Вы находитесь на странице: 1из 304

GOBERNACIN DE CUNDINAMARCA

LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)


PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.911.165 1.928.700 1.945.263 1.929.675 1.933.572 1.942.340 1.923.830
1,2 CAMPAMENTO 9 M2 UN 1.113.668 1.122.436 1.130.717 1.122.923 1.124.872 1.129.256 1.120.001
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.436 13.436 13.436 13.436 13.436 13.436 13.436
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.063 15.063 15.063 15.063 15.063 15.063 15.063
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.416 17.416 17.416 17.416 17.416 17.416 17.416
1,6 CERCA EN TABLA H=2.30 M ML 62.664 62.664 62.664 62.664 62.664 62.664 62.664
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 44.098 44.294 44.479 44.305 44.348 44.447 44.239
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.465 20.661 20.846 20.672 20.716 20.814 20.607
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 862.844 864.806 868.947 865.611 865.649 868.819 864.261
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.017 10.017 10.017 10.017 10.017 10.017 10.017
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.582 3.582 3.582 3.582 3.582 3.582 3.582
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.565.679 2.565.679 2.565.679 2.565.679 2.565.679 2.565.679 2.565.679
1,44 RED TELEFNICA PROVISIONAL UN 237.171 237.171 237.171 237.171 237.171 237.171 237.171
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
2 CIMIENTOS CONSTRUCCIN
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 73.556 73.556 103.307 82.611 82.611 103.307 73.556
2,2 BASE ARENA CEMENTO 1:20 M3 191.199 207.443 222.783 208.344 211.954 220.076 202.930
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.139 21.139 21.139 21.139 21.139 21.139 21.139
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 615.880 634.968 652.998 636.029 640.271 649.816 629.667
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 619.110 639.143 658.063 640.256 644.708 654.724 633.579
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 576.598 595.357 613.073 596.399 600.567 609.947 590.147
2,9 PILOTE DE MADERA D=20 CM ML 47.786 47.786 47.786 47.786 47.786 47.786 47.786
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2,10 ML 147.250 147.250 147.250 147.250 147.250 147.250 147.250
DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2,11 ML 183.562 183.562 183.562 183.562 183.562 183.562 183.562
DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2,12 ML 227.474 227.474 227.474 227.474 227.474 227.474 227.474
DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2,13 ML 286.587 286.587 286.587 286.587 286.587 286.587 286.587
DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 101.052 102.441 103.754 102.519 102.827 103.522 102.055
2,15 PILOTE HINCADO 30X30 ML 124.765 126.779 128.682 126.891 127.339 128.346 126.220
2,16 DADOS EN CONCRETO 3500PSI M3 563.238 581.996 599.712 583.038 587.207 596.586 576.786
2,17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 88.028 88.028 88.028 88.028 88.028 88.028 88.028

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 36.572 36.673 36.768 36.678 36.701 36.751 36.645
3,2 SIFN EN PVC 6" UN 189.332 189.433 189.528 189.438 189.461 189.511 189.405
3,3 CAJA DE INSPECCIN DE 100X100 UN 441.252 449.657 476.590 455.905 454.470 476.841 447.322
3,4 CAJA DE INSPECCIN DE 40X40 UN 216.933 219.549 223.623 220.182 220.485 223.326 218.823
3,5 CAJA DE INSPECCIN DE 60X60 UN 248.908 253.305 259.974 254.315 254.854 259.461 252.083
3,6 CAJA DE INSPECCIN DE 80X80 UN 329.143 336.620 346.200 337.802 339.026 345.173 334.543
3,7 DUCTO ELCTRICO PVC 4" ML 99.211 99.211 99.439 99.280 99.240 99.459 99.211
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.226.701 1.226.701 1.228.989 1.227.397 1.226.999 1.229.188 1.226.701
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 110.195 111.309 112.362 111.371 111.619 112.177 111.000
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 69.598 70.186 70.742 70.219 70.350 70.644 70.023
3,11 TUBERA DRENAJE PVC 110 ML 26.496 26.790 27.067 26.806 26.871 27.018 26.708
3,12 TUBERA DRENAJE PVC 160 ML 42.761 43.055 43.332 43.071 43.136 43.283 42.973
3,13 TUBERA DRENAJE PVC 200 ML 56.121 56.533 56.921 56.555 56.647 56.852 56.418
3,14 TUBERA DRENAJE PVC 250 ML 76.860 77.330 77.774 77.356 77.460 77.695 77.199
3,15 TUBERA DRENAJE PVC 315 ML 106.437 106.848 107.237 106.871 106.963 107.168 106.734
3,16 SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 913.655 918.355 922.795 918.617 919.661 922.011 917.050
3,17 SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1.291.211 1.300.611 1.309.490 1.301.134 1.303.222 1.307.922 1.298.001
3,18 SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1.680.435 1.699.235 1.716.992 1.700.280 1.704.457 1.713.857 1.694.014

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 40.311 40.311 40.311 40.311 40.311 40.311 40.311
4,2 CASETN DE LONA 0.80X0.70 M2 53.241 53.241 53.241 53.241 53.241 53.241 53.241
4,3 COLUMNAS 3500 PSI M3 772.804 791.562 809.278 792.604 796.773 806.152 786.352
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 253.049 273.577 294.660 275.948 277.492 292.145 269.245
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4,5 M2 94.466 96.287 98.007 96.389 96.793 97.704 95.782
CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4,6 M2 111.439 113.625 115.689 113.746 114.232 115.325 113.018
CONCRETO DE 3500 PSI
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 124.270 127.184 129.936 127.346 127.993 129.450 126.375
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 131.125 134.221 137.145 134.393 135.081 136.629 133.362
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 150.331 154.156 157.768 154.368 155.218 157.130 153.093
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 167.242 171.613 175.741 171.856 172.827 175.012 170.399
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) CONSTRUCCIN 185.621
M2 190.538 195.182 190.811 191.904 194.362 189.172
4,12 ENTREPISO VIGUETA PLACA M2 95.221 95.561 95.883 95.580 95.656 95.826 95.467
4,13 ESCALERA MACIZA 3500 PSI M3 913.753 932.512 950.228 933.554 937.722 947.102 927.302
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 91.399 91.708 92.001 91.726 91.794 91.949 91.622
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 76.244 78.120 79.892 78.225 78.641 79.579 77.599
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 85.793 88.088 90.255 88.215 88.725 89.873 87.451
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 100.038 102.916 105.633 103.076 103.715 105.154 102.117
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 676.592 695.351 713.067 696.393 700.562 709.941 690.141
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 47.134 47.722 48.277 47.755 47.885 48.179 47.559
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 270.792 279.169 287.081 279.635 281.496 285.685 276.843
4,21 ACERO FIGURADO 37000 PSI KG 4.005 4.005 4.005 4.005 4.005 4.005 4.005
4,22 ACERO FIGURADO 60000 PSI KG 4.200 4.200 4.200 4.200 4.200 4.200 4.200
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.877 5.877 5.877 5.877 5.877 5.877 5.877
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 815.695 834.454 852.170 835.496 839.664 849.043 829.244
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 744.876 765.399 784.783 766.540 771.101 781.363 759.699
4,26 VIGA AREA 3500 PSI M3 811.457 830.215 847.931 831.258 835.426 844.805 825.005
4,27 VIGA CINTA 3500 PSI M3 792.501 811.260 828.976 812.302 816.470 825.850 806.050
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 991.409 1.010.168 1.027.884 1.011.210 1.015.379 1.024.758 1.004.958
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 308.901 328.969 347.925 330.085 334.545 344.579 323.396

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 28.371 28.864 29.330 28.891 29.001 29.247 28.727
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 47.633 48.126 48.592 48.154 48.263 48.509 47.989
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.363 33.464 33.559 33.470 33.492 33.542 33.436
5,4 ARCOS EN LADRILLO PRENSADO ML 156.109 156.311 156.501 156.322 156.367 156.468 156.255
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 42.206 42.794 43.349 42.826 42.957 43.251 42.630
5,6 DINTELES EN BLOQUE 0.15 M ML 26.229 26.538 26.831 26.556 26.624 26.779 26.453
5,7 ENCHAPES LADRILLO PRENSADO M2 94.867 95.270 95.652 95.293 95.383 95.584 95.158
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 87.478 89.438 91.289 89.546 89.982 90.962 88.893
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 87.270 87.270 87.270 87.270 87.270 87.270 87.270
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.117 51.117 51.117 51.117 51.117 51.117 51.117
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 84.033 84.033 84.033 84.033 84.033 84.033 84.033
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 49.498 49.498 49.498 49.498 49.498 49.498 49.498
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 97.525 97.525 97.525 97.525 97.525 97.525 97.525
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 57.493 57.493 57.493 57.493 57.493 57.493 57.493
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 108.513 108.513 108.513 108.513 108.513 108.513 108.513
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 62.986 62.986 62.986 62.986 62.986 62.986 62.986
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 38.921 39.124 39.316 39.135 39.181 39.282 39.068
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.534 23.636 23.731 23.641 23.664 23.714 23.607
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 50.762 50.897 51.024 50.904 50.934 51.002 50.859
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 30.460 30.528 30.592 30.532 30.547 30.581 30.509
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 57.094 57.229 57.357 57.237 57.267 57.335 57.192
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.263 34.330 34.394 34.334 34.349 34.383 34.311
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 94.942 95.618 96.256 95.656 95.806 96.144 95.430
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 56.044 56.382 56.701 56.401 56.476 56.645 56.288
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 35.650 35.785 35.913 35.793 35.823 35.891 35.748
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.584 21.652 21.716 21.655 21.671 21.704 21.633
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 70.992 71.262 71.517 71.277 71.337 71.472 71.187
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 42.730 42.865 42.993 42.873 42.903 42.970 42.828
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 84.637 84.946 85.238 84.963 85.032 85.187 84.860
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 51.136 51.291 51.437 51.300 51.334 51.411 51.248
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 174.394 175.340 176.234 175.392 175.603 176.076 175.077
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 104.566 105.039 105.486 105.065 105.170 105.407 104.908
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 87.078 87.723 88.332 87.759 87.902 88.225 87.544
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) CONSTRUCCIN
ML 52.357 52.680 52.984 52.698 52.769 52.931 52.590
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 44.904 45.206 45.492 45.223 45.290 45.442 45.122
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.266 27.418 27.561 27.426 27.460 27.535 27.376
5,37 MURO TOLETE COMN 0.06 M M2 32.284 32.419 32.547 32.427 32.457 32.525 32.382
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.641 19.709 19.773 19.713 19.728 19.762 19.690
5,39 MURO TOLETE COMN 0.12 M M2 48.859 49.129 49.384 49.144 49.204 49.339 49.054
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 29.888 30.023 30.151 30.031 30.061 30.129 29.986
5,41 MURO TOLETE COMN 0.25 M M2 94.258 94.664 95.047 94.686 94.777 94.979 94.551
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 57.279 57.481 57.673 57.493 57.538 57.639 57.425
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 68.842 69.113 69.368 69.128 69.188 69.323 69.037
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 41.497 41.632 41.759 41.639 41.669 41.737 41.594
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 144.872 145.818 146.712 145.871 146.081 146.555 145.556
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 87.930 88.403 88.850 88.429 88.534 88.771 88.272
5,47 REMATES LADRILLO PRENSADO ML 30.342 30.443 30.539 30.449 30.471 30.522 30.415
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 35.593 36.057 36.496 36.083 36.186 36.418 35.929
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 59.824 60.442 61.027 60.477 60.614 60.924 60.271
5,50 LAVADA DE FACHADA M2 4.964 4.964 4.964 4.964 4.964 4.964 4.964
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 47.977 48.470 48.935 48.497 48.607 48.853 48.333
5,52 DOVELA, GROUTING 3000 PSI ML 10.062 10.062 10.062 10.062 10.062 10.062 10.062
5,53 ANCLAJE 3/8" L=30CM UN 13.285 13.285 13.285 13.285 13.285 13.285 13.285
5,54 ANCLAJE 1/2" L=50CM UN 17.359 17.359 17.359 17.359 17.359 17.359 17.359
5,55 ANCLAJE 5/8" L=70CM UN 24.287 24.287 24.287 24.287 24.287 24.287 24.287
5,56 ANCLAJE 3/4" L=70CM UN 36.196 36.196 36.196 36.196 36.196 36.196 36.196
5,57 ANCLAJE 1" L= 70CM UN 4.717 4.856 4.986 4.863 4.894 4.963 4.817

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.303 15.303 15.303 15.303 15.303 15.303 15.303
6,2 FILOS O DILATACIONES B/PLACA ML 5.474 5.575 5.670 5.581 5.603 5.654 5.547
6,3 FILOS O DILATACIONES S/MURO ML 6.594 6.695 6.790 6.700 6.723 6.773 6.667
6,4 GOTERA EN MORTERO 1:4 ML 7.815 7.916 8.011 7.921 7.944 7.994 7.888
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.523 6.523 6.523 6.523 6.523 6.523 6.523
6,6 MALLA BAJO ENTRAMADO M2 13.003 13.003 13.003 13.003 13.003 13.003 13.003
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 23.823 24.275 24.701 24.300 24.400 24.626 24.149
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 14.361 14.587 14.800 14.599 14.650 14.763 14.524
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 20.107 20.390 20.659 20.406 20.469 20.611 20.312
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.210 12.352 12.486 12.360 12.391 12.462 12.312
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 20.149 20.601 21.027 20.626 20.726 20.952 20.475
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 12.231 12.457 12.670 12.469 12.520 12.633 12.394
6,13 PAETE CULATAS 1:4, E=2 CM M2 20.107 20.390 20.659 20.406 20.469 20.611 20.312
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.210 12.352 12.486 12.360 12.391 12.462 12.312
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 21.101 21.422 21.726 21.440 21.512 21.673 21.333
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.706 12.867 13.019 12.876 12.911 12.992 12.822
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.719 16.935 17.140 16.947 16.995 17.104 16.875
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.244 10.352 10.454 10.358 10.382 10.436 10.322
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.751 17.095 17.420 17.115 17.191 17.363 17.000
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.260 10.432 10.594 10.441 10.480 10.566 10.384
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 20.841 21.125 21.393 21.141 21.204 21.346 21.046
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.558 12.700 12.834 12.708 12.740 12.811 12.661
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 20.884 21.335 21.762 21.361 21.461 21.687 21.210
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.580 12.805 13.019 12.818 12.868 12.981 12.743
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 17.328 17.672 17.997 17.691 17.767 17.939 17.576
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.531 10.703 10.866 10.713 10.751 10.837 10.655
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 21.724 22.175 22.602 22.200 22.301 22.527 22.050
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 13.381 13.607 13.820 13.620 13.670 13.783 13.544
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
CONSTRUCCIN
7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 25.574 25.980 26.363 26.002 26.093 26.295 25.867
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7,2 M2 79.751 80.731 81.656 80.785 81.003 81.493 80.458
IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 52.922 52.922 52.922 52.922 52.922 52.922 52.922
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.110 21.110 21.110 21.110 21.110 21.110 21.110
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.143 33.143 33.143 33.143 33.143 33.143 33.143
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 77.317 77.317 77.317 77.317 77.317 77.317 77.317
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 60.558 60.558 60.558 60.558 60.558 60.558 60.558
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.247 35.247 35.247 35.247 35.247 35.247 35.247
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 81.027 81.027 81.027 81.027 81.027 81.027 81.027
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 96.741 96.741 96.741 96.741 96.741 96.741 96.741
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 142.143 142.143 142.143 142.143 142.143 142.143 142.143
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 56.196 56.196 56.196 56.196 56.196 56.196 56.196
7,13 CANAL PVC AMAZONAS ML 78.112 78.112 78.112 78.112 78.112 78.112 78.112
7,14 CANAL PVC RAINGO ML 71.024 71.024 71.024 71.024 71.024 71.024 71.024
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 125.956 125.956 125.956 125.956 125.956 125.956 125.956
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 73.547 73.547 73.547 73.547 73.547 73.547 73.547
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 54.041 54.041 54.041 54.041 54.041 54.041 54.041
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 30.838 30.838 30.838 30.838 30.838 30.838 30.838
7,19 TEJA DE BARRO M2 56.661 57.165 57.642 57.193 57.305 57.558 57.025
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 45.047 45.047 45.047 45.047 45.047 45.047 45.047
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 41.301 41.301 41.301 41.301 41.301 41.301 41.301
7,22 TEJA FIBROCEMENTO N4 M2 34.885 34.885 34.885 34.885 34.885 34.885 34.885
7,23 TEJA FIBROCEMENTO No. 6 M2 34.154 34.154 34.154 34.154 34.154 34.154 34.154
7,24 TEJA FIBROCEMENTO No. 8 M2 34.411 34.411 34.411 34.411 34.411 34.411 34.411
7,25 TEJA TERMOACSTICA M2 48.395 48.395 48.395 48.395 48.395 48.395 48.395
7,26 TEJA PLSTICA No.6 M2 42.557 42.557 42.557 42.557 42.557 42.557 42.557
7,27 TEJA ESPAOLA ETERNIT M2 77.832 77.832 77.832 77.832 77.832 77.832 77.832
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 143.649 143.649 143.649 143.649 143.649 143.649 143.649
7,29 TEJA SIN TRASLAPO M2 64.603 64.603 64.603 64.603 64.603 64.603 64.603
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 40.605 40.605 40.605 40.605 40.605 40.605 40.605
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 31.799 31.799 31.799 31.799 31.799 31.799 31.799
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2",
7,32 M2 55.387 55.387 55.387 55.387 55.387 55.387 55.387
15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.094 19.094 19.094 19.094 19.094 19.094 19.094
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 22.958 22.958 22.958 22.958 22.958 22.958 22.958
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 24.866 24.866 24.866 24.866 24.866 24.866 24.866
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 31.999 31.999 31.999 31.999 31.999 31.999 31.999
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.140 21.140 21.140 21.140 21.140 21.140 21.140
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 49.761 49.761 49.761 49.761 49.761 49.761 49.761
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 340.224 340.224 340.224 340.224 340.224 340.224 340.224
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 390.950 390.950 390.950 390.950 390.950 390.950 390.950
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 258.740 258.740 258.740 258.740 258.740 258.740 258.740
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 276.383 276.383 276.383 276.383 276.383 276.383 276.383

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 440.351 460.493 479.517 461.613 466.088 476.159 454.898
8,2 CONCRETO 3500 PSI M3 383.316 401.528 418.728 402.540 406.587 415.693 396.470
8,3 CONCRETO 3000 PSI M3 380.530 399.062 416.566 400.092 404.210 413.477 393.915
8,4 CONCRETO 2500 PSI M3 341.548 361.146 379.656 362.235 366.590 376.389 355.703
8,5 CONCRETO 2000 PSI M3 317.065 336.680 355.207 337.771 342.129 351.937 331.232
8,6 CONCRETO 1500 PSI M3 285.635 305.119 323.522 306.202 310.532 320.274 299.708
8,7 MORTERO SECO 1:10 M3 231.342 245.265 258.414 246.038 249.132 256.094 241.397
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
8,8 MORTERO 1:4 ARENA LAVADA DE PEA CONSTRUCCIN 432.567
M3 446.086 458.854 446.837 449.841 456.601 442.330
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 434.591 456.093 476.401 457.288 462.066 472.817 450.120
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 490.504 510.614 529.607 511.732 516.200 526.255 505.028
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 706.424 726.534 745.527 727.652 732.120 742.175 720.948

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 117.712 117.712 117.712 117.712 117.712 117.712 117.712
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.810 3.911 4.006 3.917 3.939 3.990 3.883
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 131.755 131.755 131.755 131.755 131.755 131.755 131.755
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 161.313 161.313 161.313 161.313 161.313 161.313 161.313
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 234.344 234.344 234.344 234.344 234.344 234.344 234.344
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 260.822 260.822 260.822 260.822 260.822 260.822 260.822
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 287.330 287.330 287.330 287.330 287.330 287.330 287.330
9,8 HOJA PUERTA FORTEC 0.81 UN 190.792 190.792 190.792 190.792 190.792 190.792 190.792
9,9 HOJA PUERTA FORTEC 0.91 UN 216.290 216.290 216.290 216.290 216.290 216.290 216.290
9,10 HOJA PUERTA FORTEC 1.50 UN 318.282 318.282 318.282 318.282 318.282 318.282 318.282
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 120.673 120.673 120.673 120.673 120.673 120.673 120.673
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 160.195 160.195 160.195 160.195 160.195 160.195 160.195
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 178.043 178.043 178.043 178.043 178.043 178.043 178.043
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 453.422 453.422 453.422 453.422 453.422 453.422 453.422
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.233 40.233 40.233 40.233 40.233 40.233 40.233
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.078 25.078 25.078 25.078 25.078 25.078 25.078
9,17 VENTANERA EN MADERA CEDRO MACHO M2 95.121 95.121 95.121 95.121 95.121 95.121 95.121
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 116.004 116.004 116.004 116.004 116.004 116.004 116.004
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 90.123 90.123 90.123 90.123 90.123 90.123 90.123
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 27.959 27.959 27.959 27.959 27.959 27.959 27.959
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 27.959 27.959 27.959 27.959 27.959 27.959 27.959
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 26.505 26.505 26.505 26.505 26.505 26.505 26.505
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 40.546 40.546 40.546 40.546 40.546 40.546 40.546
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 50.203 50.203 50.203 50.203 50.203 50.203 50.203
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 60.504 60.504 60.504 60.504 60.504 60.504 60.504
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 72.737 72.737 72.737 72.737 72.737 72.737 72.737
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 342.488 342.488 342.488 342.488 342.488 342.488 342.488
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 239.476 239.476 239.476 239.476 239.476 239.476 239.476
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.176 32.176 32.176 32.176 32.176 32.176 32.176
9,30 VIDRIO TRANSPARENTE 4 MM M2 41.190 41.190 41.190 41.190 41.190 41.190 41.190
9,31 VIDRIO TRANSPARENTE 5 MM M2 50.203 50.203 50.203 50.203 50.203 50.203 50.203
9,32 VIDRIO TRANSPARENTE 6 MM M2 63.080 63.080 63.080 63.080 63.080 63.080 63.080

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 72.714 72.714 72.714 72.714 72.714 72.714 72.714
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 202.200 202.200 202.200 202.200 202.200 202.200 202.200
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10,3 ML 76.999 76.999 76.999 76.999 76.999 76.999 76.999
ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 137.844 137.844 137.844 137.844 137.844 137.844 137.844
10,5 MARCO TAPA CAJA DE INSPECCIN UN 130.513 130.513 130.513 130.513 130.513 130.513 130.513
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 85.689 85.689 85.689 85.689 85.689 85.689 85.689
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 201.923 201.923 201.923 201.923 201.923 201.923 201.923
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 105.197 105.197 105.197 105.197 105.197 105.197 105.197
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.312 6.312 6.312 6.312 6.312 6.312 6.312
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO ESTRUCTURAL
10,10 M2 95.058 95.058 95.058 95.058 95.058 95.058 95.058
GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.136 39.136 39.136 39.136 39.136 39.136 39.136
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 515.547 515.547 515.547 515.547 515.547 515.547 515.547
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 185.434 185.434 185.434 185.434 185.434 185.434 185.434
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA CONSTRUCCIN 208.141
M2 208.141 208.141 208.141 208.141 208.141 208.141
10,15 DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 470.100 470.100 470.100 470.100 470.100 470.100 470.100
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 122.671 122.671 122.671 122.671 122.671 122.671 122.671
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 375.960 375.960 375.960 375.960 375.960 375.960 375.960
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.766 5.766 5.766 5.766 5.766 5.766 5.766
10,19 VENTANA EN ALUMINIO CORREDIZA M2 264.433 264.433 264.433 264.433 264.433 264.433 264.433
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 116.770 116.770 116.770 116.770 116.770 116.770 116.770
10,21 REJILLA PISO 0.30 M M2 82.412 82.412 82.412 82.412 82.412 82.412 82.412
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 85.083 85.083 85.083 85.083 85.083 85.083 85.083
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS,
10,23 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. KG 10.134 10.134 10.134 10.134 10.134 10.134 10.134
CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10,24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, KG 11.240 11.240 11.240 11.240 11.240 11.240 11.240
PINTURA Y PLATINERA.CONTEMPLA TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10,25 KG 8.944 8.944 8.944 8.944 8.944 8.944 8.944
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 211.170 211.170 211.170 211.170 211.170 211.170 211.170
11,2 ACOMETIDA EN PVC 3/4" 5M UN 254.673 254.673 254.673 254.673 254.673 254.673 254.673
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.110 21.110 21.110 21.110 21.110 21.110 21.110
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.143 33.143 33.143 33.143 33.143 33.143 33.143
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 31.800 31.800 31.800 31.800 31.800 31.800 31.800
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 40.765 40.765 40.765 40.765 40.765 40.765 40.765
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 84.035 84.035 84.035 84.035 84.035 84.035 84.035
11,8 CONEXIN TANQUE ELEVADO PVC UN 212.474 212.474 212.474 212.474 212.474 212.474 212.474
11,9 INSTALACIN APARATO SANITARIO UN 41.834 41.834 41.834 41.834 41.834 41.834 41.834
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 33.485 33.485 33.485 33.485 33.485 33.485 33.485
11,13 NIPLE PASAMURO 2" UN 63.688 63.688 63.688 63.688 63.688 63.688 63.688
11,14 NIPLE PASAMURO 4" UN 95.172 95.172 95.172 95.172 95.172 95.172 95.172
11,15 PUNTO AGUA CALIENTE CPVC UN 80.322 80.322 80.322 80.322 80.322 80.322 80.322
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 58.597 58.597 58.597 58.597 58.597 58.597 58.597
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.329 62.329 62.329 62.329 62.329 62.329 62.329
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 78.761 78.761 78.761 78.761 78.761 78.761 78.761
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 63.476 63.476 63.476 63.476 63.476 63.476 63.476
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 79.404 79.404 79.404 79.404 79.404 79.404 79.404
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 84.923 84.923 84.923 84.923 84.923 84.923 84.923
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 70.372 70.372 70.372 70.372 70.372 70.372 70.372
11,23 RED SUMINISTRO CPVC 1/2" ML 11.928 11.928 11.928 11.928 11.928 11.928 11.928
11,24 RED SUMINISTRO CPVC 3/4" ML 16.789 16.789 16.789 16.789 16.789 16.789 16.789
11,25 RED SUMINISTRO PVC 1 1/2" ML 21.921 21.921 21.921 21.921 21.921 21.921 21.921
11,26 RED SUMINISTRO PVC 1" ML 13.544 13.544 13.544 13.544 13.544 13.544 13.544
11,27 RED SUMINISTRO PVC 1/2" ML 8.092 8.092 8.092 8.092 8.092 8.092 8.092
11,28 RED SUMINISTRO PVC 2 1/2" ML 48.819 48.819 48.819 48.819 48.819 48.819 48.819
11,29 RED SUMINISTRO PVC 2" ML 31.233 31.233 31.233 31.233 31.233 31.233 31.233
11,30 RED SUMINISTRO PVC 3/4" ML 10.132 10.132 10.132 10.132 10.132 10.132 10.132
11,31 RED SANITARIA PVC-S 2" ML 24.130 24.130 24.130 24.130 24.130 24.130 24.130
11,32 RED SANITARIA PVC-S 3" ML 33.474 33.474 33.474 33.474 33.474 33.474 33.474
11,33 RED SANITARIA PVC-S 4" ML 45.423 45.423 45.423 45.423 45.423 45.423 45.423
11,34 RED SANITARIA PVC-S 6" ML 84.889 84.889 84.889 84.889 84.889 84.889 84.889
11,35 REGISTRO 1" UN 103.112 103.112 103.112 103.112 103.112 103.112 103.112
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
11,36 REGISTRO 1/2" CONSTRUCCIN
UN 57.485 57.485 57.485 57.485 57.485 57.485 57.485
11,37 REGISTRO 3/4" UN 73.192 73.192 73.192 73.192 73.192 73.192 73.192
11,38 REGISTRO 1 1/2" UN 176.800 176.800 176.800 176.800 176.800 176.800 176.800
11,39 REGISTRO 2 1/2" UN 364.587 364.587 364.587 364.587 364.587 364.587 364.587
11,40 REGISTRO 2" UN 269.372 269.372 269.372 269.372 269.372 269.372 269.372
11,41 REVENTILACIN 2" ML 16.825 16.825 16.825 16.825 16.825 16.825 16.825
11,42 REVENTILACIN 3" ML 21.233 21.233 21.233 21.233 21.233 21.233 21.233
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 165.156 165.156 165.156 165.156 165.156 165.156 165.156
11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 268.825 268.825 268.825 268.825 268.825 268.825 268.825
11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 447.348 447.348 447.348 447.348 447.348 447.348 447.348
11,46 TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 38.789 38.789 38.789 38.789 38.789 38.789 38.789
11,47 TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 45.720 45.720 45.720 45.720 45.720 45.720 45.720
11,48 TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 58.740 58.740 58.740 58.740 58.740 58.740 58.740
11,49 TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 66.499 66.499 66.499 66.499 66.499 66.499 66.499
11,50 TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 85.656 85.656 85.656 85.656 85.656 85.656 85.656

11,51 TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 99.386 99.386 99.386 99.386 99.386 99.386 99.386
11,52 TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 147.030 147.030 147.030 147.030 147.030 147.030 147.030
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 59.169 59.169 59.169 59.169 59.169 59.169 59.169
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 59.410 59.410 59.410 59.410 59.410 59.410 59.410
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 38.358 38.358 38.358 38.358 38.358 38.358 38.358
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 47.231 47.231 47.231 47.231 47.231 47.231 47.231
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.006 4.006 4.006 4.006 4.006 4.006 4.006
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.304 6.304 6.304 6.304 6.304 6.304 6.304
11,59 GABINETE TIPO III UN 974.121 974.121 974.121 974.121 974.121 974.121 974.121
11,60 GABINETE TIPO I UN 744.894 744.894 744.894 744.894 744.894 744.894 744.894
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.494.295 2.494.295 2.494.295 2.494.295 2.494.295 2.494.295 2.494.295
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.079.616 2.079.616 2.079.616 2.079.616 2.079.616 2.079.616 2.079.616
11,63 VLVULA MARIPOSA 3" UN 604.638 604.638 604.638 604.638 604.638 604.638 604.638
11,64 VLVULA MARIPOSA 4" UN 782.104 782.104 782.104 782.104 782.104 782.104 782.104
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 300.812 300.812 300.812 300.812 300.812 300.812 300.812

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 347.749 347.749 347.749 347.749 347.749 347.749 347.749
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 55.252 55.252 55.252 55.252 55.252 55.252 55.252
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 65.402 65.402 65.402 65.402 65.402 65.402 65.402
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 72.615 72.615 72.615 72.615 72.615 72.615 72.615
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 85.520 85.520 85.520 85.520 85.520 85.520 85.520
12,6 SALIDA TELFONO PVC COMPLETA UN 51.950 51.950 51.950 51.950 51.950 51.950 51.950
12,7 SALIDA TIMBRE PVC COMPLETA UN 59.214 59.214 59.214 59.214 59.214 59.214 59.214
12,8 STRIP TELEFNICO 10 PARES UN 136.725 136.725 136.725 136.725 136.725 136.725 136.725
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 53.340 53.340 53.340 53.340 53.340 53.340 53.340
12,10 SALIDA TRIFSICA PVC COMPLETA UN 122.578 122.578 122.578 122.578 122.578 122.578 122.578
12,11 SALIDA T.V PVC COMPLETA. UN 73.303 73.303 73.303 73.303 73.303 73.303 73.303
12,12 SALIDA BIFSICA C.N. UN 43.472 43.472 43.472 43.472 43.472 43.472 43.472
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 91.644 91.644 91.644 91.644 91.644 91.644 91.644
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 391.315 391.315 391.315 391.315 391.315 391.315 391.315
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 521.192 521.192 521.192 521.192 521.192 521.192 521.192
12,16 TUBERA PVC CONDUIT 1/2" ML 3.374 3.374 3.374 3.374 3.374 3.374 3.374
12,17 TUBERA PVC CONDUIT 3/4" ML 4.456 4.456 4.456 4.456 4.456 4.456 4.456
12,18 TUBERA PVC CONDUIT 1" ML 6.933 6.933 6.933 6.933 6.933 6.933 6.933
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.401 12.401 12.401 12.401 12.401 12.401 12.401
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 260.546 260.546 260.546 260.546 260.546 260.546 260.546
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 73.629 73.629 73.629 73.629 73.629 73.629 73.629
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL CONSTRUCCIN
UN 99.660 99.660 99.660 99.660 99.660 99.660 99.660
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 40.696 40.696 40.696 40.696 40.696 40.696 40.696
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.336.676 1.336.676 1.336.676 1.336.676 1.336.676 1.336.676 1.336.676
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 990.816 990.816 990.816 990.816 990.816 990.816 990.816
12,26 POSTE METLICO 6M UN 1.238.481 1.238.481 1.238.481 1.238.481 1.238.481 1.238.481 1.238.481
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 575.783 575.783 575.783 575.783 575.783 575.783 575.783
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 105.151 105.151 105.151 105.151 105.151 105.151 105.151
12,29 LUMINARIA 70W SODIO UN 483.078 483.078 483.078 483.078 483.078 483.078 483.078
12,30 LUMINARIA 150W SODIO UN 604.355 604.355 604.355 604.355 604.355 604.355 604.355
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.596.143 1.596.143 1.596.143 1.596.143 1.596.143 1.596.143 1.596.143
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.175.423 1.175.423 1.175.423 1.175.423 1.175.423 1.175.423 1.175.423

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 39.356 40.129 40.859 40.172 40.344 40.731 39.914
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 39.094 39.867 40.598 39.910 40.082 40.469 39.652
13,3 ALISTADO PARA LISTN M2 14.321 14.476 14.622 14.484 14.519 14.596 14.433
13,4 ALISTADO PISOS 1:3, E=0.04 M2 29.550 31.097 32.558 31.183 31.527 32.300 30.668
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 84.146 85.693 87.154 85.779 86.123 86.896 85.263
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.492 25.885 26.255 25.906 25.994 26.190 25.776
13,7 CONCRETO BASE GRADAS 2500 PSI M2 55.661 57.621 59.472 57.730 58.165 59.145 57.077
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 77.324 80.460 83.421 80.634 81.331 82.898 79.589
13,9 MANTO FIBERGLASS 600X1 M2 29.110 29.110 29.110 29.110 29.110 29.110 29.110
13,10 PEGANTE MORTERO-CONCRETO M2 22.013 22.013 22.013 22.013 22.013 22.013 22.013
13,11 PERMA PLY 2 CAPAS M2 25.835 25.835 25.835 25.835 25.835 25.835 25.835
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 45.359 47.123 48.789 47.221 47.613 48.495 46.633
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 53.173 55.329 57.365 55.449 55.928 57.006 54.730
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 77.144 80.476 83.623 80.661 81.402 83.067 79.551
13,15 TRITURADO FINO 1/2 M3 86.655 98.554 109.794 99.215 101.860 107.810 95.249
13,16 TRITURADO GRUESO 3/4 M3 93.410 103.750 122.670 107.111 107.816 121.742 100.878

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 55.440 55.750 56.042 55.767 55.836 55.990 55.664
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 33.076 33.231 33.377 33.239 33.274 33.351 33.188
14,3 ADOQUN CONCRETO 6CM M2 64.088 64.861 65.592 64.904 65.076 65.463 64.646
14,4 ADOQUN CONCRETO 8CM M2 67.288 68.061 68.792 68.104 68.276 68.663 67.846
14,5 ADOQUN GRES PEATONAL M2 71.381 72.154 72.885 72.197 72.369 72.756 71.939
14,6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 72.929 73.238 73.531 73.256 73.324 73.479 73.153
14,7 GRAVILLA PARA GRADAS ML 35.923 36.217 36.495 36.234 36.299 36.446 36.136
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 160.007 161.399 162.714 161.477 161.786 162.482 161.013
14,9 ACABADO EN GRAVILLA LAVADA M2 45.364 46.107 46.808 46.148 46.313 46.685 45.900
14,10 GUARDAESCOBA EN GRANITO ML 42.060 42.060 42.060 42.060 42.060 42.060 42.060
14,11 GUARDAESCOBA EN GRAVILLA ML 10.095 10.389 10.667 10.406 10.471 10.618 10.308
14,12 GUARDAESCOBA PVC CARAMELO ML 9.024 9.024 9.024 9.024 9.024 9.024 9.024
14,13 GUARDAESCOBA PVC CEDRO ML 12.112 12.112 12.112 12.112 12.112 12.112 12.112
14,14 GUARDAESCOBA PINO CARIBE ML 10.115 10.115 10.115 10.115 10.115 10.115 10.115
14,15 GUARDAESCOBA CEDRO BLANCO ML 16.942 16.942 16.942 16.942 16.942 16.942 16.942
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.006 33.006 33.006 33.006 33.006 33.006 33.006
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.850 8.850 8.850 8.850 8.850 8.850 8.850
14,18 LISTN M.H. AMARILLO M2 71.495 71.495 71.495 71.495 71.495 71.495 71.495
14,19 PASO ESCALERA GRANITO ML 115.802 116.885 117.908 116.945 117.186 117.727 116.584
14,20 PIRLANES ALUMINIO ML 7.233 7.233 7.233 7.233 7.233 7.233 7.233
14,21 PIRLANES LADRILLO ML 30.771 30.972 31.163 30.983 31.028 31.129 30.916
14,22 PISO VINILO TRFICO RESIDENCIAL M2 44.134 44.134 44.134 44.134 44.134 44.134 44.134
14,23 PISO VINILO TRFICO PESADO M2 51.290 51.290 51.290 51.290 51.290 51.290 51.290
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
14,24 PULIDA LACADA PISO MADERA CONSTRUCCIN
M2 47.260 47.260 47.260 47.260 47.260 47.260 47.260
14,25 TABLETA DE GRES 25X25 M2 48.162 48.472 48.764 48.489 48.558 48.712 48.386
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 53.993 54.303 54.595 54.320 54.388 54.543 54.217
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.510 10.510 10.510 10.510 10.510 10.510 10.510
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 47.670 47.973 48.258 47.989 48.057 48.208 47.889
14,29 JABONERA PORCELANA ACUARIO UN 19.827 19.827 19.827 19.827 19.827 19.827 19.827
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14,30 UN 118.646 118.646 118.646 118.646 118.646 118.646 118.646
SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.554 9.554 9.554 9.554 9.554 9.554 9.554
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 21.642 21.642 21.642 21.642 21.642 21.642 21.642
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 13.888 13.888 13.888 13.888 13.888 13.888 13.888
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.493 13.493 13.493 13.493 13.493 13.493 13.493
14,35 REMATES BOCEL ALUMINIO ML 8.208 8.208 8.208 8.208 8.208 8.208 8.208
14,36 REMATES BOCEL PORCELANA ML 8.353 8.353 8.353 8.353 8.353 8.353 8.353
14,37 TAPA REGISTRO 20X20 UN 18.337 18.337 18.337 18.337 18.337 18.337 18.337
14,38 TAPA REGISTRO 6X6 UN 16.712 16.712 16.712 16.712 16.712 16.712 16.712
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 17.976 17.976 17.976 17.976 17.976 17.976 17.976
14,40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN SITIO M2 20.781 20.781 20.781 20.781 20.781 20.781 20.781
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 63.304 63.614 63.906 63.631 63.700 63.854 63.528
14,42 MEDIA CAA EN GRANITO ML 74.550 74.550 74.550 74.550 74.550 74.550 74.550
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.742 32.742 32.742 32.742 32.742 32.742 32.742
14,44 PINTURA ACRLICA PARA PISOS M2 12.760 12.760 12.760 12.760 12.760 12.760 12.760
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 97.920 97.920 97.920 97.920 97.920 97.920 97.920
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 118.526 118.526 118.526 118.526 118.526 118.526 118.526

15 CIELO RASO
15,1 APLIQUE YESO ML 70.044 70.044 70.044 70.044 70.044 70.044 70.044
15,2 ARMADURA MADERA Y MALLA M2 34.503 34.503 34.503 34.503 34.503 34.503 34.503
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53.299 53.299 53.299 53.299 53.299 53.299 53.299
15,4 CIELO RASO DURACUSTIC M2 65.400 65.400 65.400 65.400 65.400 65.400 65.400
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 48.816 48.816 48.816 48.816 48.816 48.816 48.816
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 90.496 90.496 90.496 90.496 90.496 90.496 90.496
15,7 CORNISAS YESO ML 47.015 47.015 47.015 47.015 47.015 47.015 47.015
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 100.026 100.026 100.026 100.026 100.026 100.026 100.026
15,9 MALLA CON VENA M2 12.912 12.912 12.912 12.912 12.912 12.912 12.912

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214
DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 71.847 71.847 101.597 80.901 75.727 104.184 71.847
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 106.930 122.268 136.754 123.120 126.529 134.198 118.007
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 140.812 165.388 193.845 170.562 166.682 192.552 162.801
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 64.107 64.107 93.858 73.162 73.162 93.858 64.107
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 129.648 119.300 182.682 138.703 132.235 171.040 125.768
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 138.151 162.727 191.184 167.901 164.021 189.891 160.140

17 APARATOS SANITARIOS
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) CONSTRUCCIN 290.440
UN 290.440 290.440 290.440 290.440 290.440 290.440
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 856.103 856.103 856.103 856.103 856.103 856.103 856.103
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 463.880 463.880 463.880 463.880 463.880 463.880 463.880
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 134.510 134.510 134.510 134.510 134.510 134.510 134.510
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 188.320 188.320 188.320 188.320 188.320 188.320 188.320
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 174.895 174.895 174.895 174.895 174.895 174.895 174.895
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 384.963 384.963 384.963 384.963 384.963 384.963 384.963
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 984.538 984.538 984.538 984.538 984.538 984.538 984.538
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 279.657 279.657 279.657 279.657 279.657 279.657 279.657
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 198.128 198.128 198.128 198.128 198.128 198.128 198.128
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 78.860 78.860 78.860 78.860 78.860 78.860 78.860
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm
17,12 UN 239.880 239.880 239.880 239.880 239.880 239.880 239.880
(INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60
17,13 UN 353.346 353.346 353.346 353.346 353.346 353.346 353.346
cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 7.989 7.989 7.989 7.989 7.989 7.989 7.989
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.962 2.962 2.962 2.962 2.962 2.962 2.962
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.639 10.639 10.639 10.639 10.639 10.639 10.639
18,4 BARNIZ SOBRE MUEBLES M2 40.474 40.474 40.474 40.474 40.474 40.474 40.474
18,5 CARBURO SOBRE PAETES M2 5.577 5.577 5.577 5.577 5.577 5.577 5.577
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 63.129 63.129 63.129 63.129 63.129 63.129 63.129
18,7 DEMARCACIN CON MARMOLINA ML 3.317 3.317 3.317 3.317 3.317 3.317 3.317
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.657 2.657 2.657 2.657 2.657 2.657 2.657
18,9 ESMALTE SOBRE LMINA LLENA M2 13.338 13.338 13.338 13.338 13.338 13.338 13.338
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.864 3.864 3.864 3.864 3.864 3.864 3.864
18,11 ESMALTE SOBRE MADERA LLENA M2 14.064 14.064 14.064 14.064 14.064 14.064 14.064
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.509 5.509 5.509 5.509 5.509 5.509 5.509
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.267 6.267 6.267 6.267 6.267 6.267 6.267
18,14 ESTUCO M2 6.706 6.706 6.706 6.706 6.706 6.706 6.706
18,15 ESTUCO (LINEAL) ML 4.198 4.198 4.198 4.198 4.198 4.198 4.198
18,16 ESTUCO Y VINILO 3 MANOS M2 14.844 14.844 14.844 14.844 14.844 14.844 14.844
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.196 9.196 9.196 9.196 9.196 9.196 9.196
18,18 LACA PISOS MADERA M2 21.748 21.748 21.748 21.748 21.748 21.748 21.748
18,19 LNEAS TRFICO 0.10 ML 2.569 2.569 2.569 2.569 2.569 2.569 2.569
18,20 MARMOLINA SOBRE PAETE M2 11.671 11.671 11.671 11.671 11.671 11.671 11.671
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.148 3.148 3.148 3.148 3.148 3.148 3.148
18,22 TINTILLA SOBRE MADERA LLENA M2 12.054 12.054 12.054 12.054 12.054 12.054 12.054
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.777 6.777 6.777 6.777 6.777 6.777 6.777
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.258 4.258 4.258 4.258 4.258 4.258 4.258
18,25 WASH-PRIMER SOBRE ALUMNIO M2 20.899 20.899 20.899 20.899 20.899 20.899 20.899
18,26 PINTURA EPXICA M2 12.124 12.124 12.124 12.124 12.124 12.124 12.124
18,27 PINTURA EPXICA (LINEAL) ML 7.487 7.487 7.487 7.487 7.487 7.487 7.487

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.830.095 5.830.095 5.830.095 5.830.095 5.830.095 5.830.095 5.830.095
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y CILINDRO PARA
19,2 UN 10.300.870 10.300.870 10.300.870 10.300.870 10.300.870 10.300.870 10.300.870
MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.695.749 2.695.749 2.695.749 2.695.749 2.695.749 2.695.749 2.695.749
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.809.887 8.809.887 8.809.887 8.809.887 8.809.887 8.809.887 8.809.887
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.250.233 8.250.233 8.250.233 8.250.233 8.250.233 8.250.233 8.250.233
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.569 2.569 2.569 2.569 2.569 2.569 2.569
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 827.301 827.301 827.301 827.301 827.301 827.301 827.301
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 82.670 82.670 82.670 82.670 82.670 82.670 82.670
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR CONSTRUCCIN 1.497.267
UN 1.497.469 1.497.659 1.497.480 1.497.525 1.497.625 1.497.413
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 650.494 655.127 659.503 655.385 656.414 658.731 653.840

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.312 28.312 28.312 28.312 28.312 28.312 28.312
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.023 42.023 42.023 42.023 42.023 42.023 42.023
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 52.079 52.079 52.079 52.079 52.079 52.079 52.079
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.002 17.002 17.002 17.002 17.002 17.002 17.002
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 20.580 20.580 20.580 20.580 20.580 20.580 20.580
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 28.042 28.042 28.042 28.042 28.042 28.042 28.042
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.194 25.194 25.194 25.194 25.194 25.194 25.194
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.547 26.547 26.547 26.547 26.547 26.547 26.547
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.174 33.174 33.174 33.174 33.174 33.174 33.174
20,10 VLVULA DE BOLA GAS 1/2" UN 16.925 16.925 16.925 16.925 16.925 16.925 16.925
20,11 VLVULA DE BOLA GAS 3/4" UN 22.191 22.191 22.191 22.191 22.191 22.191 22.191
20,12 VLVULA DE BOLA GAS 1" UN 34.145 34.145 34.145 34.145 34.145 34.145 34.145
20,13 VLVULA POLIETILENO GAS 1/2" UN 262.075 262.075 262.075 262.075 262.075 262.075 262.075
20,14 VLVULA POLIETILENO GAS 3/4" UN 301.612 301.612 301.612 301.612 301.612 301.612 301.612
20,15 VLVULA POLIETILENO GAS 1" UN 314.571 314.571 314.571 314.571 314.571 314.571 314.571
20,16 ACOMETIDA GAS 1/2" ML 291.746 291.746 291.746 291.746 291.746 291.746 291.746

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 212.833 212.833 212.833 212.833 212.833 212.833 212.833
21,2 CABLE DETECTOR LINEAL DE CALOR ML 32.637 32.637 32.637 32.637 32.637 32.637 32.637
21,3 SIRENA DE 110 V UN 99.313 99.313 99.313 99.313 99.313 99.313 99.313
21,4 CMARA CCTV UN 251.833 251.833 251.833 251.833 251.833 251.833 251.833
21,5 PARLANTE-CIELO FALSO UN 49.834 49.834 49.834 49.834 49.834 49.834 49.834
21,6 AMPLIFICADOR 100W UN 550.047 550.047 550.047 550.047 550.047 550.047 550.047
21,7 AMPLIFICADOR 300W UN 1.364.725 1.364.725 1.364.725 1.364.725 1.364.725 1.364.725 1.364.725
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.712 42.712 42.712 42.712 42.712 42.712 42.712
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 212.933 212.933 212.933 212.933 212.933 212.933 212.933
21,10 TOMA PARA MICRFONO UN 42.101 42.101 42.101 42.101 42.101 42.101 42.101
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.607 3.607 3.607 3.607 3.607 3.607 3.607
21,12 SPLITERS UN 6.065 6.065 6.065 6.065 6.065 6.065 6.065
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.791 17.791 17.791 17.791 17.791 17.791 17.791
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.345 23.345 23.345 23.345 23.345 23.345 23.345
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.287 30.287 30.287 30.287 30.287 30.287 30.287
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 117.859 117.859 117.859 117.859 117.859 117.859 117.859
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 30.747 30.747 30.747 30.747 30.747 30.747 30.747
21,18 BANDEJA PORTACABLES PARA RACK UN 100.583 100.583 100.583 100.583 100.583 100.583 100.583
21,19 RACK 2' X 24" UN 175.864 175.864 175.864 175.864 175.864 175.864 175.864
21,20 RACK 3' X 24" UN 276.581 276.581 276.581 276.581 276.581 276.581 276.581
21,21 RACK 5' X 24" UN 343.476 343.476 343.476 343.476 343.476 343.476 343.476
21,22 RACK 7' X 24" UN 375.348 375.348 375.348 375.348 375.348 375.348 375.348
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 549.391 549.391 549.391 549.391 549.391 549.391 549.391
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 323.551 323.551 323.551 323.551 323.551 323.551 323.551
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 99.886 99.886 99.886 99.886 99.886 99.886 99.886
21,26 PATCH CORD 2M CATEGORA 6A UN 13.310 13.310 13.310 13.310 13.310 13.310 13.310
21,27 PATCH CORD 5M CATEGORA 6A UN 27.206 27.206 27.206 27.206 27.206 27.206 27.206
21,28 CABLE UTP CATEGORA 6A ML 4.792 4.792 4.792 4.792 4.792 4.792 4.792
21,29 CANALETA METLICA 4X6 CMS ML 33.755 33.755 33.755 33.755 33.755 33.755 33.755
21,30 CANALETA METLICA 4X10 CMS ML 35.274 35.274 35.274 35.274 35.274 35.274 35.274
21,31 CANALETA METLICA 6X10 CMS ML 36.034 36.034 36.034 36.034 36.034 36.034 36.034
21,32 CANALETA PLSTICA 13X7 MM ML 23.501 23.501 23.501 23.501 23.501 23.501 23.501
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
21,33 CANALETA PLSTICA 20X12 MM CONSTRUCCIN
ML 25.999 25.999 25.999 25.999 25.999 25.999 25.999
21,34 CANALETA PLSTICA 32X12 MM ML 27.048 27.048 27.048 27.048 27.048 27.048 27.048
21,35 CANALETA PLSTICA 40X60 MM ML 45.503 45.503 45.503 45.503 45.503 45.503 45.503
21,36 SWITCH 10/100/1000 24 PUERTOS UN 588.932 588.932 588.932 588.932 588.932 588.932 588.932
21,37 SWITCH 10/100/1000 16 PUERTOS UN 302.415 302.415 302.415 302.415 302.415 302.415 302.415
21,38 SWITCH 10/100/1000 8 PUERTOS UN 84.745 84.745 84.745 84.745 84.745 84.745 84.745
21,39 CABLE TELEFNICO 2 PARES ML 1.759 1.759 1.759 1.759 1.759 1.759 1.759
21,40 CABLE TELEFNICO 10 PARES ML 8.123 8.123 8.123 8.123 8.123 8.123 8.123
21,41 CABLE TELEFNICO 20 PARES ML 12.119 12.119 12.119 12.119 12.119 12.119 12.119
21,42 CABLE TELEFNICO 40 PARES ML 20.232 20.232 20.232 20.232 20.232 20.232 20.232
21,43 CABLE TELEVISIN RG6 ML 3.747 3.747 3.747 3.747 3.747 3.747 3.747
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.316 21.316 21.316 21.316 21.316 21.316 21.316
21,45 ACOMETIDA TELEFNICA 1" ML 31.031 31.031 31.031 31.031 31.031 31.031 31.031
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.518 18.518 18.518 18.518 18.518 18.518 18.518
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 14.731 14.731 14.731 14.731 14.731 14.731 14.731
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 594.582 594.582 594.582 594.582 594.582 594.582 594.582
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 87.035 87.035 87.035 87.035 87.035 87.035 87.035
1,3 CODO 45 PVC UNIN MECNICA 8" UN 490.127 490.127 490.127 490.127 490.127 490.127 490.127
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.046.120 1.046.120 1.046.120 1.046.120 1.046.120 1.046.120 1.046.120
1,5 CODO 90 PVC UNIN MECNICA 4" UN 119.932 119.932 119.932 119.932 119.932 119.932 119.932
1,6 CODO 90 PVC UNIN MECNICA 8" UN 730.502 730.502 730.502 730.502 730.502 730.502 730.502
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.572.072 1.572.072 1.572.072 1.572.072 1.572.072 1.572.072 1.572.072
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.551 12.551 12.551 12.551 12.551 12.551 12.551
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.480 15.480 15.480 15.480 15.480 15.480 15.480
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.436 19.436 19.436 19.436 19.436 19.436 19.436
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.272 21.272 21.272 21.272 21.272 21.272 21.272
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 25.501 25.501 25.501 25.501 25.501 25.501 25.501
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 25.501 25.501 25.501 25.501 25.501 25.501 25.501
1,14 TAPN PVC UNIN MECNICA 3" UN 102.497 102.497 102.497 102.497 102.497 102.497 102.497
1,15 TAPN PVC UNIN MECNICA 4" UN 118.724 118.724 118.724 118.724 118.724 118.724 118.724
1,16 TAPN PVC UNIN MECNICA 8" UN 367.410 367.410 367.410 367.410 367.410 367.410 367.410
1,17 TEE PVC UNIN MECNICA 2" UN 137.965 137.965 137.965 137.965 137.965 137.965 137.965
1,18 TEE PVC UNIN MECNICA 4" UN 227.434 227.434 227.434 227.434 227.434 227.434 227.434
1,19 TEE PVC UNIN MECNICA 8" UN 1.006.391 1.006.391 1.006.391 1.006.391 1.006.391 1.006.391 1.006.391
1,20 TEE PVC UNIN MECNICA 10" UN 1.159.506 1.159.506 1.159.506 1.159.506 1.159.506 1.159.506 1.159.506
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.612 13.612 13.612 13.612 13.612 13.612 13.612
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.012 12.012 12.012 12.012 12.012 12.012 12.012
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 29.643 29.643 29.643 29.643 29.643 29.643 29.643
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 117.631 117.631 117.631 117.631 117.631 117.631 117.631
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 175.152 175.152 175.152 175.152 175.152 175.152 175.152
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 28.633 28.633 28.633 28.633 28.633 28.633 28.633
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 98.620 98.620 98.620 98.620 98.620 98.620 98.620
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 146.123 146.123 146.123 146.123 146.123 146.123 146.123
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 59.656 59.656 59.656 59.656 59.656 59.656 59.656
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 240.238 240.238 240.238 240.238 240.238 240.238 240.238
1,32 UNIN REPARACION PVC 4" UN 69.601 69.601 69.601 69.601 69.601 69.601 69.601
1,33 UNIN REPARACIN PVC 8" UN 279.505 279.505 279.505 279.505 279.505 279.505 279.505
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 167.617 167.617 167.617 167.617 167.617 167.617 167.617
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 476.982 476.982 476.982 476.982 476.982 476.982 476.982
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.277.493 1.277.493 1.277.493 1.277.493 1.277.493 1.277.493 1.277.493
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.887.634 1.887.634 1.887.634 1.887.634 1.887.634 1.887.634 1.887.634

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.257 10.257 10.257 10.257 10.257 10.257 10.257
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.439 23.439 23.439 23.439 23.439 23.439 23.439
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 61.633 71.461 80.743 72.007 74.191 79.105 68.731
2,5 RELLENO TIPO 2 "RECEBO" M3 67.068 67.068 96.818 76.122 70.948 99.405 67.068
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 68.777 68.777 98.528 77.832 77.832 98.528 68.777
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 99.285 108.508 120.807 104.409 104.409 114.658 96.210
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 81.084 100.934 123.919 105.113 101.979 122.874 98.845
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 89.803 102.919 115.305 103.647 106.562 113.120 99.275

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 109.567 109.567 109.567 109.567 109.567 109.567 109.567
3,2 CODO 45 PVC ALCANTARILLADO 16" UN 1.142.346 1.142.346 1.142.346 1.142.346 1.142.346 1.142.346 1.142.346
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
3,3 CODO 90 PVC ALCANTARILLADO 8" CONSTRUCCIN 143.186
UN 143.186 143.186 143.186 143.186 143.186 143.186
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.323.127 1.323.127 1.323.127 1.323.127 1.323.127 1.323.127 1.323.127
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 922.210 922.210 922.210 922.210 922.210 922.210 922.210
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 61.857 61.857 61.857 61.857 61.857 61.857 61.857
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 108.766 108.766 108.766 108.766 108.766 108.766 108.766
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 256.830 256.830 256.830 256.830 256.830 256.830 256.830
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 256.824 256.824 256.824 256.824 256.824 256.824 256.824
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 412.323 412.323 412.323 412.323 412.323 412.323 412.323
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 108.812 108.812 108.812 108.812 108.812 108.812 108.812
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 108.812 108.812 108.812 108.812 108.812 108.812 108.812
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 256.830 256.830 256.830 256.830 256.830 256.830 256.830
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 256.830 256.830 256.830 256.830 256.830 256.830 256.830
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 412.323 412.323 412.323 412.323 412.323 412.323 412.323
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 414.712 414.712 414.712 414.712 414.712 414.712 414.712
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 672.955 672.955 672.955 672.955 672.955 672.955 672.955
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.079.879 1.079.879 1.079.879 1.079.879 1.079.879 1.079.879 1.079.879
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 66.681 66.681 66.681 66.681 66.681 66.681 66.681
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 347.142 347.142 347.142 347.142 347.142 347.142 347.142
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 388.449 388.449 388.449 388.449 388.449 388.449 388.449
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.075.981 1.075.981 1.075.981 1.075.981 1.075.981 1.075.981 1.075.981
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 62.883 63.018 63.146 63.026 63.056 63.124 62.981
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 314.762 314.762 314.762 314.762 314.762 314.762 314.762
3,25 TUBERA PVC ALCANTARILLADO 8" ML 47.801 47.801 47.801 47.801 47.801 47.801 47.801
3,26 TUBERA PVC ALCANTARILLADO 10" ML 67.603 67.603 67.603 67.603 67.603 67.603 67.603
3,27 TUBERA PVC ALCANTARILLADO 12" ML 97.554 97.554 97.554 97.554 97.554 97.554 97.554
3,28 TUBERA PVC ALCANTARILLADO 16" ML 149.747 149.747 149.747 149.747 149.747 149.747 149.747
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 240.661 240.661 240.661 240.661 240.661 240.661 240.661
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 349.659 349.659 349.659 349.659 349.659 349.659 349.659
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 442.358 442.358 442.358 442.358 442.358 442.358 442.358
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 581.576 581.576 581.576 581.576 581.576 581.576 581.576
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 799.753 799.753 799.753 799.753 799.753 799.753 799.753

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4,1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 639.073 650.192 660.694 650.810 653.281 658.841 647.104
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO E=1.5CM Y
4,2 ML 635.063 644.917 654.224 645.465 647.654 652.581 642.180
CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA
4,3 UN 680.467 687.880 694.881 688.292 689.939 693.646 685.821
HF)
4,4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 759.152 773.051 786.179 773.824 776.912 783.862 769.191
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE INTERNO E=1.5CM Y
4,5 ML 901.920 915.796 928.901 916.567 919.650 926.588 911.942
CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA
4,6 UN 785.847 796.039 805.666 796.606 798.871 803.967 793.208
HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 946.181 951.828 957.161 952.142 953.396 956.220 950.259
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.374.546 1.390.710 1.405.978 1.391.609 1.395.201 1.403.283 1.386.221
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.883.249 1.913.117 1.941.325 1.914.776 1.921.413 1.936.348 1.904.821
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.507.042 2.556.691 2.603.581 2.559.450 2.570.483 2.595.307 2.542.902
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.748.782 1.748.782 1.748.782 1.748.782 1.748.782 1.748.782 1.748.782
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.699.733 3.699.733 3.699.733 3.699.733 3.699.733 3.699.733 3.699.733
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAETE
4,13 UN 132.658 133.060 133.440 133.082 133.172 133.373 132.948
INTERNO Y DEMOLICIN)

5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 69.707 70.414 71.081 70.453 70.610 70.963 70.217
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 82.603 83.310 83.977 83.349 83.506 83.859 83.113
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 53.836 55.893 57.837 56.008 56.465 57.494 55.322
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M CONSTRUCCIN
M2 57.929 59.875 61.713 59.983 60.415 61.388 59.334
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 58.221 60.134 61.940 60.240 60.665 61.621 59.603
5,6 BORDE SEPARADOR VERDE A-170 ML 242.547 242.949 243.329 242.971 243.061 243.262 242.837
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.541 17.788 18.021 17.802 17.857 17.980 17.719
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 38.512 39.962 41.332 40.043 40.365 41.090 39.560
5,9 CAUELA PREFABRICADA TIPO A-120 ML 79.740 79.955 80.158 79.967 80.014 80.122 79.895
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 532.639 537.396 541.888 537.660 538.717 541.096 536.074
5,11 LOSETA PREFABRICADA A-40 M2 60.942 61.862 62.731 61.913 62.118 62.578 61.606
5,12 LOSETA PREFABRICADA A-60 M2 87.835 88.755 89.624 88.806 89.011 89.471 88.499
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 31.827 32.605 33.340 32.648 32.821 33.210 32.389
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 51.276 52.851 54.339 52.939 53.289 54.076 52.413
5,15 SARDINEL PREFABRICADO A-10 ML 96.117 100.113 104.694 100.921 100.372 104.459 99.655
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 58.170 58.727 59.253 58.758 58.882 59.160 58.573

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 193.351 194.278 195.153 194.329 194.535 194.999 194.021
6,2 BANCA EN CONCRETO M-30 UN 634.909 636.207 637.432 636.279 636.567 637.216 635.846
6,3 BOLARDO M-63 ALTO/HIERRO UN 204.419 204.615 204.800 204.626 204.669 204.767 204.560
6,4 BOLARDO M-60 CONCRETO UN 154.232 155.344 156.395 155.406 155.653 156.209 155.036
6,5 BOLARDO M-61 BAJO/CONCRETO UN 155.996 157.108 158.158 157.170 157.417 157.973 156.799
6,6 BOLARDO M-62 BAJO/HIERRO UN 182.960 184.136 185.248 184.202 184.463 185.052 183.810
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 55.816 56.357 56.868 56.387 56.507 56.777 56.207
6,8 BORDILLO PREFABRICADO A-80 ML 64.668 65.273 65.845 65.307 65.442 65.744 65.105
6,9 CANECA M-120 UN 296.879 297.014 297.142 297.021 297.051 297.119 296.976
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 783.008 783.564 784.089 783.595 783.718 783.996 783.410
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.213.356 3.213.727 3.214.077 3.213.747 3.213.830 3.214.015 3.213.624
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.305.639 3.306.010 3.306.360 3.306.030 3.306.113 3.306.298 3.305.907
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 462.208 462.600 462.971 462.622 462.709 462.906 462.492
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 612.537 614.106 615.588 614.193 614.542 615.327 613.670
6,15 BANCA EN MADERA M-50 UN 508.499 508.499 508.499 508.499 508.499 508.499 508.499
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 235.771 236.327 236.852 236.357 236.481 236.759 236.172
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 547.388 547.726 548.045 547.745 547.820 547.989 547.632
6,18 POSTE HISTRICO M-131 UN 6.109.572 6.112.352 6.114.978 6.112.506 6.113.124 6.114.514 6.111.580

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.841 3.841 3.841 3.841 3.841 3.841 3.841
7,2 MARCA VIAL CON PINTURA EN FRO M2 41.284 41.284 41.284 41.284 41.284 41.284 41.284
7,3 SEAL DOBLE DE CICLORUTA UN 298.490 298.691 298.881 298.702 298.747 298.848 298.635
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 470.460 471.244 471.985 471.288 471.462 471.855 471.026
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 223.932 224.133 224.323 224.144 224.189 224.289 224.077
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 237.778 237.979 238.169 237.990 238.035 238.135 237.923
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 248.262 248.463 248.653 248.474 248.519 248.619 248.407
7,8 TACHAS REFLECTIVAS UN 12.905 12.905 12.905 12.905 12.905 12.905 12.905
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.780 13.780 13.780 13.780 13.780 13.780 13.780
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7,10 UN 111.990 111.990 111.990 111.990 111.990 111.990 111.990
INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300
DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102
DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776
UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031
DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270
SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.209 34.209 34.209 34.209 34.209 34.209 34.209
2,3 210.2.2 EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167
MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,10 600.2 M3 62.787 62.787 62.787 62.787 62.787 62.787 62.787
MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 600.3 M3 77.056 77.056 77.056 77.056 77.056 77.056 77.056
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO DE SOBRANTES
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797
A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE RETIRO DE
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 153.958 140.750 221.649 165.515 157.260 206.790 149.005
3,3 330.1 BASE GRANULAR M3 162.461 193.830 230.152 200.434 195.481 228.501 190.528
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838
CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.065 3.065 3.065 3.065 3.065 3.065 3.065
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.069 1.069 1.069 1.069 1.069 1.069 1.069
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 210.261 213.142 215.863 213.302 213.943 215.383 212.342
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 64.793 66.150 67.431 66.225 66.526 67.205 65.773
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 583.263 613.426 648.351 619.776 615.013 646.763 610.251
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 592.188 622.351 657.276 628.701 623.938 655.688 619.176
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 613.119 643.282 678.207 649.632 644.869 676.619 640.107
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 645.738 675.901 710.826 682.251 677.488 709.238 672.726
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 302.776 334.145 370.467 340.749 335.796 368.816 330.843
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 293.265 280.057 360.956 304.822 296.567 346.097 288.312
3,15 311.1 AFIRMADO M3 73.045 73.045 111.018 84.602 84.602 111.018 73.045
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 10.762 10.949 11.126 10.960 11.001 11.095 10.897
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 CONSTRUCCIN
M2 4.288 4.382 4.470 4.387 4.408 4.455 4.356
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3,18 500.1 M3 609.212 627.448 644.673 628.462 632.514 641.633 622.383
TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3,19 500.1 M3 639.946 658.999 676.994 660.058 664.292 673.819 653.707
TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3,20 500.1 M3 660.619 680.253 698.798 681.345 685.708 695.525 674.800
TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE LIMPIEZA, SUMINISTRO E
3,21 *** ML 6.671 6.671 6.671 6.671 6.671 6.671 6.671
INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 114.630 141.173 171.907 146.761 142.570 170.510 138.379

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 871.031 891.717 911.255 892.867 897.464 907.807 885.972
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 751.746 772.089 791.304 773.221 777.740 787.912 766.438
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 795.673 816.822 836.797 817.998 822.697 833.271 810.947
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 542.264 560.658 578.030 561.680 565.768 574.965 555.550
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 633.499 652.621 670.681 653.684 657.933 667.494 647.310
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 539.450 558.168 575.847 559.208 563.367 572.727 552.969
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 630.573 650.032 668.411 651.113 655.437 665.168 644.627
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 691.327 710.044 727.723 711.084 715.244 724.603 704.846
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 557.981 577.440 595.819 578.522 582.845 592.576 572.036
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 732.861 752.319 770.699 753.401 757.725 767.455 746.915
4,11 650 P SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 11.304 11.304 11.304 11.304 11.304 11.304 11.304
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO
4,12 650 P KG 14.499 14.499 14.499 14.499 14.499 14.499 14.499
B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.704 1.704 1.704 1.704 1.704 1.704 1.704
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO TREMIE 3000 PSI
4,14 621.1 ML 2.563.991 2.563.991 2.563.991 2.563.991 2.563.991 2.563.991 2.563.991
(INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN MANUAL (INCLUYE
4,15 621.1 P ML 3.923.010 3.958.394 3.991.815 3.960.361 3.968.224 3.985.917 3.948.566
EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.642.045 1.660.577 1.678.081 1.661.607 1.665.725 1.674.992 1.655.430
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 82.700 82.700 82.700 82.700 82.700 82.700 82.700
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 342.197 344.421 346.522 344.545 345.039 346.151 343.803
4,19 632 P BARANDA METLICA ML 401.620 401.620 401.620 401.620 401.620 401.620 401.620
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.057 16.057 16.057 16.057 16.057 16.057 16.057
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 466.182 486.368 528.801 494.602 499.087 525.436 480.762
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 120.205 132.778 149.542 127.190 127.190 141.160 116.014
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 80.586 80.586 115.638 91.254 85.158 118.686 80.586
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 363.407 383.218 401.930 384.320 388.721 398.628 377.716
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 354.890 376.311 398.603 378.997 380.088 396.133 372.026
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 363.330 384.751 407.043 387.438 388.528 404.573 380.466
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 369.579 390.990 413.272 393.676 394.765 410.804 386.708
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 378.020 399.431 421.713 402.116 403.205 419.244 395.149
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 494.689 514.483 533.178 515.583 519.982 529.879 508.986
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 584.253 604.831 624.266 605.974 610.547 620.836 599.116
4,31 681.1 GAVIN M3 196.443 221.779 251.116 227.113 223.113 249.783 219.112
4,32 681.1 GAVIN MALLA PVC M3 200.395 225.731 255.068 231.065 227.065 253.735 223.064
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 40.292 41.508 42.655 41.575 41.845 42.453 41.170
4,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 15.595 16.203 16.777 16.237 16.372 16.675 16.034
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA LTIMA 25
4,35 *** M2 9.591 9.591 9.591 9.591 9.591 9.591 9.591
KN)

4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.671 13.671 13.671 13.671 13.671 13.671 13.671
4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.396 18.396 18.396 18.396 18.396 18.396 18.396
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA
4,38 *** M2 22.050 22.050 22.050 22.050 22.050 22.050 22.050
100 KN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALMEIDAS
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Chocont Machet Manta Sesquil Suesca Tiribita V.Pinzn
u
4,39 *** CONSTRUCCIN
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA
M2 28.331 28.331 28.331 28.331 28.331 28.331 28.331
165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN, FILTRO Y
4,40 *** M2 6.883 6.883 6.883 6.883 6.883 6.883 6.883
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN, FILTRO Y
4,41 *** M2 7.842 7.842 7.842 7.842 7.842 7.842 7.842
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN, FILTRO Y
4,42 *** M2 8.151 8.151 8.151 8.151 8.151 8.151 8.151
SEPARACIN)

4,43 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 5.810 5.810 5.810 5.810 5.810 5.810 5.810

4,44 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.745 8.745 8.745 8.745 8.745 8.745 8.745

4,45 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 7.133 7.133 7.133 7.133 7.133 7.133 7.133

4,46 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.745 8.745 8.745 8.745 8.745 8.745 8.745
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN, FILTRO Y
4,47 *** M2 16.796 16.796 16.796 16.796 16.796 16.796 16.796
SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36" CLASE I, INCLUYE
4,48 661.1 ML 598.313 598.625 598.920 598.642 598.712 598.868 598.538
EMBOQUILLADA
4,49 660.3 SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600 MM ML 343.924 348.249 352.334 348.490 349.451 351.613 347.048
4,50 *** SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO 36" ML 836.963 836.963 836.963 836.963 836.963 836.963 836.963
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 139.290 139.290 175.803 150.403 150.403 175.803 139.290
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.200 4.200 4.200 4.200 4.200 4.200 4.200
4,53 *** GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 81.486 81.486 81.486 81.486 81.486 81.486 81.486
4,54 *** GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 124.135 124.135 124.135 124.135 124.135 124.135 124.135
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 504.470 525.048 544.484 526.192 530.764 541.053 519.333
4,56 682.1 P COLCHONETA RENO M3 211.491 236.827 266.164 242.161 238.161 264.831 234.160
4,57 *** TRINCHO EN MADERA M2 64.465 64.465 64.465 64.465 64.465 64.465 64.465

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.841 3.841 3.841 3.841 3.841 3.841 3.841
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 41.284 41.284 41.284 41.284 41.284 41.284 41.284
5,3 730.3 TOPE DEFENSA METLICA UN 79.474 79.474 79.474 79.474 79.474 79.474 79.474
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 66.113 66.113 66.113 66.113 66.113 66.113 66.113
5,5 730.1 DEFENSA METLICA ML 140.321 141.160 141.952 141.206 141.393 141.812 140.927
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 12.905 12.905 12.905 12.905 12.905 12.905 12.905

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 803 803 803 803 803 803 803
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36", INCLUYE
6,2 801.6 UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663
RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE DESCOLES Y RETIRO DE
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161
SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735
DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.659 14.659 14.659 14.659 14.659 14.659 14.659
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 23.723 23.723 23.723 23.723 23.723 23.723 23.723
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.420 9.420 9.420 9.420 9.420 9.420 9.420

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.909.639 1.894.645 1.918.035 1.929.646 1.908.440 1.912.638 1.897.644 1.915.037
1,2 CAMPAMENTO 9 M2 UN 1.113.847 1.106.350 1.118.045 1.123.851 1.113.247 1.115.347 1.107.850 1.116.546
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.541 13.541 13.541 13.541 13.541 13.541 13.541 13.541
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.182 15.182 15.182 15.182 15.182 15.182 15.182 15.182
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.548 17.548 17.548 17.548 17.548 17.548 17.548 17.548
1,6 CERCA EN TABLA H=2.30 M ML 63.499 63.499 63.499 63.499 63.499 63.499 63.499 63.499
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 44.359 44.199 44.449 44.566 44.346 44.391 44.231 44.417
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.389 20.229 20.478 20.596 20.376 20.421 20.261 20.446
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 872.802 870.307 874.295 876.660 872.475 874.216 870.627 873.975
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.142 10.142 10.142 10.142 10.142 10.142 10.142 10.142
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.630 3.630 3.630 3.630 3.630 3.630 3.630 3.630
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.602.732 2.602.732 2.602.732 2.602.732 2.602.732 2.602.732 2.602.732 2.602.732
1,44 RED TELEFNICA PROVISIONAL UN 240.238 240.238 240.238 240.238 240.238 240.238 240.238 240.238
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 71.327 59.685 79.088 94.610 62.272 82.968 72.620 81.675
2,2 BASE ARENA CEMENTO 1:20 M3 178.961 163.634 187.544 194.289 177.735 182.027 166.700 184.479
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX CONSTRUCCIN
M2 21.419 21.419 21.419 21.419 21.419 21.419 21.419 21.419
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 593.906 578.118 602.746 614.512 592.642 597.063 581.276 599.588
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 593.956 577.725 603.045 614.844 592.657 597.202 580.971 599.799
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 552.766 537.567 561.277 572.325 551.549 555.805 540.607 558.237
2,9 PILOTE DE MADERA D=20 CM ML 47.926 47.926 47.926 47.926 47.926 47.926 47.926 47.926
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 ML 147.705 147.705 147.705 147.705 147.705 147.705 147.705 147.705
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 ML 184.576 184.576 184.576 184.576 184.576 184.576 184.576 184.576
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,12 ML 229.164 229.164 229.164 229.164 229.164 229.164 229.164 229.164
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 ML 289.186 289.186 289.186 289.186 289.186 289.186 289.186 289.186
DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 99.444 98.350 100.056 100.822 99.356 99.662 98.569 99.837
2,15 PILOTE HINCADO 30X30 ML 122.435 120.850 123.322 124.432 122.308 122.752 121.167 123.005
2,16 DADOS EN CONCRETO 3500PSI M3 539.405 524.206 547.916 558.964 538.189 542.445 527.246 544.876
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2,17 ML 88.327 88.327 88.327 88.327 88.327 88.327 88.327 88.327
5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 36.884 36.789 36.938 36.980 36.877 36.903 36.808 36.919
3,2 SIFN EN PVC 6" UN 192.048 191.953 192.101 192.143 192.040 192.067 191.972 192.082
3,3 CAJA DE INSPECCIN DE 100X100 UN 438.644 424.724 447.231 459.995 436.473 449.025 426.022 445.934
3,4 CAJA DE INSPECCIN DE 40X40 UN 215.379 212.672 216.962 218.714 215.074 216.562 213.088 216.546
3,5 CAJA DE INSPECCIN DE 60X60 UN 244.890 240.460 247.476 250.305 244.395 246.783 241.149 246.787
3,6 CAJA DE INSPECCIN DE 80X80 UN 320.940 314.098 324.876 328.766 320.252 323.315 315.270 323.704
3,7 DUCTO ELCTRICO PVC 4" ML 99.769 99.680 99.829 99.949 99.750 99.879 99.680 99.829
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.246.229 1.245.333 1.246.826 1.248.020 1.246.030 1.247.323 1.245.333 1.246.826
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 110.372 109.320 110.961 111.424 110.288 110.582 109.530 110.751
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 69.942 69.387 70.253 70.497 69.897 70.053 69.498 70.142
3,11 TUBERA DRENAJE PVC 110 ML 26.615 26.317 26.781 27.001 26.591 26.674 26.377 26.722
3,12 TUBERA DRENAJE PVC 160 ML 43.129 42.832 43.296 43.516 43.106 43.189 42.891 43.237
3,13 TUBERA DRENAJE PVC 200 ML 56.620 56.204 56.853 57.162 56.587 56.703 56.287 56.770
3,14 TUBERA DRENAJE PVC 250 ML 77.651 77.175 77.917 78.269 77.612 77.746 77.270 77.822
3,15 TUBERA DRENAJE PVC 315 ML 107.747 107.331 107.980 108.288 107.714 107.830 107.414 107.897
3,16 SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 924.430 919.670 927.095 930.618 924.049 925.382 920.622 926.143

SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3,17 UN 1.305.427 1.295.907 1.310.758 1.317.803 1.304.665 1.307.331 1.297.811 1.308.854
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3,18 UN 1.695.546 1.676.506 1.706.208 1.720.298 1.694.022 1.699.354 1.680.314 1.702.400
FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 40.825 40.825 40.825 40.825 40.825 40.825 40.825 40.825
4,2 CASETN DE LONA 0.80X0.70 M2 53.967 53.967 53.967 53.967 53.967 53.967 53.967 53.967
4,3 COLUMNAS 3500 PSI M3 750.454 735.255 758.965 770.013 749.238 753.494 738.295 755.925
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 237.571 224.012 237.208 244.445 235.116 243.292 230.150 242.770
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4,5 M2 92.806 91.330 93.632 94.705 92.688 93.101 91.625 93.337
REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4,6 M2 109.464 107.693 110.455 111.742 109.322 109.818 108.047 110.101
REFUERZO, CONCRETO DE 3500 PSI
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 120.870 118.509 122.192 123.908 120.681 121.342 118.981 121.720
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 127.511 125.002 128.915 130.739 127.310 128.012 125.504 128.414
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 145.812 142.713 147.547 149.799 145.564 146.431 143.333 146.927
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 162.056 158.514 164.039 166.613 161.772 162.764 159.223 163.331
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) CONSTRUCCIN
M2 179.761 175.777 181.992 184.889 179.443 180.558 176.574 181.196
4,12 ENTREPISO VIGUETA PLACA M2 95.785 95.521 95.932 96.095 95.764 95.837 95.574 95.880
4,13 ESCALERA MACIZA 3500 PSI M3 893.302 878.104 901.813 912.861 892.086 896.342 881.143 898.774
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 91.862 91.672 91.969 92.053 91.847 91.900 91.710 91.931
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 74.036 72.516 74.887 75.992 73.914 74.340 72.820 74.583
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 83.047 81.187 84.088 85.439 82.898 83.419 81.559 83.716
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 96.543 94.212 97.849 99.544 96.357 97.010 94.678 97.383
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 653.231 638.032 661.741 672.789 652.014 656.270 641.071 658.702
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 46.450 45.987 46.709 47.033 46.413 46.542 46.079 46.616
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 260.144 253.356 263.945 268.879 259.601 261.501 254.714 262.587
4,21 ACERO FIGURADO 37000 PSI KG 4.061 4.061 4.061 4.061 4.061 4.061 4.061 4.061
4,22 ACERO FIGURADO 60000 PSI KG 4.259 4.259 4.259 4.259 4.259 4.259 4.259 4.259
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.937 5.937 5.937 5.937 5.937 5.937 5.937 5.937
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 792.727 777.528 801.238 812.286 791.511 795.767 780.568 798.198
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 719.078 702.440 728.395 740.497 717.746 722.405 705.767 725.068
4,26 VIGA AREA 3500 PSI M3 788.678 773.479 797.189 808.237 787.462 791.718 776.519 794.149
4,27 VIGA CINTA 3500 PSI M3 769.729 754.531 778.240 789.288 768.513 772.769 757.570 775.201
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 968.788 953.589 977.299 988.347 967.572 971.828 956.629 974.260
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 285.569 268.410 295.178 308.466 284.196 289.001 271.842 291.746

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 27.781 27.377 28.007 28.265 27.748 27.861 27.458 27.926
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 47.062 46.658 47.288 47.546 47.030 47.143 46.739 47.207
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.510 33.415 33.563 33.605 33.502 33.529 33.434 33.544
5,4 ARCOS EN LADRILLO PRENSADO ML 157.037 156.847 157.144 157.228 157.022 157.075 156.885 157.106
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 41.511 41.048 41.770 42.094 41.474 41.603 41.140 41.677
5,6 DINTELES EN BLOQUE 0.15 M ML 25.658 25.468 25.765 25.849 25.643 25.696 25.506 25.727
5,7 ENCHAPES LADRILLO PRENSADO M2 95.745 95.364 95.958 96.126 95.715 95.821 95.440 95.882
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 85.132 83.590 85.996 87.076 85.009 85.441 83.899 85.688
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 88.164 88.164 88.164 88.164 88.164 88.164 88.164 88.164
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.564 51.564 51.564 51.564 51.564 51.564 51.564 51.564
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 84.872 84.872 84.872 84.872 84.872 84.872 84.872 84.872
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 49.918 49.918 49.918 49.918 49.918 49.918 49.918 49.918
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 98.648 98.648 98.648 98.648 98.648 98.648 98.648 98.648
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 58.054 58.054 58.054 58.054 58.054 58.054 58.054 58.054
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 109.816 109.816 109.816 109.816 109.816 109.816 109.816 109.816
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 63.638 63.638 63.638 63.638 63.638 63.638 63.638 63.638
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 39.136 38.944 39.243 39.327 39.120 39.174 38.983 39.205
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.641 23.546 23.695 23.737 23.634 23.660 23.565 23.676
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 51.250 51.122 51.321 51.378 51.240 51.276 51.148 51.296
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 30.705 30.641 30.740 30.768 30.699 30.717 30.654 30.728
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 57.636 57.508 57.707 57.763 57.626 57.661 57.534 57.682
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.533 34.470 34.569 34.597 34.528 34.546 34.482 34.556
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 95.437 94.799 95.794 96.075 95.386 95.564 94.927 95.666
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 56.292 55.973 56.470 56.611 56.266 56.355 56.036 56.406
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 35.890 35.762 35.961 36.018 35.880 35.916 35.788 35.936
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.704 21.640 21.740 21.768 21.699 21.717 21.653 21.727
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 71.520 71.265 71.663 71.775 71.500 71.571 71.316 71.612
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 42.994 42.867 43.066 43.122 42.984 43.020 42.892 43.040
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 84.941 84.750 85.047 85.131 84.926 84.979 84.788 85.009
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 51.289 51.193 51.342 51.384 51.281 51.308 51.212 51.323
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 175.832 174.939 176.332 176.725 175.760 176.010 175.117 176.153
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 105.285 104.839 105.535 105.731 105.249 105.374 104.928 105.446
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 86.846 86.387 87.103 87.305 86.809 86.938 86.479 87.011
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) CONSTRUCCIN
ML 52.241 52.012 52.370 52.471 52.223 52.287 52.057 52.324
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 45.102 44.816 45.262 45.387 45.079 45.159 44.873 45.204
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.365 27.223 27.445 27.508 27.354 27.394 27.251 27.417
5,37 MURO TOLETE COMN 0.06 M M2 32.491 32.363 32.562 32.618 32.481 32.516 32.389 32.537
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.745 19.681 19.780 19.808 19.740 19.757 19.694 19.768
5,39 MURO TOLETE COMN 0.12 M M2 49.216 48.961 49.359 49.471 49.196 49.267 49.012 49.308
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 30.067 29.939 30.138 30.194 30.057 30.092 29.965 30.113
5,41 MURO TOLETE COMN 0.25 M M2 95.114 94.731 95.328 95.497 95.083 95.190 94.808 95.252
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 57.706 57.515 57.813 57.898 57.691 57.745 57.553 57.775
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 69.407 69.152 69.550 69.662 69.386 69.458 69.203 69.499
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 41.788 41.661 41.860 41.916 41.778 41.814 41.686 41.834
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 145.797 144.904 146.297 146.689 145.725 145.975 145.082 146.118
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 88.405 87.959 88.655 88.852 88.369 88.494 88.048 88.566
5,47 REMATES LADRILLO PRENSADO ML 30.545 30.450 30.598 30.640 30.537 30.564 30.469 30.579
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 34.996 34.666 35.181 35.326 34.970 35.062 34.732 35.115
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 59.141 58.700 59.387 59.581 59.105 59.229 58.788 59.299
5,50 LAVADA DE FACHADA M2 4.974 4.974 4.974 4.974 4.974 4.974 4.974 4.974
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 47.408 47.004 47.634 47.892 47.375 47.488 47.085 47.553
5,52 DOVELA, GROUTING 3000 PSI ML 10.080 10.080 10.080 10.080 10.080 10.080 10.080 10.080
5,53 ANCLAJE 3/8" L=30CM UN 13.341 13.341 13.341 13.341 13.341 13.341 13.341 13.341
5,54 ANCLAJE 1/2" L=50CM UN 17.442 17.442 17.442 17.442 17.442 17.442 17.442 17.442
5,55 ANCLAJE 5/8" L=70CM UN 24.456 24.456 24.456 24.456 24.456 24.456 24.456 24.456
5,56 ANCLAJE 3/4" L=70CM UN 36.520 36.520 36.520 36.520 36.520 36.520 36.520 36.520
5,57 ANCLAJE 1" L= 70CM UN 4.549 4.435 4.613 4.699 4.540 4.572 4.458 4.590

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.355 15.355 15.355 15.355 15.355 15.355 15.355 15.355
6,2 FILOS O DILATACIONES B/PLACA ML 5.406 5.311 5.459 5.501 5.399 5.425 5.330 5.440
6,3 FILOS O DILATACIONES S/MURO ML 6.526 6.431 6.579 6.621 6.518 6.545 6.450 6.560
6,4 GOTERA EN MORTERO 1:4 ML 7.762 7.667 7.815 7.857 7.754 7.781 7.686 7.796
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.594 6.594 6.594 6.594 6.594 6.594 6.594 6.594
6,6 MALLA BAJO ENTRAMADO M2 13.072 13.072 13.072 13.072 13.072 13.072 13.072 13.072
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 23.000 22.679 23.180 23.321 22.974 23.064 22.743 23.116
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.949 13.789 14.039 14.110 13.937 13.982 13.821 14.007
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 19.962 19.694 20.112 20.230 19.941 20.016 19.748 20.059
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.138 12.004 12.213 12.272 12.127 12.164 12.030 12.186
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 19.326 19.004 19.506 19.647 19.300 19.390 19.069 19.441
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.819 11.659 11.909 11.980 11.807 11.852 11.691 11.877
6,13 PAETE CULATAS 1:4, E=2 CM M2 19.962 19.694 20.112 20.230 19.941 20.016 19.748 20.059
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.138 12.004 12.213 12.272 12.127 12.164 12.030 12.186
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 20.591 20.362 20.719 20.820 20.573 20.637 20.408 20.674
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.451 12.337 12.515 12.566 12.442 12.474 12.360 12.492
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.609 16.405 16.723 16.813 16.593 16.650 16.446 16.682
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.189 10.087 10.246 10.291 10.181 10.209 10.107 10.225
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.124 15.879 16.261 16.369 16.105 16.173 15.928 16.212
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.946 9.824 10.015 10.069 9.936 9.971 9.848 9.990
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 20.697 20.429 20.847 20.965 20.675 20.751 20.483 20.793
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.486 12.352 12.561 12.620 12.475 12.513 12.379 12.534
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 20.061 19.739 20.241 20.382 20.035 20.125 19.804 20.176
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.168 12.007 12.258 12.329 12.155 12.200 12.040 12.226
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.700 16.456 16.838 16.945 16.681 16.749 16.505 16.789
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.218 10.095 10.286 10.340 10.208 10.242 10.120 10.262
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 20.900 20.579 21.080 21.222 20.875 20.965 20.643 21.016
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 12.970 12.809 13.060 13.130 12.957 13.002 12.841 13.028
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
CONSTRUCCIN
7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 25.368 24.985 25.582 25.751 25.337 25.444 25.062 25.506
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7,2 M2 79.063 78.292 79.495 80.035 79.001 79.217 78.446 79.341
IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 53.631 53.631 53.631 53.631 53.631 53.631 53.631 53.631
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.329 21.329 21.329 21.329 21.329 21.329 21.329 21.329
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.509 33.509 33.509 33.509 33.509 33.509 33.509 33.509
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 78.402 78.402 78.402 78.402 78.402 78.402 78.402 78.402
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 61.369 61.369 61.369 61.369 61.369 61.369 61.369 61.369
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.644 35.644 35.644 35.644 35.644 35.644 35.644 35.644
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 82.173 82.173 82.173 82.173 82.173 82.173 82.173 82.173
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 98.146 98.146 98.146 98.146 98.146 98.146 98.146 98.146
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 144.290 144.290 144.290 144.290 144.290 144.290 144.290 144.290
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 56.915 56.915 56.915 56.915 56.915 56.915 56.915 56.915
7,13 CANAL PVC AMAZONAS ML 79.030 79.030 79.030 79.030 79.030 79.030 79.030 79.030
7,14 CANAL PVC RAINGO ML 71.828 71.828 71.828 71.828 71.828 71.828 71.828 71.828
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 127.698 127.698 127.698 127.698 127.698 127.698 127.698 127.698
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 74.607 74.607 74.607 74.607 74.607 74.607 74.607 74.607
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 54.781 54.781 54.781 54.781 54.781 54.781 54.781 54.781
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 31.112 31.112 31.112 31.112 31.112 31.112 31.112 31.112
7,19 TEJA DE BARRO M2 56.710 56.234 56.976 57.186 56.671 56.805 56.329 56.881
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 45.672 45.672 45.672 45.672 45.672 45.672 45.672 45.672
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 41.864 41.864 41.864 41.864 41.864 41.864 41.864 41.864
7,22 TEJA FIBROCEMENTO N4 M2 35.251 35.251 35.251 35.251 35.251 35.251 35.251 35.251
7,23 TEJA FIBROCEMENTO No. 6 M2 34.521 34.521 34.521 34.521 34.521 34.521 34.521 34.521
7,24 TEJA FIBROCEMENTO No. 8 M2 34.782 34.782 34.782 34.782 34.782 34.782 34.782 34.782
7,25 TEJA TERMOACSTICA M2 49.007 49.007 49.007 49.007 49.007 49.007 49.007 49.007
7,26 TEJA PLSTICA No.6 M2 43.074 43.074 43.074 43.074 43.074 43.074 43.074 43.074
7,27 TEJA ESPAOLA ETERNIT M2 78.899 78.899 78.899 78.899 78.899 78.899 78.899 78.899
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 145.777 145.777 145.777 145.777 145.777 145.777 145.777 145.777
7,29 TEJA SIN TRASLAPO M2 65.503 65.503 65.503 65.503 65.503 65.503 65.503 65.503
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 40.909 40.909 40.909 40.909 40.909 40.909 40.909 40.909
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 32.080 32.080 32.080 32.080 32.080 32.080 32.080 32.080
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7,32 M2 56.052 56.052 56.052 56.052 56.052 56.052 56.052 56.052
ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.224 19.224 19.224 19.224 19.224 19.224 19.224 19.224
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.151 23.151 23.151 23.151 23.151 23.151 23.151 23.151
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.103 25.103 25.103 25.103 25.103 25.103 25.103 25.103
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 32.353 32.353 32.353 32.353 32.353 32.353 32.353 32.353
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.328 21.328 21.328 21.328 21.328 21.328 21.328 21.328
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 50.229 50.229 50.229 50.229 50.229 50.229 50.229 50.229
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 345.615 345.615 345.615 345.615 345.615 345.615 345.615 345.615
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 393.776 393.776 393.776 393.776 393.776 393.776 393.776 393.776
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 262.175 262.175 262.175 262.175 262.175 262.175 262.175 262.175
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 280.256 280.256 280.256 280.256 280.256 280.256 280.256 280.256

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 412.473 396.622 421.349 432.445 411.204 415.643 399.792 418.179
8,2 CONCRETO 3500 PSI M3 359.931 345.175 368.194 378.920 358.750 362.882 348.126 365.243
8,3 CONCRETO 3000 PSI M3 358.011 342.683 366.594 378.017 356.784 361.076 345.749 363.528
8,4 CONCRETO 2500 PSI M3 312.983 297.560 321.619 332.416 311.749 316.067 300.645 318.535
8,5 CONCRETO 2000 PSI M3 290.855 274.861 299.811 311.527 289.575 294.053 278.060 296.612
8,6 CONCRETO 1500 PSI M3 262.983 246.323 272.312 285.213 261.650 266.315 249.655 268.980
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
8,7 MORTERO SECO 1:10 CONSTRUCCIN
M3 221.663 208.525 229.020 234.800 220.611 224.290 211.153 226.392
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 425.686 412.929 432.829 438.442 424.664 428.237 415.480 430.278
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 395.384 380.083 403.952 410.684 394.160 398.444 383.144 400.892
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 455.119 440.809 463.132 469.428 453.974 457.980 443.671 460.270
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 674.579 660.269 682.592 688.888 673.434 677.440 663.131 679.730

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 119.143 119.143 119.143 119.143 119.143 119.143 119.143 119.143
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.756 3.660 3.809 3.851 3.748 3.775 3.679 3.790
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 133.219 133.219 133.219 133.219 133.219 133.219 133.219 133.219
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 163.260 163.260 163.260 163.260 163.260 163.260 163.260 163.260
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 237.764 237.764 237.764 237.764 237.764 237.764 237.764 237.764
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 264.665 264.665 264.665 264.665 264.665 264.665 264.665 264.665
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 291.596 291.596 291.596 291.596 291.596 291.596 291.596 291.596
9,8 HOJA PUERTA FORTEC 0.81 UN 193.714 193.714 193.714 193.714 193.714 193.714 193.714 193.714
9,9 HOJA PUERTA FORTEC 0.91 UN 219.629 219.629 219.629 219.629 219.629 219.629 219.629 219.629
9,10 HOJA PUERTA FORTEC 1.50 UN 323.290 323.290 323.290 323.290 323.290 323.290 323.290 323.290
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 122.446 122.446 122.446 122.446 122.446 122.446 122.446 122.446
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 162.615 162.615 162.615 162.615 162.615 162.615 162.615 162.615
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 180.756 180.756 180.756 180.756 180.756 180.756 180.756 180.756
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 460.643 460.643 460.643 460.643 460.643 460.643 460.643 460.643
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.675 40.675 40.675 40.675 40.675 40.675 40.675 40.675
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.272 25.272 25.272 25.272 25.272 25.272 25.272 25.272
9,17 VENTANERA EN MADERA CEDRO MACHO M2 96.152 96.152 96.152 96.152 96.152 96.152 96.152 96.152
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 117.797 117.797 117.797 117.797 117.797 117.797 117.797 117.797
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 91.493 91.493 91.493 91.493 91.493 91.493 91.493 91.493
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 28.312 28.312 28.312 28.312 28.312 28.312 28.312 28.312
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 28.312 28.312 28.312 28.312 28.312 28.312 28.312 28.312
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 26.834 26.834 26.834 26.834 26.834 26.834 26.834 26.834
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 41.020 41.020 41.020 41.020 41.020 41.020 41.020 41.020
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 50.836 50.836 50.836 50.836 50.836 50.836 50.836 50.836
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 61.305 61.305 61.305 61.305 61.305 61.305 61.305 61.305
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 73.738 73.738 73.738 73.738 73.738 73.738 73.738 73.738
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 347.758 347.758 347.758 347.758 347.758 347.758 347.758 347.758
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 243.059 243.059 243.059 243.059 243.059 243.059 243.059 243.059
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.513 32.513 32.513 32.513 32.513 32.513 32.513 32.513
9,30 VIDRIO TRANSPARENTE 4 MM M2 41.675 41.675 41.675 41.675 41.675 41.675 41.675 41.675
9,31 VIDRIO TRANSPARENTE 5 MM M2 50.836 50.836 50.836 50.836 50.836 50.836 50.836 50.836
9,32 VIDRIO TRANSPARENTE 6 MM M2 63.923 63.923 63.923 63.923 63.923 63.923 63.923 63.923

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 73.559 73.559 73.559 73.559 73.559 73.559 73.559 73.559
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 205.163 205.163 205.163 205.163 205.163 205.163 205.163 205.163
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10,3 ML 77.794 77.794 77.794 77.794 77.794 77.794 77.794 77.794
ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 138.948 138.948 138.948 138.948 138.948 138.948 138.948 138.948
10,5 MARCO TAPA CAJA DE INSPECCIN UN 131.953 131.953 131.953 131.953 131.953 131.953 131.953 131.953
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 86.630 86.630 86.630 86.630 86.630 86.630 86.630 86.630
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 204.318 204.318 204.318 204.318 204.318 204.318 204.318 204.318
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 106.343 106.343 106.343 106.343 106.343 106.343 106.343 106.343
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.375 6.375 6.375 6.375 6.375 6.375 6.375 6.375
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO
10,10 M2 95.749 95.749 95.749 95.749 95.749 95.749 95.749 95.749
ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.435 39.435 39.435 39.435 39.435 39.435 39.435 39.435
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM CONSTRUCCIN
M2 523.356 523.356 523.356 523.356 523.356 523.356 523.356 523.356
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 188.037 188.037 188.037 188.037 188.037 188.037 188.037 188.037
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 210.686 210.686 210.686 210.686 210.686 210.686 210.686 210.686
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10,15 M2 476.986 476.986 476.986 476.986 476.986 476.986 476.986 476.986
ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 123.689 123.689 123.689 123.689 123.689 123.689 123.689 123.689
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 381.768 381.768 381.768 381.768 381.768 381.768 381.768 381.768
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.827 5.827 5.827 5.827 5.827 5.827 5.827 5.827
10,19 VENTANA EN ALUMINIO CORREDIZA M2 268.267 268.267 268.267 268.267 268.267 268.267 268.267 268.267
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 117.817 117.817 117.817 117.817 117.817 117.817 117.817 117.817
10,21 REJILLA PISO 0.30 M M2 83.398 83.398 83.398 83.398 83.398 83.398 83.398 83.398
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 86.043 86.043 86.043 86.043 86.043 86.043 86.043 86.043
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10,23 KG 10.214 10.214 10.214 10.214 10.214 10.214 10.214 10.214
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN,
SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE,
10,24 KG 11.337 11.337 11.337 11.337 11.337 11.337 11.337 11.337
ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS,
10,25 KG 9.004 9.004 9.004 9.004 9.004 9.004 9.004 9.004
VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 212.962 212.962 212.962 212.962 212.962 212.962 212.962 212.962
11,2 ACOMETIDA EN PVC 3/4" 5M UN 257.178 257.178 257.178 257.178 257.178 257.178 257.178 257.178
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.329 21.329 21.329 21.329 21.329 21.329 21.329 21.329
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.509 33.509 33.509 33.509 33.509 33.509 33.509 33.509
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 32.112 32.112 32.112 32.112 32.112 32.112 32.112 32.112
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 41.202 41.202 41.202 41.202 41.202 41.202 41.202 41.202
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 85.041 85.041 85.041 85.041 85.041 85.041 85.041 85.041
11,8 CONEXIN TANQUE ELEVADO PVC UN 214.283 214.283 214.283 214.283 214.283 214.283 214.283 214.283
11,9 INSTALACIN APARATO SANITARIO UN 41.852 41.852 41.852 41.852 41.852 41.852 41.852 41.852
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 33.755 33.755 33.755 33.755 33.755 33.755 33.755 33.755
11,13 NIPLE PASAMURO 2" UN 64.064 64.064 64.064 64.064 64.064 64.064 64.064 64.064
11,14 NIPLE PASAMURO 4" UN 95.777 95.777 95.777 95.777 95.777 95.777 95.777 95.777
11,15 PUNTO AGUA CALIENTE CPVC UN 80.968 80.968 80.968 80.968 80.968 80.968 80.968 80.968
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 58.891 58.891 58.891 58.891 58.891 58.891 58.891 58.891
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.683 62.683 62.683 62.683 62.683 62.683 62.683 62.683
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 79.219 79.219 79.219 79.219 79.219 79.219 79.219 79.219
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 63.959 63.959 63.959 63.959 63.959 63.959 63.959 63.959
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 80.148 80.148 80.148 80.148 80.148 80.148 80.148 80.148
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 85.757 85.757 85.757 85.757 85.757 85.757 85.757 85.757
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 71.220 71.220 71.220 71.220 71.220 71.220 71.220 71.220
11,23 RED SUMINISTRO CPVC 1/2" ML 12.056 12.056 12.056 12.056 12.056 12.056 12.056 12.056
11,24 RED SUMINISTRO CPVC 3/4" ML 16.997 16.997 16.997 16.997 16.997 16.997 16.997 16.997
11,25 RED SUMINISTRO PVC 1 1/2" ML 22.187 22.187 22.187 22.187 22.187 22.187 22.187 22.187
11,26 RED SUMINISTRO PVC 1" ML 13.691 13.691 13.691 13.691 13.691 13.691 13.691 13.691
11,27 RED SUMINISTRO PVC 1/2" ML 8.170 8.170 8.170 8.170 8.170 8.170 8.170 8.170
11,28 RED SUMINISTRO PVC 2 1/2" ML 49.479 49.479 49.479 49.479 49.479 49.479 49.479 49.479
11,29 RED SUMINISTRO PVC 2" ML 31.633 31.633 31.633 31.633 31.633 31.633 31.633 31.633
11,30 RED SUMINISTRO PVC 3/4" ML 10.237 10.237 10.237 10.237 10.237 10.237 10.237 10.237
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
11,31 RED SANITARIA PVC-S 2" CONSTRUCCIN
ML 24.413 24.413 24.413 24.413 24.413 24.413 24.413 24.413
11,32 RED SANITARIA PVC-S 3" ML 33.889 33.889 33.889 33.889 33.889 33.889 33.889 33.889
11,33 RED SANITARIA PVC-S 4" ML 46.000 46.000 46.000 46.000 46.000 46.000 46.000 46.000
11,34 RED SANITARIA PVC-S 6" ML 86.112 86.112 86.112 86.112 86.112 86.112 86.112 86.112
11,35 REGISTRO 1" UN 104.466 104.466 104.466 104.466 104.466 104.466 104.466 104.466
11,36 REGISTRO 1/2" UN 58.218 58.218 58.218 58.218 58.218 58.218 58.218 58.218
11,37 REGISTRO 3/4" UN 74.182 74.182 74.182 74.182 74.182 74.182 74.182 74.182
11,38 REGISTRO 1 1/2" UN 179.361 179.361 179.361 179.361 179.361 179.361 179.361 179.361
11,39 REGISTRO 2 1/2" UN 370.138 370.138 370.138 370.138 370.138 370.138 370.138 370.138
11,40 REGISTRO 2" UN 273.364 273.364 273.364 273.364 273.364 273.364 273.364 273.364
11,41 REVENTILACIN 2" ML 17.008 17.008 17.008 17.008 17.008 17.008 17.008 17.008
11,42 REVENTILACIN 3" ML 21.470 21.470 21.470 21.470 21.470 21.470 21.470 21.470
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 167.026 167.026 167.026 167.026 167.026 167.026 167.026 167.026
11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 272.113 272.113 272.113 272.113 272.113 272.113 272.113 272.113
11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 453.004 453.004 453.004 453.004 453.004 453.004 453.004 453.004
11,46 TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 39.279 39.279 39.279 39.279 39.279 39.279 39.279 39.279
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,47 ML 46.307 46.307 46.307 46.307 46.307 46.307 46.307 46.307
SOPORTES)

11,48 TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 59.390 59.390 59.390 59.390 59.390 59.390 59.390 59.390
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,49 ML 67.339 67.339 67.339 67.339 67.339 67.339 67.339 67.339
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,50 ML 86.757 86.757 86.757 86.757 86.757 86.757 86.757 86.757
SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11,51 ML 100.462 100.462 100.462 100.462 100.462 100.462 100.462 100.462
SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11,52 ML 148.542 148.542 148.542 148.542 148.542 148.542 148.542 148.542
SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 59.714 59.714 59.714 59.714 59.714 59.714 59.714 59.714
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 59.958 59.958 59.958 59.958 59.958 59.958 59.958 59.958
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 38.787 38.787 38.787 38.787 38.787 38.787 38.787 38.787
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 47.805 47.805 47.805 47.805 47.805 47.805 47.805 47.805
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.060 4.060 4.060 4.060 4.060 4.060 4.060 4.060
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.396 6.396 6.396 6.396 6.396 6.396 6.396 6.396
11,59 GABINETE TIPO III UN 987.437 987.437 987.437 987.437 987.437 987.437 987.437 987.437
11,60 GABINETE TIPO I UN 754.457 754.457 754.457 754.457 754.457 754.457 754.457 754.457
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.532.997 2.532.997 2.532.997 2.532.997 2.532.997 2.532.997 2.532.997 2.532.997
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.111.529 2.111.529 2.111.529 2.111.529 2.111.529 2.111.529 2.111.529 2.111.529
11,63 VLVULA MARIPOSA 3" UN 612.384 612.384 612.384 612.384 612.384 612.384 612.384 612.384
11,64 VLVULA MARIPOSA 4" UN 792.755 792.755 792.755 792.755 792.755 792.755 792.755 792.755
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 305.556 305.556 305.556 305.556 305.556 305.556 305.556 305.556

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 352.405 352.405 352.405 352.405 352.405 352.405 352.405 352.405
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 55.997 55.997 55.997 55.997 55.997 55.997 55.997 55.997
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 66.312 66.312 66.312 66.312 66.312 66.312 66.312 66.312
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 73.599 73.599 73.599 73.599 73.599 73.599 73.599 73.599
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 86.712 86.712 86.712 86.712 86.712 86.712 86.712 86.712
12,6 SALIDA TELFONO PVC COMPLETA UN 52.635 52.635 52.635 52.635 52.635 52.635 52.635 52.635
12,7 SALIDA TIMBRE PVC COMPLETA UN 60.005 60.005 60.005 60.005 60.005 60.005 60.005 60.005
12,8 STRIP TELEFNICO 10 PARES UN 138.369 138.369 138.369 138.369 138.369 138.369 138.369 138.369
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 54.053 54.053 54.053 54.053 54.053 54.053 54.053 54.053
12,10 SALIDA TRIFSICA PVC COMPLETA UN 124.255 124.255 124.255 124.255 124.255 124.255 124.255 124.255
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
12,11 SALIDA T.V PVC COMPLETA. CONSTRUCCIN
UN 74.282 74.282 74.282 74.282 74.282 74.282 74.282 74.282
12,12 SALIDA BIFSICA C.N. UN 44.053 44.053 44.053 44.053 44.053 44.053 44.053 44.053
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 92.784 92.784 92.784 92.784 92.784 92.784 92.784 92.784
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 396.094 396.094 396.094 396.094 396.094 396.094 396.094 396.094
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 527.741 527.741 527.741 527.741 527.741 527.741 527.741 527.741
12,16 TUBERA PVC CONDUIT 1/2" ML 3.417 3.417 3.417 3.417 3.417 3.417 3.417 3.417
12,17 TUBERA PVC CONDUIT 3/4" ML 4.512 4.512 4.512 4.512 4.512 4.512 4.512 4.512
12,18 TUBERA PVC CONDUIT 1" ML 7.023 7.023 7.023 7.023 7.023 7.023 7.023 7.023
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.559 12.559 12.559 12.559 12.559 12.559 12.559 12.559
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 263.964 263.964 263.964 263.964 263.964 263.964 263.964 263.964
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 74.533 74.533 74.533 74.533 74.533 74.533 74.533 74.533
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 100.990 100.990 100.990 100.990 100.990 100.990 100.990 100.990
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 41.061 41.061 41.061 41.061 41.061 41.061 41.061 41.061
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.352.653 1.352.653 1.352.653 1.352.653 1.352.653 1.352.653 1.352.653 1.352.653
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.002.555 1.002.555 1.002.555 1.002.555 1.002.555 1.002.555 1.002.555 1.002.555
12,26 POSTE METLICO 6M UN 1.256.345 1.256.345 1.256.345 1.256.345 1.256.345 1.256.345 1.256.345 1.256.345
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 584.652 584.652 584.652 584.652 584.652 584.652 584.652 584.652
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 106.539 106.539 106.539 106.539 106.539 106.539 106.539 106.539
12,29 LUMINARIA 70W SODIO UN 490.587 490.587 490.587 490.587 490.587 490.587 490.587 490.587
12,30 LUMINARIA 150W SODIO UN 613.848 613.848 613.848 613.848 613.848 613.848 613.848 613.848
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.621.851 1.621.851 1.621.851 1.621.851 1.621.851 1.621.851 1.621.851 1.621.851
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.194.247 1.194.247 1.194.247 1.194.247 1.194.247 1.194.247 1.194.247 1.194.247

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 38.136 37.586 38.445 38.687 38.092 38.246 37.696 38.334
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 37.957 37.407 38.265 38.508 37.913 38.067 37.517 38.155
13,3 ALISTADO PARA LISTN M2 14.088 13.978 14.149 14.198 14.079 14.110 14.000 14.127
13,4 ALISTADO PISOS 1:3, E=0.04 M2 26.660 25.559 27.276 27.761 26.572 26.880 25.779 27.056
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 82.077 80.976 82.693 83.178 81.989 82.297 81.196 82.473
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 24.993 24.673 25.172 25.406 24.967 25.057 24.737 25.108
13,7 CONCRETO BASE GRADAS 2500 PSI M2 52.839 51.297 53.703 54.783 52.716 53.148 51.605 53.394
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 72.808 70.340 74.189 75.917 72.610 73.301 70.833 73.696
13,9 MANTO FIBERGLASS 600X1 M2 29.456 29.456 29.456 29.456 29.456 29.456 29.456 29.456
13,10 PEGANTE MORTERO-CONCRETO M2 22.192 22.192 22.192 22.192 22.192 22.192 22.192 22.192
13,11 PERMA PLY 2 CAPAS M2 26.020 26.020 26.020 26.020 26.020 26.020 26.020 26.020
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 42.805 41.417 43.583 44.554 42.694 43.083 41.695 43.305
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 50.049 48.352 50.999 52.186 49.913 50.388 48.691 50.659
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 72.323 69.701 73.791 75.627 72.113 72.847 70.226 73.267
13,15 TRITURADO FINO 1/2 M3 84.893 72.023 92.100 97.763 83.863 87.467 74.597 89.526
13,16 TRITURADO GRUESO 3/4 M3 92.146 78.092 100.398 112.924 90.512 98.619 80.187 98.304

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 55.395 55.175 55.519 55.616 55.378 55.439 55.219 55.475
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 33.054 32.944 33.116 33.164 33.045 33.076 32.966 33.094
14,3 ADOQUN CONCRETO 6CM M2 63.195 62.645 63.504 63.746 63.151 63.306 62.755 63.394
14,4 ADOQUN CONCRETO 8CM M2 66.395 65.845 66.704 66.946 66.351 66.506 65.955 66.594
14,5 ADOQUN GRES PEATONAL M2 70.555 70.005 70.863 71.106 70.511 70.665 70.115 70.753
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14,6 M2 73.189 72.968 73.312 73.409 73.171 73.233 73.013 73.268
INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.485 35.253 35.615 35.717 35.467 35.531 35.300 35.569
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 159.182 158.192 159.737 160.173 159.103 159.380 158.390 159.539
14,9 ACABADO EN GRAVILLA LAVADA M2 44.204 43.630 44.525 44.778 44.158 44.319 43.745 44.410
14,10 GUARDAESCOBA EN GRANITO ML 42.316 42.316 42.316 42.316 42.316 42.316 42.316 42.316
14,11 GUARDAESCOBA EN GRAVILLA ML 9.628 9.396 9.758 9.860 9.609 9.674 9.442 9.711
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
14,12 GUARDAESCOBA PVC CARAMELO CONSTRUCCIN
ML 9.151 9.151 9.151 9.151 9.151 9.151 9.151 9.151
14,13 GUARDAESCOBA PVC CEDRO ML 12.289 12.289 12.289 12.289 12.289 12.289 12.289 12.289
14,14 GUARDAESCOBA PINO CARIBE ML 10.209 10.209 10.209 10.209 10.209 10.209 10.209 10.209
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.148 17.148 17.148 17.148 17.148 17.148 17.148 17.148
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.475 33.475 33.475 33.475 33.475 33.475 33.475 33.475
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.879 8.879 8.879 8.879 8.879 8.879 8.879 8.879
14,18 LISTN M.H. AMARILLO M2 72.232 72.232 72.232 72.232 72.232 72.232 72.232 72.232
14,19 PASO ESCALERA GRANITO ML 114.636 113.866 115.068 115.407 114.575 114.790 114.020 114.914
14,20 PIRLANES ALUMINIO ML 7.245 7.245 7.245 7.245 7.245 7.245 7.245 7.245
14,21 PIRLANES LADRILLO ML 30.777 30.587 30.884 30.968 30.762 30.815 30.625 30.846
14,22 PISO VINILO TRFICO RESIDENCIAL M2 44.698 44.698 44.698 44.698 44.698 44.698 44.698 44.698
14,23 PISO VINILO TRFICO PESADO M2 51.978 51.978 51.978 51.978 51.978 51.978 51.978 51.978
14,24 PULIDA LACADA PISO MADERA M2 47.685 47.685 47.685 47.685 47.685 47.685 47.685 47.685
14,25 TABLETA DE GRES 25X25 M2 48.017 47.797 48.140 48.237 47.999 48.061 47.841 48.096
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 53.943 53.722 54.066 54.163 53.925 53.987 53.766 54.022
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.566 10.566 10.566 10.566 10.566 10.566 10.566 10.566
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 47.881 47.595 48.040 48.166 47.858 47.938 47.652 47.983
14,29 JABONERA PORCELANA ACUARIO UN 20.068 20.068 20.068 20.068 20.068 20.068 20.068 20.068
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14,30 UN 120.227 120.227 120.227 120.227 120.227 120.227 120.227 120.227
PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.601 9.601 9.601 9.601 9.601 9.601 9.601 9.601
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 21.888 21.888 21.888 21.888 21.888 21.888 21.888 21.888
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.007 14.007 14.007 14.007 14.007 14.007 14.007 14.007
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.606 13.606 13.606 13.606 13.606 13.606 13.606 13.606
14,35 REMATES BOCEL ALUMINIO ML 8.240 8.240 8.240 8.240 8.240 8.240 8.240 8.240
14,36 REMATES BOCEL PORCELANA ML 8.387 8.387 8.387 8.387 8.387 8.387 8.387 8.387
14,37 TAPA REGISTRO 20X20 UN 18.529 18.529 18.529 18.529 18.529 18.529 18.529 18.529
14,38 TAPA REGISTRO 6X6 UN 16.877 16.877 16.877 16.877 16.877 16.877 16.877 16.877
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 18.270 18.270 18.270 18.270 18.270 18.270 18.270 18.270
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN
14,40 M2 21.121 21.121 21.121 21.121 21.121 21.121 21.121 21.121
SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 63.454 63.234 63.578 63.675 63.437 63.498 63.278 63.534
14,42 MEDIA CAA EN GRANITO ML 75.655 75.655 75.655 75.655 75.655 75.655 75.655 75.655
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.797 32.797 32.797 32.797 32.797 32.797 32.797 32.797
14,44 PINTURA ACRLICA PARA PISOS M2 12.885 12.885 12.885 12.885 12.885 12.885 12.885 12.885
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 99.488 99.488 99.488 99.488 99.488 99.488 99.488 99.488
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 120.317 120.317 120.317 120.317 120.317 120.317 120.317 120.317

15 CIELO RASO
15,1 APLIQUE YESO ML 71.067 71.067 71.067 71.067 71.067 71.067 71.067 71.067
15,2 ARMADURA MADERA Y MALLA M2 34.671 34.671 34.671 34.671 34.671 34.671 34.671 34.671
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53.820 53.820 53.820 53.820 53.820 53.820 53.820 53.820
15,4 CIELO RASO DURACUSTIC M2 66.119 66.119 66.119 66.119 66.119 66.119 66.119 66.119
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49.321 49.321 49.321 49.321 49.321 49.321 49.321 49.321
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 91.582 91.582 91.582 91.582 91.582 91.582 91.582 91.582
15,7 CORNISAS YESO ML 47.723 47.723 47.723 47.723 47.723 47.723 47.723 47.723
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 101.303 101.303 101.303 101.303 101.303 101.303 101.303 101.303
15,9 MALLA CON VENA M2 12.979 12.979 12.979 12.979 12.979 12.979 12.979 12.979

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima

16,4
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE CONSTRUCCIN
M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 84.262 72.620 92.023 107.545 81.675 98.490 72.620 92.023
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 88.709 75.311 96.212 102.107 87.638 91.389 77.991 93.532
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 106.908 95.266 132.778 137.952 123.723 118.549 108.201 117.256
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 61.878 50.236 69.639 85.161 52.823 73.519 63.171 72.226
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 94.529 82.887 120.399 125.573 111.344 106.170 95.822 104.877
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 104.247 92.605 130.117 135.291 121.062 115.888 105.540 114.595

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 294.527 294.527 294.527 294.527 294.527 294.527 294.527 294.527
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 869.376 869.376 869.376 869.376 869.376 869.376 869.376 869.376
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 470.806 470.806 470.806 470.806 470.806 470.806 470.806 470.806
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 135.971 135.971 135.971 135.971 135.971 135.971 135.971 135.971
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 190.736 190.736 190.736 190.736 190.736 190.736 190.736 190.736
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 177.091 177.091 177.091 177.091 177.091 177.091 177.091 177.091
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 390.598 390.598 390.598 390.598 390.598 390.598 390.598 390.598
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 999.913 999.913 999.913 999.913 999.913 999.913 999.913 999.913
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 283.567 283.567 283.567 283.567 283.567 283.567 283.567 283.567
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 200.630 200.630 200.630 200.630 200.630 200.630 200.630 200.630
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 79.484 79.484 79.484 79.484 79.484 79.484 79.484 79.484
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE
17,12 UN 243.140 243.140 243.140 243.140 243.140 243.140 243.140 243.140
45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE
17,13 UN 358.464 358.464 358.464 358.464 358.464 358.464 358.464 358.464
120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.048 8.048 8.048 8.048 8.048 8.048 8.048 8.048
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.989 2.989 2.989 2.989 2.989 2.989 2.989 2.989
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.691 10.691 10.691 10.691 10.691 10.691 10.691 10.691
18,4 BARNIZ SOBRE MUEBLES M2 40.835 40.835 40.835 40.835 40.835 40.835 40.835 40.835
18,5 CARBURO SOBRE PAETES M2 5.606 5.606 5.606 5.606 5.606 5.606 5.606 5.606
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 64.080 64.080 64.080 64.080 64.080 64.080 64.080 64.080
18,7 DEMARCACIN CON MARMOLINA ML 3.329 3.329 3.329 3.329 3.329 3.329 3.329 3.329
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.680 2.680 2.680 2.680 2.680 2.680 2.680 2.680
18,9 ESMALTE SOBRE LMINA LLENA M2 13.429 13.429 13.429 13.429 13.429 13.429 13.429 13.429
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.894 3.894 3.894 3.894 3.894 3.894 3.894 3.894
18,11 ESMALTE SOBRE MADERA LLENA M2 14.162 14.162 14.162 14.162 14.162 14.162 14.162 14.162
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.571 5.571 5.571 5.571 5.571 5.571 5.571 5.571
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.333 6.333 6.333 6.333 6.333 6.333 6.333 6.333
18,14 ESTUCO M2 6.733 6.733 6.733 6.733 6.733 6.733 6.733 6.733
18,15 ESTUCO (LINEAL) ML 4.211 4.211 4.211 4.211 4.211 4.211 4.211 4.211
18,16 ESTUCO Y VINILO 3 MANOS M2 14.938 14.938 14.938 14.938 14.938 14.938 14.938 14.938
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.243 9.243 9.243 9.243 9.243 9.243 9.243 9.243
18,18 LACA PISOS MADERA M2 21.840 21.840 21.840 21.840 21.840 21.840 21.840 21.840
18,19 LNEAS TRFICO 0.10 ML 2.583 2.583 2.583 2.583 2.583 2.583 2.583 2.583
18,20 MARMOLINA SOBRE PAETE M2 11.795 11.795 11.795 11.795 11.795 11.795 11.795 11.795
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.180 3.180 3.180 3.180 3.180 3.180 3.180 3.180
18,22 TINTILLA SOBRE MADERA LLENA M2 12.141 12.141 12.141 12.141 12.141 12.141 12.141 12.141
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.822 6.822 6.822 6.822 6.822 6.822 6.822 6.822
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) CONSTRUCCIN
ML 4.280 4.280 4.280 4.280 4.280 4.280 4.280 4.280
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.109 21.109 21.109 21.109 21.109 21.109 21.109 21.109
18,26 PINTURA EPXICA M2 12.190 12.190 12.190 12.190 12.190 12.190 12.190 12.190
18,27 PINTURA EPXICA (LINEAL) ML 7.520 7.520 7.520 7.520 7.520 7.520 7.520 7.520

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.924.505 5.924.505 5.924.505 5.924.505 5.924.505 5.924.505 5.924.505 5.924.505
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y
19,2 UN 10.467.661 10.467.661 10.467.661 10.467.661 10.467.661 10.467.661 10.467.661 10.467.661
CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.739.323 2.739.323 2.739.323 2.739.323 2.739.323 2.739.323 2.739.323 2.739.323
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.952.468 8.952.468 8.952.468 8.952.468 8.952.468 8.952.468 8.952.468 8.952.468
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.384.150 8.384.150 8.384.150 8.384.150 8.384.150 8.384.150 8.384.150 8.384.150
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.583 2.583 2.583 2.583 2.583 2.583 2.583 2.583
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 840.274 840.274 840.274 840.274 840.274 840.274 840.274 840.274
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 84.023 84.023 84.023 84.023 84.023 84.023 84.023 84.023
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.521.042 1.520.883 1.521.131 1.521.242 1.521.029 1.521.074 1.520.915 1.521.099
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 652.191 648.359 654.337 657.192 651.884 652.957 649.125 653.570

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.595 28.595 28.595 28.595 28.595 28.595 28.595 28.595
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.512 42.512 42.512 42.512 42.512 42.512 42.512 42.512
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 52.708 52.708 52.708 52.708 52.708 52.708 52.708 52.708
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.155 17.155 17.155 17.155 17.155 17.155 17.155 17.155
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 20.782 20.782 20.782 20.782 20.782 20.782 20.782 20.782
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 28.340 28.340 28.340 28.340 28.340 28.340 28.340 28.340
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.357 25.357 25.357 25.357 25.357 25.357 25.357 25.357
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.724 26.724 26.724 26.724 26.724 26.724 26.724 26.724
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.420 33.420 33.420 33.420 33.420 33.420 33.420 33.420
20,10 VLVULA DE BOLA GAS 1/2" UN 17.149 17.149 17.149 17.149 17.149 17.149 17.149 17.149
20,11 VLVULA DE BOLA GAS 3/4" UN 22.496 22.496 22.496 22.496 22.496 22.496 22.496 22.496
20,12 VLVULA DE BOLA GAS 1" UN 34.641 34.641 34.641 34.641 34.641 34.641 34.641 34.641
20,13 VLVULA POLIETILENO GAS 1/2" UN 266.120 266.120 266.120 266.120 266.120 266.120 266.120 266.120
20,14 VLVULA POLIETILENO GAS 3/4" UN 306.304 306.304 306.304 306.304 306.304 306.304 306.304 306.304
20,15 VLVULA POLIETILENO GAS 1" UN 319.413 319.413 319.413 319.413 319.413 319.413 319.413 319.413
20,16 ACOMETIDA GAS 1/2" ML 296.060 296.060 296.060 296.060 296.060 296.060 296.060 296.060

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 216.003 216.003 216.003 216.003 216.003 216.003 216.003 216.003
21,2 CABLE DETECTOR LINEAL DE CALOR ML 33.158 33.158 33.158 33.158 33.158 33.158 33.158 33.158
21,3 SIRENA DE 110 V UN 100.676 100.676 100.676 100.676 100.676 100.676 100.676 100.676
21,4 CMARA CCTV UN 254.379 254.379 254.379 254.379 254.379 254.379 254.379 254.379
21,5 PARLANTE-CIELO FALSO UN 50.387 50.387 50.387 50.387 50.387 50.387 50.387 50.387
21,6 AMPLIFICADOR 100W UN 557.737 557.737 557.737 557.737 557.737 557.737 557.737 557.737
21,7 AMPLIFICADOR 300W UN 1.385.802 1.385.802 1.385.802 1.385.802 1.385.802 1.385.802 1.385.802 1.385.802
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.805 42.805 42.805 42.805 42.805 42.805 42.805 42.805
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 216.222 216.222 216.222 216.222 216.222 216.222 216.222 216.222
21,10 TOMA PARA MICRFONO UN 42.489 42.489 42.489 42.489 42.489 42.489 42.489 42.489
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.653 3.653 3.653 3.653 3.653 3.653 3.653 3.653
21,12 SPLITERS UN 6.156 6.156 6.156 6.156 6.156 6.156 6.156 6.156
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.885 17.885 17.885 17.885 17.885 17.885 17.885 17.885
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.486 23.486 23.486 23.486 23.486 23.486 23.486 23.486
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.491 30.491 30.491 30.491 30.491 30.491 30.491 30.491
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 119.556 119.556 119.556 119.556 119.556 119.556 119.556 119.556
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 31.184 31.184 31.184 31.184 31.184 31.184 31.184 31.184
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
21,18 BANDEJA PORTACABLES PARA RACK CONSTRUCCIN
UN 102.117 102.117 102.117 102.117 102.117 102.117 102.117 102.117
21,19 RACK 2' X 24" UN 177.429 177.429 177.429 177.429 177.429 177.429 177.429 177.429
21,20 RACK 3' X 24" UN 279.795 279.795 279.795 279.795 279.795 279.795 279.795 279.795
21,21 RACK 5' X 24" UN 347.128 347.128 347.128 347.128 347.128 347.128 347.128 347.128
21,22 RACK 7' X 24" UN 379.522 379.522 379.522 379.522 379.522 379.522 379.522 379.522
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 554.443 554.443 554.443 554.443 554.443 554.443 554.443 554.443
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 326.220 326.220 326.220 326.220 326.220 326.220 326.220 326.220
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 101.316 101.316 101.316 101.316 101.316 101.316 101.316 101.316
21,26 PATCH CORD 2M CATEGORA 6A UN 13.516 13.516 13.516 13.516 13.516 13.516 13.516 13.516
21,27 PATCH CORD 5M CATEGORA 6A UN 27.640 27.640 27.640 27.640 27.640 27.640 27.640 27.640
21,28 CABLE UTP CATEGORA 6A ML 4.844 4.844 4.844 4.844 4.844 4.844 4.844 4.844
21,29 CANALETA METLICA 4X6 CMS ML 34.072 34.072 34.072 34.072 34.072 34.072 34.072 34.072
21,30 CANALETA METLICA 4X10 CMS ML 35.616 35.616 35.616 35.616 35.616 35.616 35.616 35.616
21,31 CANALETA METLICA 6X10 CMS ML 36.388 36.388 36.388 36.388 36.388 36.388 36.388 36.388
21,32 CANALETA PLSTICA 13X7 MM ML 23.728 23.728 23.728 23.728 23.728 23.728 23.728 23.728
21,33 CANALETA PLSTICA 20X12 MM ML 26.267 26.267 26.267 26.267 26.267 26.267 26.267 26.267
21,34 CANALETA PLSTICA 32X12 MM ML 27.334 27.334 27.334 27.334 27.334 27.334 27.334 27.334
21,35 CANALETA PLSTICA 40X60 MM ML 46.091 46.091 46.091 46.091 46.091 46.091 46.091 46.091
21,36 SWITCH 10/100/1000 24 PUERTOS UN 597.258 597.258 597.258 597.258 597.258 597.258 597.258 597.258
21,37 SWITCH 10/100/1000 16 PUERTOS UN 306.380 306.380 306.380 306.380 306.380 306.380 306.380 306.380
21,38 SWITCH 10/100/1000 8 PUERTOS UN 85.475 85.475 85.475 85.475 85.475 85.475 85.475 85.475
21,39 CABLE TELEFNICO 2 PARES ML 1.777 1.777 1.777 1.777 1.777 1.777 1.777 1.777
21,40 CABLE TELEFNICO 10 PARES ML 8.209 8.209 8.209 8.209 8.209 8.209 8.209 8.209
21,41 CABLE TELEFNICO 20 PARES ML 12.268 12.268 12.268 12.268 12.268 12.268 12.268 12.268
21,42 CABLE TELEFNICO 40 PARES ML 20.497 20.497 20.497 20.497 20.497 20.497 20.497 20.497
21,43 CABLE TELEVISIN RG6 ML 3.789 3.789 3.789 3.789 3.789 3.789 3.789 3.789
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.402 21.402 21.402 21.402 21.402 21.402 21.402 21.402
21,45 ACOMETIDA TELEFNICA 1" ML 31.211 31.211 31.211 31.211 31.211 31.211 31.211 31.211
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.663 18.663 18.663 18.663 18.663 18.663 18.663 18.663
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 14.893 14.893 14.893 14.893 14.893 14.893 14.893 14.893
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 603.752 603.752 603.752 603.752 603.752 603.752 603.752 603.752
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 88.356 88.356 88.356 88.356 88.356 88.356 88.356 88.356
1,3 CODO 45 PVC UNIN MECNICA 8" UN 497.941 497.941 497.941 497.941 497.941 497.941 497.941 497.941
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.062.827 1.062.827 1.062.827 1.062.827 1.062.827 1.062.827 1.062.827 1.062.827
1,5 CODO 90 PVC UNIN MECNICA 4" UN 121.791 121.791 121.791 121.791 121.791 121.791 121.791 121.791
1,6 CODO 90 PVC UNIN MECNICA 8" UN 742.251 742.251 742.251 742.251 742.251 742.251 742.251 742.251
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.597.597 1.597.597 1.597.597 1.597.597 1.597.597 1.597.597 1.597.597 1.597.597
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.673 12.673 12.673 12.673 12.673 12.673 12.673 12.673
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.650 15.650 15.650 15.650 15.650 15.650 15.650 15.650
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.670 19.670 19.670 19.670 19.670 19.670 19.670 19.670
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.536 21.536 21.536 21.536 21.536 21.536 21.536 21.536
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 25.834 25.834 25.834 25.834 25.834 25.834 25.834 25.834
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 25.834 25.834 25.834 25.834 25.834 25.834 25.834 25.834
1,14 TAPN PVC UNIN MECNICA 3" UN 104.113 104.113 104.113 104.113 104.113 104.113 104.113 104.113
1,15 TAPN PVC UNIN MECNICA 4" UN 120.584 120.584 120.584 120.584 120.584 120.584 120.584 120.584
1,16 TAPN PVC UNIN MECNICA 8" UN 373.215 373.215 373.215 373.215 373.215 373.215 373.215 373.215
1,17 TEE PVC UNIN MECNICA 2" UN 140.161 140.161 140.161 140.161 140.161 140.161 140.161 140.161
1,18 TEE PVC UNIN MECNICA 4" UN 231.053 231.053 231.053 231.053 231.053 231.053 231.053 231.053
1,19 TEE PVC UNIN MECNICA 8" UN 1.022.656 1.022.656 1.022.656 1.022.656 1.022.656 1.022.656 1.022.656 1.022.656
1,20 TEE PVC UNIN MECNICA 10" UN 1.178.278 1.178.278 1.178.278 1.178.278 1.178.278 1.178.278 1.178.278 1.178.278
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.772 13.772 13.772 13.772 13.772 13.772 13.772 13.772
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.146 12.146 12.146 12.146 12.146 12.146 12.146 12.146
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 30.119 30.119 30.119 30.119 30.119 30.119 30.119 30.119
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 119.348 119.348 119.348 119.348 119.348 119.348 119.348 119.348
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 177.811 177.811 177.811 177.811 177.811 177.811 177.811 177.811
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 29.019 29.019 29.019 29.019 29.019 29.019 29.019 29.019
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 100.026 100.026 100.026 100.026 100.026 100.026 100.026 100.026
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 148.306 148.306 148.306 148.306 148.306 148.306 148.306 148.306
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 60.529 60.529 60.529 60.529 60.529 60.529 60.529 60.529
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 243.962 243.962 243.962 243.962 243.962 243.962 243.962 243.962
1,32 UNIN REPARACION PVC 4" UN 70.637 70.637 70.637 70.637 70.637 70.637 70.637 70.637
1,33 UNIN REPARACIN PVC 8" UN 283.872 283.872 283.872 283.872 283.872 283.872 283.872 283.872
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 169.986 169.986 169.986 169.986 169.986 169.986 169.986 169.986
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 484.420 484.420 484.420 484.420 484.420 484.420 484.420 484.420
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.298.288 1.298.288 1.298.288 1.298.288 1.298.288 1.298.288 1.298.288 1.298.288
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.918.399 1.918.399 1.918.399 1.918.399 1.918.399 1.918.399 1.918.399 1.918.399

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.317 10.317 10.317 10.317 10.317 10.317 10.317 10.317
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.559 23.559 23.559 23.559 23.559 23.559 23.559 23.559
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 72.632 59.512 79.978 85.751 71.582 75.256 62.136 77.355
2,5 RELLENO TIPO 2 "RECEBO" M3 79.483 67.841 87.244 102.766 76.896 93.711 67.841 87.244
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 66.548 54.906 74.309 89.831 57.493 78.189 67.841 76.896
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 97.457 87.208 87.208 92.332 94.382 104.631 89.258 104.631
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 89.857 80.454 75.230 82.544 85.678 99.260 90.902 94.036
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 78.820 66.444 85.750 91.196 77.829 81.295 68.919 83.275

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 111.298 111.298 111.298 111.298 111.298 111.298 111.298 111.298
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
3,2 CODO 45 PVC ALCANTARILLADO 16" CONSTRUCCIN
UN 1.160.961 1.160.961 1.160.961 1.160.961 1.160.961 1.160.961 1.160.961 1.160.961
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 145.468 145.468 145.468 145.468 145.468 145.468 145.468 145.468
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.344.702 1.344.702 1.344.702 1.344.702 1.344.702 1.344.702 1.344.702 1.344.702
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 937.200 937.200 937.200 937.200 937.200 937.200 937.200 937.200
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.058 62.058 62.058 62.058 62.058 62.058 62.058 62.058
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 110.486 110.486 110.486 110.486 110.486 110.486 110.486 110.486
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 260.951 260.951 260.951 260.951 260.951 260.951 260.951 260.951
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 260.945 260.945 260.945 260.945 260.945 260.945 260.945 260.945
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 418.968 418.968 418.968 418.968 418.968 418.968 418.968 418.968
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 110.532 110.532 110.532 110.532 110.532 110.532 110.532 110.532
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 110.532 110.532 110.532 110.532 110.532 110.532 110.532 110.532
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 260.951 260.951 260.951 260.951 260.951 260.951 260.951 260.951
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 260.951 260.951 260.951 260.951 260.951 260.951 260.951 260.951
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 418.968 418.968 418.968 418.968 418.968 418.968 418.968 418.968
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 420.862 420.862 420.862 420.862 420.862 420.862 420.862 420.862
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 683.332 683.332 683.332 683.332 683.332 683.332 683.332 683.332
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.096.675 1.096.675 1.096.675 1.096.675 1.096.675 1.096.675 1.096.675 1.096.675
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 67.707 67.707 67.707 67.707 67.707 67.707 67.707 67.707
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 352.186 352.186 352.186 352.186 352.186 352.186 352.186 352.186
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 394.599 394.599 394.599 394.599 394.599 394.599 394.599 394.599
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.092.766 1.092.766 1.092.766 1.092.766 1.092.766 1.092.766 1.092.766 1.092.766
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 63.707 63.580 63.779 63.835 63.697 63.733 63.605 63.753
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 319.276 319.276 319.276 319.276 319.276 319.276 319.276 319.276
3,25 TUBERA PVC ALCANTARILLADO 8" ML 48.523 48.523 48.523 48.523 48.523 48.523 48.523 48.523
3,26 TUBERA PVC ALCANTARILLADO 10" ML 68.647 68.647 68.647 68.647 68.647 68.647 68.647 68.647
3,27 TUBERA PVC ALCANTARILLADO 12" ML 99.088 99.088 99.088 99.088 99.088 99.088 99.088 99.088
3,28 TUBERA PVC ALCANTARILLADO 16" ML 152.115 152.115 152.115 152.115 152.115 152.115 152.115 152.115
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 244.518 244.518 244.518 244.518 244.518 244.518 244.518 244.518
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 354.969 354.969 354.969 354.969 354.969 354.969 354.969 354.969
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 449.165 449.165 449.165 449.165 449.165 449.165 449.165 449.165
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 590.558 590.558 590.558 590.558 590.558 590.558 590.558 590.558
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 812.306 812.306 812.306 812.306 812.306 812.306 812.306 812.306

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4,1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 629.450 620.253 634.599 641.453 628.713 631.289 622.092 632.760
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO
4,2 ML 621.885 614.873 625.811 628.896 621.323 623.286 616.275 624.409
E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE
4,3 UN 677.611 671.480 681.044 685.613 677.120 678.837 672.706 679.818
ARO Y TAPA HF)
4,4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 747.036 735.540 753.474 762.041 746.116 749.335 737.840 751.174
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE INTERNO
4,5 ML 884.310 874.436 889.839 894.184 883.520 886.284 876.411 887.865
E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE
4,6 UN 780.291 771.861 785.012 791.295 779.616 781.977 773.547 783.326
ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 943.501 938.943 946.053 948.713 943.138 944.412 939.855 945.142
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.359.322 1.346.226 1.366.657 1.375.131 1.358.277 1.361.941 1.348.846 1.364.037
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.855.385 1.831.172 1.868.944 1.886.556 1.853.447 1.860.227 1.836.014 1.864.102
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.452.488 2.412.239 2.475.026 2.504.301 2.449.267 2.460.537 2.420.288 2.466.977
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.773.799 1.773.799 1.773.799 1.773.799 1.773.799 1.773.799 1.773.799 1.773.799
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.755.401 3.755.401 3.755.401 3.755.401 3.755.401 3.755.401 3.755.401 3.755.401
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE
4,13 UN 132.855 132.568 133.015 133.141 132.832 132.912 132.626 132.958
PAETE INTERNO Y DEMOLICIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
5 ANDENES Y SARDINELES CONSTRUCCIN
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 69.896 69.230 70.269 70.562 69.843 70.029 69.363 70.136
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 83.000 82.334 83.373 83.666 82.947 83.133 82.467 83.240
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 50.890 49.271 51.797 52.931 50.761 51.214 49.595 51.473
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 55.618 54.009 56.520 57.719 55.490 55.940 54.331 56.198
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 55.820 54.271 56.688 57.814 55.696 56.130 54.580 56.378
5,6 BORDE SEPARADOR VERDE A-170 ML 245.469 245.183 245.629 245.755 245.446 245.526 245.240 245.572
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.206 17.012 17.315 17.451 17.191 17.245 17.051 17.276
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 36.423 35.282 37.062 37.861 36.332 36.651 35.510 36.834
5,9 CAUELA PREFABRICADA TIPO A-120 ML 80.294 80.141 80.380 80.447 80.282 80.324 80.171 80.349
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 531.327 527.358 533.549 535.295 531.009 532.120 528.152 532.755
5,11 LOSETA PREFABRICADA A-40 M2 59.707 59.052 60.073 60.362 59.654 59.838 59.183 59.942
5,12 LOSETA PREFABRICADA A-60 M2 87.123 86.468 87.489 87.778 87.070 87.254 86.599 87.358
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 30.940 30.296 31.300 31.780 30.888 31.068 30.425 31.171
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 49.420 48.118 50.150 51.121 49.316 49.681 48.378 49.889
5,15 SARDINEL PREFABRICADO A-10 ML 91.559 89.615 95.625 96.488 94.134 93.380 91.635 93.206
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 57.686 57.289 57.908 58.082 57.654 57.765 57.369 57.828

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 194.597 193.831 195.027 195.598 194.536 194.751 193.984 194.873
6,2 BANCA EN CONCRETO M-30 UN 642.532 641.459 643.133 643.932 642.446 642.747 641.674 642.918
6,3 BOLARDO M-63 ALTO/HIERRO UN 206.873 206.713 206.963 207.080 206.860 206.905 206.745 206.931
6,4 BOLARDO M-60 CONCRETO UN 154.454 153.535 154.969 155.655 154.381 154.638 153.719 154.785
6,5 BOLARDO M-61 BAJO/CONCRETO UN 156.218 155.298 156.733 157.418 156.144 156.402 155.482 156.549
6,6 BOLARDO M-62 BAJO/HIERRO UN 183.493 182.533 184.030 184.733 183.416 183.685 182.725 183.838
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 55.810 55.300 56.096 56.320 55.769 55.912 55.402 55.993
6,8 BORDILLO PREFABRICADO A-80 ML 64.991 64.420 65.311 65.562 64.945 65.105 64.534 65.197
6,9 CANECA M-120 UN 301.288 301.160 301.359 301.415 301.278 301.313 301.186 301.334
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 793.952 793.493 794.210 794.553 793.916 794.044 793.585 794.118
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.264.120 3.263.813 3.264.291 3.264.520 3.264.095 3.264.181 3.263.874 3.264.230
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.357.913 3.357.606 3.358.084 3.358.313 3.357.888 3.357.974 3.357.667 3.358.023
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 468.826 468.506 469.005 469.239 468.800 468.890 468.570 468.941
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 619.639 618.360 620.356 621.293 619.537 619.895 618.616 620.100
6,15 BANCA EN MADERA M-50 UN 516.316 516.316 516.316 516.316 516.316 516.316 516.316 516.316
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 238.000 237.540 238.257 238.600 237.963 238.092 237.632 238.165
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 555.689 555.370 555.867 556.008 555.663 555.753 555.434 555.804
6,18 POSTE HISTRICO M-131 UN 6.203.025 6.200.726 6.204.313 6.206.026 6.202.841 6.203.485 6.201.186 6.203.853

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.902 3.902 3.902 3.902 3.902 3.902 3.902 3.902
7,2 MARCA VIAL CON PINTURA EN FRO M2 41.807 41.807 41.807 41.807 41.807 41.807 41.807 41.807
7,3 SEAL DOBLE DE CICLORUTA UN 302.526 302.383 302.606 302.669 302.514 302.554 302.411 302.577
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 475.947 475.308 476.306 476.774 475.896 476.075 475.435 476.178
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 226.264 226.121 226.344 226.407 226.253 226.293 226.150 226.316
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 240.336 240.193 240.416 240.479 240.325 240.365 240.222 240.388
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 250.992 250.849 251.072 251.135 250.981 251.021 250.878 251.044
7,8 TACHAS REFLECTIVAS UN 13.083 13.083 13.083 13.083 13.083 13.083 13.083 13.083
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.973 13.973 13.973 13.973 13.973 13.973 13.973 13.973
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7,10 UN 113.707 113.707 113.707 113.707 113.707 113.707 113.707 113.707
INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.394 34.394 34.394 34.394 34.394 34.394 34.394 34.394
2,3 210.2.2 EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 600.2 M3 63.020 63.020 63.020 63.020 63.020 63.020 63.020 63.020
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A
2,11 600.3 M3 77.289 77.289 77.289 77.289 77.289 77.289 77.289 77.289
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO DE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO DE
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 103.109 88.250 136.129 142.733 124.572 117.968 104.760 116.317
3,3 330.1 BASE GRANULAR M3 112.827 97.968 145.847 152.451 134.290 127.686 114.478 126.035
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.108 3.108 3.108 3.108 3.108 3.108 3.108 3.108
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.166 1.166 1.166 1.166 1.166 1.166 1.166 1.166
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 213.508 210.051 215.443 216.964 213.231 214.199 210.742 214.752
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 62.889 61.904 63.441 63.922 62.810 63.086 62.101 63.244
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 540.876 517.063 613.901 575.801 591.676 532.938 540.876 556.751
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 548.313 524.501 621.338 583.238 599.113 540.376 548.313 564.188
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 571.311 547.499 644.336 606.236 622.111 563.374 571.311 587.186
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 578.063 554.251 651.088 612.988 628.863 570.126 578.063 593.938
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 255.585 240.726 288.605 295.209 277.048 270.444 257.236 268.793
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 244.772 229.913 277.792 284.396 266.235 259.631 246.423 257.980
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima
3,15 311.1 AFIRMADO CONSTRUCCIN
M3 70.458 55.599 80.364 100.176 58.901 85.317 72.109 83.666
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 11.539 11.289 11.679 11.789 11.519 11.589 11.339 11.629
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.638 4.513 4.708 4.763 4.628 4.663 4.538 4.683
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3,18 500.1 M3 584.853 570.502 592.890 602.937 583.705 587.723 573.372 590.020
ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3,19 500.1 M3 614.692 599.698 623.088 633.585 613.492 617.690 602.696 620.089
ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3,20 500.1 M3 634.447 619.048 643.070 653.800 633.214 637.526 622.128 639.990
ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE LIMPIEZA,
3,21 *** ML 6.716 6.716 6.716 6.716 6.716 6.716 6.716 6.716
SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 120.493 107.920 100.935 110.714 114.905 133.066 121.890 126.081

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 842.750 826.471 851.867 863.263 841.448 846.006 829.727 848.611
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 723.677 707.668 732.642 743.849 722.396 726.879 710.870 729.440
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 766.401 749.757 775.721 787.372 765.069 769.730 753.086 772.392
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 518.733 503.830 527.079 537.912 517.541 521.714 506.810 524.099
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 609.032 593.539 617.709 628.971 607.792 612.131 596.637 614.610
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 516.794 501.313 525.463 537.000 515.555 519.890 504.410 522.366
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 607.016 590.922 616.029 628.023 605.728 610.235 594.141 612.809
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 668.671 653.189 677.340 688.877 667.431 671.766 656.286 674.243
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 534.336 518.242 543.349 555.343 533.048 537.555 521.461 540.129
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 709.216 693.122 718.228 730.222 707.928 712.434 696.341 715.009
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-
4,11 650 P KG 11.380 11.380 11.380 11.380 11.380 11.380 11.380 11.380
36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-
4,12 650 P KG 14.622 14.622 14.622 14.622 14.622 14.622 14.622 14.622
588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO
4,14 621.1 ML 2.591.155 2.591.155 2.591.155 2.591.155 2.591.155 2.591.155 2.591.155 2.591.155
TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN MANUAL
4,15 621.1 P ML 3.884.543 3.856.697 3.900.136 3.919.630 3.882.314 3.890.112 3.862.266 3.894.567
(INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.622.049 1.606.721 1.630.632 1.642.055 1.620.822 1.625.114 1.609.787 1.627.566
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 83.814 83.814 83.814 83.814 83.814 83.814 83.814 83.814
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 341.790 339.951 342.820 344.191 341.643 342.158 340.318 342.452
4,19 632 P BARANDA METLICA ML 405.471 405.471 405.471 405.471 405.471 405.471 405.471 405.471
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.259 16.259 16.259 16.259 16.259 16.259 16.259 16.259
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 435.171 410.141 450.162 473.475 426.788 447.492 423.479 449.018
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 119.160 105.190 105.190 112.175 114.969 128.939 107.984 128.939
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 95.037 81.321 104.181 122.469 91.989 111.801 81.321 104.181
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 336.935 320.781 345.980 357.813 335.642 340.165 324.012 342.749
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 341.296 327.127 339.557 350.143 338.496 347.786 334.127 346.782
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 349.736 335.568 347.998 358.583 346.936 356.227 342.567 355.222
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 354.572 340.747 352.642 362.676 351.800 360.995 347.678 359.936
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 363.013 349.187 361.082 371.117 360.240 369.435 356.118 368.376
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 465.839 450.261 474.561 485.466 464.592 468.953 453.377 471.446
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 554.260 538.066 563.327 574.664 552.964 557.498 541.305 560.089
4,31 681.1 GAVIN M3 202.874 190.873 184.205 193.540 197.540 214.876 204.208 208.208
4,32 681.1 GAVIN MALLA PVC M3 206.891 194.890 188.222 197.557 201.557 218.893 208.225 212.225
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 38.546 37.590 39.082 39.751 38.470 38.738 37.782 38.891
4,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 14.735 14.257 15.002 15.337 14.697 14.830 14.352 14.907
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA
4,35 *** M2 9.711 9.711 9.711 9.711 9.711 9.711 9.711 9.711
LTIMA 25 KN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima

4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50


CONSTRUCCIN
M2 13.857 13.857 13.857 13.857 13.857 13.857 13.857 13.857

4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.660 18.660 18.660 18.660 18.660 18.660 18.660 18.660
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,38 *** M2 22.373 22.373 22.373 22.373 22.373 22.373 22.373 22.373
(RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,39 *** M2 28.756 28.756 28.756 28.756 28.756 28.756 28.756 28.756
(RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN, FILTRO Y
4,40 *** M2 6.969 6.969 6.969 6.969 6.969 6.969 6.969 6.969
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN, FILTRO Y
4,41 *** M2 7.944 7.944 7.944 7.944 7.944 7.944 7.944 7.944
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN, FILTRO Y
4,42 *** M2 8.257 8.257 8.257 8.257 8.257 8.257 8.257 8.257
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN, FILTRO Y
4,43 *** M2 5.878 5.878 5.878 5.878 5.878 5.878 5.878 5.878
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN, FILTRO Y
4,44 *** M2 8.862 8.862 8.862 8.862 8.862 8.862 8.862 8.862
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN, FILTRO Y
4,45 *** M2 7.223 7.223 7.223 7.223 7.223 7.223 7.223 7.223
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN, FILTRO Y
4,46 *** M2 8.862 8.862 8.862 8.862 8.862 8.862 8.862 8.862
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN, FILTRO Y
4,47 *** M2 17.045 17.045 17.045 17.045 17.045 17.045 17.045 17.045
SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36" CLASE
4,48 661.1 ML 606.158 605.966 606.266 606.351 606.143 606.197 606.004 606.227
I, INCLUYE EMBOQUILLADA
4,49 660.3 SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600 MM ML 342.173 338.688 344.125 346.594 341.894 342.870 339.385 343.428

