CALCULATION OF SIZE OF SEPTIC TANK

Population = 629 Souls


Total Domestic Water Demand = 200 LPM 160 240
50000 Ltr / Day 12000
4.166667
1 FOR SEDIMENTATION

Surface area of tank at 0.92 m2 / 10 lpm peak flow rate


= 18.4 m2
Assuming Depth = 0.3 m
Volume = 5.52 m3

2 FOR SLUDGE DIGESTION

Capacity required for sludge digestion at 0.032 m3 / capita

The volume of sludge deposited


= 20.128 m3

3 FOR SLUDGE STORAGE

Assuming cleaning once in 1 year,


Volume required for digested sludge at
= 0.0002 m3/capita/day (clause:Sec 6.13.3.2, SP35)
Volume required = 45.917 m3

4 FOR SEED SLUDGE

Increase the volume by 10 percent to provide for seed sludge


= 4.5917 m3

5 FREE BOARD

Assuming a free board of 30cm


= 5.52 m3

Total Capacity and Dimension

Total Capacity of tank = 81.6767 m3

Area of Tank = 18.4 m2


total Depth of tank = 4.438951
CALCULATION OF SIZE OF SOCK PIT

Total Waste water generation per day


= #REF! Ltr/d
= #REF! m3/d
Percolation Rate = 3 min.
Max. rate of effluent application 2040
Q = 204 / sqrt(t)
Q = 117.7795
ec 6.13.3.2, SP35)
CALCULATION OF SIZE OF SEPTIC TANK

Population = 629 Souls


Total Domestic Water Demand = 43480 Ltr / Day
43.48 m3 / Day

1 CAPACITY OF SEWAGE

Assuming that 80% of water supplied become sewage,


The quantity of sewage produced
= 34.78 m3/day

Detention period varies between 12 to 36 hours


Assuming the detention time to be 24 hours
The quantity of sewage produced dering detention period
= 34.78 m3

2 CAPACITY OF SLUDGE

Assuming the rate of deposited sludge as 0.032 m3/capita/year


& assuming the period of cleaning as 1/2 (6 month) year

The volume of sludge deposited


= 10.064 m3

3 CAPACITY OF DIGESTED SLUDGE

Volume required by digested sludge


= 0.0002 m3/capita/day (clause:Sec 6.13.3.2, SP35)
Volume required = 45.917 m3/capita/day

4 TOTAL REQUIRED CAPACITY OF SEPTIK TANK

Total required capacity of tank


= Capacity of sewage + Capacity of sludge + Capacity of digested sludge
= 90.765 m3

Assume Depth of Septic Tank D = 1.8 Mtr.


W = 4.099797 = 4.1 Mtr.
L = 12.29939 = 12.3 Mtr.

CALCULATION OF SIZE OF SOCK PIT

Total Waste water generation per day


= 34.78 m3/d
34784
Percolation Rate = 1 min.
Max. rate of effluent application
Q = 204 / sqrt(t)
Q = 204 ltr/m2/day

Area of Trench required 3.14 x dia x depth


= 170.5 ltr
= 0.2 m2
Assume Depth (Liquid depth)
= 3.5 mtr
Diameter of Sock pit = 15.5 mtr
ec 6.13.3.2, SP35)

Capacity of digested sludge


DESIGN OF SEPTIC TANK

Population 743 Souls


Total Water Demand 50000 LPD
50.00 m3/d
Sewage Generation Factor 0.80
Waste Water Generation per day 40 m3/d
1.67 m3/hr

Volume of Tank
Assuming Detention Period 24 hrs
Quantity of sewage generation during D.T. Period 40.00 m3/d
Assuming Cleaning period at every 1 year
Space for sludge deposited 30 ltr/capita/year
Volume of sludge 22290 litre
22.29 m3

Volume required by digested sludge 0.0002 m3/capita/D


Population 743 Capita
Volume Required 54.24 m3

Total volume required of the tank 116.53 m3

Dimension of tank
Assuming Depth of tank 1.8 m
Surface area of Tank 64.74 m2
Assuming Length & Width ratio 3 :'1
Therefore, For Width (b x 3) 4.65
So, Width of the Tank 4.60 m
Length of the tank 13.8 m
say 13.8 m

Size of septic tank 8.70m Length x 2.90m Width x 1.80m Depth

DESIGN OF SOCK PIT

Total Waste water generation per day 40.00 m3/d

Percolation Rate 3 min


180 cm/ min
1.8 m/min
Max.Rate of effluent application Q = 204 / sqrt(t) 152.05 l/d/m2

Area of Trench required 3.14 x dia x depth 263.0668 m2


Assume Depth (Liquid depth) 1.5 m
Total Depth ( Liquid Depth + Last Manhole invert Lvl) 2.45 m
Diameter of Sock pit 55.85283 m
say 2.50 m
(clause:Sec 6.13.3.2, SP35)

(as per soil test report)


PROJECT - IT BUILDING AT NAVI MUMBAI(C-6)
DOCUMENT - WATER DEMAND

TOTAL
BASE WATER
SR. AREA AREA LOAD WATER
LOCATIONS OCCUPANCY DEMAND IN
NO. (SQ.MTR.) (SQ.FT.) FACTOR DEMAND
L/C/D
IN L/D

TYPICAL FLOOR ( 1 TO 9 FLOOR )

1 OFFICE AREA 325.0 3497.0 50 70 45 3147.3


SUB TOTAL 325.0 3497.0 70 3147.3
TOTAL( 1 TO 9 FLOOR) 2925.0 31473.0 629 28325.7

10TH FLOOR

1 FOOD COURT 325.0 3497.0 50 70 70 4895.8


SUB TOTAL 325.0 3497.0 70 4895.8

GROUND FLOOR

1 BANKING ZONE 62.0 667.1 50 13 45 600.4


2 A/C WAITING LOUNGE 40.0 430.4 50 9 45 387.4
3 FOYAR 102.0 1097.5 50 22 45 987.8
SUB TOTAL 204.0 2195.0 50 44 45 1975.5

GRAND TOTAL 743 35197.0

DRINKING WATER DEMAND 743 5 3717


SAY 4000
DOMESTIC WATER DEMAND 35197
(+) 15 % FLOTING DEMAND 5280
TOTAL DOMESTIC WATER DEMAND 44477
SAY 45000
MAKE UP WATER DEMAND FOR AIR
CONDITIONING SAY 50000

FIRE WATER DEMAND SAY 200000

TOTAL WATER DEMAND 295000


TOTAL SEWAGE GENERATION (@ 80%) 36000