B. Holding NOC:-
Ref:
Date:
Trakhees
Ports, Customs & Free Zone Corporation (PCFC)
Civil Engineering Department
P.O Box 17000
Jebel Ali
The above projects have been substantially completed as per the CED approved
drawings, Building Regulations & Design Guidelines and Building & General Civil
Work Construction Regulations . We assure you that all the required tests have been
done and found satisfactory.
We request CED to inspect the premises and issue Building Completion Certificate.
Thanking you
Yours faithfully
(Signature)
____________
(Designation)
Standard Format-A2:
(Letter Head)
Ref:
Date:
Trakhees
Ports, Customs & Free Zone Corporation (PCFC)
Civil Engineering Department
P.O Box 17000
Jebel Ali
The above projects have been completed satisfactorily as per the contract terms,
conditions and project specification. We assure you that there are no outstanding issues
related to this project.
We request CED to inspect the premises and issue Building Completion Certificate.
Thanking you
Yours faithfully
(Signature)
____________
(Designation)
Standard Format-A3:
(Consultant Letter Head)
Ref:
Date:
Trakhees
Ports, Customs & Free Zone Corporation (PCFC)
Civil Engineering Department
P.O Box 17000
Jebel Ali
The above projects have been substantially completed as per the CED approved
drawings, Building Regulations & Design Guidelines and Building & General Civil
Work Construction Regulations . We assure you that DEWA power is required to carry
out the required tests to our satisfaction.
We request CED to inspect the premises and issue DEWA purpose NOC.
Thanking you
Yours faithfully
(Signature)
____________
(Designation)
Standard Format-A4:
(Letter Head)
Ref:
Date:
Trakhees
Ports, Customs & Free Zone Corporation (PCFC)
Civil Engineering Department
P.O Box 17000
Jebel Ali
The above Modifications / Fitout / Renovation works / Racking Systems have been
completed satisfactorily as per the contract terms, conditions and specifications. We
assure you that there are no outstanding issues related to this work.
Thanking you
Yours faithfully
(Signature)
____________
(Designation)
Standard Format-A5:
(Contractor Letter Head)
Ref:
Date:
Trakhees
Ports, Customs & Free Zone Corporation (PCFC)
Civil Engineering Department
P.O Box 17000
Jebel Ali
The above Modifications / Fitout / Renovation works / Racking Systems have been
substantially completed as per the CED approved drawings and Regulations. We assure
you that all the required tests have been done and found satisfactory.
Thanking you
Yours faithfully
(Signature)
____________
(Designation)
Standard Format-A6:
Email-IDs:-
2. Client : ________________________________________
3. Contractor : ________________________________________
Name: ____________________________________________________________
Mob: ____________________________________________________________
Undertaking:
We certify that all the documents are submitted in compliance with List of Documents to
be submitted for completion inspection in pdf. And we confirm that the hard copy of CED
approved drawings, CED-NOC and EHS-NOCs are available at site for verification.