PRESUPUESTO TOTAL

Recurso Unidad Cantidad Precio S/. Parcial S/.


23 OPERADOR DE EQUIPO LIVIANO hh 106.2688 7.64 811.89
23 OPERADOR DE EQUIPO PESADO hh 350.0000 10.00 3,500.00
23 OPERARIO hh 4,055.1854 8.48 34,387.97
23 OFICIAL hh 988.0108 7.64 7,548.40
23 PEON hh 3,380.8514 6.79 22,955.98

24 ACEITE PARA MOTOR SAE-30 gln 3.1740 55.00 174.57


24 ALAMBRE NEGRO RECOCIDO # 16 kg 344.2817 6.00 2,065.69
24 ALAMBRE NEGRO RECOCIDO # 8 kg 87.7601 6.00 526.56
24 CLAVOS PARA MADERA C/C 1 1/2 " kg 6.5850 10.00 65.85
24 CLAVOS PARA MADERA C/C 3" kg 86.5650 6.00 519.39
24 CLAVOS PARA MADERA C/C 4" kg 19.1400 6.00 114.84
24 SOPORTE METALICO PARA TANQUE S/D und 1.0000 850.00 850.00
24 ACERO DE REFUERZO FY=4200 GRADO 60 kg 5,978.5100 3.70 22,120.49
24 ARENA FINA m3 26.9821 50.00 1,349.11
24 PIEDRA LAJA O SIMILAR DE LA ZONA E=1CM m2 12.6500 20.00 253.00
24 ARENA GRUESA m3 39.2582 50.00 1,962.91
24 PIEDRA ZARANDEADA DE 1/2" @ 3/4" m3 40.7130 50.00 2,035.65
24 CABLE TW # 14 AWG 2.5 MM2 m 154.8500 1.20 185.82
24 CABLE TW AWG-MCM #12 - 4 MM2 m 260.8000 1.50 391.20
24 CABLE ELECTRICO DE Cu 6MM2 AWG TW m 10.5000 5.00 52.50
24 INODORO TQUE. BAJO NORMAL COLOR C/A. und 3.0000 320.00 960.00
24 LAVATORIO DE PARED BLANCO 1 GRIF. INC./ACCES. und 3.0000 300.00 900.00
24 URINARIO PICO BLANCO C/ACCESORIOS und 1.0000 250.00 250.00
24 TOALLERA C/BARRA PLASTICA COLOR und 1.0000 50.00 50.00
24 PAPELERA C/EJE 15x15 COLOR und 1.0000 35.00 35.00
24 REGISTRO DE BRONCE DE 4" und 2.0000 15.00 30.00
24 TABLERO ELECTRICO PVC SAP - 6 CIRCUITOS und 1.0000 120.00 120.00
24 TOMACORRIENTE DOBLE DE BAKELITA C/PUESTA A TIERRA und 32.0000 7.00 224.00
24 INTERRUPTOR TERMOMAGNETICO DE 2x20A und 4.0000 15.00 60.00
24 INTERRUPTOR SIMPLE - DOBLE BIPOLAR BAKELITA und 14.0000 6.00 84.00
24 CAJA RECTANG GALV 4"X2 1/8" und 51.0000 3.00 153.00
24 CAJA OCTOGONAL GALV. 4" X 2 1/8 " und 19.0000 3.00 57.00
24 FOCO "WS" 150R JOSFEL + LAMPAPRA DE 1OOW und 4.0000 15.00 60.00
24 BRAQUETE CON PROTECTOR JOSFEL 150R und 4.0000 5.00 20.00
24 FLUORES. RECTO ISPE 1X40 W C/EQ + PANT und 15.0000 50.00 750.00
24 PEGAMENTO PARA CERAMICO BOL 8.2225 20.00 164.45
24 LADRILLO PANDERETA DE 10x12x24 CM und 2,203.1100 1.00 2,203.11
24 LADRILLO MECANIZADO DE ARCILLA KK 10 X 14 X 24 CM und 9,824.4000 1.70 16,701.48
24 LADRILLO DE TECHO 30X30X15 CM und 1,988.7000 4.30 8,551.41
24 CEMENTO PORTLAND TIPO IP (42.5 KG) BOL 919.3880 26.00 23,904.09
24 BISAGRAS CAPUCHINAS DE 4" X 3" pza 42.0000 8.00 336.00
24 CERRADURA EXTERIOR DE DOS GOLPES und 6.0000 50.00 300.00
24 CERRADURA DE TRES GOLPES und 4.0000 70.00 280.00
24 JALADOR DE BRONCE DE 4 " und 10.0000 8.00 80.00
24 CERA PARA PISO gln 2.7668 25.00 69.17
24 CINTA AISLANTE und 4.6000 2.50 11.50
24 CINTA TEFLON rll 2.8500 4.00 11.40
24 CANASTILLA DE SALIDA PVC SAP 1/2" X 2"X4" und 1.0000 50.00 50.00
24 OCRE ROJO kg 3.8046 15.00 57.07
24 OCRE kg 21.6760 15.00 325.14
24 JEBE MICROPOROSO DE 2 X 1.30M, e=1" pln 1.4850 150.00 222.75
24 SELLADOR DE JUNTAS und 1.9800 150.00 297.00
24 SILICONA und 57.5360 15.00 863.04
24 PEGAMENTO PARA PVC gln 1.2370 90.00 111.33
24 FRAGUA BOL 3.2890 12.00 39.47
24 POLICARBONATO E=6mm INC/ACC. m2 7.8750 100.00 787.50
24 IMPRIMANTE gln 51.8465 28.00 1,451.70
24 WINCHA und 3.8046 50.00 190.23
24 GASOLINA 84 OCTANOS gln 24.0738 15.00 361.11
24 HORMIGON m3 0.9050 50.00 45.25
24 LIJA und 51.8465 2.50 129.62
24 AGUA m3 20.4286 3.00 61.29
24 TANQUE ELEVADO ETERNIT 1100 LITROS pza 1.0000 650.00 650.00
24 REGLA METALICA DE 1"x2"x6.0 MTS und 2.0549 80.00 164.39
24 CERAMICO NACIONAL ANTIDESLIZANTE DE COLOR 30x30 CM m2 7.6020 35.00 266.07
24 CERAMICO DE 27X45 CM m2 26.9325 35.00 942.64
24 PARQUET DE 0.06X0.30 M. m2 145.2570 30.00 4,357.71
24 MADERA NACIONAL PARA ENCOFRADO p2 2,268.7233 4.50 10,209.25
24 RODON DE MADERA 3/4" x 3/4" m 138.2850 1.50 207.43
24 CONTRAZOCALO DE MADERA SACSA 3/4"X3" m 138.2850 10.00 1,382.85
24 PUERTA P-1 und 2.0000 800.00 1,600.00
24 PUERTA P-2 und 2.0000 1,350.00 2,700.00
24 PUERTA CONTRAPLACADA P-3 S/D und 3.0000 500.00 1,500.00
24 PUERTA CONTRAPLACADA P-4 S/D und 3.0000 400.00 1,200.00
24 ESTRUCTURA METALICA SEG/PLANO P/DUCTO ILUMINACION m2 7.5000 110.00 825.00
24 BARANDA METALICA DE F N S/D m 7.7000 95.00 731.50
24 TUBO DE ALUMINIO DE 2"X1"X1/16" m 551.0050 5.00 2,755.03
24 ACONDICIONADOR P/META VENCEACRIL 1/4 GLN und 7.6092 15.00 114.14
24 BREA kg 3.9565 10.00 39.57
24 PETROLEO gln 501.0327 15.00 7,515.49
24 PINTURA LATEX PATO CPP gln 39.7360 30.00 1,192.08
24 PINTURA ACRILICA gln 12.1105 60.00 726.63
24 PINTURA ESMALTE gln 1.0000 35.00 35.00
24 BARNIZ gln 0.5750 32.00 18.40
24 NIPLE ESPECIAL PVC SAP 2" C/AJUSTE Y EMPAQUE und 1.0000 6.00 6.00
24 NIPLE ESPECIAL FG3/4" C/AJUSTE Y EMPAQUE und 1.0000 7.00 7.00
24 NIPLE ESPECIAL FG1/2" C/AJUSTE Y EMPAQUE und 1.0000 5.00 5.00
24 UNION UNIVERSAL DE Fo. GALV. DE 3/4" und 1.0000 7.0000 7.0000
24 UNION UNIVERSAL DE Fo. GALV. DE 1/2" und 1.0000 5.0000 5.0000
24 CODO F GALV. DE 3/4" X 90 und 1.0000 7.0000 7.0000
24 CODO F GALV. DE 1/2" X 90 und 1.0000 5.0000 5.0000
24 TEE DE F GALV. DE 1/2" und 1.0000 5.0000 5.0000
24 REPUESTOS Y LUBRICANTES GLB 1.0000 5,073.3900 5,073.3900
24 SUMIDERO DE BRONCE DE 2" und 3.0000 10.0000 30.0000
24 TUB. PVC SAP PRESION P/AGUA C-10 EC 1/2" m 70.0000 2.5000 175.0000
24 TUBERIA PVC SAP C-10 DE 1/2" HIDRO m 15.7500 10.0000 157.5000
24 TUBERIA PVC SAP CLASE 7.5, 3" m 39.3750 15.0000 590.6300
24 UNION UNIVERSAL PVC SAP DE 1/2" und 9.0000 12.0000 108.0000
24 TUB. PVC SAP P/INST. ELECT. DE 3/4" pza 204.0000 3.0000 612.0000
24 CURVA PESADO PVC SAP P/INST. ELECT. 3/4" und 51.0000 1.0000 51.0000
24 CONEXION A CAJA PVC SAP INST ELECT 3/4" und 64.0000 1.0000 64.0000
24 TEE PVC SAP 1/2" und 6.0000 2.0000 12.0000
24 REDUCCION PVC SAP 4" A 2" und 1.0000 15.0000 15.0000
24 REDUCCION PVC SAP 2" A 3/4" und 1.0000 5.0000 5.0000
24 NIPLE PVC SAP 1/2"X 1 1/4" und 6.0000 2.0000 12.0000
24 YEE PVC SAL C/REDUCC. 4" - 2" und 6.0000 7.0000 42.0000
24 CODO PVC SAL 2" X 45 pza 2.0000 5.0000 10.0000
24 CODO PVC SAL 4" X 45 und 2.0000 6.0000 12.0000
24 CODO PVC SAL 4" X 90 und 2.0000 6.0000 12.0000
24 CODO PVC SAP 1/2" X 90 C/R und 24.0000 2.0000 48.0000
24 CODO PVC SAP 3/4" X 90 C/R und 1.0000 3.5000 3.5000
24 CODO PVC SAP 3"X90 und 9.3750 25.0000 234.3800
24 CODOS PVC SAL 2X90 pza 11.0000 5.0000 55.0000
24 TUBERIA PVC SAL 2" m 51.8000 10.0000 518.0000
24 TUBERIA PVC SAL 4" m 27.0000 17.0000 459.0000
24 TEE PVC SAL 4" X 4" und 4.0000 7.0000 28.0000
24 YEE PVC SAL DE 4" X 2" pza 3.0000 6.5000 19.5000
24 YEE PVC SAL 2" X 2" X 2" und 2.0000 6.0000 12.0000
24 LLAVE DE PASO FG DE 3/4" und 1.0000 35.0000 35.0000
24 VALVULA CHECK DE BRONCE DE 1/2" und 1.0000 20.0000 20.0000
24 VALVULA FLOTADORA 1/2" C/BOLA DE COBRE und 1.0000 30.0000 30.0000
24 VALVULA COMPUERTA ACERO INOXIDABLE 1/2" und 3.0000 30.0000 90.0000
24 VIDRIO CATEDRAL DE 4mm p2 51.1455 5.0000 255.7300
24 VIDRIO SISTEMA MODUGLAS DE 6MM p2 1,157.1105 10.50 12,149.66
24 ESPEJO DE 12"X24" C/MARCO DE ACERO und 1.0000 50.00 50.00
24 HERRAMIENTAS MANUALES %MO 1.0000 2,045.52 2,045.52