4,50 *** SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO 36" ML 849.516 849.516 849.516 849.516 849.516 849.516 849.516 849.516
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 136.833 122.545 146.358 165.408 125.720 151.120 138.420 149.533
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.259 4.259 4.259 4.259 4.259 4.259 4.259 4.259
4,53 *** GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 82.736 82.736 82.736 82.736 82.736 82.736 82.736 82.736

4,54 *** GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 126.057 126.057 126.057 126.057 126.057 126.057 126.057 126.057
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 474.995 458.801 484.063 495.400 473.699 478.233 462.040 480.825
4,56 682.1 P COLCHONETA RENO M3 217.987 205.986 199.318 208.653 212.653 229.989 219.321 223.321
4,57 *** TRINCHO EN MADERA M2 65.430 65.430 65.430 65.430 65.430 65.430 65.430 65.430

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.902 3.902 3.902 3.902 3.902 3.902 3.902 3.902
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 41.807 41.807 41.807 41.807 41.807 41.807 41.807 41.807
5,3 730.3 TOPE DEFENSA METLICA UN 80.689 80.689 80.689 80.689 80.689 80.689 80.689 80.689
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 67.109 67.109 67.109 67.109 67.109 67.109 67.109 67.109
5,5 730.1 DEFENSA METLICA ML 141.444 140.659 141.884 142.230 141.382 141.601 140.816 141.727
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 13.083 13.083 13.083 13.083 13.083 13.083 13.083 13.083

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 807 807 807 807 807 807 807 807
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36", INCLUYE
6,2 801.6 UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE DESCOLES
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ALTO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Agua_de_Dios Girardot Guataqu Jerusaln Nario Nilo Ricaurte Tocaima

6,6 801.4
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A CONSTRUCCIN
M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.848 14.848 14.848 14.848 14.848 14.848 14.848 14.848
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 24.058 24.058 24.058 24.058 24.058 24.058 24.058 24.058
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.504 9.504 9.504 9.504 9.504 9.504 9.504 9.504

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 2.116.844 2.041.210 2.123.146
1,2 CAMPAMENTO 9 M2 UN 1.221.063 1.183.246 1.224.214
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.946 13.946 13.946
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.640 15.640 15.640
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 18.056 18.056 18.056
1,6 CERCA EN TABLA H=2.30 M ML 66.711 66.711 66.711
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 47.782 47.001 47.847
1,8 CERCA EN TELA VERDE H = 2.10 M ML 22.502 21.721 22.567
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 935.475 926.173 934.434
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.607 10.607 10.607
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.811 3.811 3.811
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.745.813 2.745.813 2.745.813
1,44 RED TELEFNICA PROVISIONAL UN 252.019 252.019 252.019
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 144.751 109.826 116.294
2,2 BASE ARENA CEMENTO 1:20 M3 260.710 203.233 265.500
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
2,4 DEMOLICIN CIMIENTO ENTERRADO CONSTRUCCIN M3 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 22.503 22.503 22.503
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 742.299 664.441 748.786
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 742.373 663.478 748.947
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 690.662 616.787 696.817
2,9 PILOTE DE MADERA D=20 CM ML 48.466 48.466 48.466
2,10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 149.462 149.462 149.462

2,11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 188.491 188.491 188.491

2,12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 235.690 235.690 235.690

2,13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 299.227 299.227 299.227
2,14 PILOTE HINCADO 25X25 ML 110.348 105.145 110.781
2,15 PILOTE HINCADO 30X30 ML 138.238 130.698 138.866
2,16 DADOS EN CONCRETO 3500PSI M3 677.301 603.426 683.456
2,17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 89.483 89.483 89.483

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 38.894 38.537 38.924
3,2 SIFN EN PVC 6" UN 203.346 202.989 203.376
3,3 CAJA DE INSPECCIN DE 100X100 UN 518.661 481.395 506.695
3,4 CAJA DE INSPECCIN DE 40X40 UN 236.780 227.464 236.285
3,5 CAJA DE INSPECCIN DE 60X60 UN 275.331 260.295 274.587
3,6 CAJA DE INSPECCIN DE 80X80 UN 367.427 343.048 367.461
3,7 DUCTO ELCTRICO PVC 4" ML 101.951 101.802 101.782
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.321.905 1.320.413 1.320.214
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 119.915 115.970 120.244
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 75.944 73.862 76.117
3,11 TUBERA DRENAJE PVC 110 ML 30.554 28.899 30.692
3,12 TUBERA DRENAJE PVC 160 ML 48.035 46.381 48.173
3,13 TUBERA DRENAJE PVC 200 ML 63.422 61.106 63.615
3,14 TUBERA DRENAJE PVC 250 ML 86.283 83.635 86.503
3,15 TUBERA DRENAJE PVC 315 ML 117.684 115.367 117.877
3,16 SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 1.021.774 995.299 1.023.980
3,17 SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1.471.794 1.418.844 1.476.206
3,18 SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1.976.823 1.870.922 1.985.647

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 42.818 42.818 42.818
4,2 CASETN DE LONA 0.80X0.70 M2 56.778 56.778 56.778
4,3 COLUMNAS 3500 PSI M3 894.080 820.205 900.235
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 304.534 273.105 326.725
4,5 ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 108.720 101.548 109.318

4,6 ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 128.626 120.019 129.343
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 143.457 131.982 144.413
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 151.501 139.308 152.517
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 175.236 160.175 176.491
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 195.603 178.389 197.037
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 217.407 198.042 219.020
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
4,12 ENTREPISO VIGUETA PLACA CONSTRUCCIN M2 101.820 100.707 101.913
4,13 ESCALERA MACIZA 3500 PSI M3 1.044.294 970.420 1.050.450
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 97.573 96.859 97.633
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 88.504 81.117 89.120
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 100.572 91.535 101.325
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 118.323 106.991 119.267
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 792.943 719.068 799.098
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 51.043 48.842 51.227
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 321.714 288.722 324.463
4,21 ACERO FIGURADO 37000 PSI KG 4.280 4.280 4.280
4,22 ACERO FIGURADO 60000 PSI KG 4.489 4.489 4.489
4,23 REFUERZO MALLA ELECTROSOLDADA KG 6.169 6.169 6.169
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 933.948 860.073 940.103
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 871.015 790.112 877.755
4,26 VIGA AREA 3500 PSI M3 930.631 856.756 936.786
4,27 VIGA CINTA 3500 PSI M3 911.709 837.834 917.864
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.111.347 1.037.472 1.117.502
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 439.636 353.077 446.848

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 31.127 29.303 31.279
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 50.483 48.658 50.635
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 34.855 34.498 34.885
5,4 ARCOS EN LADRILLO PRENSADO ML 162.208 161.494 162.268
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 46.063 43.862 46.246
5,6 DINTELES EN BLOQUE 0.15 M ML 27.362 26.648 27.422
5,7 ENCHAPES LADRILLO PRENSADO M2 102.204 100.776 102.323
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 100.194 92.858 100.806
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 91.642 91.642 91.642
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 53.303 53.303 53.303
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 88.146 88.146 88.146
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 51.555 51.555 51.555
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 102.967 102.967 102.967
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 60.213 60.213 60.213
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 114.829 114.829 114.829
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 66.144 66.144 66.144
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 41.555 40.838 41.615
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 24.851 24.492 24.881
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 54.195 53.717 54.235
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 32.177 31.938 32.197
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 60.860 60.381 60.900
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 36.145 35.906 36.165
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 102.721 100.329 102.921
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 59.934 58.738 60.033
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 37.843 37.365 37.883
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 22.681 22.442 22.701
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 75.670 74.713 75.749
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 45.069 44.591 45.109
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 90.036 89.322 90.096
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 53.836 53.479 53.866
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 188.694 185.345 188.973
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 111.716 110.042 111.855
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 92.493 91.004 92.617
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) CONSTRUCCIN ML 55.064 54.320 55.126
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 48.323 47.252 48.412
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 28.976 28.440 29.020
5,37 MURO TOLETE COMN 0.06 M M2 34.248 33.770 34.288
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 20.623 20.384 20.643
5,39 MURO TOLETE COMN 0.12 M M2 52.539 51.582 52.618
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 31.728 31.250 31.768
5,41 MURO TOLETE COMN 0.25 M M2 101.198 99.763 101.318
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 60.749 60.031 60.808
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 73.717 72.760 73.797
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 43.978 43.500 44.018
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 156.849 153.501 157.128
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 93.982 92.307 94.121
5,47 REMATES LADRILLO PRENSADO ML 32.101 31.744 32.131
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 37.491 36.420 37.580
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 62.915 61.487 63.034
5,50 LAVADA DE FACHADA M2 5.009 5.009 5.009
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 50.837 49.012 50.989
5,52 DOVELA, GROUTING 3000 PSI ML 10.150 10.150 10.150
5,53 ANCLAJE 3/8" L=30CM UN 13.559 13.559 13.559
5,54 ANCLAJE 1/2" L=50CM UN 17.764 17.764 17.764
5,55 ANCLAJE 5/8" L=70CM UN 25.112 25.112 25.112
5,56 ANCLAJE 3/4" L=70CM UN 37.776 37.776 37.776
5,57 ANCLAJE 1" L= 70CM UN 5.591 5.026 5.638

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.555 15.555 15.555
6,2 FILOS O DILATACIONES B/PLACA ML 5.945 5.588 5.975
6,3 FILOS O DILATACIONES S/MURO ML 7.065 6.708 7.095
6,4 GOTERA EN MORTERO 1:4 ML 8.359 8.002 8.389
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.867 6.867 6.867
6,6 MALLA BAJO ENTRAMADO M2 13.336 13.336 13.336
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 24.475 23.433 24.562
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 14.687 14.166 14.730
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 21.661 20.656 21.744
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.987 12.485 13.029
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 20.800 19.758 20.887
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 12.557 12.036 12.600
6,13 PAETE CULATAS 1:4, E=2 CM M2 21.661 20.656 21.744
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.987 12.485 13.029
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 21.940 21.198 22.002
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 13.126 12.754 13.157
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 17.903 17.138 17.967
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.836 10.453 10.868
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 17.248 16.454 17.314
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.508 10.111 10.541
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 22.396 21.391 22.479
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 13.335 12.833 13.377
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 21.535 20.493 21.622
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.905 12.384 12.949
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 17.824 17.030 17.890
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.779 10.382 10.812
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 22.375 21.333 22.462
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) CONSTRUCCIN ML 13.707 13.186 13.750

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 27.794 26.359 27.914
7,2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 88.452 84.784 88.757
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 56.357 56.357 56.357
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 22.173 22.173 22.173
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 34.923 34.923 34.923
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 82.594 82.594 82.594
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 64.500 64.500 64.500
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 37.175 37.175 37.175
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 86.600 86.600 86.600
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 103.565 103.565 103.565
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 152.580 152.580 152.580
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 59.672 59.672 59.672
7,13 CANAL PVC AMAZONAS ML 82.578 82.578 82.578
7,14 CANAL PVC RAINGO ML 74.928 74.928 74.928
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 134.422 134.422 134.422
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 78.700 78.700 78.700
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 57.641 57.641 57.641
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 32.170 32.170 32.170
7,19 TEJA DE BARRO M2 60.910 59.125 61.058
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 48.073 48.073 48.073
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 44.029 44.029 44.029
7,22 TEJA FIBROCEMENTO N4 M2 36.660 36.660 36.660
7,23 TEJA FIBROCEMENTO No. 6 M2 35.936 35.936 35.936
7,24 TEJA FIBROCEMENTO No. 8 M2 36.214 36.214 36.214
7,25 TEJA TERMOACSTICA M2 51.371 51.371 51.371
7,26 TEJA PLSTICA No.6 M2 45.068 45.068 45.068
7,27 TEJA ESPAOLA ETERNIT M2 83.025 83.025 83.025
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 153.993 153.993 153.993
7,29 TEJA SIN TRASLAPO M2 68.970 68.970 68.970
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 42.081 42.081 42.081
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 33.159 33.159 33.159
7,32 ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 58.623 58.623 58.623
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.727 19.727 19.727
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.898 23.898 23.898
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 26.018 26.018 26.018
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 33.717 33.717 33.717
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 22.057 22.057 22.057
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 52.037 52.037 52.037
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 366.395 366.395 366.395
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 404.656 404.656 404.656
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 275.415 275.415 275.415
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 295.120 295.120 295.120

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 552.674 477.276 558.956
8,2 CONCRETO 3500 PSI M3 492.862 421.139 498.838
8,3 CONCRETO 3000 PSI M3 497.512 421.922 503.811
8,4 CONCRETO 2500 PSI M3 443.795 370.436 449.908
8,5 CONCRETO 2000 PSI M3 429.858 351.769 436.364
8,6 CONCRETO 1500 PSI M3 412.562 328.524 419.564
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
8,7 MORTERO SECO 1:10 CONSTRUCCIN M3 294.866 245.600 298.971
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 506.570 458.732 510.556
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 465.610 415.987 469.745
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 525.786 479.376 529.653
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 758.886 712.476 762.753

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 124.675 124.675 124.675
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 4.349 3.992 4.378
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 138.874 138.874 138.874
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 170.784 170.784 170.784
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 250.990 250.990 250.990
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 279.526 279.526 279.526
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 308.092 308.092 308.092
9,8 HOJA PUERTA FORTEC 0.81 UN 205.000 205.000 205.000
9,9 HOJA PUERTA FORTEC 0.91 UN 232.527 232.527 232.527
9,10 HOJA PUERTA FORTEC 1.50 UN 342.638 342.638 342.638
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 129.299 129.299 129.299
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 171.966 171.966 171.966
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 191.236 191.236 191.236
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 488.535 488.535 488.535
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 42.382 42.382 42.382
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 26.021 26.021 26.021
9,17 VENTANERA EN MADERA CEDRO MACHO M2 100.139 100.139 100.139
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 124.727 124.727 124.727
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 96.786 96.786 96.786
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 29.674 29.674 29.674
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 29.674 29.674 29.674
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 28.105 28.105 28.105
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 42.853 42.853 42.853
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 53.279 53.279 53.279
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 64.400 64.400 64.400
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 77.606 77.606 77.606
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 368.113 368.113 368.113
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 256.901 256.901 256.901
9,29 VIDRIO TRANSPARENTE 3 MM M2 33.816 33.816 33.816
9,30 VIDRIO TRANSPARENTE 4 MM M2 43.547 43.547 43.547
9,31 VIDRIO TRANSPARENTE 5 MM M2 53.279 53.279 53.279
9,32 VIDRIO TRANSPARENTE 6 MM M2 67.179 67.179 67.179

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 76.818 76.818 76.818
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 216.610 216.610 216.610
10,3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML 80.881 80.881 80.881
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 143.202 143.202 143.202
10,5 MARCO TAPA CAJA DE INSPECCIN UN 137.534 137.534 137.534
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 90.264 90.264 90.264
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 213.564 213.564 213.564
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 110.764 110.764 110.764
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.616 6.616 6.616
10,10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 98.412 98.412 98.412
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 40.567 40.567 40.567
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 553.522 553.522 553.522
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M CONSTRUCCIN M2 198.089 198.089 198.089
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 220.501 220.501 220.501
10,15 DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 503.589 503.589 503.589
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 127.623 127.623 127.623
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 404.201 404.201 404.201
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 6.056 6.056 6.056
10,19 VENTANA EN ALUMINIO CORREDIZA M2 283.076 283.076 283.076
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 121.855 121.855 121.855
10,21 REJILLA PISO 0.30 M M2 87.205 87.205 87.205
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 89.750 89.750 89.750
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10,23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA KG 10.518 10.518 10.518
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,
10,24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA KG 11.712 11.712 11.712
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10,25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 9.233 9.233 9.233
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 219.874 219.874 219.874
11,2 ACOMETIDA EN PVC 3/4" 5M UN 266.844 266.844 266.844
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 22.173 22.173 22.173
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 34.923 34.923 34.923
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 33.318 33.318 33.318
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 42.892 42.892 42.892
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 88.923 88.923 88.923
11,8 CONEXIN TANQUE ELEVADO PVC UN 221.275 221.275 221.275
11,9 INSTALACIN APARATO SANITARIO UN 41.921 41.921 41.921
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 34.799 34.799 34.799
11,13 NIPLE PASAMURO 2" UN 65.515 65.515 65.515
11,14 NIPLE PASAMURO 4" UN 98.115 98.115 98.115
11,15 PUNTO AGUA CALIENTE CPVC UN 83.472 83.472 83.472
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 60.020 60.020 60.020
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 64.049 64.049 64.049
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 80.977 80.977 80.977
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 65.828 65.828 65.828
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 83.021 83.021 83.021
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 88.982 88.982 88.982
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 74.499 74.499 74.499
11,23 RED SUMINISTRO CPVC 1/2" ML 12.552 12.552 12.552
11,24 RED SUMINISTRO CPVC 3/4" ML 17.801 17.801 17.801
11,25 RED SUMINISTRO PVC 1 1/2" ML 23.216 23.216 23.216
11,26 RED SUMINISTRO PVC 1" ML 14.261 14.261 14.261
11,27 RED SUMINISTRO PVC 1/2" ML 8.467 8.467 8.467
11,28 RED SUMINISTRO PVC 2 1/2" ML 52.030 52.030 52.030
11,29 RED SUMINISTRO PVC 2" ML 33.178 33.178 33.178
11,30 RED SUMINISTRO PVC 3/4" ML 10.639 10.639 10.639
11,31 RED SANITARIA PVC-S 2" ML 25.510 25.510 25.510
11,32 RED SANITARIA PVC-S 3" ML 35.490 35.490 35.490
11,33 RED SANITARIA PVC-S 4" ML 48.229 48.229 48.229
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
11,34 RED SANITARIA PVC-S 6" CONSTRUCCIN ML 90.835 90.835 90.835
11,35 REGISTRO 1" UN 109.697 109.697 109.697
11,36 REGISTRO 1/2" UN 61.048 61.048 61.048
11,37 REGISTRO 3/4" UN 78.005 78.005 78.005
11,38 REGISTRO 1 1/2" UN 189.252 189.252 189.252
11,39 REGISTRO 2 1/2" UN 391.581 391.581 391.581
11,40 REGISTRO 2" UN 288.787 288.787 288.787
11,41 REVENTILACIN 2" ML 17.714 17.714 17.714
11,42 REVENTILACIN 3" ML 22.382 22.382 22.382
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 174.249 174.249 174.249
11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 284.818 284.818 284.818
11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 474.850 474.850 474.850
11,46 TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 41.170 41.170 41.170
11,47 TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 48.579 48.579 48.579
11,48 TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 61.905 61.905 61.905
11,49 TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 70.584 70.584 70.584
11,50 TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 91.007 91.007 91.007
11,51 TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 104.615 104.615 104.615
11,52 TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 154.383 154.383 154.383
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 61.810 61.810 61.810
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 62.070 62.070 62.070
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 40.440 40.440 40.440
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 50.020 50.020 50.020
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.269 4.269 4.269
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.749 6.749 6.749
11,59 GABINETE TIPO III UN 1.038.868 1.038.868 1.038.868
11,60 GABINETE TIPO I UN 791.394 791.394 791.394
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.682.494 2.682.494 2.682.494
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.234.806 2.234.806 2.234.806
11,63 VLVULA MARIPOSA 3" UN 642.308 642.308 642.308
11,64 VLVULA MARIPOSA 4" UN 833.900 833.900 833.900
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 323.885 323.885 323.885

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 370.444 370.444 370.444
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 58.877 58.877 58.877
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 69.838 69.838 69.838
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 77.373 77.373 77.373
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 91.309 91.309 91.309
12,6 SALIDA TELFONO PVC COMPLETA UN 55.269 55.269 55.269
12,7 SALIDA TIMBRE PVC COMPLETA UN 63.061 63.061 63.061
12,8 STRIP TELEFNICO 10 PARES UN 144.699 144.699 144.699
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 56.812 56.812 56.812
12,10 SALIDA TRIFSICA PVC COMPLETA UN 130.757 130.757 130.757
12,11 SALIDA T.V PVC COMPLETA. UN 78.039 78.039 78.039
12,12 SALIDA BIFSICA C.N. UN 46.299 46.299 46.299
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 97.181 97.181 97.181
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 414.536 414.536 414.536
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 553.014 553.014 553.014
12,16 TUBERA PVC CONDUIT 1/2" ML 3.583 3.583 3.583
12,17 TUBERA PVC CONDUIT 3/4" ML 4.727 4.727 4.727
12,18 TUBERA PVC CONDUIT 1" ML 7.370 7.370 7.370
12,19 TUBERA PVC CONDUIT 1 1/2" ML 13.170 13.170 13.170
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) CONSTRUCCIN UN 277.169 277.169 277.169
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 78.020 78.020 78.020
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 106.123 106.123 106.123
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 42.466 42.466 42.466
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.414.370 1.414.370 1.414.370
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.047.900 1.047.900 1.047.900
12,26 POSTE METLICO 6M UN 1.325.349 1.325.349 1.325.349
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 618.913 618.913 618.913
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 111.900 111.900 111.900
12,29 LUMINARIA 70W SODIO UN 519.599 519.599 519.599
12,30 LUMINARIA 150W SODIO UN 650.529 650.529 650.529
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.721.167 1.721.167 1.721.167
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.266.959 1.266.959 1.266.959

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 41.395 39.610 41.544
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 41.541 39.756 41.690
13,3 ALISTADO PARA LISTN M2 14.784 14.427 14.814
13,4 ALISTADO PISOS 1:3, E=0.04 M2 31.447 27.877 31.745
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 90.042 86.472 90.340
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 27.869 26.307 27.999
13,7 CONCRETO BASE GRADAS 2500 PSI M2 66.054 58.718 66.665
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 93.946 82.208 94.924
13,9 MANTO FIBERGLASS 600X1 M2 30.789 30.789 30.789
13,10 PEGANTE MORTERO-CONCRETO M2 22.888 22.888 22.888
13,11 PERMA PLY 2 CAPAS M2 26.731 26.731 26.731
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 54.645 48.043 55.195
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 64.505 56.435 65.177
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 94.695 82.224 95.734
13,15 TRITURADO FINO 1/2 M3 202.340 134.166 208.021
13,16 TRITURADO GRUESO 3/4 M3 210.833 146.618 208.920

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 58.412 57.698 58.472
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 34.564 34.207 34.594
14,3 ADOQUN CONCRETO 6CM M2 67.562 65.777 67.711
14,4 ADOQUN CONCRETO 8CM M2 71.012 69.227 71.161
14,5 ADOQUN GRES PEATONAL M2 75.341 73.556 75.489
14,6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 77.380 76.666 77.439
14,7 GRAVILLA PARA GRADAS ML 36.818 35.937 36.892
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 170.331 167.118 170.599
14,9 ACABADO EN GRAVILLA LAVADA M2 47.368 45.248 47.545
14,10 GUARDAESCOBA EN GRANITO ML 43.301 43.301 43.301
14,11 GUARDAESCOBA EN GRAVILLA ML 10.848 9.966 10.922
14,12 GUARDAESCOBA PVC CARAMELO ML 9.644 9.644 9.644
14,13 GUARDAESCOBA PVC CEDRO ML 12.978 12.978 12.978
14,14 GUARDAESCOBA PINO CARIBE ML 10.569 10.569 10.569
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.939 17.939 17.939
14,16 GUARDAESCOBA EN MADERA SAPAN ML 35.282 35.282 35.282
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.993 8.993 8.993
14,18 LISTN M.H. AMARILLO M2 75.080 75.080 75.080
14,19 PASO ESCALERA GRANITO ML 121.292 118.793 121.500
14,20 PIRLANES ALUMINIO ML 7.285 7.285 7.285
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
14,21 PIRLANES LADRILLO CONSTRUCCIN ML 32.429 31.715 32.489
14,22 PISO VINILO TRFICO RESIDENCIAL M2 46.874 46.874 46.874
14,23 PISO VINILO TRFICO PESADO M2 54.639 54.639 54.639
14,24 PULIDA LACADA PISO MADERA M2 49.327 49.327 49.327
14,25 TABLETA DE GRES 25X25 M2 50.643 49.929 50.702
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 56.937 56.223 56.996
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.785 10.785 10.785
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 51.103 50.032 51.192
14,29 JABONERA PORCELANA ACUARIO UN 21.004 21.004 21.004
14,30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN 126.335 126.335 126.335
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.788 9.788 9.788
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 22.838 22.838 22.838
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.468 14.468 14.468
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 14.041 14.041 14.041
14,35 REMATES BOCEL ALUMINIO ML 8.361 8.361 8.361
14,36 REMATES BOCEL PORCELANA ML 8.517 8.517 8.517
14,37 TAPA REGISTRO 20X20 UN 19.270 19.270 19.270
14,38 TAPA REGISTRO 6X6 UN 17.516 17.516 17.516
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 19.407 19.407 19.407
14,40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN SITIO M2 22.435 22.435 22.435
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 67.224 66.510 67.284
14,42 MEDIA CAA EN GRANITO ML 79.924 79.924 79.924
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 33.009 33.009 33.009
14,44 PINTURA ACRLICA PARA PISOS M2 13.368 13.368 13.368
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 105.538 105.538 105.538
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 127.250 127.250 127.250

15 CIELO RASO
15,1 APLIQUE YESO ML 75.017 75.017 75.017
15,2 ARMADURA MADERA Y MALLA M2 35.317 35.317 35.317
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 55.828 55.828 55.828
15,4 CIELO RASO DURACUSTIC M2 68.891 68.891 68.891
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 51.268 51.268 51.268
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 95.775 95.775 95.775
15,7 CORNISAS YESO ML 50.456 50.456 50.456
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 106.232 106.232 106.232
15,9 MALLA CON VENA M2 13.237 13.237 13.237

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16,2 M3 18.214 18.214 18.214
MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 135.371 115.969 113.382
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 175.655 117.929 180.467
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 208.828 164.849 198.480
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 135.302 100.377 106.845
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) CONSTRUCCIN M3 174.817 130.838 164.469
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 206.167 162.188 195.819

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 310.316 310.316 310.316
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 920.646 920.646 920.646
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 497.562 497.562 497.562
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 141.614 141.614 141.614
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 200.067 200.067 200.067
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 185.574 185.574 185.574
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 412.364 412.364 412.364
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 1.059.304 1.059.304 1.059.304
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 298.674 298.674 298.674
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 210.295 210.295 210.295
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 81.894 81.894 81.894
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17,12 UN 255.731 255.731 255.731
ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17,13 UN 378.229 378.229 378.229
ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.275 8.275 8.275
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 3.093 3.093 3.093
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.888 10.888 10.888
18,4 BARNIZ SOBRE MUEBLES M2 42.226 42.226 42.226
18,5 CARBURO SOBRE PAETES M2 5.717 5.717 5.717
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 67.752 67.752 67.752
18,7 DEMARCACIN CON MARMOLINA ML 3.379 3.379 3.379
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.765 2.765 2.765
18,9 ESMALTE SOBRE LMINA LLENA M2 13.778 13.778 13.778
18,10 ESMALTE SOBRE MADERA LINEAL ML 4.010 4.010 4.010
18,11 ESMALTE SOBRE MADERA LLENA M2 14.537 14.537 14.537
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.812 5.812 5.812
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.586 6.586 6.586
18,14 ESTUCO M2 6.836 6.836 6.836
18,15 ESTUCO (LINEAL) ML 4.263 4.263 4.263
18,16 ESTUCO Y VINILO 3 MANOS M2 15.299 15.299 15.299
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.424 9.424 9.424
18,18 LACA PISOS MADERA M2 22.192 22.192 22.192
18,19 LNEAS TRFICO 0.10 ML 2.638 2.638 2.638
18,20 MARMOLINA SOBRE PAETE M2 12.277 12.277 12.277
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.303 3.303 3.303
18,22 TINTILLA SOBRE MADERA LLENA M2 12.475 12.475 12.475
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.994 6.994 6.994
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.366 4.366 4.366
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.917 21.917 21.917
18,26 PINTURA EPXICA M2 12.444 12.444 12.444
18,27 PINTURA EPXICA (LINEAL) ML 7.647 7.647 7.647

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 6.289.198 6.289.198 6.289.198
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19,2 UN 11.111.952 11.111.952 11.111.952
(PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.907.643 2.907.643 2.907.643
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) CONSTRUCCIN UN 9.503.239 9.503.239 9.503.239
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.901.453 8.901.453 8.901.453
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.638 2.638 2.638
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 890.387 890.387 890.387
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 89.250 89.250 89.250
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.615.356 1.614.602 1.615.419
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 715.338 696.440 716.913

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 29.688 29.688 29.688
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 44.400 44.400 44.400
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 55.139 55.139 55.139
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.745 17.745 17.745
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 21.565 21.565 21.565
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 29.492 29.492 29.492
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.990 25.990 25.990
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 27.409 27.409 27.409
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 34.366 34.366 34.366
20,10 VLVULA DE BOLA GAS 1/2" UN 18.015 18.015 18.015
20,11 VLVULA DE BOLA GAS 3/4" UN 23.677 23.677 23.677
20,12 VLVULA DE BOLA GAS 1" UN 36.555 36.555 36.555
20,13 VLVULA POLIETILENO GAS 1/2" UN 281.745 281.745 281.745
20,14 VLVULA POLIETILENO GAS 3/4" UN 324.429 324.429 324.429
20,15 VLVULA POLIETILENO GAS 1" UN 338.116 338.116 338.116
20,16 ACOMETIDA GAS 1/2" ML 312.730 312.730 312.730

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 228.242 228.242 228.242
21,2 CABLE DETECTOR LINEAL DE CALOR ML 35.174 35.174 35.174
21,3 SIRENA DE 110 V UN 105.941 105.941 105.941
21,4 CMARA CCTV UN 264.214 264.214 264.214
21,5 PARLANTE-CIELO FALSO UN 52.523 52.523 52.523
21,6 AMPLIFICADOR 100W UN 587.443 587.443 587.443
21,7 AMPLIFICADOR 300W UN 1.467.221 1.467.221 1.467.221
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 43.164 43.164 43.164
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 228.925 228.925 228.925
21,10 TOMA PARA MICRFONO UN 43.989 43.989 43.989
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.830 3.830 3.830
21,12 SPLITERS UN 6.510 6.510 6.510
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 18.250 18.250 18.250
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 24.030 24.030 24.030
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 31.279 31.279 31.279
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 126.113 126.113 126.113
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 32.875 32.875 32.875
21,18 BANDEJA PORTACABLES PARA RACK UN 108.042 108.042 108.042
21,19 RACK 2' X 24" UN 183.475 183.475 183.475
21,20 RACK 3' X 24" UN 292.209 292.209 292.209
21,21 RACK 5' X 24" UN 361.235 361.235 361.235
21,22 RACK 7' X 24" UN 395.645 395.645 395.645
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 573.959 573.959 573.959
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 336.530 336.530 336.530
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 106.829 106.829 106.829
21,26 PATCH CORD 2M CATEGORA 6A UN 14.314 14.314 14.314
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
21,27 PATCH CORD 5M CATEGORA 6A CONSTRUCCIN UN 29.317 29.317 29.317
21,28 CABLE UTP CATEGORA 6A ML 5.046 5.046 5.046
21,29 CANALETA METLICA 4X6 CMS ML 35.294 35.294 35.294
21,30 CANALETA METLICA 4X10 CMS ML 36.934 36.934 36.934
21,31 CANALETA METLICA 6X10 CMS ML 37.754 37.754 37.754
21,32 CANALETA PLSTICA 13X7 MM ML 24.602 24.602 24.602
21,33 CANALETA PLSTICA 20X12 MM ML 27.300 27.300 27.300
21,34 CANALETA PLSTICA 32X12 MM ML 28.433 28.433 28.433
21,35 CANALETA PLSTICA 40X60 MM ML 48.358 48.358 48.358
21,36 SWITCH 10/100/1000 24 PUERTOS UN 629.423 629.423 629.423
21,37 SWITCH 10/100/1000 16 PUERTOS UN 321.697 321.697 321.697
21,38 SWITCH 10/100/1000 8 PUERTOS UN 88.296 88.296 88.296
21,39 CABLE TELEFNICO 2 PARES ML 1.844 1.844 1.844
21,40 CABLE TELEFNICO 10 PARES ML 8.539 8.539 8.539
21,41 CABLE TELEFNICO 20 PARES ML 12.844 12.844 12.844
21,42 CABLE TELEFNICO 40 PARES ML 21.522 21.522 21.522
21,43 CABLE TELEVISIN RG6 ML 3.949 3.949 3.949
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.735 21.735 21.735
21,45 ACOMETIDA TELEFNICA 1" ML 31.903 31.903 31.903
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 19.225 19.225 19.225
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 15.520 15.520 15.520
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 639.174 639.174 639.174
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 93.457 93.457 93.457
1,3 CODO 45 PVC UNIN MECNICA 8" UN 528.127 528.127 528.127
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.127.363 1.127.363 1.127.363
1,5 CODO 90 PVC UNIN MECNICA 4" UN 128.972 128.972 128.972
1,6 CODO 90 PVC UNIN MECNICA 8" UN 787.636 787.636 787.636
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.696.195 1.696.195 1.696.195
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 13.144 13.144 13.144
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 16.306 16.306 16.306
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 20.577 20.577 20.577
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 22.559 22.559 22.559
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 27.124 27.124 27.124
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 27.124 27.124 27.124
1,14 TAPN PVC UNIN MECNICA 3" UN 110.352 110.352 110.352
1,15 TAPN PVC UNIN MECNICA 4" UN 127.769 127.769 127.769
1,16 TAPN PVC UNIN MECNICA 8" UN 395.642 395.642 395.642
1,17 TEE PVC UNIN MECNICA 2" UN 148.643 148.643 148.643
1,18 TEE PVC UNIN MECNICA 4" UN 245.031 245.031 245.031
1,19 TEE PVC UNIN MECNICA 8" UN 1.085.486 1.085.486 1.085.486
1,20 TEE PVC UNIN MECNICA 10" UN 1.250.789 1.250.789 1.250.789
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 14.392 14.392 14.392
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.665 12.665 12.665
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 31.962 31.962 31.962
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 125.981 125.981 125.981
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 188.081 188.081 188.081
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 30.507 30.507 30.507
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 105.457 105.457 105.457
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 156.741 156.741 156.741
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 63.899 63.899 63.899
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 258.347 258.347 258.347
1,32 UNIN REPARACION PVC 4" UN 74.635 74.635 74.635
1,33 UNIN REPARACIN PVC 8" UN 300.740 300.740 300.740
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 179.136 179.136 179.136
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 513.149 513.149 513.149
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.378.614 1.378.614 1.378.614
1,37 VLVULA COMPUERTA ELSTICA 8" UN 2.037.240 2.037.240 2.037.240

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.547 10.547 10.547
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 24.023 24.023 24.023
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 126.985 82.003 130.733
2,5 RELLENO TIPO 2 "RECEBO" M3 130.592 111.190 108.603
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 139.972 105.047 111.515
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 83.691 135.958 135.958
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 90.193 113.177 137.207
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 140.700 94.290 144.567

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 117.985 117.985 117.985
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
3,2 CODO 45 PVC ALCANTARILLADO 16" CONSTRUCCIN UN 1.232.871 1.232.871 1.232.871
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 154.281 154.281 154.281
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.428.042 1.428.042 1.428.042
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 995.110 995.110 995.110
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.832 62.832 62.832
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 117.120 117.120 117.120
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 276.867 276.867 276.867
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 276.860 276.860 276.860
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 444.636 444.636 444.636
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 117.170 117.170 117.170
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 117.170 117.170 117.170
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 276.867 276.867 276.867
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 276.867 276.867 276.867
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 444.636 444.636 444.636
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 444.618 444.618 444.618
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 723.419 723.419 723.419
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.161.555 1.161.555 1.161.555
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 71.671 71.671 71.671
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 371.670 371.670 371.670
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 418.353 418.353 418.353
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.157.607 1.157.607 1.157.607
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 67.965 67.487 68.005
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 336.713 336.713 336.713
3,25 TUBERA PVC ALCANTARILLADO 8" ML 51.311 51.311 51.311
3,26 TUBERA PVC ALCANTARILLADO 10" ML 72.684 72.684 72.684
3,27 TUBERA PVC ALCANTARILLADO 12" ML 105.015 105.015 105.015
3,28 TUBERA PVC ALCANTARILLADO 16" ML 161.260 161.260 161.260
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 259.413 259.413 259.413
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 375.482 375.482 375.482
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 475.458 475.458 475.458
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 625.256 625.256 625.256
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 860.799 860.799 860.799

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4,1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 728.307 682.953 732.087
4,2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO E=1.5CM Y CAUELA) ML 673.093 650.352 674.988
4,3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 757.243 727.007 759.763
4,4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 870.269 813.577 874.993
4,5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE INTERNO E=1.5CM Y CAUELA) ML 960.236 928.213 962.904
4,6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 883.494 841.919 886.958
4,7 SUMIDERO EN LADRILLO SL-100 UN 993.297 974.321 994.875
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.483.712 1.425.181 1.488.584
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 2.114.024 1.996.288 2.123.834
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.850.559 2.654.853 2.866.865
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.870.436 1.870.436 1.870.436
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.970.437 3.970.437 3.970.437
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAETE INTERNO Y
4,13 UN 137.873 136.944 137.950
DEMOLICIN)

5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 76.140 73.641 76.348
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 90.076 87.577 90.284
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 64.834 57.131 65.476
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M CONSTRUCCIN M2 70.474 62.537 71.135
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 69.986 62.455 70.613
5,6 BORDE SEPARADOR VERDE A-170 ML 260.901 259.973 260.979
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 18.944 18.020 19.021
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 46.193 40.765 46.646
5,9 CAUELA PREFABRICADA TIPO A-120 ML 84.647 84.151 84.689
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 566.102 553.000 567.194
5,11 LOSETA PREFABRICADA A-40 M2 64.429 62.305 64.606
5,12 LOSETA PREFABRICADA A-60 M2 93.864 91.740 94.041
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 37.013 33.838 37.277
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 61.492 55.067 62.028
5,15 SARDINEL PREFABRICADO A-10 ML 112.000 104.738 110.449
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 61.557 60.271 61.664

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 210.736 206.957 211.051
6,2 BANCA EN CONCRETO M-30 UN 687.831 682.540 688.272
6,3 BOLARDO M-63 ALTO/HIERRO UN 218.759 217.978 218.824
6,4 BOLARDO M-60 CONCRETO UN 168.902 164.367 169.280
6,5 BOLARDO M-61 BAJO/CONCRETO UN 170.666 166.131 171.044
6,6 BOLARDO M-62 BAJO/HIERRO UN 199.969 195.284 200.359
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 60.087 58.174 60.247
6,8 BORDILLO PREFABRICADO A-80 ML 71.057 68.915 71.235
6,9 CANECA M-120 UN 319.397 318.918 319.437
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 843.022 840.755 843.211
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.464.742 3.463.230 3.464.868
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.564.370 3.562.858 3.564.496
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 499.191 497.629 499.321
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 666.293 660.046 666.814
6,15 BANCA EN MADERA M-50 UN 546.517 546.517 546.517
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 253.407 251.139 253.596
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 590.440 589.244 590.540
6,18 POSTE HISTRICO M-131 UN 6.597.994 6.586.656 6.598.939

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.137 4.137 4.137
7,2 MARCA VIAL CON PINTURA EN FRO M2 43.829 43.829 43.829
7,3 SEAL DOBLE DE CICLORUTA UN 320.187 319.723 320.226
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 506.755 503.632 507.016
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 237.344 236.880 237.383
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 252.291 251.827 252.330
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 263.611 263.147 263.650
7,8 TACHAS REFLECTIVAS UN 13.769 13.769 13.769
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 14.717 14.717 14.717
7,10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIN) UN 120.337 120.337 120.337
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1,1 201 P M3 147.300 147.300 147.300
5KM)
1,2 201 P DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 52.102 52.102 52.102
1,3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA 2.513.232 2.513.232 2.513.232
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,4 200.2 HA 893.776 893.776 893.776
DISTANCIA DE 5KM)
1,5 201.7 DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 86.031 86.031 86.031
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS, SOBREACARREOS Y
1,6 *** M3-KM 1.270 1.270 1.270
DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 35.105 35.105 35.105
2,3 210.2.2 EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 8.415 8.415 8.415
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354
MATERIAL ADICIONADO
2,9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 20.167 20.167 20.167
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2,10 600.2 M3 63.913 63.913 63.913
KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2,11 600.3 M3 78.182 78.182 78.182
5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,12 600.4 M3 18.323 18.323 18.323
MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 600.4 P M3 37.797 37.797 37.797
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2,14 600.5 M3 30.022 30.022 30.022
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2,15 600.5 P M3 50.972 50.972 50.972
DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 208.422 152.288 195.214
3,3 330.1 BASE GRANULAR M3 239.772 183.638 226.564
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON
3,4 365.1 M3 133.838 133.838 133.838
CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.273 3.273 3.273
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.117 1.117 1.117
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 235.645 223.685 236.641
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 69.996 66.537 70.284
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 633.163 604.588 674.438
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 659.938 631.363 701.213
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 682.429 653.854 723.704
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 667.376 638.801 708.651
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 391.902 335.768 378.694
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 359.127 302.993 345.919
3,15 311.1 AFIRMADO M3 161.042 116.465 124.720
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 12.435 11.578 12.507
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 5.095 4.667 5.131
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
3,18 500.1 CONSTRUCCIN
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
M3 715.228 646.963 720.917
UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3,19 500.1 M3 751.672 680.350 757.615
UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3,20 500.1 M3 775.129 702.074 781.216
UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIN
3,21 *** ML 6.892 6.892 6.892
DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 116.610 147.344 179.475

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 988.097 910.662 994.550
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 865.621 789.469 871.966
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 913.612 834.444 920.208
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 653.335 580.894 659.370
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 748.951 673.642 755.226
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 658.031 581.685 664.393
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 753.833 674.464 760.447
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 809.908 733.562 816.270
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 680.813 601.443 687.426
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 855.692 776.322 862.306
4,11 650 P SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 11.673 11.673 11.673
4,12 650 P SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG 15.101 15.101 15.101
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.773 1.773 1.773
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4,14 621.1 ML 2.696.376 2.696.376 2.696.376
REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN MANUAL (INCLUYE EXCAVACIN EN
4,15 621.1 P ML 4.171.774 4.039.320 4.182.811
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.771.384 1.695.794 1.777.683
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 88.113 88.113 88.113
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 367.440 358.369 368.196
4,19 632 P BARANDA METLICA ML 420.351 420.351 420.351
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 17.041 17.041 17.041
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 625.664 522.672 609.608
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 97.501 168.748 168.748
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 154.818 131.958 128.910
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 477.328 398.458 483.899
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 423.285 387.608 450.049
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 431.726 396.048 458.489
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 431.648 398.808 458.175
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 440.088 407.249 466.616
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 597.959 523.866 604.133
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 691.612 614.585 698.031
4,31 681.1 GAVIN M3 202.393 231.730 262.401
4,32 681.1 GAVIN MALLA PVC M3 206.660 235.997 266.667
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 46.747 42.199 47.126
4,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 18.880 16.606 19.069
4,35 *** SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA LTIMA 25 KN) M2 10.176 10.176 10.176
4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 14.580 14.580 14.580
4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 19.681 19.681 19.681
4,38 *** SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA 100 KN) M2 23.627 23.627 23.627
4,39 *** SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA 165 KN) M2 30.410 30.410 30.410
4,40 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 7.304 7.304 7.304
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: BAJO MAGDALENA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Puerto_Salgar Guaduas Caparrap
u
4,41 *** CONSTRUCCIN
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.339 8.339 8.339

4,42 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.672 8.672 8.672

4,43 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 6.145 6.145 6.145

4,44 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 9.315 9.315 9.315

4,45 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 7.574 7.574 7.574

4,46 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 9.315 9.315 9.315

4,47 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 18.007 18.007 18.007
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36" CLASE I, INCLUYE
4,48 661.1 ML 640.414 639.693 640.474
EMBOQUILLADA
4,49 660.3 SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600 MM ML 387.605 371.059 388.984
4,50 *** SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO 36" ML 898.008 898.008 898.008
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 224.023 181.160 189.098
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.489 4.489 4.489
4,53 *** GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 87.566 87.566 87.566
4,54 *** GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 133.477 133.477 133.477
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 614.348 537.321 620.766
4,56 682.1 P COLCHONETA RENO M3 217.756 247.093 277.763
4,57 *** TRINCHO EN MADERA M2 69.157 69.157 69.157

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.137 4.137 4.137
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 43.829 43.829 43.829
5,3 730.3 TOPE DEFENSA METLICA UN 85.381 85.381 85.381
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 70.956 70.956 70.956
5,5 730.1 DEFENSA METLICA ML 152.103 149.319 152.335
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 13.769 13.769 13.769

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 819 819 819
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36", INCLUYE RECTIFICACIN DE
6,2 801.6 UN 124.663 124.663 124.663
DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE DESCOLES Y RETIRO DE SOBRANTES A
6,3 801.7 ML 24.161 24.161 24.161
UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219
6,6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 1.735 1.735 1.735
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 15.566 15.566 15.566
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 25.346 25.346 25.346
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.829 9.829 9.829

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO
SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.979.317 1.981.269 1.982.244 1.979.317 1.972.490 1.967.614 1.991.997 1.962.737 2.001.752 1.979.317 1.985.170 1.952.982
1,2 CAMPAMENTO 9 M2 UN 1.149.615 1.150.591 1.151.078 1.149.615 1.146.201 1.143.763 1.155.955 1.141.325 1.160.832 1.149.615 1.152.541 1.136.448
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.646 13.646 13.646 13.646 13.646 13.646 13.646 13.646 13.646 13.646 13.646 13.646
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.300 15.300 15.300 15.300 15.300 15.300 15.300 15.300 15.300 15.300 15.300 15.300
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.679 17.679 17.679 17.679 17.679 17.679 17.679 17.679 17.679 17.679 17.679 17.679
1,6 CERCA EN TABLA H=2.30 M ML 64.327 64.327 64.327 64.327 64.327 64.327 64.327 64.327 64.327 64.327 64.327 64.327
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 45.473 45.494 45.505 45.473 45.398 45.345 45.612 45.291 45.719 45.473 45.537 45.184
1,8 CERCA EN TELA VERDE H = 2.10 M ML 21.163 21.184 21.195 21.163 21.088 21.035 21.302 20.981 21.409 21.163 21.227 20.874
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 890.393 891.104 889.917 889.298 888.650 887.121 889.294 886.586 892.054 889.199 890.238 884.025
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1,41 M2 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263
DE PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.677 3.677 3.677 3.677 3.677 3.677 3.677 3.677 3.677 3.677 3.677 3.677
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657 2.639.657
1,44 RED TELEFNICA PROVISIONAL UN 243.269 243.269 243.269 243.269 243.269 243.269 243.269 243.269 243.269 243.269 243.269 243.269
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1,45 M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854
CARGUE)

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 87.512 91.392 75.870 74.577 70.696 68.109 78.457 62.935 96.566 73.283 71.990 48.707
2,2 BASE ARENA CEMENTO 1:20 M3 248.373 250.651 251.791 248.373 240.399 234.703 263.183 229.006 274.576 248.373 255.209 217.614
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 CONSTRUCCIN
197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.700 21.700 21.700 21.700 21.700 21.700 21.700 21.700 21.700 21.700 21.700 21.700
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 652.963 655.056 656.103 652.963 645.641 640.410 666.565 635.180 677.026 652.963 659.241 624.717
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 655.973 658.149 659.238 655.973 648.357 642.916 670.119 637.475 681.001 655.973 662.503 626.593
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 610.555 612.593 613.612 610.555 603.424 598.329 623.801 593.235 633.991 610.555 616.669 583.045
2,9 PILOTE DE MADERA D=20 CM ML 48.066 48.066 48.066 48.066 48.066 48.066 48.066 48.066 48.066 48.066 48.066 48.066
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2,10 ML 148.160 148.160 148.160 148.160 148.160 148.160 148.160 148.160 148.160 148.160 148.160 148.160
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE
2,11 ML 185.589 185.589 185.589 185.589 185.589 185.589 185.589 185.589 185.589 185.589 185.589 185.589
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE
2,12 ML 230.853 230.853 230.853 230.853 230.853 230.853 230.853 230.853 230.853 230.853 230.853 230.853
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE
2,13 ML 291.785 291.785 291.785 291.785 291.785 291.785 291.785 291.785 291.785 291.785 291.785 291.785
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 104.088 104.237 104.311 104.088 103.566 103.193 105.057 102.821 105.803 104.088 104.535 102.075
2,15 PILOTE HINCADO 30X30 ML 129.165 129.381 129.489 129.165 128.409 127.869 130.570 127.329 131.650 129.165 129.814 126.248
2,16 DADOS EN CONCRETO 3500PSI M3 597.194 599.232 600.251 597.194 590.063 584.968 610.440 579.874 620.630 597.194 603.309 569.684
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2,17 ML 88.626 88.626 88.626 88.626 88.626 88.626 88.626 88.626 88.626 88.626 88.626 88.626
DISTANCIA MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 37.704 37.718 37.725 37.704 37.655 37.619 37.796 37.584 37.867 37.704 37.747 37.513
3,2 SIFN EN PVC 6" UN 195.272 195.287 195.294 195.272 195.223 195.187 195.364 195.152 195.435 195.272 195.315 195.081
3,3 CAJA DE INSPECCIN DE 100X100 UN 460.498 465.409 455.063 451.414 449.506 439.294 444.930 437.341 462.875 450.588 456.235 421.047
3,4 CAJA DE INSPECCIN DE 40X40 UN 222.347 222.938 222.155 221.580 220.797 219.492 222.189 218.883 224.591 221.511 222.520 216.620
3,5 CAJA DE INSPECCIN DE 60X60 UN 255.724 256.680 255.461 254.520 253.200 251.085 255.643 250.064 259.546 254.411 256.074 246.380
3,6 CAJA DE INSPECCIN DE 80X80 UN 338.704 339.946 338.871 337.500 335.179 332.348 340.482 330.612 345.816 337.391 339.912 325.498
3,7 DUCTO ELCTRICO PVC 4" ML 100.246 100.296 100.167 100.137 100.147 100.047 99.998 100.047 100.167 100.127 100.167 99.898
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.264.948 1.265.445 1.264.152 1.263.853 1.263.953 1.262.958 1.262.460 1.262.958 1.264.152 1.263.754 1.264.152 1.261.465
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 116.153 116.310 116.388 116.153 115.606 115.215 117.170 114.824 117.952 116.153 116.622 114.042
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 73.243 73.326 73.367 73.243 72.954 72.748 73.779 72.542 74.192 73.243 73.491 72.129
3,11 TUBERA DRENAJE PVC 110 ML 27.635 27.671 27.688 27.635 27.512 27.423 27.865 27.335 28.042 27.635 27.741 27.158
3,12 TUBERA DRENAJE PVC 160 ML 44.400 44.435 44.453 44.400 44.276 44.188 44.630 44.099 44.807 44.400 44.506 43.923
3,13 TUBERA DRENAJE PVC 200 ML 58.382 58.432 58.457 58.382 58.209 58.085 58.704 57.961 58.952 58.382 58.531 57.714
3,14 TUBERA DRENAJE PVC 250 ML 79.887 79.944 79.972 79.887 79.689 79.548 80.255 79.406 80.538 79.887 80.057 79.123
3,15 TUBERA DRENAJE PVC 315 ML 110.321 110.371 110.395 110.321 110.148 110.024 110.643 109.900 110.891 110.321 110.470 109.653
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3,16 UN 949.653 950.219 950.503 949.653 947.673 946.258 953.332 944.843 956.162 949.653 951.351 942.013
MATERIAL FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3,17 UN 1.348.542 1.349.674 1.350.241 1.348.542 1.344.581 1.341.751 1.355.900 1.338.921 1.361.560 1.348.542 1.351.938 1.333.261
MATERIAL FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3,18 UN 1.768.455 1.770.719 1.771.852 1.768.455 1.760.532 1.754.872 1.783.170 1.749.213 1.794.490 1.768.455 1.775.247 1.737.893
MATERIAL FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 41.339 41.339 41.339 41.339 41.339 41.339 41.339 41.339 41.339 41.339 41.339 41.339
4,2 CASETN DE LONA 0.80X0.70 M2 54.693 54.693 54.693 54.693 54.693 54.693 54.693 54.693 54.693 54.693 54.693 54.693
4,3 COLUMNAS 3500 PSI M3 809.723 811.761 812.780 809.723 802.592 797.497 822.969 792.403 833.159 809.723 815.838 782.213
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 262.801 266.499 262.498 259.875 254.452 249.803 268.872 245.989 280.678 259.457 268.045 235.436
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4,5 M2 99.071 99.269 99.368 99.071 98.379 97.884 100.357 97.389 101.346 99.071 99.665 96.400
MALLA DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.
4,6 M2 116.998 117.236 117.355 116.998 116.168 115.574 118.542 114.981 119.729 116.998 117.711 113.793
MALLA DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN
4,7 M2 130.150 130.467 130.625 130.150 129.042 128.251 132.208 127.460 133.791 130.150 131.100 125.877
REFUERZO)
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
4,8
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN
M2 137.369 137.705
CONSTRUCCIN
137.873 137.369 136.192 135.351 139.555 134.510 141.237 137.369 138.378 132.828
REFUERZO)
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN
4,9 M2 157.935 158.350 158.558 157.935 156.481 155.442 160.635 154.403 162.713 157.935 159.181 152.326
REFUERZO)
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN
4,10 M2 175.890 176.364 176.602 175.890 174.228 173.041 178.976 171.854 181.350 175.890 177.314 169.479
REFUERZO)
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN
4,11 M2 195.300 195.834 196.101 195.300 193.430 192.095 198.772 190.760 201.443 195.300 196.903 188.089
REFUERZO)
4,12 ENTREPISO VIGUETA PLACA M2 97.792 97.827 97.844 97.792 97.672 97.585 98.016 97.499 98.189 97.792 97.896 97.327
4,13 ESCALERA MACIZA 3500 PSI M3 954.490 956.528 957.548 954.490 947.359 942.264 967.736 937.170 977.926 954.490 960.605 926.980
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 94.053 94.083 94.098 94.053 93.947 93.872 94.248 93.797 94.399 94.053 94.143 93.646
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 79.991 80.195 80.297 79.991 79.278 78.768 81.315 78.259 82.334 79.991 80.602 77.240
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 90.287 90.536 90.661 90.287 89.414 88.791 91.907 88.168 93.153 90.287 91.035 86.921
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 105.571 105.883 106.040 105.571 104.477 103.695 107.603 102.914 109.166 105.571 106.509 101.351
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 711.494 713.531 714.551 711.494 704.362 699.267 724.739 694.173 734.929 711.494 717.608 683.983
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI
4,19 UN 48.410 48.473 48.505 48.410 48.189 48.032 48.820 47.874 49.135 48.410 48.599 47.558
(ANCHO 1 M)
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 285.950 286.860 287.315 285.950 282.765 280.490 291.866 278.215 296.416 285.950 288.681 273.664
4,21 ACERO FIGURADO 37000 PSI KG 4.118 4.118 4.118 4.118 4.118 4.118 4.118 4.118 4.118 4.118 4.118 4.118
4,22 ACERO FIGURADO 60000 PSI KG 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.997 5.997 5.997 5.997 5.997 5.997 5.997 5.997 5.997 5.997 5.997 5.997
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 851.382 853.419 854.439 851.382 844.250 839.156 864.628 834.061 874.817 851.382 857.496 823.872
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 782.531 784.761 785.877 782.531 774.726 769.151 797.027 763.576 808.178 782.531 789.222 752.425
4,26 VIGA AREA 3500 PSI M3 847.519 849.557 850.577 847.519 840.388 835.293 860.765 830.199 870.955 847.519 853.634 820.009
4,27 VIGA CINTA 3500 PSI M3 828.578 830.615 831.635 828.578 821.446 816.352 841.824 811.257 852.014 828.578 834.692 801.068
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.027.787 1.029.825 1.030.844 1.027.787 1.020.656 1.015.561 1.041.033 1.010.467 1.051.223 1.027.787 1.033.901 1.000.277
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 343.901 346.134 347.251 343.901 336.088 330.507 358.413 324.926 369.576 343.901 350.599 313.763

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 29.461 29.517 29.545 29.461 29.264 29.123 29.826 28.983 30.107 29.461 29.629 28.702
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 48.761 48.817 48.845 48.761 48.564 48.424 49.126 48.283 49.407 48.761 48.930 48.002
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 34.151 34.165 34.172 34.151 34.101 34.066 34.243 34.031 34.314 34.151 34.193 33.960
5,4 ARCOS EN LADRILLO PRENSADO ML 158.964 158.993 159.007 158.964 158.865 158.794 159.148 158.724 159.290 158.964 159.049 158.582
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 43.460 43.523 43.555 43.460 43.240 43.082 43.870 42.924 44.186 43.460 43.650 42.609
5,6 DINTELES EN BLOQUE 0.15 M ML 26.814 26.844 26.859 26.814 26.709 26.633 27.010 26.558 27.160 26.814 26.904 26.408
5,7 ENCHAPES LADRILLO PRENSADO M2 98.621 98.677 98.706 98.621 98.422 98.281 98.989 98.139 99.272 98.621 98.790 97.856

5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 91.603 91.813 91.918 91.603 90.867 90.341 92.969 89.816 94.021 91.603 92.234 88.764

5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 89.055 89.055 89.055 89.055 89.055 89.055 89.055 89.055 89.055 89.055 89.055 89.055
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 52.010 52.010 52.010 52.010 52.010 52.010 52.010 52.010 52.010 52.010 52.010 52.010
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 85.712 85.712 85.712 85.712 85.712 85.712 85.712 85.712 85.712 85.712 85.712 85.712
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 50.338 50.338 50.338 50.338 50.338 50.338 50.338 50.338 50.338 50.338 50.338 50.338
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 99.755 99.755 99.755 99.755 99.755 99.755 99.755 99.755 99.755 99.755 99.755 99.755
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 58.607 58.607 58.607 58.607 58.607 58.607 58.607 58.607 58.607 58.607 58.607 58.607
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 111.102 111.102 111.102 111.102 111.102 111.102 111.102 111.102 111.102 111.102 111.102 111.102
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 64.281 64.281 64.281 64.281 64.281 64.281 64.281 64.281 64.281 64.281 64.281 64.281
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 40.369 40.398 40.412 40.369 40.270 40.199 40.554 40.128 40.696 40.369 40.455 39.985
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 24.258 24.272 24.279 24.258 24.208 24.173 24.351 24.137 24.422 24.258 24.301 24.066
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 52.405 52.424 52.433 52.405 52.339 52.291 52.528 52.244 52.623 52.405 52.462 52.149
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 31.282 31.291 31.296 31.282 31.249 31.225 31.344 31.201 31.391 31.282 31.310 31.154
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 58.870 58.889 58.899 58.870 58.804 58.756 58.994 58.709 59.088 58.870 58.927 58.614
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 35.151 35.160 35.165 35.151 35.117 35.094 35.212 35.070 35.260 35.151 35.179 35.023
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 99.329 99.424 99.472 99.329 98.997 98.760 99.946 98.523 100.420 99.329 99.614 98.049
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 58.238 58.285 CONSTRUCCIN
58.309 58.238 58.072 57.953 58.546 57.835 58.783 58.238 58.380 57.598
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 36.797 36.816 36.825 36.797 36.730 36.683 36.920 36.635 37.015 36.797 36.853 36.541
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 22.157 22.167 22.172 22.157 22.124 22.100 22.219 22.077 22.266 22.157 22.186 22.029
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 73.408 73.446 73.465 73.408 73.275 73.180 73.654 73.086 73.844 73.408 73.522 72.896
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 43.938 43.957 43.967 43.938 43.872 43.825 44.062 43.777 44.156 43.938 43.995 43.682
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 86.972 87.002 87.017 86.972 86.866 86.791 87.167 86.716 87.318 86.972 87.062 86.565
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 52.304 52.319 52.327 52.304 52.251 52.214 52.402 52.176 52.477 52.304 52.349 52.101
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 181.907 182.040 182.106 181.907 181.443 181.111 182.770 180.779 183.434 181.907 182.305 180.115
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 108.323 108.389 108.422 108.323 108.090 107.924 108.754 107.758 109.086 108.323 108.522 107.427
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 89.296 89.355 89.384 89.296 89.089 88.942 89.679 88.794 89.974 89.296 89.473 88.499
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 53.466 53.495 53.510 53.466 53.363 53.289 53.658 53.215 53.805 53.466 53.554 53.068

5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 46.821 46.863 46.885 46.821 46.672 46.566 47.097 46.460 47.309 46.821 46.948 46.248
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 28.225 28.246 28.257 28.225 28.151 28.098 28.363 28.045 28.469 28.225 28.289 27.938
5,37 MURO TOLETE COMN 0.06 M M2 33.346 33.365 33.375 33.346 33.280 33.233 33.470 33.185 33.564 33.346 33.403 33.090
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 20.172 20.182 20.187 20.172 20.139 20.116 20.234 20.092 20.281 20.172 20.201 20.044
5,39 MURO TOLETE COMN 0.12 M M2 50.878 50.915 50.934 50.878 50.745 50.650 51.124 50.555 51.314 50.878 50.991 50.366
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 30.898 30.917 30.926 30.898 30.831 30.784 31.021 30.736 31.116 30.898 30.955 30.642
5,41 MURO TOLETE COMN 0.25 M M2 97.890 97.947 97.976 97.890 97.691 97.549 98.260 97.407 98.544 97.890 98.061 97.122
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 59.094 59.123 59.137 59.094 58.995 58.924 59.279 58.853 59.422 59.094 59.180 58.710
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 71.274 71.312 71.330 71.274 71.141 71.046 71.520 70.951 71.710 71.274 71.387 70.762
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5,44 ML 42.731 42.750 42.759 42.731 42.664 42.617 42.854 42.569 42.949 42.731 42.787 42.475
(LINEAL)
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 151.363 151.496 151.562 151.363 150.898 150.566 152.226 150.235 152.889 151.363 151.761 149.571
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5,46 ML 91.201 91.268 91.301 91.201 90.969 90.803 91.633 90.637 91.965 91.201 91.400 90.305
(LINEAL)
5,47 REMATES LADRILLO PRENSADO ML 31.239 31.253 31.260 31.239 31.189 31.154 31.331 31.119 31.402 31.239 31.281 31.048
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 36.371 36.414 36.435 36.371 36.222 36.116 36.647 36.010 36.859 36.371 36.498 35.798
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 61.087 61.144 61.172 61.087 60.889 60.748 61.455 60.606 61.738 61.087 61.257 60.323
5,50 LAVADA DE FACHADA M2 4.984 4.984 4.984 4.984 4.984 4.984 4.984 4.984 4.984 4.984 4.984 4.984
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 49.109 49.165 49.193 49.109 48.912 48.772 49.474 48.631 49.755 49.109 49.278 48.350
5,52 DOVELA, GROUTING 3000 PSI ML 10.098 10.098 10.098 10.098 10.098 10.098 10.098 10.098 10.098 10.098 10.098 10.098
5,53 ANCLAJE 3/8" L=30CM UN 13.397 13.397 13.397 13.397 13.397 13.397 13.397 13.397 13.397 13.397 13.397 13.397
5,54 ANCLAJE 1/2" L=50CM UN 17.524 17.524 17.524 17.524 17.524 17.524 17.524 17.524 17.524 17.524 17.524 17.524
5,55 ANCLAJE 5/8" L=70CM UN 24.625 24.625 24.625 24.625 24.625 24.625 24.625 24.625 24.625 24.625 24.625 24.625
5,56 ANCLAJE 3/4" L=70CM UN 36.844 36.844 36.844 36.844 36.844 36.844 36.844 36.844 36.844 36.844 36.844 36.844
5,57 ANCLAJE 1" L= 70CM UN 4.969 4.984 4.991 4.969 4.915 4.878 5.067 4.840 5.143 4.969 5.014 4.764

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.407 15.407 15.407 15.407 15.407 15.407 15.407 15.407 15.407 15.407 15.407 15.407
6,2 FILOS O DILATACIONES B/PLACA ML 5.845 5.859 5.867 5.845 5.796 5.760 5.937 5.725 6.008 5.845 5.888 5.654
6,3 FILOS O DILATACIONES S/MURO ML 6.965 6.979 6.986 6.965 6.916 6.880 7.057 6.845 7.128 6.965 7.008 6.774
6,4 GOTERA EN MORTERO 1:4 ML 8.216 8.230 8.237 8.216 8.166 8.131 8.308 8.096 8.379 8.216 8.258 8.025
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.664 6.664 6.664 6.664 6.664 6.664 6.664 6.664 6.664 6.664 6.664 6.664
6,6 MALLA BAJO ENTRAMADO M2 13.140 13.140 13.140 13.140 13.140 13.140 13.140 13.140 13.140 13.140 13.140 13.140
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 24.095 24.137 24.157 24.095 23.951 23.847 24.364 23.744 24.570 24.095 24.219 23.538
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 14.497 14.518 14.528 14.497 14.425 14.373 14.631 14.322 14.735 14.497 14.559 14.218
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 21.245 21.284 21.304 21.245 21.105 21.006 21.504 20.906 21.703 21.245 21.364 20.707
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.779 12.799 12.809 12.779 12.709 12.659 12.908 12.610 13.008 12.779 12.839 12.510
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 20.421 20.462 20.483 20.421 20.277 20.173 20.690 20.070 20.896 20.421 20.545 19.863
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 12.367 12.388 12.398 12.367 12.295 12.243 12.501 12.192 12.605 12.367 12.429 12.088
6,13 PAETE CULATAS 1:4, E=2 CM M2 21.245 21.284 21.304 21.245 21.105 21.006 21.504 20.906 21.703 21.245 21.364 20.707
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.779 12.799 12.809 12.779 12.709 12.659 12.908 12.610 13.008 12.779 12.839 12.510
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 21.449 21.478 CONSTRUCCIN
21.493 21.449 21.346 21.272 21.640 21.198 21.787 21.449 21.537 21.051

6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.880 12.895 12.902 12.880 12.828 12.792 12.976 12.755 13.049 12.880 12.924 12.681

6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 17.586 17.616 17.632 17.586 17.480 17.404 17.783 17.328 17.935 17.586 17.677 17.177
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.677 10.692 10.700 10.677 10.624 10.586 10.776 10.548 10.852 10.677 10.723 10.472
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.959 16.990 17.006 16.959 16.848 16.770 17.163 16.691 17.321 16.959 17.053 16.534
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.364 10.379 10.387 10.364 10.308 10.269 10.466 10.230 10.545 10.364 10.411 10.151
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 21.980 22.019 22.039 21.980 21.840 21.741 22.238 21.641 22.437 21.980 22.099 21.442
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 13.127 13.147 13.157 13.127 13.058 13.008 13.257 12.958 13.356 13.127 13.187 12.859
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 21.156 21.197 21.218 21.156 21.011 20.908 21.424 20.805 21.631 21.156 21.280 20.598
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.716 12.736 12.747 12.716 12.643 12.592 12.850 12.540 12.953 12.716 12.778 12.437
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 17.535 17.566 17.582 17.535 17.425 17.346 17.740 17.267 17.897 17.535 17.629 17.110
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.635 10.651 10.658 10.635 10.580 10.540 10.737 10.501 10.816 10.635 10.682 10.422
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 21.996 22.037 22.058 21.996 21.851 21.748 22.264 21.645 22.471 21.996 22.120 21.438
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 13.517 13.538 13.548 13.517 13.445 13.393 13.652 13.342 13.755 13.517 13.579 13.239

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 27.200 27.257 27.286 27.200 27.001 26.859 27.570 26.717 27.854 27.200 27.371 26.432
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN
7,2 M2 82.779 82.884 82.937 82.779 82.411 82.148 83.462 81.886 83.988 82.779 83.094 81.360
ASFALTO (INCLUYE TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 54.336 54.336 54.336 54.336 54.336 54.336 54.336 54.336 54.336 54.336 54.336 54.336
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 79.489 79.489 79.489 79.489 79.489 79.489 79.489 79.489 79.489 79.489 79.489 79.489
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 62.180 62.180 62.180 62.180 62.180 62.180 62.180 62.180 62.180 62.180 62.180 62.180
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 36.039 36.039 36.039 36.039 36.039 36.039 36.039 36.039 36.039 36.039 36.039 36.039
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 83.319 83.319 83.319 83.319 83.319 83.319 83.319 83.319 83.319 83.319 83.319 83.319
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 99.548 99.548 99.548 99.548 99.548 99.548 99.548 99.548 99.548 99.548 99.548 99.548
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 146.436 146.436 146.436 146.436 146.436 146.436 146.436 146.436 146.436 146.436 146.436 146.436
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 57.628 57.628 57.628 57.628 57.628 57.628 57.628 57.628 57.628 57.628 57.628 57.628
7,13 CANAL PVC AMAZONAS ML 79.948 79.948 79.948 79.948 79.948 79.948 79.948 79.948 79.948 79.948 79.948 79.948
7,14 CANAL PVC RAINGO ML 72.628 72.628 72.628 72.628 72.628 72.628 72.628 72.628 72.628 72.628 72.628 72.628
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 129.439 129.439 129.439 129.439 129.439 129.439 129.439 129.439 129.439 129.439 129.439 129.439
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 75.666 75.666 75.666 75.666 75.666 75.666 75.666 75.666 75.666 75.666 75.666 75.666
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 55.522 55.522 55.522 55.522 55.522 55.522 55.522 55.522 55.522 55.522 55.522 55.522
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 31.386 31.386 31.386 31.386 31.386 31.386 31.386 31.386 31.386 31.386 31.386 31.386
7,19 TEJA DE BARRO M2 59.294 59.365 59.400 59.294 59.046 58.869 59.754 58.693 60.108 59.294 59.506 58.339
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 46.293 46.293 46.293 46.293 46.293 46.293 46.293 46.293 46.293 46.293 46.293 46.293
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 42.424 42.424 42.424 42.424 42.424 42.424 42.424 42.424 42.424 42.424 42.424 42.424
7,22 TEJA FIBROCEMENTO N4 M2 35.615 35.615 35.615 35.615 35.615 35.615 35.615 35.615 35.615 35.615 35.615 35.615
7,23 TEJA FIBROCEMENTO No. 6 M2 34.887 34.887 34.887 34.887 34.887 34.887 34.887 34.887 34.887 34.887 34.887 34.887
7,24 TEJA FIBROCEMENTO No. 8 M2 35.153 35.153 35.153 35.153 35.153 35.153 35.153 35.153 35.153 35.153 35.153 35.153
7,25 TEJA TERMOACSTICA M2 49.619 49.619 49.619 49.619 49.619 49.619 49.619 49.619 49.619 49.619 49.619 49.619
7,26 TEJA PLSTICA No.6 M2 43.590 43.590 43.590 43.590 43.590 43.590 43.590 43.590 43.590 43.590 43.590 43.590
7,27 TEJA ESPAOLA ETERNIT M2 79.968 79.968 79.968 79.968 79.968 79.968 79.968 79.968 79.968 79.968 79.968 79.968
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO
7,28 M2 147.905 147.905 147.905 147.905 147.905 147.905 147.905 147.905 147.905 147.905 147.905 147.905
INYECTADO 30MM
7,29 TEJA SIN TRASLAPO M2 66.400 66.400 66.400 66.400 66.400 66.400 66.400 66.400 66.400 66.400 66.400 66.400
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 41.213 41.213 41.213 41.213 41.213 41.213 41.213 41.213 41.213 41.213 41.213 41.213
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 32.360 32.360 32.360 32.360 32.360 32.360 32.360 32.360 32.360 32.360 32.360 32.360
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO
7,32 M2 56.718 56.718 56.718 56.718 56.718 56.718 56.718 56.718 56.718 56.718 56.718 56.718
ESTRUCTURAL ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.355 19.355 19.355 19.355 19.355 19.355 19.355 19.355 19.355 19.355 19.355 19.355
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.345 23.345 CONSTRUCCIN
23.345 23.345 23.345 23.345 23.345 23.345 23.345 23.345 23.345 23.345
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.339 25.339 25.339 25.339 25.339 25.339 25.339 25.339 25.339 25.339 25.339 25.339
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 32.705 32.705 32.705 32.705 32.705 32.705 32.705 32.705 32.705 32.705 32.705 32.705
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.517 21.517 21.517 21.517 21.517 21.517 21.517 21.517 21.517 21.517 21.517 21.517
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 50.697 50.697 50.697 50.697 50.697 50.697 50.697 50.697 50.697 50.697 50.697 50.697
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 350.995 350.995 350.995 350.995 350.995 350.995 350.995 350.995 350.995 350.995 350.995 350.995
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 396.591 396.591 396.591 396.591 396.591 396.591 396.591 396.591 396.591 396.591 396.591 396.591
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 265.604 265.604 265.604 265.604 265.604 265.604 265.604 265.604 265.604 265.604 265.604 265.604
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 284.100 284.100 284.100 284.100 284.100 284.100 284.100 284.100 284.100 284.100 284.100 284.100

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 475.205 477.366 478.447 475.205 467.643 462.241 489.251 456.839 500.056 475.205 481.689 446.034
8,2 CONCRETO 3500 PSI M3 415.793 417.771 418.761 415.793 408.869 403.923 428.653 398.977 438.546 415.793 421.729 389.084
8,3 CONCRETO 3000 PSI M3 414.176 416.208 417.224 414.176 407.067 401.988 427.381 396.910 437.538 414.176 420.271 386.752
8,4 CONCRETO 2500 PSI M3 372.579 374.681 375.733 372.579 365.221 359.965 386.245 354.709 396.758 372.579 378.887 344.196
8,5 CONCRETO 2000 PSI M3 349.372 351.509 352.578 349.372 341.894 336.552 363.262 331.210 373.946 349.372 355.783 320.526
8,6 CONCRETO 1500 PSI M3 319.616 321.784 322.868 319.616 312.030 306.612 333.705 301.193 344.543 319.616 326.119 290.355
8,7 MORTERO SECO 1:10 M3 281.969 283.921 284.898 281.969 275.133 270.251 294.663 265.368 304.428 281.969 287.828 255.604
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 486.761 488.657 489.605 486.761 480.124 475.383 499.087 470.642 508.569 486.761 492.450 461.160
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 447.544 449.511 450.495 447.544 440.659 435.741 460.330 430.824 470.166 447.544 453.446 420.988
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 505.184 507.024 507.944 505.184 498.745 494.146 517.143 489.546 526.342 505.184 510.704 480.348
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 728.164 730.004 730.924 728.164 721.725 717.126 740.123 712.526 749.322 728.164 733.684 703.328

