TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C 18.65 18.367 16 100 Nil 100 29.3 84.7 44.5 0.98770 99 0.248 99 0.12551
2C 9.24 8.978 3,193 20,086 18.074 17.816 26.711 168 19,918 29.2 84.6 44.6 0.98773 19,674 49.184 19,624 0.12544
3C 14.47 14.207 1,460 9,185 Nil 9,185 29.3 84.7 44.6 0.98768 9,072 22.680 9,049 0.12544
4C 17.98 17.714 71 445 Nil 445 29.2 84.6 44.6 0.98773 439 1.098 438 0.12544
5C 17.93 17.658 102 641 Nil 641 29.0 84.2 44.6 0.98793 633 1.584 632 0.12544
6C 15.83 15.572 917 5,766 Nil 5,766 29.0 84.2 44.6 0.98793 5,697 14.24 5,682 0.12544
7C 3.80 3.544 5,780 36,353 Nil 36,353 29.6 85.3 44.5 0.98740 35,895 89.737 35,805 0.12551
8C 10.30 10.038 2,803 17,630 18.347 18.089 19 122 17,508 29.1 84.4 44.6 0.98783 17,295 43.237 17,252 0.12544
SL.P 16.05 15.761 79 495 16.141 15.851 75.827 477 18 29.0 84.2 44.6 0.98793 18 0.045 18 0.12544
SL.S 16.67 16.366 57 359 Nil 359 28.8 83.8 44.6 0.98813 354 0.886 354 0.12544
TOTAL
TOTAL 14,477 91,061 122 767 90,294 89,176 88,953
REMARKS: 899 46 854 851 849
PRODUCTION LOADING IN TO 2C
Gross Volume :(T.O.V.) 91,061 Oil Volume @ 60 F :(N.S.V.) 88,953 DRAFT FWD 7.20 m AFT
Less Free Water : 767 Less OBQ/ROB :
Oil Volume :(G.O.V.) 90,294 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 89,176 Long tons/Metric tons :
Long Tons/Metric Tons : 11,189 11,368 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 4-Mar-17
11,189 11,368
Staff
Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bah
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
TO COT 2C
19583 / 88576
e Vessel
Comment
anifold
DSS equipment
gency machinery
tainer at laydown
ld
m
ss deck
t. activity
crew
PKK
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
NIL
Bunkering/Debunkering :
NIL
Personnel & Material Transfer :
05.30: 1 Person Mafhindo, 1 Persons Spektra, 23 Persons Pkp by. KST.51 ( Out )
10.00: 1 Santos rep by. KST.51 ( Out )
17.00: 1 Person Spektra, 2 Persons Pkp by. KST.51 ( In )
21.45: 1 Person Mafhindo, 21 Persons Pkp by. KST.51 ( In )
1.2 Planned/Unplanned Maintenance
DECK :
1. Assisted transfer santos rep and contractor personel
2. Maintenance pipe reducer at port manifold
3. Weekly tested LSA, FFA and Nav/GMDSS equipment
4. Collected garbage into garbage container at laydown
5. Marked passage way at port manifold
6. Cleaned fresh water tank at compass deck
ENGINE :
1. Weekly tested safety device and emergency machinery
2. House keeping and collected garbage from engine room into garbage container at laydown
3. Cleaned high sea chest strainer
4. Cleaned of condenser sea water side tubes for AC accommodation
5. Workplace inspection in engine room
6. Warm up aux.boiler
7. Running up A/E No. 1 & 3 :
11.18 - 12.18: - Warm up aux.boiler
9. EHS AUDIT/INSPECTION
TOTAL
3820
3818
TRANS ROB
0 225,862
0 79,634
ROB `
85
185
ROB
200
POB
46
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
NIL
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 225,862 0 0 0 0 225,862
02 225,862 0 0 0 0 225,862
03 225,862 0 0 0 0 225,862
04 225,862 0 0 0 0 225,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Averag
e/Day 4,970 4,973 642 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
TOTAL 87 1 98 186
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 4/Mar/17
Action/Comme Positive /
Reported by Rank Location Description Total
nt Negative
2 ANDI AHMAD UNIT 2/O Bridge Weekly tested Nav/GMDSS equipment Done Positive 1
3 IHSANUDIN 3/O On deck Weekly tested LSA and FFA equipment Done Positive 1
7 LILIK WAHYUWANTO 4/E Engine room Cleaned high sea chest strainer Done Positive 1
9 A AFANDI Bosun Main deck Marked passage way at port manifold Done Positive 1
10 MIFTAKHUL ARKHAM AB Main deck Maintenance pipe reducer at port manifold Done Positive 1
12 MOHAMMAD ANSORI AB Main deck Maintenance pipe reducer at port manifold Done Positive 1
13 ANTONY OS Compass deck Cleaned fresh water tank at compass deck Done Positive 1
14 SYAEFUL IMAM FTR Engine room Collected garbage engine room Done Positive 1
15 NUR ALI MTM Engine room Cleaned of A/E floor Done Positive 1
20 RANGGUN JAWI STWD Laydown Collected garbage into garbage container Done Positive 1
21 HARIANTO SULE TANAN STWD Laydown Collected garbage into garbage container Done Positive 1
TOTAL 21