25 CEPILLADORA PISOS DE PARQUET hm 92.2313 4.00 368.93


25 ANDAMIO METALICO hm 1,667.8164 1.30 2,168.16
25 VIBRADOR DE CONCRETO 4 HP 2.40" hm 34.0634 20.00 681.27
25 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 hm 40.2064 25.00 1,005.16
25 WINCHE DE DOS BALDES (350KG)M.E. 3.6HP hm 26.5836 50.00 1,329.18
25 DISEO DE MEZCLAS DE CONCRETO GLB 1.0000 500.00 500.00
25 PRUEBA : ROTURA DE PROBETA RESISTENCIA A LA COMPRESIO und 12.0000 30.00 360.00
25
25
25
25
25
25
301,061.86 133,183.87 6,412.70
440,658.43

PERSONAL

SERVICIOS
BIENES
69,204.24
34,892.58
6,412.70
23 24 25
Presupuestado S/.
811.89 811.89 811.8900
3,500.00 3500 3,500.0000
34,387.97 34387.97 34,387.9700
7,548.40 7548.4 7,548.4000
22,955.98 22955.98 22,955.9800
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
174.57 174.57 174.5700
2,065.69 2065.69 2,065.6900
526.56 526.56 526.5600
65.85 65.85 65.8500
519.39 519.39 519.3900
114.84 114.84 114.8400
850.00 850 850.0000
22,120.49 22120.49 22,120.4900
1,349.11 1349.11 1,349.1100
253.00 253 253.0000
1,962.91 1962.91 1,962.9100
2,035.65 2035.65 2,035.6500
185.82 185.82 185.8200
391.20 391.2 391.2000
52.50 52.5 52.5000
960.00 960 960.0000
900.00 900 900.0000
250.00 250 250.0000
50.00 50 50.0000
35.00 35 35.0000
30.00 30 30.0000
120.00 120 120.0000
224.00 224 224.0000
60.00 60 60.0000
84.00 84 84.0000
153.00 153 153.0000
57.00 57 57.0000
60.00 60 60.0000
20.00 20 20.0000
750.00 750 750.0000
164.45 164.45 164.4500
2,203.11 2203.11 2,203.1100
16,701.48 16701.48 16,701.4800
8,551.41 8551.41 8,551.4100
23,904.09 23904.09 23,904.0900
336.00 336 336.0000
300.00 300 300.0000
280.00 280 280.0000
80.00 80 80.0000
69.17 69.17 69.1700
11.50 11.5 11.5000
11.40 11.4 11.4000
50.00 50 50.0000
57.07 57.07 57.0700
325.14 325.14 325.1400
222.75 222.75 222.7500
297.00 297 297.0000
863.04 863.04 863.0400
111.33 111.33 111.3300
39.47 39.47 39.4700
787.50 787.5 787.5000
1,451.70 1451.7 1,451.7000
190.23 190.23 190.2300
361.11 361.11 361.1100
45.25 45.25 45.2500
129.62 129.62 129.6200
61.29 61.29 61.2900
650.00 650 650.0000
164.39 164.39 164.3900
266.07 266.07 266.0700
942.64 942.64 942.6400
4,357.71 4357.71 4,357.7100
10,209.25 10209.25 10,209.2500
207.43 207.43 207.4300
1,382.85 1382.85 1,382.8500
1,600.00 1600 1,600.0000
2,700.00 2700 2,700.0000
1,500.00 1500 1,500.0000
1,200.00 1200 1,200.0000
825.00 825 825.0000
731.50 731.5 731.5000
2,755.03 2755.03 2,755.0300
114.14 114.14 114.1400
39.57 39.57 39.5700
7,515.49 7515.49 7,515.4900
1,192.08 1192.08 1,192.0800
726.63 726.63 726.6300
35.00 35 35.0000
18.40 18.4 18.4000
6.00 6 6.0000
7.00 7 7.0000
5.00 5 5.0000
7.00 7 7.0000
5.00
7.00
5.00
5.00
5,073.39
30.00
175.00
157.50
590.63
108.00
612.00
51.00
64.00
12.00
15.00
5.00
12.00
42.00
10.00
12.00
12.00
48.00
3.50
234.38
55.00
518.00
459.00
28.00
19.50
12.00
35.00
20.00
30.00
90.00
255.73
12,149.66
50.00
2,045.52

368.93 368.93 368.9300


2,168.16 2168.16 2,168.1600
681.27 681.27 681.2700
1,005.16 1005.16 1,005.1600
1,329.18 1329.18 1,329.1800
500.00 500 500.0000
360.00 360 360.0000
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -

231,857.62 231857.62 231,857.6200 -


"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

RESUMEN DE ANALISIS DE PRESUPUESTO ANALITICO


SEGN ESPECIFICA DE GASTO

Costo Directo Costo Indirecto


GEN/ESP DESCRIPCION PARTIDA Gastos Expediente
Aporte MDP Supervisin Liquidacin
Generales Tcnico

OTRAS ESTRUCTURAS DIVERSAS

2.6.2 2.4 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 31,637.05 0.00 0.00 0.00 0.00

2.6.2 2.4 4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 69,258.52 2,876.00 875.00 300.00 500.00

2.6.2 2.4 5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 18,866.27 21,100.00 5,000.00 6,000.00 7,500.00

TOTAL 119,761.84 23,976.00 5,875.00 6,300.00 8,000.00

TOTAL APORTE DE LA ENTIDAD EJECUTORA


L CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

ANALISIS DE PRESUPUESTO ANALITICO


EGN ESPECIFICA DE GASTO

Presupuesto Total

31,637.05

73,809.52

58,466.27

163,912.84

163,912.84
MUNICIPALIDAD DISTRITAL
DE PISACOMA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO
PISACOMA - CHUCUITO - PUNO"

ANALISIS DE COSTOS DIRECTOS


2.6.2 2 OTRAS ESTRUCTURAS DIVERSAS

2.6.2 2.4 3 COSTO POR CONSTRUCCION ADMINISTRACION DIRECTA - PERSONAL


NRO. DESCRIPCION UND CANTIDAD PRECIO PARCIAL
MANO DE OBRA (INCLUIDO LEYES SOCIALES)
OPERADOR DE EQUIPO LIVIANO hh 11.56 7.64 88.33
OPERADOR DE EQUIPO PESADO hh 175.00 10 1,750.00
OPERARIO hh 3,041.37 8.48 25,790.83
OFICIAL hh 230.09 7.64 1,757.91
PEON hh 2,540.50 6.79 17,249.98

2.6.2 2.4 4 COSTO POR CONSTRUCCION ADMINISTRACION DIRECTA - BIENES


NRO. DESCRIPCION UND CANTIDAD PRECIO PARCIAL
MATERIALES DE CONSTRUCCION y HERRAMIENTAS
ACEITE PARA MOTOR SAE-30 gln 3.17 55.00 174.57
ALAMBRE NEGRO RECOCIDO # 16 kg 344.28 6.00
ALAMBRE NEGRO RECOCIDO # 8 kg 87.76 6.00
CLAVOS PARA MADERA C/C 1 1/2 " kg 6.59 10.00
CLAVOS PARA MADERA C/C 3" kg 86.57 6.00
CLAVOS PARA MADERA C/C 4" kg 19.14 6.00
SOPORTE METALICO PARA TANQUE S/D und 1.00 850.00 850.00
ACERO DE REFUERZO FY=4200 GRADO 60 kg 5,978.51 3.70
ARENA FINA m3 26.98 50.00 1,349.11
PIEDRA LAJA O SIMILAR DE LA ZONA E=1CM m2 12.65 20.00 253.00
ARENA GRUESA m3 39.26 50.00 1,962.91
PIEDRA ZARANDEADA DE 1/2" @ 3/4" m3 40.71 50.00 2,035.65
CABLE TW # 14 AWG 2.5 MM2 m 154.85 1.20 185.82
CABLE TW AWG-MCM #12 - 4 MM2 m 260.80 1.50 391.20
CABLE ELECTRICO DE Cu 6MM2 AWG TW m 10.50 5.00 52.50
INODORO TQUE. BAJO NORMAL COLOR C/A. und 3.00 320.00 960.00
LAVATORIO DE PARED BLANCO 1 GRIF. INC./ACCES. und 3.00 300.00 900.00
URINARIO PICO BLANCO C/ACCESORIOS und 1.00 250.00 250.00
TOALLERA C/BARRA PLASTICA COLOR und 1.00 50.00 50.00
PAPELERA C/EJE 15x15 COLOR und 1.00 35.00 35.00
REGISTRO DE BRONCE DE 4" und 2.00 15.00 30.00
TABLERO ELECTRICO PVC SAP - 6 CIRCUITOS und 1.00 120.00 120.00
TOMACORRIENTE DOBLE DE BAKELITA C/PUESTA A TIERRA und 32.00 7.00 224.00
INTERRUPTOR TERMOMAGNETICO DE 2x20A und 4.00 15.00 60.00
INTERRUPTOR SIMPLE - DOBLE BIPOLAR BAKELITA und 14.00 6.00 84.00
CAJA RECTANG GALV 4"X2 1/8" und 51.00 3.00 153.00
CAJA OCTOGONAL GALV. 4" X 2 1/8 " und 19.00 3.00 57.00
FOCO "WS" 150R JOSFEL + LAMPAPRA DE 1OOW und 4.00 15.00 60.00
BRAQUETE CON PROTECTOR JOSFEL 150R und 4.00 5.00 20.00
FLUORES. RECTO ISPE 1X40 W C/EQ + PANT und 15.00 50.00 750.00
PEGAMENTO PARA CERAMICO BOL 8.22 20.00 164.45
LADRILLO PANDERETA DE 10x12x24 CM und 2,203.11 1.00
LADRILLO MECANIZADO DE ARCILLA KK 10 X 14 X 24 CM und 9,824.40 1.70
LADRILLO DE TECHO 30X30X15 CM und 1,988.70 4.30
CEMENTO PORTLAND TIPO IP (42.5 KG) BOL 919.39 26.00
BISAGRAS CAPUCHINAS DE 4" X 3" pza 42.00 8.00 336.00
CERRADURA EXTERIOR DE DOS GOLPES und 6.00 50.00 300.00
CERRADURA DE TRES GOLPES und 4.00 70.00 280.00
JALADOR DE BRONCE DE 4 " und 10.00 8.00 80.00
CERA PARA PISO gln 2.77 25.00 69.17
CINTA AISLANTE und 4.60 2.50 11.50
CINTA TEFLON rll 2.85 4.00 11.40
CANASTILLA DE SALIDA PVC SAP 1/2" X 2"X4" und 1.00 50.00 50.00
OCRE ROJO kg 3.80 15.00 57.07
OCRE kg 21.68 15.00 325.14
MUNICIPALIDAD DISTRITAL
DE PISACOMA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO
PISACOMA - CHUCUITO - PUNO"