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 120.575 120.575 120.575 120.575 120.575 120.575 120.575 120.575 120.575 120.575 120.575 120.575
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 4.209 4.223 4.230 4.209 4.160 4.124 4.301 4.089 4.372 4.209 4.252 4.018
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 134.683 134.683 134.683 134.683 134.683 134.683 134.683 134.683 134.683 134.683 134.683 134.683
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 165.207 165.207 165.207 165.207 165.207 165.207 165.207 165.207 165.207 165.207 165.207 165.207
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 241.189 241.189 241.189 241.189 241.189 241.189 241.189 241.189 241.189 241.189 241.189 241.189
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 268.512 268.512 268.512 268.512 268.512 268.512 268.512 268.512 268.512 268.512 268.512 268.512
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 295.867 295.867 295.867 295.867 295.867 295.867 295.867 295.867 295.867 295.867 295.867 295.867
9,8 HOJA PUERTA FORTEC 0.81 UN 196.635 196.635 196.635 196.635 196.635 196.635 196.635 196.635 196.635 196.635 196.635 196.635
9,9 HOJA PUERTA FORTEC 0.91 UN 222.968 222.968 222.968 222.968 222.968 222.968 222.968 222.968 222.968 222.968 222.968 222.968
9,10 HOJA PUERTA FORTEC 1.50 UN 328.300 328.300 328.300 328.300 328.300 328.300 328.300 328.300 328.300 328.300 328.300 328.300
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 124.220 124.220 124.220 124.220 124.220 124.220 124.220 124.220 124.220 124.220 124.220 124.220
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 165.036 165.036 165.036 165.036 165.036 165.036 165.036 165.036 165.036 165.036 165.036 165.036
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 183.469 183.469 183.469 183.469 183.469 183.469 183.469 183.469 183.469 183.469 183.469 183.469
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 467.863 467.863 467.863 467.863 467.863 467.863 467.863 467.863 467.863 467.863 467.863 467.863
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 41.117 41.117 41.117 41.117 41.117 41.117 41.117 41.117 41.117 41.117 41.117 41.117
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.466 25.466 25.466 25.466 25.466 25.466 25.466 25.466 25.466 25.466 25.466 25.466
9,17 VENTANERA EN MADERA CEDRO MACHO M2 97.184 97.184 97.184 97.184 97.184 97.184 97.184 97.184 97.184 97.184 97.184 97.184
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 119.591 119.591 119.591 119.591 119.591 119.591 119.591 119.591 119.591 119.591 119.591 119.591
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 92.864 92.864 92.864 92.864 92.864 92.864 92.864 92.864 92.864 92.864 92.864 92.864
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664 28.664
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 27.163 27.163 27.163 27.163 27.163 27.163 27.163 27.163 27.163 27.163 27.163 27.163
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 41.494 41.494 41.494 41.494 41.494 41.494 41.494 41.494 41.494 41.494 41.494 41.494
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 62.106 62.106 62.106 62.106 62.106 62.106 62.106 62.106 62.106 62.106 62.106 62.106
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 74.739 74.739 74.739 74.739 74.739 74.739 74.739 74.739 74.739 74.739 74.739 74.739
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 353.027 353.027 353.027 353.027 353.027 353.027 353.027 353.027 353.027 353.027 353.027 353.027
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 246.643 246.643 246.643 246.643 246.643 246.643 246.643 246.643 246.643 246.643 246.643 246.643
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.850 32.850 CONSTRUCCIN
32.850 32.850 32.850 32.850 32.850 32.850 32.850 32.850 32.850 32.850
9,30 VIDRIO TRANSPARENTE 4 MM M2 42.160 42.160 42.160 42.160 42.160 42.160 42.160 42.160 42.160 42.160 42.160 42.160
9,31 VIDRIO TRANSPARENTE 5 MM M2 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468 51.468
9,32 VIDRIO TRANSPARENTE 6 MM M2 64.766 64.766 64.766 64.766 64.766 64.766 64.766 64.766 64.766 64.766 64.766 64.766

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 74.402 74.402 74.402 74.402 74.402 74.402 74.402 74.402 74.402 74.402 74.402 74.402
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 208.127 208.127 208.127 208.127 208.127 208.127 208.127 208.127 208.127 208.127 208.127 208.127
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO
10,3 ML 78.595 78.595 78.595 78.595 78.595 78.595 78.595 78.595 78.595 78.595 78.595 78.595
DE 1" (INCLUYE ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 140.048 140.048 140.048 140.048 140.048 140.048 140.048 140.048 140.048 140.048 140.048 140.048
10,5 MARCO TAPA CAJA DE INSPECCIN UN 133.402 133.402 133.402 133.402 133.402 133.402 133.402 133.402 133.402 133.402 133.402 133.402
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 87.571 87.571 87.571 87.571 87.571 87.571 87.571 87.571 87.571 87.571 87.571 87.571
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 206.711 206.711 206.711 206.711 206.711 206.711 206.711 206.711 206.711 206.711 206.711 206.711
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 107.486 107.486 107.486 107.486 107.486 107.486 107.486 107.486 107.486 107.486 107.486 107.486
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.437 6.437 6.437 6.437 6.437 6.437 6.437 6.437 6.437 6.437 6.437 6.437
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO
10,10 M2 96.438 96.438 96.438 96.438 96.438 96.438 96.438 96.438 96.438 96.438 96.438 96.438
(PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")
CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC.
10,11 ML 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728
ANTICORROSIVO
DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10,12 M2 531.165 531.165 531.165 531.165 531.165 531.165 531.165 531.165 531.165 531.165 531.165 531.165
E=6MM
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 190.639 190.639 190.639 190.639 190.639 190.639 190.639 190.639 190.639 190.639 190.639 190.639
PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA
10,14 M2 213.224 213.224 213.224 213.224 213.224 213.224 213.224 213.224 213.224 213.224 213.224 213.224
ELECTROSTTICA

DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20


10,15 M2 483.873 483.873 483.873 483.873 483.873 483.873 483.873 483.873 483.873 483.873 483.873 483.873
(INCLUYE PUERTAS Y ACCESORIOS)
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.
10,16 M2 124.706 124.706 124.706 124.706 124.706 124.706 124.706 124.706 124.706 124.706 124.706 124.706
ANTICORROSIVO
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 387.575 387.575 387.575 387.575 387.575 387.575 387.575 387.575 387.575 387.575 387.575 387.575
SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC.
10,18 ML 5.887 5.887 5.887 5.887 5.887 5.887 5.887 5.887 5.887 5.887 5.887 5.887
ANTICORROSIVO
10,19 VENTANA EN ALUMINIO CORREDIZA M2 272.101 272.101 272.101 272.101 272.101 272.101 272.101 272.101 272.101 272.101 272.101 272.101
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 118.861 118.861 118.861 118.861 118.861 118.861 118.861 118.861 118.861 118.861 118.861 118.861
10,21 REJILLA PISO 0.30 M M2 84.379 84.379 84.379 84.379 84.379 84.379 84.379 84.379 84.379 84.379 84.379 84.379
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 87.003 87.003 87.003 87.003 87.003 87.003 87.003 87.003 87.003 87.003 87.003 87.003
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS
10,23 DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. KG 10.292 10.292 10.292 10.292 10.292 10.292 10.292 10.292 10.292 10.292 10.292 10.292
CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y
MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO
C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,24 COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, KG 11.434 11.434 11.434 11.434 11.434 11.434 11.434 11.434 11.434 11.434 11.434 11.434
PINTURA Y PLATINERA.CONTEMPLA TAMBIEN:FABRICACIN,
SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR),
PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS,
10,25 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, KG 9.064 9.064 9.064 9.064 9.064 9.064 9.064 9.064 9.064 9.064 9.064 9.064
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11,1 ACOMETIDA EN PVC 1/2" 5M UN 214.749 214.749 214.749 214.749 214.749 214.749 214.749 214.749 214.749 214.749 214.749 214.749
11,2 ACOMETIDA EN PVC 3/4" 5M UN 259.680 259.680 259.680 259.680 259.680 259.680 259.680 259.680 259.680 259.680 259.680 259.680
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.548 21.548 CONSTRUCCIN
21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548 21.548
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875 33.875
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 32.424 32.424 32.424 32.424 32.424 32.424 32.424 32.424 32.424 32.424 32.424 32.424
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 41.640 41.640 41.640 41.640 41.640 41.640 41.640 41.640 41.640 41.640 41.640 41.640
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 86.046 86.046 86.046 86.046 86.046 86.046 86.046 86.046 86.046 86.046 86.046 86.046
11,8 CONEXIN TANQUE ELEVADO PVC UN 216.092 216.092 216.092 216.092 216.092 216.092 216.092 216.092 216.092 216.092 216.092 216.092
11,9 INSTALACIN APARATO SANITARIO UN 41.870 41.870 41.870 41.870 41.870 41.870 41.870 41.870 41.870 41.870 41.870 41.870
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 34.025 34.025 34.025 34.025 34.025 34.025 34.025 34.025 34.025 34.025 34.025 34.025
11,13 NIPLE PASAMURO 2" UN 64.440 64.440 64.440 64.440 64.440 64.440 64.440 64.440 64.440 64.440 64.440 64.440
11,14 NIPLE PASAMURO 4" UN 96.383 96.383 96.383 96.383 96.383 96.383 96.383 96.383 96.383 96.383 96.383 96.383
11,15 PUNTO AGUA CALIENTE CPVC UN 81.618 81.618 81.618 81.618 81.618 81.618 81.618 81.618 81.618 81.618 81.618 81.618
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 59.183 59.183 59.183 59.183 59.183 59.183 59.183 59.183 59.183 59.183 59.183 59.183
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 63.038 63.038 63.038 63.038 63.038 63.038 63.038 63.038 63.038 63.038 63.038 63.038
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 79.674 79.674 79.674 79.674 79.674 79.674 79.674 79.674 79.674 79.674 79.674 79.674
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 64.444 64.444 64.444 64.444 64.444 64.444 64.444 64.444 64.444 64.444 64.444 64.444
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 80.892 80.892 80.892 80.892 80.892 80.892 80.892 80.892 80.892 80.892 80.892 80.892
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 86.592 86.592 86.592 86.592 86.592 86.592 86.592 86.592 86.592 86.592 86.592 86.592
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 72.070 72.070 72.070 72.070 72.070 72.070 72.070 72.070 72.070 72.070 72.070 72.070
11,23 RED SUMINISTRO CPVC 1/2" ML 12.184 12.184 12.184 12.184 12.184 12.184 12.184 12.184 12.184 12.184 12.184 12.184
11,24 RED SUMINISTRO CPVC 3/4" ML 17.206 17.206 17.206 17.206 17.206 17.206 17.206 17.206 17.206 17.206 17.206 17.206
11,25 RED SUMINISTRO PVC 1 1/2" ML 22.453 22.453 22.453 22.453 22.453 22.453 22.453 22.453 22.453 22.453 22.453 22.453
11,26 RED SUMINISTRO PVC 1" ML 13.838 13.838 13.838 13.838 13.838 13.838 13.838 13.838 13.838 13.838 13.838 13.838
11,27 RED SUMINISTRO PVC 1/2" ML 8.246 8.246 8.246 8.246 8.246 8.246 8.246 8.246 8.246 8.246 8.246 8.246
11,28 RED SUMINISTRO PVC 2 1/2" ML 50.139 50.139 50.139 50.139 50.139 50.139 50.139 50.139 50.139 50.139 50.139 50.139
11,29 RED SUMINISTRO PVC 2" ML 32.033 32.033 32.033 32.033 32.033 32.033 32.033 32.033 32.033 32.033 32.033 32.033
11,30 RED SUMINISTRO PVC 3/4" ML 10.341 10.341 10.341 10.341 10.341 10.341 10.341 10.341 10.341 10.341 10.341 10.341
11,31 RED SANITARIA PVC-S 2" ML 24.697 24.697 24.697 24.697 24.697 24.697 24.697 24.697 24.697 24.697 24.697 24.697
11,32 RED SANITARIA PVC-S 3" ML 34.303 34.303 34.303 34.303 34.303 34.303 34.303 34.303 34.303 34.303 34.303 34.303
11,33 RED SANITARIA PVC-S 4" ML 46.577 46.577 46.577 46.577 46.577 46.577 46.577 46.577 46.577 46.577 46.577 46.577
11,34 RED SANITARIA PVC-S 6" ML 87.335 87.335 87.335 87.335 87.335 87.335 87.335 87.335 87.335 87.335 87.335 87.335
11,35 REGISTRO 1" UN 105.820 105.820 105.820 105.820 105.820 105.820 105.820 105.820 105.820 105.820 105.820 105.820
11,36 REGISTRO 1/2" UN 58.950 58.950 58.950 58.950 58.950 58.950 58.950 58.950 58.950 58.950 58.950 58.950
11,37 REGISTRO 3/4" UN 75.171 75.171 75.171 75.171 75.171 75.171 75.171 75.171 75.171 75.171 75.171 75.171
11,38 REGISTRO 1 1/2" UN 181.922 181.922 181.922 181.922 181.922 181.922 181.922 181.922 181.922 181.922 181.922 181.922
11,39 REGISTRO 2 1/2" UN 375.689 375.689 375.689 375.689 375.689 375.689 375.689 375.689 375.689 375.689 375.689 375.689
11,40 REGISTRO 2" UN 277.358 277.358 277.358 277.358 277.358 277.358 277.358 277.358 277.358 277.358 277.358 277.358
11,41 REVENTILACIN 2" ML 17.191 17.191 17.191 17.191 17.191 17.191 17.191 17.191 17.191 17.191 17.191 17.191
11,42 REVENTILACIN 3" ML 21.706 21.706 21.706 21.706 21.706 21.706 21.706 21.706 21.706 21.706 21.706 21.706
TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11,43 UN 168.896 168.896 168.896 168.896 168.896 168.896 168.896 168.896 168.896 168.896 168.896 168.896
INSTALACIN)
TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11,44 UN 275.402 275.402 275.402 275.402 275.402 275.402 275.402 275.402 275.402 275.402 275.402 275.402
ISNTALACIN)
TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11,45 UN 458.659 458.659 458.659 458.659 458.659 458.659 458.659 458.659 458.659 458.659 458.659 458.659
INSTALACIN)
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE
11,46 ML 39.768 39.768 39.768 39.768 39.768 39.768 39.768 39.768 39.768 39.768 39.768 39.768
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11,47 ML 46.896 46.896 46.896 46.896 46.896 46.896 46.896 46.896 46.896 46.896 46.896 46.896
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE
11,48 ML 60.042 60.042 60.042 60.042 60.042 60.042 60.042 60.042 60.042 60.042 60.042 60.042
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE
11,49 ML 68.179 68.179 68.179 68.179 68.179 68.179 68.179 68.179 68.179 68.179 68.179 68.179
ACCESORIOS Y SOPORTES)
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
87.858 CONSTRUCCIN
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11,50 ML 87.858 87.858 87.858 87.858 87.858 87.858 87.858 87.858 87.858 87.858 87.858
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE
11,51 ML 101.537 101.537 101.537 101.537 101.537 101.537 101.537 101.537 101.537 101.537 101.537 101.537
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE
11,52 ML 150.055 150.055 150.055 150.055 150.055 150.055 150.055 150.055 150.055 150.055 150.055 150.055
ACCESORIOS Y SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 60.257 60.257 60.257 60.257 60.257 60.257 60.257 60.257 60.257 60.257 60.257 60.257
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 60.506 60.506 60.506 60.506 60.506 60.506 60.506 60.506 60.506 60.506 60.506 60.506
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 39.215 39.215 39.215 39.215 39.215 39.215 39.215 39.215 39.215 39.215 39.215 39.215
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 48.379 48.379 48.379 48.379 48.379 48.379 48.379 48.379 48.379 48.379 48.379 48.379
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO
11,57 ML 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114
DE HASTA 2"
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO
11,58 ML 6.487 6.487 6.487 6.487 6.487 6.487 6.487 6.487 6.487 6.487 6.487 6.487
MAYOR A 2"
11,59 GABINETE TIPO III UN 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752 1.000.752
11,60 GABINETE TIPO I UN 764.020 764.020 764.020 764.020 764.020 764.020 764.020 764.020 764.020 764.020 764.020 764.020
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699 2.571.699
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443 2.143.443
11,63 VLVULA MARIPOSA 3" UN 620.130 620.130 620.130 620.130 620.130 620.130 620.130 620.130 620.130 620.130 620.130 620.130
11,64 VLVULA MARIPOSA 4" UN 803.407 803.407 803.407 803.407 803.407 803.407 803.407 803.407 803.407 803.407 803.407 803.407
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 310.301 310.301 310.301 310.301 310.301 310.301 310.301 310.301 310.301 310.301 310.301 310.301

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 357.087 357.087 357.087 357.087 357.087 357.087 357.087 357.087 357.087 357.087 357.087 357.087
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 56.741 56.741 56.741 56.741 56.741 56.741 56.741 56.741 56.741 56.741 56.741 56.741
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 67.226 67.226 67.226 67.226 67.226 67.226 67.226 67.226 67.226 67.226 67.226 67.226
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 74.569 74.569 74.569 74.569 74.569 74.569 74.569 74.569 74.569 74.569 74.569 74.569
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 87.899 87.899 87.899 87.899 87.899 87.899 87.899 87.899 87.899 87.899 87.899 87.899
12,6 SALIDA TELFONO PVC COMPLETA UN 53.310 53.310 53.310 53.310 53.310 53.310 53.310 53.310 53.310 53.310 53.310 53.310
12,7 SALIDA TIMBRE PVC COMPLETA UN 60.795 60.795 60.795 60.795 60.795 60.795 60.795 60.795 60.795 60.795 60.795 60.795
12,8 STRIP TELEFNICO 10 PARES UN 140.002 140.002 140.002 140.002 140.002 140.002 140.002 140.002 140.002 140.002 140.002 140.002
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 54.766 54.766 54.766 54.766 54.766 54.766 54.766 54.766 54.766 54.766 54.766 54.766
12,10 SALIDA TRIFSICA PVC COMPLETA UN 125.945 125.945 125.945 125.945 125.945 125.945 125.945 125.945 125.945 125.945 125.945 125.945
12,11 SALIDA T.V PVC COMPLETA. UN 75.251 75.251 75.251 75.251 75.251 75.251 75.251 75.251 75.251 75.251 75.251 75.251
12,12 SALIDA BIFSICA C.N. UN 44.634 44.634 44.634 44.634 44.634 44.634 44.634 44.634 44.634 44.634 44.634 44.634
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 93.920 93.920 93.920 93.920 93.920 93.920 93.920 93.920 93.920 93.920 93.920 93.920
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 400.860 400.860 400.860 400.860 400.860 400.860 400.860 400.860 400.860 400.860 400.860 400.860

12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 534.272 534.272 534.272 534.272 534.272 534.272 534.272 534.272 534.272 534.272 534.272 534.272
12,16 TUBERA PVC CONDUIT 1/2" ML 3.460 3.460 3.460 3.460 3.460 3.460 3.460 3.460 3.460 3.460 3.460 3.460
12,17 TUBERA PVC CONDUIT 3/4" ML 4.568 4.568 4.568 4.568 4.568 4.568 4.568 4.568 4.568 4.568 4.568 4.568
12,18 TUBERA PVC CONDUIT 1" ML 7.113 7.113 7.113 7.113 7.113 7.113 7.113 7.113 7.113 7.113 7.113 7.113
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.717 12.717 12.717 12.717 12.717 12.717 12.717 12.717 12.717 12.717 12.717 12.717
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 267.383 267.383 267.383 267.383 267.383 267.383 267.383 267.383 267.383 267.383 267.383 267.383
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 75.433 75.433 75.433 75.433 75.433 75.433 75.433 75.433 75.433 75.433 75.433 75.433
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 102.316 102.316 102.316 102.316 102.316 102.316 102.316 102.316 102.316 102.316 102.316 102.316
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 41.422 41.422 41.422 41.422 41.422 41.422 41.422 41.422 41.422 41.422 41.422 41.422
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630 1.368.630
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294 1.014.294
12,26 POSTE METLICO 6M UN 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208 1.274.208
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE
12,27 UN 593.522 593.522 593.522 593.522 593.522 593.522 593.522 593.522 593.522 593.522 593.522 593.522
LUMINARIA)
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 107.927 107.927 CONSTRUCCIN
107.927 107.927 107.927 107.927 107.927 107.927 107.927 107.927 107.927 107.927
12,29 LUMINARIA 70W SODIO UN 498.099 498.099 498.099 498.099 498.099 498.099 498.099 498.099 498.099 498.099 498.099 498.099
12,30 LUMINARIA 150W SODIO UN 623.346 623.346 623.346 623.346 623.346 623.346 623.346 623.346 623.346 623.346 623.346 623.346
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563 1.647.563
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071 1.213.071

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 40.200 40.271 40.306 40.200 39.953 39.776 40.660 39.599 41.014 40.200 40.412 39.245
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 40.106 40.177 40.212 40.106 39.859 39.682 40.566 39.505 40.920 40.106 40.319 39.151
13,3 ALISTADO PARA LISTN M2 14.512 14.526 14.533 14.512 14.463 14.427 14.604 14.392 14.675 14.512 14.555 14.321
13,4 ALISTADO PISOS 1:3, E=0.04 M2 30.343 30.484 30.555 30.343 29.847 29.494 31.263 29.140 31.970 30.343 30.767 28.432
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 86.583 86.724 86.795 86.583 86.087 85.734 87.503 85.380 88.210 86.583 87.007 84.672
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 26.188 26.231 26.252 26.188 26.038 25.932 26.466 25.825 26.679 26.188 26.316 25.611
13,7 CONCRETO BASE GRADAS 2500 PSI M2 58.833 59.044 59.149 58.833 58.098 57.572 60.200 57.046 61.251 58.833 59.464 55.995
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 82.397 82.733 82.902 82.397 81.220 80.379 84.583 79.538 86.266 82.397 83.406 77.856
13,9 MANTO FIBERGLASS 600X1 M2 29.801 29.801 29.801 29.801 29.801 29.801 29.801 29.801 29.801 29.801 29.801 29.801
13,10 PEGANTE MORTERO-CONCRETO M2 22.372 22.372 22.372 22.372 22.372 22.372 22.372 22.372 22.372 22.372 22.372 22.372
13,11 PERMA PLY 2 CAPAS M2 26.203 26.203 26.203 26.203 26.203 26.203 26.203 26.203 26.203 26.203 26.203 26.203
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 48.186 48.376 48.470 48.186 47.524 47.051 49.416 46.578 50.362 48.186 48.754 45.632
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 56.621 56.853 56.968 56.621 55.812 55.234 58.125 54.656 59.281 56.621 57.315 53.499
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 82.489 82.846 83.025 82.489 81.238 80.345 84.812 79.451 86.599 82.489 83.561 77.664
13,15 TRITURADO FINO 1/2 M3 113.086 114.544 115.273 113.086 107.986 104.343 122.559 100.700 129.847 113.086 117.459 93.412
13,16 TRITURADO GRUESO 3/4 M3 119.435 122.671 118.120 115.057 111.098 104.005 117.579 100.893 130.571 114.659 119.987 88.697

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 56.665 56.693 56.707 56.665 56.566 56.495 56.849 56.424 56.990 56.665 56.749 56.282
BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA
14,2 ML 33.689 33.703 33.711 33.689 33.640 33.604 33.781 33.569 33.852 33.689 33.732 33.498
(LINEAL)
14,3 ADOQUN CONCRETO 6CM M2 65.540 65.610 65.646 65.540 65.292 65.115 66.000 64.938 66.353 65.540 65.752 64.584
14,4 ADOQUN CONCRETO 8CM M2 68.840 68.910 68.946 68.840 68.592 68.415 69.300 68.238 69.653 68.840 69.052 67.884
14,5 ADOQUN GRES PEATONAL M2 73.016 73.087 73.123 73.016 72.769 72.592 73.476 72.415 73.830 73.016 73.229 72.061
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14,6 M2 74.761 74.789 74.803 74.761 74.662 74.591 74.945 74.520 75.086 74.761 74.846 74.379
FONDO BLANCO. INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 36.085 36.112 36.126 36.085 35.990 35.922 36.261 35.854 36.397 36.085 36.166 35.719
ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y
14,8 M2 164.251 164.379 164.442 164.251 163.806 163.487 165.079 163.169 165.716 164.251 164.633 162.532
PULIDA)
14,9 ACABADO EN GRAVILLA LAVADA M2 45.776 45.845 45.879 45.776 45.537 45.366 46.221 45.195 46.563 45.776 45.982 44.853
14,10 GUARDAESCOBA EN GRANITO ML 42.568 42.568 42.568 42.568 42.568 42.568 42.568 42.568 42.568 42.568 42.568 42.568
14,11 GUARDAESCOBA EN GRAVILLA ML 10.198 10.226 10.239 10.198 10.104 10.036 10.375 9.968 10.510 10.198 10.280 9.832
14,12 GUARDAESCOBA PVC CARAMELO ML 9.279 9.279 9.279 9.279 9.279 9.279 9.279 9.279 9.279 9.279 9.279 9.279
14,13 GUARDAESCOBA PVC CEDRO ML 12.468 12.468 12.468 12.468 12.468 12.468 12.468 12.468 12.468 12.468 12.468 12.468
14,14 GUARDAESCOBA PINO CARIBE ML 10.302 10.302 10.302 10.302 10.302 10.302 10.302 10.302 10.302 10.302 10.302 10.302
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.351 17.351 17.351 17.351 17.351 17.351 17.351 17.351 17.351 17.351 17.351 17.351
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.941 33.941 33.941 33.941 33.941 33.941 33.941 33.941 33.941 33.941 33.941 33.941
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.908 8.908 8.908 8.908 8.908 8.908 8.908 8.908 8.908 8.908 8.908 8.908
14,18 LISTN M.H. AMARILLO M2 72.969 72.969 72.969 72.969 72.969 72.969 72.969 72.969 72.969 72.969 72.969 72.969
14,19 PASO ESCALERA GRANITO ML 118.062 118.161 118.210 118.062 117.715 117.467 118.706 117.220 119.201 118.062 118.359 116.724
14,20 PIRLANES ALUMINIO ML 7.254 7.254 7.254 7.254 7.254 7.254 7.254 7.254 7.254 7.254 7.254 7.254
14,21 PIRLANES LADRILLO ML 31.798 31.827 31.841 31.798 31.699 31.629 31.982 31.558 32.124 31.798 31.883 31.416
14,22 PISO VINILO TRFICO RESIDENCIAL M2 45.261 45.261 45.261 45.261 45.261 45.261 45.261 45.261 45.261 45.261 45.261 45.261
14,23 PISO VINILO TRFICO PESADO M2 52.667 52.667 52.667 52.667 52.667 52.667 52.667 52.667 52.667 52.667 52.667 52.667
14,24 PULIDA LACADA PISO MADERA M2 48.110 48.110 48.110 48.110 48.110 48.110 48.110 48.110 48.110 48.110 48.110 48.110
14,25 TABLETA DE GRES 25X25 M2 49.185 49.213 49.228 49.185 49.086 49.015 49.369 48.945 49.511 49.185 49.270 48.803
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 55.206 55.235 CONSTRUCCIN
55.249 55.206 55.107 55.037 55.390 54.966 55.532 55.206 55.291 54.824
GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO
14,27 ML 10.623 10.623 10.623 10.623 10.623 10.623 10.623 10.623 10.623 10.623 10.623 10.623
BLANCO
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 49.613 49.655 49.676 49.613 49.464 49.358 49.889 49.252 50.101 49.613 49.740 49.040
14,29 JABONERA PORCELANA ACUARIO UN 20.310 20.310 20.310 20.310 20.310 20.310 20.310 20.310 20.310 20.310 20.310 20.310
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14,30 UN 121.807 121.807 121.807 121.807 121.807 121.807 121.807 121.807 121.807 121.807 121.807 121.807
JABONERA,CEPILLERA Y PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.650 9.650 9.650 9.650 9.650 9.650 9.650 9.650 9.650 9.650 9.650 9.650
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 22.134 22.134 22.134 22.134 22.134 22.134 22.134 22.134 22.134 22.134 22.134 22.134
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.718 13.718 13.718 13.718 13.718 13.718 13.718 13.718 13.718 13.718 13.718 13.718
14,35 REMATES BOCEL ALUMINIO ML 8.271 8.271 8.271 8.271 8.271 8.271 8.271 8.271 8.271 8.271 8.271 8.271
14,36 REMATES BOCEL PORCELANA ML 8.421 8.421 8.421 8.421 8.421 8.421 8.421 8.421 8.421 8.421 8.421 8.421
14,37 TAPA REGISTRO 20X20 UN 18.720 18.720 18.720 18.720 18.720 18.720 18.720 18.720 18.720 18.720 18.720 18.720
14,38 TAPA REGISTRO 6X6 UN 17.042 17.042 17.042 17.042 17.042 17.042 17.042 17.042 17.042 17.042 17.042 17.042
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14,39 M2 18.565 18.565 18.565 18.565 18.565 18.565 18.565 18.565 18.565 18.565 18.565 18.565
MRMOL N.5
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE
14,40 M2 21.461 21.461 21.461 21.461 21.461 21.461 21.461 21.461 21.461 21.461 21.461 21.461
MRMOL FUNDIDO EN SITIO

14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 64.919 64.947 64.962 64.919 64.820 64.749 65.103 64.679 65.245 64.919 65.004 64.537
14,42 MEDIA CAA EN GRANITO ML 76.761 76.761 76.761 76.761 76.761 76.761 76.761 76.761 76.761 76.761 76.761 76.761
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.852 32.852 32.852 32.852 32.852 32.852 32.852 32.852 32.852 32.852 32.852 32.852
14,44 PINTURA ACRLICA PARA PISOS M2 13.010 13.010 13.010 13.010 13.010 13.010 13.010 13.010 13.010 13.010 13.010 13.010
PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS
14,45 M2 101.054 101.054 101.054 101.054 101.054 101.054 101.054 101.054 101.054 101.054 101.054 101.054
DEPORTIVOS

14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 122.105 122.105 122.105 122.105 122.105 122.105 122.105 122.105 122.105 122.105 122.105 122.105

15 CIELO RASO
15,1 APLIQUE YESO ML 72.089 72.089 72.089 72.089 72.089 72.089 72.089 72.089 72.089 72.089 72.089 72.089
15,2 ARMADURA MADERA Y MALLA M2 34.839 34.839 34.839 34.839 34.839 34.839 34.839 34.839 34.839 34.839 34.839 34.839
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 54.338 54.338 54.338 54.338 54.338 54.338 54.338 54.338 54.338 54.338 54.338 54.338
15,4 CIELO RASO DURACUSTIC M2 66.835 66.835 66.835 66.835 66.835 66.835 66.835 66.835 66.835 66.835 66.835 66.835
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49.823 49.823 49.823 49.823 49.823 49.823 49.823 49.823 49.823 49.823 49.823 49.823
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 92.666 92.666 92.666 92.666 92.666 92.666 92.666 92.666 92.666 92.666 92.666 92.666
15,7 CORNISAS YESO ML 48.430 48.430 48.430 48.430 48.430 48.430 48.430 48.430 48.430 48.430 48.430 48.430
LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE
15,8 M2 102.580 102.580 102.580 102.580 102.580 102.580 102.580 102.580 102.580 102.580 102.580 102.580
APOYO)
15,9 MALLA CON VENA M2 13.046 13.046 13.046 13.046 13.046 13.046 13.046 13.046 13.046 13.046 13.046 13.046

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M
16,4 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M
16,5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
DE 5 KM)
EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN
16,6 M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569
EXPLOSIVOS)
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
16,7
RELLENO CON MATERIAL DEL SITIO COMPACTADO
M3 18.202 18.202
CONSTRUCCIN
18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
MECNICAMENTE
RELLENO EN RECEBO COMN COMPACTADO
16,8 M3 86.160 92.627 75.812 71.931 73.225 60.290 53.822 60.290 75.812 70.638 75.812 40.887
MECNICAMENTE

16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 112.357 113.783 114.497 112.357 107.361 103.792 121.634 100.224 128.771 112.357 116.638 93.087

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO


16,10 M3 161.846 168.313 154.085 150.204 146.324 133.389 147.617 139.856 161.846 148.911 167.020 113.986
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 78.063 81.943 66.421 65.128 61.247 58.660 69.008 53.486 87.117 63.834 62.541 39.258
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 126.405 131.579 117.350 114.763 110.883 97.948 112.176 104.415 126.405 113.470 131.579 78.545
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 159.185 165.652 151.424 147.543 143.663 130.728 144.956 137.195 159.185 146.250 164.359 111.325

17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE
17,1 UN 298.615 298.615 298.615 298.615 298.615 298.615 298.615 298.615 298.615 298.615 298.615 298.615
GRIFERA)
SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO
17,2 UN 882.648 882.648 882.648 882.648 882.648 882.648 882.648 882.648 882.648 882.648 882.648 882.648
(INCLUYE GRIFERA)
SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE
17,3 UN 477.733 477.733 477.733 477.733 477.733 477.733 477.733 477.733 477.733 477.733 477.733 477.733
GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE
17,4 UN 137.432 137.432 137.432 137.432 137.432 137.432 137.432 137.432 137.432 137.432 137.432 137.432
GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL
17,5 UN 193.152 193.152 193.152 193.152 193.152 193.152 193.152 193.152 193.152 193.152 193.152 193.152
(INCLUYE GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS DE
17,6 UN 179.287 179.287 179.287 179.287 179.287 179.287 179.287 179.287 179.287 179.287 179.287 179.287
EMPOTRAR(INCLUYE GRIFERA)
SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE
17,7 UN 396.233 396.233 396.233 396.233 396.233 396.233 396.233 396.233 396.233 396.233 396.233 396.233
GRIFERA)
SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO
17,8 UN 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288 1.015.288
(INCLUYE GRIFERA)
SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE
17,9 UN 287.478 287.478 287.478 287.478 287.478 287.478 287.478 287.478 287.478 287.478 287.478 287.478
GRIFERA)
SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN
17,10 UN 203.132 203.132 203.132 203.132 203.132 203.132 203.132 203.132 203.132 203.132 203.132 203.132
SALIDA A BAERA
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 80.108 80.108 80.108 80.108 80.108 80.108 80.108 80.108 80.108 80.108 80.108 80.108

SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN


17,12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN 246.400 246.400 246.400 246.400 246.400 246.400 246.400 246.400 246.400 246.400 246.400 246.400
GRIFERA)

SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER


17,13 EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y UN 363.581 363.581 363.581 363.581 363.581 363.581 363.581 363.581 363.581 363.581 363.581 363.581
GRIFERA)

18 PINTURAS
IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O
18,1 M2 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107
SIMILAR
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 3.016 3.016 3.016 3.016 3.016 3.016 3.016 3.016 3.016 3.016 3.016 3.016
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.742 10.742 10.742 10.742 10.742 10.742 10.742 10.742 10.742 10.742 10.742 10.742
18,4 BARNIZ SOBRE MUEBLES M2 41.196 41.196 41.196 41.196 41.196 41.196 41.196 41.196 41.196 41.196 41.196 41.196
18,5 CARBURO SOBRE PAETES M2 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 65.031 65.031 65.031 65.031 65.031 65.031 65.031 65.031 65.031 65.031 65.031 65.031
18,7 DEMARCACIN CON MARMOLINA ML 3.342 3.342 3.342 3.342 3.342 3.342 3.342 3.342 3.342 3.342 3.342 3.342
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.702 2.702 2.702 2.702 2.702 2.702 2.702 2.702 2.702 2.702 2.702 2.702
18,9 ESMALTE SOBRE LMINA LLENA M2 13.519 13.519 13.519 13.519 13.519 13.519 13.519 13.519 13.519 13.519 13.519 13.519
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.924 3.924 3.924 3.924 3.924 3.924 3.924 3.924 3.924 3.924 3.924 3.924
18,11 ESMALTE SOBRE MADERA LLENA M2 14.259 14.259 14.259 14.259 14.259 14.259 14.259 14.259 14.259 14.259 14.259 14.259
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634 5.634
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.399 6.399 CONSTRUCCIN
6.399 6.399 6.399 6.399 6.399 6.399 6.399 6.399 6.399 6.399
18,14 ESTUCO M2 6.759 6.759 6.759 6.759 6.759 6.759 6.759 6.759 6.759 6.759 6.759 6.759
18,15 ESTUCO (LINEAL) ML 4.225 4.225 4.225 4.225 4.225 4.225 4.225 4.225 4.225 4.225 4.225 4.225
18,16 ESTUCO Y VINILO 3 MANOS M2 15.031 15.031 15.031 15.031 15.031 15.031 15.031 15.031 15.031 15.031 15.031 15.031
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.290 9.290 9.290 9.290 9.290 9.290 9.290 9.290 9.290 9.290 9.290 9.290
18,18 LACA PISOS MADERA M2 21.931 21.931 21.931 21.931 21.931 21.931 21.931 21.931 21.931 21.931 21.931 21.931
18,19 LNEAS TRFICO 0.10 ML 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597
18,20 MARMOLINA SOBRE PAETE M2 11.919 11.919 11.919 11.919 11.919 11.919 11.919 11.919 11.919 11.919 11.919 11.919
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.212 3.212 3.212 3.212 3.212 3.212 3.212 3.212 3.212 3.212 3.212 3.212
18,22 TINTILLA SOBRE MADERA LLENA M2 12.227 12.227 12.227 12.227 12.227 12.227 12.227 12.227 12.227 12.227 12.227 12.227
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.866 6.866 6.866 6.866 6.866 6.866 6.866 6.866 6.866 6.866 6.866 6.866
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.302 4.302 4.302 4.302 4.302 4.302 4.302 4.302 4.302 4.302 4.302 4.302
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318
18,26 PINTURA EPXICA M2 12.256 12.256 12.256 12.256 12.256 12.256 12.256 12.256 12.256 12.256 12.256 12.256
18,27 PINTURA EPXICA (LINEAL) ML 7.553 7.553 7.553 7.553 7.553 7.553 7.553 7.553 7.553 7.553 7.553 7.553

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915 6.018.915
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON
19,2 UN ######## 10.634.453 ######### 10.634.453 ######### 10.634.453 10.634.453 ######### 10.634.453 ######## ######### 10.634.453
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897 2.782.897
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19,4 UN 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049 9.095.049
(PAR)
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067 8.518.067
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597 2.597
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 853.247 853.247 853.247 853.247 853.247 853.247 853.247 853.247 853.247 853.247 853.247 853.247
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 85.376 85.376 85.376 85.376 85.376 85.376 85.376 85.376 85.376 85.376 85.376 85.376
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.545.723 1.545.744 1.545.755 1.545.723 1.545.647 1.545.593 1.545.863 1.545.539 1.545.971 1.545.723 1.545.787 1.545.431
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 673.528 674.036 674.290 673.528 671.751 670.481 676.829 669.211 679.368 673.528 675.052 666.672

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.877 28.877 28.877 28.877 28.877 28.877 28.877 28.877 28.877 28.877 28.877 28.877
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 43.001 43.001 43.001 43.001 43.001 43.001 43.001 43.001 43.001 43.001 43.001 43.001
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 53.337 53.337 53.337 53.337 53.337 53.337 53.337 53.337 53.337 53.337 53.337 53.337
TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20,4 ML 17.309 17.309 17.309 17.309 17.309 17.309 17.309 17.309 17.309 17.309 17.309 17.309
ACCESORIOS)
TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE
20,5 ML 20.985 20.985 20.985 20.985 20.985 20.985 20.985 20.985 20.985 20.985 20.985 20.985
ACCESORIOS)
TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE
20,6 ML 28.639 28.639 28.639 28.639 28.639 28.639 28.639 28.639 28.639 28.639 28.639 28.639
ACCESORIOS)
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.521 25.521 25.521 25.521 25.521 25.521 25.521 25.521 25.521 25.521 25.521 25.521
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.901 26.901 26.901 26.901 26.901 26.901 26.901 26.901 26.901 26.901 26.901 26.901
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.664 33.664 33.664 33.664 33.664 33.664 33.664 33.664 33.664 33.664 33.664 33.664
20,10 VLVULA DE BOLA GAS 1/2" UN 17.373 17.373 17.373 17.373 17.373 17.373 17.373 17.373 17.373 17.373 17.373 17.373
20,11 VLVULA DE BOLA GAS 3/4" UN 22.802 22.802 22.802 22.802 22.802 22.802 22.802 22.802 22.802 22.802 22.802 22.802
20,12 VLVULA DE BOLA GAS 1" UN 35.136 35.136 35.136 35.136 35.136 35.136 35.136 35.136 35.136 35.136 35.136 35.136
20,13 VLVULA POLIETILENO GAS 1/2" UN 270.165 270.165 270.165 270.165 270.165 270.165 270.165 270.165 270.165 270.165 270.165 270.165
20,14 VLVULA POLIETILENO GAS 3/4" UN 310.996 310.996 310.996 310.996 310.996 310.996 310.996 310.996 310.996 310.996 310.996 310.996
20,15 VLVULA POLIETILENO GAS 1" UN 324.255 324.255 324.255 324.255 324.255 324.255 324.255 324.255 324.255 324.255 324.255 324.255
20,16 ACOMETIDA GAS 1/2" ML 300.377 300.377 300.377 300.377 300.377 300.377 300.377 300.377 300.377 300.377 300.377 300.377

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 219.171 219.171 219.171 219.171 219.171 219.171 219.171 219.171 219.171 219.171 219.171 219.171
21,2 CABLE DETECTOR LINEAL DE CALOR ML 33.680 33.680 33.680 33.680 33.680 33.680 33.680 33.680 33.680 33.680 33.680 33.680
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
21,3 SIRENA DE 110 V UN 102.039 102.039 CONSTRUCCIN
102.039 102.039 102.039 102.039 102.039 102.039 102.039 102.039 102.039 102.039
21,4 CMARA CCTV UN 256.925 256.925 256.925 256.925 256.925 256.925 256.925 256.925 256.925 256.925 256.925 256.925
21,5 PARLANTE-CIELO FALSO UN 50.940 50.940 50.940 50.940 50.940 50.940 50.940 50.940 50.940 50.940 50.940 50.940
21,6 AMPLIFICADOR 100W UN 565.428 565.428 565.428 565.428 565.428 565.428 565.428 565.428 565.428 565.428 565.428 565.428
21,7 AMPLIFICADOR 300W UN 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880 1.406.880
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.898 42.898 42.898 42.898 42.898 42.898 42.898 42.898 42.898 42.898 42.898 42.898
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 219.510 219.510 219.510 219.510 219.510 219.510 219.510 219.510 219.510 219.510 219.510 219.510
21,10 TOMA PARA MICRFONO UN 42.877 42.877 42.877 42.877 42.877 42.877 42.877 42.877 42.877 42.877 42.877 42.877
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.699 3.699 3.699 3.699 3.699 3.699 3.699 3.699 3.699 3.699 3.699 3.699
21,12 SPLITERS UN 6.248 6.248 6.248 6.248 6.248 6.248 6.248 6.248 6.248 6.248 6.248 6.248
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.980 17.980 17.980 17.980 17.980 17.980 17.980 17.980 17.980 17.980 17.980 17.980
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.626 23.626 23.626 23.626 23.626 23.626 23.626 23.626 23.626 23.626 23.626 23.626
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.695 30.695 30.695 30.695 30.695 30.695 30.695 30.695 30.695 30.695 30.695 30.695
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 121.252 121.252 121.252 121.252 121.252 121.252 121.252 121.252 121.252 121.252 121.252 121.252
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO
21,17 ML 31.621 31.621 31.621 31.621 31.621 31.621 31.621 31.621 31.621 31.621 31.621 31.621
30X120
21,18 BANDEJA PORTACABLES PARA RACK UN 103.651 103.651 103.651 103.651 103.651 103.651 103.651 103.651 103.651 103.651 103.651 103.651
21,19 RACK 2' X 24" UN 178.994 178.994 178.994 178.994 178.994 178.994 178.994 178.994 178.994 178.994 178.994 178.994
21,20 RACK 3' X 24" UN 283.008 283.008 283.008 283.008 283.008 283.008 283.008 283.008 283.008 283.008 283.008 283.008
21,21 RACK 5' X 24" UN 350.780 350.780 350.780 350.780 350.780 350.780 350.780 350.780 350.780 350.780 350.780 350.780
21,22 RACK 7' X 24" UN 383.696 383.696 383.696 383.696 383.696 383.696 383.696 383.696 383.696 383.696 383.696 383.696
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 559.495 559.495 559.495 559.495 559.495 559.495 559.495 559.495 559.495 559.495 559.495 559.495
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 328.889 328.889 328.889 328.889 328.889 328.889 328.889 328.889 328.889 328.889 328.889 328.889
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y
21,25 UN 102.745 102.745 102.745 102.745 102.745 102.745 102.745 102.745 102.745 102.745 102.745 102.745
MARCACIN)
21,26 PATCH CORD 2M CATEGORA 6A UN 13.723 13.723 13.723 13.723 13.723 13.723 13.723 13.723 13.723 13.723 13.723 13.723
21,27 PATCH CORD 5M CATEGORA 6A UN 28.074 28.074 28.074 28.074 28.074 28.074 28.074 28.074 28.074 28.074 28.074 28.074
21,28 CABLE UTP CATEGORA 6A ML 4.897 4.897 4.897 4.897 4.897 4.897 4.897 4.897 4.897 4.897 4.897 4.897
21,29 CANALETA METLICA 4X6 CMS ML 34.386 34.386 34.386 34.386 34.386 34.386 34.386 34.386 34.386 34.386 34.386 34.386
21,30 CANALETA METLICA 4X10 CMS ML 35.955 35.955 35.955 35.955 35.955 35.955 35.955 35.955 35.955 35.955 35.955 35.955
21,31 CANALETA METLICA 6X10 CMS ML 36.739 36.739 36.739 36.739 36.739 36.739 36.739 36.739 36.739 36.739 36.739 36.739
21,32 CANALETA PLSTICA 13X7 MM ML 23.955 23.955 23.955 23.955 23.955 23.955 23.955 23.955 23.955 23.955 23.955 23.955
21,33 CANALETA PLSTICA 20X12 MM ML 26.535 26.535 26.535 26.535 26.535 26.535 26.535 26.535 26.535 26.535 26.535 26.535
21,34 CANALETA PLSTICA 32X12 MM ML 27.620 27.620 27.620 27.620 27.620 27.620 27.620 27.620 27.620 27.620 27.620 27.620
21,35 CANALETA PLSTICA 40X60 MM ML 46.679 46.679 46.679 46.679 46.679 46.679 46.679 46.679 46.679 46.679 46.679 46.679
21,36 SWITCH 10/100/1000 24 PUERTOS UN 605.585 605.585 605.585 605.585 605.585 605.585 605.585 605.585 605.585 605.585 605.585 605.585
21,37 SWITCH 10/100/1000 16 PUERTOS UN 310.345 310.345 310.345 310.345 310.345 310.345 310.345 310.345 310.345 310.345 310.345 310.345
21,38 SWITCH 10/100/1000 8 PUERTOS UN 86.205 86.205 86.205 86.205 86.205 86.205 86.205 86.205 86.205 86.205 86.205 86.205
21,39 CABLE TELEFNICO 2 PARES ML 1.793 1.793 1.793 1.793 1.793 1.793 1.793 1.793 1.793 1.793 1.793 1.793
21,40 CABLE TELEFNICO 10 PARES ML 8.294 8.294 8.294 8.294 8.294 8.294 8.294 8.294 8.294 8.294 8.294 8.294
21,41 CABLE TELEFNICO 20 PARES ML 12.417 12.417 12.417 12.417 12.417 12.417 12.417 12.417 12.417 12.417 12.417 12.417
21,42 CABLE TELEFNICO 40 PARES ML 20.762 20.762 20.762 20.762 20.762 20.762 20.762 20.762 20.762 20.762 20.762 20.762
21,43 CABLE TELEVISIN RG6 ML 3.831 3.831 3.831 3.831 3.831 3.831 3.831 3.831 3.831 3.831 3.831 3.831
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.488 21.488 21.488 21.488 21.488 21.488 21.488 21.488 21.488 21.488 21.488 21.488
21,45 ACOMETIDA TELEFNICA 1" ML 31.390 31.390 31.390 31.390 31.390 31.390 31.390 31.390 31.390 31.390 31.390 31.390
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.810 18.810 18.810 18.810 18.810 18.810 18.810 18.810 18.810 18.810 18.810 18.810
CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE
21,47 ML 15.056 15.056 15.056 15.056 15.056 15.056 15.056 15.056 15.056 15.056 15.056 15.056
CERTIFICACIN)
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 612.922 612.922 612.922 612.922 612.922 612.922 612.922 612.922 612.922 612.922 612.922 612.922
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 89.676 89.676 89.676 89.676 89.676 89.676 89.676 89.676 89.676 89.676 89.676 89.676
1,3 CODO 45 PVC UNIN MECNICA 8" UN 505.755 505.755 505.755 505.755 505.755 505.755 505.755 505.755 505.755 505.755 505.755 505.755
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534 1.079.534
1,5 CODO 90 PVC UNIN MECNICA 4" UN 123.650 123.650 123.650 123.650 123.650 123.650 123.650 123.650 123.650 123.650 123.650 123.650
1,6 CODO 90 PVC UNIN MECNICA 8" UN 754.000 754.000 754.000 754.000 754.000 754.000 754.000 754.000 754.000 754.000 754.000 754.000
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122 1.623.122
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.795 12.795 12.795 12.795 12.795 12.795 12.795 12.795 12.795 12.795 12.795 12.795
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.819 15.819 15.819 15.819 15.819 15.819 15.819 15.819 15.819 15.819 15.819 15.819
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.905 19.905 19.905 19.905 19.905 19.905 19.905 19.905 19.905 19.905 19.905 19.905
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.801 21.801 21.801 21.801 21.801 21.801 21.801 21.801 21.801 21.801 21.801 21.801
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168 26.168
1,14 TAPN PVC UNIN MECNICA 3" UN 105.728 105.728 105.728 105.728 105.728 105.728 105.728 105.728 105.728 105.728 105.728 105.728
1,15 TAPN PVC UNIN MECNICA 4" UN 122.444 122.444 122.444 122.444 122.444 122.444 122.444 122.444 122.444 122.444 122.444 122.444
1,16 TAPN PVC UNIN MECNICA 8" UN 379.021 379.021 379.021 379.021 379.021 379.021 379.021 379.021 379.021 379.021 379.021 379.021
1,17 TEE PVC UNIN MECNICA 2" UN 142.357 142.357 142.357 142.357 142.357 142.357 142.357 142.357 142.357 142.357 142.357 142.357
1,18 TEE PVC UNIN MECNICA 4" UN 234.671 234.671 234.671 234.671 234.671 234.671 234.671 234.671 234.671 234.671 234.671 234.671
1,19 TEE PVC UNIN MECNICA 8" UN 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921 1.038.921
1,20 TEE PVC UNIN MECNICA 10" UN 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049 1.197.049
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.933 13.933 13.933 13.933 13.933 13.933 13.933 13.933 13.933 13.933 13.933 13.933
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.281 12.281 12.281 12.281 12.281 12.281 12.281 12.281 12.281 12.281 12.281 12.281
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 30.597 30.597 30.597 30.597 30.597 30.597 30.597 30.597 30.597 30.597 30.597 30.597
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 121.065 121.065 121.065 121.065 121.065 121.065 121.065 121.065 121.065 121.065 121.065 121.065
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 180.469 180.469 180.469 180.469 180.469 180.469 180.469 180.469 180.469 180.469 180.469 180.469
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 29.403 29.403 29.403 29.403 29.403 29.403 29.403 29.403 29.403 29.403 29.403 29.403
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 101.431 101.431 101.431 101.431 101.431 101.431 101.431 101.431 101.431 101.431 101.431 101.431
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 150.489 150.489 150.489 150.489 150.489 150.489 150.489 150.489 150.489 150.489 150.489 150.489
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 61.402 61.402 61.402 61.402 61.402 61.402 61.402 61.402 61.402 61.402 61.402 61.402
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 247.686 247.686 247.686 247.686 247.686 247.686 247.686 247.686 247.686 247.686 247.686 247.686
1,32 UNIN REPARACION PVC 4" UN 71.671 71.671 71.671 71.671 71.671 71.671 71.671 71.671 71.671 71.671 71.671 71.671
1,33 UNIN REPARACIN PVC 8" UN 288.239 288.239 288.239 288.239 288.239 288.239 288.239 288.239 288.239 288.239 288.239 288.239
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 172.355 172.355 172.355 172.355 172.355 172.355 172.355 172.355 172.355 172.355 172.355 172.355
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 491.857 491.857 491.857 491.857 491.857 491.857 491.857 491.857 491.857 491.857 491.857 491.857
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082 1.319.082
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164 1.949.164

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.377 10.377 10.377 10.377 10.377 10.377 10.377 10.377 10.377 10.377 10.377 10.377
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.680 23.680 23.680 23.680 23.680 23.680 23.680 23.680 23.680 23.680 23.680 23.680
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 91.282 92.609 93.273 91.282 86.639 83.322 99.906 80.005 106.540 91.282 95.262 73.371
2,5 RELLENO TIPO 2 "RECEBO" M3 81.381 87.848 71.033 67.152 68.446 55.511 49.043 55.511 71.033 65.859 71.033 36.108
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 82.733 86.613 71.091 69.798 65.917 63.330 73.678 58.156 91.787 68.504 67.211 43.928
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 112.696 118.846 107.572 105.522 102.448 95.274 102.448 96.299 119.870 104.498 116.796 85.025
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 81.415 87.683 76.191 74.102 70.967 66.788 77.236 64.699 91.862 73.057 85.594 53.207
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 133.764 135.604 136.524 133.764 127.325 122.726 145.723 118.126 154.922 133.764 139.284 108.928

3 ALCANTARILLADO - TUBERA
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 113.029 113.029 CONSTRUCCIN
113.029 113.029 113.029 113.029 113.029 113.029 113.029 113.029 113.029 113.029
3,2 CODO 45 PVC ALCANTARILLADO 16" UN 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577 1.179.577
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 147.749 147.749 147.749 147.749 147.749 147.749 147.749 147.749 147.749 147.749 147.749 147.749
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276 1.366.276
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 952.192 952.192 952.192 952.192 952.192 952.192 952.192 952.192 952.192 952.192 952.192 952.192
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.257 62.257 62.257 62.257 62.257 62.257 62.257 62.257 62.257 62.257 62.257 62.257
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 112.202 112.202 112.202 112.202 112.202 112.202 112.202 112.202 112.202 112.202 112.202 112.202
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 265.063 265.063 265.063 265.063 265.063 265.063 265.063 265.063 265.063 265.063 265.063 265.063
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249 112.249
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069 265.069
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612 425.612
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 427.012 427.012 427.012 427.012 427.012 427.012 427.012 427.012 427.012 427.012 427.012 427.012
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 693.710 693.710 693.710 693.710 693.710 693.710 693.710 693.710 693.710 693.710 693.710 693.710
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471 1.113.471
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 68.733 68.733 68.733 68.733 68.733 68.733 68.733 68.733 68.733 68.733 68.733 68.733
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 357.230 357.230 357.230 357.230 357.230 357.230 357.230 357.230 357.230 357.230 357.230 357.230
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 400.748 400.748 400.748 400.748 400.748 400.748 400.748 400.748 400.748 400.748 400.748 400.748
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552 1.109.552
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 65.211 65.230 65.240 65.211 65.145 65.097 65.334 65.050 65.429 65.211 65.268 64.955
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 323.790 323.790 323.790 323.790 323.790 323.790 323.790 323.790 323.790 323.790 323.790 323.790
3,25 TUBERA PVC ALCANTARILLADO 8" ML 49.244 49.244 49.244 49.244 49.244 49.244 49.244 49.244 49.244 49.244 49.244 49.244
3,26 TUBERA PVC ALCANTARILLADO 10" ML 69.692 69.692 69.692 69.692 69.692 69.692 69.692 69.692 69.692 69.692 69.692 69.692
3,27 TUBERA PVC ALCANTARILLADO 12" ML 100.622 100.622 100.622 100.622 100.622 100.622 100.622 100.622 100.622 100.622 100.622 100.622
3,28 TUBERA PVC ALCANTARILLADO 16" ML 154.482 154.482 154.482 154.482 154.482 154.482 154.482 154.482 154.482 154.482 154.482 154.482
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 248.373 248.373 248.373 248.373 248.373 248.373 248.373 248.373 248.373 248.373 248.373 248.373
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 360.279 360.279 360.279 360.279 360.279 360.279 360.279 360.279 360.279 360.279 360.279 360.279
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 455.972 455.972 455.972 455.972 455.972 455.972 455.972 455.972 455.972 455.972 455.972 455.972
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 599.541 599.541 599.541 599.541 599.541 599.541 599.541 599.541 599.541 599.541 599.541 599.541
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 824.860 824.860 824.860 824.860 824.860 824.860 824.860 824.860 824.860 824.860 824.860 824.860

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000
4,1 UN 667.037 668.256 668.866 667.037 662.772 659.724 674.960 656.678 681.054 667.037 670.694 650.583
PSI CON REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M
4,2 ML 650.574 651.476 651.927 650.574 647.419 645.166 656.434 642.912 660.942 650.574 653.279 638.405
(INC. PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4,3 UN 706.230 707.043 707.450 706.230 703.387 701.355 711.512 699.324 715.575 706.230 708.668 695.261
REFUERZO (INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000
4,4 UN 793.934 795.458 796.220 793.934 788.602 784.793 803.837 780.984 811.455 793.934 798.505 773.366
PSI CON REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M
4,5 ML 925.659 926.929 927.564 925.659 921.216 918.043 933.911 914.869 940.258 925.659 929.468 908.522
(INC. PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4,6 UN 818.014 819.131 819.690 818.014 814.104 811.310 825.277 808.518 830.863 818.014 821.366 802.931
REFUERZO (INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 965.643 966.257 966.567 965.643 963.479 961.934 969.658 960.388 972.749 965.643 967.494 957.301
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.414.616 1.416.374 1.417.256 1.414.616 1.408.440 1.404.029 1.426.079 1.399.617 1.434.902 1.414.616 1.419.903 1.390.801
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.957.456 1.960.701 1.962.325 1.957.456 1.946.098 1.937.984 1.978.552 1.929.871 1.994.780 1.957.456 1.967.193 1.913.643
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.613.906 2.619.300 2.621.999 2.613.906 2.595.026 2.581.539 2.648.973 2.568.052 2.675.949 2.613.906 2.630.092 2.541.076
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816 1.798.816
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068 3.811.068
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
134.797 CONSTRUCCIN
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 134.760 134.815 134.760 134.631 134.539 134.999 134.447 135.183 134.760 134.870 134.263
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)

5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 73.634 73.734 73.783 73.634 73.288 73.040 74.278 72.792 74.774 73.634 73.932 72.297
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 86.946 87.046 87.095 86.946 86.600 86.352 87.590 86.104 88.086 86.946 87.244 85.609
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 57.202 57.423 57.533 57.202 56.429 55.878 58.637 55.326 59.741 57.202 57.864 54.222
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 61.570 61.783 61.890 61.570 60.823 60.290 62.956 59.757 64.023 61.570 62.210 58.690
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 61.740 61.947 62.051 61.740 61.013 60.493 63.090 59.974 64.129 61.740 62.363 58.935
5,6 BORDE SEPARADOR VERDE A-170 ML 250.099 250.136 250.155 250.099 249.971 249.879 250.339 249.787 250.523 250.099 250.210 249.603
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.977 18.004 18.017 17.977 17.884 17.818 18.149 17.752 18.282 17.977 18.057 17.619

5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 40.853 41.009 41.087 40.853 40.309 39.920 41.865 39.531 42.643 40.853 41.320 38.753
5,9 CAUELA PREFABRICADA TIPO A-120 ML 81.760 81.780 81.790 81.760 81.692 81.642 81.888 81.593 81.987 81.760 81.820 81.495
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 546.798 547.274 547.512 546.798 545.133 543.943 549.892 542.753 552.271 546.798 548.226 540.374
5,11 LOSETA PREFABRICADA A-40 M2 62.383 62.467 62.509 62.383 62.088 61.877 62.930 61.667 63.351 62.383 62.635 61.246
5,12 LOSETA PREFABRICADA A-60 M2 90.322 90.406 90.448 90.322 90.027 89.817 90.869 89.606 91.290 90.322 90.574 89.185
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5,13 ML 33.347 33.433 33.475 33.347 33.049 32.835 33.902 32.622 34.329 33.347 33.603 32.196
3000 PSI
SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO
5,14 ML 54.243 54.416 54.502 54.243 53.639 53.207 55.366 52.776 56.229 54.243 54.761 51.912
3000 PSI
5,15 SARDINEL PREFABRICADO A-10 ML 101.584 102.598 100.419 99.793 99.127 97.088 99.523 98.034 101.810 99.594 102.439 93.955
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 59.567 59.618 59.644 59.567 59.389 59.262 59.898 59.134 60.153 59.567 59.720 58.879

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 199.779 199.880 199.931 199.779 199.423 199.169 200.439 198.915 200.947 199.779 200.083 198.407
6,2 BANCA EN CONCRETO M-30 UN 655.663 655.805 655.876 655.663 655.165 654.809 656.587 654.454 657.298 655.663 656.089 653.743
6,3 BOLARDO M-63 ALTO/HIERRO UN 210.175 210.196 210.207 210.175 210.100 210.047 210.314 209.993 210.421 210.175 210.239 209.887
6,4 BOLARDO M-60 CONCRETO UN 159.398 159.520 159.581 159.398 158.972 158.667 160.190 158.362 160.800 159.398 159.764 157.753
6,5 BOLARDO M-61 BAJO/CONCRETO UN 161.162 161.284 161.345 161.162 160.735 160.431 161.954 160.126 162.564 161.162 161.527 159.516
6,6 BOLARDO M-62 BAJO/HIERRO UN 189.110 189.238 189.302 189.110 188.661 188.341 189.943 188.020 190.584 189.110 189.495 187.379
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 58.523 58.599 58.637 58.523 58.257 58.068 59.016 57.878 59.395 58.523 58.750 57.499
6,8 BORDILLO PREFABRICADO A-80 ML 68.357 68.442 68.484 68.357 68.060 67.848 68.909 67.635 69.334 68.357 68.612 67.211
6,9 CANECA M-120 UN 306.378 306.397 306.406 306.378 306.311 306.264 306.501 306.216 306.596 306.378 306.435 306.122
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 807.257 807.318 807.349 807.257 807.044 806.892 807.653 806.739 807.958 807.257 807.440 806.435
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.316.457 3.316.498 3.316.518 3.316.457 3.316.315 3.316.213 3.316.721 3.316.112 3.316.924 3.316.457 3.316.579 3.315.908
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.411.761 3.411.802 3.411.822 3.411.761 3.411.619 3.411.517 3.412.025 3.411.416 3.412.228 3.411.761 3.411.883 3.411.212
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 477.137 477.180 477.201 477.137 476.988 476.881 477.415 476.774 477.629 477.137 477.266 476.560
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 633.519 633.690 633.776 633.519 632.921 632.494 634.631 632.067 635.485 633.519 634.032 631.212
6,15 BANCA EN MADERA M-50 UN 524.134 524.134 524.134 524.134 524.134 524.134 524.134 524.134 524.134 524.134 524.134 524.134
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 242.590 242.651 242.681 242.590 242.377 242.224 242.986 242.072 243.291 242.590 242.773 241.767
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 565.689 565.736 565.760 565.689 565.523 565.404 565.997 565.286 566.234 565.689 565.831 565.049
6,18 POSTE HISTRICO M-131 UN 6.308.281 6.308.586 6.308.738 6.308.281 6.307.215 6.306.453 6.310.262 6.305.691 6.311.785 6.308.281 6.309.195 6.304.167

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963
7,2 MARCA VIAL CON PINTURA EN FRO M2 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330
7,3 SEAL DOBLE DE CICLORUTA UN 307.416 307.434 307.443 307.416 307.351 307.305 307.535 307.259 307.627 307.416 307.471 307.167
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 484.824 484.909 484.952 484.824 484.525 484.311 485.380 484.097 485.807 484.824 485.080 483.670
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 229.450 229.468 229.478 229.450 229.386 229.340 229.570 229.294 229.662 229.450 229.505 229.202
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 243.748 243.766 243.776 243.748 243.684 243.638 243.868 243.592 243.960 243.748 243.803 243.500
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 254.577 254.595 254.605 254.577 254.513 254.467 254.697 254.421 254.789 254.577 254.632 254.329
7,8 TACHAS REFLECTIVAS UN 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 14.166 14.166 CONSTRUCCIN
14.166 14.166 14.166 14.166 14.166 14.166 14.166 14.166 14.166 14.166

TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M


7,10 UN 115.423 115.423 115.423 115.423 115.423 115.423 115.423 115.423 115.423 115.423 115.423 115.423
(INCLUYE SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
NORMA
1 PRELIMILARES
INV
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
DE SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
DE SOBRANTES A UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

NORMA
2 EXPLANACIN Y EXCAVACIONES
INV
EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y
2,1 210.1.1 M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
PRSTAMOS
EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y
2,2 210.2.1 M3 34.577 34.577 34.577 34.577 34.577 34.577 34.577 34.577 34.577 34.577 34.577 34.577
PRSTAMOS
EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN,
2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
CANALES Y PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL
2,7 230.1 M2 463 463 463 463 463 463 463 463 463 463 463 463
SUELO EXISTENTE

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO


2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
NICAMENTE MATERIAL ADICIONADO

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO


2,10 600.2 M3 63.249 63.249 63.249 63.249 63.249 63.249 63.249 63.249 63.249 63.249 63.249 63.249
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE


2,11 600.3 M3 77.518 77.518 77.518 77.518 77.518 77.518 77.518 77.518 77.518 77.518 77.518 77.518
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO
2,13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA
2,14 600.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A
2,15 600.5 P MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
MENOR DE 5 KM)

NORMA
3 ESTRUCTURA DE PAVIMENTO
INV
3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 141.420 148.024 129.863 126.561 121.608 105.098 123.259 113.353 141.420 124.910 148.024 80.333
3,3 330.1 BASE GRANULAR M3 174.200 182.455 164.294 159.341 154.388 137.878 156.039 146.133 174.200 157.690 180.804 113.113
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE CONSTRUCCIN
3,4 365.1 (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.151 3.151 3.151 3.151 3.151 3.151 3.151 3.151 3.151 3.151 3.151 3.151
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.089 1.089 1.089 1.089 1.089 1.089 1.089 1.089 1.089 1.089 1.089 1.089
PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON
3,7 461.1 M3 221.597 221.966 222.150 221.597 220.307 219.386 223.993 218.465 225.836 221.597 222.703 216.622
EMULSION ASFLTICA
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 66.815 66.942 67.006 66.815 66.368 66.050 67.643 65.731 68.281 66.815 67.197 65.093
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE
3,9 450.1 P M3 518.876 560.151 499.826 529.988 531.576 558.563 491.888 537.926 518.876 576.026 536.338 612.526
CEMENTO ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE
3,10 450.2 P M3 524.676 565.951 505.626 535.788 537.376 564.363 497.688 543.726 524.676 581.826 542.138 639.301
CEMENTO ASFLTICO)
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE
3,11 450.9 P M3 546.244 587.519 527.194 557.356 558.944 585.931 519.256 565.294 546.244 603.394 563.706 660.869
CEMENTO ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE
3,12 450.3 P M3 555.126 596.401 536.076 566.238 567.826 594.813 528.138 574.176 555.126 612.276 572.588 646.738
CEMENTO ASFLTICO)
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 319.400 327.655 309.494 304.541 299.588 283.078 301.239 291.333 319.400 302.890 326.004 258.313
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 285.439 292.043 273.882 270.580 265.627 249.117 267.278 257.372 285.439 268.929 292.043 224.352
3,15 311.1 AFIRMADO M3 90.575 95.528 75.716 74.065 69.112 65.810 79.018 59.206 102.132 72.414 70.763 41.045
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 11.502 11.527 11.540 11.502 11.413 11.350 11.666 11.287 11.792 11.502 11.578 11.161
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.646 4.659 4.665 4.646 4.602 4.570 4.728 4.539 4.791 4.646 4.684 4.475
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE
3,18 500.1 M3 642.534 644.491 645.469 642.534 635.687 630.796 655.251 625.905 665.034 642.534 648.404 616.122
SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE
3,19 500.1 M3 675.151 677.195 678.217 675.151 667.997 662.887 688.437 657.777 698.658 675.151 681.283 647.556
SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE
3,20 500.1 M3 696.939 699.042 700.094 696.939 689.577 684.319 710.611 679.060 721.128 696.939 703.249 668.543
SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO
3,21 *** (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y ML 6.762 6.762 6.762 6.762 6.762 6.762 6.762 6.762 6.762 6.762 6.762 6.762
SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 114.069 122.451 107.084 104.290 100.099 94.511 108.481 91.717 128.039 102.893 119.657 76.350

NORMA
4 OBRAS DE ARTE
INV
4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 907.530 909.749 910.859 907.530 899.763 894.215 921.955 888.667 933.052 907.530 914.188 877.570
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 787.125 789.308 790.399 787.125 779.487 774.031 801.311 768.575 812.224 787.125 793.674 757.662
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 832.270 834.539 835.674 832.270 824.330 818.657 847.018 812.985 858.363 832.270 839.078 801.640
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 575.242 577.240 578.240 575.242 568.249 563.254 588.231 558.258 598.223 575.242 581.238 548.266
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 667.776 669.853 670.892 667.776 660.506 655.312 681.279 650.119 691.666 667.776 674.009 639.731
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 573.609 575.661 576.688 573.609 566.429 561.299 586.946 556.170 597.205 573.609 579.765 545.911
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 666.078 668.212 669.278 666.078 658.613 653.281 679.943 647.949 690.608 666.078 672.478 637.283
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 725.486 727.538 728.564 725.486 718.306 713.176 738.823 708.047 749.081 725.486 731.642 697.787
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 593.310 595.443 596.510 593.310 585.845 580.512 607.175 575.180 617.840 593.310 599.709 564.515
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 768.189 770.323 771.390 768.189 760.725 755.392 782.054 750.060 792.719 768.189 774.589 739.394
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y
4,11 650 P KG 11.455 11.455 11.455 11.455 11.455 11.455 11.455 11.455 11.455 11.455 11.455 11.455
MONTAJE DE ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y
4,12 650 P KG 14.746 14.746 14.746 14.746 14.746 14.746 14.746 14.746 14.746 14.746 14.746 14.746
MONTAJE DE ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.732 1.732 1.732 1.732 1.732 1.732 1.732 1.732 1.732 1.732 1.732 1.732
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO
4,14 621.1 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ML 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319 2.618.319
ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M.
4,15 621.1 P CONSTRUCCIN MANUAL (INCLUYE EXCAVACIN EN ML 4.005.257 4.009.053 4.010.952 4.005.257 3.991.971 3.982.481 4.029.932 3.972.991 4.048.913 4.005.257 4.016.646 3.954.009
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI
4,16 621.2 M3 1.680.737 1.682.769 1.683.785 1.680.737 1.673.628 1.668.549 1.693.942 1.663.471 1.704.099 1.680.737 1.686.832 1.653.313
(INCLUYE REFUERZO)
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 84.927 84.927 84.927 84.927 84.927 84.927 84.927 84.927 84.927 84.927 84.927 84.927
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
CONSTRUCCIN
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 350.825 351.069 351.190 350.825 349.972 349.362 352.409 348.753 353.628 350.825 351.556 347.534

4,19 632 P BARANDA METLICA ML 409.323 409.323 409.323 409.323 409.323 409.323 409.323 409.323 409.323 409.323 409.323 409.323
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.462 16.462 16.462 16.462 16.462 16.462 16.462 16.462 16.462 16.462 16.462 16.462
CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL
4,21 671.1 M3 508.938 514.151 503.043 498.778 488.151 480.706 515.902 471.228 540.954 497.762 503.243 449.224
LUGAR
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 133.620 142.002 126.635 123.841 119.650 109.871 119.650 111.268 143.399 122.444 139.208 95.901
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 98.790 106.410 86.598 82.026 83.550 68.310 60.690 68.310 86.598 80.502 86.598 45.450
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 396.037 398.195 399.275 396.037 388.484 383.089 410.066 377.693 420.857 396.037 402.512 366.902
CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA
4,25 630.7 M3 374.070 378.400 373.453 370.514 364.503 359.266 380.372 355.045 393.894 370.006 379.948 343.046
BASES
CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA
4,26 630.7 M3 382.510 386.840 381.894 378.954 372.943 367.706 388.812 363.485 402.335 378.446 388.389 351.487
ELEVACIONES
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 387.994 392.303 387.346 384.438 378.499 373.314 394.162 369.144 407.581 383.930 393.811 357.248
CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA
4,28 630 P M3 396.434 400.744 395.787 392.878 386.940 381.754 402.602 377.584 416.022 392.370 402.251 365.689
ELEVACIONES
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 526.031 528.154 529.216 526.031 518.599 513.290 539.833 507.982 550.451 526.031 532.402 497.364
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 616.835 619.043 620.147 616.835 609.110 603.591 631.185 598.072 642.223 616.835 623.459 587.033
4,31 681.1 GAVIN M3 197.577 205.578 190.910 188.243 184.242 178.908 192.243 176.241 210.912 186.909 202.911 161.573
4,32 681.1 GAVIN MALLA PVC M3 201.659 209.660 194.991 192.324 188.324 182.990 196.325 180.323 214.994 190.991 206.993 165.654
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO
4,33 672.1 ML 42.261 42.392 42.457 42.261 41.805 41.479 43.109 41.153 43.761 42.261 42.653 40.502
CLASE E, 2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO


4,34 672.1 ML 16.602 16.667 16.700 16.602 16.374 16.211 17.026 16.048 17.352 16.602 16.798 15.722
CLASE E, 2500 PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE
4,35 *** M2 9.832 9.832 9.832 9.832 9.832 9.832 9.832 9.832 9.832 9.832 9.832 9.832
REFUERZO (RESISTENCIA LTIMA 25 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO
4,36 *** M2 14.046 14.046 14.046 14.046 14.046 14.046 14.046 14.046 14.046 14.046 14.046 14.046
BX-50

SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO


4,37 *** M2 18.924 18.924 18.924 18.924 18.924 18.924 18.924 18.924 18.924 18.924 18.924 18.924
BX-75

SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE


4,38 *** M2 22.699 22.699 22.699 22.699 22.699 22.699 22.699 22.699 22.699 22.699 22.699 22.699
REFUERZO (RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE
4,39 *** M2 29.187 29.187 29.187 29.187 29.187 29.187 29.187 29.187 29.187 29.187 29.187 29.187
REFUERZO (RESISTENCIA LTIMA 165 KN)

SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800


4,40 *** M2 7.057 7.057 7.057 7.057 7.057 7.057 7.057 7.057 7.057 7.057 7.057 7.057
(ESTABILIZACIN, FILTRO Y SEPARACIN)

SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000


4,41 *** M2 8.048 8.048 8.048 8.048 8.048 8.048 8.048 8.048 8.048 8.048 8.048 8.048
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500
4,42 *** M2 8.366 8.366 8.366 8.366 8.366 8.366 8.366 8.366 8.366 8.366 8.366 8.366
(ESTABILIZACIN, FILTRO Y SEPARACIN)

SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700


4,43 *** M2 5.947 5.947 5.947 5.947 5.947 5.947 5.947 5.947 5.947 5.947 5.947 5.947
(ESTABILIZACIN, FILTRO Y SEPARACIN)

SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100


4,44 *** M2 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981
(ESTABILIZACIN, FILTRO Y SEPARACIN)

SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400


4,45 *** M2 7.314 7.314 7.314 7.314 7.314 7.314 7.314 7.314 7.314 7.314 7.314 7.314
(ESTABILIZACIN, FILTRO Y SEPARACIN)

SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400


4,46 *** M2 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981 8.981
(ESTABILIZACIN, FILTRO Y SEPARACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUALIV
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Albn La_Pea La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supat tica Vergara Villeta
u
4,47 ***
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000
M2 17.294 17.294
CONSTRUCCIN
17.294 17.294 17.294 17.294 17.294 17.294 17.294 17.294 17.294 17.294
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO
4,48 661.1 ML 615.748 615.778 615.793 615.748 615.641 615.565 615.945 615.489 616.097 615.748 615.839 615.337
REFORZADO =36" CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE,
4,49 660.3 ML 359.076 359.540 359.772 359.076 357.452 356.291 362.093 355.131 364.414 359.076 360.469 352.810
DIMETRO 600 MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-
4,50 *** ML 862.070 862.070 862.070 862.070 862.070 862.070 862.070 862.070 862.070 862.070 862.070 862.070
ALCANTARILLADO, DIMETRO 36"

