Вы находитесь на странице: 1из 1

QMIS: RFI Data Entry

User1 : SAMUEL | Role : Contractor QC |


Change Password
|
Change Role
| Logout


RFI Entered Successfully Quality Record No = NDE-51

RFI #348
Project:
10-01277-6892-611 Contractor: :Saudi KAD

JO/WBS:: Sub System ID..

. **Eng. Index:NDE

Saudi Aramco TIP No.
. SAIC No.:
.

SATIP Title:
.

SAIC Title:
.

Project Phase:
. Discipline:
Mechanical


Scheduled Insp. Date:
4/12/2017 Scheduled Insp. Time:
10:00:00 AM

Contractor Inspection Level:
. Aramco Inspection Level:.


Equipment ID.:
.NON DESTRUCTIVE TESTING(NDT)


Layout Drawing No.:
.VARIOUS Layout Drawing Rev. No:.

Purchase Order No.:
. Saudi Aramco Activity No.:.3.1-a


Location Description:
FIELD


NON DESTRUCTIVE TESTING(NDT) REQUESTED (SATIP-NDE-RT-01),(SATR-NDE-2011), ( ACTIVITY NUMBER

RFI Description:
3.1-a), QATIF# 546,725 (QC: JAMAL)

Exceptions:
.

SAPID Primary Rep's Email To:KHANMN0H

SAPMT Primary Engineer Email To:asadah

SAPMT Secondary Engineer Email To:asadah

Contractor QC Primary Email To:SAMUEL

Contractor QC Secondary Email To:SAMUEL


SAIR : OTAIMS1E


Back

For Further Assistance Please Call :


Ijaz Ahmed - 880 1409 / Mohammad Ahmed- 880 1578
Inspection Department Quality Management Information System Website- Version 4.0. RFI Process
|| Surveillance Process || QMIS Manual
Designed & Developed by Inspection Department.

QMIS RFI Data Entry_348 asp RT-50.htm[4/12/2017 9:42:19 AM]

Вам также может понравиться