ANALISIS DE COSTOS DIRECTOS


2.6.2 2 OTRAS ESTRUCTURAS DIVERSAS
JEBE MICROPOROSO DE 2 X 1.30M, e=1" pln 1.49 150.00 222.75
SELLADOR DE JUNTAS und 1.98 150.00 297.00
SILICONA und 57.54 15.00 863.04
PEGAMENTO PARA PVC gln 1.24 90.00 111.33
FRAGUA BOL 3.29 12.00 39.47
POLICARBONATO E=6mm INC/ACC. m2 7.88 100.00 787.50
IMPRIMANTE gln 51.85 28.00 1,451.70
WINCHA und 3.80 50.00 190.23
GASOLINA 84 OCTANOS gln 24.07 15.00 361.11
HORMIGON m3 0.91 50.00 45.25
LIJA und 51.85 2.50 129.62
AGUA m3 20.43 3.00 61.29
TANQUE ELEVADO ETERNIT 1100 LITROS pza 1.00 650.00 650.00
REGLA METALICA DE 1"x2"x6.0 MTS und 2.05 80.00 164.39
CERAMICO NACIONAL ANTIDESLIZANTE DE COLOR 30x30 CM m2 7.60 35.00 266.07
CERAMICO DE 27X45 CM m2 26.93 35.00 942.64
PARQUET DE 0.06X0.30 M. m2 145.26 30.00 4,357.71
MADERA NACIONAL PARA ENCOFRADO p2 2,268.72 4.50
RODON DE MADERA 3/4" x 3/4" m 138.29 1.50 207.43
CONTRAZOCALO DE MADERA SACSA 3/4"X3" m 138.29 10.00 1,382.85
PUERTA P-1 und 2.00 800.00 1,600.00
PUERTA P-2 und 2.00 1,350.00 2,700.00
PUERTA CONTRAPLACADA P-3 S/D und 3.00 500.00 1,500.00
PUERTA CONTRAPLACADA P-4 S/D und 3.00 400.00 1,200.00
ESTRUCTURA METALICA SEG/PLANO P/DUCTO ILUMINACION m2 7.50 110.00 825.00
BARANDA METALICA DE F N S/D m 7.70 95.00 731.50
TUBO DE ALUMINIO DE 2"X1"X1/16" m 551.01 5.00 2,755.03
ACONDICIONADOR P/META VENCEACRIL 1/4 GLN und 7.61 15.00 114.14
BREA kg 3.96 10.00 39.57
PETROLEO gln 501.03 15.00 7,515.49
PINTURA LATEX PATO CPP gln 39.74 30.00 1,192.08
PINTURA ACRILICA gln 12.11 60.00 726.63
PINTURA ESMALTE gln 1.00 35.00 35.00
BARNIZ gln 0.58 32.00 18.40
NIPLE ESPECIAL PVC SAP 2" C/AJUSTE Y EMPAQUE und 1.00 6.00 6.00
NIPLE ESPECIAL FG3/4" C/AJUSTE Y EMPAQUE und 1.00 7.00 7.00
NIPLE ESPECIAL FG1/2" C/AJUSTE Y EMPAQUE und 1.00 5.00 5.00
UNION UNIVERSAL DE Fo. GALV. DE 3/4" und 1.00 7.00 7.00
UNION UNIVERSAL DE Fo. GALV. DE 1/2" und 1.00 5.00 5.00
CODO F GALV. DE 3/4" X 90 und 1.00 7.00 7.00
CODO F GALV. DE 1/2" X 90 und 1.00 5.00 5.00
TEE DE F GALV. DE 1/2" und 1.00 5.00 5.00
REPUESTOS Y LUBRICANTES GLB 1.00 5,073.39 5,073.39
SUMIDERO DE BRONCE DE 2" und 3.00 10.00 30.00
TUB. PVC SAP PRESION P/AGUA C-10 EC 1/2" m 70.00 2.50 175.00
TUBERIA PVC SAP C-10 DE 1/2" HIDRO m 15.75 10.00 157.50
TUBERIA PVC SAP CLASE 7.5, 3" m 39.38 15.00 590.63
UNION UNIVERSAL PVC SAP DE 1/2" und 9.00 12.00 108.00
TUB. PVC SAP P/INST. ELECT. DE 3/4" pza 204.00 3.00 612.00
CURVA PESADO PVC SAP P/INST. ELECT. 3/4" und 51.00 1.00 51.00
CONEXION A CAJA PVC SAP INST ELECT 3/4" und 64.00 1.00 64.00
TEE PVC SAP 1/2" und 6.00 2.00 12.00
REDUCCION PVC SAP 4" A 2" und 1.00 15.00 15.00
REDUCCION PVC SAP 2" A 3/4" und 1.00 5.00 5.00
NIPLE PVC SAP 1/2"X 1 1/4" und 6.00 2.00 12.00
YEE PVC SAL C/REDUCC. 4" - 2" und 6.00 7.00 42.00
CODO PVC SAL 2" X 45 pza 2.00 5.00 10.00
CODO PVC SAL 4" X 45 und 2.00 6.00 12.00
MUNICIPALIDAD DISTRITAL
DE PISACOMA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO
PISACOMA - CHUCUITO - PUNO"

ANALISIS DE COSTOS DIRECTOS


2.6.2 2 OTRAS ESTRUCTURAS DIVERSAS
CODO PVC SAL 4" X 90 und 2.00 6.00 12.00
CODO PVC SAP 1/2" X 90 C/R und 24.00 2.00 48.00
CODO PVC SAP 3/4" X 90 C/R und 1.00 3.50 3.50
CODO PVC SAP 3"X90 und 9.38 25.00 234.38
CODOS PVC SAL 2X90 pza 11.00 5.00 55.00
TUBERIA PVC SAL 2" m 51.80 10.00 518.00
TUBERIA PVC SAL 4" m 27.00 17.00 459.00
TEE PVC SAL 4" X 4" und 4.00 7.00 28.00
YEE PVC SAL DE 4" X 2" pza 3.00 6.50 19.50
YEE PVC SAL 2" X 2" X 2" und 2.00 6.00 12.00
LLAVE DE PASO FG DE 3/4" und 1.00 35.00 35.00
VALVULA CHECK DE BRONCE DE 1/2" und 1.00 20.00 20.00
VALVULA FLOTADORA 1/2" C/BOLA DE COBRE und 1.00 30.00 30.00
VALVULA COMPUERTA ACERO INOXIDABLE 1/2" und 3.00 30.00 90.00
VIDRIO CATEDRAL DE 4mm p2 51.15 5.00 255.73
VIDRIO SISTEMA MODUGLAS DE 6MM p2 1,157.11 10.50 12,149.66
ESPEJO DE 12"X24" C/MARCO DE ACERO und 1.00 50.00 50.00
HERRAMIENTAS MANUALES %MO 1.00 2,045.52 2,045.52

2.6.2 2.4 5 COSTO POR CONSTRUCCION ADMINISTRACION DIRECTA - SERVICIOS


NRO. DESCRIPCION UND CANTIDAD PRECIO PARCIAL
MAQUINARIAS Y EQUIPOS
CEPILLADORA PISOS DE PARQUET hm 92.23 4.00 368.93
ANDAMIO METALICO hm 1,667.82 1.30 2,168.16
VIBRADOR DE CONCRETO 4 HP 2.40" hm 34.06 20.00
MEZCLADORA CONCRETO TAMBOR 18HP 11P3 hm 40.21 25.00
WINCHE DE DOS BALDES (350KG)M.E. 3.6HP hm 26.58 50.00 1,329.18
DISEO DE MEZCLAS DE CONCRETO GLB 1.00 500.00
PRUEBA : ROTURA DE PROBETA RESISTENCIA A LA COMPRESIO und 12.00 30.00

TOTAL COSTO DIRECTO


UNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE
SACOMA - CHUCUITO - PUNO"

LISIS DE COSTOS DIRECTOS

46,637.05

69,258.52
UNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE
SACOMA - CHUCUITO - PUNO"

LISIS DE COSTOS DIRECTOS


UNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE
SACOMA - CHUCUITO - PUNO"

LISIS DE COSTOS DIRECTOS

3,866.27

119,761.84
MUNICIPALIDAD DISTRITAL
DE PISACOMA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PU

RESUMEN DE COSTOS INDIRECTOS

A. COSTO DE GASTOS GENERALES

NRO. Coef. DESCRIPCION UND. CANTIDAD PRECIO PARCIAL


2.6.2 2.4 4 COSTO ADMINISTRACION DIRECTA - BIENES
Utiles de Oficina GLB 0.50 700.00 350.00
Vestuario Para Personal de Obra Und 0.70 180.00 126.00
Placa recordatoria Und 1 450.00 450.00
Gasolina de 84 Oct. Gln 100.00 14.50 1,450.00
Cartel de obra Und 1 500.00 500.00

2.6.2 2.4 5 COSTO ADMINISTRACION DIRECTA - SERVICIOS


1.00 Ingeniero Residente MES 2.00 3,600.00 7,200.00
1.00 Asistente Tecnico MES 2.00 2,000.00 4,000.00
1.00 Asistente Administrativo MES 2.00 1,500.00 3,000.00
1.00 Maestro de obra MES 2.00 2,000.00 4,000.00
1.00 Almacenero Guardian MES 2.00 1,350.00 2,700.00
1.00 Fotocopiado Und. 2,000.00 0.10 200.00

TOTAL ANALITICO DE LOS GASTOS GENERALES S/.

B. COSTO DE SUPERVISION

NRO. Coef. DESCRIPCION UND. CANTIDAD PRECIO PARCIAL


2.6.2 2.4 4 COSTO POR ADMINISTRACION DIRECTA - BIENES
1 Utiles de Oficina GLB 1.00 150.00 150.00
1 Gasolina de 84 Oct. Gln 50.00 14.50 725.00

2.6.2 2.4 5 COSTO POR ADMINISTRACION DIRECTA- SERVICIOS


0.50 1 Ingeniero Supervisor MES 2.00 5,000.00 5,000.00

TOTAL ANALITICO DE LOS GASTOS DE SUPERVISIN S/.