4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 156.207 160.969 141.919 140.332 135.569 132.394 145.094 126.044 167.319 138.744 137.157 108.582

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO


4,52 640.1 KG 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318 4.318
60000 PSI
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE
4,53 *** ML 83.987 83.987 83.987 83.987 83.987 83.987 83.987 83.987 83.987 83.987 83.987 83.987
SUMINISTRO E INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE
4,54 *** ML 127.978 127.978 127.978 127.978 127.978 127.978 127.978 127.978 127.978 127.978 127.978 127.978
SUMINISTRO E INSTALACIN)
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 538.089 540.296 541.401 538.089 530.363 524.844 552.438 519.325 563.477 538.089 544.712 508.287
4,56 682.1 P COLCHONETA RENO M3 212.755 220.756 206.087 203.420 199.420 194.086 207.421 191.419 226.090 202.087 218.089 176.750
4,57 *** TRINCHO EN MADERA M2 66.396 66.396 66.396 66.396 66.396 66.396 66.396 66.396 66.396 66.396 66.396 66.396

NORMA
5 SEALIZACIN
INV
5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963 3.963
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330 42.330
5,3 730.3 TOPE DEFENSA METLICA UN 81.903 81.903 81.903 81.903 81.903 81.903 81.903 81.903 81.903 81.903 81.903 81.903
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 68.105 68.105 68.105 68.105 68.105 68.105 68.105 68.105 68.105 68.105 68.105 68.105
5,5 730.1 DEFENSA METLICA ML 145.449 145.544 145.592 145.449 145.114 144.875 146.071 144.635 146.549 145.449 145.736 144.157
SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS
5,6 701.1 UN 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260
UNIDIRECCIONALES

NORMA
6 MANTENIMIENTO VIAL
INV
6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 811 811 811 811 811 811 811 811 811 811 811 811
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O
6,2 801.6 IGUAL A = 36", INCLUYE RECTIFICACIN DE DESCOLES, Y UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE
6,3 801.7 RECTIFICACIN DE DESCOLES Y RETIRO DE SOBRANTES A UNA ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
6,5 801.1 HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
DE 5 KM)
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 15.033 15.033 15.033 15.033 15.033 15.033 15.033 15.033 15.033 15.033 15.033 15.033
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 24.391 24.391 24.391 24.391 24.391 24.391 24.391 24.391 24.391 24.391 24.391 24.391
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.588 9.588 9.588 9.588 9.588 9.588 9.588 9.588 9.588 9.588 9.588 9.588

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL
FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 2.005.759 1.978.913 1.989.797 2.010.839 2.018.820 1.989.797 2.029.704 1.997.052
1,2 CAMPAMENTO 9 M2 UN 1.165.130 1.151.707 1.157.149 1.167.670 1.171.660 1.157.149 1.177.102 1.160.777
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.901 13.901 13.901 13.901 13.901 13.901 13.901 13.901
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.590 15.590 15.590 15.590 15.590 15.590 15.590 15.590
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 18.000 18.000 18.000 18.000 18.000 18.000 18.000 18.000
1,6 CERCA EN TABLA H=2.30 M ML 66.366 66.366 66.366 66.366 66.366 66.366 66.366 66.366
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 46.556 46.261 46.381 46.612 46.699 46.381 46.819 46.460
1,8 CERCA EN TELA VERDE H = 2.10 M ML 21.419 21.124 21.244 21.475 21.562 21.244 21.682 21.323
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 917.008 912.269 913.464 916.073 916.650 913.763 917.845 914.957
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.555 10.555 10.555 10.555 10.555 10.555 10.555 10.555
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.792 3.792 3.792 3.792 3.792 3.792 3.792 3.792
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.730.177 2.730.177 2.730.177 2.730.177 2.730.177 2.730.177 2.730.177 2.730.177
1,44 RED TELEFNICA PROVISIONAL UN 250.730 250.730 250.730 250.730 250.730 250.730 250.730 250.730
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 89.286 66.003 66.003 69.884 66.003 69.884 66.003 75.058
2,2 BASE ARENA CEMENTO 1:20 M3 217.114 187.341 199.411 222.746 231.598 199.411 243.668 207.458
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX CONSTRUCCIN
M2 22.384 22.384 22.384 22.384 22.384 22.384 22.384 22.384
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 639.157 610.316 622.009 644.614 653.188 622.009 664.881 629.804
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 640.840 610.814 622.986 646.521 655.448 622.986 667.621 631.102
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 595.706 567.590 578.988 601.025 609.384 578.988 620.782 586.587
2,9 PILOTE DE MADERA D=20 CM ML 48.407 48.407 48.407 48.407 48.407 48.407 48.407 48.407
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,10 ML 149.269 149.269 149.269 149.269 149.269 149.269 149.269 149.269
MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,11 ML 188.063 188.063 188.063 188.063 188.063 188.063 188.063 188.063
MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,12 ML 234.975 234.975 234.975 234.975 234.975 234.975 234.975 234.975
MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,13 ML 298.127 298.127 298.127 298.127 298.127 298.127 298.127 298.127
MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 103.807 101.747 102.582 104.196 104.809 102.582 105.644 103.139
2,15 PILOTE HINCADO 30X30 ML 128.758 125.772 126.983 129.323 130.210 126.983 131.420 127.789
2,16 DADOS EN CONCRETO 3500PSI M3 582.345 554.229 565.627 587.664 596.024 565.627 607.422 573.227
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2,17 ML 89.357 89.357 89.357 89.357 89.357 89.357 89.357 89.357
KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 38.458 38.273 38.348 38.493 38.548 38.348 38.623 38.398
3,2 SIFN EN PVC 6" UN 201.893 201.708 201.783 201.928 201.983 201.783 202.058 201.833
3,3 CAJA DE INSPECCIN DE 100X100 UN 461.942 436.136 440.571 451.624 452.399 443.049 456.834 449.309
3,4 CAJA DE INSPECCIN DE 40X40 UN 224.304 219.580 220.987 223.916 224.738 221.196 226.145 222.412
3,5 CAJA DE INSPECCIN DE 60X60 UN 256.213 248.487 250.820 255.660 257.042 251.149 259.376 253.142
3,6 CAJA DE INSPECCIN DE 80X80 UN 337.942 326.192 330.157 338.151 340.730 330.485 344.695 333.567
3,7 DUCTO ELCTRICO PVC 4" ML 101.401 101.222 101.222 101.251 101.222 101.251 101.222 101.291
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.310.507 1.308.716 1.308.716 1.309.015 1.308.716 1.309.015 1.308.716 1.309.413
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 116.489 114.446 115.274 116.876 117.483 115.274 118.312 115.826
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 74.032 72.954 73.391 74.236 74.556 73.391 74.993 73.682
3,11 TUBERA DRENAJE PVC 110 ML 27.818 27.335 27.531 27.909 28.053 27.531 28.249 27.661
3,12 TUBERA DRENAJE PVC 160 ML 45.194 44.711 44.907 45.285 45.429 44.907 45.624 45.037
3,13 TUBERA DRENAJE PVC 200 ML 59.451 58.775 59.049 59.579 59.780 59.049 60.054 59.231
3,14 TUBERA DRENAJE PVC 250 ML 81.650 80.878 81.191 81.796 82.026 81.191 82.339 81.400
3,15 TUBERA DRENAJE PVC 315 ML 113.371 112.695 112.969 113.498 113.699 112.969 113.973 113.151
3,16 SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 974.246 966.521 969.653 975.708 978.005 969.653 981.137 971.741
3,17 SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1.379.839 1.364.388 1.370.652 1.382.762 1.387.356 1.370.652 1.393.620 1.374.828

3,18 SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1.798.545 1.767.643 1.780.171 1.804.391 1.813.579 1.780.171 1.826.107 1.788.523

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 42.601 42.601 42.601 42.601 42.601 42.601 42.601 42.601
4,2 CASETN DE LONA 0.80X0.70 M2 56.472 56.472 56.472 56.472 56.472 56.472 56.472 56.472
4,3 COLUMNAS 3500 PSI M3 798.497 770.381 781.779 803.816 812.176 781.779 823.574 789.379
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 249.422 234.017 233.692 246.430 252.415 234.110 264.032 240.462
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4,5 M2 99.224 96.494 97.601 99.740 100.552 97.601 101.658 98.338
CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4,6 M2 117.223 113.948 115.276 117.843 118.817 115.276 120.145 116.161
CONCRETO DE 3500 PSI
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 128.580 124.212 125.983 129.406 130.705 125.983 132.475 127.163
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 135.695 131.055 132.936 136.573 137.953 132.936 139.834 134.190
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 155.734 150.002 152.326 156.819 158.523 152.326 160.847 153.875
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 173.323 166.772 169.428 174.563 176.510 169.428 179.166 171.199
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 192.353 184.983 187.970 193.747 195.938 187.970 198.926 189.963
4,12 ENTREPISO VIGUETA PLACA M2 100.092 99.627 99.816 100.180 100.318 99.816 100.507 99.941
4,13 ESCALERA MACIZA 3500 PSI M3 947.911 919.795 931.193 953.230 961.590 931.193 972.988 938.793
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm CONSTRUCCIN
M2 96.689 96.268 96.439 96.768 96.893 96.439 97.064 96.552
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 78.934 76.122 77.262 79.466 80.302 77.262 81.442 78.022
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 88.884 85.445 86.839 89.535 90.557 86.839 91.952 87.769
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 103.688 99.375 101.123 104.504 105.786 101.123 107.535 102.289
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 697.790 669.674 681.072 703.109 711.469 681.072 722.867 688.672
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 48.282 47.411 47.764 48.447 48.706 47.764 49.059 47.999
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 279.308 266.751 271.841 281.683 285.417 271.841 290.507 275.235
4,21 ACERO FIGURADO 37000 PSI KG 4.255 4.255 4.255 4.255 4.255 4.255 4.255 4.255
4,22 ACERO FIGURADO 60000 PSI KG 4.463 4.463 4.463 4.463 4.463 4.463 4.463 4.463
4,23 REFUERZO MALLA ELECTROSOLDADA KG 6.144 6.144 6.144 6.144 6.144 6.144 6.144 6.144
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 838.635 810.519 821.917 843.954 852.313 821.917 863.711 829.516
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 766.853 736.084 748.558 772.674 781.822 748.558 794.295 756.874
4,26 VIGA AREA 3500 PSI M3 835.235 807.119 818.517 840.554 848.914 818.517 860.312 826.117
4,27 VIGA CINTA 3500 PSI M3 816.311 788.195 799.593 821.630 829.989 799.593 841.387 807.192
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.015.887 987.771 999.169 1.021.206 1.029.565 999.169 1.040.963 1.006.768
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 321.493 290.769 303.225 327.306 336.440 303.225 348.896 311.528

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 29.040 28.274 28.584 29.185 29.412 28.584 29.723 28.791
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 48.387 47.621 47.931 48.532 48.759 47.931 49.070 48.138
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 34.499 34.314 34.389 34.534 34.589 34.389 34.664 34.439
5,4 ARCOS EN LADRILLO PRENSADO ML 161.218 160.848 160.998 161.288 161.398 160.998 161.548 161.098
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 43.306 42.435 42.788 43.471 43.730 42.788 44.083 43.024
5,6 DINTELES EN BLOQUE 0.15 M ML 26.933 26.512 26.683 27.013 27.138 26.683 27.308 26.797
5,7 ENCHAPES LADRILLO PRENSADO M2 100.682 99.942 100.242 100.822 101.042 100.242 101.342 100.442
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 91.018 88.113 89.291 91.568 92.431 89.291 93.609 90.076
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 91.265 91.265 91.265 91.265 91.265 91.265 91.265 91.265
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 53.114 53.114 53.114 53.114 53.114 53.114 53.114 53.114
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 87.791 87.791 87.791 87.791 87.791 87.791 87.791 87.791
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 51.378 51.378 51.378 51.378 51.378 51.378 51.378 51.378
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 102.491 102.491 102.491 102.491 102.491 102.491 102.491 102.491
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 59.975 59.975 59.975 59.975 59.975 59.975 59.975 59.975
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 114.276 114.276 114.276 114.276 114.276 114.276 114.276 114.276
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 65.868 65.868 65.868 65.868 65.868 65.868 65.868 65.868
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 40.860 40.488 40.639 40.930 41.041 40.639 41.191 40.739
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 24.503 24.317 24.393 24.538 24.594 24.393 24.669 24.443
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 53.577 53.330 53.430 53.624 53.698 53.430 53.798 53.497
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 31.868 31.744 31.795 31.892 31.929 31.795 31.979 31.828
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 60.215 59.967 60.068 60.262 60.336 60.068 60.436 60.135
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 35.823 35.699 35.749 35.847 35.883 35.749 35.934 35.783
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 100.469 99.230 99.733 100.704 101.072 99.733 101.574 100.067
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 58.808 58.188 58.439 58.925 59.109 58.439 59.360 58.607
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 37.336 37.088 37.188 37.383 37.456 37.188 37.557 37.255
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 22.427 22.303 22.353 22.450 22.487 22.353 22.537 22.387
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 74.645 74.149 74.350 74.739 74.886 74.350 75.087 74.484
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 44.557 44.309 44.409 44.604 44.677 44.409 44.778 44.476
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 89.220 88.800 88.970 89.300 89.425 88.970 89.596 89.084
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 53.428 53.218 53.303 53.468 53.531 53.303 53.616 53.360
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 185.320 183.585 184.288 185.648 186.164 184.288 186.867 184.757
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 110.029 109.162 109.513 110.193 110.451 109.513 110.802 109.748
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 90.972 90.200 90.513 91.117 91.347 90.513 91.659 90.721
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 54.304 53.918 54.075 54.377 54.491 54.075 54.648 54.179
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 47.318 46.763 46.988 47.423 47.588 46.988 47.813 47.138
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 28.473 28.196 28.309 28.526 28.608 28.309 28.721 28.383
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
5,37 MURO TOLETE COMN 0.06 M CONSTRUCCIN
M2 33.777 33.530 33.630 33.824 33.898 33.630 33.998 33.697
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 20.388 20.264 20.314 20.411 20.448 20.314 20.498 20.348
5,39 MURO TOLETE COMN 0.12 M M2 51.615 51.120 51.321 51.709 51.857 51.321 52.057 51.455
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 31.267 31.019 31.119 31.313 31.387 31.119 31.488 31.186
5,41 MURO TOLETE COMN 0.25 M M2 99.707 98.964 99.265 99.848 100.069 99.265 100.370 99.466
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 60.003 59.631 59.782 60.073 60.184 59.782 60.334 59.882
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 72.666 72.170 72.371 72.760 72.907 72.371 73.108 72.505
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 43.449 43.201 43.302 43.496 43.570 43.302 43.670 43.369
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 153.609 151.875 152.578 153.937 154.453 152.578 155.156 153.047
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 92.356 91.489 91.841 92.520 92.778 91.841 93.130 92.075
5,47 REMATES LADRILLO PRENSADO ML 31.723 31.538 31.613 31.758 31.813 31.613 31.888 31.663
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 36.540 35.986 36.210 36.645 36.810 36.210 37.035 36.360
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 61.597 60.857 61.157 61.737 61.957 61.157 62.257 61.357
5,50 LAVADA DE FACHADA M2 5.006 5.006 5.006 5.006 5.006 5.006 5.006 5.006
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 48.740 47.974 48.285 48.885 49.113 48.285 49.423 48.492
5,52 DOVELA, GROUTING 3000 PSI ML 10.142 10.142 10.142 10.142 10.142 10.142 10.142 10.142
5,53 ANCLAJE 3/8" L=30CM UN 13.535 13.535 13.535 13.535 13.535 13.535 13.535 13.535
5,54 ANCLAJE 1/2" L=50CM UN 17.727 17.727 17.727 17.727 17.727 17.727 17.727 17.727
5,55 ANCLAJE 5/8" L=70CM UN 25.039 25.039 25.039 25.039 25.039 25.039 25.039 25.039
5,56 ANCLAJE 3/4" L=70CM UN 37.637 37.637 37.637 37.637 37.637 37.637 37.637 37.637
5,57 ANCLAJE 1" L= 70CM UN 4.847 4.638 4.722 4.886 4.948 4.722 5.033 4.779

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.533 15.533 15.533 15.533 15.533 15.533 15.533 15.533
6,2 FILOS O DILATACIONES B/PLACA ML 5.670 5.485 5.560 5.705 5.760 5.560 5.835 5.610
6,3 FILOS O DILATACIONES S/MURO ML 6.790 6.605 6.680 6.825 6.880 6.680 6.955 6.730
6,4 GOTERA EN MORTERO 1:4 ML 8.077 7.892 7.967 8.112 8.167 7.967 8.242 8.017
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.837 6.837 6.837 6.837 6.837 6.837 6.837 6.837
6,6 MALLA BAJO ENTRAMADO M2 13.308 13.308 13.308 13.308 13.308 13.308 13.308 13.308
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 23.658 23.118 23.337 23.760 23.920 23.337 24.139 23.483
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 14.278 14.008 14.118 14.329 14.410 14.118 14.519 14.191
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 20.864 20.344 20.555 20.963 21.118 20.555 21.329 20.696
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.589 12.329 12.434 12.638 12.715 12.434 12.821 12.504
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 19.984 19.444 19.663 20.086 20.246 19.663 20.465 19.808
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 12.148 11.878 11.988 12.199 12.280 11.988 12.389 12.061
6,13 PAETE CULATAS 1:4, E=2 CM M2 20.864 20.344 20.555 20.963 21.118 20.555 21.329 20.696
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.589 12.329 12.434 12.638 12.715 12.434 12.821 12.504
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 21.324 20.939 21.095 21.397 21.511 21.095 21.667 21.199
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.817 12.625 12.703 12.854 12.911 12.703 12.989 12.755
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 17.296 16.900 17.061 17.371 17.489 17.061 17.650 17.168
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.532 10.334 10.415 10.570 10.629 10.415 10.709 10.468
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.625 16.214 16.381 16.703 16.825 16.381 16.992 16.492
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.197 9.991 10.075 10.236 10.297 10.075 10.380 10.130
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 21.599 21.079 21.290 21.698 21.852 21.290 22.063 21.431
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.937 12.677 12.783 12.987 13.064 12.783 13.169 12.853
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 20.718 20.179 20.397 20.821 20.981 20.397 21.200 20.543
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.497 12.227 12.336 12.548 12.628 12.336 12.738 12.409
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 17.202 16.790 16.957 17.279 17.402 16.957 17.568 17.068
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.468 10.263 10.346 10.507 10.568 10.346 10.652 10.401
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 21.558 21.018 21.237 21.660 21.821 21.237 22.040 21.383
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 13.299 13.029 13.138 13.350 13.430 13.138 13.539 13.211

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 26.657 25.914 26.215 26.798 27.019 26.215 27.320 26.416
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
7,2
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA CONSTRUCCIN
M2 83.664 82.211 82.800 83.938 84.370 82.800 84.959 83.193
IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 56.058 56.058 56.058 56.058 56.058 56.058 56.058 56.058
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 22.081 22.081 22.081 22.081 22.081 22.081 22.081 22.081
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 34.769 34.769 34.769 34.769 34.769 34.769 34.769 34.769
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 82.134 82.134 82.134 82.134 82.134 82.134 82.134 82.134
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 64.158 64.158 64.158 64.158 64.158 64.158 64.158 64.158
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 37.007 37.007 37.007 37.007 37.007 37.007 37.007 37.007
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 86.116 86.116 86.116 86.116 86.116 86.116 86.116 86.116
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 102.971 102.971 102.971 102.971 102.971 102.971 102.971 102.971
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 151.672 151.672 151.672 151.672 151.672 151.672 151.672 151.672
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 59.370 59.370 59.370 59.370 59.370 59.370 59.370 59.370
7,13 CANAL PVC AMAZONAS ML 82.187 82.187 82.187 82.187 82.187 82.187 82.187 82.187
7,14 CANAL PVC RAINGO ML 74.586 74.586 74.586 74.586 74.586 74.586 74.586 74.586
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 133.687 133.687 133.687 133.687 133.687 133.687 133.687 133.687
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 78.252 78.252 78.252 78.252 78.252 78.252 78.252 78.252
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 57.328 57.328 57.328 57.328 57.328 57.328 57.328 57.328
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 32.054 32.054 32.054 32.054 32.054 32.054 32.054 32.054
7,19 TEJA DE BARRO M2 59.360 58.435 58.810 59.535 59.809 58.810 60.184 59.060
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 47.810 47.810 47.810 47.810 47.810 47.810 47.810 47.810
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 43.792 43.792 43.792 43.792 43.792 43.792 43.792 43.792
7,22 TEJA FIBROCEMENTO N4 M2 36.505 36.505 36.505 36.505 36.505 36.505 36.505 36.505
7,23 TEJA FIBROCEMENTO No. 6 M2 35.781 35.781 35.781 35.781 35.781 35.781 35.781 35.781
7,24 TEJA FIBROCEMENTO No. 8 M2 36.057 36.057 36.057 36.057 36.057 36.057 36.057 36.057
7,25 TEJA TERMOACSTICA M2 51.112 51.112 51.112 51.112 51.112 51.112 51.112 51.112
7,26 TEJA PLSTICA No.6 M2 44.850 44.850 44.850 44.850 44.850 44.850 44.850 44.850
7,27 TEJA ESPAOLA ETERNIT M2 82.573 82.573 82.573 82.573 82.573 82.573 82.573 82.573
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 153.093 153.093 153.093 153.093 153.093 153.093 153.093 153.093
7,29 TEJA SIN TRASLAPO M2 68.590 68.590 68.590 68.590 68.590 68.590 68.590 68.590
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 41.955 41.955 41.955 41.955 41.955 41.955 41.955 41.955
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 33.044 33.044 33.044 33.044 33.044 33.044 33.044 33.044
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7,32 M2 58.342 58.342 58.342 58.342 58.342 58.342 58.342 58.342
4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.672 19.672 19.672 19.672 19.672 19.672 19.672 19.672
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.817 23.817 23.817 23.817 23.817 23.817 23.817 23.817
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.919 25.919 25.919 25.919 25.919 25.919 25.919 25.919
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 33.570 33.570 33.570 33.570 33.570 33.570 33.570 33.570
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.977 21.977 21.977 21.977 21.977 21.977 21.977 21.977
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 51.839 51.839 51.839 51.839 51.839 51.839 51.839 51.839
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 364.119 364.119 364.119 364.119 364.119 364.119 364.119 364.119
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 403.464 403.464 403.464 403.464 403.464 403.464 403.464 403.464
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 273.964 273.964 273.964 273.964 273.964 273.964 273.964 273.964
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 293.491 293.491 293.491 293.491 293.491 293.491 293.491 293.491

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 459.890 430.034 442.138 465.538 474.414 442.138 486.517 450.207
8,2 CONCRETO 3500 PSI M3 400.774 373.477 384.543 405.938 414.054 384.543 425.120 391.921
8,3 CONCRETO 3000 PSI M3 397.869 369.868 381.220 403.167 411.491 381.220 422.843 388.788
8,4 CONCRETO 2500 PSI M3 354.228 325.180 336.956 359.724 368.359 336.956 380.136 344.807
8,5 CONCRETO 2000 PSI M3 329.451 299.978 311.927 335.027 343.789 311.927 355.738 319.892
8,6 CONCRETO 1500 PSI M3 297.860 268.031 280.124 303.504 312.372 280.124 324.465 288.186
8,7 MORTERO SECO 1:10 M3 257.108 231.587 241.933 261.935 269.522 241.933 279.868 248.830
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 468.655 443.875 453.921 473.343 480.710 453.921 490.756 460.618
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 426.709 401.004 411.425 431.571 439.213 411.425 449.634 418.372
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
8,10 MORTERO 1:3 ARENA LAVADA DE PEA CONSTRUCCIN
M3 488.770 464.730 474.476 493.318 500.465 474.476 510.211 480.973
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 720.370 696.330 706.076 724.918 732.065 706.076 741.811 712.573

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 124.068 124.068 124.068 124.068 124.068 124.068 124.068 124.068
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 4.069 3.884 3.959 4.104 4.159 3.959 4.234 4.009
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 138.254 138.254 138.254 138.254 138.254 138.254 138.254 138.254
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 169.960 169.960 169.960 169.960 169.960 169.960 169.960 169.960
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 249.534 249.534 249.534 249.534 249.534 249.534 249.534 249.534
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 277.891 277.891 277.891 277.891 277.891 277.891 277.891 277.891
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 306.279 306.279 306.279 306.279 306.279 306.279 306.279 306.279
9,8 HOJA PUERTA FORTEC 0.81 UN 203.764 203.764 203.764 203.764 203.764 203.764 203.764 203.764
9,9 HOJA PUERTA FORTEC 0.91 UN 231.115 231.115 231.115 231.115 231.115 231.115 231.115 231.115
9,10 HOJA PUERTA FORTEC 1.50 UN 340.520 340.520 340.520 340.520 340.520 340.520 340.520 340.520
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 128.549 128.549 128.549 128.549 128.549 128.549 128.549 128.549
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 170.943 170.943 170.943 170.943 170.943 170.943 170.943 170.943
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 190.089 190.089 190.089 190.089 190.089 190.089 190.089 190.089
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 485.481 485.481 485.481 485.481 485.481 485.481 485.481 485.481
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 42.194 42.194 42.194 42.194 42.194 42.194 42.194 42.194
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.938 25.938 25.938 25.938 25.938 25.938 25.938 25.938
9,17 VENTANERA EN MADERA CEDRO MACHO M2 99.699 99.699 99.699 99.699 99.699 99.699 99.699 99.699
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 123.968 123.968 123.968 123.968 123.968 123.968 123.968 123.968
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 96.207 96.207 96.207 96.207 96.207 96.207 96.207 96.207
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 29.525 29.525 29.525 29.525 29.525 29.525 29.525 29.525
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 29.525 29.525 29.525 29.525 29.525 29.525 29.525 29.525
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 27.966 27.966 27.966 27.966 27.966 27.966 27.966 27.966
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 42.652 42.652 42.652 42.652 42.652 42.652 42.652 42.652
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 53.011 53.011 53.011 53.011 53.011 53.011 53.011 53.011
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 64.060 64.060 64.060 64.060 64.060 64.060 64.060 64.060
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 77.182 77.182 77.182 77.182 77.182 77.182 77.182 77.182
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 365.885 365.885 365.885 365.885 365.885 365.885 365.885 365.885
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 255.386 255.386 255.386 255.386 255.386 255.386 255.386 255.386
9,29 VIDRIO TRANSPARENTE 3 MM M2 33.674 33.674 33.674 33.674 33.674 33.674 33.674 33.674
9,30 VIDRIO TRANSPARENTE 4 MM M2 43.342 43.342 43.342 43.342 43.342 43.342 43.342 43.342
9,31 VIDRIO TRANSPARENTE 5 MM M2 53.011 53.011 53.011 53.011 53.011 53.011 53.011 53.011
9,32 VIDRIO TRANSPARENTE 6 MM M2 66.823 66.823 66.823 66.823 66.823 66.823 66.823 66.823

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 76.461 76.461 76.461 76.461 76.461 76.461 76.461 76.461
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 215.357 215.357 215.357 215.357 215.357 215.357 215.357 215.357
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10,3 ML 80.541 80.541 80.541 80.541 80.541 80.541 80.541 80.541
ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 142.735 142.735 142.735 142.735 142.735 142.735 142.735 142.735
10,5 MARCO TAPA CAJA DE INSPECCIN UN 136.917 136.917 136.917 136.917 136.917 136.917 136.917 136.917
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 89.866 89.866 89.866 89.866 89.866 89.866 89.866 89.866
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 212.551 212.551 212.551 212.551 212.551 212.551 212.551 212.551
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 110.280 110.280 110.280 110.280 110.280 110.280 110.280 110.280
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.590 6.590 6.590 6.590 6.590 6.590 6.590 6.590
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO ESTRUCTURAL
10,10 M2 98.121 98.121 98.121 98.121 98.121 98.121 98.121 98.121
GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 40.445 40.445 40.445 40.445 40.445 40.445 40.445 40.445
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 550.220 550.220 550.220 550.220 550.220 550.220 550.220 550.220
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 196.989 196.989 196.989 196.989 196.989 196.989 196.989 196.989
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA
CONSTRUCCIN
M2 219.424 219.424 219.424 219.424 219.424 219.424 219.424 219.424
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10,15 M2 500.676 500.676 500.676 500.676 500.676 500.676 500.676 500.676
ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 127.192 127.192 127.192 127.192 127.192 127.192 127.192 127.192
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 401.746 401.746 401.746 401.746 401.746 401.746 401.746 401.746
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 6.032 6.032 6.032 6.032 6.032 6.032 6.032 6.032
10,19 VENTANA EN ALUMINIO CORREDIZA M2 281.455 281.455 281.455 281.455 281.455 281.455 281.455 281.455
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 121.412 121.412 121.412 121.412 121.412 121.412 121.412 121.412
10,21 REJILLA PISO 0.30 M M2 86.784 86.784 86.784 86.784 86.784 86.784 86.784 86.784
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 89.344 89.344 89.344 89.344 89.344 89.344 89.344 89.344
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
10,23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, KG 10.485 10.485 10.485 10.485 10.485 10.485 10.485 10.485
PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10,24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, KG 11.670 11.670 11.670 11.670 11.670 11.670 11.670 11.670
PINTURA Y PLATINERA.CONTEMPLA TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10,25 KG 9.208 9.208 9.208 9.208 9.208 9.208 9.208 9.208
ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN,
SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11,1 ACOMETIDA EN PVC 1/2" 5M UN 219.118 219.118 219.118 219.118 219.118 219.118 219.118 219.118
11,2 ACOMETIDA EN PVC 3/4" 5M UN 265.782 265.782 265.782 265.782 265.782 265.782 265.782 265.782
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 22.081 22.081 22.081 22.081 22.081 22.081 22.081 22.081
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 34.769 34.769 34.769 34.769 34.769 34.769 34.769 34.769
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 33.186 33.186 33.186 33.186 33.186 33.186 33.186 33.186
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 42.707 42.707 42.707 42.707 42.707 42.707 42.707 42.707
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 88.499 88.499 88.499 88.499 88.499 88.499 88.499 88.499
11,8 CONEXIN TANQUE ELEVADO PVC UN 220.509 220.509 220.509 220.509 220.509 220.509 220.509 220.509
11,9 INSTALACIN APARATO SANITARIO UN 41.914 41.914 41.914 41.914 41.914 41.914 41.914 41.914
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 34.685 34.685 34.685 34.685 34.685 34.685 34.685 34.685
11,13 NIPLE PASAMURO 2" UN 65.356 65.356 65.356 65.356 65.356 65.356 65.356 65.356
11,14 NIPLE PASAMURO 4" UN 97.859 97.859 97.859 97.859 97.859 97.859 97.859 97.859
11,15 PUNTO AGUA CALIENTE CPVC UN 83.198 83.198 83.198 83.198 83.198 83.198 83.198 83.198
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 59.898 59.898 59.898 59.898 59.898 59.898 59.898 59.898
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 63.900 63.900 63.900 63.900 63.900 63.900 63.900 63.900
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 80.786 80.786 80.786 80.786 80.786 80.786 80.786 80.786
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 65.622 65.622 65.622 65.622 65.622 65.622 65.622 65.622
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 82.707 82.707 82.707 82.707 82.707 82.707 82.707 82.707
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 88.628 88.628 88.628 88.628 88.628 88.628 88.628 88.628
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 74.141 74.141 74.141 74.141 74.141 74.141 74.141 74.141
11,23 RED SUMINISTRO CPVC 1/2" ML 12.498 12.498 12.498 12.498 12.498 12.498 12.498 12.498
11,24 RED SUMINISTRO CPVC 3/4" ML 17.713 17.713 17.713 17.713 17.713 17.713 17.713 17.713
11,25 RED SUMINISTRO PVC 1 1/2" ML 23.103 23.103 23.103 23.103 23.103 23.103 23.103 23.103
11,26 RED SUMINISTRO PVC 1" ML 14.198 14.198 14.198 14.198 14.198 14.198 14.198 14.198
11,27 RED SUMINISTRO PVC 1/2" ML 8.434 8.434 8.434 8.434 8.434 8.434 8.434 8.434
11,28 RED SUMINISTRO PVC 2 1/2" ML 51.751 51.751 51.751 51.751 51.751 51.751 51.751 51.751
11,29 RED SUMINISTRO PVC 2" ML 33.008 33.008 33.008 33.008 33.008 33.008 33.008 33.008
11,30 RED SUMINISTRO PVC 3/4" ML 10.595 10.595 10.595 10.595 10.595 10.595 10.595 10.595
11,31 RED SANITARIA PVC-S 2" ML 25.389 25.389 25.389 25.389 25.389 25.389 25.389 25.389
11,32 RED SANITARIA PVC-S 3" ML 35.314 35.314 35.314 35.314 35.314 35.314 35.314 35.314
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
11,33 RED SANITARIA PVC-S 4" CONSTRUCCIN
ML 47.985 47.985 47.985 47.985 47.985 47.985 47.985 47.985
11,34 RED SANITARIA PVC-S 6" ML 90.319 90.319 90.319 90.319 90.319 90.319 90.319 90.319
11,35 REGISTRO 1" UN 109.125 109.125 109.125 109.125 109.125 109.125 109.125 109.125
11,36 REGISTRO 1/2" UN 60.738 60.738 60.738 60.738 60.738 60.738 60.738 60.738
11,37 REGISTRO 3/4" UN 77.586 77.586 77.586 77.586 77.586 77.586 77.586 77.586
11,38 REGISTRO 1 1/2" UN 188.170 188.170 188.170 188.170 188.170 188.170 188.170 188.170
11,39 REGISTRO 2 1/2" UN 389.234 389.234 389.234 389.234 389.234 389.234 389.234 389.234
11,40 REGISTRO 2" UN 287.099 287.099 287.099 287.099 287.099 287.099 287.099 287.099
11,41 REVENTILACIN 2" ML 17.637 17.637 17.637 17.637 17.637 17.637 17.637 17.637
11,42 REVENTILACIN 3" ML 22.283 22.283 22.283 22.283 22.283 22.283 22.283 22.283
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 173.458 173.458 173.458 173.458 173.458 173.458 173.458 173.458
11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 283.427 283.427 283.427 283.427 283.427 283.427 283.427 283.427
11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 472.458 472.458 472.458 472.458 472.458 472.458 472.458 472.458
11,46 TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 40.964 40.964 40.964 40.964 40.964 40.964 40.964 40.964

11,47 TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 48.330 48.330 48.330 48.330 48.330 48.330 48.330 48.330

11,48 TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 61.630 61.630 61.630 61.630 61.630 61.630 61.630 61.630

11,49 TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 70.229 70.229 70.229 70.229 70.229 70.229 70.229 70.229

11,50 TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 90.544 90.544 90.544 90.544 90.544 90.544 90.544 90.544

11,51 TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 104.161 104.161 104.161 104.161 104.161 104.161 104.161 104.161

11,52 TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 153.744 153.744 153.744 153.744 153.744 153.744 153.744 153.744
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 61.580 61.580 61.580 61.580 61.580 61.580 61.580 61.580
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 61.839 61.839 61.839 61.839 61.839 61.839 61.839 61.839
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 40.259 40.259 40.259 40.259 40.259 40.259 40.259 40.259
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 49.777 49.777 49.777 49.777 49.777 49.777 49.777 49.777
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.246 4.246 4.246 4.246 4.246 4.246 4.246 4.246
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.710 6.710 6.710 6.710 6.710 6.710 6.710 6.710
11,59 GABINETE TIPO III UN 1.033.236 1.033.236 1.033.236 1.033.236 1.033.236 1.033.236 1.033.236 1.033.236
11,60 GABINETE TIPO I UN 787.349 787.349 787.349 787.349 787.349 787.349 787.349 787.349
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.666.128 2.666.128 2.666.128 2.666.128 2.666.128 2.666.128 2.666.128 2.666.128
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.221.310 2.221.310 2.221.310 2.221.310 2.221.310 2.221.310 2.221.310 2.221.310
11,63 VLVULA MARIPOSA 3" UN 639.032 639.032 639.032 639.032 639.032 639.032 639.032 639.032
11,64 VLVULA MARIPOSA 4" UN 829.396 829.396 829.396 829.396 829.396 829.396 829.396 829.396
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 321.878 321.878 321.878 321.878 321.878 321.878 321.878 321.878

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 368.474 368.474 368.474 368.474 368.474 368.474 368.474 368.474
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 58.564 58.564 58.564 58.564 58.564 58.564 58.564 58.564
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 69.453 69.453 69.453 69.453 69.453 69.453 69.453 69.453
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 76.963 76.963 76.963 76.963 76.963 76.963 76.963 76.963
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 90.806 90.806 90.806 90.806 90.806 90.806 90.806 90.806
12,6 SALIDA TELFONO PVC COMPLETA UN 54.987 54.987 54.987 54.987 54.987 54.987 54.987 54.987
12,7 SALIDA TIMBRE PVC COMPLETA UN 62.737 62.737 62.737 62.737 62.737 62.737 62.737 62.737
12,8 STRIP TELEFNICO 10 PARES UN 144.001 144.001 144.001 144.001 144.001 144.001 144.001 144.001
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 56.513 56.513 56.513 56.513 56.513 56.513 56.513 56.513
12,10 SALIDA TRIFSICA PVC COMPLETA UN 130.048 130.048 130.048 130.048 130.048 130.048 130.048 130.048
12,11 SALIDA T.V PVC COMPLETA. UN 77.630 77.630 77.630 77.630 77.630 77.630 77.630 77.630
12,12 SALIDA BIFSICA C.N. UN 46.056 46.056 46.056 46.056 46.056 46.056 46.056 46.056
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 96.702 96.702 96.702 96.702 96.702 96.702 96.702 96.702
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 412.525 412.525 412.525 412.525 412.525 412.525 412.525 412.525
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) CONSTRUCCIN
UN 550.258 550.258 550.258 550.258 550.258 550.258 550.258 550.258
12,16 TUBERA PVC CONDUIT 1/2" ML 3.565 3.565 3.565 3.565 3.565 3.565 3.565 3.565
12,17 TUBERA PVC CONDUIT 3/4" ML 4.704 4.704 4.704 4.704 4.704 4.704 4.704 4.704
12,18 TUBERA PVC CONDUIT 1" ML 7.332 7.332 7.332 7.332 7.332 7.332 7.332 7.332
12,19 TUBERA PVC CONDUIT 1 1/2" ML 13.103 13.103 13.103 13.103 13.103 13.103 13.103 13.103
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 275.722 275.722 275.722 275.722 275.722 275.722 275.722 275.722
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 77.636 77.636 77.636 77.636 77.636 77.636 77.636 77.636
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 105.559 105.559 105.559 105.559 105.559 105.559 105.559 105.559
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 42.309 42.309 42.309 42.309 42.309 42.309 42.309 42.309
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.407.614 1.407.614 1.407.614 1.407.614 1.407.614 1.407.614 1.407.614 1.407.614
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.042.936 1.042.936 1.042.936 1.042.936 1.042.936 1.042.936 1.042.936 1.042.936
12,26 POSTE METLICO 6M UN 1.317.796 1.317.796 1.317.796 1.317.796 1.317.796 1.317.796 1.317.796 1.317.796
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 615.163 615.163 615.163 615.163 615.163 615.163 615.163 615.163
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 111.313 111.313 111.313 111.313 111.313 111.313 111.313 111.313
12,29 LUMINARIA 70W SODIO UN 516.424 516.424 516.424 516.424 516.424 516.424 516.424 516.424
12,30 LUMINARIA 150W SODIO UN 646.514 646.514 646.514 646.514 646.514 646.514 646.514 646.514
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.710.295 1.710.295 1.710.295 1.710.295 1.710.295 1.710.295 1.710.295 1.710.295
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.259.003 1.259.003 1.259.003 1.259.003 1.259.003 1.259.003 1.259.003 1.259.003

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 39.911 38.986 39.361 40.086 40.361 39.361 40.736 39.611
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 40.021 39.097 39.471 40.196 40.471 39.471 40.846 39.721
13,3 ALISTADO PARA LISTN M2 14.483 14.298 14.373 14.518 14.573 14.373 14.648 14.423
13,4 ALISTADO PISOS 1:3, E=0.04 M2 28.679 26.830 27.580 29.029 29.579 27.580 30.329 28.080
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 86.916 85.066 85.816 87.266 87.815 85.816 88.565 86.316
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.850 25.260 25.499 25.961 26.137 25.499 26.376 25.659
13,7 CONCRETO BASE GRADAS 2500 PSI M2 57.082 54.177 55.355 57.632 58.495 55.355 59.673 56.140
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 79.591 74.944 76.828 80.471 81.852 76.828 83.737 78.084
13,9 MANTO FIBERGLASS 600X1 M2 30.643 30.643 30.643 30.643 30.643 30.643 30.643 30.643
13,10 PEGANTE MORTERO-CONCRETO M2 22.811 22.811 22.811 22.811 22.811 22.811 22.811 22.811
13,11 PERMA PLY 2 CAPAS M2 26.655 26.655 26.655 26.655 26.655 26.655 26.655 26.655
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 46.577 43.962 45.022 47.071 47.848 45.022 48.908 45.729
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 54.645 51.449 52.745 55.249 56.199 52.745 57.495 53.608
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 79.453 74.515 76.517 80.387 81.855 76.517 83.857 77.851
13,15 TRITURADO FINO 1/2 M3 94.203 74.310 82.375 97.967 103.881 82.375 111.946 87.752
13,16 TRITURADO GRUESO 3/4 M3 104.264 80.104 86.995 101.510 105.369 88.189 112.259 94.374

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 57.632 57.262 57.412 57.702 57.811 57.412 57.961 57.512
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 34.174 33.989 34.064 34.209 34.264 34.064 34.339 34.114
14,3 ADOQUN CONCRETO 6CM M2 65.976 65.051 65.426 66.151 66.426 65.426 66.800 65.676
14,4 ADOQUN CONCRETO 8CM M2 69.376 68.451 68.826 69.551 69.826 68.826 70.200 69.076
14,5 ADOQUN GRES PEATONAL M2 73.701 72.777 73.152 73.876 74.151 73.152 74.526 73.401
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14,6 M2 76.471 76.101 76.251 76.541 76.651 76.251 76.801 76.351
ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.849 35.471 35.625 35.921 36.033 35.625 36.187 35.727
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 167.091 165.427 166.101 167.406 167.901 166.101 168.576 166.551
14,9 ACABADO EN GRAVILLA LAVADA M2 45.152 44.211 44.592 45.330 45.609 44.592 45.991 44.846
14,10 GUARDAESCOBA EN GRANITO ML 43.194 43.194 43.194 43.194 43.194 43.194 43.194 43.194
14,11 GUARDAESCOBA EN GRAVILLA ML 9.893 9.515 9.668 9.965 10.077 9.668 10.230 9.771
14,12 GUARDAESCOBA PVC CARAMELO ML 9.590 9.590 9.590 9.590 9.590 9.590 9.590 9.590
14,13 GUARDAESCOBA PVC CEDRO ML 12.903 12.903 12.903 12.903 12.903 12.903 12.903 12.903
14,14 GUARDAESCOBA PINO CARIBE ML 10.530 10.530 10.530 10.530 10.530 10.530 10.530 10.530
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.854 17.854 17.854 17.854 17.854 17.854 17.854 17.854
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
14,16 GUARDAESCOBA EN MADERA SAPAN CONSTRUCCIN
ML 35.085 35.085 35.085 35.085 35.085 35.085 35.085 35.085
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.980 8.980 8.980 8.980 8.980 8.980 8.980 8.980
14,18 LISTN M.H. AMARILLO M2 74.768 74.768 74.768 74.768 74.768 74.768 74.768 74.768
14,19 PASO ESCALERA GRANITO ML 118.993 117.699 118.224 119.238 119.623 118.224 120.148 118.573
14,20 PIRLANES ALUMINIO ML 7.278 7.278 7.278 7.278 7.278 7.278 7.278 7.278
14,21 PIRLANES LADRILLO ML 31.815 31.445 31.595 31.884 31.994 31.595 32.144 31.695
14,22 PISO VINILO TRFICO RESIDENCIAL M2 46.636 46.636 46.636 46.636 46.636 46.636 46.636 46.636
14,23 PISO VINILO TRFICO PESADO M2 54.347 54.347 54.347 54.347 54.347 54.347 54.347 54.347
14,24 PULIDA LACADA PISO MADERA M2 49.147 49.147 49.147 49.147 49.147 49.147 49.147 49.147
14,25 TABLETA DE GRES 25X25 M2 49.905 49.535 49.685 49.975 50.085 49.685 50.235 49.785
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 56.159 55.789 55.939 56.229 56.339 55.939 56.489 56.039
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.761 10.761 10.761 10.761 10.761 10.761 10.761 10.761
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 50.100 49.545 49.770 50.205 50.370 49.770 50.595 49.920
14,29 JABONERA PORCELANA ACUARIO UN 20.901 20.901 20.901 20.901 20.901 20.901 20.901 20.901
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14,30 UN 125.667 125.667 125.667 125.667 125.667 125.667 125.667 125.667
SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.767 9.767 9.767 9.767 9.767 9.767 9.767 9.767
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 22.734 22.734 22.734 22.734 22.734 22.734 22.734 22.734
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.417 14.417 14.417 14.417 14.417 14.417 14.417 14.417
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.993 13.993 13.993 13.993 13.993 13.993 13.993 13.993
14,35 REMATES BOCEL ALUMINIO ML 8.347 8.347 8.347 8.347 8.347 8.347 8.347 8.347
14,36 REMATES BOCEL PORCELANA ML 8.503 8.503 8.503 8.503 8.503 8.503 8.503 8.503
14,37 TAPA REGISTRO 20X20 UN 19.189 19.189 19.189 19.189 19.189 19.189 19.189 19.189
14,38 TAPA REGISTRO 6X6 UN 17.446 17.446 17.446 17.446 17.446 17.446 17.446 17.446
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 19.283 19.283 19.283 19.283 19.283 19.283 19.283 19.283
14,40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN SITIO M2 22.291 22.291 22.291 22.291 22.291 22.291 22.291 22.291
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 66.361 65.991 66.141 66.431 66.541 66.141 66.691 66.241
14,42 MEDIA CAA EN GRANITO ML 79.456 79.456 79.456 79.456 79.456 79.456 79.456 79.456
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.986 32.986 32.986 32.986 32.986 32.986 32.986 32.986
14,44 PINTURA ACRLICA PARA PISOS M2 13.315 13.315 13.315 13.315 13.315 13.315 13.315 13.315
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 104.875 104.875 104.875 104.875 104.875 104.875 104.875 104.875
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 126.491 126.491 126.491 126.491 126.491 126.491 126.491 126.491

15 CIELO RASO
15,1 APLIQUE YESO ML 74.584 74.584 74.584 74.584 74.584 74.584 74.584 74.584
15,2 ARMADURA MADERA Y MALLA M2 35.248 35.248 35.248 35.248 35.248 35.248 35.248 35.248
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 55.610 55.610 55.610 55.610 55.610 55.610 55.610 55.610
15,4 CIELO RASO DURACUSTIC M2 68.589 68.589 68.589 68.589 68.589 68.589 68.589 68.589
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 51.057 51.057 51.057 51.057 51.057 51.057 51.057 51.057
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 95.316 95.316 95.316 95.316 95.316 95.316 95.316 95.316
15,7 CORNISAS YESO ML 50.157 50.157 50.157 50.157 50.157 50.157 50.157 50.157
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 105.694 105.694 105.694 105.694 105.694 105.694 105.694 105.694
15,9 MALLA CON VENA M2 13.209 13.209 13.209 13.209 13.209 13.209 13.209 13.209

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE CONSTRUCCIN
M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 89.286 66.003 66.003 69.884 66.003 69.884 66.003 75.058
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 100.384 79.139 87.752 104.404 110.720 87.752 119.333 93.494
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 154.394 131.111 133.698 159.568 163.449 134.992 160.862 140.166
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 79.837 56.554 56.554 60.435 56.554 60.435 56.554 65.609
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 120.093 96.810 99.397 125.267 129.148 100.691 126.561 105.865
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 151.733 128.450 131.037 156.907 160.788 132.331 158.201 137.505

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 308.588 308.588 308.588 308.588 308.588 308.588 308.588 308.588
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 915.033 915.033 915.033 915.033 915.033 915.033 915.033 915.033
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 494.633 494.633 494.633 494.633 494.633 494.633 494.633 494.633
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 140.996 140.996 140.996 140.996 140.996 140.996 140.996 140.996
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 199.047 199.047 199.047 199.047 199.047 199.047 199.047 199.047
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 184.645 184.645 184.645 184.645 184.645 184.645 184.645 184.645
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 409.981 409.981 409.981 409.981 409.981 409.981 409.981 409.981
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 1.052.802 1.052.802 1.052.802 1.052.802 1.052.802 1.052.802 1.052.802 1.052.802
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 297.021 297.021 297.021 297.021 297.021 297.021 297.021 297.021
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 209.237 209.237 209.237 209.237 209.237 209.237 209.237 209.237
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 81.630 81.630 81.630 81.630 81.630 81.630 81.630 81.630
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49
17,12 UN 254.352 254.352 254.352 254.352 254.352 254.352 254.352 254.352
cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120
17,13 UN 376.064 376.064 376.064 376.064 376.064 376.064 376.064 376.064
X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.250 8.250 8.250 8.250 8.250 8.250 8.250 8.250
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 3.083 3.083 3.083 3.083 3.083 3.083 3.083 3.083
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.867 10.867 10.867 10.867 10.867 10.867 10.867 10.867
18,4 BARNIZ SOBRE MUEBLES M2 42.076 42.076 42.076 42.076 42.076 42.076 42.076 42.076
18,5 CARBURO SOBRE PAETES M2 5.704 5.704 5.704 5.704 5.704 5.704 5.704 5.704
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 67.350 67.350 67.350 67.350 67.350 67.350 67.350 67.350
18,7 DEMARCACIN CON MARMOLINA ML 3.373 3.373 3.373 3.373 3.373 3.373 3.373 3.373
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.756 2.756 2.756 2.756 2.756 2.756 2.756 2.756
18,9 ESMALTE SOBRE LMINA LLENA M2 13.741 13.741 13.741 13.741 13.741 13.741 13.741 13.741
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.998 3.998 3.998 3.998 3.998 3.998 3.998 3.998
18,11 ESMALTE SOBRE MADERA LLENA M2 14.497 14.497 14.497 14.497 14.497 14.497 14.497 14.497
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.786 5.786 5.786 5.786 5.786 5.786 5.786 5.786
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.559 6.559 6.559 6.559 6.559 6.559 6.559 6.559
18,14 ESTUCO M2 6.825 6.825 6.825 6.825 6.825 6.825 6.825 6.825
18,15 ESTUCO (LINEAL) ML 4.257 4.257 4.257 4.257 4.257 4.257 4.257 4.257
18,16 ESTUCO Y VINILO 3 MANOS M2 15.259 15.259 15.259 15.259 15.259 15.259 15.259 15.259
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.404 9.404 9.404 9.404 9.404 9.404 9.404 9.404
18,18 LACA PISOS MADERA M2 22.153 22.153 22.153 22.153 22.153 22.153 22.153 22.153
18,19 LNEAS TRFICO 0.10 ML 2.632 2.632 2.632 2.632 2.632 2.632 2.632 2.632
18,20 MARMOLINA SOBRE PAETE M2 12.224 12.224 12.224 12.224 12.224 12.224 12.224 12.224
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.290 3.290 3.290 3.290 3.290 3.290 3.290 3.290
18,22 TINTILLA SOBRE MADERA LLENA M2 12.439 12.439 12.439 12.439 12.439 12.439 12.439 12.439
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.975 6.975 6.975 6.975 6.975 6.975 6.975 6.975
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.357 4.357 4.357 4.357 4.357 4.357 4.357 4.357
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.829 21.829 21.829 21.829 21.829 21.829 21.829 21.829
18,26 PINTURA EPXICA M2 12.416 12.416 12.416 12.416 12.416 12.416 12.416 12.416
18,27 PINTURA EPXICA (LINEAL) ML 7.633 7.633 7.633 7.633 7.633 7.633 7.633 7.633
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
19 DOTACIONES DEPORTIVAS CONSTRUCCIN
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 6.249.276 6.249.276 6.249.276 6.249.276 6.249.276 6.249.276 6.249.276 6.249.276
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y CILINDRO
19,2 UN 11.041.424 11.041.424 11.041.424 11.041.424 11.041.424 11.041.424 11.041.424 11.041.424
PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.889.217 2.889.217 2.889.217 2.889.217 2.889.217 2.889.217 2.889.217 2.889.217
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 9.442.947 9.442.947 9.442.947 9.442.947 9.442.947 9.442.947 9.442.947 9.442.947
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.844.825 8.844.825 8.844.825 8.844.825 8.844.825 8.844.825 8.844.825 8.844.825
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.632 2.632 2.632 2.632 2.632 2.632 2.632 2.632
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 884.901 884.901 884.901 884.901 884.901 884.901 884.901 884.901
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 88.678 88.678 88.678 88.678 88.678 88.678 88.678 88.678
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.604.258 1.603.960 1.604.081 1.604.315 1.604.403 1.604.081 1.604.524 1.604.161
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 687.312 680.312 683.150 688.637 690.718 683.150 693.556 685.042

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 29.568 29.568 29.568 29.568 29.568 29.568 29.568 29.568
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 44.193 44.193 44.193 44.193 44.193 44.193 44.193 44.193
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 54.873 54.873 54.873 54.873 54.873 54.873 54.873 54.873
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.681 17.681 17.681 17.681 17.681 17.681 17.681 17.681
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 21.478 21.478 21.478 21.478 21.478 21.478 21.478 21.478
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 29.366 29.366 29.366 29.366 29.366 29.366 29.366 29.366
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.921 25.921 25.921 25.921 25.921 25.921 25.921 25.921
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 27.334 27.334 27.334 27.334 27.334 27.334 27.334 27.334
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 34.262 34.262 34.262 34.262 34.262 34.262 34.262 34.262
20,10 VLVULA DE BOLA GAS 1/2" UN 17.921 17.921 17.921 17.921 17.921 17.921 17.921 17.921
20,11 VLVULA DE BOLA GAS 3/4" UN 23.548 23.548 23.548 23.548 23.548 23.548 23.548 23.548
20,12 VLVULA DE BOLA GAS 1" UN 36.346 36.346 36.346 36.346 36.346 36.346 36.346 36.346
20,13 VLVULA POLIETILENO GAS 1/2" UN 280.034 280.034 280.034 280.034 280.034 280.034 280.034 280.034
20,14 VLVULA POLIETILENO GAS 3/4" UN 322.445 322.445 322.445 322.445 322.445 322.445 322.445 322.445
20,15 VLVULA POLIETILENO GAS 1" UN 336.069 336.069 336.069 336.069 336.069 336.069 336.069 336.069
20,16 ACOMETIDA GAS 1/2" ML 310.908 310.908 310.908 310.908 310.908 310.908 310.908 310.908

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 226.902 226.902 226.902 226.902 226.902 226.902 226.902 226.902
21,2 CABLE DETECTOR LINEAL DE CALOR ML 34.953 34.953 34.953 34.953 34.953 34.953 34.953 34.953
21,3 SIRENA DE 110 V UN 105.364 105.364 105.364 105.364 105.364 105.364 105.364 105.364
21,4 CMARA CCTV UN 263.137 263.137 263.137 263.137 263.137 263.137 263.137 263.137
21,5 PARLANTE-CIELO FALSO UN 52.289 52.289 52.289 52.289 52.289 52.289 52.289 52.289
21,6 AMPLIFICADOR 100W UN 584.191 584.191 584.191 584.191 584.191 584.191 584.191 584.191
21,7 AMPLIFICADOR 300W UN 1.458.309 1.458.309 1.458.309 1.458.309 1.458.309 1.458.309 1.458.309 1.458.309
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 43.125 43.125 43.125 43.125 43.125 43.125 43.125 43.125
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 227.534 227.534 227.534 227.534 227.534 227.534 227.534 227.534
21,10 TOMA PARA MICRFONO UN 43.825 43.825 43.825 43.825 43.825 43.825 43.825 43.825
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.811 3.811 3.811 3.811 3.811 3.811 3.811 3.811
21,12 SPLITERS UN 6.471 6.471 6.471 6.471 6.471 6.471 6.471 6.471
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 18.210 18.210 18.210 18.210 18.210 18.210 18.210 18.210
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.970 23.970 23.970 23.970 23.970 23.970 23.970 23.970
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 31.192 31.192 31.192 31.192 31.192 31.192 31.192 31.192
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 125.394 125.394 125.394 125.394 125.394 125.394 125.394 125.394
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 32.690 32.690 32.690 32.690 32.690 32.690 32.690 32.690
21,18 BANDEJA PORTACABLES PARA RACK UN 107.394 107.394 107.394 107.394 107.394 107.394 107.394 107.394
21,19 RACK 2' X 24" UN 182.813 182.813 182.813 182.813 182.813 182.813 182.813 182.813
21,20 RACK 3' X 24" UN 290.850 290.850 290.850 290.850 290.850 290.850 290.850 290.850
21,21 RACK 5' X 24" UN 359.691 359.691 359.691 359.691 359.691 359.691 359.691 359.691
21,22 RACK 7' X 24" UN 393.880 393.880 393.880 393.880 393.880 393.880 393.880 393.880
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A CONSTRUCCIN
UN 571.823 571.823 571.823 571.823 571.823 571.823 571.823 571.823
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 335.402 335.402 335.402 335.402 335.402 335.402 335.402 335.402
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 106.231 106.231 106.231 106.231 106.231 106.231 106.231 106.231
21,26 PATCH CORD 2M CATEGORA 6A UN 14.227 14.227 14.227 14.227 14.227 14.227 14.227 14.227
21,27 PATCH CORD 5M CATEGORA 6A UN 29.133 29.133 29.133 29.133 29.133 29.133 29.133 29.133
21,28 CABLE UTP CATEGORA 6A ML 5.024 5.024 5.024 5.024 5.024 5.024 5.024 5.024
21,29 CANALETA METLICA 4X6 CMS ML 35.160 35.160 35.160 35.160 35.160 35.160 35.160 35.160
21,30 CANALETA METLICA 4X10 CMS ML 36.789 36.789 36.789 36.789 36.789 36.789 36.789 36.789
21,31 CANALETA METLICA 6X10 CMS ML 37.604 37.604 37.604 37.604 37.604 37.604 37.604 37.604
21,32 CANALETA PLSTICA 13X7 MM ML 24.508 24.508 24.508 24.508 24.508 24.508 24.508 24.508
21,33 CANALETA PLSTICA 20X12 MM ML 27.188 27.188 27.188 27.188 27.188 27.188 27.188 27.188
21,34 CANALETA PLSTICA 32X12 MM ML 28.315 28.315 28.315 28.315 28.315 28.315 28.315 28.315
21,35 CANALETA PLSTICA 40X60 MM ML 48.110 48.110 48.110 48.110 48.110 48.110 48.110 48.110
21,36 SWITCH 10/100/1000 24 PUERTOS UN 625.902 625.902 625.902 625.902 625.902 625.902 625.902 625.902
21,37 SWITCH 10/100/1000 16 PUERTOS UN 320.020 320.020 320.020 320.020 320.020 320.020 320.020 320.020
21,38 SWITCH 10/100/1000 8 PUERTOS UN 87.988 87.988 87.988 87.988 87.988 87.988 87.988 87.988
21,39 CABLE TELEFNICO 2 PARES ML 1.837 1.837 1.837 1.837 1.837 1.837 1.837 1.837
21,40 CABLE TELEFNICO 10 PARES ML 8.504 8.504 8.504 8.504 8.504 8.504 8.504 8.504
21,41 CABLE TELEFNICO 20 PARES ML 12.781 12.781 12.781 12.781 12.781 12.781 12.781 12.781
21,42 CABLE TELEFNICO 40 PARES ML 21.410 21.410 21.410 21.410 21.410 21.410 21.410 21.410
21,43 CABLE TELEVISIN RG6 ML 3.932 3.932 3.932 3.932 3.932 3.932 3.932 3.932
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.699 21.699 21.699 21.699 21.699 21.699 21.699 21.699
21,45 ACOMETIDA TELEFNICA 1" ML 31.828 31.828 31.828 31.828 31.828 31.828 31.828 31.828
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 19.164 19.164 19.164 19.164 19.164 19.164 19.164 19.164
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 15.452 15.452 15.452 15.452 15.452 15.452 15.452 15.452
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 635.296 635.296 635.296 635.296 635.296 635.296 635.296 635.296
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 92.899 92.899 92.899 92.899 92.899 92.899 92.899 92.899
1,3 CODO 45 PVC UNIN MECNICA 8" UN 524.824 524.824 524.824 524.824 524.824 524.824 524.824 524.824
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.120.299 1.120.299 1.120.299 1.120.299 1.120.299 1.120.299 1.120.299 1.120.299
1,5 CODO 90 PVC UNIN MECNICA 4" UN 128.186 128.186 128.186 128.186 128.186 128.186 128.186 128.186
1,6 CODO 90 PVC UNIN MECNICA 8" UN 782.669 782.669 782.669 782.669 782.669 782.669 782.669 782.669
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.685.403 1.685.403 1.685.403 1.685.403 1.685.403 1.685.403 1.685.403 1.685.403
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 13.093 13.093 13.093 13.093 13.093 13.093 13.093 13.093
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 16.234 16.234 16.234 16.234 16.234 16.234 16.234 16.234
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 20.478 20.478 20.478 20.478 20.478 20.478 20.478 20.478
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 22.447 22.447 22.447 22.447 22.447 22.447 22.447 22.447
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 26.983 26.983 26.983 26.983 26.983 26.983 26.983 26.983
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 26.983 26.983 26.983 26.983 26.983 26.983 26.983 26.983
1,14 TAPN PVC UNIN MECNICA 3" UN 109.669 109.669 109.669 109.669 109.669 109.669 109.669 109.669
1,15 TAPN PVC UNIN MECNICA 4" UN 126.983 126.983 126.983 126.983 126.983 126.983 126.983 126.983
1,16 TAPN PVC UNIN MECNICA 8" UN 393.188 393.188 393.188 393.188 393.188 393.188 393.188 393.188
1,17 TEE PVC UNIN MECNICA 2" UN 147.714 147.714 147.714 147.714 147.714 147.714 147.714 147.714
1,18 TEE PVC UNIN MECNICA 4" UN 243.501 243.501 243.501 243.501 243.501 243.501 243.501 243.501
1,19 TEE PVC UNIN MECNICA 8" UN 1.078.608 1.078.608 1.078.608 1.078.608 1.078.608 1.078.608 1.078.608 1.078.608
1,20 TEE PVC UNIN MECNICA 10" UN 1.242.852 1.242.852 1.242.852 1.242.852 1.242.852 1.242.852 1.242.852 1.242.852
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 14.324 14.324 14.324 14.324 14.324 14.324 14.324 14.324
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.608 12.608 12.608 12.608 12.608 12.608 12.608 12.608
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 31.760 31.760 31.760 31.760 31.760 31.760 31.760 31.760
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 125.256 125.256 125.256 125.256 125.256 125.256 125.256 125.256
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 186.957 186.957 186.957 186.957 186.957 186.957 186.957 186.957
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 30.344 30.344 30.344 30.344 30.344 30.344 30.344 30.344
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 104.863 104.863 104.863 104.863 104.863 104.863 104.863 104.863
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 155.818 155.818 155.818 155.818 155.818 155.818 155.818 155.818
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 63.530 63.530 63.530 63.530 63.530 63.530 63.530 63.530
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 256.773 256.773 256.773 256.773 256.773 256.773 256.773 256.773
1,32 UNIN REPARACION PVC 4" UN 74.197 74.197 74.197 74.197 74.197 74.197 74.197 74.197
1,33 UNIN REPARACIN PVC 8" UN 298.893 298.893 298.893 298.893 298.893 298.893 298.893 298.893
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 178.134 178.134 178.134 178.134 178.134 178.134 178.134 178.134
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 510.004 510.004 510.004 510.004 510.004 510.004 510.004 510.004
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.369.820 1.369.820 1.369.820 1.369.820 1.369.820 1.369.820 1.369.820 1.369.820
1,37 VLVULA COMPUERTA ELSTICA 8" UN 2.024.231 2.024.231 2.024.231 2.024.231 2.024.231 2.024.231 2.024.231 2.024.231

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.522 10.522 10.522 10.522 10.522 10.522 10.522 10.522
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.973 23.973 23.973 23.973 23.973 23.973 23.973 23.973
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 78.930 59.512 67.384 82.602 88.375 67.384 96.247 72.632
2,5 RELLENO TIPO 2 "RECEBO" M3 84.507 61.224 61.224 65.105 61.224 65.105 61.224 70.279
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 84.507 61.224 61.224 65.105 61.224 65.105 61.224 70.279
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 91.544 76.172 78.221 76.172 78.221 79.246 89.495 83.346
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 65.171 69.954 51.590 49.500 51.590 52.634 63.082 56.813
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 105.955 81.914 91.660 110.502 117.649 91.660 127.395 98.157

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 117.253 117.253 117.253 117.253 117.253 117.253 117.253 117.253
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
3,2 CODO 45 PVC ALCANTARILLADO 16" CONSTRUCCIN
UN 1.224.999 1.224.999 1.224.999 1.224.999 1.224.999 1.224.999 1.224.999 1.224.999
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 153.316 153.316 153.316 153.316 153.316 153.316 153.316 153.316
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.418.919 1.418.919 1.418.919 1.418.919 1.418.919 1.418.919 1.418.919 1.418.919
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 988.771 988.771 988.771 988.771 988.771 988.771 988.771 988.771
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.747 62.747 62.747 62.747 62.747 62.747 62.747 62.747
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 116.394 116.394 116.394 116.394 116.394 116.394 116.394 116.394
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 275.124 275.124 275.124 275.124 275.124 275.124 275.124 275.124
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 275.118 275.118 275.118 275.118 275.118 275.118 275.118 275.118
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 441.825 441.825 441.825 441.825 441.825 441.825 441.825 441.825
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 116.443 116.443 116.443 116.443 116.443 116.443 116.443 116.443
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 116.443 116.443 116.443 116.443 116.443 116.443 116.443 116.443
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 275.124 275.124 275.124 275.124 275.124 275.124 275.124 275.124
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 275.124 275.124 275.124 275.124 275.124 275.124 275.124 275.124
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 441.825 441.825 441.825 441.825 441.825 441.825 441.825 441.825
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 442.018 442.018 442.018 442.018 442.018 442.018 442.018 442.018
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 719.030 719.030 719.030 719.030 719.030 719.030 719.030 719.030
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.154.452 1.154.452 1.154.452 1.154.452 1.154.452 1.154.452 1.154.452 1.154.452
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 71.237 71.237 71.237 71.237 71.237 71.237 71.237 71.237
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 369.537 369.537 369.537 369.537 369.537 369.537 369.537 369.537
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 415.753 415.753 415.753 415.753 415.753 415.753 415.753 415.753
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.150.508 1.150.508 1.150.508 1.150.508 1.150.508 1.150.508 1.150.508 1.150.508
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 67.209 66.961 67.062 67.256 67.330 67.062 67.430 67.129
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 334.804 334.804 334.804 334.804 334.804 334.804 334.804 334.804
3,25 TUBERA PVC ALCANTARILLADO 8" ML 51.005 51.005 51.005 51.005 51.005 51.005 51.005 51.005
3,26 TUBERA PVC ALCANTARILLADO 10" ML 72.241 72.241 72.241 72.241 72.241 72.241 72.241 72.241
3,27 TUBERA PVC ALCANTARILLADO 12" ML 104.367 104.367 104.367 104.367 104.367 104.367 104.367 104.367
3,28 TUBERA PVC ALCANTARILLADO 16" ML 160.260 160.260 160.260 160.260 160.260 160.260 160.260 160.260
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 257.782 257.782 257.782 257.782 257.782 257.782 257.782 257.782
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 373.236 373.236 373.236 373.236 373.236 373.236 373.236 373.236
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 472.581 472.581 472.581 472.581 472.581 472.581 472.581 472.581
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 621.457 621.457 621.457 621.457 621.457 621.457 621.457 621.457
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 855.491 855.491 855.491 855.491 855.491 855.491 855.491 855.491

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4,1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 666.809 650.008 656.819 669.988 674.982 656.819 681.793 661.360
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO
4,2 ML 653.113 641.334 646.109 655.342 658.844 646.109 663.619 649.293
E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y
4,3 UN 714.753 703.553 708.093 716.872 720.202 708.093 724.743 711.121
TAPA HF)
4,4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 793.434 772.433 780.947 797.408 803.651 780.947 812.165 786.623
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE INTERNO
4,5 ML 931.677 915.090 921.814 934.815 939.747 921.814 946.472 926.297
E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4,6 UN 825.758 810.357 816.601 828.672 833.250 816.601 839.494 820.763
Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 971.019 962.730 966.092 972.589 975.057 966.092 978.415 968.333
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.412.616 1.388.668 1.398.379 1.417.149 1.424.274 1.398.379 1.433.978 1.404.853
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.958.286 1.913.509 1.931.662 1.966.757 1.980.070 1.931.662 1.998.223 1.943.764
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.595.187 2.520.755 2.550.929 2.609.268 2.631.398 2.550.929 2.661.572 2.571.047
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.859.858 1.859.858 1.859.858 1.859.858 1.859.858 1.859.858 1.859.858 1.859.858
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.946.897 3.946.897 3.946.897 3.946.897 3.946.897 3.946.897 3.946.897 3.946.897
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAETE
4,13 UN 136.732 136.251 136.446 136.823 136.966 136.446 137.161 136.576
INTERNO Y DEMOLICIN)

5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 73.957 72.663 73.187 74.202 74.587 73.187 75.112 73.537
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
5,2 ADOQUN DE ARCILLA 20X10X8CM CONSTRUCCIN
M2 87.789 86.495 87.019 88.034 88.419 87.019 88.944 87.369
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 55.406 52.356 53.592 55.983 56.890 53.592 58.126 54.417
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 59.988 57.048 58.240 60.544 61.418 58.240 62.610 59.035
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 60.293 57.427 58.589 60.835 61.688 58.589 62.849 59.364
5,6 BORDE SEPARADOR VERDE A-170 ML 258.626 258.145 258.340 258.717 258.860 258.340 259.055 258.470
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.806 17.440 17.588 17.875 17.984 17.588 18.132 17.687
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 39.555 37.406 38.277 39.962 40.601 38.277 41.473 38.858
5,9 CAUELA PREFABRICADA TIPO A-120 ML 83.858 83.601 83.706 83.907 83.983 83.706 84.088 83.775
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 552.796 546.379 548.980 554.009 555.917 548.980 558.519 550.714
5,11 LOSETA PREFABRICADA A-40 M2 62.580 61.479 61.926 62.788 63.115 61.926 63.561 62.223
5,12 LOSETA PREFABRICADA A-60 M2 91.794 90.694 91.140 92.002 92.329 91.140 92.775 91.437
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 32.804 31.628 32.105 33.026 33.376 32.105 33.853 32.423
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 52.999 50.619 51.584 53.449 54.157 51.584 55.121 52.227
5,15 SARDINEL PREFABRICADO A-10 ML 102.793 98.954 99.456 103.637 104.311 99.655 104.017 100.520
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 60.324 59.658 59.928 60.450 60.648 59.928 60.918 60.108

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 204.751 203.351 203.919 205.016 205.432 203.919 206.000 204.297
6,2 BANCA EN CONCRETO M-30 UN 676.966 675.006 675.801 677.337 677.920 675.801 678.714 676.330
6,3 BOLARDO M-63 ALTO/HIERRO UN 216.605 216.310 216.430 216.661 216.749 216.430 216.868 216.510
6,4 BOLARDO M-60 CONCRETO UN 162.259 160.579 161.260 162.577 163.076 161.260 163.757 161.714
6,5 BOLARDO M-61 BAJO/CONCRETO UN 164.022 162.342 163.023 164.340 164.840 163.023 165.521 163.478
6,6 BOLARDO M-62 BAJO/HIERRO UN 193.054 191.285 192.002 193.388 193.914 192.002 194.631 192.480
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 58.457 57.465 57.867 58.644 58.939 57.867 59.341 58.135
6,8 BORDILLO PREFABRICADO A-80 ML 69.097 67.987 68.437 69.307 69.637 68.437 70.087 68.737
6,9 CANECA M-120 UN 317.124 316.876 316.976 317.170 317.244 316.976 317.345 317.043
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 835.120 834.280 834.621 835.279 835.529 834.621 835.869 834.848
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.441.093 3.440.533 3.440.760 3.441.199 3.441.365 3.440.760 3.441.592 3.440.911
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.540.082 3.539.522 3.539.749 3.540.188 3.540.354 3.539.749 3.540.581 3.539.900
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 494.164 493.574 493.813 494.275 494.451 493.813 494.690 493.973
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 654.371 652.013 652.969 654.817 655.518 652.969 656.474 653.606
6,15 BANCA EN MADERA M-50 UN 543.210 543.210 543.210 543.210 543.210 543.210 543.210 543.210
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 249.189 248.349 248.689 249.348 249.597 248.689 249.938 248.916
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 585.909 585.290 585.541 586.026 586.211 585.541 586.462 585.708
6,18 POSTE HISTRICO M-131 UN 6.542.103 6.537.903 6.539.606 6.542.898 6.544.146 6.539.606 6.545.849 6.540.741

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.112 4.112 4.112 4.112 4.112 4.112 4.112 4.112
7,2 MARCA VIAL CON PINTURA EN FRO M2 43.607 43.607 43.607 43.607 43.607 43.607 43.607 43.607
7,3 SEAL DOBLE DE CICLORUTA UN 317.961 317.720 317.818 318.006 318.078 317.818 318.175 317.883
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 499.975 498.796 499.274 500.198 500.549 499.274 501.027 499.593
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 235.838 235.598 235.695 235.884 235.955 235.695 236.052 235.760
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 250.690 250.450 250.547 250.736 250.807 250.547 250.904 250.612
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 261.937 261.697 261.794 261.983 262.054 261.794 262.151 261.859
7,8 TACHAS REFLECTIVAS UN 13.694 13.694 13.694 13.694 13.694 13.694 13.694 13.694
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 14.635 14.635 14.635 14.635 14.635 14.635 14.635 14.635
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7,10 UN 119.611 119.611 119.611 119.611 119.611 119.611 119.611 119.611
INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 35.028 35.028 35.028 35.028 35.028 35.028 35.028 35.028
2,3 210.2.2 EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 600.2 M3 63.815 63.815 63.815 63.815 63.815 63.815 63.815 63.815
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 600.3 M3 78.085 78.085 78.085 78.085 78.085 78.085 78.085 78.085
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE SOBRANTES A
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO DE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO DE
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE RETIRO
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 131.891 102.173 105.475 138.495 143.448 107.126 140.146 113.730
3,3 330.1 BASE GRANULAR M3 163.531 133.813 137.115 170.135 175.088 138.766 171.786 145.370
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.255 3.255 3.255 3.255 3.255 3.255 3.255 3.255
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.113 1.113 1.113 1.113 1.113 1.113 1.113 1.113
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 222.786 217.427 219.600 223.800 225.394 219.600 227.566 221.048
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 66.675 64.993 65.675 66.993 67.493 65.675 68.175 66.130
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 561.101 662.701 683.338 592.851 565.863 678.576 605.551 699.213
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 598.288 699.888 720.526 630.038 603.051 715.763 642.738 736.401
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 620.649 722.249 742.887 652.399 625.412 738.124 665.099 758.762
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 628.038 729.638 750.276 659.788 632.801 745.513 672.488 766.151
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 314.638 284.920 288.222 321.242 326.195 289.873 322.893 296.477
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 281.610 251.892 255.194 288.214 293.167 256.845 289.865 263.449
3,15 311.1 AFIRMADO M3 91.635 61.917 61.917 66.870 61.917 66.870 61.917 73.474
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 CONSTRUCCIN
M2 11.484 11.114 11.264 11.554 11.664 11.264 11.814 11.364
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.622 4.437 4.512 4.657 4.712 4.512 4.787 4.562
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3,18 500.1 M3 630.831 603.800 614.758 635.945 643.981 614.758 654.940 622.064
TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3,19 500.1 M3 663.397 635.156 646.605 668.740 677.136 646.605 688.585 654.238
TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3,20 500.1 M3 685.154 656.089 667.872 690.653 699.294 667.872 711.078 675.728
TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE LIMPIEZA,
3,21 *** ML 6.874 6.874 6.874 6.874 6.874 6.874 6.874 6.874
SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 96.447 96.920 78.286 75.492 78.286 79.683 93.653 85.271

