUNIT
No. Equipment RH Activities Status Remark
1 DehydrationVesselsA/B/C VisualCheck Good
2 KVValve VisualCheck Good
3 DustFilter VisualCheck Good
1.PMVisualCheck&LogSheetParameter Monitoringincreasesealleakage
4 RegenerationGasCompressor Good
2.PMcheckalarmsummary from0.4psigto2.7psig
1.PMchecksettingpressurefuel
BNR=22486
2.PMcheckminmaxreadingflamescanner
5 RegenerationGasHeater Good
3.PMCheckalarmsummary
SYS=36314
4.PMcheckinstrumentairpurgingenclosure
6 RegenGasCooler VisualCheck Good
7 K.O.Drum VisualCheck Good

IV.CRYOGENICUNIT
No. Equipment RH Activities Status Remark
1 GasLiquidExchanger VisualCheck Good
2 FeedResiduExchanger VisualCheck Good
3 ColdSeparator VisualCheck Good
Undermonitoringafterresetting:
TogetherwithLABcrewtotakeOilsampleofturbo 1.TimedelayOST3S
4 TurboExpanderPackage 35664
expanderaftermakeupwithPreslia68,statuscompleted 2.TimedelayHighVibTripComp
Side 5S
5 ExpanderComp.DischargeCooler VisualCheck Good
6 DeEthanizerColumn&Reboiler VisualCheck Good
7 RefluxExchanger VisualCheck Good
A=19763 A=Standby
8 RefluxPumpsA/B VisualCheck Good
B=4597 B=Running
9 RefluxAccumulator VisualCheck Good
PM2000HrsofNGLPump01P3501A&B
A=17440 1.Checkpumpforleaks,loosenuts,coupling&bearing
condition,OK A=Running
10 NGLPumpsA/B Good
2.ReplacebearinglubeoilTurbolube46 B=Standby
B=15731 3.Checkvibrationbeforeandafter
4.Checkalignment,OK
EXTRACTIONPLANTPT.PERTASAMTANGAS
MAINTENANCEREPORT
16February2017
V.UTILITIES
No. Equipment RH Activities Status Remark
PM2000potablewaterpump01P5901B,status
A=19870
completed A=Standby
1 PotableWater Good
PMCheck2000Hoursofelectricmotor01PM5901B, B=Running
B=16052 statuscompleted

A=16752
A=Running
2 UtilityWaterPump(01P5802A/B) Cleaningsuctionstrainerutilitywaterpump01P5802A Good
B=Standby
B=18513

A=2010 A=Standby
3 RawWaterPump VisualCheck Good
B=7654 B=Standby
1.PMcompressorinstrumentairA01K5501A
A=7437 2.PMCheck2000Hoursofelectricmotor01KM5501A
A=Lead
4 InstrumentAirCompressorA/B Regreaseelectricmotor01EM2101B1/B2,01EM2301 Good
B=Lag
A1/A2,01EM330121/223.
B=8461 PMCheckinstrumentdevicesat01K5501A
5 InstrumentAirReceiver&Header VisualCheck Good
6 MethanolInjectionPumpsA/B VisualCheck Good
7 HotOilMakeUpPump&ExpansionVessel 4,54 VisualCheck Good Standby
1.PM2000ofhotoilcirculationpump01P5702B,status
A=17075
completed A=Standby
8 HotOilCirculationPump&Filter Good
4.PMCheck2000Hoursofelectricmotor01PM5702B B=Running
B=20029 completed
BRN=32950 1.PMchecksettingpressurefuel
Monitoringplugleakageafter
9 HotOilHeater 2.PMcheckminmaxreadingflamescanner Good
SYS=37351 groutingwithSIKA
3.PMcheckalarmsummary
10 HPFlarePackage VisualCheck Good
A=7.48
11 K.O.Drum&Pump VisualCheck Good
B=7.17
12 ColdVent VisualCheck Good
13 ClosedDrainDrum&Pump 188,52 VisualCheck Good Standby
14 ClosedDrainSumpPump 483,45 VisualCheck Good Standby
15 APISeparator&Pumps 181,67 VisualCheck Good Standby
16 WaterSumpPump 693,18 VisualCheck Good Standby
17 PigLauncher&PigReceiver VisualCheck Good
18 DieselFireWaterPump 79,00 VisualCheck Good Standby
19 JockeyPump 113,00 VisualCheck Good Standby
20 FuelGas&SealGas VisualCheck Good
A=15427 A=Running
B=30758 B=Running
21 GEGA/B/CandDEG GEGA,MakeupoilofGEGA20liters(completed) Good
C=27220 C=Standby
D=386,1 D=Standby