C. COSTO DE LIQUIDACIN

NRO. Coef. DESCRIPCION UND. CANTIDAD PRECIO PARCIAL


2.6.2 2.4 4 COSTO POR ADMINISTRACION DIRECTA - BIENES
Utiles de Oficina Glb 1.00 300.00 300.00

2.6.2 2.4 5 COSTO POR ADMINISTRACION DIRECTA- SERVICIOS


1.00 Liquidacion Tecnica Mes 1.00 3,500.00 3,500.00
1.00 Liquidacion financiera Mes 1.00 2,500.00 2,500.00

TOTAL ANALITICO DE LOS GASTOS DE LIQUIDACIN S/.

D. COSTO DE EXPEDIENTE TCNICO

NRO. Coef. DESCRIPCION UND. CANTIDAD PRECIO PARCIAL


2.6.2 2.4 4 COSTO POR ADMINISTRACION DIRECTA - BIENES
Utiles de Oficina GLB 0.00 0.00 500.00

2.6.2 2.4 5 COSTO POR ADMINISTRACION DIRECTA- SERVICIOS


1 Ingeniero Consultor GLB 1.00 7,500.00 7,500.00

TOTAL ANALITICO DE LOS GASTOS DE EXPEDIENTE TCNICO S/.


O DE PISACOMA - CHUCUITO - PUNO"

2,876.00

21,100.00

23,976.00

875.00

5,000.00

5,875.00

300.00

6,000.00

6,300.00

500.00

7,500.00

8,000.00
MUNICIPALIDAD DISTRITAL
DE PISACOMA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

ANALISIS DE COSTOS INDIRECTOS


DETERMINACIN DE GASTOS GENERALES

TOTAL COSTO DIRECTO S/.

TIEMPO DE EJECUCION (MESES)

A. GASTOS GENERALES

1. GASTOS GENERALES VARIABLES


1.1 COSTO DE DIRECCION TECNICA DE OBRA

Cargo Mes Coef. Haber Bsico

1 Ingeniero Residente 2.00 1.00 3,600.00


1 Asistente Tecnico 2.00 1.00 2,000.00
1 Asistente Administrativo 2.00 1.00 1,500.00
1 Maestro de obra 2.00 1.00 2,000.00
1 Almacenero Guardian 2.00 1.00 1,350.00
Sub-total
TOTAL

TOTAL PERSONAL DIRECTIVO Y ADMINISTRATIVO

1.1.1 Gastos de Oficina

Concepto Mes Costo Mens.

Utiles de Oficina GLB 0.50 700.00

TOTAL

1.1.2 Servicios a Terceros

Concepto Und. Costo

Fotocopiado 2000.00 0.10


Flete Terrestre
TOTAL

1.1.3 Seguridad Personal y otros

Concepto Und Costo

1 Vestuario Para Personal de Obra 0.5 180.00


2 Placa recordatoria 1 450.00
3 Cartel de obra 1 500.00
TOTAL

1.1.4 Equipo Mantenimiento movilidad y Servicio

Cargo Und Cant. C.U.

Gasolina de 84 Oct. Gln 100.00 14.50


TOTAL

TOTAL DE GASTOS DIRECTOS VARIABLES


B. COSTO DE SUPERVISION

1. COSTO DE SUPERVISION DE OBRA


1.1 Sueldos del Personal

Cargo Coef.Part. Mes Haber Bsico

1 Ingeniero Supervisor 0.5 2.00 5,000.00

Sub-total

TOTAL

1.2 Utiles de Oficina, Mobiliario, Amortizacin de Equipos de Oficina

Concepto Und Costo


1 Utiles de Oficina Glb 150.00

TOTAL

1.3 Movilidad

Cargo Und Cant. Nro.Viajes/me Nro.Meses C.U.

1 Movilidad (Camioneta 4x4)


Gasolina de 84 Oct. Gln 50.00 14.50

Costo Total de Combustibles y Lubricantes (1.3)

TOTAL COSTO DE SUPERVISIN

C. COSTO DE LIQUIDACION

1. COSTO DE LIQUIDACION DE OBRA


1.1 Sueldos del Personal

Cargo Coef.Part. Mes Haber Bsico

Liquidacion Tecnica 1 1.00 3,500.00


Liquidacion financiera 1 1.00 2,500.00

Sub-total

TOTAL

1.2 Utiles de Oficina, Mobiliario, Amortizacin de Equipos de Oficina

Concepto Und Costo


1 Utiles de Oficina Glb 300.00

TOTAL

TOTAL COSTO LIQUIDACION

D. COSTO DE EXPEDIENTE TECNICO

1. COSTO DE EXPEDIENTE TECNICO


1.1 Sueldos del Personal

Cargo Coef.Part. Mes Haber Bsico

1 Ingeniero Consultor 1 1.00 7,500.00

Sub-total

TOTAL

1.2 Utiles de Oficina, Mobiliario, Amortizacin de Equipos de Oficina

Concepto Und Costo


1 Utiles de Oficina Glb 500.00

TOTAL

TOTAL COSTO DE EXPEDIENTE TCNICO

RESUMEN
TOTAL GASTOS GENERALES 23,940.00
TOTAL COSTO DE SUPERVISIN 5,875.00
TOTAL COSTO DE LIQUIDACIN 6,300.00
TOTAL COSTO DE EXPEDIENTE TCNICO 8,000.00
TOTAL 44,115.00
E PISACOMA - CHUCUITO - PUNO"

119,761.84

2.00

Total

7,200.00
4,000.00
3,000.00
4,000.00
2,700.00
20,900.00

20,900.00

Total

350.00

350.00

Total

200.00
0.00
200.00

Total

90.00
450.00
500.00
1,040.00

Total

1,450.00
1,450.00

23,940.00
Total

5,000.00

5,000.00

5,000.00

Total
150.00

150.00

Total

725.00

725.00

5,875.00

Total

3,500.00
2,500.00

6,000.00

6,000.00

Total
300.00

300.00

6,300.00

Total

7,500.00

7,500.00

7,500.00

Total
500.00

500.00

8,000.00

19.99%
4.91%
5.26%
6.68%
36.84%
PRESUPUESTO DE OBRA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA


OBRA : CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST.

Item Descripcin Und. Metrado Precio (S/.)

01 TRABAJOS PRELIMINARES

01.01 LIMPIEZA DE TERRENO Y ACERO m2 380.46 1.42

01.02 TRAZO, NIVELACION Y REPLANTEO m2 380.46 1.86

01.03 DEMOLICION DE PISO DE CONCRETO SIMPLE m2 198.72 3.37

01.04 ELIMINACION DE MATERIAL PROVENIENTE DE DEMOLICION m3 17.35 29.23

02 OBRAS DE CONCRETO ARMADO

02.01 COLUMNAS

02.01.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS m3 9.35 448.69

02.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 92.83 39.10

02.01.03 ACERO DE REFUERZO FY= 4,200 KG/CM2 PARA COLUMNAS kg 636.14 4.85

02.02 VIGAS

02.02.01 CONCRETO F'C=210 KG/CM2 PARA VIGAS m3 25.30 468.41

02.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 165.11 45.15

02.02.03 ACERO DE REFUERZO FY= 4,200 KG/CM2 PARA VIGAS kg 2,837.32 4.81

02.03 LOSAS ALIGERADAS

02.03.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS m3 19.89 411.06

02.03.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS m2 227.36 35.25

02.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 PARA LOSAS ALIGERADAS kg 1,898.30 4.78

02.03.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 1,894.00 4.97

02.03.05 JUNTA DE CONSTRUCCION TECHO m 9.90 57.05

02.04 ESCALERAS

02.04.01 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS m3 3.30 442.69

02.04.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 25.02 55.05

02.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 PARA ESCALERAS kg 282.92 4.78

03 ESTRUCTURA METALICA Y COBERTURA

03.01 DUCTO DE ILUMINACION

03.01.01 ESTRUCTURA METALICA SEGUN DISEO und 7.50 171.54

03.01.02 COBERTURA CON POLICARBONATO m2 7.50 110.41

04 MUROS Y TABIQUES DE ALBANILERIA

04.01 MUROS DE LADRILLO KK 18 H. DE SOGA C/A 1:4 X 1.5 CM m2 272.90 85.21

04.02 MURO DE SOGA LADRILLO PANDERETA CON CEMENTO-ARENA m2 56.49 61.07

05 REVOQUES ENLUCIDOS Y MOLDURAS

05.01 EN MUROS

05.01.01 TARRAJEO RAYADO O PRIMARIO C/MORTERO C:A 1:5 E=1.5CM m2 24.90 25.19

05.01.02 TARRAJEO EN INTERIORES C/MORTERO C:A 1:5 E=1.5CM m2 319.28 22.38

05.01.03 TARRAJEO EN EXTERIORES C/MORTERO C:A 1:5 E=1.5CM m2 242.21 25.32


PRESUPUESTO DE OBRA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA


OBRA : CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST.

Item Descripcin Und. Metrado Precio (S/.)

05.02 EN COLUMNAS

05.02.01 TARRAJEO DE SUPERFICIE DE COLUMNAS C/MORTERO C:A 1:5 E=1.5CM m2 73.11 26.87

05.02.02 VESTIDURA DE ARISTAS EN COLUMNAS C/M C:A 1:5 E=1.5CM m 118.00 5.30

05.03 EN VIGAS

05.03.01 TARRAJEO DE SUPERFICIE DE VIGAS C/M C:A 1:5 E=1.5CM m2 135.01 27.39

05.03.02 VESTIDURA DE ARISTAS EN VIGAS C/M C:A 1:5 E=1.5CM m 132.80 7.20

05.04 EN ESCALERA

05.04.01 TARRAJEO DE SUPERFICIE EN GRADAS C/M C:A 1:5 E=1.5CM m2 33.18 29.61

05.05 VESTIDURA DE DERRAMES

05.05.01 VESTIDURA DE DERRAMES EN PUERTAS C/M C:A 1:5 E=1.5CM m 62.45 7.20

05.05.02 VESTIDURA DE DERRAMES EN VENTANAS C/M C:A 1:5 E=1.5CM m 203.90 7.20

05.06 BRUAS EN SUPERFICIES E=2CM m 78.00 3.49

05.07 CIELORRASOS

05.07.01 CIELORRASOS DE MORTERO DE CEMENTO C:A 1:4, E=1.5 CM m2 227.36 32.56

05.08 ENCHAPADOS

05.08.01 ENCHAPADO CON PIEDRA LAJA O SIMILAR EN MUROS m2 11.50 59.12

06 PISOS Y PAVIMENTOS

06.01 FALSO PISO DE 4" DE CONCRETO 1:10 C:H m2 7.24 30.55

06.02 PISO DE GRESS CERAMICO ANTIDESLIZANTE m2 7.24 68.14

06.03 PISOS DE CONCRETO COLOREADO FROTACHADO E=2.5 CMS. ESPESOR m2 108.38 21.98

06.04 PISO DE PARQUET INCLUYE PULIDO m2 138.34 55.93

07 ZOCALOS

07.01 CONTRAZOCALO DE SACSA DE 3/4"X4" y RODON DE 3/4" m 131.70 15.03

07.02 ZOCALO DE CERAMICO DE 27X45 CM m2 25.65 68.13

08 CARPINTERIA DE MADERA

08.01 PUERTAS DE MADERA AGUANO P-1 DE TABLEROS REBAJADOS S/D und 2.00 867.70

08.02 PUERTAS DE MADERA AGUANO P-2 DE TABLEROS REBAJADOS S/D und 2.00 1,417.70

08.03 PUERTA CONTRAPLACADA P-3 S/D und 3.00 569.88

08.04 PUERTA CONTRAPLACADA P-4 S/D und 3.00 469.88

09 CARPINTERIA METALICA

09.01 BARANDA DE TUBO F G, PASAMANO Y PARANTE DE 2" X 1.00M DE ALT. S/D m 7.70 104.79

10 CERRAJERIA

10.01 BISAGRA CAPUCHINA DE 4" pza 42.00 11.49

10.02 CERRADURA PARA PUERTA PRINCIPAL 3 GOLPES PESADA pza 4.00 87.47

10.03 CERRADURA PARA PUERTA 2 GOLPES pza 6.00 63.98

10.04 JALADORES DE BRONCE DE 4" und 10.00 9.40


PRESUPUESTO DE OBRA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA


OBRA : CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST.

