The document is a rate analysis from KITCO LTD for construction of a 500TPD cattle feed factory in Thodupuzha. It provides unit rates for various construction items including:
1) Precast cement concrete string courses at Rs. 8,551/cum.
2) Machine batched M25 grade concrete at plinth level at Rs. 7,905.83/cum.
3) Providing and fixing 63mm PVC pipes as weep holes at Rs. 113.88/m.
4) Providing grooves on plastered surfaces at Rs. 20.24/m.
The document is a rate analysis from KITCO LTD for construction of a 500TPD cattle feed factory in Thodupuzha. It provides unit rates for various construction items including:
1) Precast cement concrete string courses at Rs. 8,551/cum.
2) Machine batched M25 grade concrete at plinth level at Rs. 7,905.83/cum.
3) Providing and fixing 63mm PVC pipes as weep holes at Rs. 113.88/m.
4) Providing grooves on plastered surfaces at Rs. 20.24/m.
The document is a rate analysis from KITCO LTD for construction of a 500TPD cattle feed factory in Thodupuzha. It provides unit rates for various construction items including:
1) Precast cement concrete string courses at Rs. 8,551/cum.
2) Machine batched M25 grade concrete at plinth level at Rs. 7,905.83/cum.
3) Providing and fixing 63mm PVC pipes as weep holes at Rs. 113.88/m.
4) Providing grooves on plastered surfaces at Rs. 20.24/m.
CONSTRUCTION OF 500TPD CATTLE FEED FACTORY AT THODUPUZHA
EXTRA ITEM RATE ANALYSIS BASED ON DSR 2013
SL.No. Code Description Unit Quantity Rate Amount Remarks
DEVIATED ITEM
DI 01 Providing ,hoisting and fixing upto floor five
level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, slabs,brackets etc. including hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required centering, shuttering and finishing smooth with 6mm thick cement plaster 1:3 (1 Cement : 3 fine sand) on exposed surfaces complete.but excluding the cost of reinforcement
with design mix M-25 grade cement
concrete for reinforced cement concrete using cement content as per approved design mix including pumping of concrete to site of laying cum Quoted rate as per Item # 28.01 for Precast slab Concrete with 1:2:4 cum 1.00 8200.00 8200.00 A) 1:2:4 changed to M25 design mix Additional quantity of cement for 1:2:4 = Rate of cement as per 319kg & M25 = 360kg kg 41.00 5.24 214.84 DSR 2013 Total Add 1% for water charges 2.15 Total 216.99 Add 15% for contractor's profit and overheads 32.55 Total 249.54 Add TE @ 40.66% for this item DSR item rate for Item 101.46 # 28.01 = 5829.65/cum Cost of cement 1cum 351.00 B) Cost of 1cum (A+B) 8551.00
Say Rs. 8551.00 \cum
DI 02 Providing and laying in position machine batched, machine mixed and machine vibrated design mix M-25 grade cement concrete for reinforced cement concrete using cement content as per approved design mix including pumping of concrete to site of laying but, excluding the cost of centering, shuttering, finishing and reinforcement including admixtures in recommended proportion (as per IS 9103) to accelerate,retard setting of concrete to improve workability without impairing strength and durability as per direction of Engineer-in-Charge. Minimum cement content considered in this item is @ 330 kg/cum
All Work upto plinth level cum
Quoted rate as per Item # 25.01 for Precast slab Concrete with 1:2:4 cum 1.00 8000.00 8000.00 A) M25 design mix changed to 1:2:4 Deduct quantity of cement for 1:2:4 = Rate of cement as per 319kg & M25 = 330kg kg -11.00 5.24 -57.64 DSR 2013 Total Add 1% for water charges -0.58 Total -58.22 Add 15% for contractor's profit and overheads -8.73 Total -66.95 Add TE @ 40.24% for this item DSR item rate for Item -27.22 # 25.01 = 5704.45/cum Cost of cement 1cum -94.17 B) Cost of 1cum (A+B) 7905.83
Say Rs. 7905.83 \cum
EXTRA ITEM
EI 01 Providing and fixing 63mm pvc pipes in RR
masonry work as wheap holes . the rate is including Supplying Cutting and Fixing at all levels including tools and tack eels etc. m Observed Data Details of cost for one 1 x 0.20 x 0.15 = 0.03 cum. MATERIAL: MR 63mm (4 kg) m 1.00 52.00 52.00 Bill not submitted 5% Wastage 2.60 LABOUR: Plumber day 0.05 471.00 23.55 Coolie day 0.05 397.98 19.90 Total 98.05 Add for water charges @ 1% 0.98 Total 99.03 Add 15 % CP & OH 14.85 Total 113.88 Say Rs. 113.88 \m
EI 02 Providing grooves on the plastered surface
to lines and levels including all cost of labour materials and scaffolding charges etc complete. m Observed Data Details for 10m Mason day 0.30 373.75 112.13 Man day 0.23 276.00 62.10 Total 174.23 Add for water charges @ 1% 1.74 Total 175.97 Add 15 % CP 26.40 Cost of 10m 202.36 Cost of 1m 20.24