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 892.637 861.975 874.405 898.438 907.554 874.405 919.984 882.692
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 771.872 741.717 753.942 777.576 786.541 753.942 798.765 762.092
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 816.189 784.840 797.549 822.119 831.439 797.549 844.147 806.022
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 560.288 532.718 543.895 565.504 573.701 543.895 584.878 551.347
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 652.221 623.559 635.178 657.643 666.165 635.178 677.784 642.925
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 557.354 529.073 540.539 562.705 571.112 540.539 582.578 548.182
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 649.171 619.770 631.689 654.734 663.474 631.689 675.393 639.636
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 709.231 680.950 692.415 714.582 722.989 692.415 734.454 700.059
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 576.187 546.786 558.706 581.750 590.490 558.706 602.410 566.652
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 751.067 721.666 733.585 756.630 765.370 733.585 777.290 741.532

4,11 650 P SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 11.640 11.640 11.640 11.640 11.640 11.640 11.640 11.640
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-588
4,12 650 P KG 15.049 15.049 15.049 15.049 15.049 15.049 15.049 15.049
GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.767 1.767 1.767 1.767 1.767 1.767 1.767 1.767
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO TREMIE
4,14 621.1 ML 2.684.744 2.684.744 2.684.744 2.684.744 2.684.744 2.684.744 2.684.744 2.684.744
3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN MANUAL
4,15 621.1 P ML 4.004.174 3.951.725 3.972.988 4.014.096 4.029.689 3.972.988 4.050.951 3.987.163
(INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.670.630 1.642.629 1.653.981 1.675.928 1.684.252 1.653.981 1.695.604 1.661.549
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 87.643 87.643 87.643 87.643 87.643 87.643 87.643 87.643
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 354.493 351.133 352.495 355.129 356.128 352.495 357.490 353.403
4,19 632 P BARANDA METLICA ML 418.722 418.722 418.722 418.722 418.722 418.722 418.722 418.722
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.956 16.956 16.956 16.956 16.956 16.956 16.956 16.956
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 490.696 442.489 454.618 481.117 486.963 457.666 499.093 469.817
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 110.426 89.471 92.265 89.471 92.265 93.662 107.632 99.250
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 99.408 71.976 71.976 76.548 71.976 76.548 71.976 82.644
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 375.917 346.149 358.217 381.548 390.398 358.217 402.467 366.262
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 355.709 338.197 338.591 351.435 357.708 339.099 370.465 345.910
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 364.150 346.638 347.031 359.875 366.148 347.539 378.906 354.350
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 370.575 353.319 353.608 366.253 372.450 354.116 385.104 360.859
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 379.016 361.759 362.049 374.693 380.890 362.557 393.545 369.299
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 507.496 478.158 490.051 513.047 521.768 490.051 533.663 497.981
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 597.567 567.067 579.431 603.338 612.404 579.431 624.770 587.675
4,31 681.1 GAVIN M3 182.794 183.245 165.458 162.791 165.458 166.792 180.127 172.126
4,32 681.1 GAVIN MALLA PVC M3 187.033 187.485 169.698 167.031 169.698 171.031 184.366 176.365
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 41.184 39.383 40.113 41.524 42.060 40.113 42.790 40.600
4,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 16.093 15.193 15.558 16.264 16.531 15.558 16.897 15.801
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA
4,35 *** M2 10.126 10.126 10.126 10.126 10.126 10.126 10.126 10.126
LTIMA 25 KN)
4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 14.502 14.502 14.502 14.502 14.502 14.502 14.502 14.502
4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 19.570 19.570 19.570 19.570 19.570 19.570 19.570 19.570
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Gachal Gachet Gama Guasca Guatavita Junn La_Calera Ubal
u
4,38 ***
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA CONSTRUCCIN
M2 23.490 23.490 23.490 23.490 23.490 23.490 23.490 23.490
LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4,39 *** M2 30.229 30.229 30.229 30.229 30.229 30.229 30.229 30.229
LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN, FILTRO Y
4,40 *** M2 7.268 7.268 7.268 7.268 7.268 7.268 7.268 7.268
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN, FILTRO Y
4,41 *** M2 8.297 8.297 8.297 8.297 8.297 8.297 8.297 8.297
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN, FILTRO Y
4,42 *** M2 8.627 8.627 8.627 8.627 8.627 8.627 8.627 8.627
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN, FILTRO Y
4,43 *** M2 6.116 6.116 6.116 6.116 6.116 6.116 6.116 6.116
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN, FILTRO Y
4,44 *** M2 9.265 9.265 9.265 9.265 9.265 9.265 9.265 9.265
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN, FILTRO Y
4,45 *** M2 7.536 7.536 7.536 7.536 7.536 7.536 7.536 7.536
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN, FILTRO Y
4,46 *** M2 9.265 9.265 9.265 9.265 9.265 9.265 9.265 9.265
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN, FILTRO Y
4,47 *** M2 17.901 17.901 17.901 17.901 17.901 17.901 17.901 17.901
SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36" CLASE I,
4,48 661.1 ML 636.415 635.991 636.163 636.496 636.622 636.163 636.794 636.278
INCLUYE EMBOQUILLADA
4,49 660.3 SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600 MM ML 365.008 358.633 361.218 366.215 368.110 361.218 370.695 362.941
4,50 *** SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO 36" ML 892.701 892.701 892.701 892.701 892.701 892.701 892.701 892.701
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 157.285 128.710 128.710 133.473 128.710 133.473 128.710 139.823
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.463 4.463 4.463 4.463 4.463 4.463 4.463 4.463
4,53 *** GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 87.037 87.037 87.037 87.037 87.037 87.037 87.037 87.037
4,54 *** GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 132.665 132.665 132.665 132.665 132.665 132.665 132.665 132.665
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 520.083 489.583 501.948 525.854 534.921 501.948 547.287 510.191
4,56 682.1 P COLCHONETA RENO M3 198.129 198.581 180.794 178.127 180.794 182.127 195.462 187.461
4,57 *** TRINCHO EN MADERA M2 68.751 68.751 68.751 68.751 68.751 68.751 68.751 68.751

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.111 4.111 4.111 4.111 4.111 4.111 4.111 4.111
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 43.607 43.607 43.607 43.607 43.607 43.607 43.607 43.607
5,3 730.3 TOPE DEFENSA METLICA UN 84.867 84.867 84.867 84.867 84.867 84.867 84.867 84.867
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 70.535 70.535 70.535 70.535 70.535 70.535 70.535 70.535
5,5 730.1 DEFENSA METLICA ML 148.962 147.591 148.147 149.221 149.629 148.147 150.185 148.518
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 13.694 13.694 13.694 13.694 13.694 13.694 13.694 13.694

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 819 819 819 819 819 819 819 819
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36", INCLUYE
6,2 801.6 UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE DESCOLES Y
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 15.487 15.487 15.487 15.487 15.487 15.487 15.487 15.487
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 25.205 25.205 25.205 25.205 25.205 25.205 25.205 25.205
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.790 9.790 9.790 9.790 9.790 9.790 9.790 9.790

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 2.014.901 1.994.989 1.996.464 2.002.364 2.000.151 1.981.714 1.992.777
1,2 CAMPAMENTO 9 M2 UN 1.169.773 1.159.817 1.160.554 1.163.504 1.162.398 1.153.179 1.158.710
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.909 13.909 13.909 13.909 13.909 13.909 13.909
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.599 15.599 15.599 15.599 15.599 15.599 15.599
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 18.010 18.010 18.010 18.010 18.010 18.010 18.010
1,6 CERCA EN TABLA H=2.30 M ML 66.430 66.430 66.430 66.430 66.430 66.430 66.430
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 46.658 46.444 46.459 46.523 46.499 46.301 46.420
1,8 CERCA EN TELA VERDE H = 2.10 M ML 21.495 21.281 21.296 21.360 21.336 21.138 21.257
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 918.469 914.386 921.892 915.032 916.884 913.907 913.106
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.566 10.566 10.566 10.566 10.566 10.566 10.566
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.795 3.795 3.795 3.795 3.795 3.795 3.795
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.732.923 2.732.923 2.732.923 2.732.923 2.732.923 2.732.923 2.732.923
1,44 RED TELEFNICA PROVISIONAL UN 250.958 250.958 250.958 250.958 250.958 250.958 250.958
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 103.879 73.069 80.830 76.715 103.879 90.944 65.074
2,2 BASE ARENA CEMENTO 1:20 M3 213.621 193.765 195.236 201.119 198.914 180.527 191.559
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 CONSTRUCCIN
22.405 22.405 22.405 22.405 22.405 22.405 22.405
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 646.006 624.930 626.491 632.736 630.395 610.879 622.588
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 646.873 625.132 626.742 633.185 630.769 610.638 622.716
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 601.337 580.979 582.487 588.520 586.258 567.408 578.717
2,9 PILOTE DE MADERA D=20 CM ML 48.418 48.418 48.418 48.418 48.418 48.418 48.418
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 ML 149.303 149.303 149.303 149.303 149.303 149.303 149.303
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 ML 188.137 188.137 188.137 188.137 188.137 188.137 188.137
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,12 ML 235.100 235.100 235.100 235.100 235.100 235.100 235.100
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 ML 298.319 298.319 298.319 298.319 298.319 298.319 298.319
DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 104.142 102.670 102.779 103.215 103.052 101.689 102.506
2,15 PILOTE HINCADO 30X30 ML 129.244 127.111 127.269 127.901 127.664 125.688 126.873
2,16 DADOS EN CONCRETO 3500PSI M3 587.976 567.619 569.126 575.159 572.897 554.047 565.357
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,17 ML 89.379 89.379 89.379 89.379 89.379 89.379 89.379
MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 38.466 38.342 38.351 38.388 38.374 38.260 38.328
3,2 SIFN EN PVC 6" UN 202.079 201.955 201.965 202.001 201.987 201.873 201.942
3,3 CAJA DE INSPECCIN DE 100X100 UN 465.783 441.400 502.992 443.239 459.664 443.757 431.829
3,4 CAJA DE INSPECCIN DE 40X40 UN 225.846 221.821 227.161 222.705 223.872 220.708 220.795
3,5 CAJA DE INSPECCIN DE 60X60 UN 258.512 251.986 260.393 253.450 255.261 250.103 250.352
3,6 CAJA DE INSPECCIN DE 80X80 UN 341.850 332.257 340.891 334.857 336.327 328.329 330.282
3,7 DUCTO ELCTRICO PVC 4" ML 101.433 101.238 101.973 101.224 101.433 101.333 101.134
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.311.869 1.309.926 1.317.273 1.309.779 1.311.869 1.310.874 1.308.884
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 116.327 114.964 115.065 115.469 115.317 114.055 114.812
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 73.964 73.245 73.298 73.511 73.431 72.765 73.165
3,11 TUBERA DRENAJE PVC 110 ML 28.121 27.735 27.764 27.878 27.835 27.478 27.692
3,12 TUBERA DRENAJE PVC 160 ML 45.515 45.129 45.158 45.272 45.229 44.872 45.086
3,13 TUBERA DRENAJE PVC 200 ML 59.899 59.359 59.399 59.559 59.499 58.999 59.299
3,14 TUBERA DRENAJE PVC 250 ML 82.178 81.562 81.607 81.790 81.722 81.150 81.493
3,15 TUBERA DRENAJE PVC 315 ML 113.878 113.339 113.379 113.539 113.479 112.979 113.279
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3,16 UN 979.742 973.573 974.030 975.858 975.173 969.461 972.888
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3,17 UN 1.390.287 1.377.949 1.378.863 1.382.519 1.381.148 1.369.724 1.376.578
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3,18 UN 1.818.450 1.793.775 1.795.602 1.802.914 1.800.172 1.777.324 1.791.032
FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 42.638 42.638 42.638 42.638 42.638 42.638 42.638
4,2 CASETN DE LONA 0.80X0.70 M2 56.523 56.523 56.523 56.523 56.523 56.523 56.523
4,3 COLUMNAS 3500 PSI M3 804.239 783.881 785.389 791.422 789.160 770.310 781.619
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 252.580 239.611 240.989 243.996 251.749 235.123 238.170
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4,5 M2 99.819 97.843 97.989 98.575 98.355 96.525 97.623
REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4,6 M2 117.938 115.566 115.742 116.445 116.181 113.985 115.303
REFUERZO, CONCRETO DE 3500 PSI
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 129.475 126.312 126.547 127.484 127.132 124.204 125.961
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 136.646 133.286 133.535 134.530 134.157 131.046 132.912
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 156.905 152.754 153.061 154.291 153.830 149.987 152.293
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 174.659 169.916 170.267 171.673 171.146 166.754 169.389
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 CONSTRUCCIN
193.854 188.518 188.913 190.494 189.901 184.960 187.925
4,12 ENTREPISO VIGUETA PLACA M2 100.275 99.937 99.962 100.062 100.025 99.711 99.899
4,13 ESCALERA MACIZA 3500 PSI M3 953.789 933.431 934.939 940.972 938.710 919.860 931.169
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 96.678 96.410 96.430 96.509 96.479 96.231 96.380
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 79.510 77.474 77.625 78.228 78.002 76.117 77.248
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 89.586 87.095 87.280 88.018 87.741 85.435 86.819
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 104.564 101.441 101.672 102.598 102.251 99.359 101.094
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 703.455 683.097 684.605 690.638 688.376 669.526 680.835
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 48.422 47.799 47.845 48.030 47.961 47.384 47.730
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 281.823 272.731 273.404 276.099 275.088 266.670 271.721
4,21 ACERO FIGURADO 37000 PSI KG 4.260 4.260 4.260 4.260 4.260 4.260 4.260
4,22 ACERO FIGURADO 60000 PSI KG 4.468 4.468 4.468 4.468 4.468 4.468 4.468
4,23 REFUERZO MALLA ELECTROSOLDADA KG 6.148 6.148 6.148 6.148 6.148 6.148 6.148
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 844.323 823.965 825.473 831.506 829.244 810.394 821.704
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 773.060 750.775 752.426 759.029 756.554 735.920 748.300
4,26 VIGA AREA 3500 PSI M3 840.941 820.583 822.091 828.123 825.861 807.011 818.321
4,27 VIGA CINTA 3500 PSI M3 822.016 801.658 803.166 809.199 806.937 788.087 799.397
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.021.602 1.001.244 1.002.752 1.008.785 1.006.523 987.673 998.983
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 330.331 307.542 309.231 315.983 313.450 292.350 305.011

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 29.107 28.568 28.608 28.768 28.708 28.209 28.509
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 48.456 47.917 47.957 48.117 48.057 47.558 47.857
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 34.492 34.369 34.378 34.414 34.401 34.286 34.355
5,4 ARCOS EN LADRILLO PRENSADO ML 161.254 161.007 161.025 161.098 161.071 160.843 160.980
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 43.445 42.823 42.869 43.053 42.984 42.407 42.753
5,6 DINTELES EN BLOQUE 0.15 M ML 26.831 26.563 26.583 26.663 26.633 26.385 26.534
5,7 ENCHAPES LADRILLO PRENSADO M2 100.671 100.178 100.214 100.361 100.306 99.849 100.123
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 91.479 89.403 89.557 90.172 89.941 88.020 89.173
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 91.330 91.330 91.330 91.330 91.330 91.330 91.330
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 53.147 53.147 53.147 53.147 53.147 53.147 53.147
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 87.852 87.852 87.852 87.852 87.852 87.852 87.852
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 51.408 51.408 51.408 51.408 51.408 51.408 51.408
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 102.580 102.580 102.580 102.580 102.580 102.580 102.580
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 60.020 60.020 60.020 60.020 60.020 60.020 60.020
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 114.379 114.379 114.379 114.379 114.379 114.379 114.379
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 65.919 65.919 65.919 65.919 65.919 65.919 65.919
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 40.846 40.599 40.617 40.690 40.663 40.433 40.571
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 24.497 24.373 24.382 24.419 24.405 24.290 24.359
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 53.591 53.426 53.438 53.487 53.469 53.316 53.408
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 31.875 31.793 31.799 31.823 31.814 31.738 31.783
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 60.229 60.064 60.076 60.125 60.107 59.954 60.046
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 35.830 35.747 35.754 35.778 35.769 35.692 35.738
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 100.409 99.583 99.644 99.889 99.797 99.032 99.491
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 58.778 58.365 58.395 58.518 58.472 58.089 58.319
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 37.323 37.157 37.170 37.219 37.200 37.047 37.139
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 22.420 22.338 22.344 22.368 22.359 22.283 22.329
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 74.646 74.316 74.340 74.438 74.402 74.096 74.279
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 44.558 44.392 44.405 44.454 44.435 44.282 44.374
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 89.196 88.928 88.948 89.027 88.997 88.749 88.898
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 53.416 53.282 53.292 53.332 53.317 53.193 53.267
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 185.259 184.102 184.188 184.531 184.402 183.331 183.974
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 109.999 109.420 109.463 109.634 109.570 109.035 109.356
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 CONSTRUCCIN
91.188 90.629 90.670 90.836 90.774 90.256 90.567
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 54.412 54.133 54.153 54.236 54.205 53.946 54.102
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 47.299 46.929 46.957 47.066 47.025 46.683 46.888
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 28.464 28.279 28.293 28.348 28.327 28.156 28.259
5,37 MURO TOLETE COMN 0.06 M M2 33.751 33.586 33.598 33.647 33.629 33.476 33.568
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 20.375 20.292 20.299 20.323 20.314 20.237 20.283
5,39 MURO TOLETE COMN 0.12 M M2 51.564 51.233 51.258 51.356 51.319 51.013 51.197
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 31.241 31.076 31.088 31.137 31.118 30.965 31.057
5,41 MURO TOLETE COMN 0.25 M M2 99.630 99.134 99.171 99.317 99.262 98.803 99.079
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 59.964 59.716 59.735 59.808 59.781 59.551 59.689
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 72.616 72.285 72.310 72.408 72.371 72.065 72.249
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 43.425 43.259 43.272 43.321 43.302 43.149 43.241
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 153.430 152.274 152.359 152.702 152.574 151.502 152.145
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 92.268 91.689 91.732 91.904 91.839 91.304 91.625
5,47 REMATES LADRILLO PRENSADO ML 31.720 31.596 31.605 31.642 31.628 31.514 31.582
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 36.677 36.275 36.305 36.424 36.379 36.007 36.230
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 61.791 61.255 61.294 61.453 61.394 60.897 61.195
5,50 LAVADA DE FACHADA M2 5.007 5.007 5.007 5.007 5.007 5.007 5.007
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 48.809 48.270 48.310 48.470 48.410 47.911 48.211
5,52 DOVELA, GROUTING 3000 PSI ML 10.144 10.144 10.144 10.144 10.144 10.144 10.144
5,53 ANCLAJE 3/8" L=30CM UN 13.539 13.539 13.539 13.539 13.539 13.539 13.539
5,54 ANCLAJE 1/2" L=50CM UN 17.734 17.734 17.734 17.734 17.734 17.734 17.734
5,55 ANCLAJE 5/8" L=70CM UN 25.052 25.052 25.052 25.052 25.052 25.052 25.052
5,56 ANCLAJE 3/4" L=70CM UN 37.662 37.662 37.662 37.662 37.662 37.662 37.662
5,57 ANCLAJE 1" L= 70CM UN 4.896 4.743 4.754 4.800 4.783 4.641 4.726

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.537 15.537 15.537 15.537 15.537 15.537 15.537
6,2 FILOS O DILATACIONES B/PLACA ML 5.650 5.526 5.535 5.572 5.558 5.444 5.512
6,3 FILOS O DILATACIONES S/MURO ML 6.769 6.646 6.655 6.692 6.678 6.564 6.632
6,4 GOTERA EN MORTERO 1:4 ML 8.057 7.934 7.943 7.980 7.966 7.852 7.920
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.842 6.842 6.842 6.842 6.842 6.842 6.842
6,6 MALLA BAJO ENTRAMADO M2 13.312 13.312 13.312 13.312 13.312 13.312 13.312
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 23.768 23.377 23.406 23.522 23.478 23.116 23.333
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 14.333 14.138 14.152 14.210 14.189 14.007 14.116
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 20.810 20.463 20.489 20.592 20.553 20.232 20.425
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.562 12.388 12.401 12.452 12.433 12.273 12.369
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 20.094 19.702 19.731 19.847 19.804 19.441 19.659
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 12.203 12.008 12.022 12.080 12.059 11.877 11.986
6,13 PAETE CULATAS 1:4, E=2 CM M2 20.810 20.463 20.489 20.592 20.553 20.232 20.425
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.562 12.388 12.401 12.452 12.433 12.273 12.369
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 21.409 21.130 21.151 21.233 21.202 20.944 21.099
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.860 12.721 12.731 12.772 12.757 12.628 12.705
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 17.255 16.991 17.010 17.089 17.059 16.814 16.961
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.512 10.380 10.389 10.429 10.414 10.291 10.365
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.709 16.411 16.433 16.521 16.488 16.212 16.378
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.239 10.090 10.101 10.145 10.128 9.990 10.073
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 21.545 21.198 21.224 21.327 21.288 20.967 21.159
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.910 12.737 12.750 12.801 12.782 12.621 12.717
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 20.829 20.437 20.466 20.582 20.539 20.176 20.394
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.552 12.356 12.371 12.429 12.407 12.226 12.335
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 17.286 16.987 17.009 17.098 17.065 16.789 16.954
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.510 10.361 10.372 10.416 10.400 10.262 10.345
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 CONSTRUCCIN
21.668 21.277 21.306 21.422 21.378 21.016 21.234
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 13.354 13.158 13.172 13.230 13.209 13.028 13.136

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 26.580 26.084 26.121 26.267 26.212 25.753 26.029
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7,2 M2 83.924 82.886 82.963 83.270 83.155 82.194 82.771
TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 56.112 56.112 56.112 56.112 56.112 56.112 56.112
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 22.097 22.097 22.097 22.097 22.097 22.097 22.097
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 34.795 34.795 34.795 34.795 34.795 34.795 34.795
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 82.216 82.216 82.216 82.216 82.216 82.216 82.216
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 64.218 64.218 64.218 64.218 64.218 64.218 64.218
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 37.037 37.037 37.037 37.037 37.037 37.037 37.037
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 86.200 86.200 86.200 86.200 86.200 86.200 86.200
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 103.077 103.077 103.077 103.077 103.077 103.077 103.077
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 151.832 151.832 151.832 151.832 151.832 151.832 151.832
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 59.422 59.422 59.422 59.422 59.422 59.422 59.422
7,13 CANAL PVC AMAZONAS ML 82.255 82.255 82.255 82.255 82.255 82.255 82.255
7,14 CANAL PVC RAINGO ML 74.644 74.644 74.644 74.644 74.644 74.644 74.644
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 133.816 133.816 133.816 133.816 133.816 133.816 133.816
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 78.330 78.330 78.330 78.330 78.330 78.330 78.330
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 57.383 57.383 57.383 57.383 57.383 57.383 57.383
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 32.074 32.074 32.074 32.074 32.074 32.074 32.074
7,19 TEJA DE BARRO M2 59.290 58.674 58.719 58.902 58.834 58.263 58.605
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 47.856 47.856 47.856 47.856 47.856 47.856 47.856
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 43.833 43.833 43.833 43.833 43.833 43.833 43.833
7,22 TEJA FIBROCEMENTO N4 M2 36.532 36.532 36.532 36.532 36.532 36.532 36.532
7,23 TEJA FIBROCEMENTO No. 6 M2 35.809 35.809 35.809 35.809 35.809 35.809 35.809
7,24 TEJA FIBROCEMENTO No. 8 M2 36.085 36.085 36.085 36.085 36.085 36.085 36.085
7,25 TEJA TERMOACSTICA M2 51.157 51.157 51.157 51.157 51.157 51.157 51.157
7,26 TEJA PLSTICA No.6 M2 44.888 44.888 44.888 44.888 44.888 44.888 44.888
7,27 TEJA ESPAOLA ETERNIT M2 82.652 82.652 82.652 82.652 82.652 82.652 82.652
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 153.252 153.252 153.252 153.252 153.252 153.252 153.252
7,29 TEJA SIN TRASLAPO M2 68.657 68.657 68.657 68.657 68.657 68.657 68.657
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 41.976 41.976 41.976 41.976 41.976 41.976 41.976
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 33.063 33.063 33.063 33.063 33.063 33.063 33.063
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7,32 M2 58.393 58.393 58.393 58.393 58.393 58.393 58.393
ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.682 19.682 19.682 19.682 19.682 19.682 19.682
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.831 23.831 23.831 23.831 23.831 23.831 23.831
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.937 25.937 25.937 25.937 25.937 25.937 25.937
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 33.596 33.596 33.596 33.596 33.596 33.596 33.596
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.991 21.991 21.991 21.991 21.991 21.991 21.991
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 51.874 51.874 51.874 51.874 51.874 51.874 51.874
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 364.517 364.517 364.517 364.517 364.517 364.517 364.517
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 403.672 403.672 403.672 403.672 403.672 403.672 403.672
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 274.216 274.216 274.216 274.216 274.216 274.216 274.216
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 293.768 293.768 293.768 293.768 293.768 293.768 293.768

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 464.363 443.031 444.611 450.932 448.561 428.809 440.660
8,2 CONCRETO 3500 PSI M3 406.223 386.458 387.922 393.779 391.583 373.282 384.262
8,3 CONCRETO 3000 PSI M3 404.428 383.966 385.481 391.544 389.271 370.324 381.692
8,4 CONCRETO 2500 PSI M3 358.439 337.683 339.220 345.370 343.064 323.845 335.377
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
8,5 CONCRETO 2000 PSI M3 CONSTRUCCIN
335.509 314.108 315.693 322.034 319.656 299.841 311.730
8,6 CONCRETO 1500 PSI M3 306.441 284.316 285.955 292.511 290.052 269.566 281.858
8,7 MORTERO SECO 1:10 M3 254.191 237.172 238.433 243.476 241.585 225.825 235.281
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 466.074 449.548 450.772 455.669 453.833 438.530 447.712
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 431.952 413.317 414.698 420.219 418.149 400.895 411.248
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 493.800 476.373 477.664 482.827 480.891 464.755 474.437
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 725.680 708.253 709.544 714.707 712.771 696.635 706.317

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 124.174 124.174 124.174 124.174 124.174 124.174 124.174
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 4.048 3.925 3.934 3.971 3.957 3.843 3.911
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 138.363 138.363 138.363 138.363 138.363 138.363 138.363
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 170.105 170.105 170.105 170.105 170.105 170.105 170.105
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 249.790 249.790 249.790 249.790 249.790 249.790 249.790
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 278.179 278.179 278.179 278.179 278.179 278.179 278.179
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 306.598 306.598 306.598 306.598 306.598 306.598 306.598
9,8 HOJA PUERTA FORTEC 0.81 UN 203.981 203.981 203.981 203.981 203.981 203.981 203.981
9,9 HOJA PUERTA FORTEC 0.91 UN 231.363 231.363 231.363 231.363 231.363 231.363 231.363
9,10 HOJA PUERTA FORTEC 1.50 UN 340.892 340.892 340.892 340.892 340.892 340.892 340.892
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 128.680 128.680 128.680 128.680 128.680 128.680 128.680
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 171.123 171.123 171.123 171.123 171.123 171.123 171.123
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 190.290 190.290 190.290 190.290 190.290 190.290 190.290
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 486.018 486.018 486.018 486.018 486.018 486.018 486.018
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 42.227 42.227 42.227 42.227 42.227 42.227 42.227
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.952 25.952 25.952 25.952 25.952 25.952 25.952
9,17 VENTANERA EN MADERA CEDRO MACHO M2 99.775 99.775 99.775 99.775 99.775 99.775 99.775
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 124.102 124.102 124.102 124.102 124.102 124.102 124.102
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 96.309 96.309 96.309 96.309 96.309 96.309 96.309
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 29.551 29.551 29.551 29.551 29.551 29.551 29.551
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 29.551 29.551 29.551 29.551 29.551 29.551 29.551
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 27.990 27.990 27.990 27.990 27.990 27.990 27.990
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 42.687 42.687 42.687 42.687 42.687 42.687 42.687
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 53.058 53.058 53.058 53.058 53.058 53.058 53.058
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 64.120 64.120 64.120 64.120 64.120 64.120 64.120
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 77.257 77.257 77.257 77.257 77.257 77.257 77.257
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 366.275 366.275 366.275 366.275 366.275 366.275 366.275
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 255.652 255.652 255.652 255.652 255.652 255.652 255.652
9,29 VIDRIO TRANSPARENTE 3 MM M2 33.699 33.699 33.699 33.699 33.699 33.699 33.699
9,30 VIDRIO TRANSPARENTE 4 MM M2 43.379 43.379 43.379 43.379 43.379 43.379 43.379
9,31 VIDRIO TRANSPARENTE 5 MM M2 53.058 53.058 53.058 53.058 53.058 53.058 53.058
9,32 VIDRIO TRANSPARENTE 6 MM M2 66.885 66.885 66.885 66.885 66.885 66.885 66.885

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 76.524 76.524 76.524 76.524 76.524 76.524 76.524
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 215.578 215.578 215.578 215.578 215.578 215.578 215.578
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10,3 ML 80.602 80.602 80.602 80.602 80.602 80.602 80.602
ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 142.819 142.819 142.819 142.819 142.819 142.819 142.819
10,5 MARCO TAPA CAJA DE INSPECCIN UN 137.027 137.027 137.027 137.027 137.027 137.027 137.027
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 89.936 89.936 89.936 89.936 89.936 89.936 89.936
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 212.729 212.729 212.729 212.729 212.729 212.729 212.729
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 110.364 110.364 110.364 110.364 110.364 110.364 110.364
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.595 6.595 6.595 6.595 6.595 6.595 6.595
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
M2 CONSTRUCCIN
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO
10,10 98.173 98.173 98.173 98.173 98.173 98.173 98.173
ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 40.468 40.468 40.468 40.468 40.468 40.468 40.468
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 550.800 550.800 550.800 550.800 550.800 550.800 550.800
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 197.182 197.182 197.182 197.182 197.182 197.182 197.182
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 219.615 219.615 219.615 219.615 219.615 219.615 219.615
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10,15 M2 501.188 501.188 501.188 501.188 501.188 501.188 501.188
ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 127.267 127.267 127.267 127.267 127.267 127.267 127.267
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 402.177 402.177 402.177 402.177 402.177 402.177 402.177
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 6.036 6.036 6.036 6.036 6.036 6.036 6.036
10,19 VENTANA EN ALUMINIO CORREDIZA M2 281.739 281.739 281.739 281.739 281.739 281.739 281.739
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 121.489 121.489 121.489 121.489 121.489 121.489 121.489
10,21 REJILLA PISO 0.30 M M2 86.857 86.857 86.857 86.857 86.857 86.857 86.857
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 89.416 89.416 89.416 89.416 89.416 89.416 89.416
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10,23 KG 10.491 10.491 10.491 10.491 10.491 10.491 10.491
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN,
SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10,24 KG 11.677 11.677 11.677 11.677 11.677 11.677 11.677
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,25 KG 9.213 9.213 9.213 9.213 9.213 9.213 9.213
COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 219.248 219.248 219.248 219.248 219.248 219.248 219.248
11,2 ACOMETIDA EN PVC 3/4" 5M UN 265.967 265.967 265.967 265.967 265.967 265.967 265.967
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 22.097 22.097 22.097 22.097 22.097 22.097 22.097
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 34.795 34.795 34.795 34.795 34.795 34.795 34.795
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 33.209 33.209 33.209 33.209 33.209 33.209 33.209
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 42.739 42.739 42.739 42.739 42.739 42.739 42.739
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 88.573 88.573 88.573 88.573 88.573 88.573 88.573
11,8 CONEXIN TANQUE ELEVADO PVC UN 220.647 220.647 220.647 220.647 220.647 220.647 220.647
11,9 INSTALACIN APARATO SANITARIO UN 41.915 41.915 41.915 41.915 41.915 41.915 41.915
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 34.705 34.705 34.705 34.705 34.705 34.705 34.705
11,13 NIPLE PASAMURO 2" UN 65.384 65.384 65.384 65.384 65.384 65.384 65.384
11,14 NIPLE PASAMURO 4" UN 97.904 97.904 97.904 97.904 97.904 97.904 97.904
11,15 PUNTO AGUA CALIENTE CPVC UN 83.247 83.247 83.247 83.247 83.247 83.247 83.247
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 59.917 59.917 59.917 59.917 59.917 59.917 59.917
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 63.925 63.925 63.925 63.925 63.925 63.925 63.925
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 80.818 80.818 80.818 80.818 80.818 80.818 80.818
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 65.659 65.659 65.659 65.659 65.659 65.659 65.659
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 82.763 82.763 82.763 82.763 82.763 82.763 82.763
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 88.690 88.690 88.690 88.690 88.690 88.690 88.690
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 74.204 74.204 74.204 74.204 74.204 74.204 74.204
11,23 RED SUMINISTRO CPVC 1/2" ML 12.508 12.508 12.508 12.508 12.508 12.508 12.508
11,24 RED SUMINISTRO CPVC 3/4" ML 17.729 17.729 17.729 17.729 17.729 17.729 17.729
11,25 RED SUMINISTRO PVC 1 1/2" ML 23.123 23.123 23.123 23.123 23.123 23.123 23.123
11,26 RED SUMINISTRO PVC 1" ML 14.209 14.209 14.209 14.209 14.209 14.209 14.209
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
11,27 RED SUMINISTRO PVC 1/2" ML CONSTRUCCIN
8.439 8.439 8.439 8.439 8.439 8.439 8.439
11,28 RED SUMINISTRO PVC 2 1/2" ML 51.800 51.800 51.800 51.800 51.800 51.800 51.800
11,29 RED SUMINISTRO PVC 2" ML 33.039 33.039 33.039 33.039 33.039 33.039 33.039
11,30 RED SUMINISTRO PVC 3/4" ML 10.602 10.602 10.602 10.602 10.602 10.602 10.602
11,31 RED SANITARIA PVC-S 2" ML 25.411 25.411 25.411 25.411 25.411 25.411 25.411
11,32 RED SANITARIA PVC-S 3" ML 35.346 35.346 35.346 35.346 35.346 35.346 35.346
11,33 RED SANITARIA PVC-S 4" ML 48.028 48.028 48.028 48.028 48.028 48.028 48.028
11,34 RED SANITARIA PVC-S 6" ML 90.409 90.409 90.409 90.409 90.409 90.409 90.409
11,35 REGISTRO 1" UN 109.226 109.226 109.226 109.226 109.226 109.226 109.226
11,36 REGISTRO 1/2" UN 60.793 60.793 60.793 60.793 60.793 60.793 60.793
11,37 REGISTRO 3/4" UN 77.660 77.660 77.660 77.660 77.660 77.660 77.660
11,38 REGISTRO 1 1/2" UN 188.360 188.360 188.360 188.360 188.360 188.360 188.360
11,39 REGISTRO 2 1/2" UN 389.646 389.646 389.646 389.646 389.646 389.646 389.646
11,40 REGISTRO 2" UN 287.396 287.396 287.396 287.396 287.396 287.396 287.396
11,41 REVENTILACIN 2" ML 17.650 17.650 17.650 17.650 17.650 17.650 17.650
11,42 REVENTILACIN 3" ML 22.300 22.300 22.300 22.300 22.300 22.300 22.300
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 173.597 173.597 173.597 173.597 173.597 173.597 173.597

11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 283.672 283.672 283.672 283.672 283.672 283.672 283.672

11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 472.879 472.879 472.879 472.879 472.879 472.879 472.879

TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11,46 ML 41.000 41.000 41.000 41.000 41.000 41.000 41.000
SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,47 ML 48.376 48.376 48.376 48.376 48.376 48.376 48.376
SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,48 ML 61.678 61.678 61.678 61.678 61.678 61.678 61.678
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,49 ML 70.291 70.291 70.291 70.291 70.291 70.291 70.291
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,50 ML 90.625 90.625 90.625 90.625 90.625 90.625 90.625
SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11,51 ML 104.241 104.241 104.241 104.241 104.241 104.241 104.241
SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11,52 ML 153.857 153.857 153.857 153.857 153.857 153.857 153.857
SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 61.622 61.622 61.622 61.622 61.622 61.622 61.622
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 61.881 61.881 61.881 61.881 61.881 61.881 61.881
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 40.292 40.292 40.292 40.292 40.292 40.292 40.292
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 49.821 49.821 49.821 49.821 49.821 49.821 49.821
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.250 4.250 4.250 4.250 4.250 4.250 4.250
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.717 6.717 6.717 6.717 6.717 6.717 6.717
11,59 GABINETE TIPO III UN 1.034.227 1.034.227 1.034.227 1.034.227 1.034.227 1.034.227 1.034.227
11,60 GABINETE TIPO I UN 788.061 788.061 788.061 788.061 788.061 788.061 788.061
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.669.004 2.669.004 2.669.004 2.669.004 2.669.004 2.669.004 2.669.004
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.223.682 2.223.682 2.223.682 2.223.682 2.223.682 2.223.682 2.223.682
11,63 VLVULA MARIPOSA 3" UN 639.607 639.607 639.607 639.607 639.607 639.607 639.607
11,64 VLVULA MARIPOSA 4" UN 830.187 830.187 830.187 830.187 830.187 830.187 830.187
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 322.231 322.231 322.231 322.231 322.231 322.231 322.231

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 368.815 368.815 368.815 368.815 368.815 368.815 368.815
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN CONSTRUCCIN
58.621 58.621 58.621 58.621 58.621 58.621 58.621
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 69.521 69.521 69.521 69.521 69.521 69.521 69.521
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 77.036 77.036 77.036 77.036 77.036 77.036 77.036
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 90.894 90.894 90.894 90.894 90.894 90.894 90.894
12,6 SALIDA TELFONO PVC COMPLETA UN 55.041 55.041 55.041 55.041 55.041 55.041 55.041
12,7 SALIDA TIMBRE PVC COMPLETA UN 62.793 62.793 62.793 62.793 62.793 62.793 62.793
12,8 STRIP TELEFNICO 10 PARES UN 144.124 144.124 144.124 144.124 144.124 144.124 144.124
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 56.567 56.567 56.567 56.567 56.567 56.567 56.567
12,10 SALIDA TRIFSICA PVC COMPLETA UN 130.170 130.170 130.170 130.170 130.170 130.170 130.170
12,11 SALIDA T.V PVC COMPLETA. UN 77.707 77.707 77.707 77.707 77.707 77.707 77.707
12,12 SALIDA BIFSICA C.N. UN 46.100 46.100 46.100 46.100 46.100 46.100 46.100
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 96.786 96.786 96.786 96.786 96.786 96.786 96.786
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 412.877 412.877 412.877 412.877 412.877 412.877 412.877
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 550.740 550.740 550.740 550.740 550.740 550.740 550.740
12,16 TUBERA PVC CONDUIT 1/2" ML 3.569 3.569 3.569 3.569 3.569 3.569 3.569
12,17 TUBERA PVC CONDUIT 3/4" ML 4.708 4.708 4.708 4.708 4.708 4.708 4.708
12,18 TUBERA PVC CONDUIT 1" ML 7.339 7.339 7.339 7.339 7.339 7.339 7.339
12,19 TUBERA PVC CONDUIT 1 1/2" ML 13.115 13.115 13.115 13.115 13.115 13.115 13.115
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 275.977 275.977 275.977 275.977 275.977 275.977 275.977
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 77.703 77.703 77.703 77.703 77.703 77.703 77.703
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 105.658 105.658 105.658 105.658 105.658 105.658 105.658
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 42.337 42.337 42.337 42.337 42.337 42.337 42.337
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.408.801 1.408.801 1.408.801 1.408.801 1.408.801 1.408.801 1.408.801
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.043.808 1.043.808 1.043.808 1.043.808 1.043.808 1.043.808 1.043.808
12,26 POSTE METLICO 6M UN 1.319.123 1.319.123 1.319.123 1.319.123 1.319.123 1.319.123 1.319.123
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 615.821 615.821 615.821 615.821 615.821 615.821 615.821
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 111.416 111.416 111.416 111.416 111.416 111.416 111.416
12,29 LUMINARIA 70W SODIO UN 516.982 516.982 516.982 516.982 516.982 516.982 516.982
12,30 LUMINARIA 150W SODIO UN 647.220 647.220 647.220 647.220 647.220 647.220 647.220
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.712.207 1.712.207 1.712.207 1.712.207 1.712.207 1.712.207 1.712.207
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.260.399 1.260.399 1.260.399 1.260.399 1.260.399 1.260.399 1.260.399

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 40.113 39.443 39.492 39.691 39.617 38.996 39.368
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 40.233 39.562 39.612 39.811 39.736 39.116 39.488
13,3 ALISTADO PARA LISTN M2 14.525 14.391 14.401 14.440 14.425 14.301 14.376
13,4 ALISTADO PISOS 1:3, E=0.04 M2 29.050 27.710 27.809 28.206 28.057 26.816 27.561
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 87.352 86.011 86.111 86.508 86.359 85.118 85.862
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.973 25.545 25.577 25.704 25.656 25.260 25.497
13,7 CONCRETO BASE GRADAS 2500 PSI M2 57.506 55.431 55.584 56.199 55.969 54.047 55.200
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 80.269 76.948 77.194 78.178 77.809 74.734 76.579
13,9 MANTO FIBERGLASS 600X1 M2 30.669 30.669 30.669 30.669 30.669 30.669 30.669
13,10 PEGANTE MORTERO-CONCRETO M2 22.824 22.824 22.824 22.824 22.824 22.824 22.824
13,11 PERMA PLY 2 CAPAS M2 26.669 26.669 26.669 26.669 26.669 26.669 26.669
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 46.957 45.089 45.227 45.781 45.573 43.844 44.881
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 55.109 52.826 52.995 53.672 53.418 51.304 52.573
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 80.172 76.643 76.905 77.950 77.558 74.291 76.251
13,15 TRITURADO FINO 1/2 M3 105.853 89.968 91.144 95.851 94.086 79.378 88.203
13,16 TRITURADO GRUESO 3/4 M3 114.147 92.806 123.199 97.244 104.094 87.548 87.128

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 57.745 57.477 57.497 57.576 57.547 57.298 57.447
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 34.231 34.097 34.107 34.146 34.131 34.007 34.082
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
14,3 ADOQUN CONCRETO 6CM M2 CONSTRUCCIN
66.202 65.531 65.581 65.780 65.705 65.085 65.457
14,4 ADOQUN CONCRETO 8CM M2 69.602 68.931 68.981 69.180 69.105 68.485 68.857
14,5 ADOQUN GRES PEATONAL M2 73.931 73.261 73.310 73.509 73.434 72.814 73.186
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14,6 M2 76.607 76.339 76.358 76.438 76.408 76.160 76.309
INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 36.016 35.725 35.746 35.833 35.800 35.531 35.693
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 167.544 166.337 166.427 166.784 166.650 165.533 166.203
14,9 ACABADO EN GRAVILLA LAVADA M2 45.522 44.806 44.859 45.072 44.992 44.329 44.727
14,10 GUARDAESCOBA EN GRANITO ML 43.210 43.210 43.210 43.210 43.210 43.210 43.210
14,11 GUARDAESCOBA EN GRAVILLA ML 10.057 9.766 9.788 9.874 9.841 9.572 9.734
14,12 GUARDAESCOBA PVC CARAMELO ML 9.600 9.600 9.600 9.600 9.600 9.600 9.600
14,13 GUARDAESCOBA PVC CEDRO ML 12.917 12.917 12.917 12.917 12.917 12.917 12.917
14,14 GUARDAESCOBA PINO CARIBE ML 10.538 10.538 10.538 10.538 10.538 10.538 10.538
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.869 17.869 17.869 17.869 17.869 17.869 17.869
14,16 GUARDAESCOBA EN MADERA SAPAN ML 35.119 35.119 35.119 35.119 35.119 35.119 35.119
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.982 8.982 8.982 8.982 8.982 8.982 8.982
14,18 LISTN M.H. AMARILLO M2 74.822 74.822 74.822 74.822 74.822 74.822 74.822
14,19 PASO ESCALERA GRANITO ML 119.310 118.371 118.441 118.719 118.615 117.746 118.267
14,20 PIRLANES ALUMINIO ML 7.279 7.279 7.279 7.279 7.279 7.279 7.279
14,21 PIRLANES LADRILLO ML 31.789 31.542 31.560 31.634 31.606 31.378 31.515
14,22 PISO VINILO TRFICO RESIDENCIAL M2 46.678 46.678 46.678 46.678 46.678 46.678 46.678
14,23 PISO VINILO TRFICO PESADO M2 54.399 54.399 54.399 54.399 54.399 54.399 54.399
14,24 PULIDA LACADA PISO MADERA M2 49.179 49.179 49.179 49.179 49.179 49.179 49.179
14,25 TABLETA DE GRES 25X25 M2 50.012 49.744 49.764 49.843 49.813 49.565 49.714
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 56.273 56.005 56.025 56.104 56.075 55.826 55.975
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.765 10.765 10.765 10.765 10.765 10.765 10.765
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 50.069 49.699 49.727 49.836 49.795 49.453 49.658
14,29 JABONERA PORCELANA ACUARIO UN 20.919 20.919 20.919 20.919 20.919 20.919 20.919
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14,30 UN 125.783 125.783 125.783 125.783 125.783 125.783 125.783
Y PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.771 9.771 9.771 9.771 9.771 9.771 9.771
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 22.753 22.753 22.753 22.753 22.753 22.753 22.753
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.426 14.426 14.426 14.426 14.426 14.426 14.426
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 14.001 14.001 14.001 14.001 14.001 14.001 14.001
14,35 REMATES BOCEL ALUMINIO ML 8.350 8.350 8.350 8.350 8.350 8.350 8.350
14,36 REMATES BOCEL PORCELANA ML 8.505 8.505 8.505 8.505 8.505 8.505 8.505
14,37 TAPA REGISTRO 20X20 UN 19.203 19.203 19.203 19.203 19.203 19.203 19.203
14,38 TAPA REGISTRO 6X6 UN 17.458 17.458 17.458 17.458 17.458 17.458 17.458
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 19.304 19.304 19.304 19.304 19.304 19.304 19.304
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN
14,40 M2 22.316 22.316 22.316 22.316 22.316 22.316 22.316
SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 66.490 66.222 66.242 66.321 66.292 66.043 66.192
14,42 MEDIA CAA EN GRANITO ML 79.538 79.538 79.538 79.538 79.538 79.538 79.538
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.990 32.990 32.990 32.990 32.990 32.990 32.990
14,44 PINTURA ACRLICA PARA PISOS M2 13.324 13.324 13.324 13.324 13.324 13.324 13.324
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 104.992 104.992 104.992 104.992 104.992 104.992 104.992
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 126.622 126.622 126.622 126.622 126.622 126.622 126.622

15 CIELO RASO
15,1 APLIQUE YESO ML 74.660 74.660 74.660 74.660 74.660 74.660 74.660
15,2 ARMADURA MADERA Y MALLA M2 35.259 35.259 35.259 35.259 35.259 35.259 35.259
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 55.646 55.646 55.646 55.646 55.646 55.646 55.646
15,4 CIELO RASO DURACUSTIC M2 68.641 68.641 68.641 68.641 68.641 68.641 68.641
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 51.092 51.092 51.092 51.092 51.092 51.092 51.092
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 CONSTRUCCIN
95.396 95.396 95.396 95.396 95.396 95.396 95.396
15,7 CORNISAS YESO ML 50.209 50.209 50.209 50.209 50.209 50.209 50.209
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 105.788 105.788 105.788 105.788 105.788 105.788 105.788
15,9 MALLA CON VENA M2 13.214 13.214 13.214 13.214 13.214 13.214 13.214

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 89.059 63.806 159.317 61.895 89.059 76.124 50.254
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 114.454 97.187 98.466 103.582 101.664 85.675 95.268
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 137.579 137.579 138.872 136.285 164.742 163.449 137.579
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 94.430 63.620 71.381 67.266 94.430 81.495 55.625
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 124.338 124.338 125.631 123.044 151.501 141.524 124.338
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 134.918 134.918 136.211 133.624 162.081 160.788 134.918

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 308.891 308.891 308.891 308.891 308.891 308.891 308.891

17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 916.018 916.018 916.018 916.018 916.018 916.018 916.018

17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 495.147 495.147 495.147 495.147 495.147 495.147 495.147
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 141.105 141.105 141.105 141.105 141.105 141.105 141.105
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 199.226 199.226 199.226 199.226 199.226 199.226 199.226

17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 184.809 184.809 184.809 184.809 184.809 184.809 184.809
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 410.399 410.399 410.399 410.399 410.399 410.399 410.399
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 1.053.945 1.053.945 1.053.945 1.053.945 1.053.945 1.053.945 1.053.945
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 297.311 297.311 297.311 297.311 297.311 297.311 297.311
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 209.423 209.423 209.423 209.423 209.423 209.423 209.423
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 81.676 81.676 81.676 81.676 81.676 81.676 81.676
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO
17,12 UN 254.596 254.596 254.596 254.596 254.596 254.596 254.596
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO
17,13 UN 376.447 376.447 376.447 376.447 376.447 376.447 376.447
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.255 8.255 8.255 8.255 8.255 8.255 8.255
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 3.084 3.084 3.084 3.084 3.084 3.084 3.084
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.870 10.870 10.870 10.870 10.870 10.870 10.870
18,4 BARNIZ SOBRE MUEBLES M2 42.101 42.101 42.101 42.101 42.101 42.101 42.101
18,5 CARBURO SOBRE PAETES M2 5.707 5.707 5.707 5.707 5.707 5.707 5.707
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 67.419 67.419 67.419 67.419 67.419 67.419 67.419
18,7 DEMARCACIN CON MARMOLINA ML 3.374 3.374 3.374 3.374 3.374 3.374 3.374
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.757 2.757 2.757 2.757 2.757 2.757 2.757
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
18,9 ESMALTE SOBRE LMINA LLENA M2 CONSTRUCCIN
13.747 13.747 13.747 13.747 13.747 13.747 13.747
18,10 ESMALTE SOBRE MADERA LINEAL ML 4.000 4.000 4.000 4.000 4.000 4.000 4.000
18,11 ESMALTE SOBRE MADERA LLENA M2 14.504 14.504 14.504 14.504 14.504 14.504 14.504
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.791 5.791 5.791 5.791 5.791 5.791 5.791
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.563 6.563 6.563 6.563 6.563 6.563 6.563
18,14 ESTUCO M2 6.827 6.827 6.827 6.827 6.827 6.827 6.827
18,15 ESTUCO (LINEAL) ML 4.258 4.258 4.258 4.258 4.258 4.258 4.258
18,16 ESTUCO Y VINILO 3 MANOS M2 15.266 15.266 15.266 15.266 15.266 15.266 15.266
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.407 9.407 9.407 9.407 9.407 9.407 9.407
18,18 LACA PISOS MADERA M2 22.160 22.160 22.160 22.160 22.160 22.160 22.160
18,19 LNEAS TRFICO 0.10 ML 2.633 2.633 2.633 2.633 2.633 2.633 2.633
18,20 MARMOLINA SOBRE PAETE M2 12.233 12.233 12.233 12.233 12.233 12.233 12.233
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.292 3.292 3.292 3.292 3.292 3.292 3.292
18,22 TINTILLA SOBRE MADERA LLENA M2 12.445 12.445 12.445 12.445 12.445 12.445 12.445
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.978 6.978 6.978 6.978 6.978 6.978 6.978
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.358 4.358 4.358 4.358 4.358 4.358 4.358
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.844 21.844 21.844 21.844 21.844 21.844 21.844
18,26 PINTURA EPXICA M2 12.421 12.421 12.421 12.421 12.421 12.421 12.421
18,27 PINTURA EPXICA (LINEAL) ML 7.636 7.636 7.636 7.636 7.636 7.636 7.636

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 6.256.289 6.256.289 6.256.289 6.256.289 6.256.289 6.256.289 6.256.289
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y
19,2 UN 11.053.814 11.053.814 11.053.814 11.053.814 11.053.814 11.053.814 11.053.814
CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.892.454 2.892.454 2.892.454 2.892.454 2.892.454 2.892.454 2.892.454
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 9.453.539 9.453.539 9.453.539 9.453.539 9.453.539 9.453.539 9.453.539
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.854.773 8.854.773 8.854.773 8.854.773 8.854.773 8.854.773 8.854.773
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.633 2.633 2.633 2.633 2.633 2.633 2.633
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 885.865 885.865 885.865 885.865 885.865 885.865 885.865
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 88.779 88.779 88.779 88.779 88.779 88.779 88.779
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.606.089 1.605.876 1.605.892 1.605.955 1.605.931 1.605.734 1.605.852
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 689.518 684.403 684.782 686.297 685.729 680.992 683.834

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 29.589 29.589 29.589 29.589 29.589 29.589 29.589
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 44.229 44.229 44.229 44.229 44.229 44.229 44.229
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 54.920 54.920 54.920 54.920 54.920 54.920 54.920
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.693 17.693 17.693 17.693 17.693 17.693 17.693
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 21.494 21.494 21.494 21.494 21.494 21.494 21.494
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 29.388 29.388 29.388 29.388 29.388 29.388 29.388
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.933 25.933 25.933 25.933 25.933 25.933 25.933
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 27.346 27.346 27.346 27.346 27.346 27.346 27.346
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 34.281 34.281 34.281 34.281 34.281 34.281 34.281
20,10 VLVULA DE BOLA GAS 1/2" UN 17.938 17.938 17.938 17.938 17.938 17.938 17.938
20,11 VLVULA DE BOLA GAS 3/4" UN 23.571 23.571 23.571 23.571 23.571 23.571 23.571
20,12 VLVULA DE BOLA GAS 1" UN 36.383 36.383 36.383 36.383 36.383 36.383 36.383
20,13 VLVULA POLIETILENO GAS 1/2" UN 280.335 280.335 280.335 280.335 280.335 280.335 280.335
20,14 VLVULA POLIETILENO GAS 3/4" UN 322.793 322.793 322.793 322.793 322.793 322.793 322.793
20,15 VLVULA POLIETILENO GAS 1" UN 336.429 336.429 336.429 336.429 336.429 336.429 336.429
20,16 ACOMETIDA GAS 1/2" ML 311.228 311.228 311.228 311.228 311.228 311.228 311.228

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 227.137 227.137 227.137 227.137 227.137 227.137 227.137
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
21,2 CABLE DETECTOR LINEAL DE CALOR ML CONSTRUCCIN
34.992 34.992 34.992 34.992 34.992 34.992 34.992
21,3 SIRENA DE 110 V UN 105.466 105.466 105.466 105.466 105.466 105.466 105.466
21,4 CMARA CCTV UN 263.326 263.326 263.326 263.326 263.326 263.326 263.326
21,5 PARLANTE-CIELO FALSO UN 52.330 52.330 52.330 52.330 52.330 52.330 52.330
21,6 AMPLIFICADOR 100W UN 584.763 584.763 584.763 584.763 584.763 584.763 584.763
21,7 AMPLIFICADOR 300W UN 1.459.874 1.459.874 1.459.874 1.459.874 1.459.874 1.459.874 1.459.874
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 43.132 43.132 43.132 43.132 43.132 43.132 43.132
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 227.778 227.778 227.778 227.778 227.778 227.778 227.778
21,10 TOMA PARA MICRFONO UN 43.853 43.853 43.853 43.853 43.853 43.853 43.853
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.814 3.814 3.814 3.814 3.814 3.814 3.814
21,12 SPLITERS UN 6.478 6.478 6.478 6.478 6.478 6.478 6.478
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 18.217 18.217 18.217 18.217 18.217 18.217 18.217
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.981 23.981 23.981 23.981 23.981 23.981 23.981
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 31.208 31.208 31.208 31.208 31.208 31.208 31.208
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 125.520 125.520 125.520 125.520 125.520 125.520 125.520
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 32.722 32.722 32.722 32.722 32.722 32.722 32.722
21,18 BANDEJA PORTACABLES PARA RACK UN 107.508 107.508 107.508 107.508 107.508 107.508 107.508
21,19 RACK 2' X 24" UN 182.929 182.929 182.929 182.929 182.929 182.929 182.929
21,20 RACK 3' X 24" UN 291.089 291.089 291.089 291.089 291.089 291.089 291.089
21,21 RACK 5' X 24" UN 359.962 359.962 359.962 359.962 359.962 359.962 359.962
21,22 RACK 7' X 24" UN 394.190 394.190 394.190 394.190 394.190 394.190 394.190
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 572.198 572.198 572.198 572.198 572.198 572.198 572.198
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 335.600 335.600 335.600 335.600 335.600 335.600 335.600
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 106.341 106.341 106.341 106.341 106.341 106.341 106.341
21,26 PATCH CORD 2M CATEGORA 6A UN 14.242 14.242 14.242 14.242 14.242 14.242 14.242
21,27 PATCH CORD 5M CATEGORA 6A UN 29.165 29.165 29.165 29.165 29.165 29.165 29.165
21,28 CABLE UTP CATEGORA 6A ML 5.028 5.028 5.028 5.028 5.028 5.028 5.028
21,29 CANALETA METLICA 4X6 CMS ML 35.186 35.186 35.186 35.186 35.186 35.186 35.186
21,30 CANALETA METLICA 4X10 CMS ML 36.818 36.818 36.818 36.818 36.818 36.818 36.818
21,31 CANALETA METLICA 6X10 CMS ML 37.632 37.632 37.632 37.632 37.632 37.632 37.632
21,32 CANALETA PLSTICA 13X7 MM ML 24.523 24.523 24.523 24.523 24.523 24.523 24.523
21,33 CANALETA PLSTICA 20X12 MM ML 27.208 27.208 27.208 27.208 27.208 27.208 27.208
21,34 CANALETA PLSTICA 32X12 MM ML 28.334 28.334 28.334 28.334 28.334 28.334 28.334
21,35 CANALETA PLSTICA 40X60 MM ML 48.153 48.153 48.153 48.153 48.153 48.153 48.153
21,36 SWITCH 10/100/1000 24 PUERTOS UN 626.521 626.521 626.521 626.521 626.521 626.521 626.521
21,37 SWITCH 10/100/1000 16 PUERTOS UN 320.315 320.315 320.315 320.315 320.315 320.315 320.315
21,38 SWITCH 10/100/1000 8 PUERTOS UN 88.042 88.042 88.042 88.042 88.042 88.042 88.042
21,39 CABLE TELEFNICO 2 PARES ML 1.838 1.838 1.838 1.838 1.838 1.838 1.838
21,40 CABLE TELEFNICO 10 PARES ML 8.510 8.510 8.510 8.510 8.510 8.510 8.510
21,41 CABLE TELEFNICO 20 PARES ML 12.792 12.792 12.792 12.792 12.792 12.792 12.792
21,42 CABLE TELEFNICO 40 PARES ML 21.430 21.430 21.430 21.430 21.430 21.430 21.430
21,43 CABLE TELEVISIN RG6 ML 3.935 3.935 3.935 3.935 3.935 3.935 3.935
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.707 21.707 21.707 21.707 21.707 21.707 21.707
21,45 ACOMETIDA TELEFNICA 1" ML 31.841 31.841 31.841 31.841 31.841 31.841 31.841
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 19.175 19.175 19.175 19.175 19.175 19.175 19.175
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 15.464 15.464 15.464 15.464 15.464 15.464 15.464
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 635.977 635.977 635.977 635.977 635.977 635.977 635.977
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 92.997 92.997 92.997 92.997 92.997 92.997 92.997
1,3 CODO 45 PVC UNIN MECNICA 8" UN 525.403 525.403 525.403 525.403 525.403 525.403 525.403
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.121.540 1.121.540 1.121.540 1.121.540 1.121.540 1.121.540 1.121.540
1,5 CODO 90 PVC UNIN MECNICA 4" UN 128.324 128.324 128.324 128.324 128.324 128.324 128.324
1,6 CODO 90 PVC UNIN MECNICA 8" UN 783.541 783.541 783.541 783.541 783.541 783.541 783.541
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.687.298 1.687.298 1.687.298 1.687.298 1.687.298 1.687.298 1.687.298
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 13.102 13.102 13.102 13.102 13.102 13.102 13.102
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 16.247 16.247 16.247 16.247 16.247 16.247 16.247
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 20.495 20.495 20.495 20.495 20.495 20.495 20.495
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 22.467 22.467 22.467 22.467 22.467 22.467 22.467
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 27.008 27.008 27.008 27.008 27.008 27.008 27.008
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 27.008 27.008 27.008 27.008 27.008 27.008 27.008
1,14 TAPN PVC UNIN MECNICA 3" UN 109.789 109.789 109.789 109.789 109.789 109.789 109.789
1,15 TAPN PVC UNIN MECNICA 4" UN 127.121 127.121 127.121 127.121 127.121 127.121 127.121
1,16 TAPN PVC UNIN MECNICA 8" UN 393.618 393.618 393.618 393.618 393.618 393.618 393.618
1,17 TEE PVC UNIN MECNICA 2" UN 147.878 147.878 147.878 147.878 147.878 147.878 147.878
1,18 TEE PVC UNIN MECNICA 4" UN 243.770 243.770 243.770 243.770 243.770 243.770 243.770
1,19 TEE PVC UNIN MECNICA 8" UN 1.079.816 1.079.816 1.079.816 1.079.816 1.079.816 1.079.816 1.079.816
1,20 TEE PVC UNIN MECNICA 10" UN 1.244.246 1.244.246 1.244.246 1.244.246 1.244.246 1.244.246 1.244.246
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 14.335 14.335 14.335 14.335 14.335 14.335 14.335
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.617 12.617 12.617 12.617 12.617 12.617 12.617
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 31.795 31.795 31.795 31.795 31.795 31.795 31.795
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 125.382 125.382 125.382 125.382 125.382 125.382 125.382
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 187.154 187.154 187.154 187.154 187.154 187.154 187.154
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 30.373 30.373 30.373 30.373 30.373 30.373 30.373
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 104.966 104.966 104.966 104.966 104.966 104.966 104.966
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 155.979 155.979 155.979 155.979 155.979 155.979 155.979
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 63.595 63.595 63.595 63.595 63.595 63.595 63.595
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 257.049 257.049 257.049 257.049 257.049 257.049 257.049
1,32 UNIN REPARACION PVC 4" UN 74.274 74.274 74.274 74.274 74.274 74.274 74.274
1,33 UNIN REPARACIN PVC 8" UN 299.218 299.218 299.218 299.218 299.218 299.218 299.218
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 178.310 178.310 178.310 178.310 178.310 178.310 178.310
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 510.556 510.556 510.556 510.556 510.556 510.556 510.556
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.371.365 1.371.365 1.371.365 1.371.365 1.371.365 1.371.365 1.371.365
1,37 VLVULA COMPUERTA ELSTICA 8" UN 2.026.516 2.026.516 2.026.516 2.026.516 2.026.516 2.026.516 2.026.516

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.526 10.526 10.526 10.526 10.526 10.526 10.526
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.982 23.982 23.982 23.982 23.982 23.982 23.982
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 106.681 88.125 89.500 94.998 92.937 75.755 86.064
2,5 RELLENO TIPO 2 "RECEBO" M3 84.280 59.027 154.538 57.116 84.280 71.345 45.475
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 99.100 68.290 76.051 71.936 99.100 86.165 60.295
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 57.812 57.812 58.837 56.787 79.334 78.309 57.812
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 58.798 58.798 59.843 57.753 80.738 69.193 58.798
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 103.043 87.010 88.198 92.948 91.167 76.321 85.229

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 117.382 117.382 117.382 117.382 117.382 117.382 117.382
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
3,2 CODO 45 PVC ALCANTARILLADO 16" UN CONSTRUCCIN
1.226.382 1.226.382 1.226.382 1.226.382 1.226.382 1.226.382 1.226.382
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 153.485 153.485 153.485 153.485 153.485 153.485 153.485
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.420.522 1.420.522 1.420.522 1.420.522 1.420.522 1.420.522 1.420.522
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 989.884 989.884 989.884 989.884 989.884 989.884 989.884
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.764 62.764 62.764 62.764 62.764 62.764 62.764
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 116.522 116.522 116.522 116.522 116.522 116.522 116.522
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 275.433 275.433 275.433 275.433 275.433 275.433 275.433
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 275.426 275.426 275.426 275.426 275.426 275.426 275.426
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 442.321 442.321 442.321 442.321 442.321 442.321 442.321
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 116.572 116.572 116.572 116.572 116.572 116.572 116.572
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 116.572 116.572 116.572 116.572 116.572 116.572 116.572
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 275.433 275.433 275.433 275.433 275.433 275.433 275.433
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 275.433 275.433 275.433 275.433 275.433 275.433 275.433
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 442.321 442.321 442.321 442.321 442.321 442.321 442.321
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 442.475 442.475 442.475 442.475 442.475 442.475 442.475
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 719.801 719.801 719.801 719.801 719.801 719.801 719.801
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.155.700 1.155.700 1.155.700 1.155.700 1.155.700 1.155.700 1.155.700
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 71.313 71.313 71.313 71.313 71.313 71.313 71.313
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 369.913 369.913 369.913 369.913 369.913 369.913 369.913
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 416.209 416.209 416.209 416.209 416.209 416.209 416.209
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.151.756 1.151.756 1.151.756 1.151.756 1.151.756 1.151.756 1.151.756
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 67.249 67.084 67.096 67.145 67.127 66.974 67.066
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 335.140 335.140 335.140 335.140 335.140 335.140 335.140
3,25 TUBERA PVC ALCANTARILLADO 8" ML 51.060 51.060 51.060 51.060 51.060 51.060 51.060
3,26 TUBERA PVC ALCANTARILLADO 10" ML 72.319 72.319 72.319 72.319 72.319 72.319 72.319
3,27 TUBERA PVC ALCANTARILLADO 12" ML 104.480 104.480 104.480 104.480 104.480 104.480 104.480
3,28 TUBERA PVC ALCANTARILLADO 16" ML 160.436 160.436 160.436 160.436 160.436 160.436 160.436
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 258.069 258.069 258.069 258.069 258.069 258.069 258.069
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 373.631 373.631 373.631 373.631 373.631 373.631 373.631
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 473.086 473.086 473.086 473.086 473.086 473.086 473.086
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 622.124 622.124 622.124 622.124 622.124 622.124 622.124
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 856.423 856.423 856.423 856.423 856.423 856.423 856.423

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4,1 UN 671.073 658.796 659.705 663.343 661.979 650.611 657.432
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE
4,2 ML 656.027 647.488 648.121 650.650 649.702 641.795 646.539
INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,3 UN 717.852 709.667 710.273 712.698 711.789 704.210 708.757
(INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4,4 UN 798.757 783.411 784.547 789.094 787.390 773.179 781.705
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE
4,5 ML 935.891 923.867 924.757 928.320 926.984 915.850 922.531
INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,6 UN 829.898 818.644 819.477 822.812 821.561 811.141 817.393
(INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 972.318 966.416 966.856 968.604 967.947 962.485 965.764
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.416.771 1.399.573 1.400.850 1.405.945 1.404.032 1.388.112 1.397.667
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.968.058 1.935.628 1.938.030 1.947.640 1.944.037 1.914.009 1.932.025
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.610.814 2.556.907 2.560.900 2.576.874 2.570.885 2.520.971 2.550.918
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.861.716 1.861.716 1.861.716 1.861.716 1.861.716 1.861.716 1.861.716
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.951.033 3.951.033 3.951.033 3.951.033 3.951.033 3.951.033 3.951.033
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 136.930 136.582 136.607 136.711 136.672 136.349 136.543
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
CONSTRUCCIN
5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 73.852 72.989 73.053 73.309 73.213 72.413 72.893
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 87.736 86.873 86.937 87.193 87.097 86.297 86.777
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 55.852 53.673 53.834 54.480 54.238 52.220 53.431
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 60.681 58.532 58.691 59.328 59.089 57.100 58.294
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 60.869 58.794 58.948 59.563 59.332 57.411 58.563
5,6 BORDE SEPARADOR VERDE A-170 ML 258.997 258.648 258.674 258.777 258.739 258.416 258.609
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.864 17.602 17.622 17.699 17.670 17.428 17.573
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 39.872 38.336 38.450 38.905 38.734 37.312 38.165
5,9 CAUELA PREFABRICADA TIPO A-120 ML 83.982 83.796 83.810 83.865 83.844 83.672 83.775
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 556.595 551.517 551.893 553.398 552.834 548.131 550.953
5,11 LOSETA PREFABRICADA A-40 M2 62.835 62.037 62.096 62.333 62.244 61.506 61.949
5,12 LOSETA PREFABRICADA A-60 M2 92.088 91.290 91.350 91.586 91.497 90.759 91.202
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 33.090 32.231 32.294 32.549 32.454 31.658 32.135
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 53.567 51.828 51.956 52.472 52.279 50.668 51.634
5,15 SARDINEL PREFABRICADO A-10 ML 100.336 100.149 100.362 100.019 104.377 104.005 100.129
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 60.499 60.016 60.052 60.195 60.141 59.694 59.963

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 205.255 204.232 204.308 204.611 204.497 203.550 204.118
6,2 BANCA EN CONCRETO M-30 UN 678.108 676.676 676.782 677.206 677.047 675.721 676.517
6,3 BOLARDO M-63 ALTO/HIERRO UN 216.868 216.654 216.670 216.734 216.710 216.512 216.630
6,4 BOLARDO M-60 CONCRETO UN 162.769 161.542 161.632 161.996 161.860 160.723 161.405
6,5 BOLARDO M-61 BAJO/CONCRETO UN 164.533 163.305 163.396 163.760 163.623 162.487 163.169
6,6 BOLARDO M-62 BAJO/HIERRO UN 193.574 192.290 192.385 192.766 192.623 191.434 192.147
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 58.373 57.712 57.761 57.957 57.884 57.272 57.639
6,8 BORDILLO PREFABRICADO A-80 ML 69.025 68.285 68.340 68.559 68.477 67.792 68.203
6,9 CANECA M-120 UN 317.431 317.266 317.278 317.327 317.308 317.155 317.247
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 836.180 835.566 835.611 835.793 835.725 835.157 835.498
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.445.029 3.444.620 3.444.650 3.444.771 3.444.726 3.444.347 3.444.574
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.544.130 3.543.721 3.543.751 3.543.872 3.543.827 3.543.448 3.543.675
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 494.815 494.387 494.419 494.546 494.498 494.102 494.339
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 655.538 653.826 653.953 654.460 654.270 652.685 653.636
6,15 BANCA EN MADERA M-50 UN 543.791 543.791 543.791 543.791 543.791 543.791 543.791
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 249.601 248.988 249.033 249.215 249.147 248.578 248.919
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 586.474 586.060 586.091 586.213 586.168 585.785 586.015
6,18 POSTE HISTRICO M-131 UN 6.550.280 6.547.211 6.547.438 6.548.347 6.548.006 6.545.164 6.546.869

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.116 4.116 4.116 4.116 4.116 4.116 4.116
7,2 MARCA VIAL CON PINTURA EN FRO M2 43.646 43.646 43.646 43.646 43.646 43.646 43.646
7,3 SEAL DOBLE DE CICLORUTA UN 318.337 318.163 318.176 318.228 318.208 318.047 318.144
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 500.703 499.847 499.911 500.164 500.069 499.277 499.752
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 236.089 235.915 235.927 235.979 235.960 235.798 235.895
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 250.957 250.783 250.795 250.847 250.828 250.666 250.763
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 262.217 262.043 262.055 262.107 262.088 261.926 262.023
7,8 TACHAS REFLECTIVAS UN 13.708 13.708 13.708 13.708 13.708 13.708 13.708
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 14.649 14.649 14.649 14.649 14.649 14.649 14.649
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7,10 UN 119.739 119.739 119.739 119.739 119.739 119.739 119.739
SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102
A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031
UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270
SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES

2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 35.039 35.039 35.039 35.039 35.039 35.039 35.039
EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y
2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415
PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A
2,10 600.2 M3 63.829 63.829 63.829 63.829 63.829 63.829 63.829
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2,11 600.3 M3 78.098 78.098 78.098 78.098 78.098 78.098 78.098
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 131.488 131.488 133.139 129.837 166.159 155.824 131.488
3,3 330.1 BASE GRANULAR M3 142.068 142.068 143.719 140.417 176.739 175.088 142.068
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.258 3.258 3.258 3.258 3.258 3.258 3.258
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.114 1.114 1.114 1.114 1.114 1.114 1.114
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 229.323 224.436 224.798 226.246 225.703 221.178 223.893
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 67.052 65.832 65.922 66.284 66.148 65.019 65.697
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 598.238 615.701 583.951 663.326 641.101 634.751 615.701
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 625.013 642.476 610.726 690.101 667.876 661.526 642.476
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 647.387 664.850 633.100 712.475 690.250 683.900 664.850
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 632.451 649.913 618.163 697.538 675.313 668.963 649.913
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 CONSTRUCCIN
293.346 293.346 294.997 291.695 328.017 326.366 293.346
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 281.371 281.371 283.022 279.720 316.042 305.707 281.371
3,15 311.1 AFIRMADO M3 108.730 72.557 82.463 74.059 108.730 92.220 59.200
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 12.016 11.663 11.689 11.794 11.755 11.427 11.624
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.888 4.711 4.724 4.777 4.757 4.594 4.692
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3,18 500.1 M3 634.951 615.636 617.067 622.790 620.644 602.760 613.490
ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3,19 500.1 M3 667.721 647.541 649.036 655.015 652.773 634.088 645.299
ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3,20 500.1 M3 689.441 668.705 670.241 676.385 674.081 654.881 666.401
ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE
3,21 *** ML 6.877 6.877 6.877 6.877 6.877 6.877 6.877
LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 86.745 86.745 88.142 85.348 116.082 103.685 86.745