Item Descripcin Und. Metrado Precio (S/.)

11 VIDRIOS, CRISTALES Y SIMILARES

11.01 VIDRIO SISTEMA DE 6MM VENTANAS p2 1,102.01 15.39

11.02 VIDRIO CATEDRAL DE 4MM p2 48.71 6.86

12 PINTURA

12.01 PINTURA EN INTERIORES MUROS, COLUMNAS, VIGAS Y CIELORASO 2 MANOS m2 794.72 7.02

12.02 PINTURA ACRILICA EN EXTERIORES 2 MANOS m2 242.21 9.52

12.03 PINTURA BARNIZ m2 11.50 7.62

13 LIMPIEZA DE OBRA

13.01 LIMPIEZA PERMANENTE DE OBRA m2 2,663.22 0.56

13.02 LIMPIEZA FINAL DE OBRA m2 380.46 2.53

14 FLETE TERRESTRE

14.01 TRASLADO DE MATERIALES DE PISACOMA A OBRA GLB 1.00 15,323.39

15 INSTALACIONES ELECTRICAS

15.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4) pto 19.00 56.20

15.02 SALIDA TOMACORRIENTE C/AWG TW 4.0MM(12)+D PVC SEL 19MM(3/4) pto 32.00 75.22

16 TABLEROS PRINCIPALES

16.01 TABLERO DE DISTRIBUCION DE 6 CIRCUITOS und 1.00 140.27

16.02 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20 A und 4.00 27.21

17 CONDUCTORES ELECTRICOS

17.01 CONDUCTOR DE Cu 2x6 mm2 AWG TW m 10.00 5.71

18 ARTEFACTOS

18.01 FLUORESCENTE RECTO ISPE 1 X 40 W INCLUYENDO EQUIPO Y PANTALL und 15.00 62.12

18.02 LAMPARA TIPO JOSFEL und 4.00 24.61

19 INTERRUPTORES Y TOMACORRIENTES

19.01 INTERRUPTOR SIMPLE und 14.00 11.84

19.02 TOMACORRIENTE DOBLE und 32.00 18.43

20 APARATOS Y ACCESORIOS SANITARIOS

20.01 SUMINISTRO

20.01.01 INODORO TANQUE BAJO COLOR C/ACCESORIOS und 3.00 320.00

20.01.02 LAVATORIO DE PARED DE COLOR C/ACCESORIOS pza 3.00 300.00

20.01.03 URINARIO BLANCO pza 1.00 250.00

20.01.04 PAPELERA DE LOZA DE COLOR DE 15X15CM C/ACCESOSIOS pza 1.00 35.00

20.01.05 TOALLERA DE PLASTICO 24" DE COLOR C/ACCESORIOS pza 1.00 50.00

20.01.06 ESPEJO DE PARED DE 12"X24" C/MARCO DE ACERO und 1.00 50.00

20.02 INSTALACION

20.02.01 INSTALACION DE APARATOS SANITARIOS und 7.00 48.93


PRESUPUESTO DE OBRA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA


OBRA : CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST.

Item Descripcin Und. Metrado Precio (S/.)

20.02.02 INSTAL. DE ACCESORIOS SANITARIOS und 3.00 16.32

21 SISTEMA DE DESAGUE

21.01 SALIDAS

21.01.01 SALIDA DE DESAGUE TUBERIA PVC 2" pto 7.00 35.91

21.01.02 SALIDA DE DESAGUE TUBERIA PVC 4" pto 3.00 55.33

21.02 REDES DE DERIVACION Y COLECTORAS

21.02.01 TUBERIA PVC SAL 2 m 12.00 13.13

21.02.02 TUBERIA PVC SAL 4 m 20.00 20.57

21.03 ACCESORIOS PVC SAL DESAGUE GLB 1.00 157.00

21.04 INSTAL. DE ACCESORIOS SANITARIOS COMPLEMENTARIOS und 28.00 6.66

21.05 ADITAMIENTOS VARIOS

21.05.01 SUMIDERO DE BRONCE 2" und 3.00 34.30

21.05.02 REGISTRO ROSCADO DE BRONCE 4" pza 2.00 38.32

22 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

22.01 SALIDAS DE AGUA

22.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 7.00 32.81

22.02 REDES DE DISTRIBUCION

22.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" C-10 PVC-SAP m 50.00 5.26

22.03 ACCESORIOS

22.03.01 SUMIN. DE ACCESORIOS PVC SAP 1/2" GLB 1.00 96.00

22.03.02 INSTAL. DE ACCESORIOS PVC SAP 1/2" und 33.00 3.45

22.04 VALVULAS

22.04.01 VALVULA COMPUERTA DE BRONCE 1/2" und 3.00 70.65

22.05 ALMACENAMIENTO

22.05.01 TANQUE ELEVADO DE ETERNIT DE 1100 LITROS und 1.00 681.46

22.05.02 SOPORTE METALICO PARA TANQUE S/DISEO und 1.00 919.20

22.05.03 SUMIN. DE ACCESORIOS Y VALVULAS und 1.00 205.50

22.05.04 SUMNISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" HIDRO m 15.00 18.59

22.05.05 INSTAL. DE ACCESORIOS Y VALVULAS VARIOS und 1.00 23.14

23 SISTEMA DE DRENAJE PLUVIAL

23.01 TUBERIA PVC SAL 2" m 24.00 15.32

23.02 MONTANTE AGUAS PLUVIALES TUBERIA PVC SAP CLASE 7.5 3" m 37.50 24.72

23.03 PROTECCION DE CONCRETO PARA MONTANTE H=1.50M und 5.00 173.14

24 VARIOS

24.01 CONTROL DE CALIDAD

24.01.01 DISEO DE MEZCLAS GLB 1.00 500.00


PRESUPUESTO DE OBRA

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA


OBRA : CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST.

Item Descripcin Und. Metrado Precio (S/.)

24.01.02 PRUEBA DE RESISTENCIA A LA COMPRESION DE CONCRETO und 12.00 30.00

24.02 LETREROS GLB 1.00 160.82

24.03 CURADO DE ELEMENTOS DE CONCRETO m3 100.00 7.46

24.04 ZARANDEO DE HORMIGON SELECCIONADO m3 60.00 13.99

COSTO DIRECTO S/.


GASTOS GENERALES S/.
GASTOS DE SUPERVISIN S/.
GASTOS DE LIQUIDACIN S/.
GASTOS DE EXPEDIENTE TECNICO S/.
PRESUPUESTO TOTAL DE OBRA . S/.

gastado
BLADO DE TANIRI CIRCA
O"

PISACOMA

Parcial (S/.) Total (S/.)

2,424.74

540.25 540.25
707.66 707.66
669.69 669.69
507.14 507.14
83,296.04

10,910.18

4,195.25 4195.25
3,629.65 3629.65
3,085.28 3085.28
32,953.00

11,850.77 11850.77
7,454.72 7454.72
13,647.51 13647.51
35,242.27

8,175.98 8175.98
8,014.44 8014.44
9,073.87 9073.87
9,413.18 9413.18
564.80 564.8
4,190.59

1,460.88 1460.88
1,377.35 1377.35
1,352.36 1352.36
2,114.63

2,114.63

1,286.55 1286.55
828.08 828.08
26,703.65

23,253.81 23253.81
3,449.84 3449.84
32,404.55

13,905.48

627.23 627.23
7,145.49 7145.49
6,132.76 6132.76
BLADO DE TANIRI CIRCA
O"

PISACOMA

Parcial (S/.) Total (S/.)

2,589.87

1,964.47 1964.47
625.40 625.4
4,654.08

3,697.92 3697.92
956.16 956.16
982.46

982.46 982.46
1,917.72

449.64 449.64
1,468.08 1468.08
272.22 272.22
7,402.84

7,402.84 7402.84
679.88

679.88 679.88
10,834.06

221.18 221.18
493.33 493.33
2,382.19 2382.19
7,737.36 7737.36
3,726.98

1,979.45 1979.45
1,747.53 1747.53
7,690.08

1,735.40 1735.4
2,835.40 2835.4
1,709.64 1709.64
1,409.64 1409.64
806.88

806.88 806.88
1,310.34

482.58 482.58
349.88 349.88
383.88 383.88
94.00 94
BLADO DE TANIRI CIRCA
O"

PISACOMA

Parcial (S/.) Total (S/.)

17,294.08

16,959.93 16959.93
334.15 334.15
7,972.40

5,578.93 5578.93
2,305.84 2305.84
87.63 87.63
2,453.96

1,491.40 1491.4
962.56 962.56
15,323.39

15,323.39 15323.39
3,474.84

1,067.80 1067.8
2,407.04 2407.04
249.11

140.27 140.27
108.84 108.84
57.10

57.10 57.1
1,030.24

931.80 931.8
98.44 98.44
755.52

165.76 165.76
589.76 589.76
2,636.47

2,245.00

960.00 960
900.00 900
250.00 250
35.00 35
50.00 50
50.00 50
391.47

342.51 342.51
BLADO DE TANIRI CIRCA
O"

PISACOMA

Parcial (S/.) Total (S/.)

48.96 48.96
1,509.34

417.36

251.37 251.37
165.99 165.99
568.96

157.56 157.56
411.40 411.4
157.00 157
186.48 186.48
179.54

102.90 102.9
76.64 76.64
3,022.62

229.67

229.67 229.67
263.00

263.00 263
209.85

96.00 96
113.85 113.85
211.95

211.95 211.95
2,108.15

681.46 681.46
919.20 919.2
205.50 205.5
278.85 278.85
23.14 23.14
2,160.38

367.68 367.68
927.00 927
865.70 865.7
2,606.22

860.00

500.00 500
BLADO DE TANIRI CIRCA
O"

PISACOMA

Parcial (S/.) Total (S/.)