VI.FACILITY&PIPELINE
No. Equipment/Area Activities Remark
MonitoringNGLPressurePipeline&monitoring;
1.KP9Cambai
CheckconditionLBCV7702=Openposition
Checkconditionpipeline&equipments=stillingoodcondition
CheckconditionI/Obuilding&equipmentsinsideofbuilding
CleaningareainsideofI/OBuilding
1 Pipeline,Piping&Facility Continuemonitoring
2.KP33Gelumbang
CheckconditionLBCV7704=Openposition
Checkconditionpipeline&equipments=stillingoodcondition
CheckconditionI/Obuilding&equipmentsinsideofbuilding
CleaningareainsideofI/OBuilding

ReplaceValve#800SSLongSteam(LineDrainfromRefluxPumptoLine
2 RefluxPump Completed
Blowing)
RepaintingDischargeScrubberA&B
CleaningmossofVessel
3 VesselDischargeScrubberA/B/C Continue
RushRemovalScrubber
RepaintingwithTopPaint(Grey)
ProjectSKGX
NDT(RadiographyLine20and16)
4 PEPProjectatSKGX FabricationlineLiquidDrainfromNewSlugChatcher
CommunicationwithPakTaufikPEPforRegardingProgressPEPProjectLowering
andFitupSpool,Remaining2JointWelding
5 DelugeSystem MonitorleakageaftertemporaryrepairseatvalveXV6022 Continuemonitoring

VII.OTHERS
No. Equipment Activities Remark

1 PMCheckinstrumentdevicesat01K5501A CheckandfunctiontestPressureswitch50PS,3APS. completed


CheckandfunctiontestTemperaturesensor50TT,7ATT,3ATT,4ATT,2ATT.
2 Check01FT2252 ChangeupScalerangefrom0,4MMSCFDto0,499MMSCFD

3 Check01FT5721 Changeupscalerangefrom0,6MMSCFDto0,8982MMSCFD
CreatenewMMIofruninghourspumps,Alreadycreatesome,continueforthe
4 DCS StatusContinue
others
Check,CleaningandrepositionintotherightdirectionofFlamedetector01BE
5 Flamedetector01BE3101 StatusCompleted
3101.
EXTRACTIONPLANTPT.PERTASAMTANGAS
MAINTENANCEREPORT
16February2017
VIII.MAINTENANCEISSUE/OUTSTANDINGITEM
No. Item Activities Remarks
1 LTZ1001HH(bypass)&LTZ1001LLspikevaluewhenlightning Addsurgearrestertoprotectfalsesignalduetolightning

2 FeedGasCompressorBconnectiontoDCSmodbad WaitingEthernetcard,POalreadysubmittotransavia
Pengecekan&VerifikasiI/ACompressorAduetoHighLamp
3 I/ACompressorA
Discharge
4 DisplayatDCS MakedisplayrunninghoursequipmentatDCS

