BLASTING AND PAINTING REPORT

BLASTING AND PAINTING REPORT

REPORT NO : SSB-QCDP-106-01 DATE :


WORKPACK NO : SSB-QCDP-106 LOCATION : TRAIN-3
WORKORDER NO : PAINT MANUFACTURER : JOTHUN
SPECIFICATION : EC-CP-21 ISSUE2
SYSTEM NO. : SYSTEM-1
SURFACE PREAPARATION :

METHOD: Blast Clean Solvent Clean METHOD: Accept Reject


Power Tool Hand Tool SA 3 SA 2.5
Garnet Emery Paper ST 3 ST 2

PAINT/COATING APPLICATION METHOD: SURFACE PROFILE:

Airless Spray Brush


Conventional Spray Roller PROFILE 50-75 AVERAGE MICRONS
AMBIENT CONDITION / RELATIVE HUMIDITY
TIME AIR TEMP WET SURF TEMP DEW POINT RH % DATE ACCEPT REJECT
TEMP () (X)
PLEASE REFER TO THE ATTACHMENT 1 of 1
WORK ORDER ITEMS:
ITEM DESCRIPTION BLAST/PRIME MID COAT FINAL COAT OTHERS
NO.

PAINT:
PRIMER INTERMEDIATE FINAL OTHER REMARKS
TYPE
BATCH No.
HARDENER No.
MEAN AVERAGE AVERAGE AVERAGE
DFT VALUE MICRON MICRON MICRON
The above blasting and painting has been carried out in accordance with BLNG/RES Specifications
INSPECTED BY : REVEIWED BY :

SIGNATURE & DATE : SIGNATURE & DATE :

NAME : NAME :
WEEKLY AMBIENT CONDITION REPORT
WEEKLY AMBIENT CONDITION REPORT

NO. DATE TIME DRY BULB WET BULB SUBSTRATE DEW POINT RELATIVE
24 HRS C C TEMPERATURE C HUMIDITY %
C

PREPARED BY: ATTACHMENT : of