360.00 360
160.82 160.82
746.00 746
839.40 839.4

231,857.62
43,300.00
10,500.00
6,300.00
8,000.00
299,957.62

167351.3
CRONOGRAMA VALORIZADO DE OBRA

OBRA : "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA PISACOMA


Mes 1 Mes 2
Item Descripcin Und. Metrado Precio (S/.) Parcial (S/.) Total (S/.) Metrado Valorizacion Metrado
Mensual mensual Mensual
01 SERVICIOS HIGIENICOS 40,253.39
01.01 OBRAS PRELIMINARES 170.56
01.01.01 TRAZO, NIVELACION Y REPLANTEO m2 28.81 3.60 103.72 103.72
01.01.02 LIMPIEZA DEL TERRENO MANUAL m2 28.81 2.32 66.84 66.84
01.02 MOVIMIENTO DE TIERRAS 725.31
01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 16.12 22.82 367.86 367.86
01.02.02 RELLENO CON MATERIAL PROPIO m3 3.04 56.27 171.06 171.06
01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 16.35 11.40 186.39 186.39
01.03 OBRAS DE CONCRETO SIMPLE 2,616.48
01.03.01 SOLADO PARA ZAPATAS 1:10 e=4" m2 9.68 26.37 255.26 255.26
01.03.02 CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 7.02 190.23 1,335.41 1335.41
01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 17.28 39.95 690.34 690.34
01.03.04 CONCRETO EN SOBRECIMIENTO 1:8 + 25% PM m3 1.30 258.05 335.47 335.47
01.04 OBRAS DE CONCRETO ARMADO 5,765.05
01.04.01 ZAPATAS 1,566.68
01.04.01.01 CONCRETO ZAPATAS f'c=175 kg/cm2 m3 3.87 335.09 1,296.80 1296.8
01.04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 53.76 5.02 269.88 269.88
01.04.02 COLUMNAS 2,112.24
01.04.02.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 182.21 5.00 911.05 911.05
01.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 16.32 43.63 712.04 712.04
01.04.02.03 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 1.22 400.94 489.15 489.15
01.04.03 VIGAS 2,086.13
01.04.03.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 172.97 5.00 864.85 864.85
01.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE AMARRE m2 12.84 59.83 768.22 768.22
01.04.03.03 CONCRETO VIGAS f'c=210 kg/cm2 m3 1.13 400.94 453.06 453.06
01.05 MUROS Y TABIQUES 2,923.00
01.05.01 MURO DE SOGA CON LADRILLO DE 24X15X9 cm J=1.5 cm m2 41.14 71.05 2,923.00 2923
01.06 ESTRUCTURA Y COBERTURAS 1,620.46
01.06.01 VIGAS DE MADERA COPAYBA O SIMILAR DE 2"X4" und 7.00 57.72 404.04 404.04
01.06.02 CORREAS DE MADERA CORRIENTE 2"X2" m 35.50 8.67 307.79 307.79
CRONOGRAMA VALORIZADO DE OBRA

OBRA : "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA PISACOMA


Mes 1 Mes 2
Item Descripcin Und. Metrado Precio (S/.) Parcial (S/.) Total (S/.) Metrado Valorizacion Metrado
Mensual mensual Mensual
01.06.03 COBERTURA DE PLANCHA ZINCADA ONDULADA DE 0.25mm m2 24.14 37.64 908.63 908.63
01.07 SISTEMA DE AGUA PLUVIAL 694.80
01.07.01 CANALETAS PARA AGUAS DE LLUVIA DE 4" INCLUYE SOPORTE m 7.10 20.84 147.96 147.96
01.07.02 MONTANTES DE AGUAS PLUVIALES 3" m 7.00 63.54 444.78 444.78
01.07.03 PROTECCION DE CONCRETO PARA MONTANTE H=1.20m und 2.00 51.03 102.06 102.06
01.08 REVOQUES, ENLUCIDOS Y MOLDURAS 3,770.50
01.08.01 TARRAJEO DE MUROS, COLUMNAS, VIGAS INTERIOR m2 50.97 26.81 1,366.51 1366.51
01.08.02 TARRAJEO DE MUROS, COLUMNAS, VIGAS, ZOCALO ESTERIOR m2 63.22 26.81 1,694.93 1694.93
01.08.03 VESTIDURA DE DERRAMES H=0.15-0.25 m 43.70 13.96 610.05 610.05
01.08.04 BRUAS m 41.60 2.38 99.01 99.01
01.09 CIELO RASOS 515.68
01.09.01 CIELORASOS CON TRIPLAY de 4 mm m2 16.56 31.14 515.68 515.68
01.10 PISOS 2,282.45
01.10.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 15.25 26.19 399.40 399.4
01.10.02 PISO CERAMICO ANTIDESLIZANTE m2 15.25 72.33 1,103.03 1103.03
01.10.03 CONFORMACION Y COMPACTADO DE SUB BASE PARA VEREDAS m3 2.08 94.63 196.83 196.83
01.10.04 ENCOFRADO DESENCOFRADO EN VEREDAS m2 2.00 33.30 66.60 66.6
01.10.05 CONCRETO EN VEREDAS FC'=175 KG/CM2 INC. ACABADOS Y BRUADO m2 11.55 43.10 497.81 497.81
01.10.06 JUNTA ASFALTICA e=1/2" m 3.00 6.26 18.78 18.78
01.11 CONTRAZOCALOS 2,110.28
01.11.01 CONTRAZOCALO DE CERAMICO EN SSHH m2 29.76 70.91 2,110.28 2110.28
01.12 CARPINTERIA METALICA 5,812.92
01.12.01 PUERTA METALICA P-01 SEGUN DISEO und 3.00 400.00 1,200.00 1200
01.12.02 VENTANA METALICAS glb 1.00 1,925.82 1,925.82 1925.82
01.12.03 CABINAS METALICAS EN SSHH. und 6.00 447.85 2,687.10 2687.1
01.13 VIDRIOS 513.76
01.13.01 VIDRIO SEMI DOBLE p2 49.07 10.47 513.76 513.76
01.14 APARATOS SANITARIOS 4,107.83
01.14.01 LAVATORIO DE CONCRETO DE 1.60*0.50 PARA 3 GRIFOS INC. ACABADO Y A und 2.00 476.34 952.68 952.68
01.14.02 INODORO CON TANQUE BAJO PARA NIOS DE 3-5 AOS INC/COLOCACION und 6.00 360.38 2,162.28 2162.28
CRONOGRAMA VALORIZADO DE OBRA

OBRA : "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA PISACOMA


Mes 1 Mes 2
Item Descripcin Und. Metrado Precio (S/.) Parcial (S/.) Total (S/.) Metrado Valorizacion Metrado
Mensual mensual Mensual
01.14.03 INODORO CON TANQUE BAJO PARA DOCENTES und 1.00 430.38 430.38 430.38
01.14.04 LAVATORIO PARA DOCENTES und 1.00 360.38 360.38 360.38
01.14.05 URINARIO DE CONCRETO PARA NIOS und 1.00 202.11 202.11 202.11
01.15 SISTEMA DE DESAGUE 3,781.10
01.15.01 SALIDA DE TUBERIA DE DESAGUE DE PVC SAL 2" pto 6.00 56.29 337.74 337.74
01.15.02 SALIDA DE TUBERIA DE DESAGUE DE PVC SAL 4" pto 7.00 49.38 345.66 345.66
01.15.03 RED DE DISTRIBUCION INTERIOR CON TUBERIA PVC SAL DE 4" m 15.00 29.56 443.40 443.4
01.15.04 TUBERIA PVC SAL DE 4" RED COLECTORA m 45.00 14.62 657.90 657.9
01.15.05 EXCAVACION DE TERRENO MANUAL RED DE DISTRIBUCION Y COLECTORA m3 24.00 22.38 537.12 537.12
01.15.06 RELLENO CON MATERIAL PROPIO DE RED DE DISTRIBUCION Y COLECTORA m3 21.00 7.13 149.73 149.73
01.15.07 ACCESORIOS DE SISTEMA DE DESAGUE glb 1.00 178.00 178.00 178
01.15.08 INSTALACION DE ACCESORIOS pza 19.00 21.38 406.22 406.22
01.15.09 SUMIDEROS DE BRONCE DE 2" pza 5.00 29.53 147.65 147.65
01.15.10 REGISTRO ROSCADO DE BRONCE 4" pza 3.00 40.36 121.08 121.08
01.15.11 SALIDA DE TUBERIA PVC PARA VENTILACION DE 2" pto 3.00 54.29 162.87 162.87
01.15.12 CAJA DE REGISTRO und 3.00 97.91 293.73 293.73
01.16 SISTEMA DE AGUA 1,373.66
01.16.01 RED CON TUBERIA PVC SAP C-10 DE 3/4"X5m C/ROSCA m 48.00 7.56 362.88 362.88
01.16.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 1/2"X5m C/ m 20.00 5.46 109.20 109.2
01.16.03 ACCESORIOS DE SISTEMA DE AGUA glb 1.00 51.00 51.00 51
01.16.04 INSTALACION DE ACCESORIOS pza 28.00 21.38 598.64 598.64
01.16.05 VALVULA DE COMPUERTA Y CONTROL DE BRONCE pza 6.00 41.99 251.94 251.94
01.17 INSTALACIONES ELECTRICAS 613.16
01.17.01 SALIDA DE CENTRO DE LUZ PTO 4.00 80.79 323.16 323.16
01.17.02 ARTEFACTO FOCO TIPO BOMBILLADE 60 W und 4.00 35.73 142.92 142.92
01.17.03 TABLERO DE DISTRIBUCION und 1.00 147.08 147.08 147.08
01.18 PINTURAS 856.39
01.18.01 PINTURA EN INTERIOR m2 21.21 10.57 224.19 224.19
01.18.02 PINTURA ACRILICA EN EXTERIORES m2 63.22 10.00 632.20 632.2
02 AREA DE JUEGOS 14,790.22
CRONOGRAMA VALORIZADO DE OBRA