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 897.265 875.356 876.979 883.471 881.036 860.750 872.922
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 776.396 754.851 756.447 762.831 760.436 740.487 752.456
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 820.886 798.487 800.146 806.783 804.293 783.554 795.997
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 565.798 545.836 547.314 553.230 551.012 532.528 543.618
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 657.949 637.196 638.733 644.883 642.577 623.361 634.890
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 563.985 543.319 544.849 550.973 548.677 529.540 541.022
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 656.064 634.579 636.170 642.536 640.149 620.255 632.191
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 715.862 695.195 696.725 702.849 700.553 681.417 692.898
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 583.074 561.589 563.180 569.546 567.159 547.265 559.202
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 757.954 736.469 738.059 744.426 742.039 722.145 734.081
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,11 650 P KG 11.646 11.646 11.646 11.646 11.646 11.646 11.646
ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,12 650 P KG 15.058 15.058 15.058 15.058 15.058 15.058 15.058
ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.768 1.768 1.768 1.768 1.768 1.768 1.768
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO
4,14 621.1 ML 2.686.846 2.686.846 2.686.846 2.686.846 2.686.846 2.686.846 2.686.846
TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN
4,15 621.1 P MANUAL (INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, ML 4.012.898 3.975.421 3.978.197 3.989.301 3.985.138 3.950.437 3.971.257
REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.677.403 1.656.941 1.658.456 1.664.519 1.662.246 1.643.299 1.654.667
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 87.725 87.725 87.725 87.725 87.725 87.725 87.725
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 355.460 353.005 353.186 353.914 353.641 351.367 352.732
4,19 632 P BARANDA METLICA ML 419.007 419.007 419.007 419.007 419.007 419.007 419.007
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.971 16.971 16.971 16.971 16.971 16.971 16.971
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 505.554 461.915 469.594 470.757 489.718 459.762 451.320
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 71.376 71.376 72.773 69.979 100.713 99.316 71.376
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 101.508 73.248 163.392 69.504 101.508 86.268 55.788
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 382.035 360.420 362.021 368.426 366.024 346.011 358.019
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 355.816 342.975 344.434 347.223 356.972 340.575 341.549

4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 364.256 351.416 352.875 355.663 365.413 349.016 349.989

4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 369.574 357.120 358.551 361.225 371.017 354.978 355.737
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 378.014 365.561 366.991 369.665 379.457 363.418 364.177
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 511.749 490.786 492.338 498.549 496.220 476.809 488.457
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 601.988 580.195 581.809 588.266 585.845 565.665 577.773
4,31 681.1 GAVIN M3 173.595 173.595 174.928 172.261 201.598 189.765 173.595
4,32 681.1 GAVIN MALLA PVC M3 177.839 177.839 179.173 176.506 205.843 194.009 177.839
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML
CONSTRUCCIN
41.450 40.163 40.258 40.639 40.496 39.305 40.020

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500


4,34 672.1 ML 16.229 15.585 15.633 15.824 15.752 15.156 15.514
PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO
4,35 *** M2 10.135 10.135 10.135 10.135 10.135 10.135 10.135
(RESISTENCIA LTIMA 25 KN)

4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 14.515 14.515 14.515 14.515 14.515 14.515 14.515

4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 19.590 19.590 19.590 19.590 19.590 19.590 19.590
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,38 *** M2 23.515 23.515 23.515 23.515 23.515 23.515 23.515
(RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,39 *** M2 30.261 30.261 30.261 30.261 30.261 30.261 30.261
(RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN,
4,40 *** M2 7.274 7.274 7.274 7.274 7.274 7.274 7.274
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN,
4,41 *** M2 8.304 8.304 8.304 8.304 8.304 8.304 8.304
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN,
4,42 *** M2 8.636 8.636 8.636 8.636 8.636 8.636 8.636
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN,
4,43 *** M2 6.120 6.120 6.120 6.120 6.120 6.120 6.120
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN,
4,44 *** M2 9.274 9.274 9.274 9.274 9.274 9.274 9.274
FILTRO Y SEPARACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
u
M2 CONSTRUCCIN
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN,
4,45 *** 7.543 7.543 7.543 7.543 7.543 7.543 7.543
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN,
4,46 *** M2 9.274 9.274 9.274 9.274 9.274 9.274 9.274
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN,
4,47 *** M2 17.920 17.920 17.920 17.920 17.920 17.920 17.920
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36"
4,48 661.1 ML 636.939 636.668 636.688 636.768 636.738 636.487 636.638
CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600
4,49 660.3 ML 366.633 362.004 362.347 363.718 363.204 358.918 361.490
MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO
4,50 *** ML 893.633 893.633 893.633 893.633 893.633 893.633 893.633
36"
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 173.723 138.942 148.467 140.385 173.723 157.848 126.098
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.468 4.468 4.468 4.468 4.468 4.468 4.468
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4,53 *** ML 87.131 87.131 87.131 87.131 87.131 87.131 87.131
INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4,54 *** ML 132.808 132.808 132.808 132.808 132.808 132.808 132.808
INSTALACIN)
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 524.543 502.749 504.363 510.820 508.399 488.219 500.328
4,56 682.1 P COLCHONETA RENO M3 188.935 188.935 190.269 187.602 216.939 205.105 188.935
4,57 *** TRINCHO EN MADERA M2 68.821 68.821 68.821 68.821 68.821 68.821 68.821

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.116 4.116 4.116 4.116 4.116 4.116 4.116
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 43.646 43.646 43.646 43.646 43.646 43.646 43.646
5,3 730.3 TOPE DEFENSA METLICA UN 84.957 84.957 84.957 84.957 84.957 84.957 84.957
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 70.609 70.609 70.609 70.609 70.609 70.609 70.609
5,5 730.1 DEFENSA METLICA ML 149.984 148.874 148.957 149.285 149.162 148.135 148.751

5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 13.708 13.708 13.708 13.708 13.708 13.708 13.708

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 819 819 819 819 819 819 819
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36",
6,2 801.6 INCLUYE RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663
DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735
SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 15.503 15.503 15.503 15.503 15.503 15.503 15.503
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 25.230 25.230 25.230 25.230 25.230 25.230 25.230
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.800 9.800 9.800 9.800 9.800 9.800 9.800
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.886.243 1.931.579
1,2 CAMPAMENTO 9 M2 UN 1.102.037 1.124.705
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.529 13.529
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.168 15.168
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.532 17.532
1,6 CERCA EN TABLA H=2.30 M ML 63.400 63.400
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 44.117 44.638
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.186 20.708
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 874.696 878.915
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.129 10.129
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.625 3.625
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.598.511 2.598.511
1,44 RED TELEFNICA PROVISIONAL UN 239.874 239.874
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 149.938 137.003
2,2 BASE ARENA CEMENTO 1:20 M3 158.731 206.207
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
2,4 DEMOLICIN CIMIENTO ENTERRADO CONSTRUCCIN M3 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.387 21.387
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 574.386 624.714
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 575.923 629.354
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 535.913 585.944
2,9 PILOTE DE MADERA D=20 CM ML 47.910 47.910
2,10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 147.654 147.654
2,11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 184.461 184.461
2,12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 228.973 228.973
2,13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 288.893 288.893
2,14 PILOTE HINCADO 25X25 ML 98.390 102.156
2,15 PILOTE HINCADO 30X30 ML 120.907 126.366
2,16 DADOS EN CONCRETO 3500PSI M3 522.552 572.584
2,17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 88.294 88.294

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 36.714 37.009
3,2 SIFN EN PVC 6" UN 191.603 191.898
3,3 CAJA DE INSPECCIN DE 100X100 UN 468.386 477.470
3,4 CAJA DE INSPECCIN DE 40X40 UN 214.713 219.395
3,5 CAJA DE INSPECCIN DE 60X60 UN 243.663 251.534
3,6 CAJA DE INSPECCIN DE 80X80 UN 315.022 329.155
3,7 DUCTO ELCTRICO PVC 4" ML 100.221 100.122
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.249.158 1.248.163
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 108.868 112.127
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 69.120 70.839
3,11 TUBERA DRENAJE PVC 110 ML 25.900 26.575
3,12 TUBERA DRENAJE PVC 160 ML 42.386 43.061
3,13 TUBERA DRENAJE PVC 200 ML 55.581 56.526
3,14 TUBERA DRENAJE PVC 250 ML 76.440 77.519
3,15 TUBERA DRENAJE PVC 315 ML 106.616 107.561
3,16 SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 911.987 922.782
3,17 SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1.281.379 1.302.970
3,18 SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1.648.971 1.692.153

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 40.769 40.769
4,2 CASETN DE LONA 0.80X0.70 M2 53.888 53.888
4,3 COLUMNAS 3500 PSI M3 733.424 783.455
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 227.959 253.195
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4,5 M2 91.096 95.953
PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4,6 M2 107.411 113.240
PSI
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 118.219 125.991
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 124.694 132.952
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 142.338 152.539
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 158.089 169.746
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 175.301 188.416
4,12 ENTREPISO VIGUETA PLACA M2 95.272 96.056
4,13 ESCALERA MACIZA 3500 PSI M3 876.068 926.100
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 91.914 92.849
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 72.331 77.334
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 80.966 87.087
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M CONSTRUCCIN M2 93.940 101.615
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 636.323 686.354
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 46.004 47.597
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 252.619 274.963
4,21 ACERO FIGURADO 37000 PSI KG 4.054 4.054
4,22 ACERO FIGURADO 60000 PSI KG 4.252 4.252
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.931 5.931
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 775.775 825.806
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 700.546 755.270
4,26 VIGA AREA 3500 PSI M3 771.702 821.734
4,27 VIGA CINTA 3500 PSI M3 752.753 802.784
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 951.792 1.001.823
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 261.323 313.208

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 27.365 28.722
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 46.644 48.001
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.357 33.652
5,4 ARCOS EN LADRILLO PRENSADO ML 156.661 157.251
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 41.066 42.659
5,6 DINTELES EN BLOQUE 0.15 M ML 25.798 26.733
5,7 ENCHAPES LADRILLO PRENSADO M2 95.114 96.294
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 83.654 88.964
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 88.060 88.060
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.512 51.512
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 84.776 84.776
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 49.870 49.870
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 98.510 98.510
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 57.985 57.985
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 109.656 109.656
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 63.558 63.558
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 38.840 39.433
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.493 23.790
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 51.012 51.407
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 30.586 30.783
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 57.398 57.793
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.414 34.612
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 94.487 96.462
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 55.817 56.804
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 35.680 36.075
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.599 21.797
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 71.097 71.887
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 42.783 43.178
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 85.006 85.941
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 51.321 51.789
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 174.390 177.156
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 104.564 105.947
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 85.886 87.116
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 51.761 52.376
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 44.678 45.563
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.154 27.596
5,37 MURO TOLETE COMN 0.06 M M2 32.289 32.684
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.644 19.841
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
5,39 MURO TOLETE COMN 0.12 M CONSTRUCCIN M2 48.818 49.608
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 29.868 30.263
5,41 MURO TOLETE COMN 0.25 M M2 94.481 95.666
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 57.390 57.983
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 68.947 69.738
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 41.557 41.952
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 144.362 147.128
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 87.686 89.069
5,47 REMATES LADRILLO PRENSADO ML 30.385 30.680
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 34.363 35.248
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 58.284 59.464
5,50 LAVADA DE FACHADA M2 4.973 4.973
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 46.989 48.346
5,52 DOVELA, GROUTING 3000 PSI ML 10.078 10.078
5,53 ANCLAJE 3/8" L=30CM UN 13.335 13.335
5,54 ANCLAJE 1/2" L=50CM UN 17.432 17.432
5,55 ANCLAJE 5/8" L=70CM UN 24.436 24.436
5,56 ANCLAJE 3/4" L=70CM UN 36.482 36.482
5,57 ANCLAJE 1" L= 70CM UN 4.409 4.774

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.348 15.348
6,2 FILOS O DILATACIONES B/PLACA ML 5.280 5.575
6,3 FILOS O DILATACIONES S/MURO ML 6.399 6.694
6,4 GOTERA EN MORTERO 1:4 ML 7.634 7.929
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.585 6.585
6,6 MALLA BAJO ENTRAMADO M2 13.064 13.064
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 22.411 23.272
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.655 14.085
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 19.602 20.431
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 11.957 12.372
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 18.737 19.597
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.525 11.955
6,13 PAETE CULATAS 1:4, E=2 CM M2 19.602 20.431
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 11.957 12.372
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 20.163 20.776
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.237 12.544
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.334 16.967
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.051 10.367
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 15.675 16.331
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.722 10.050
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 20.336 21.166
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.306 12.721
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 19.471 20.332
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 11.873 12.304
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.252 16.907
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.993 10.321
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 20.311 21.172
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 12.675 13.105

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 24.853 26.038
7,2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 78.266 80.921
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
7,3 BAJANTE PVC (AMAZONAS, RAINGO) CONSTRUCCIN ML 53.551 53.551
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.304 21.304
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.467 33.467
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 78.279 78.279
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 61.275 61.275
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.599 35.599
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 82.043 82.043
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 97.985 97.985
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 144.043 144.043
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 56.829 56.829
7,13 CANAL PVC AMAZONAS ML 78.927 78.927
7,14 CANAL PVC RAINGO ML 71.737 71.737
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 127.498 127.498
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 74.486 74.486
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 54.697 54.697
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 31.081 31.081
7,19 TEJA DE BARRO M2 56.031 57.505
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 45.599 45.599
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 41.798 41.798
7,22 TEJA FIBROCEMENTO N4 M2 35.209 35.209
7,23 TEJA FIBROCEMENTO No. 6 M2 34.478 34.478
7,24 TEJA FIBROCEMENTO No. 8 M2 34.739 34.739
7,25 TEJA TERMOACSTICA M2 48.936 48.936
7,26 TEJA PLSTICA No.6 M2 43.014 43.014
7,27 TEJA ESPAOLA ETERNIT M2 78.777 78.777
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 145.534 145.534
7,29 TEJA SIN TRASLAPO M2 65.397 65.397
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 40.875 40.875
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 32.048 32.048
7,32 ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 55.975 55.975
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.209 19.209
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.129 23.129
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.074 25.074
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 32.309 32.309
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.307 21.307
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 50.176 50.176
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 344.991 344.991
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 393.446 393.446
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 261.780 261.780
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 279.797 279.797

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 397.744 452.327
8,2 CONCRETO 3500 PSI M3 343.598 392.172
8,3 CONCRETO 3000 PSI M3 339.195 388.057
8,4 CONCRETO 2500 PSI M3 298.794 351.901
8,5 CONCRETO 2000 PSI M3 272.694 324.831
8,6 CONCRETO 1500 PSI M3 239.443 289.817
8,7 MORTERO SECO 1:10 M3 204.245 244.938
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 408.522 448.036
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 367.327 408.316
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 428.752 467.086
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 647.792 686.126
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
CONSTRUCCIN
9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 118.980 118.980
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.627 3.922
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 133.052 133.052
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 163.037 163.037
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 237.373 237.373
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 264.225 264.225
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 291.108 291.108
9,8 HOJA PUERTA FORTEC 0.81 UN 193.380 193.380
9,9 HOJA PUERTA FORTEC 0.91 UN 219.248 219.248
9,10 HOJA PUERTA FORTEC 1.50 UN 322.718 322.718
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 122.244 122.244
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 162.339 162.339
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 180.446 180.446
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 459.817 459.817
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.624 40.624
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.250 25.250
9,17 VENTANERA EN MADERA CEDRO MACHO M2 96.035 96.035
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 117.592 117.592
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 91.337 91.337
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 28.271 28.271
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 28.271 28.271
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 26.797 26.797
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 40.966 40.966
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 50.764 50.764
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 61.214 61.214
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 73.624 73.624
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 347.155 347.155
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 242.650 242.650
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.475 32.475
9,30 VIDRIO TRANSPARENTE 4 MM M2 41.619 41.619
9,31 VIDRIO TRANSPARENTE 5 MM M2 50.764 50.764
9,32 VIDRIO TRANSPARENTE 6 MM M2 63.826 63.826

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 73.462 73.462
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 204.825 204.825
10,3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML 77.703 77.703
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 138.820 138.820
10,5 MARCO TAPA CAJA DE INSPECCIN UN 131.787 131.787
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 86.522 86.522
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 204.044 204.044
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 106.212 106.212
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.367 6.367
10,10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 95.671 95.671
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.397 39.397
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 522.464 522.464
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 187.739 187.739
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 210.393 210.393
10,15 DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 476.199 476.199
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 123.573 123.573
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 381.104 381.104
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO CONSTRUCCIN ML 5.818 5.818
10,19 VENTANA EN ALUMINIO CORREDIZA M2 267.829 267.829
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 117.697 117.697
10,21 REJILLA PISO 0.30 M M2 83.284 83.284
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 85.934 85.934
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10,23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA KG 10.204 10.204
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,
10,24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA KG 11.326 11.326
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10,25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 8.997 8.997
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 212.757 212.757
11,2 ACOMETIDA EN PVC 3/4" 5M UN 256.891 256.891
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.304 21.304
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.467 33.467
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 32.077 32.077
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 41.152 41.152
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 84.926 84.926
11,8 CONEXIN TANQUE ELEVADO PVC UN 214.073 214.073
11,9 INSTALACIN APARATO SANITARIO UN 41.850 41.850
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 33.725 33.725
11,13 NIPLE PASAMURO 2" UN 64.021 64.021
11,14 NIPLE PASAMURO 4" UN 95.708 95.708
11,15 PUNTO AGUA CALIENTE CPVC UN 80.898 80.898
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 58.859 58.859
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.645 62.645
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 79.167 79.167
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 63.904 63.904
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 80.063 80.063
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 85.663 85.663
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 71.125 71.125
11,23 RED SUMINISTRO CPVC 1/2" ML 12.042 12.042
11,24 RED SUMINISTRO CPVC 3/4" ML 16.974 16.974
11,25 RED SUMINISTRO PVC 1 1/2" ML 22.157 22.157
11,26 RED SUMINISTRO PVC 1" ML 13.673 13.673
11,27 RED SUMINISTRO PVC 1/2" ML 8.161 8.161
11,28 RED SUMINISTRO PVC 2 1/2" ML 49.404 49.404
11,29 RED SUMINISTRO PVC 2" ML 31.587 31.587
11,30 RED SUMINISTRO PVC 3/4" ML 10.225 10.225
11,31 RED SANITARIA PVC-S 2" ML 24.381 24.381
11,32 RED SANITARIA PVC-S 3" ML 33.841 33.841
11,33 RED SANITARIA PVC-S 4" ML 45.935 45.935
11,34 RED SANITARIA PVC-S 6" ML 85.972 85.972
11,35 REGISTRO 1" UN 104.311 104.311
11,36 REGISTRO 1/2" UN 58.134 58.134
11,37 REGISTRO 3/4" UN 74.068 74.068
11,38 REGISTRO 1 1/2" UN 179.068 179.068
11,39 REGISTRO 2 1/2" UN 369.504 369.504
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
11,40 REGISTRO 2" CONSTRUCCIN UN 272.909 272.909
11,41 REVENTILACIN 2" ML 16.987 16.987
11,42 REVENTILACIN 3" ML 21.443 21.443
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 166.812 166.812
11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 271.738 271.738
11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 452.357 452.357
11,46 TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 39.222 39.222
11,47 TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 46.240 46.240
11,48 TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 59.317 59.317
11,49 TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 67.243 67.243
11,50 TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 86.630 86.630
11,51 TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 100.340 100.340
11,52 TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 148.370 148.370
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 59.651 59.651
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 59.895 59.895
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 38.738 38.738
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 47.740 47.740
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.054 4.054
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.385 6.385
11,59 GABINETE TIPO III UN 985.916 985.916
11,60 GABINETE TIPO I UN 753.365 753.365
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.528.575 2.528.575
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.107.883 2.107.883
11,63 VLVULA MARIPOSA 3" UN 611.499 611.499
11,64 VLVULA MARIPOSA 4" UN 791.538 791.538
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 305.014 305.014

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 351.882 351.882
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 55.914 55.914
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 66.213 66.213
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 73.490 73.490
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 86.584 86.584
12,6 SALIDA TELFONO PVC COMPLETA UN 52.553 52.553
12,7 SALIDA TIMBRE PVC COMPLETA UN 59.907 59.907
12,8 STRIP TELEFNICO 10 PARES UN 138.173 138.173
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 53.974 53.974
12,10 SALIDA TRIFSICA PVC COMPLETA UN 124.068 124.068
12,11 SALIDA T.V PVC COMPLETA. UN 74.163 74.163
12,12 SALIDA BIFSICA C.N. UN 43.987 43.987
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 92.653 92.653
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 395.546 395.546
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 526.990 526.990
12,16 TUBERA PVC CONDUIT 1/2" ML 3.412 3.412
12,17 TUBERA PVC CONDUIT 3/4" ML 4.505 4.505
12,18 TUBERA PVC CONDUIT 1" ML 7.013 7.013
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.541 12.541
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 263.573 263.573
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 74.428 74.428
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 100.836 100.836
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 41.017 41.017
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.350.827 1.350.827
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.001.213 1.001.213
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
12,26 POSTE METLICO 6M CONSTRUCCIN UN 1.254.303 1.254.303
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 583.639 583.639
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 106.380 106.380
12,29 LUMINARIA 70W SODIO UN 489.731 489.731
12,30 LUMINARIA 150W SODIO UN 612.765 612.765
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.618.915 1.618.915
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.192.095 1.192.095

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 37.107 38.581
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 36.917 38.391
13,3 ALISTADO PARA LISTN M2 13.881 14.176
13,4 ALISTADO PISOS 1:3, E=0.04 M2 24.648 27.596
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 79.975 82.924
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 24.627 25.669
13,7 CONCRETO BASE GRADAS 2500 PSI M2 51.416 56.727
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 70.531 79.028
13,9 MANTO FIBERGLASS 600X1 M2 29.416 29.416
13,10 PEGANTE MORTERO-CONCRETO M2 22.172 22.172
13,11 PERMA PLY 2 CAPAS M2 25.997 25.997
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 41.526 46.306
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 48.486 54.328
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 69.907 78.935
13,15 TRITURADO FINO 1/2 M3 56.702 87.075
13,16 TRITURADO GRUESO 3/4 M3 88.269 108.039

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 54.932 55.522
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 32.823 33.117
14,3 ADOQUN CONCRETO 6CM M2 62.099 63.573
14,4 ADOQUN CONCRETO 8CM M2 65.349 66.823
14,5 ADOQUN GRES PEATONAL M2 69.476 70.951
14,6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 72.689 73.279
14,7 GRAVILLA PARA GRADAS ML 34.995 35.559
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 157.150 159.804
14,9 ACABADO EN GRAVILLA LAVADA M2 43.020 44.445
14,10 GUARDAESCOBA EN GRANITO ML 42.283 42.283
14,11 GUARDAESCOBA EN GRAVILLA ML 9.140 9.705
14,12 GUARDAESCOBA PVC CARAMELO ML 9.137 9.137
14,13 GUARDAESCOBA PVC CEDRO ML 12.269 12.269
14,14 GUARDAESCOBA PINO CARIBE ML 10.197 10.197
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.124 17.124
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.420 33.420
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.876 8.876
14,18 LISTN M.H. AMARILLO M2 72.148 72.148
14,19 PASO ESCALERA GRANITO ML 113.120 115.184
14,20 PIRLANES ALUMINIO ML 7.244 7.244
14,21 PIRLANES LADRILLO ML 30.508 31.098
14,22 PISO VINILO TRFICO RESIDENCIAL M2 44.633 44.633
14,23 PISO VINILO TRFICO PESADO M2 51.900 51.900
14,24 PULIDA LACADA PISO MADERA M2 47.637 47.637
14,25 TABLETA DE GRES 25X25 M2 47.565 48.155
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 53.481 54.070
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO CONSTRUCCIN ML 10.560 10.560
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 47.454 48.339
14,29 JABONERA PORCELANA ACUARIO UN 20.040 20.040
14,30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN 120.046 120.046
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.596 9.596
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 21.860 21.860
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 13.994 13.994
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.593 13.593
14,35 REMATES BOCEL ALUMINIO ML 8.237 8.237
14,36 REMATES BOCEL PORCELANA ML 8.383 8.383
14,37 TAPA REGISTRO 20X20 UN 18.507 18.507
14,38 TAPA REGISTRO 6X6 UN 16.858 16.858
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 18.237 18.237
14,40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN SITIO M2 21.082 21.082
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 62.969 63.559
14,42 MEDIA CAA EN GRANITO ML 75.530 75.530
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.791 32.791
14,44 PINTURA ACRLICA PARA PISOS M2 12.870 12.870
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 99.308 99.308
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 120.114 120.114

15 CIELO RASO
15,1 APLIQUE YESO ML 70.950 70.950
15,2 ARMADURA MADERA Y MALLA M2 34.650 34.650
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53.757 53.757
15,4 CIELO RASO DURACUSTIC M2 66.034 66.034
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49.260 49.260
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 91.455 91.455
15,7 CORNISAS YESO ML 47.642 47.642
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 101.153 101.153
15,9 MALLA CON VENA M2 12.971 12.971

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16,2 M3 18.214 18.214
MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 149.938 137.003
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 57.062 86.750
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 162.301 149.366
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 140.489 127.554
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 145.281 138.612
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 159.640 146.705

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 294.060 294.060
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 867.858 867.858
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) CONSTRUCCIN UN 470.015 470.015
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 135.804 135.804
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 190.460 190.460
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 176.840 176.840
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 389.954 389.954
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 998.156 998.156
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 283.120 283.120
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 200.344 200.344
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 79.412 79.412
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17,12 UN 242.767 242.767
ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17,13 UN 357.878 357.878
ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.041 8.041
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.986 2.986
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.684 10.684
18,4 BARNIZ SOBRE MUEBLES M2 40.792 40.792
18,5 CARBURO SOBRE PAETES M2 5.603 5.603
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 63.972 63.972
18,7 DEMARCACIN CON MARMOLINA ML 3.328 3.328
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.677 2.677
18,9 ESMALTE SOBRE LMINA LLENA M2 13.418 13.418
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.891 3.891
18,11 ESMALTE SOBRE MADERA LLENA M2 14.150 14.150
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.564 5.564
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.325 6.325
18,14 ESTUCO M2 6.730 6.730
18,15 ESTUCO (LINEAL) ML 4.210 4.210
18,16 ESTUCO Y VINILO 3 MANOS M2 14.927 14.927
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.238 9.238
18,18 LACA PISOS MADERA M2 21.829 21.829
18,19 LNEAS TRFICO 0.10 ML 2.581 2.581
18,20 MARMOLINA SOBRE PAETE M2 11.781 11.781
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.176 3.176
18,22 TINTILLA SOBRE MADERA LLENA M2 12.131 12.131
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.816 6.816
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.277 4.277
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.084 21.084
18,26 PINTURA EPXICA M2 12.182 12.182
18,27 PINTURA EPXICA (LINEAL) ML 7.516 7.516

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.913.715 5.913.715
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19,2 UN 10.448.599 10.448.599
(PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.734.343 2.734.343
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.936.173 8.936.173
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.368.845 8.368.845
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.581 2.581
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 838.791 838.791
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 83.868 83.868
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.518.146 1.518.691
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD CONSTRUCCIN ML 646.633 658.849

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.563 28.563
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.456 42.456
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 52.636 52.636
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.138 17.138
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 20.759 20.759
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 28.307 28.307
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.339 25.339
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.704 26.704
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.392 33.392
20,10 VLVULA DE BOLA GAS 1/2" UN 17.124 17.124
20,11 VLVULA DE BOLA GAS 3/4" UN 22.462 22.462
20,12 VLVULA DE BOLA GAS 1" UN 34.585 34.585
20,13 VLVULA POLIETILENO GAS 1/2" UN 265.657 265.657
20,14 VLVULA POLIETILENO GAS 3/4" UN 305.768 305.768
20,15 VLVULA POLIETILENO GAS 1" UN 318.859 318.859
20,16 ACOMETIDA GAS 1/2" ML 295.570 295.570

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 215.640 215.640
21,2 CABLE DETECTOR LINEAL DE CALOR ML 33.099 33.099
21,3 SIRENA DE 110 V UN 100.520 100.520
21,4 CMARA CCTV UN 254.088 254.088
21,5 PARLANTE-CIELO FALSO UN 50.324 50.324
21,6 AMPLIFICADOR 100W UN 556.859 556.859
21,7 AMPLIFICADOR 300W UN 1.383.393 1.383.393
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.794 42.794
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 215.846 215.846
21,10 TOMA PARA MICRFONO UN 42.445 42.445
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.647 3.647
21,12 SPLITERS UN 6.146 6.146
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.875 17.875
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.470 23.470
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.467 30.467
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 119.361 119.361
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 31.135 31.135
21,18 BANDEJA PORTACABLES PARA RACK UN 101.942 101.942
21,19 RACK 2' X 24" UN 177.250 177.250
21,20 RACK 3' X 24" UN 279.427 279.427
21,21 RACK 5' X 24" UN 346.710 346.710
21,22 RACK 7' X 24" UN 379.045 379.045
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 553.866 553.866
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 325.915 325.915
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 101.146 101.146
21,26 PATCH CORD 2M CATEGORA 6A UN 13.493 13.493
21,27 PATCH CORD 5M CATEGORA 6A UN 27.590 27.590
21,28 CABLE UTP CATEGORA 6A ML 4.838 4.838
21,29 CANALETA METLICA 4X6 CMS ML 34.034 34.034
21,30 CANALETA METLICA 4X10 CMS ML 35.576 35.576
21,31 CANALETA METLICA 6X10 CMS ML 36.345 36.345
21,32 CANALETA PLSTICA 13X7 MM ML 23.700 23.700
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
21,33 CANALETA PLSTICA 20X12 MM CONSTRUCCIN ML 26.235 26.235
21,34 CANALETA PLSTICA 32X12 MM ML 27.300 27.300
21,35 CANALETA PLSTICA 40X60 MM ML 46.023 46.023
21,36 SWITCH 10/100/1000 24 PUERTOS UN 596.307 596.307
21,37 SWITCH 10/100/1000 16 PUERTOS UN 305.927 305.927
21,38 SWITCH 10/100/1000 8 PUERTOS UN 85.391 85.391
21,39 CABLE TELEFNICO 2 PARES ML 1.775 1.775
21,40 CABLE TELEFNICO 10 PARES ML 8.198 8.198
21,41 CABLE TELEFNICO 20 PARES ML 12.250 12.250
21,42 CABLE TELEFNICO 40 PARES ML 20.467 20.467
21,43 CABLE TELEVISIN RG6 ML 3.784 3.784
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.393 21.393
21,45 ACOMETIDA TELEFNICA 1" ML 31.190 31.190
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.647 18.647
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 14.875 14.875
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 602.705 602.705
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 88.205 88.205
1,3 CODO 45 PVC UNIN MECNICA 8" UN 497.048 497.048
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.060.917 1.060.917
1,5 CODO 90 PVC UNIN MECNICA 4" UN 121.578 121.578
1,6 CODO 90 PVC UNIN MECNICA 8" UN 740.908 740.908
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.594.680 1.594.680
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.659 12.659
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.630 15.630
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.644 19.644
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.506 21.506
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 25.796 25.796
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 25.796 25.796
1,14 TAPN PVC UNIN MECNICA 3" UN 103.928 103.928
1,15 TAPN PVC UNIN MECNICA 4" UN 120.371 120.371
1,16 TAPN PVC UNIN MECNICA 8" UN 372.552 372.552
1,17 TEE PVC UNIN MECNICA 2" UN 139.910 139.910
1,18 TEE PVC UNIN MECNICA 4" UN 230.639 230.639
1,19 TEE PVC UNIN MECNICA 8" UN 1.020.797 1.020.797
1,20 TEE PVC UNIN MECNICA 10" UN 1.176.132 1.176.132
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.754 13.754
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.131 12.131
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 30.065 30.065
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 119.152 119.152
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 177.507 177.507
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 28.974 28.974
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 99.865 99.865
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 148.056 148.056
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 60.429 60.429
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 243.537 243.537
1,32 UNIN REPARACION PVC 4" UN 70.518 70.518
1,33 UNIN REPARACIN PVC 8" UN 283.373 283.373
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 169.715 169.715
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 483.570 483.570
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.295.911 1.295.911
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.914.883 1.914.883

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.310 10.310
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.546 23.546
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 44.518 76.005
2,5 RELLENO TIPO 2 "RECEBO" M3 145.159 132.224
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 145.159 132.224
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 115.966 132.363
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 101.213 90.765
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 62.576 100.911

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 111.101 111.101
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
3,2 CODO 45 PVC ALCANTARILLADO 16" CONSTRUCCIN UN 1.158.834 1.158.834
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 145.208 145.208
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.342.236 1.342.236
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 935.487 935.487
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.034 62.034
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 110.288 110.288
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 260.479 260.479
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 260.473 260.473
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 418.208 418.208
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 110.335 110.335
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 110.335 110.335
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 260.479 260.479
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 260.479 260.479
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 418.208 418.208
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 420.159 420.159
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 682.146 682.146
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.094.755 1.094.755
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 67.590 67.590
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 351.610 351.610
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 393.896 393.896
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.090.848 1.090.848
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 63.434 63.829
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 318.760 318.760
3,25 TUBERA PVC ALCANTARILLADO 8" ML 48.441 48.441
3,26 TUBERA PVC ALCANTARILLADO 10" ML 68.528 68.528
3,27 TUBERA PVC ALCANTARILLADO 12" ML 98.913 98.913
3,28 TUBERA PVC ALCANTARILLADO 16" ML 151.844 151.844
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 244.077 244.077
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 354.362 354.362
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 448.387 448.387
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 589.532 589.532
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 810.872 810.872

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4,1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 617.699 647.016
4,2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO E=1.5CM Y CAUELA) ML 608.499 627.283
4,3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 669.375 688.919
4,4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 732.358 769.005
4,5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE INTERNO E=1.5CM Y CAUELA) ML 865.358 891.808
4,6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 769.152 796.026
4,7 SUMIDERO EN LADRILLO SL-100 UN 936.663 950.604
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.341.884 1.383.056
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.827.297 1.906.936
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.406.735 2.539.119
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.770.940 1.770.940
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.749.039 3.749.039
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAETE INTERNO Y
4,13 UN 132.226 132.993
DEMOLICIN)

5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 68.917 70.981
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 82.021 84.085
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 49.394 54.971
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M CONSTRUCCIN M2 53.637 58.767
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 54.099 59.199
5,6 BORDE SEPARADOR VERDE A-170 ML 244.527 245.293
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.022 17.691
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 35.368 39.298
5,9 CAUELA PREFABRICADA TIPO A-120 ML 79.905 80.314
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 523.149 533.431
5,11 LOSETA PREFABRICADA A-40 M2 58.453 60.207
5,12 LOSETA PREFABRICADA A-60 M2 85.810 87.564
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 30.138 32.191
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 47.810 51.963
5,15 SARDINEL PREFABRICADO A-10 ML 99.680 98.100
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 56.898 57.960

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 193.386 195.829
6,2 BANCA EN CONCRETO M-30 UN 640.163 643.583
6,3 BOLARDO M-63 ALTO/HIERRO UN 206.381 206.902
6,4 BOLARDO M-60 CONCRETO UN 153.145 156.077
6,5 BOLARDO M-61 BAJO/CONCRETO UN 154.909 157.841
6,6 BOLARDO M-62 BAJO/HIERRO UN 182.162 185.290
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 55.093 56.674
6,8 BORDILLO PREFABRICADO A-80 ML 64.147 65.917
6,9 CANECA M-120 UN 300.605 301.000
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 792.060 793.526
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.257.890 3.258.868
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.351.511 3.352.489
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 467.647 468.690
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 617.134 621.305
6,15 BANCA EN MADERA M-50 UN 515.423 515.423
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 237.103 238.569
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 554.292 555.280
6,18 POSTE HISTRICO M-131 UN 6.189.137 6.196.466

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.895 3.895
7,2 MARCA VIAL CON PINTURA EN FRO M2 41.747 41.747
7,3 SEAL DOBLE DE CICLORUTA UN 301.760 302.143
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 474.474 476.559
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 225.693 226.077
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 239.739 240.123
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 250.376 250.760
7,8 TACHAS REFLECTIVAS UN 13.062 13.062
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.951 13.951

7,10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIN) UN 113.511 113.511
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1,1 201 P M3 147.300 147.300
5KM)
1,2 201 P DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 52.102 52.102
1,3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA 2.513.232 2.513.232
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,4 200.2 HA 893.776 893.776
DISTANCIA DE 5KM)
1,5 201.7 DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 86.031 86.031
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS, SOBREACARREOS Y
1,6 *** M3-KM 1.270 1.270
DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.373 34.373
2,3 210.2.2 EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 8.415 8.415
2,4 220.1 TERRAPLENES M3 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2,9 600.1 M3 20.167 20.167
KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2,10 600.2 M3 62.992 62.992
KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2,11 600.3 M3 77.261 77.261
DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,12 600.4 M3 18.323 18.323
MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 600.4 P M3 37.797 37.797
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2,14 600.5 M3 30.022 30.022
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A
2,15 600.5 P M3 50.972 50.972
UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 171.736 161.492
3,3 330.1 BASE GRANULAR M3 186.095 169.585
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON
3,4 365.1 M3 133.838 133.838
CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.103 3.103
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.078 1.078
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 206.872 216.006
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 61.161 63.894
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 613.226 597.351
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 626.613 610.738
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 647.830 631.955
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 759.001 641.526
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 328.569 312.059
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 313.125 302.881
3,15 311.1 AFIRMADO M3 166.944 150.434
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 10.515 11.114
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 CONSTRUCCIN M2 4.159 4.459
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3,18 500.1 M3 571.415 620.834
UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3,19 500.1 M3 600.630 652.262
UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3,20 500.1 M3 620.328 673.633
UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE LIMPIEZA, SUMINISTRO E
3,21 *** ML 6.711 6.711
INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 147.515 133.545

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 827.590 883.648
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 708.791 763.920
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 750.936 808.248
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 502.227 551.287
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 591.873 642.875
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 497.780 547.131
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 587.249 638.555
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 649.656 699.007
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 514.580 565.885
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 689.459 740.764
4,11 650 P SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 11.371 11.371
4,12 650 P SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG 14.608 14.608
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.716 1.716
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4,14 621.1 ML 2.588.016 2.588.016
REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN MANUAL (INCLUYE EXCAVACIN EN
4,15 621.1 P ML 3.857.420 3.953.308
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.602.934 1.651.796
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 83.686 83.686
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 339.262 345.125
4,19 632 P BARANDA METLICA ML 405.031 405.031
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.236 16.236
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 479.932 524.472
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 149.817 164.304
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 168.861 153.621
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 318.592 371.251
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 340.225 366.427
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 348.665 374.868
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 355.885 382.669
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 364.325 391.110
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 451.508 505.146
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 539.361 595.124
4,31 681.1 GAVIN M3 228.572 215.237
4,32 681.1 GAVIN MALLA PVC M3 232.582 219.247
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 37.662 40.954
4,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 14.290 15.936
4,35 *** SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA LTIMA 25 KN) M2 9.697 9.697
4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.836 13.836

4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.629 18.629


4,38 *** SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA 100 KN) M2 22.337 22.337
4,39 *** SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA 165 KN) M2 28.708 28.708
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: MEDINA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Medina Paratebueno
4,40 *** CONSTRUCCIN
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 6.959 6.959
4,41 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 7.933 7.933

4,42 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.245 8.245

4,43 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 5.869 5.869

4,44 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.849 8.849

4,45 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 7.212 7.212

4,46 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.849 8.849

4,47 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 17.016 17.016
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36" CLASE I, INCLUYE
4,48 661.1 ML 605.339 606.284
EMBOQUILLADA
4,49 660.3 SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600 MM ML 337.534 348.728
4,50 *** SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO 36" ML 848.082 848.082
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 229.608 213.733
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.252 4.252
4,53 *** GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 82.593 82.593
4,54 *** GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 125.837 125.837
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 460.038 515.800
4,56 682.1 P COLCHONETA RENO M3 243.677 230.342
4,57 *** TRINCHO EN MADERA M2 65.321 65.321

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.895 3.895
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 41.747 41.747
5,3 730.3 TOPE DEFENSA METLICA UN 80.550 80.550
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 66.995 66.995
5,5 730.1 DEFENSA METLICA ML 140.407 143.009
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 13.062 13.062

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 807 807
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36", INCLUYE RECTIFICACIN DE
6,2 801.6 UN 124.663 124.663
DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE DESCOLES Y RETIRO DE SOBRANTES
6,3 801.7 ML 24.161 24.161
A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6,6 801.4 M2 1.735 1.735
KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.826 14.826
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 24.019 24.019
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.497 9.497

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL
ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.897.386 1.914.270 1.918.491 1.916.803 1.915.115 1.926.089 1.932.843 1.915.959 1.908.361 1.923.557
1,2 CAMPAMENTO 9 M2 UN 1.106.740 1.115.182 1.117.293 1.116.448 1.115.604 1.121.092 1.124.468 1.116.026 1.112.227 1.119.825
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.432 13.432 13.432 13.432 13.432 13.432 13.432 13.432 13.432 13.432
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.058 15.058 15.058 15.058 15.058 15.058 15.058 15.058 15.058 15.058
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.411 17.411 17.411 17.411 17.411 17.411 17.411 17.411 17.411 17.411
1,6 CERCA EN TABLA H=2.30 M ML 62.629 62.629 62.629 62.629 62.629 62.629 62.629 62.629 62.629 62.629
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 43.901 44.084 44.130 44.112 44.093 44.212 44.285 44.102 44.020 44.185
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.282 20.465 20.511 20.492 20.474 20.593 20.666 20.483 20.401 20.565
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 860.200 861.829 862.187 862.203 863.512 864.999 865.730 863.803 861.388 863.829
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.013 10.013 10.013 10.013 10.013 10.013 10.013 10.013 10.013 10.013
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.580 3.580 3.580 3.580 3.580 3.580 3.580 3.580 3.580 3.580
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.564.129 2.564.129 2.564.129 2.564.129 2.564.129 2.564.129 2.564.129 2.564.129 2.564.129 2.564.129
1,44 RED TELEFNICA PROVISIONAL UN 237.040 237.040 237.040 237.040 237.040 237.040 237.040 237.040 237.040 237.040
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 75.422 72.835 71.541 74.128 93.531 97.411 97.411 96.118 75.422 85.770
2,2 BASE ARENA CEMENTO 1:20 M3 168.017 181.428 184.782 183.441 182.100 190.816 196.181 182.769 176.735 188.805
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 CONSTRUCCIN
197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.128 21.128 21.128 21.128 21.128 21.128 21.128 21.128 21.128 21.128
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 599.583 617.544 622.035 620.239 618.442 630.117 637.302 619.341 611.257 627.423
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 600.729 619.316 623.963 622.104 620.245 632.328 639.763 621.175 612.810 629.539
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 559.400 576.804 581.155 579.415 577.674 588.988 595.949 578.544 570.712 586.377
2,9 PILOTE DE MADERA D=20 CM ML 47.780 47.780 47.780 47.780 47.780 47.780 47.780 47.780 47.780 47.780
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 ML 147.232 147.232 147.232 147.232 147.232 147.232 147.232 147.232 147.232 147.232
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 ML 183.523 183.523 183.523 183.523 183.523 183.523 183.523 183.523 183.523 183.523
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,12 ML 227.408 227.408 227.408 227.408 227.408 227.408 227.408 227.408 227.408 227.408
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 ML 286.486 286.486 286.486 286.486 286.486 286.486 286.486 286.486 286.486 286.486
DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 99.641 100.905 101.221 101.095 100.968 101.790 102.296 101.031 100.463 101.600
2,15 PILOTE HINCADO 30X30 ML 122.720 124.553 125.011 124.828 124.644 125.835 126.568 124.736 123.911 125.560
2,16 DADOS EN CONCRETO 3500PSI M3 546.039 563.443 567.795 566.054 564.313 575.627 582.589 565.184 557.351 573.016
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,17 ML 88.016 88.016 88.016 88.016 88.016 88.016 88.016 88.016 88.016 88.016
MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 36.412 36.496 36.516 36.508 36.500 36.554 36.587 36.504 36.466 36.541
3,2 SIFN EN PVC 6" UN 189.077 189.160 189.181 189.172 189.164 189.218 189.252 189.168 189.131 189.206
3,3 CAJA DE INSPECCIN DE 100X100 UN 426.287 431.681 432.616 433.563 445.247 452.303 455.122 447.250 430.867 443.814
3,4 CAJA DE INSPECCIN DE 40X40 UN 213.319 215.423 215.914 215.829 216.650 218.317 219.214 216.901 214.777 217.353
3,5 CAJA DE INSPECCIN DE 60X60 UN 242.626 246.129 246.950 246.796 248.066 250.813 252.302 248.471 245.045 249.270
3,6 CAJA DE INSPECCIN DE 80X80 UN 318.764 324.870 326.342 325.928 326.938 331.377 333.907 327.473 322.875 329.443
3,7 DUCTO ELCTRICO PVC 4" ML 99.150 99.130 99.120 99.140 99.289 99.319 99.319 99.309 99.150 99.230
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.225.538 1.225.339 1.225.239 1.225.438 1.226.931 1.227.229 1.227.229 1.227.130 1.225.538 1.226.334
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 108.564 109.485 109.715 109.623 109.531 110.129 110.497 109.577 109.163 109.991
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 68.728 69.213 69.335 69.286 69.238 69.553 69.748 69.262 69.043 69.480
3,11 TUBERA DRENAJE PVC 110 ML 26.448 26.767 26.847 26.815 26.783 26.990 27.118 26.799 26.656 26.943
3,12 TUBERA DRENAJE PVC 160 ML 42.703 43.022 43.102 43.070 43.038 43.245 43.373 43.054 42.910 43.197
3,13 TUBERA DRENAJE PVC 200 ML 56.042 56.488 56.600 56.555 56.511 56.801 56.980 56.533 56.332 56.734
3,14 TUBERA DRENAJE PVC 250 ML 76.760 77.270 77.398 77.346 77.295 77.627 77.831 77.321 77.091 77.551
3,15 TUBERA DRENAJE PVC 315 ML 106.325 106.771 106.883 106.838 106.793 107.084 107.262 106.816 106.615 107.017
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3,16 UN 912.542 917.646 918.922 918.411 917.901 921.218 923.260 918.156 915.859 920.453
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3,17 UN 1.289.276 1.299.484 1.302.036 1.301.015 1.299.994 1.306.629 1.310.712 1.300.504 1.295.911 1.305.098
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3,18 UN 1.677.098 1.697.514 1.702.618 1.700.576 1.698.534 1.711.805 1.719.971 1.699.555 1.690.368 1.708.742
FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 40.290 40.290 40.290 40.290 40.290 40.290 40.290 40.290 40.290 40.290
4,2 CASETN DE LONA 0.80X0.70 M2 53.212 53.212 53.212 53.212 53.212 53.212 53.212 53.212 53.212 53.212
4,3 COLUMNAS 3500 PSI M3 755.542 772.946 777.298 775.557 773.817 785.130 792.092 774.687 766.855 782.519
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 233.529 244.820 248.374 246.033 245.782 262.461 254.273 245.490 240.597 256.233
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4,5 M2 92.771 94.460 94.883 94.714 94.545 95.643 96.319 94.629 93.869 95.390
REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4,6 M2 109.405 111.433 111.940 111.737 111.534 112.852 113.663 111.635 110.723 112.548
REFUERZO, CONCRETO DE 3500 PSI

4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 121.588 124.292 124.968 124.698 124.427 126.185 127.266 124.562 123.346 125.779

4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 128.276 131.148 131.867 131.579 131.292 133.159 134.308 131.436 130.143 132.728
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une

4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2
CONSTRUCCIN
146.813 150.362 151.249 150.894 150.539 152.846 154.265 150.717 149.120 152.314

4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 163.223 167.278 168.292 167.886 167.481 170.117 171.739 167.683 165.859 169.508

4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 181.100 185.662 186.803 186.346 185.890 188.856 190.681 186.118 184.065 188.171
4,12 ENTREPISO VIGUETA PLACA M2 94.760 95.055 95.128 95.099 95.069 95.261 95.378 95.084 94.952 95.217
4,13 ESCALERA MACIZA 3500 PSI M3 896.407 913.811 918.162 916.422 914.681 925.994 932.956 915.551 907.719 923.383
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 90.831 91.071 91.131 91.107 91.083 91.239 91.335 91.095 90.987 91.203
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 74.517 76.257 76.693 76.518 76.344 77.476 78.172 76.431 75.648 77.215
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 83.682 85.811 86.343 86.130 85.917 87.301 88.153 86.024 85.066 86.982
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 97.393 100.063 100.730 100.463 100.196 101.932 103.000 100.330 99.128 101.531
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 659.375 676.778 681.130 679.390 677.649 688.962 695.924 678.519 670.687 686.351
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 46.535 47.070 47.204 47.150 47.097 47.444 47.658 47.123 46.883 47.364
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 263.111 270.884 272.828 272.050 271.273 276.325 279.435 271.661 268.164 275.159
4,21 ACERO FIGURADO 37000 PSI KG 4.003 4.003 4.003 4.003 4.003 4.003 4.003 4.003 4.003 4.003
4,22 ACERO FIGURADO 60000 PSI KG 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.874 5.874 5.874 5.874 5.874 5.874 5.874 5.874 5.874 5.874
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 798.459 815.862 820.214 818.474 816.733 828.046 835.008 817.603 809.771 825.435
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 726.078 745.127 749.890 747.985 746.080 758.462 766.082 747.032 738.460 755.605
4,26 VIGA AREA 3500 PSI M3 794.214 811.618 815.970 814.229 812.488 823.802 830.764 813.359 805.527 821.191
4,27 VIGA CINTA 3500 PSI M3 775.258 792.662 797.014 795.273 793.533 804.846 811.808 794.403 786.571 802.235
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 974.160 991.564 995.916 994.175 992.434 1.003.748 1.010.709 993.304 985.472 1.001.137
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 294.020 313.342 318.173 316.241 314.308 326.868 334.597 315.275 306.579 323.970

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 27.830 28.270 28.380 28.336 28.292 28.578 28.754 28.314 28.116 28.512
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 47.092 47.531 47.641 47.597 47.553 47.839 48.015 47.575 47.377 47.773
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.219 33.302 33.323 33.315 33.307 33.361 33.394 33.311 33.273 33.348
5,4 ARCOS EN LADRILLO PRENSADO ML 155.788 155.954 155.996 155.979 155.962 156.071 156.137 155.971 155.896 156.046
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 41.607 42.142 42.276 42.222 42.169 42.516 42.730 42.195 41.955 42.436
5,6 DINTELES EN BLOQUE 0.15 M ML 25.704 25.944 26.004 25.980 25.956 26.112 26.208 25.968 25.860 26.076
5,7 ENCHAPES LADRILLO PRENSADO M2 94.270 94.603 94.686 94.653 94.619 94.836 94.969 94.636 94.486 94.786
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 85.484 87.266 87.712 87.534 87.355 88.514 89.227 87.445 86.642 88.247
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 87.235 87.235 87.235 87.235 87.235 87.235 87.235 87.235 87.235 87.235
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.100 51.100 51.100 51.100 51.100 51.100 51.100 51.100 51.100 51.100
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 83.999 83.999 83.999 83.999 83.999 83.999 83.999 83.999 83.999 83.999
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 49.482 49.482 49.482 49.482 49.482 49.482 49.482 49.482 49.482 49.482
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 97.481 97.481 97.481 97.481 97.481 97.481 97.481 97.481 97.481 97.481
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 57.471 57.471 57.471 57.471 57.471 57.471 57.471 57.471 57.471 57.471
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 108.461 108.461 108.461 108.461 108.461 108.461 108.461 108.461 108.461 108.461
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 62.961 62.961 62.961 62.961 62.961 62.961 62.961 62.961 62.961 62.961
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 38.619 38.787 38.829 38.812 38.795 38.904 38.971 38.803 38.728 38.879
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.383 23.467 23.488 23.479 23.471 23.525 23.559 23.475 23.437 23.513
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 50.542 50.654 50.682 50.670 50.659 50.732 50.776 50.665 50.615 50.715
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 30.351 30.406 30.420 30.415 30.409 30.445 30.468 30.412 30.387 30.437
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 56.875 56.986 57.014 57.003 56.992 57.064 57.109 56.998 56.947 57.048
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.153 34.209 34.223 34.217 34.211 34.248 34.270 34.214 34.189 34.239
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 93.943 94.501 94.641 94.585 94.529 94.892 95.115 94.557 94.306 94.808
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 55.545 55.824 55.893 55.866 55.838 56.019 56.131 55.852 55.726 55.977
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 35.457 35.569 35.597 35.586 35.574 35.647 35.692 35.580 35.530 35.630
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.488 21.543 21.557 21.552 21.546 21.583 21.605 21.549 21.524 21.574
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 70.579 70.802 70.858 70.836 70.813 70.958 71.048 70.825 70.724 70.925
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML CONSTRUCCIN
42.524 42.635 42.663 42.652 42.641 42.714 42.758 42.647 42.596 42.697
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 84.076 84.316 84.376 84.352 84.328 84.484 84.580 84.340 84.232 84.448
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 50.856 50.976 51.006 50.994 50.982 51.060 51.108 50.988 50.934 51.042
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 173.043 173.824 174.020 173.942 173.863 174.371 174.684 173.902 173.551 174.254
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 103.891 104.281 104.379 104.340 104.301 104.555 104.711 104.320 104.145 104.496
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 85.996 86.497 86.622 86.572 86.522 86.847 87.047 86.547 86.322 86.772
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 51.816 52.066 52.129 52.104 52.079 52.242 52.342 52.092 51.979 52.204
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 44.431 44.681 44.743 44.718 44.693 44.856 44.956 44.706 44.593 44.818
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.030 27.155 27.186 27.174 27.161 27.242 27.292 27.167 27.111 27.224
5,37 MURO TOLETE COMN 0.06 M M2 32.091 32.203 32.231 32.220 32.208 32.281 32.326 32.214 32.164 32.264
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.545 19.601 19.615 19.609 19.604 19.640 19.662 19.606 19.581 19.631
5,39 MURO TOLETE COMN 0.12 M M2 48.473 48.696 48.752 48.730 48.707 48.852 48.942 48.718 48.618 48.819
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 29.695 29.807 29.835 29.824 29.812 29.885 29.930 29.818 29.768 29.868
5,41 MURO TOLETE COMN 0.25 M M2 93.680 94.014 94.098 94.065 94.031 94.249 94.383 94.048 93.897 94.199
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 56.989 57.157 57.198 57.182 57.165 57.274 57.341 57.173 57.098 57.249
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 68.399 68.622 68.678 68.655 68.633 68.778 68.867 68.644 68.544 68.745
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 41.274 41.386 41.414 41.403 41.392 41.464 41.509 41.397 41.347 41.447
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 143.406 144.187 144.382 144.304 144.226 144.734 145.046 144.265 143.913 144.617
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 87.196 87.587 87.684 87.645 87.606 87.860 88.016 87.626 87.450 87.802
5,47 REMATES LADRILLO PRENSADO ML 30.198 30.282 30.303 30.294 30.286 30.340 30.373 30.290 30.253 30.328
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 34.799 35.159 35.249 35.213 35.177 35.411 35.555 35.195 35.033 35.357
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 58.756 59.236 59.356 59.308 59.260 59.572 59.764 59.284 59.068 59.500
5,50 LAVADA DE FACHADA M2 4.964 4.964 4.964 4.964 4.964 4.964 4.964 4.964 4.964 4.964
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 47.435 47.875 47.985 47.941 47.897 48.183 48.359 47.919 47.721 48.117
5,52 DOVELA, GROUTING 3000 PSI ML 10.061 10.061 10.061 10.061 10.061 10.061 10.061 10.061 10.061 10.061
5,53 ANCLAJE 3/8" L=30CM UN 13.283 13.283 13.283 13.283 13.283 13.283 13.283 13.283 13.283 13.283
5,54 ANCLAJE 1/2" L=50CM UN 17.356 17.356 17.356 17.356 17.356 17.356 17.356 17.356 17.356 17.356
5,55 ANCLAJE 5/8" L=70CM UN 24.281 24.281 24.281 24.281 24.281 24.281 24.281 24.281 24.281 24.281
5,56 ANCLAJE 3/4" L=70CM UN 36.184 36.184 36.184 36.184 36.184 36.184 36.184 36.184 36.184 36.184
5,57 ANCLAJE 1" L= 70CM UN 4.600 4.730 4.762 4.749 4.736 4.821 4.873 4.743 4.684 4.801

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.301 15.301 15.301 15.301 15.301 15.301 15.301 15.301 15.301 15.301
6,2 FILOS O DILATACIONES B/PLACA ML 5.330 5.413 5.434 5.426 5.418 5.472 5.505 5.422 5.384 5.459
6,3 FILOS O DILATACIONES S/MURO ML 6.450 6.533 6.554 6.546 6.537 6.592 6.625 6.542 6.504 6.579
6,4 GOTERA EN MORTERO 1:4 ML 7.671 7.754 7.775 7.767 7.758 7.812 7.846 7.762 7.725 7.800
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.520 6.520 6.520 6.520 6.520 6.520 6.520 6.520 6.520 6.520
6,6 MALLA BAJO ENTRAMADO M2 13.000 13.000 13.000 13.000 13.000 13.000 13.000 13.000 13.000 13.000
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 23.066 23.416 23.504 23.469 23.434 23.662 23.802 23.451 23.294 23.609
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.983 14.158 14.201 14.184 14.166 14.280 14.350 14.175 14.096 14.254
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 19.701 19.936 19.994 19.971 19.948 20.100 20.194 19.959 19.854 20.065
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.007 12.125 12.154 12.142 12.130 12.207 12.253 12.136 12.084 12.189
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 19.392 19.742 19.830 19.795 19.760 19.987 20.127 19.777 19.620 19.935
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.853 12.028 12.071 12.054 12.036 12.150 12.220 12.045 11.966 12.124
6,13 PAETE CULATAS 1:4, E=2 CM M2 19.701 19.936 19.994 19.971 19.948 20.100 20.194 19.959 19.854 20.065
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.007 12.125 12.154 12.142 12.130 12.207 12.253 12.136 12.084 12.189
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 20.559 20.809 20.871 20.846 20.821 20.983 21.083 20.833 20.721 20.946
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.435 12.560 12.591 12.579 12.566 12.647 12.697 12.572 12.516 12.628
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.410 16.589 16.634 16.616 16.598 16.714 16.785 16.607 16.526 16.687
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.089 10.179 10.201 10.192 10.183 10.241 10.277 10.188 10.147 10.228
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.174 16.441 16.508 16.481 16.455 16.628 16.735 16.468 16.348 16.588
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.971 10.105 10.138 10.125 10.112 10.198 10.252 10.118 10.058 10.178
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 20.436 20.671 20.729 20.706 20.682 20.835 20.929 20.694 20.589 20.800
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.356 12.473 12.502 12.491 12.479 12.555 12.602 12.485 12.432 12.538
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 CONSTRUCCIN
20.127 20.477 20.565 20.530 20.494 20.722 20.862 20.512 20.354 20.670
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.201 12.376 12.420 12.402 12.385 12.499 12.569 12.394 12.315 12.473
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.751 17.018 17.084 17.058 17.031 17.205 17.311 17.044 16.924 17.164
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.243 10.376 10.410 10.396 10.383 10.470 10.523 10.390 10.330 10.450
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 20.967 21.317 21.404 21.369 21.334 21.562 21.702 21.352 21.194 21.509
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 13.003 13.178 13.222 13.204 13.187 13.300 13.371 13.195 13.117 13.274

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 24.996 25.330 25.414 25.381 25.347 25.565 25.699 25.364 25.213 25.515
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7,2 M2 78.738 79.630 79.852 79.763 79.674 80.254 80.610 79.719 79.318 80.120
(INCLUYE TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 52.897 52.897 52.897 52.897 52.897 52.897 52.897 52.897 52.897 52.897
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.101 21.101 21.101 21.101 21.101 21.101 21.101 21.101 21.101 21.101
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 77.274 77.274 77.274 77.274 77.274 77.274 77.274 77.274 77.274 77.274
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 60.525 60.525 60.525 60.525 60.525 60.525 60.525 60.525 60.525 60.525
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.232 35.232 35.232 35.232 35.232 35.232 35.232 35.232 35.232 35.232
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 80.981 80.981 80.981 80.981 80.981 80.981 80.981 80.981 80.981 80.981
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 96.686 96.686 96.686 96.686 96.686 96.686 96.686 96.686 96.686 96.686
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 142.058 142.058 142.058 142.058 142.058 142.058 142.058 142.058 142.058 142.058
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 56.168 56.168 56.168 56.168 56.168 56.168 56.168 56.168 56.168 56.168
7,13 CANAL PVC AMAZONAS ML 78.076 78.076 78.076 78.076 78.076 78.076 78.076 78.076 78.076 78.076
7,14 CANAL PVC RAINGO ML 70.991 70.991 70.991 70.991 70.991 70.991 70.991 70.991 70.991 70.991
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 125.886 125.886 125.886 125.886 125.886 125.886 125.886 125.886 125.886 125.886
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 73.505 73.505 73.505 73.505 73.505 73.505 73.505 73.505 73.505 73.505
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 54.012 54.012 54.012 54.012 54.012 54.012 54.012 54.012 54.012 54.012
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 30.827 30.827 30.827 30.827 30.827 30.827 30.827 30.827 30.827 30.827
7,19 TEJA DE BARRO M2 55.930 56.346 56.451 56.409 56.367 56.638 56.805 56.388 56.201 56.575
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 45.023 45.023 45.023 45.023 45.023 45.023 45.023 45.023 45.023 45.023
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 41.279 41.279 41.279 41.279 41.279 41.279 41.279 41.279 41.279 41.279
7,22 TEJA FIBROCEMENTO N4 M2 34.871 34.871 34.871 34.871 34.871 34.871 34.871 34.871 34.871 34.871
7,23 TEJA FIBROCEMENTO No. 6 M2 34.140 34.140 34.140 34.140 34.140 34.140 34.140 34.140 34.140 34.140
7,24 TEJA FIBROCEMENTO No. 8 M2 34.396 34.396 34.396 34.396 34.396 34.396 34.396 34.396 34.396 34.396
7,25 TEJA TERMOACSTICA M2 48.370 48.370 48.370 48.370 48.370 48.370 48.370 48.370 48.370 48.370
7,26 TEJA PLSTICA No.6 M2 42.536 42.536 42.536 42.536 42.536 42.536 42.536 42.536 42.536 42.536
7,27 TEJA ESPAOLA ETERNIT M2 77.790 77.790 77.790 77.790 77.790 77.790 77.790 77.790 77.790 77.790

7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 143.563 143.563 143.563 143.563 143.563 143.563 143.563 143.563 143.563 143.563

7,29 TEJA SIN TRASLAPO M2 64.566 64.566 64.566 64.566 64.566 64.566 64.566 64.566 64.566 64.566
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 40.591 40.591 40.591 40.591 40.591 40.591 40.591 40.591 40.591 40.591
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 31.787 31.787 31.787 31.787 31.787 31.787 31.787 31.787 31.787 31.787
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO
7,32 M2 55.359 55.359 55.359 55.359 55.359 55.359 55.359 55.359 55.359 55.359
ESTRUCTURAL ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.089 19.089 19.089 19.089 19.089 19.089 19.089 19.089 19.089 19.089
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 22.950 22.950 22.950 22.950 22.950 22.950 22.950 22.950 22.950 22.950
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 24.855 24.855 24.855 24.855 24.855 24.855 24.855 24.855 24.855 24.855
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 31.982 31.982 31.982 31.982 31.982 31.982 31.982 31.982 31.982 31.982
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.132 21.132 21.132 21.132 21.132 21.132 21.132 21.132 21.132 21.132
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 49.742 49.742 49.742 49.742 49.742 49.742 49.742 49.742 49.742 49.742
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 340.012 340.012 340.012 340.012 340.012 340.012 340.012 340.012 340.012 340.012
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 390.838 390.838 390.838 390.838 390.838 390.838 390.838 390.838 390.838 390.838
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 258.604 258.604 258.604 258.604 258.604 258.604 258.604 258.604 258.604 258.604
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 276.230 276.230 276.230 276.230 276.230 276.230 276.230 276.230 276.230 276.230
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
8 MORTEROS Y CONCRETOS CONSTRUCCIN
8,1 CONCRETO 4000 PSI M3 420.061 438.383 442.964 441.132 439.299 451.209 458.538 440.215 431.970 448.460
8,2 CONCRETO 3500 PSI M3 366.629 383.526 387.751 386.061 384.371 395.355 402.114 385.216 377.612 392.820
8,3 CONCRETO 3000 PSI M3 364.762 382.200 386.560 384.816 383.072 394.407 401.382 383.944 376.096 391.791
8,4 CONCRETO 2500 PSI M3 321.807 339.634 344.091 342.308 340.525 352.113 359.244 341.417 333.394 349.439
8,5 CONCRETO 2000 PSI M3 299.481 317.759 322.329 320.501 318.673 330.554 337.865 319.587 311.362 327.812
8,6 CONCRETO 1500 PSI M3 271.187 289.947 294.637 292.761 290.885 303.079 310.583 291.823 283.381 300.265
8,7 MORTERO SECO 1:10 M3 211.472 222.967 225.842 224.692 223.543 231.014 235.612 224.117 218.945 229.290
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 413.273 424.435 427.226 426.110 424.993 432.248 436.713 425.551 420.529 430.575
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 398.532 415.212 419.382 417.714 416.046 426.888 433.560 416.880 409.374 424.386
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 456.780 472.380 476.280 474.720 473.160 483.300 489.540 473.940 466.920 480.960
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 672.560 688.160 692.060 690.500 688.940 699.080 705.320 689.720 682.700 696.740

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 117.654 117.654 117.654 117.654 117.654 117.654 117.654 117.654 117.654 117.654
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.665 3.748 3.769 3.761 3.753 3.807 3.840 3.757 3.719 3.794
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 131.697 131.697 131.697 131.697 131.697 131.697 131.697 131.697 131.697 131.697
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 161.235 161.235 161.235 161.235 161.235 161.235 161.235 161.235 161.235 161.235
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 234.208 234.208 234.208 234.208 234.208 234.208 234.208 234.208 234.208 234.208
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 260.669 260.669 260.669 260.669 260.669 260.669 260.669 260.669 260.669 260.669
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 287.160 287.160 287.160 287.160 287.160 287.160 287.160 287.160 287.160 287.160
9,8 HOJA PUERTA FORTEC 0.81 UN 190.675 190.675 190.675 190.675 190.675 190.675 190.675 190.675 190.675 190.675
9,9 HOJA PUERTA FORTEC 0.91 UN 216.157 216.157 216.157 216.157 216.157 216.157 216.157 216.157 216.157 216.157
9,10 HOJA PUERTA FORTEC 1.50 UN 318.082 318.082 318.082 318.082 318.082 318.082 318.082 318.082 318.082 318.082
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 120.602 120.602 120.602 120.602 120.602 120.602 120.602 120.602 120.602 120.602
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 160.098 160.098 160.098 160.098 160.098 160.098 160.098 160.098 160.098 160.098
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 177.935 177.935 177.935 177.935 177.935 177.935 177.935 177.935 177.935 177.935
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 453.133 453.133 453.133 453.133 453.133 453.133 453.133 453.133 453.133 453.133
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.216 40.216 40.216 40.216 40.216 40.216 40.216 40.216 40.216 40.216
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.071 25.071 25.071 25.071 25.071 25.071 25.071 25.071 25.071 25.071
9,17 VENTANERA EN MADERA CEDRO MACHO M2 95.080 95.080 95.080 95.080 95.080 95.080 95.080 95.080 95.080 95.080
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 115.932 115.932 115.932 115.932 115.932 115.932 115.932 115.932 115.932 115.932
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 90.068 90.068 90.068 90.068 90.068 90.068 90.068 90.068 90.068 90.068
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 27.945 27.945 27.945 27.945 27.945 27.945 27.945 27.945 27.945 27.945
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 27.945 27.945 27.945 27.945 27.945 27.945 27.945 27.945 27.945 27.945
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 26.492 26.492 26.492 26.492 26.492 26.492 26.492 26.492 26.492 26.492
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 40.527 40.527 40.527 40.527 40.527 40.527 40.527 40.527 40.527 40.527
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 50.178 50.178 50.178 50.178 50.178 50.178 50.178 50.178 50.178 50.178
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 60.473 60.473 60.473 60.473 60.473 60.473 60.473 60.473 60.473 60.473
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 72.697 72.697 72.697 72.697 72.697 72.697 72.697 72.697 72.697 72.697
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 342.278 342.278 342.278 342.278 342.278 342.278 342.278 342.278 342.278 342.278
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 239.333 239.333 239.333 239.333 239.333 239.333 239.333 239.333 239.333 239.333
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.163 32.163 32.163 32.163 32.163 32.163 32.163 32.163 32.163 32.163
9,30 VIDRIO TRANSPARENTE 4 MM M2 41.171 41.171 41.171 41.171 41.171 41.171 41.171 41.171 41.171 41.171
9,31 VIDRIO TRANSPARENTE 5 MM M2 50.178 50.178 50.178 50.178 50.178 50.178 50.178 50.178 50.178 50.178
9,32 VIDRIO TRANSPARENTE 6 MM M2 63.046 63.046 63.046 63.046 63.046 63.046 63.046 63.046 63.046 63.046

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 72.681 72.681 72.681 72.681 72.681 72.681 72.681 72.681 72.681 72.681
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 202.082 202.082 202.082 202.082 202.082 202.082 202.082 202.082 202.082 202.082
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10,3 ML 76.963 76.963 76.963 76.963 76.963 76.963 76.963 76.963 76.963 76.963
(INCLUYE ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 137.801 137.801 137.801 137.801 137.801 137.801 137.801 137.801 137.801 137.801
10,5 MARCO TAPA CAJA DE INSPECCIN UN 130.454 130.454 130.454 130.454 130.454 130.454 130.454 130.454 130.454 130.454
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 CONSTRUCCIN
85.651 85.651 85.651 85.651 85.651 85.651 85.651 85.651 85.651 85.651
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 201.829 201.829 201.829 201.829 201.829 201.829 201.829 201.829 201.829 201.829
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 105.153 105.153 105.153 105.153 105.153 105.153 105.153 105.153 105.153 105.153
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.310 6.310 6.310 6.310 6.310 6.310 6.310 6.310 6.310 6.310
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO
10,10 M2 95.030 95.030 95.030 95.030 95.030 95.030 95.030 95.030 95.030 95.030
ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.125 39.125 39.125 39.125 39.125 39.125 39.125 39.125 39.125 39.125
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 515.235 515.235 515.235 515.235 515.235 515.235 515.235 515.235 515.235 515.235
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 185.330 185.330 185.330 185.330 185.330 185.330 185.330 185.330 185.330 185.330
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 208.042 208.042 208.042 208.042 208.042 208.042 208.042 208.042 208.042 208.042
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10,15 M2 469.824 469.824 469.824 469.824 469.824 469.824 469.824 469.824 469.824 469.824
PUERTAS Y ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 122.631 122.631 122.631 122.631 122.631 122.631 122.631 122.631 122.631 122.631
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 375.727 375.727 375.727 375.727 375.727 375.727 375.727 375.727 375.727 375.727
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.764 5.764 5.764 5.764 5.764 5.764 5.764 5.764 5.764 5.764
10,19 VENTANA EN ALUMINIO CORREDIZA M2 264.280 264.280 264.280 264.280 264.280 264.280 264.280 264.280 264.280 264.280
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 116.730 116.730 116.730 116.730 116.730 116.730 116.730 116.730 116.730 116.730
10,21 REJILLA PISO 0.30 M M2 82.376 82.376 82.376 82.376 82.376 82.376 82.376 82.376 82.376 82.376
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 85.045 85.045 85.045 85.045 85.045 85.045 85.045 85.045 85.045 85.045
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10,23 KG 10.131 10.131 10.131 10.131 10.131 10.131 10.131 10.131 10.131 10.131
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10,24 KG 11.236 11.236 11.236 11.236 11.236 11.236 11.236 11.236 11.236 11.236
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 8.943 8.943 8.943 8.943 8.943 8.943 8.943 8.943 8.943 8.943
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 211.099 211.099 211.099 211.099 211.099 211.099 211.099 211.099 211.099 211.099
11,2 ACOMETIDA EN PVC 3/4" 5M UN 254.577 254.577 254.577 254.577 254.577 254.577 254.577 254.577 254.577 254.577
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.101 21.101 21.101 21.101 21.101 21.101 21.101 21.101 21.101 21.101
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 31.788 31.788 31.788 31.788 31.788 31.788 31.788 31.788 31.788 31.788
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 40.747 40.747 40.747 40.747 40.747 40.747 40.747 40.747 40.747 40.747
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 83.995 83.995 83.995 83.995 83.995 83.995 83.995 83.995 83.995 83.995
11,8 CONEXIN TANQUE ELEVADO PVC UN 212.396 212.396 212.396 212.396 212.396 212.396 212.396 212.396 212.396 212.396
11,9 INSTALACIN APARATO SANITARIO UN 41.833 41.833 41.833 41.833 41.833 41.833 41.833 41.833 41.833 41.833
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 33.475 33.475 33.475 33.475 33.475 33.475 33.475 33.475 33.475 33.475
11,13 NIPLE PASAMURO 2" UN 63.673 63.673 63.673 63.673 63.673 63.673 63.673 63.673 63.673 63.673
11,14 NIPLE PASAMURO 4" UN 95.148 95.148 95.148 95.148 95.148 95.148 95.148 95.148 95.148 95.148
11,15 PUNTO AGUA CALIENTE CPVC UN 80.292 80.292 80.292 80.292 80.292 80.292 80.292 80.292 80.292 80.292
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 58.585 58.585 58.585 58.585 58.585 58.585 58.585 58.585 58.585 58.585
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.314 62.314 62.314 62.314 62.314 62.314 62.314 62.314 62.314 62.314
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 78.743 78.743 78.743 78.743 78.743 78.743 78.743 78.743 78.743 78.743
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 63.457 63.457 63.457 63.457 63.457 63.457 63.457 63.457 63.457 63.457
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN CONSTRUCCIN
79.374 79.374 79.374 79.374 79.374 79.374 79.374 79.374 79.374 79.374
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 84.890 84.890 84.890 84.890 84.890 84.890 84.890 84.890 84.890 84.890
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 70.338 70.338 70.338 70.338 70.338 70.338 70.338 70.338 70.338 70.338
11,23 RED SUMINISTRO CPVC 1/2" ML 11.922 11.922 11.922 11.922 11.922 11.922 11.922 11.922 11.922 11.922
11,24 RED SUMINISTRO CPVC 3/4" ML 16.780 16.780 16.780 16.780 16.780 16.780 16.780 16.780 16.780 16.780
11,25 RED SUMINISTRO PVC 1 1/2" ML 21.910 21.910 21.910 21.910 21.910 21.910 21.910 21.910 21.910 21.910
11,26 RED SUMINISTRO PVC 1" ML 13.537 13.537 13.537 13.537 13.537 13.537 13.537 13.537 13.537 13.537
11,27 RED SUMINISTRO PVC 1/2" ML 8.089 8.089 8.089 8.089 8.089 8.089 8.089 8.089 8.089 8.089
11,28 RED SUMINISTRO PVC 2 1/2" ML 48.793 48.793 48.793 48.793 48.793 48.793 48.793 48.793 48.793 48.793
11,29 RED SUMINISTRO PVC 2" ML 31.217 31.217 31.217 31.217 31.217 31.217 31.217 31.217 31.217 31.217
11,30 RED SUMINISTRO PVC 3/4" ML 10.129 10.129 10.129 10.129 10.129 10.129 10.129 10.129 10.129 10.129
11,31 RED SANITARIA PVC-S 2" ML 24.118 24.118 24.118 24.118 24.118 24.118 24.118 24.118 24.118 24.118
11,32 RED SANITARIA PVC-S 3" ML 33.458 33.458 33.458 33.458 33.458 33.458 33.458 33.458 33.458 33.458
11,33 RED SANITARIA PVC-S 4" ML 45.400 45.400 45.400 45.400 45.400 45.400 45.400 45.400 45.400 45.400
11,34 RED SANITARIA PVC-S 6" ML 84.840 84.840 84.840 84.840 84.840 84.840 84.840 84.840 84.840 84.840
11,35 REGISTRO 1" UN 103.057 103.057 103.057 103.057 103.057 103.057 103.057 103.057 103.057 103.057
11,36 REGISTRO 1/2" UN 57.456 57.456 57.456 57.456 57.456 57.456 57.456 57.456 57.456 57.456
11,37 REGISTRO 3/4" UN 73.152 73.152 73.152 73.152 73.152 73.152 73.152 73.152 73.152 73.152
11,38 REGISTRO 1 1/2" UN 176.698 176.698 176.698 176.698 176.698 176.698 176.698 176.698 176.698 176.698
11,39 REGISTRO 2 1/2" UN 364.365 364.365 364.365 364.365 364.365 364.365 364.365 364.365 364.365 364.365
11,40 REGISTRO 2" UN 269.212 269.212 269.212 269.212 269.212 269.212 269.212 269.212 269.212 269.212
11,41 REVENTILACIN 2" ML 16.818 16.818 16.818 16.818 16.818 16.818 16.818 16.818 16.818 16.818
11,42 REVENTILACIN 3" ML 21.223 21.223 21.223 21.223 21.223 21.223 21.223 21.223 21.223 21.223
TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11,43 UN 165.081 165.081 165.081 165.081 165.081 165.081 165.081 165.081 165.081 165.081
INSTALACIN)
TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11,44 UN 268.693 268.693 268.693 268.693 268.693 268.693 268.693 268.693 268.693 268.693
ISNTALACIN)
TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11,45 UN 447.122 447.122 447.122 447.122 447.122 447.122 447.122 447.122 447.122 447.122
INSTALACIN)
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11,46 ML 38.769 38.769 38.769 38.769 38.769 38.769 38.769 38.769 38.769 38.769
SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS
11,47 ML 45.697 45.697 45.697 45.697 45.697 45.697 45.697 45.697 45.697 45.697
Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,48 ML 58.714 58.714 58.714 58.714 58.714 58.714 58.714 58.714 58.714 58.714
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,49 ML 66.465 66.465 66.465 66.465 66.465 66.465 66.465 66.465 66.465 66.465
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS
11,50 ML 85.612 85.612 85.612 85.612 85.612 85.612 85.612 85.612 85.612 85.612
Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11,51 ML 99.344 99.344 99.344 99.344 99.344 99.344 99.344 99.344 99.344 99.344
SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11,52 ML 146.969 146.969 146.969 146.969 146.969 146.969 146.969 146.969 146.969 146.969
SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 59.150 59.150 59.150 59.150 59.150 59.150 59.150 59.150 59.150 59.150
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 59.390 59.390 59.390 59.390 59.390 59.390 59.390 59.390 59.390 59.390
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 38.342 38.342 38.342 38.342 38.342 38.342 38.342 38.342 38.342 38.342
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 47.209 47.209 47.209 47.209 47.209 47.209 47.209 47.209 47.209 47.209
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.004 4.004 4.004 4.004 4.004 4.004 4.004 4.004 4.004 4.004

