Project management Croatia

In order to prepare, design and use of hydro-technical systems and structures that
make them the knowledge of appropriate properties Society (element man in the
systematic presentation of the relationship man - water, Figure 1), the nature of the
existing and planned projects (artificial nature - part of which has been or is expected
to be achieved by human activities). These skills are the starting point or the
substrate to achieve the hydraulic structures. The starting points or pads preferably
made available and accessible materials, processed and stored in different offices
and institutions. For example, basic information about the company and the state of
the company are located in the Department of Statistics. The Geodetic Administration
is all basic cartographic material about Croatia.
Basic meteorological and hydrological data are located in the State
Hydrometeorological Institute Croatian (MHS), and data about the sea in the Croatian
Hydrographic Institute. Cadastre of geological, hydrogeological and similar studies is
in the Geological Institute. Available and accessible materials are generally for
specific procedures are sufficient, and in a first step carried out additional processing
and studies (Rating available and accessible substrate). It is usually required and the
next step (for major surgery is that step usually required), which on the basis of the
program, which makes the designer, conducted additional research in nature,
laboratory and modeling (mathematical and physical models). What is the procedure
more complicated and preparing the surface is more complex, requires a greater
range of research, investigations are complex, and it takes more time and resources.
Such detailed substrates (and those with the most HG) must be ordered separately,
with a significant payment, for which the project management Croatia designer
should make the program design of existing data or research program of the missing
data. Any intervention in nature, including hydraulic structures, can only be carried
out in accordance with the physical planning documents, and these documents
constitute one of the main substrate. In doing so, these documents can change over
time and adapt to new knowledge and needs.
In the process of preparing the construction and start using it is important to point out
three basic steps in which the competent institutions outcomes specific permission.
Location permit, laying down the conditions under which the permits execution
procedure.
As one of the basis for the issuance of building permits made the preliminary design
of the planned project, and carried out an environmental impact assessment. Part of
the location permit and the water management policies.
Building permit, which is issued on the basis of the main project, confirming that the
decision made in accordance with the building permit and that it can access the
building.
An integral part of the water management and approval. Operation permit is issued
after the complete construction and operation of fitness for use, and before arrival. It
is determined that the operation is performed as in the construction permit and that is
suitable for use.