OBRA : "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA PISACOMA


Mes 1 Mes 2
Item Descripcin Und. Metrado Precio (S/.) Parcial (S/.) Total (S/.) Metrado Valorizacion Metrado
Mensual mensual Mensual
02.01 GRAS SINTETICO 11,882.75
02.01.01 TRAZO, NIVELACION Y REPLANTEO m2 73.50 4.12 302.82 302.82
02.01.02 LIMPIEZA DEL TERRENO MANUAL m2 73.50 2.32 170.52 170.52
02.01.03 CERCO PERIMETRICO DE PROTECCION m 20.00 21.80 436.00 436
02.01.04 EXCAVACION MANUAL EN TERRENO NORMAL m3 36.75 22.38 822.47 822.47
02.01.05 ELIMINACION DE MATERIAL EXCEDENTE DM=1 km m3 45.94 19.72 905.94 905.94
02.01.06 NIVELACION, RIEGO, COMAPACTADO DE SUB RASANTE m2 73.50 14.29 1,050.32 1050.32
02.01.07 TUBERIA CRIBADA PARA DRENAJE PVC-SAP C-7.5 3" m 19.00 30.19 573.61 573.61
02.01.08 TUBERIA PVC SAL DE 4" m 5.00 30.97 154.85 154.85
02.01.09 COLOCADO DE PIEDRA ZARANDEADO DE 3/4" m2 50.60 12.03 608.72 608.72
02.01.10 TENDIDO Y COLOCADO DE HORMIGON SELECCIONADA m2 50.60 10.28 520.17 520.17
02.01.11 TENDIDO Y COLOCADO DE ARENA SELECCIONADA m2 50.60 10.28 520.17 520.17
02.01.12 SUMINISTRO E INSTALACION DE GRASS SISTETICO m2 50.60 88.00 4,452.80 4452.8
02.01.13 CAJA DE REGISTRO DE CONCRETO und 2.00 97.91 195.82 195.82
02.01.14 CERCO METALICO DE PROTECCION m 16.10 72.58 1,168.54 1168.54
02.02 SARDINELES 1,191.46
02.02.01 EXCAVACION DE ZANJAS MANUAL EN TERRENO NORMAL m3 0.79 22.38 17.68 17.68
02.02.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 17.50 30.46 533.05 533.05
02.02.03 CONCRETO f'c=175 kg/cm2 EN SARDINEL m3 1.31 374.21 490.22 490.22
02.02.04 TARRAJEO DE SARDINEL m2 6.13 22.51 137.99 137.99
02.02.05 JUNTA ASFALTIC e=1/2 m 2.00 6.26 12.52 12.52
02.03 VEREDAS 1,716.01
02.03.01 CONFORMACION Y COMPACTADO DE SUB BASE PARA VEREDAS m3 4.03 94.63 381.36 381.36
02.03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 2.10 30.46 63.97 63.97
02.03.03 CONCRETO f'c=175 kg/cm2 EN VEREDAS INC. ACABADOS m3 2.73 457.54 1,249.08 1249.08
02.03.04 JUNTAS ASFALTICAS e=1/2" m 3.45 6.26 21.60 21.6
03 OTROS 5,444.23
03.01 TRANSPORTE DE MATERIALES glb 1.00 3,150.00 3,150.00 3150
03.02 CURADO DE ELEMENTOS DE CONCRETO m3 48.00 12.60 604.80 604.8
03.03 ZARANDEO DE HORMIGON PARA CONCRETO m3 60.00 23.02 1,381.20 1381.2
CRONOGRAMA VALORIZADO DE OBRA

OBRA : "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA PISACOMA


Mes 1 Mes 2
Item Descripcin Und. Metrado Precio (S/.) Parcial (S/.) Total (S/.) Metrado Valorizacion Metrado
Mensual mensual Mensual
03.04 LIMPIEZA FINAL DE OBRA m2 99.75 3.09 308.23 308.23
-

COSTO DIRECTO TOTAL 60,487.84 -

% AVANCE FISICO PROGRAMADO 0.00%

GASTOS GENERALES 43,300.00 -


GASTOS DE SUPERVISIN 10,500.00 -
GASTOS DE LIQUIDACIN 6,300.00 -
GASTOS DE EXPEDIENTE TECNICO 8,000.00 -

PRESUPUESTO TOTAL DE OBRA . 128,587.84 0.00


NOGRAMA VALORIZADO DE OBRA

EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

Mes 2 Mes 3
Valorizacion Metrado Valorizacion
mensual Mensual mensual
NOGRAMA VALORIZADO DE OBRA

EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

Mes 2 Mes 3
Valorizacion Metrado Valorizacion
mensual Mensual mensual
NOGRAMA VALORIZADO DE OBRA

EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

Mes 2 Mes 3
Valorizacion Metrado Valorizacion
mensual Mensual mensual
NOGRAMA VALORIZADO DE OBRA

EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

Mes 2 Mes 3
Valorizacion Metrado Valorizacion
mensual Mensual mensual
NOGRAMA VALORIZADO DE OBRA

EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

Mes 2 Mes 3
Valorizacion Metrado Valorizacion
mensual Mensual mensual

- -

- -

0.00% 0.00%

- -
- -
- -
- -

0.00 0.00
CRONOGRAMA DE ADQUISICION DE INSUMOS

OBRA "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA


MES 1 MES 2
NRO. DESCRIPCION UND CANTIDAD PRECIO PARCIAL
CANTIDAD COSTO S/. CANTIDAD COSTO S/.
2.6.2 2 INFRAESTRUCTURA
2.6.2 2.4 3 COSTO POR CONSTRUCCION ADMINISTRACION DIRECTA - PERSONAL 21,488.40
MANO DE OBRA (INCLUIDO LEYES SOCIALES)
1 OPERARIO hh 1,014.78 8.48 8,605.33 - -
2 OFICIAL hh 133.52 7.64 1,020.06 - -
3 PEON hh 1,594.67 6.79 10,827.81 - -
4 OPERADOR DE EQUIPO LIVIANO hh 19.01 7.64 145.20 - -
OPERADOR DE EQUIPO PESADO glb 1.00 890.00 890.00 - -
- - -
2.6.2 2.4 4 COSTO POR CONSTRUCCION ADMINISTRACION DIRECTA - BIENES 35,170.95 - - - -
MATERIALES DE CONSTRUCCION - - - -
1 GASOLINA 84 gal 3.24 15.00 48.59 - -
2 PETROLEO D-2 gal 61.53 15.00 922.93 - -
3 ASFALTO RC-250 gal 1.10 18.00 19.77 - -
4 ALAMBRE NEGRO RECOCIDO N 8 kg 23.57 6.00 141.41 - -
5 ALAMBRE NEGRO RECOCIDO N 16 kg 20.85 6.00 125.08 - -
6 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 446.53 3.50 1,562.84 - -
7 CLAVOS PARA MADERA CON CABEZA 1 1/2" kg 1.32 6.00 7.95 - -
8 CLAVOS PARA MADERA CON CABEZA DE 2" kg 1.60 6.00 9.60 - -
9 CLAVOS PARA MADERA CON CABEZA DE 3" kg 15.55 6.00 93.31 - -
10 CLAVOS PARA MADERA CON CABEZA DE 4" kg 4.84 6.00 29.06 - -
11 CLAVOS PARA CALAMINA kg 3.62 9.00 32.59 - -
12 ABRAZADERA DE FIERRO GALVANIZADO 3" und 3.50 10.00 35.00 - -
13 TUBERIA PVC-SEL ELECTRICA DE 3/4" X 3 m und 10.00 3.00 30.00 - -
14 TUBERIA PVC-SAP C-10 C/R DE 1/2" X 5 m und 4.20 12.00 50.40 - -
15 TUBERIA PVC-SAP C-10 C/R DE 3/4" X 5 m und 10.08 25.00 252.00 - -
16 TUBERIA PVC-SAP C-7.5 DE 3" X 5 m und 2.10 75.00 157.50 - -
17 TUBERIA PVC SAP C-7.5 DE 3" X 5 m CRIBADO m 19.95 20.00 399.00 - -
18 CODO PVC-SAP C/R 1/2" X 90 und 19.00 1.50 28.50 - -
19 CODO PVC SAP DE 3" X 90 und 5.60 35.00 196.00 - -
20 TEE PVC-SAP C/R 1/2" und 9.00 1.50 13.50 - -
21 UNION UNIVERSAL PVC-SAP C/R 1/2" und 6.00 1.50 9.00 - -
22 TUBERIA PVC-SAL 2" X 3 m und 10.50 12.00 126.00 - -
23 TUBERIA PVC-SAL 4" X 3 m und 28.70 25.00 717.50 - -
24 TEE PVC-SAL 4" und 3.00 10.00 30.00 - -
CRONOGRAMA DE ADQUISICION DE INSUMOS

OBRA "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA


MES 1 MES 2
NRO. DESCRIPCION UND CANTIDAD PRECIO PARCIAL
CANTIDAD COSTO S/. CANTIDAD COSTO S/.
2.6.2 2 INFRAESTRUCTURA
25 YEE PVC-SAL 2" und 2.00 7.00 14.00 - -
26 YEE PVC-SAL 4" und 8.00 10.00 80.00 - -
27 YEE PVC SAL 4" x 2" und 4.00 10.00 40.00 - -
28 PIEDRA MEDIANA m3 0.52 35.00 18.20 - -
29 PIEDRA GRANDE DE 8" m3 3.51 35.00 122.85 - -
30 PIEDRA ZARANDEADO DE 3/4" m3 10.12 35.00 354.20 - -
31 ARENA m3 11.18 35.00 391.28 - -
32 ARENA GRUESA m3 2.83 35.00 98.99 - -
33 HORMIGON m3 33.95 35.00 1,188.35 - -
34 MATERIAL GRANULAR PARA SUB-BASE m3 7.94 20.00 158.86 - -
35 AGUA m3 66.88 1.00 66.88 - -
36 GRASS SINTETICO INC. MATERIALES E INSUMOS Y COLOCACION m2 55.66 80.00 4,452.80 - -
37 CERCO METALICO SEGUN DISEO m 16.10 60.00 966.00 - -
38 ARPILLERA PARA CERCO H=1.50 m 21.00 8.00 168.00 - -
39 CEMENTO PORTLAND TIPO IP(42.50KG) bol 191.99 26.00 4,991.63 - -
40 YESO kg 1.15 8.00 9.22 - -
41 FRAGUA bol 4.50 12.00 54.01 - -
42 CODO PVC SAL DE 4" x 90 und 9.00 7.00 63.00 - -
43 CODO PVC SAL DE 2" x 90 und 36.00 5.00 180.00 - -
44 LADRILLO DE 24X15X9 und 1,645.60 1.00 1,645.60 - -
45 PEGAMENTO PARA PVC gal 5.36 35.00 187.44 - -
46 PEGAMENTO CELIMA EN POLVO DE 28 KG. bol 11.75 20.00 235.05 - -
47 CERAMICA CELIMA 0.30X0.30 cm m2 48.26 35.00 1,689.12 - -
48 CERAMICA CELIMA m2 3.00 35.00 105.00 - -
49 MADERA 2"X2"X10'
ROLLIZO DE EUCALIPTO DE 3"X3M m 37.28 5.00 186.38 - -
50 und 4.00 25.00 100.00 - -
51 MADERA COPAYBA DE 2"x 4"x12' und 7.35 35.00 257.25 - -
52 MADERA PARA ENCOFRADOS p2 298.43 3.50 1,044.49 - -
53 TRIPLAY LUPUNA 4 x 8 x 4 mm pln 6.13 25.00 153.18 - -
54 LIJA PARA PARED plg 18.35 3.00 55.06 - -
55 PINTURA LATEX LAVABLE gal 0.85 35.00 29.69 - -
56 PINTURA ACRILICA gal 3.16 62.00 195.98 - -
57 IMPRIMANTE gal 3.38 28.00 94.57 - -
58 PASTA MURAL gal 1.06 28.00 29.69 - -
CRONOGRAMA DE ADQUISICION DE INSUMOS