IX.SPAREPART/WAREHOUSE
No. Item Remarks
1 RepairmanualvalveGLT16"=2ea&GLT6"=2eaforbackupKVValve Alreadydelivertovendor
2 PrepareselenoidvalveforcontrolvalvewithbrandAscoforspareitem Logistic/Procurementprocess
3 PanelsystemP6003 Procurementprocess
4 PrepareprocureEMCP+2forsparepanelGEG Procurementprocess
5 CreatePRreplaceflexiblecable,valvemembrane&columnforAT3501 Procurementprocess
6 PrepareprocurenewHMISolarTurbineforspareitem Procurementprocess
7 PergantianDoubleBlockValve ProsesPR,WaitingPO

Preparedby, Acknowledgedby,

Dandy AcepSaefuddin
(MaintenanceSuperintendent) (Operation&MaintenanceManager)

TrendingTurboExpander

15591,00015435,00015343,000 15689,00015569,00015642,000
15490,00015478,000
15196,00015354,000 15356,00015498,00015323,00015178,00015356,00015498,00015323,00015568,00015508,000 15349,00015452,00015360,000
2,40 15074,00015178,000 16000,000
2,20
14000,000
2,00
1,80 12000,000
1,60
10000,000
1,40
Vibration

1,20 1,090 1,090 8000,000


1,080 1,040 1,080
1,030 1,040 1,070 1,070 0,940 1,070 1,070 1,040 0,960
1,080 1,060 1,060 0,920 0,930
1,00 0,910 0,990
0,810 0,880 0,980 0,980 0,970
0,800 0,940 0,850 0,940 0,930
0,780
0,940
0,860 0,920 0,870 0,860
0,820
0,800
0,890 0,860 0,860
0,770
0,870
0,860 0,860 0,870 1,000 0,750 6000,000
0,870 0,930 0,840
0,820 0,850 0,960 0,820
0,80 0,720 0,750
0,760 0,790 0,800
0,730 0,730 0,740 0,870 0,720 0,840
0,760 0,800 0,810 0,640 0,640 0,670
0,60 0,720 0,710 0,560 0,580 0,560 0,580 0,740 0,720 0,740 4000,000
0,510 0,530 0,510 0,530 0,660 0,670
0,570 0,600 0,570 0,600
0,40 0,530 0,550 0,530 0,550
2000,000
723,000 719,000 720,000 725,000 724,000 718,000 720,000 724,000 725,000 721,000 722,000 721,000 725,000 721,000 722,000 721,000 722,000 721,000 719,000 720,000 722,000 722,000 723,000 724,000
0,20
0,000
8:25 17:15 20:00 6:00 8:34 11:10 14:31 16:53 8:35 11:02 15:47 17:10 8:35 11:02 15:47 17:10 8:34 11:10 14.11 16:24 8:30 17:25 20:00 6:00

11Feb17 12Feb17 13Feb17 14Feb17 15Feb17 16Feb17


Time

ExpVib"X"(mils) ExpVib"Y"(mils) CompVib"X"(mils) CompVib"Y"(mils) Speed(Rpm) ExpSuctPress(Psi)

PipelinePressure
350,00

300,00 286,00
278,00
270,00 263,00 256,00
248,00 243,00
250,00 237,00 232,00 230,00
210,00
Pressure(Psi)

200,00 184,04
182,28
181,50 185,00
184,91
184,76 136,29 134,00
150,00 132,24
126,77 130,00
125,00 132,54
129,43
124,84 130,78
127,85 129,00
127,00 128,00
125,00 126,97
124,85
123,09 123,00 122,00 121,22 121,00
120,00
118,00 118,00
117,00 115,84
114,92
131,89 130,00 129,10 127,06 127,00 112,08 106,00
105,50
126,00 124,39 121,00 118,00 103,30
130,32 115,04
100,00 128,00 127,60 125,20 125,00 124,00 122,48 105,70
120,00 118,00 114,00
105,20

50,00

0,00
KP0 KP9 KP21 KP33 KP42 KP54 KP63 KP68 KP78 KP79 KP86 NGLSurge
Drum
Location
PresureDesign 10Feb17 11Feb17 13Feb17 14Feb17 15Feb17