OBRA "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA


MES 1 MES 2
NRO. DESCRIPCION UND CANTIDAD PRECIO PARCIAL
CANTIDAD COSTO S/. CANTIDAD COSTO S/.
2.6.2 2 INFRAESTRUCTURA
59 BARNIZ gal 1.32 28.00 37.09 - -
60 CINTA AILANTE 3M und 3.00 4.00 12.00 - -
61 CINTA TEFLON und 2.95 3.00 8.84 - -
62 VIDRIO TRANSPARENTE SEMI DOBLE p2 51.52 4.50 231.86 - -
63 SUMIDERO DE BRONCE DE 2" und 9.00 12.00 108.00 - -
64 REGISTRO DE BRONCE DE 4" und 3.00 20.00 60.00 - -
65 LAVATORIO OVALIN GR. STD BLANCO (TREBOLCENTRO) INCLUY und 1.00 280.00 280.00 - -
66 INODORO NACIONAL BABY INTEGRADO CON ACCESORIOS und 6.00 280.00 1,680.00 - -
67 INODORO IMPORTADO KOHLER INCLUYE ACCESORIOS und 1.00 350.00 350.00 - -
68 TUBERIA DE FIERRO GALVANIZADO 1/2" ROCEADOR m 2.00 30.00 60.00 - -
69 VENTANA METALICA V-1 SEGUN DISEO und 2.00 350.00 700.00 - -
70 PUERTA METALICA P-1 SEGUN DISEO und 3.00 400.00 1,200.00 - -
71 VENTANA METALICA V-2 SEGUN DISEO und 3.00 200.00 600.00 - -
72 VENTANA METALICA V-3 SEGUN DISEO und 2.00 250.00 500.00 - -
73 VALVULA COMPUERTA DE BRONCE DE 1/2" und 6.00 20.00 120.00 - -
74 GRIFERIA PARA LAVATORIO DE 1/2" und 6.00 35.00 210.00 - -
75 FOCOS AHORRADORES DE 60 W und 4.00 15.00 60.00 - -
76 INTERRUPTOR TERMOMAGNETICO 2 X32 A X 220 V und 2.00 18.00 36.00 - -
77 INTERRUPTOR SIMPLE und 4.00 7.00 28.00 - -
78 CABLE N 14 AWG m 80.00 1.20 96.00 - -
79 SOCKET PARA ARTEFACTO FOCO und 4.00 5.00 20.00 - -
80 CANALETA METALICA PARA LLUVIA DE 4" INC. ACCESORIOS m 7.46 15.00 111.83 - -
81 REGISTRO DE CONCRETO CON TAPA PARA DESAGUE und 5.00 35.00 175.00 - -
82 TABLERO DE DISTRIBUCION und 1.00 50.00 50.00 - -
83 CABINAS DE SS HH und 6.00 350.00 2,100.00 - -
84 REPUESTOS Y LUBRICANTES glb 1.00 400.00 400.00 - -
85 PLANCHA ZINCADA ONDULADA 0.80X3.60X0.25mm pln 12.07 60.00 724.20 - -
86 HERRAMIENTAS MANUALES %mo 3.00 747.83 747.83 - -

2.6.2 2.4 5 COSTO POR CONSTRUCCION ADMINISTRACION DIRECTA - SERVICIOS 3,828.49 -


EQUIPOS Y OTROS -
1 NIVEL TOPOGRAFICO hm 14.64 10.00 146.41 - -
2 COMPACTADORA VIBRATORIA TIPO PLANCHA 2.5 HP hm 42.41 20.00 848.21 - -
CRONOGRAMA DE ADQUISICION DE INSUMOS

OBRA "MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA


MES 1 MES 2
NRO. DESCRIPCION UND CANTIDAD PRECIO PARCIAL
CANTIDAD COSTO S/. CANTIDAD COSTO S/.
2.6.2 2 INFRAESTRUCTURA
3 CARGADOR FRONTAL CAT-930 hm 3.06 160.00 490.27 - -
4 CAMION VOLQUETE hm 11.06 120.00 1,327.70 - -
5 VIBRADOR DE CONCRETO 4 HP 1.25" hm 7.69 15.00 115.38 - -
6 MEZCLADORA DE CONCRETO 9-11 P3 hm 17.47 25.00 436.65 - -
7 ANDAMIO METALICO est 22.39 10.00 223.87 - -
8 ZARANDA METALICA m 3.00 80.00 240.00 - -

TOTAL COSTO DIRECTO 60,487.84 - - - -

GASTOS GENERALES 71.58% 43,300.00 - - - -

GASTOS DE SUPERVISION 17.36% 10,500.00 - - - -

GASTOS DE LIQUIDACIN 10.42% 6,300.00 - - - -

GASTOS DE EXPEDIENTE TECNICO 13.23% 8,000.00 - - - -

TOTAL GASTOS EN OBRA S/. 0.00 0.00

% FINANCIERO PROGRAMADO 0.00% 0.00%


RAMA DE ADQUISICION DE INSUMOS

L EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

MES 3
CANTIDAD COSTO S/.

-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RAMA DE ADQUISICION DE INSUMOS

L EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

MES 3
CANTIDAD COSTO S/.

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RAMA DE ADQUISICION DE INSUMOS

L EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

MES 3
CANTIDAD COSTO S/.

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
RAMA DE ADQUISICION DE INSUMOS

L EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

MES 3
CANTIDAD COSTO S/.

-
-
-
-
-
-

- -

- -

- -

- -

- -

0.00

0.00%
FLETE TERRESTRE

"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA -
OBRA CHUCUITO - PUNO"

FECHA : AGOSTO DEL 2015 PROV : CHUCUITO DIST PISACOMA


1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTAL


CEMENTO BL. 150.00 42.50 6,375.00
FIERRO, CLAV. ETC KG 551.86 1.00 551.86
MADERA P2 482.22 1.50 723.33
LADRILLO UN 4.50
CALAMINA UN 3.00
YESO BL 25.00
TAPA BUZON UN 130.00
OTROS KG 200.00 1.00 200.00
MAQUINARIA Y EQUIP KG 100.00 1.00 100.00

TAPA DE FIERRO UN 15.00


BOMBA MANUAL UN 120.00

PESO TOTAL 7,950.19 0.63

B-POR VOLUMEN

EN AGREGADOS Y MADERA
DESCRIPC. UNIDAD AFECTOS IGV SIN IGV
ARENA M3 33.64 0.00
PIEDRA M3 1.09 0.00
HORMIGN M3 11.06 0.00
MATERIAL RELLENO M3 23.92 0.00

VOLUMEN TOTAL 45.85 45.85


CAPACIDAD DEL CAMION (M3) 14.00 3.8205376
NUMERO DE VIAJES 3.27
REDONDEO 4.00

EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.


CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJES Volumen / tubo
Tub, 1/2" 5,050.00 U 5.98 1.20 0.00 0.00175 0.00
Tub, 3/4" 4,200.00 U 0.00314
Tub, 1" 3,360.00 U 6.00 1.20 0.00 0.00493 0.01
Tub,1 1/2" 1,690.00 U 1,256.56 251.31 0.15 0.01063 2.67
Tub 2:" 994.00 U 859.70 171.94 0.17 0.01729 2.97
Tub, 3" 470.00 U 733.69 146.74 0.31 0.03545 5.20
Tub 4": 259.00 U 0.06006
Tub 6:" U-PVC 110.00 U 0.14450
Tub 8" U-PVC 65.00 U 0.24200
Tub 6'; CSN 160.00 U 0.00440
Tub 8'; CSN 80.00 U 0.09380
NUMERO TOTAL DE VIAJES 0.63
REDONDEO 1.00
TUBERIA EN VOLUMEN 11 9.90

2- FLETE TERRESTRE

UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 12.00 CAPACIDAD DEL CAMION ( M3 ) 12.00
COSTO POR VIAJE S/. 400.00 COSTO POR VIAJE S/. 300.00
CAPACIDAD DEL CAMION (KG) 5,000.00 CAPACIDAD DEL CAMION (KG) 0.00
FLETE POR KG 0.0800
7,950.27
AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por peso
FLETE POR PESO 636.02 3,144.58 FLETE POR VOLUMEN=No viajes*costo por viaje
FLETE POR VOLUMEN
AGREGADOS 1,200.00
TUBERIA 400.00
COSTO TOTAL FLETE TERR. 1,036.02 4,344.58

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV


FLETE TERRESTRE 1,036.02 4,344.58
FLETE FLUVIAL
FLETE EN ACEMILA
FLETES TOTALES S/. 1,036.02 4,344.58 5,380.59
A, DISTRITO DE PISACOMA -

Peso/tubo Peso en Kg
0.50 0.60
0.75
1.00 1.20
1.75 439.80
2.68 460.80
6.41 940.59
10.60
15.53
26.17
50.00
100.00
1,842.98
COSTO HORA HOMBRE
PROYECTO
"MEJORAMIENTO Y AMPLIACION DEL LOCAL MUNICIPAL EN EL CENTRO POBLADO DE TANIRI CIRCA CHINGA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"

Cargo Remuneraciones C.T.S. Monto


Obligaciones del Empleador
S.C.T.R
Vacacione
Aguinal Prest. .S.
s truncas
do Salud (1.53%
Clasificado Rem. Diaria B.C.C (6%) Rem mensual B.C.C. (6%) (9%) )
Operador de Equipo Pesado 3.00 4.17 0.25 4.42 5.17 0.88
Operario 50.00 3.00 4.17 0.25 4.42 5.17 0.88
Oficial 45.00 2.70 3.75 0.23 3.98 4.65 0.79
Peon 40.00 2.40 3.33 0.20 3.53 4.13 0.70
B.C.C. Bonificacion por Construccin Civil
S.C.T.R.S. Seguro Com. Trabajador Riesgo Sal.

Cargo Remuneraciones C.T.S. Monto


Obligaciones del Empleador
Vacacione
Aguinal
Clasificado Rem. Hora B.C.C (6%) Rem mensual B.C.C. (6%) s truncas Prest. Sa S.C.T.R.
do
Operador de Equipo Pesado 6.25 0.38 0.52 0.03 0.55 0.00 0.65 0.11
Operario 6.25 0.38 0.52 0.03 0.55 0.00 0.65 0.11
Oficial 5.63 0.34 0.47 0.03 0.50 0.00 0.58 0.10
Peon 5.00 0.30 0.42 0.03 0.44 0.00 0.52 0.09

Clasificador 10 11 13 18
Cargo Retribucion y Obligaciones Gastos VariablesGratificaciones
Clasificado Complemento Empleador y Ocasionales y Aguinaldos FIRM
Operador de Equipo Pesado 6.63 0.76 1.10 0.00
Operario 6.63 0.76 1.10 0.00 5.14
Oficial 5.96 0.68 0.99 0.00 4.81
Peon 5.30 0.60 0.88 0.00 4.3
Mostrar
Mostrar
GA, DISTRITO DE PISACOMA - CHUCUITO - PUNO"
Mostrar

TOTAL Mostrar
HH

DIARIO X
67.88 8.48 Mostrar
67.88 8.48 Mostrar
61.09 7.64 Mostrar
54.30 6.79 Mostrar
Mostrar
Mostrar
Mostrar
X
HH
X
8.48 Mostrar
8.48 Mostrar
7.64 Mostrar
6.79 Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar

Вам также может понравиться