11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.301 6.301 6.301 6.301 6.301 6.301 6.301 6.301 6.301 6.301
11,59 GABINETE TIPO III UN 973.589 973.589 973.589 973.589 973.589 973.589 973.589 973.589 973.589 973.589
11,60 GABINETE TIPO I UN 744.512 744.512 744.512 744.512 744.512 744.512 744.512 744.512 744.512 744.512
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.492.748 2.492.748 2.492.748 2.492.748 2.492.748 2.492.748 2.492.748 2.492.748 2.492.748 2.492.748
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.078.340 2.078.340 2.078.340 2.078.340 2.078.340 2.078.340 2.078.340 2.078.340 2.078.340 2.078.340
11,63 VLVULA MARIPOSA 3" UN 604.328 604.328 604.328 604.328 604.328 604.328 604.328 604.328 604.328 604.328
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
11,64 VLVULA MARIPOSA 4" UN CONSTRUCCIN
781.678 781.678 781.678 781.678 781.678 781.678 781.678 781.678 781.678 781.678
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 300.622 300.622 300.622 300.622 300.622 300.622 300.622 300.622 300.622 300.622

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 347.562 347.562 347.562 347.562 347.562 347.562 347.562 347.562 347.562 347.562
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 55.223 55.223 55.223 55.223 55.223 55.223 55.223 55.223 55.223 55.223
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 65.363 65.363 65.363 65.363 65.363 65.363 65.363 65.363 65.363 65.363
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 72.580 72.580 72.580 72.580 72.580 72.580 72.580 72.580 72.580 72.580
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 85.472 85.472 85.472 85.472 85.472 85.472 85.472 85.472 85.472 85.472
12,6 SALIDA TELFONO PVC COMPLETA UN 51.933 51.933 51.933 51.933 51.933 51.933 51.933 51.933 51.933 51.933
12,7 SALIDA TIMBRE PVC COMPLETA UN 59.182 59.182 59.182 59.182 59.182 59.182 59.182 59.182 59.182 59.182
12,8 STRIP TELEFNICO 10 PARES UN 136.664 136.664 136.664 136.664 136.664 136.664 136.664 136.664 136.664 136.664
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 53.312 53.312 53.312 53.312 53.312 53.312 53.312 53.312 53.312 53.312
12,10 SALIDA TRIFSICA PVC COMPLETA UN 122.510 122.510 122.510 122.510 122.510 122.510 122.510 122.510 122.510 122.510
12,11 SALIDA T.V PVC COMPLETA. UN 73.270 73.270 73.270 73.270 73.270 73.270 73.270 73.270 73.270 73.270
12,12 SALIDA BIFSICA C.N. UN 43.449 43.449 43.449 43.449 43.449 43.449 43.449 43.449 43.449 43.449
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 91.597 91.597 91.597 91.597 91.597 91.597 91.597 91.597 91.597 91.597
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 391.119 391.119 391.119 391.119 391.119 391.119 391.119 391.119 391.119 391.119
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 520.922 520.922 520.922 520.922 520.922 520.922 520.922 520.922 520.922 520.922
12,16 TUBERA PVC CONDUIT 1/2" ML 3.373 3.373 3.373 3.373 3.373 3.373 3.373 3.373 3.373 3.373
12,17 TUBERA PVC CONDUIT 3/4" ML 4.454 4.454 4.454 4.454 4.454 4.454 4.454 4.454 4.454 4.454
12,18 TUBERA PVC CONDUIT 1" ML 6.929 6.929 6.929 6.929 6.929 6.929 6.929 6.929 6.929 6.929
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.395 12.395 12.395 12.395 12.395 12.395 12.395 12.395 12.395 12.395
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 260.409 260.409 260.409 260.409 260.409 260.409 260.409 260.409 260.409 260.409
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 73.595 73.595 73.595 73.595 73.595 73.595 73.595 73.595 73.595 73.595
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 99.609 99.609 99.609 99.609 99.609 99.609 99.609 99.609 99.609 99.609
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 40.683 40.683 40.683 40.683 40.683 40.683 40.683 40.683 40.683 40.683
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.336.037 1.336.037 1.336.037 1.336.037 1.336.037 1.336.037 1.336.037 1.336.037 1.336.037 1.336.037
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 990.347 990.347 990.347 990.347 990.347 990.347 990.347 990.347 990.347 990.347
12,26 POSTE METLICO 6M UN 1.237.766 1.237.766 1.237.766 1.237.766 1.237.766 1.237.766 1.237.766 1.237.766 1.237.766 1.237.766
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 575.428 575.428 575.428 575.428 575.428 575.428 575.428 575.428 575.428 575.428
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 105.095 105.095 105.095 105.095 105.095 105.095 105.095 105.095 105.095 105.095
12,29 LUMINARIA 70W SODIO UN 482.777 482.777 482.777 482.777 482.777 482.777 482.777 482.777 482.777 482.777
12,30 LUMINARIA 150W SODIO UN 603.974 603.974 603.974 603.974 603.974 603.974 603.974 603.974 603.974 603.974
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.595.115 1.595.115 1.595.115 1.595.115 1.595.115 1.595.115 1.595.115 1.595.115 1.595.115 1.595.115
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.174.671 1.174.671 1.174.671 1.174.671 1.174.671 1.174.671 1.174.671 1.174.671 1.174.671 1.174.671

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 38.055 38.655 38.805 38.745 38.685 39.075 39.315 38.715 38.445 38.985
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 37.788 38.388 38.538 38.478 38.418 38.808 39.048 38.448 38.178 38.718
13,3 ALISTADO PARA LISTN M2 14.059 14.179 14.209 14.197 14.185 14.263 14.311 14.191 14.137 14.245
13,4 ALISTADO PISOS 1:3, E=0.04 M2 26.956 28.156 28.456 28.336 28.216 28.996 29.476 28.276 27.736 28.816
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 81.527 82.727 83.027 82.907 82.787 83.567 84.047 82.847 82.307 83.387
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.140 25.505 25.597 25.560 25.523 25.761 25.907 25.542 25.377 25.706
13,7 CONCRETO BASE GRADAS 2500 PSI M2 53.686 55.469 55.914 55.736 55.558 56.717 57.430 55.647 54.845 56.449
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 74.164 77.017 77.730 77.444 77.159 79.013 80.154 77.302 76.018 78.585
13,9 MANTO FIBERGLASS 600X1 M2 29.096 29.096 29.096 29.096 29.096 29.096 29.096 29.096 29.096 29.096
13,10 PEGANTE MORTERO-CONCRETO M2 22.006 22.006 22.006 22.006 22.006 22.006 22.006 22.006 22.006 22.006
13,11 PERMA PLY 2 CAPAS M2 25.826 25.826 25.826 25.826 25.826 25.826 25.826 25.826 25.826 25.826
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 43.582 45.186 45.587 45.427 45.266 46.309 46.951 45.347 44.624 46.069
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 51.001 52.962 53.453 53.256 53.060 54.335 55.119 53.158 52.276 54.041
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 73.787 76.818 77.576 77.273 76.969 78.939 80.152 77.121 75.757 78.485
13,15 TRITURADO FINO 1/2 M3 86.258 99.401 102.687 101.372 100.058 108.601 113.858 100.715 94.801 106.629
13,16 TRITURADO GRUESO 3/4 M3 90.431 100.864 103.273 102.946 107.793 116.286 120.777 109.151 97.730 111.020
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
CONSTRUCCIN
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 54.901 55.141 55.201 55.177 55.153 55.309 55.405 55.165 55.057 55.273
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 32.806 32.926 32.956 32.944 32.932 33.010 33.058 32.938 32.884 32.992
14,3 ADOQUN CONCRETO 6CM M2 62.791 63.391 63.541 63.481 63.421 63.811 64.051 63.451 63.181 63.721
14,4 ADOQUN CONCRETO 8CM M2 65.941 66.541 66.691 66.631 66.571 66.961 67.201 66.601 66.331 66.871
14,5 ADOQUN GRES PEATONAL M2 70.056 70.656 70.806 70.746 70.686 71.076 71.316 70.716 70.446 70.986
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14,6 M2 72.376 72.616 72.676 72.652 72.628 72.784 72.880 72.640 72.532 72.748
BLANCO. INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.527 35.775 35.837 35.812 35.787 35.948 36.047 35.799 35.688 35.911
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 157.590 158.670 158.940 158.832 158.724 159.426 159.858 158.778 158.292 159.264
14,9 ACABADO EN GRAVILLA LAVADA M2 44.311 44.927 45.080 45.019 44.957 45.357 45.603 44.988 44.711 45.265
14,10 GUARDAESCOBA EN GRANITO ML 42.047 42.047 42.047 42.047 42.047 42.047 42.047 42.047 42.047 42.047
14,11 GUARDAESCOBA EN GRAVILLA ML 9.699 9.947 10.009 9.984 9.959 10.120 10.219 9.972 9.860 10.083
14,12 GUARDAESCOBA PVC CARAMELO ML 9.018 9.018 9.018 9.018 9.018 9.018 9.018 9.018 9.018 9.018
14,13 GUARDAESCOBA PVC CEDRO ML 12.104 12.104 12.104 12.104 12.104 12.104 12.104 12.104 12.104 12.104
14,14 GUARDAESCOBA PINO CARIBE ML 10.112 10.112 10.112 10.112 10.112 10.112 10.112 10.112 10.112 10.112
14,15 GUARDAESCOBA CEDRO BLANCO ML 16.935 16.935 16.935 16.935 16.935 16.935 16.935 16.935 16.935 16.935
14,16 GUARDAESCOBA EN MADERA SAPAN ML 32.988 32.988 32.988 32.988 32.988 32.988 32.988 32.988 32.988 32.988
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.849 8.849 8.849 8.849 8.849 8.849 8.849 8.849 8.849 8.849
14,18 LISTN M.H. AMARILLO M2 71.465 71.465 71.465 71.465 71.465 71.465 71.465 71.465 71.465 71.465
14,19 PASO ESCALERA GRANITO ML 113.945 114.785 114.995 114.911 114.827 115.373 115.709 114.869 114.491 115.247
14,20 PIRLANES ALUMINIO ML 7.232 7.232 7.232 7.232 7.232 7.232 7.232 7.232 7.232 7.232
14,21 PIRLANES LADRILLO ML 30.467 30.633 30.675 30.658 30.642 30.750 30.817 30.650 30.575 30.725
14,22 PISO VINILO TRFICO RESIDENCIAL M2 44.112 44.112 44.112 44.112 44.112 44.112 44.112 44.112 44.112 44.112
14,23 PISO VINILO TRFICO PESADO M2 51.262 51.262 51.262 51.262 51.262 51.262 51.262 51.262 51.262 51.262
14,24 PULIDA LACADA PISO MADERA M2 47.243 47.243 47.243 47.243 47.243 47.243 47.243 47.243 47.243 47.243
14,25 TABLETA DE GRES 25X25 M2 47.628 47.868 47.928 47.904 47.880 48.036 48.132 47.892 47.784 48.000
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 53.455 53.695 53.755 53.731 53.707 53.863 53.959 53.719 53.611 53.827
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.508 10.508 10.508 10.508 10.508 10.508 10.508 10.508 10.508 10.508
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 47.222 47.472 47.534 47.509 47.484 47.647 47.747 47.497 47.384 47.609
14,29 JABONERA PORCELANA ACUARIO UN 19.817 19.817 19.817 19.817 19.817 19.817 19.817 19.817 19.817 19.817
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14,30 UN 118.582 118.582 118.582 118.582 118.582 118.582 118.582 118.582 118.582 118.582
JABONERA,CEPILLERA Y PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.552 9.552 9.552 9.552 9.552 9.552 9.552 9.552 9.552 9.552
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 21.633 21.633 21.633 21.633 21.633 21.633 21.633 21.633 21.633 21.633
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 13.884 13.884 13.884 13.884 13.884 13.884 13.884 13.884 13.884 13.884
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.489 13.489 13.489 13.489 13.489 13.489 13.489 13.489 13.489 13.489
14,35 REMATES BOCEL ALUMINIO ML 8.207 8.207 8.207 8.207 8.207 8.207 8.207 8.207 8.207 8.207
14,36 REMATES BOCEL PORCELANA ML 8.352 8.352 8.352 8.352 8.352 8.352 8.352 8.352 8.352 8.352
14,37 TAPA REGISTRO 20X20 UN 18.329 18.329 18.329 18.329 18.329 18.329 18.329 18.329 18.329 18.329
14,38 TAPA REGISTRO 6X6 UN 16.705 16.705 16.705 16.705 16.705 16.705 16.705 16.705 16.705 16.705
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 17.964 17.964 17.964 17.964 17.964 17.964 17.964 17.964 17.964 17.964
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL
14,40 M2 20.767 20.767 20.767 20.767 20.767 20.767 20.767 20.767 20.767 20.767
FUNDIDO EN SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 62.758 62.998 63.058 63.034 63.010 63.166 63.262 63.022 62.914 63.130
14,42 MEDIA CAA EN GRANITO ML 74.506 74.506 74.506 74.506 74.506 74.506 74.506 74.506 74.506 74.506
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.740 32.740 32.740 32.740 32.740 32.740 32.740 32.740 32.740 32.740
14,44 PINTURA ACRLICA PARA PISOS M2 12.754 12.754 12.754 12.754 12.754 12.754 12.754 12.754 12.754 12.754
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 97.858 97.858 97.858 97.858 97.858 97.858 97.858 97.858 97.858 97.858
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 118.456 118.456 118.456 118.456 118.456 118.456 118.456 118.456 118.456 118.456

15 CIELO RASO
15,1 APLIQUE YESO ML 70.003 70.003 70.003 70.003 70.003 70.003 70.003 70.003 70.003 70.003
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
15,2 ARMADURA MADERA Y MALLA M2 CONSTRUCCIN
34.495 34.495 34.495 34.495 34.495 34.495 34.495 34.495 34.495 34.495
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53.280 53.280 53.280 53.280 53.280 53.280 53.280 53.280 53.280 53.280
15,4 CIELO RASO DURACUSTIC M2 65.371 65.371 65.371 65.371 65.371 65.371 65.371 65.371 65.371 65.371
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 48.797 48.797 48.797 48.797 48.797 48.797 48.797 48.797 48.797 48.797
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 90.452 90.452 90.452 90.452 90.452 90.452 90.452 90.452 90.452 90.452
15,7 CORNISAS YESO ML 46.987 46.987 46.987 46.987 46.987 46.987 46.987 46.987 46.987 46.987
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 99.974 99.974 99.974 99.974 99.974 99.974 99.974 99.974 99.974 99.974
15,9 MALLA CON VENA M2 12.909 12.909 12.909 12.909 12.909 12.909 12.909 12.909 12.909 12.909

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 66.390 63.803 62.509 65.096 84.499 88.379 88.379 87.086 66.390 76.738
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 91.899 105.935 109.444 108.040 106.637 115.760 121.375 107.339 101.022 113.655
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 128.871 128.871 128.871 157.328 128.871 128.871 157.328 157.328 157.328 144.393
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 65.973 63.386 62.092 64.679 84.082 87.962 87.962 86.669 65.973 76.321
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 118.039 118.039 118.039 146.496 118.039 118.039 146.496 146.496 146.496 133.561
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 126.210 126.210 126.210 154.667 126.210 126.210 154.667 154.667 154.667 141.732

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 290.276 290.276 290.276 290.276 290.276 290.276 290.276 290.276 290.276 290.276
SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE
17,2 UN 855.572 855.572 855.572 855.572 855.572 855.572 855.572 855.572 855.572 855.572
GRIFERA)
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 463.603 463.603 463.603 463.603 463.603 463.603 463.603 463.603 463.603 463.603

17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 134.452 134.452 134.452 134.452 134.452 134.452 134.452 134.452 134.452 134.452

17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 188.223 188.223 188.223 188.223 188.223 188.223 188.223 188.223 188.223 188.223
SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE
17,6 UN 174.808 174.808 174.808 174.808 174.808 174.808 174.808 174.808 174.808 174.808
GRIFERA)
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 384.738 384.738 384.738 384.738 384.738 384.738 384.738 384.738 384.738 384.738
SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE
17,8 UN 983.923 983.923 983.923 983.923 983.923 983.923 983.923 983.923 983.923 983.923
GRIFERA)
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 279.500 279.500 279.500 279.500 279.500 279.500 279.500 279.500 279.500 279.500
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 198.028 198.028 198.028 198.028 198.028 198.028 198.028 198.028 198.028 198.028
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 78.835 78.835 78.835 78.835 78.835 78.835 78.835 78.835 78.835 78.835
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO
17,12 UN 239.749 239.749 239.749 239.749 239.749 239.749 239.749 239.749 239.749 239.749
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO
17,13 UN 353.141 353.141 353.141 353.141 353.141 353.141 353.141 353.141 353.141 353.141
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 7.987 7.987 7.987 7.987 7.987 7.987 7.987 7.987 7.987 7.987
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.961 2.961 2.961 2.961 2.961 2.961 2.961 2.961 2.961 2.961
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.637 10.637 10.637 10.637 10.637 10.637 10.637 10.637 10.637 10.637
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
18,4 BARNIZ SOBRE MUEBLES M2 CONSTRUCCIN
40.459 40.459 40.459 40.459 40.459 40.459 40.459 40.459 40.459 40.459
18,5 CARBURO SOBRE PAETES M2 5.575 5.575 5.575 5.575 5.575 5.575 5.575 5.575 5.575 5.575
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 63.090 63.090 63.090 63.090 63.090 63.090 63.090 63.090 63.090 63.090
18,7 DEMARCACIN CON MARMOLINA ML 3.316 3.316 3.316 3.316 3.316 3.316 3.316 3.316 3.316 3.316
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.657 2.657 2.657 2.657 2.657 2.657 2.657 2.657 2.657 2.657
18,9 ESMALTE SOBRE LMINA LLENA M2 13.334 13.334 13.334 13.334 13.334 13.334 13.334 13.334 13.334 13.334
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.863 3.863 3.863 3.863 3.863 3.863 3.863 3.863 3.863 3.863
18,11 ESMALTE SOBRE MADERA LLENA M2 14.060 14.060 14.060 14.060 14.060 14.060 14.060 14.060 14.060 14.060
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.506 5.506 5.506 5.506 5.506 5.506 5.506 5.506 5.506 5.506
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.264 6.264 6.264 6.264 6.264 6.264 6.264 6.264 6.264 6.264
18,14 ESTUCO M2 6.705 6.705 6.705 6.705 6.705 6.705 6.705 6.705 6.705 6.705
18,15 ESTUCO (LINEAL) ML 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198
18,16 ESTUCO Y VINILO 3 MANOS M2 14.840 14.840 14.840 14.840 14.840 14.840 14.840 14.840 14.840 14.840
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.194 9.194 9.194 9.194 9.194 9.194 9.194 9.194 9.194 9.194
18,18 LACA PISOS MADERA M2 21.745 21.745 21.745 21.745 21.745 21.745 21.745 21.745 21.745 21.745
18,19 LNEAS TRFICO 0.10 ML 2.568 2.568 2.568 2.568 2.568 2.568 2.568 2.568 2.568 2.568
18,20 MARMOLINA SOBRE PAETE M2 11.665 11.665 11.665 11.665 11.665 11.665 11.665 11.665 11.665 11.665
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.147 3.147 3.147 3.147 3.147 3.147 3.147 3.147 3.147 3.147
18,22 TINTILLA SOBRE MADERA LLENA M2 12.051 12.051 12.051 12.051 12.051 12.051 12.051 12.051 12.051 12.051
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.775 6.775 6.775 6.775 6.775 6.775 6.775 6.775 6.775 6.775
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.257 4.257 4.257 4.257 4.257 4.257 4.257 4.257 4.257 4.257
18,25 WASH-PRIMER SOBRE ALUMNIO M2 20.891 20.891 20.891 20.891 20.891 20.891 20.891 20.891 20.891 20.891
18,26 PINTURA EPXICA M2 12.122 12.122 12.122 12.122 12.122 12.122 12.122 12.122 12.122 12.122
18,27 PINTURA EPXICA (LINEAL) ML 7.486 7.486 7.486 7.486 7.486 7.486 7.486 7.486 7.486 7.486

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.826.318 5.826.318 5.826.318 5.826.318 5.826.318 5.826.318 5.826.318 5.826.318 5.826.318 5.826.318
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES
19,2 UN 10.294.198 10.294.198 10.294.198 10.294.198 10.294.198 10.294.198 10.294.198 10.294.198 10.294.198 10.294.198
Y CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.694.006 2.694.006 2.694.006 2.694.006 2.694.006 2.694.006 2.694.006 2.694.006 2.694.006 2.694.006
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.804.184 8.804.184 8.804.184 8.804.184 8.804.184 8.804.184 8.804.184 8.804.184 8.804.184 8.804.184
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.244.876 8.244.876 8.244.876 8.244.876 8.244.876 8.244.876 8.244.876 8.244.876 8.244.876 8.244.876
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.568 2.568 2.568 2.568 2.568 2.568 2.568 2.568 2.568 2.568
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 826.782 826.782 826.782 826.782 826.782 826.782 826.782 826.782 826.782 826.782
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 82.616 82.616 82.616 82.616 82.616 82.616 82.616 82.616 82.616 82.616
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.496.104 1.496.287 1.496.333 1.496.315 1.496.296 1.496.415 1.496.489 1.496.305 1.496.223 1.496.388
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 646.265 650.624 651.714 651.278 650.842 653.676 655.420 651.060 649.098 653.022

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.301 28.301 28.301 28.301 28.301 28.301 28.301 28.301 28.301 28.301
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.004 42.004 42.004 42.004 42.004 42.004 42.004 42.004 42.004 42.004
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 52.054 52.054 52.054 52.054 52.054 52.054 52.054 52.054 52.054 52.054
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 16.997 16.997 16.997 16.997 16.997 16.997 16.997 16.997 16.997 16.997

20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 20.572 20.572 20.572 20.572 20.572 20.572 20.572 20.572 20.572 20.572
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 28.031 28.031 28.031 28.031 28.031 28.031 28.031 28.031 28.031 28.031
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.187 25.187 25.187 25.187 25.187 25.187 25.187 25.187 25.187 25.187
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.540 26.540 26.540 26.540 26.540 26.540 26.540 26.540 26.540 26.540
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.164 33.164 33.164 33.164 33.164 33.164 33.164 33.164 33.164 33.164
20,10 VLVULA DE BOLA GAS 1/2" UN 16.917 16.917 16.917 16.917 16.917 16.917 16.917 16.917 16.917 16.917
20,11 VLVULA DE BOLA GAS 3/4" UN 22.179 22.179 22.179 22.179 22.179 22.179 22.179 22.179 22.179 22.179
20,12 VLVULA DE BOLA GAS 1" UN 34.127 34.127 34.127 34.127 34.127 34.127 34.127 34.127 34.127 34.127
20,13 VLVULA POLIETILENO GAS 1/2" UN 261.913 261.913 261.913 261.913 261.913 261.913 261.913 261.913 261.913 261.913
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
20,14 VLVULA POLIETILENO GAS 3/4" UN CONSTRUCCIN
301.424 301.424 301.424 301.424 301.424 301.424 301.424 301.424 301.424 301.424
20,15 VLVULA POLIETILENO GAS 1" UN 314.377 314.377 314.377 314.377 314.377 314.377 314.377 314.377 314.377 314.377
20,16 ACOMETIDA GAS 1/2" ML 291.576 291.576 291.576 291.576 291.576 291.576 291.576 291.576 291.576 291.576

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 212.707 212.707 212.707 212.707 212.707 212.707 212.707 212.707 212.707 212.707
21,2 CABLE DETECTOR LINEAL DE CALOR ML 32.616 32.616 32.616 32.616 32.616 32.616 32.616 32.616 32.616 32.616
21,3 SIRENA DE 110 V UN 99.259 99.259 99.259 99.259 99.259 99.259 99.259 99.259 99.259 99.259
21,4 CMARA CCTV UN 251.731 251.731 251.731 251.731 251.731 251.731 251.731 251.731 251.731 251.731
21,5 PARLANTE-CIELO FALSO UN 49.812 49.812 49.812 49.812 49.812 49.812 49.812 49.812 49.812 49.812
21,6 AMPLIFICADOR 100W UN 549.740 549.740 549.740 549.740 549.740 549.740 549.740 549.740 549.740 549.740
21,7 AMPLIFICADOR 300W UN 1.363.882 1.363.882 1.363.882 1.363.882 1.363.882 1.363.882 1.363.882 1.363.882 1.363.882 1.363.882
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.709 42.709 42.709 42.709 42.709 42.709 42.709 42.709 42.709 42.709
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 212.802 212.802 212.802 212.802 212.802 212.802 212.802 212.802 212.802 212.802
21,10 TOMA PARA MICRFONO UN 42.086 42.086 42.086 42.086 42.086 42.086 42.086 42.086 42.086 42.086
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.605 3.605 3.605 3.605 3.605 3.605 3.605 3.605 3.605 3.605
21,12 SPLITERS UN 6.061 6.061 6.061 6.061 6.061 6.061 6.061 6.061 6.061 6.061
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.788 17.788 17.788 17.788 17.788 17.788 17.788 17.788 17.788 17.788
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.339 23.339 23.339 23.339 23.339 23.339 23.339 23.339 23.339 23.339
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.279 30.279 30.279 30.279 30.279 30.279 30.279 30.279 30.279 30.279
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 117.791 117.791 117.791 117.791 117.791 117.791 117.791 117.791 117.791 117.791
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 30.729 30.729 30.729 30.729 30.729 30.729 30.729 30.729 30.729 30.729
21,18 BANDEJA PORTACABLES PARA RACK UN 100.522 100.522 100.522 100.522 100.522 100.522 100.522 100.522 100.522 100.522
21,19 RACK 2' X 24" UN 175.801 175.801 175.801 175.801 175.801 175.801 175.801 175.801 175.801 175.801
21,20 RACK 3' X 24" UN 276.452 276.452 276.452 276.452 276.452 276.452 276.452 276.452 276.452 276.452
21,21 RACK 5' X 24" UN 343.330 343.330 343.330 343.330 343.330 343.330 343.330 343.330 343.330 343.330
21,22 RACK 7' X 24" UN 375.181 375.181 375.181 375.181 375.181 375.181 375.181 375.181 375.181 375.181
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 549.189 549.189 549.189 549.189 549.189 549.189 549.189 549.189 549.189 549.189
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 323.444 323.444 323.444 323.444 323.444 323.444 323.444 323.444 323.444 323.444
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 99.835 99.835 99.835 99.835 99.835 99.835 99.835 99.835 99.835 99.835
21,26 PATCH CORD 2M CATEGORA 6A UN 13.301 13.301 13.301 13.301 13.301 13.301 13.301 13.301 13.301 13.301
21,27 PATCH CORD 5M CATEGORA 6A UN 27.189 27.189 27.189 27.189 27.189 27.189 27.189 27.189 27.189 27.189
21,28 CABLE UTP CATEGORA 6A ML 4.790 4.790 4.790 4.790 4.790 4.790 4.790 4.790 4.790 4.790
21,29 CANALETA METLICA 4X6 CMS ML 33.742 33.742 33.742 33.742 33.742 33.742 33.742 33.742 33.742 33.742
21,30 CANALETA METLICA 4X10 CMS ML 35.262 35.262 35.262 35.262 35.262 35.262 35.262 35.262 35.262 35.262
21,31 CANALETA METLICA 6X10 CMS ML 36.020 36.020 36.020 36.020 36.020 36.020 36.020 36.020 36.020 36.020
21,32 CANALETA PLSTICA 13X7 MM ML 23.492 23.492 23.492 23.492 23.492 23.492 23.492 23.492 23.492 23.492
21,33 CANALETA PLSTICA 20X12 MM ML 25.989 25.989 25.989 25.989 25.989 25.989 25.989 25.989 25.989 25.989
21,34 CANALETA PLSTICA 32X12 MM ML 27.038 27.038 27.038 27.038 27.038 27.038 27.038 27.038 27.038 27.038
21,35 CANALETA PLSTICA 40X60 MM ML 45.481 45.481 45.481 45.481 45.481 45.481 45.481 45.481 45.481 45.481
21,36 SWITCH 10/100/1000 24 PUERTOS UN 588.599 588.599 588.599 588.599 588.599 588.599 588.599 588.599 588.599 588.599
21,37 SWITCH 10/100/1000 16 PUERTOS UN 302.257 302.257 302.257 302.257 302.257 302.257 302.257 302.257 302.257 302.257
21,38 SWITCH 10/100/1000 8 PUERTOS UN 84.715 84.715 84.715 84.715 84.715 84.715 84.715 84.715 84.715 84.715
21,39 CABLE TELEFNICO 2 PARES ML 1.758 1.758 1.758 1.758 1.758 1.758 1.758 1.758 1.758 1.758
21,40 CABLE TELEFNICO 10 PARES ML 8.119 8.119 8.119 8.119 8.119 8.119 8.119 8.119 8.119 8.119
21,41 CABLE TELEFNICO 20 PARES ML 12.113 12.113 12.113 12.113 12.113 12.113 12.113 12.113 12.113 12.113
21,42 CABLE TELEFNICO 40 PARES ML 20.221 20.221 20.221 20.221 20.221 20.221 20.221 20.221 20.221 20.221
21,43 CABLE TELEVISIN RG6 ML 3.746 3.746 3.746 3.746 3.746 3.746 3.746 3.746 3.746 3.746
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.314 21.314 21.314 21.314 21.314 21.314 21.314 21.314 21.314 21.314
21,45 ACOMETIDA TELEFNICA 1" ML 31.024 31.024 31.024 31.024 31.024 31.024 31.024 31.024 31.024 31.024
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.512 18.512 18.512 18.512 18.512 18.512 18.512 18.512 18.512 18.512
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 14.724 14.724 14.724 14.724 14.724 14.724 14.724 14.724 14.724 14.724
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 594.216 594.216 594.216 594.216 594.216 594.216 594.216 594.216 594.216 594.216
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
CONSTRUCCIN
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 86.983 86.983 86.983 86.983 86.983 86.983 86.983 86.983 86.983 86.983
1,3 CODO 45 PVC UNIN MECNICA 8" UN 489.814 489.814 489.814 489.814 489.814 489.814 489.814 489.814 489.814 489.814
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.045.452 1.045.452 1.045.452 1.045.452 1.045.452 1.045.452 1.045.452 1.045.452 1.045.452 1.045.452
1,5 CODO 90 PVC UNIN MECNICA 4" UN 119.858 119.858 119.858 119.858 119.858 119.858 119.858 119.858 119.858 119.858
1,6 CODO 90 PVC UNIN MECNICA 8" UN 730.032 730.032 730.032 730.032 730.032 730.032 730.032 730.032 730.032 730.032
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.571.051 1.571.051 1.571.051 1.571.051 1.571.051 1.571.051 1.571.051 1.571.051 1.571.051 1.571.051
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.546 12.546 12.546 12.546 12.546 12.546 12.546 12.546 12.546 12.546
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.472 15.472 15.472 15.472 15.472 15.472 15.472 15.472 15.472 15.472
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.426 19.426 19.426 19.426 19.426 19.426 19.426 19.426 19.426 19.426
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.261 21.261 21.261 21.261 21.261 21.261 21.261 21.261 21.261 21.261
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 25.487 25.487 25.487 25.487 25.487 25.487 25.487 25.487 25.487 25.487
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 25.487 25.487 25.487 25.487 25.487 25.487 25.487 25.487 25.487 25.487
1,14 TAPN PVC UNIN MECNICA 3" UN 102.433 102.433 102.433 102.433 102.433 102.433 102.433 102.433 102.433 102.433
1,15 TAPN PVC UNIN MECNICA 4" UN 118.650 118.650 118.650 118.650 118.650 118.650 118.650 118.650 118.650 118.650
1,16 TAPN PVC UNIN MECNICA 8" UN 367.178 367.178 367.178 367.178 367.178 367.178 367.178 367.178 367.178 367.178
1,17 TEE PVC UNIN MECNICA 2" UN 137.877 137.877 137.877 137.877 137.877 137.877 137.877 137.877 137.877 137.877
1,18 TEE PVC UNIN MECNICA 4" UN 227.290 227.290 227.290 227.290 227.290 227.290 227.290 227.290 227.290 227.290
1,19 TEE PVC UNIN MECNICA 8" UN 1.005.740 1.005.740 1.005.740 1.005.740 1.005.740 1.005.740 1.005.740 1.005.740 1.005.740 1.005.740
1,20 TEE PVC UNIN MECNICA 10" UN 1.158.755 1.158.755 1.158.755 1.158.755 1.158.755 1.158.755 1.158.755 1.158.755 1.158.755 1.158.755
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.606 13.606 13.606 13.606 13.606 13.606 13.606 13.606 13.606 13.606
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.007 12.007 12.007 12.007 12.007 12.007 12.007 12.007 12.007 12.007
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 29.623 29.623 29.623 29.623 29.623 29.623 29.623 29.623 29.623 29.623
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 117.562 117.562 117.562 117.562 117.562 117.562 117.562 117.562 117.562 117.562
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 175.046 175.046 175.046 175.046 175.046 175.046 175.046 175.046 175.046 175.046
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 28.618 28.618 28.618 28.618 28.618 28.618 28.618 28.618 28.618 28.618
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 98.563 98.563 98.563 98.563 98.563 98.563 98.563 98.563 98.563 98.563
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 146.035 146.035 146.035 146.035 146.035 146.035 146.035 146.035 146.035 146.035
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 59.622 59.622 59.622 59.622 59.622 59.622 59.622 59.622 59.622 59.622
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 240.089 240.089 240.089 240.089 240.089 240.089 240.089 240.089 240.089 240.089
1,32 UNIN REPARACION PVC 4" UN 69.560 69.560 69.560 69.560 69.560 69.560 69.560 69.560 69.560 69.560
1,33 UNIN REPARACIN PVC 8" UN 279.330 279.330 279.330 279.330 279.330 279.330 279.330 279.330 279.330 279.330
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 167.523 167.523 167.523 167.523 167.523 167.523 167.523 167.523 167.523 167.523
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 476.685 476.685 476.685 476.685 476.685 476.685 476.685 476.685 476.685 476.685
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.276.661 1.276.661 1.276.661 1.276.661 1.276.661 1.276.661 1.276.661 1.276.661 1.276.661 1.276.661
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.886.403 1.886.403 1.886.403 1.886.403 1.886.403 1.886.403 1.886.403 1.886.403 1.886.403 1.886.403

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.255 10.255 10.255 10.255 10.255 10.255 10.255 10.255 10.255 10.255
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.434 23.434 23.434 23.434 23.434 23.434 23.434 23.434 23.434 23.434
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 74.023 87.421 90.770 89.431 88.091 96.799 102.159 88.761 82.732 94.790
2,5 RELLENO TIPO 2 "RECEBO" M3 61.610 59.023 57.730 60.317 79.719 83.600 83.600 82.306 61.610 71.958
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 70.643 68.056 66.762 69.349 88.752 92.632 92.632 91.339 70.643 80.991
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 88.120 91.194 91.194 88.120 90.169 113.741 88.120 88.120 88.120 98.368
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 71.214 72.259 74.348 71.214 73.304 97.333 65.990 71.214 71.214 85.841
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 71.085 81.914 84.622 83.539 82.456 89.494 93.826 82.997 78.124 87.870

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 109.499 109.499 109.499 109.499 109.499 109.499 109.499 109.499 109.499 109.499
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
3,2 CODO 45 PVC ALCANTARILLADO 16" UN CONSTRUCCIN
1.141.601 1.141.601 1.141.601 1.141.601 1.141.601 1.141.601 1.141.601 1.141.601 1.141.601 1.141.601
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 143.096 143.096 143.096 143.096 143.096 143.096 143.096 143.096 143.096 143.096
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.322.264 1.322.264 1.322.264 1.322.264 1.322.264 1.322.264 1.322.264 1.322.264 1.322.264 1.322.264
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 921.609 921.609 921.609 921.609 921.609 921.609 921.609 921.609 921.609 921.609
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 61.850 61.850 61.850 61.850 61.850 61.850 61.850 61.850 61.850 61.850
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 108.699 108.699 108.699 108.699 108.699 108.699 108.699 108.699 108.699 108.699
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 256.660 256.660 256.660 256.660 256.660 256.660 256.660 256.660 256.660 256.660
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 412.057 412.057 412.057 412.057 412.057 412.057 412.057 412.057 412.057 412.057
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 108.745 108.745 108.745 108.745 108.745 108.745 108.745 108.745 108.745 108.745
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 108.745 108.745 108.745 108.745 108.745 108.745 108.745 108.745 108.745 108.745
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666 256.666
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 412.057 412.057 412.057 412.057 412.057 412.057 412.057 412.057 412.057 412.057
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 414.465 414.465 414.465 414.465 414.465 414.465 414.465 414.465 414.465 414.465
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 672.540 672.540 672.540 672.540 672.540 672.540 672.540 672.540 672.540 672.540
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.079.208 1.079.208 1.079.208 1.079.208 1.079.208 1.079.208 1.079.208 1.079.208 1.079.208 1.079.208
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 66.641 66.641 66.641 66.641 66.641 66.641 66.641 66.641 66.641 66.641
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 346.940 346.940 346.940 346.940 346.940 346.940 346.940 346.940 346.940 346.940
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 388.203 388.203 388.203 388.203 388.203 388.203 388.203 388.203 388.203 388.203
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.075.309 1.075.309 1.075.309 1.075.309 1.075.309 1.075.309 1.075.309 1.075.309 1.075.309 1.075.309
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 62.654 62.766 62.794 62.783 62.771 62.844 62.889 62.777 62.727 62.827
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 314.581 314.581 314.581 314.581 314.581 314.581 314.581 314.581 314.581 314.581
3,25 TUBERA PVC ALCANTARILLADO 8" ML 47.772 47.772 47.772 47.772 47.772 47.772 47.772 47.772 47.772 47.772
3,26 TUBERA PVC ALCANTARILLADO 10" ML 67.561 67.561 67.561 67.561 67.561 67.561 67.561 67.561 67.561 67.561
3,27 TUBERA PVC ALCANTARILLADO 12" ML 97.492 97.492 97.492 97.492 97.492 97.492 97.492 97.492 97.492 97.492
3,28 TUBERA PVC ALCANTARILLADO 16" ML 149.652 149.652 149.652 149.652 149.652 149.652 149.652 149.652 149.652 149.652
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 240.507 240.507 240.507 240.507 240.507 240.507 240.507 240.507 240.507 240.507
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 349.446 349.446 349.446 349.446 349.446 349.446 349.446 349.446 349.446 349.446
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 442.086 442.086 442.086 442.086 442.086 442.086 442.086 442.086 442.086 442.086
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 581.217 581.217 581.217 581.217 581.217 581.217 581.217 581.217 581.217 581.217
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 799.250 799.250 799.250 799.250 799.250 799.250 799.250 799.250 799.250 799.250

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4,1 UN 629.480 639.942 642.558 641.512 640.466 647.267 651.452 640.989 636.280 645.697
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE
4,2 ML 618.107 625.751 627.662 626.898 626.134 631.102 634.160 626.516 623.076 629.956
INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,3 UN 673.923 680.898 682.642 681.945 681.247 685.781 688.571 681.596 678.457 684.735
(INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4,4 UN 747.164 760.242 763.512 762.204 760.896 769.398 774.629 761.550 755.664 767.436
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE
4,5 ML 877.925 888.689 891.380 890.304 889.228 896.224 900.530 889.766 884.922 894.610
INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,6 UN 776.914 786.505 788.903 787.944 786.985 793.219 797.055 787.465 783.148 791.780
(INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 939.015 943.879 945.096 944.611 944.121 947.283 949.232 944.364 942.177 946.555
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.356.638 1.371.042 1.374.645 1.373.207 1.371.762 1.381.125 1.386.892 1.372.481 1.366.002 1.378.967
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.855.506 1.883.228 1.890.159 1.887.386 1.884.614 1.902.634 1.913.723 1.886.000 1.873.525 1.898.475
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.461.258 2.507.338 2.518.861 2.514.252 2.509.643 2.539.598 2.558.031 2.511.947 2.491.210 2.532.685
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.747.781 1.747.781 1.747.781 1.747.781 1.747.781 1.747.781 1.747.781 1.747.781 1.747.781 1.747.781
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.697.506 3.697.506 3.697.506 3.697.506 3.697.506 3.697.506 3.697.506 3.697.506 3.697.506 3.697.506
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 131.890 132.202 132.280 132.249 132.217 132.420 132.545 132.233 132.093 132.373
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
5 ANDENES Y SARDINELES CONSTRUCCIN
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 68.699 69.283 69.428 69.370 69.312 69.691 69.924 69.341 69.078 69.603
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 81.595 82.179 82.324 82.266 82.208 82.587 82.820 82.237 81.974 82.499
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 51.762 53.634 54.102 53.914 53.727 54.944 55.693 53.821 52.979 54.663
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 56.272 58.103 58.561 58.378 58.195 59.385 60.117 58.286 57.462 59.110
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 56.468 58.242 58.686 58.509 58.331 59.484 60.194 58.420 57.621 59.218
5,6 BORDE SEPARADOR VERDE A-170 ML 241.727 242.039 242.117 242.086 242.055 242.258 242.382 242.070 241.930 242.211
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.292 17.517 17.573 17.551 17.528 17.674 17.764 17.539 17.438 17.640
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 37.051 38.370 38.700 38.568 38.436 39.294 39.822 38.502 37.909 39.096
5,9 CAUELA PREFABRICADA TIPO A-120 ML 79.342 79.508 79.550 79.533 79.517 79.625 79.692 79.525 79.450 79.600
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 527.302 531.542 532.602 532.178 531.754 534.510 536.206 531.966 530.058 533.874
5,11 LOSETA PREFABRICADA A-40 M2 59.377 60.091 60.270 60.198 60.127 60.591 60.876 60.162 59.841 60.484
5,12 LOSETA PREFABRICADA A-60 M2 86.249 86.963 87.142 87.070 86.999 87.463 87.748 87.034 86.713 87.356
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 31.164 31.896 32.079 32.006 31.933 32.409 32.702 31.970 31.640 32.299
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 49.935 51.417 51.788 51.640 51.491 52.455 53.048 51.566 50.898 52.233
5,15 SARDINEL PREFABRICADO A-10 ML 93.877 94.044 94.085 98.447 94.052 94.160 98.605 98.438 98.363 96.523
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 57.215 57.647 57.755 57.712 57.669 57.950 58.123 57.691 57.496 57.885

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 192.468 193.340 193.558 193.471 193.383 193.950 194.299 193.427 193.035 193.819
6,2 BANCA EN CONCRETO M-30 UN 633.438 634.658 634.963 634.841 634.719 635.513 636.001 634.780 634.231 635.330
6,3 BOLARDO M-63 ALTO/HIERRO UN 204.134 204.317 204.363 204.345 204.326 204.445 204.518 204.335 204.253 204.418
6,4 BOLARDO M-60 CONCRETO UN 153.223 154.270 154.531 154.427 154.322 155.002 155.421 154.374 153.903 154.845
6,5 BOLARDO M-61 BAJO/CONCRETO UN 154.987 156.033 156.295 156.190 156.086 156.766 157.184 156.138 155.667 156.609
6,6 BOLARDO M-62 BAJO/HIERRO UN 181.820 182.917 183.191 183.082 182.972 183.685 184.124 183.027 182.533 183.520
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 55.033 55.480 55.591 55.547 55.502 55.792 55.971 55.524 55.324 55.725
6,8 BORDILLO PREFABRICADO A-80 ML 63.773 64.273 64.398 64.348 64.298 64.623 64.822 64.323 64.098 64.548
6,9 CANECA M-120 UN 296.507 296.618 296.646 296.635 296.624 296.697 296.741 296.630 296.579 296.680
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 782.071 782.594 782.725 782.673 782.620 782.960 783.170 782.646 782.411 782.882
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.210.993 3.211.341 3.211.429 3.211.394 3.211.359 3.211.586 3.211.725 3.211.376 3.211.219 3.211.533
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.303.215 3.303.563 3.303.651 3.303.616 3.303.581 3.303.808 3.303.947 3.303.598 3.303.441 3.303.755
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 461.572 461.937 462.028 461.992 461.955 462.193 462.339 461.974 461.809 462.138
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 610.762 612.224 612.590 612.444 612.298 613.248 613.833 612.371 611.713 613.029
6,15 BANCA EN MADERA M-50 UN 508.186 508.186 508.186 508.186 508.186 508.186 508.186 508.186 508.186 508.186
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 235.182 235.705 235.835 235.783 235.731 236.071 236.280 235.757 235.522 235.992
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 546.567 546.846 546.915 546.888 546.860 547.041 547.153 546.874 546.748 546.999
6,18 POSTE HISTRICO M-131 UN 6.103.334 6.105.950 6.106.604 6.106.342 6.106.080 6.107.781 6.108.827 6.106.211 6.105.034 6.107.388

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.838 3.838 3.838 3.838 3.838 3.838 3.838 3.838 3.838 3.838
7,2 MARCA VIAL CON PINTURA EN FRO M2 41.263 41.263 41.263 41.263 41.263 41.263 41.263 41.263 41.263 41.263
7,3 SEAL DOBLE DE CICLORUTA UN 297.977 298.133 298.172 298.157 298.141 298.242 298.305 298.149 298.079 298.219
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 469.495 470.226 470.409 470.336 470.263 470.738 471.031 470.300 469.971 470.629
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 223.488 223.644 223.683 223.667 223.651 223.753 223.815 223.659 223.589 223.729
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 237.324 237.480 237.519 237.503 237.487 237.589 237.651 237.495 237.425 237.565
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 247.802 247.958 247.997 247.981 247.965 248.067 248.129 247.973 247.903 248.043
7,8 TACHAS REFLECTIVAS UN 12.898 12.898 12.898 12.898 12.898 12.898 12.898 12.898 12.898 12.898
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.772 13.772 13.772 13.772 13.772 13.772 13.772 13.772 13.772 13.772
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7,10 UN 111.922 111.922 111.922 111.922 111.922 111.922 111.922 111.922 111.922 111.922
SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
SOBRANTES A UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
PRESTAMOS, SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y
2,1 210.1.1 M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
PRSTAMOS
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.202 34.202 34.202 34.202 34.202 34.202 34.202 34.202 34.202 34.202
EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y
2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2,10 600.2 M3 62.778 62.778 62.778 62.778 62.778 62.778 62.778 62.778 62.778 62.778
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2,11 600.3 M3 77.047 77.047 77.047 77.047 77.047 77.047 77.047 77.047 77.047 77.047
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 130.552 130.552 130.552 166.874 130.552 130.552 166.874 166.874 166.874 150.364
3,3 330.1 BASE GRANULAR M3 138.723 138.723 138.723 175.045 138.723 138.723 175.045 175.045 175.045 158.535
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.064 3.064 3.064 3.064 3.064 3.064 3.064 3.064 3.064 3.064
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 212.258 215.868 216.770 216.409 216.048 218.395 219.839 216.229 214.604 217.853
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 62.620 63.703 63.973 63.865 63.757 64.461 64.894 63.811 63.324 64.298
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3,9 450.1 P M3 541.388 512.813 574.726 577.901 568.376 592.188 598.538 571.551 562.026 531.863
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3,10 450.2 P M3 606.638 578.063 639.976 643.151 633.626 657.438 663.788 636.801 627.276 597.113
ASFLTICO)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une

3,11 450.9 P
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
M3 CONSTRUCCIN
627.556 598.981 660.894 664.069 654.544 678.356 684.706 657.719 648.194 618.031
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3,12 450.3 P M3 628.388 599.813 661.726 664.901 655.376 679.188 685.538 658.551 649.026 618.863
ASFLTICO)
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 278.981 278.981 278.981 315.303 278.981 278.981 315.303 315.303 315.303 298.793
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 269.804 269.804 269.804 306.126 269.804 269.804 306.126 306.126 306.126 289.616
3,15 311.1 AFIRMADO M3 72.408 69.106 67.455 70.757 95.522 100.475 100.475 98.824 72.408 85.616
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 10.995 11.250 11.314 11.288 11.262 11.428 11.530 11.275 11.160 11.390
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.405 4.532 4.564 4.551 4.539 4.622 4.673 4.545 4.488 4.602
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE
3,18 500.1 M3 590.809 607.398 611.546 609.887 608.228 619.011 625.646 609.057 601.592 616.522
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE
3,19 500.1 M3 620.717 638.049 642.382 640.648 638.915 650.181 657.114 639.782 631.982 647.581
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE
3,20 500.1 M3 640.597 658.416 662.871 661.089 659.307 670.890 678.018 660.198 652.179 668.217
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE
3,21 *** ML 6.669 6.669 6.669 6.669 6.669 6.669 6.669 6.669 6.669 6.669
LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 98.240 99.637 102.431 98.240 101.034 133.165 91.255 98.240 98.240 117.798

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 850.192 869.010 873.714 871.833 869.951 882.182 889.709 870.892 862.424 879.360
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 731.249 749.755 754.381 752.531 750.680 762.709 770.111 751.605 743.278 759.932
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 774.368 793.607 798.417 796.493 794.568 807.074 814.769 795.530 786.873 804.187
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 525.407 542.473 546.740 545.033 543.326 554.420 561.247 544.180 536.500 551.860
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 615.974 633.715 638.152 636.377 634.603 646.136 653.233 635.490 627.506 643.474
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 523.521 541.133 545.537 543.776 542.014 553.462 560.507 542.895 534.968 550.820
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 614.013 632.323 636.901 635.070 633.239 645.140 652.464 634.154 625.914 642.394
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 675.397 693.010 697.413 695.652 693.891 705.339 712.384 694.771 686.845 702.697
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 541.425 559.735 564.313 562.482 560.651 572.552 579.876 561.566 553.326 569.805
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 716.304 734.614 739.192 737.361 735.530 747.432 754.755 736.446 728.205 744.685
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,11 650 P KG 11.300 11.300 11.300 11.300 11.300 11.300 11.300 11.300 11.300 11.300
ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,12 650 P KG 14.494 14.494 14.494 14.494 14.494 14.494 14.494 14.494 14.494 14.494
ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.703 1.703 1.703 1.703 1.703 1.703 1.703 1.703 1.703 1.703
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M,
4,14 621.1 ML 2.562.955 2.562.955 2.562.955 2.562.955 2.562.955 2.562.955 2.562.955 2.562.955 2.562.955 2.562.955
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN
4,15 621.1 P MANUAL (INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, ML 3.886.985 3.919.173 3.927.220 3.924.001 3.920.782 3.941.705 3.954.580 3.922.392 3.907.907 3.936.876
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4,16 621.2 M3 1.626.191 1.643.629 1.647.989 1.646.245 1.644.501 1.655.836 1.662.811 1.645.373 1.637.525 1.653.220
REFUERZO)
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 82.656 82.656 82.656 82.656 82.656 82.656 82.656 82.656 82.656 82.656
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 340.215 342.308 342.831 342.622 342.412 343.772 344.609 342.517 341.575 343.459
4,19 632 P BARANDA METLICA ML 401.464 401.464 401.464 401.464 401.464 401.464 401.464 401.464 401.464 401.464
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.049 16.049 16.049 16.049 16.049 16.049 16.049 16.049 16.049 16.049
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 445.457 461.786 465.361 465.557 478.960 493.944 501.289 481.911 457.391 482.046
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 102.231 106.422 106.422 102.231 105.025 137.156 102.231 102.231 102.231 116.201
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 73.239 70.191 68.667 71.715 94.575 99.147 99.147 97.623 73.239 85.431
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 345.647 364.108 368.723 366.877 365.031 377.031 384.415 365.954 357.647 374.261
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 338.379 349.854 353.612 350.991 350.910 369.723 358.870 350.443 345.508 362.490
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 346.820 358.294 362.052 359.432 359.351 378.163 367.310 358.883 353.948 370.930
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 351.775 362.979 366.669 364.075 364.022 382.658 371.697 363.541 358.727 375.466
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 360.215 371.419 375.110 372.516 372.462 391.099 380.137 371.981 367.167 383.906
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 474.751 492.756 497.258 495.457 493.656 505.360 512.562 494.557 486.454 502.659
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 CONSTRUCCIN
563.525 582.243 586.923 585.051 583.179 595.346 602.834 584.115 575.691 592.538
4,31 681.1 GAVIN M3 180.764 182.097 184.764 180.764 183.431 214.101 174.096 180.764 180.764 199.433
4,32 681.1 GAVIN MALLA PVC M3 184.713 186.047 188.714 184.713 187.380 218.051 178.046 184.713 184.713 203.382
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500
4,33 672.1 ML 39.069 40.174 40.450 40.340 40.229 40.948 41.390 40.284 39.787 40.782
PSI
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,
4,34 672.1 ML 14.983 15.536 15.674 15.619 15.564 15.923 16.144 15.591 15.343 15.840
2500 PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO
4,35 *** M2 9.587 9.587 9.587 9.587 9.587 9.587 9.587 9.587 9.587 9.587
(RESISTENCIA LTIMA 25 KN)

4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.663 13.663 13.663 13.663 13.663 13.663 13.663 13.663 13.663 13.663
4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.385 18.385 18.385 18.385 18.385 18.385 18.385 18.385 18.385 18.385
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,38 *** M2 22.038 22.038 22.038 22.038 22.038 22.038 22.038 22.038 22.038 22.038
(RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,39 *** M2 28.314 28.314 28.314 28.314 28.314 28.314 28.314 28.314 28.314 28.314
(RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN,
4,40 *** M2 6.880 6.880 6.880 6.880 6.880 6.880 6.880 6.880 6.880 6.880
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN,
4,41 *** M2 7.839 7.839 7.839 7.839 7.839 7.839 7.839 7.839 7.839 7.839
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN,
4,42 *** M2 8.147 8.147 8.147 8.147 8.147 8.147 8.147 8.147 8.147 8.147
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN,
4,43 *** M2 5.806 5.806 5.806 5.806 5.806 5.806 5.806 5.806 5.806 5.806
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN,
4,44 *** M2 8.741 8.741 8.741 8.741 8.741 8.741 8.741 8.741 8.741 8.741
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN,
4,45 *** M2 7.130 7.130 7.130 7.130 7.130 7.130 7.130 7.130 7.130 7.130
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN,
4,46 *** M2 8.741 8.741 8.741 8.741 8.741 8.741 8.741 8.741 8.741 8.741
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN,
4,47 *** M2 16.786 16.786 16.786 16.786 16.786 16.786 16.786 16.786 16.786 16.786
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO
4,48 661.1 ML 597.449 597.691 597.752 597.727 597.703 597.861 597.958 597.715 597.606 597.824
=36" CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO
4,49 660.3 ML 339.565 343.532 344.524 344.127 343.731 346.310 347.897 343.929 342.144 345.714
600 MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO,
4,50 *** ML 836.460 836.460 836.460 836.460 836.460 836.460 836.460 836.460 836.460 836.460
DIMETRO 36"
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 138.678 135.503 133.915 137.090 160.903 165.665 165.665 164.078 138.678 151.378
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198 4.198
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4,53 *** ML 81.436 81.436 81.436 81.436 81.436 81.436 81.436 81.436 81.436 81.436
INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4,54 *** ML 124.059 124.059 124.059 124.059 124.059 124.059 124.059 124.059 124.059 124.059
INSTALACIN)
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 483.722 502.441 507.120 505.248 503.376 515.544 523.031 504.313 495.889 512.736
4,56 682.1 P COLCHONETA RENO M3 195.809 197.143 199.810 195.809 198.476 229.147 189.142 195.809 195.809 214.478
4,57 *** TRINCHO EN MADERA M2 64.426 64.426 64.426 64.426 64.426 64.426 64.426 64.426 64.426 64.426

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.838 3.838 3.838 3.838 3.838 3.838 3.838 3.838 3.838 3.838
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 41.263 41.263 41.263 41.263 41.263 41.263 41.263 41.263 41.263 41.263
5,3 730.3 TOPE DEFENSA METLICA UN 79.426 79.426 79.426 79.426 79.426 79.426 79.426 79.426 79.426 79.426
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 66.073 66.073 66.073 66.073 66.073 66.073 66.073 66.073 66.073 66.073
5,5 730.1 DEFENSA METLICA ML 139.946 140.817 141.034 140.947 140.860 141.426 141.774 140.904 140.512 141.296
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 12.898 12.898 12.898 12.898 12.898 12.898 12.898 12.898 12.898 12.898
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: ORIENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cqueza Chipaque Choach Fmeque Fosca Guayabetal Guterrez Quetame Ubaque Une
6 NORMA INV MANTENIMIENTO VIAL CONSTRUCCIN
6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 803 803 803 803 803 803 803 803 803 803
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36",
6,2 801.6 INCLUYE RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993

6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.652 14.652 14.652 14.652 14.652 14.652 14.652 14.652 14.652 14.652
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 23.710 23.710 23.710 23.710 23.710 23.710 23.710 23.710 23.710 23.710
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.418 9.418 9.418 9.418 9.418 9.418 9.418 9.418 9.418 9.418

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 2.137.658 2.173.622 2.101.694 2.162.966 2.142.986 2.158.970 2.138.990 2.205.590
1,2 CAMPAMENTO 9 M2 UN 1.233.876 1.251.858 1.215.894 1.246.530 1.236.540 1.244.532 1.234.542 1.267.842
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 14.214 14.214 14.214 14.214 14.214 14.214 14.214 14.214
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.943 15.943 15.943 15.943 15.943 15.943 15.943 15.943
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 18.392 18.392 18.392 18.392 18.392 18.392 18.392 18.392
1,6 CERCA EN TABLA H=2.30 M ML 68.853 68.853 68.853 68.853 68.853 68.853 68.853 68.853
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 48.950 49.340 48.560 49.224 49.008 49.181 48.964 49.687
1,8 CERCA EN TELA VERDE H = 2.10 M ML 22.803 23.193 22.413 23.077 22.861 23.034 22.817 23.540
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 957.664 960.867 954.760 960.707 957.246 961.269 958.008 964.633
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.916 10.916 10.916 10.916 10.916 10.916 10.916 10.916
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.933 3.933 3.933 3.933 3.933 3.933 3.933 3.933
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.840.430 2.840.430 2.840.430 2.840.430 2.840.430 2.840.430 2.840.430 2.840.430
1,44 RED TELEFNICA PROVISIONAL UN 259.874 259.874 259.874 259.874 259.874 259.874 259.874 259.874
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 137.230 143.594 132.056 129.469 119.121 139.817 125.589 123.002
2,2 BASE ARENA CEMENTO 1:20 M3 243.639 271.895 215.384 263.523 247.825 260.383 244.686 297.011
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
2,4 DEMOLICIN CIMIENTO ENTERRADO CONSTRUCCIN
M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 23.218 23.218 23.218 23.218 23.218 23.218 23.218 23.218
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 727.650 765.961 689.340 754.610 733.326 750.353 729.069 800.015
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 730.992 770.671 691.313 758.914 736.870 754.505 732.461 805.941
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 679.293 716.447 642.139 705.439 684.798 701.311 680.669 749.473
2,9 PILOTE DE MADERA D=20 CM ML 48.824 48.824 48.824 48.824 48.824 48.824 48.824 48.824
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,10 ML 150.623 150.623 150.623 150.623 150.623 150.623 150.623 150.623
MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,11 ML 191.079 191.079 191.079 191.079 191.079 191.079 191.079 191.079
MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,12 ML 240.003 240.003 240.003 240.003 240.003 240.003 240.003 240.003
MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,13 ML 305.862 305.862 305.862 305.862 305.862 305.862 305.862 305.862
MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 110.807 113.509 108.105 112.709 111.207 112.408 110.907 115.911
2,15 PILOTE HINCADO 30X30 ML 138.904 142.820 134.987 141.659 139.484 141.224 139.049 146.301
2,16 DADOS EN CONCRETO 3500PSI M3 665.932 703.087 628.778 692.078 671.437 687.950 667.309 736.113
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2,17 ML 90.247 90.247 90.247 90.247 90.247 90.247 90.247 90.247
KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 39.780 39.956 39.605 39.904 39.806 39.884 39.787 40.112
3,2 SIFN EN PVC 6" UN 210.373 210.549 210.198 210.497 210.399 210.477 210.380 210.705
3,3 CAJA DE INSPECCIN DE 100X100 UN 483.022 491.999 476.519 495.888 476.944 502.514 485.221 507.610
3,4 CAJA DE INSPECCIN DE 40X40 UN 237.255 241.432 233.287 240.746 237.249 240.925 237.567 245.788
3,5 CAJA DE INSPECCIN DE 60X60 UN 274.942 281.949 268.262 280.741 274.998 280.973 275.449 289.190
3,6 CAJA DE INSPECCIN DE 80X80 UN 369.833 382.284 357.710 379.462 370.696 379.089 370.541 394.362
3,7 DUCTO ELCTRICO PVC 4" ML 102.558 102.488 102.658 102.588 102.459 102.687 102.578 102.518
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.363.596 1.362.897 1.364.592 1.363.893 1.362.600 1.364.889 1.363.795 1.363.196
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 121.340 123.279 119.401 122.705 121.627 122.489 121.412 125.003
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 77.337 78.360 76.313 78.057 77.488 77.943 77.375 79.269
3,11 TUBERA DRENAJE PVC 110 ML 29.987 30.662 29.312 30.462 30.087 30.387 30.012 31.262
3,12 TUBERA DRENAJE PVC 160 ML 48.108 48.783 47.433 48.583 48.208 48.508 48.133 49.383
3,13 TUBERA DRENAJE PVC 200 ML 63.480 64.425 62.535 64.145 63.620 64.040 63.515 65.265
3,14 TUBERA DRENAJE PVC 250 ML 86.916 87.996 85.836 87.676 87.076 87.556 86.956 88.956
3,15 TUBERA DRENAJE PVC 315 ML 119.815 120.760 118.870 120.480 119.955 120.375 119.850 121.600
3,16 SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 1.035.397 1.046.197 1.024.597 1.042.997 1.036.997 1.041.797 1.035.797 1.055.797
3,17 SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1.480.310 1.501.910 1.458.710 1.495.510 1.483.510 1.493.110 1.481.110 1.521.110

3,18 SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1.959.828 2.003.028 1.916.628 1.990.228 1.966.228 1.985.428 1.961.428 2.041.428

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 44.135 44.135 44.135 44.135 44.135 44.135 44.135 44.135
4,2 CASETN DE LONA 0.80X0.70 M2 58.635 58.635 58.635 58.635 58.635 58.635 58.635 58.635
4,3 COLUMNAS 3500 PSI M3 886.495 923.650 849.341 912.641 892.000 908.513 887.872 956.676
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 306.828 337.737 282.189 324.787 310.169 324.371 305.574 361.961
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4,5 M2 109.285 112.892 105.678 111.824 109.820 111.423 109.419 116.099
CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4,6 M2 129.345 133.674 125.017 132.391 129.986 131.910 129.506 137.522
CONCRETO DE 3500 PSI
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 142.463 148.234 136.691 146.524 143.318 145.883 142.676 153.364
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 150.439 156.571 144.307 154.754 151.348 154.073 150.666 162.022
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 173.785 181.360 166.210 179.116 174.907 178.274 174.066 188.094
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 193.890 202.547 185.233 199.982 195.173 199.020 194.211 210.243
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) CONSTRUCCIN
M2 215.417 225.157 205.678 222.271 216.860 221.189 215.778 233.814
4,12 ENTREPISO VIGUETA PLACA M2 104.717 105.349 104.086 105.161 104.811 105.091 104.741 105.910
4,13 ESCALERA MACIZA 3500 PSI M3 1.041.598 1.078.752 1.004.444 1.067.743 1.047.102 1.063.615 1.042.974 1.111.778
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 101.254 101.772 100.735 101.619 101.331 101.561 101.273 102.233
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 87.816 91.531 84.100 90.430 88.366 90.018 87.953 94.834
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 99.616 104.161 95.071 102.814 100.289 102.309 99.784 108.201
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 116.993 122.692 111.293 121.004 117.837 120.370 117.204 127.758
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 782.777 819.932 745.623 808.923 788.282 804.795 784.154 852.958
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 51.231 52.374 50.088 52.035 51.400 51.908 51.273 53.390
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 316.626 333.219 300.032 328.302 319.084 326.458 317.240 347.968
4,21 ACERO FIGURADO 37000 PSI KG 4.424 4.424 4.424 4.424 4.424 4.424 4.424 4.424
4,22 ACERO FIGURADO 60000 PSI KG 4.640 4.640 4.640 4.640 4.640 4.640 4.640 4.640
4,23 REFUERZO MALLA ELECTROSOLDADA KG 6.322 6.322 6.322 6.322 6.322 6.322 6.322 6.322
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 924.784 961.938 887.630 950.929 930.288 946.801 926.160 994.964
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 859.049 899.714 818.384 887.665 865.073 883.147 860.555 935.861
4,26 VIGA AREA 3500 PSI M3 921.948 959.102 884.794 948.094 927.453 943.966 923.324 992.128
4,27 VIGA CINTA 3500 PSI M3 903.044 940.199 865.890 929.190 908.549 925.062 904.420 973.224
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.103.066 1.140.220 1.065.912 1.129.211 1.108.570 1.125.083 1.104.442 1.173.246
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 408.222 449.381 367.063 437.185 414.319 432.612 409.746 485.966

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 30.998 31.935 30.060 31.657 31.136 31.553 31.032 32.768
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 50.402 51.340 49.465 51.062 50.541 50.958 50.437 52.173
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 35.306 35.482 35.131 35.430 35.332 35.410 35.313 35.638
5,4 ARCOS EN LADRILLO PRENSADO ML 164.747 165.098 164.396 164.994 164.799 164.955 164.760 165.410
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 46.223 47.366 45.080 47.028 46.393 46.901 46.266 48.382
5,6 DINTELES EN BLOQUE 0.15 M ML 28.396 28.914 27.878 28.761 28.473 28.703 28.415 29.375
5,7 ENCHAPES LADRILLO PRENSADO M2 104.715 105.417 104.013 105.209 104.819 105.131 104.741 106.041
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 100.655 104.465 96.845 103.336 101.219 102.913 100.796 107.852
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 93.953 93.953 93.953 93.953 93.953 93.953 93.953 93.953
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 54.458 54.458 54.458 54.458 54.458 54.458 54.458 54.458
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 90.322 90.322 90.322 90.322 90.322 90.322 90.322 90.322
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 52.643 52.643 52.643 52.643 52.643 52.643 52.643 52.643
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 105.824 105.824 105.824 105.824 105.824 105.824 105.824 105.824
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 61.642 61.642 61.642 61.642 61.642 61.642 61.642 61.642
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 118.147 118.147 118.147 118.147 118.147 118.147 118.147 118.147
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 67.803 67.803 67.803 67.803 67.803 67.803 67.803 67.803
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 42.279 42.631 41.926 42.527 42.331 42.488 42.292 42.945
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 25.213 25.389 25.036 25.337 25.239 25.317 25.219 25.546
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 55.542 55.777 55.307 55.708 55.577 55.682 55.551 55.986
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 32.851 32.968 32.733 32.933 32.868 32.920 32.855 33.073
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 62.392 62.628 62.157 62.558 62.427 62.532 62.401 62.837
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 36.912 37.029 36.794 36.994 36.929 36.981 36.916 37.134
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 104.571 105.747 103.395 105.399 104.745 105.268 104.615 106.792
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 60.859 61.447 60.271 61.273 60.946 61.207 60.881 61.969
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 38.530 38.765 38.294 38.695 38.564 38.669 38.538 38.974
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 23.024 23.141 22.906 23.107 23.041 23.094 23.028 23.246
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 77.256 77.726 76.785 77.587 77.325 77.534 77.273 78.144
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 45.862 46.097 45.627 46.028 45.897 46.002 45.871 46.306
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 93.308 93.826 92.790 93.673 93.385 93.615 93.327 94.287
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 55.472 55.731 55.213 55.655 55.511 55.626 55.482 55.962
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 193.076 194.722 191.430 194.234 193.320 194.051 193.137 196.185
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 113.907 114.730 113.084 114.486 114.029 114.395 113.937 115.462
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M CONSTRUCCIN
M2 96.244 97.325 95.163 97.005 96.404 96.885 96.284 98.286
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 56.940 57.481 56.400 57.321 57.020 57.261 56.960 57.961
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 49.131 49.657 48.604 49.501 49.209 49.443 49.150 50.125
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 29.380 29.643 29.117 29.565 29.419 29.536 29.390 29.877
5,37 MURO TOLETE COMN 0.06 M M2 34.831 35.066 34.596 34.997 34.866 34.971 34.840 35.275
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 20.915 21.032 20.797 20.998 20.932 20.985 20.919 21.137
5,39 MURO TOLETE COMN 0.12 M M2 53.574 54.045 53.104 53.905 53.644 53.853 53.592 54.463
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 32.246 32.481 32.011 32.412 32.281 32.385 32.255 32.690
5,41 MURO TOLETE COMN 0.25 M M2 103.497 104.203 102.792 103.994 103.602 103.915 103.523 104.830
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 61.898 62.251 61.545 62.146 61.950 62.107 61.911 62.564
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 75.354 75.825 74.884 75.685 75.424 75.633 75.372 76.243
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 44.820 45.056 44.585 44.986 44.855 44.960 44.829 45.265
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 159.948 161.594 158.302 161.106 160.192 160.923 160.009 163.057
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 95.564 96.388 94.741 96.144 95.686 96.052 95.595 97.119
5,47 REMATES LADRILLO PRENSADO ML 32.691 32.867 32.516 32.815 32.717 32.795 32.698 33.023
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 39.139 39.917 38.361 39.686 39.254 39.600 39.168 40.608
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 65.409 66.446 64.372 66.138 65.562 66.023 65.447 67.367
5,50 LAVADA DE FACHADA M2 5.033 5.033 5.033 5.033 5.033 5.033 5.033 5.033
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 50.762 51.699 49.824 51.422 50.901 51.317 50.797 52.533
5,52 DOVELA, GROUTING 3000 PSI ML 10.196 10.196 10.196 10.196 10.196 10.196 10.196 10.196
5,53 ANCLAJE 3/8" L=30CM UN 13.702 13.702 13.702 13.702 13.702 13.702 13.702 13.702
5,54 ANCLAJE 1/2" L=50CM UN 17.975 17.975 17.975 17.975 17.975 17.975 17.975 17.975
5,55 ANCLAJE 5/8" L=70CM UN 25.544 25.544 25.544 25.544 25.544 25.544 25.544 25.544
5,56 ANCLAJE 3/4" L=70CM UN 38.604 38.604 38.604 38.604 38.604 38.604 38.604 38.604
5,57 ANCLAJE 1" L= 70CM UN 5.462 5.740 5.184 5.657 5.503 5.626 5.472 5.986

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.687 15.687 15.687 15.687 15.687 15.687 15.687 15.687
6,2 FILOS O DILATACIONES B/PLACA ML 5.859 6.035 5.684 5.983 5.885 5.963 5.866 6.191
6,3 FILOS O DILATACIONES S/MURO ML 6.979 7.154 6.803 7.102 7.005 7.083 6.985 7.310
6,4 GOTERA EN MORTERO 1:4 ML 8.310 8.486 8.135 8.434 8.336 8.414 8.317 8.642
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 7.047 7.047 7.047 7.047 7.047 7.047 7.047 7.047
6,6 MALLA BAJO ENTRAMADO M2 13.511 13.511 13.511 13.511 13.511 13.511 13.511 13.511
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 25.449 26.206 24.692 25.981 25.561 25.897 25.477 26.878
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 15.174 15.552 14.796 15.440 15.230 15.398 15.188 15.889
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 21.535 22.029 21.041 21.883 21.608 21.828 21.554 22.468
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.924 13.171 12.677 13.098 12.961 13.071 12.933 13.391
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 21.775 22.531 21.018 22.307 21.887 22.223 21.803 23.204
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 13.044 13.422 12.666 13.310 13.100 13.268 13.058 13.759
6,13 PAETE CULATAS 1:4, E=2 CM M2 21.535 22.029 21.041 21.883 21.608 21.828 21.554 22.468
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.924 13.171 12.677 13.098 12.961 13.071 12.933 13.391
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 22.830 23.369 22.291 23.210 22.910 23.150 22.850 23.849
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 13.571 13.840 13.301 13.760 13.611 13.730 13.581 14.080
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 17.808 18.184 17.431 18.072 17.863 18.031 17.821 18.518
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.788 10.976 10.600 10.920 10.816 10.899 10.795 11.143
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 17.990 18.566 17.413 18.396 18.075 18.332 18.011 19.079
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.879 11.167 10.591 11.082 10.922 11.050 10.890 11.424
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 22.270 22.764 21.776 22.618 22.343 22.563 22.288 23.203
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 13.273 13.520 13.026 13.447 13.309 13.419 13.282 13.739
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 22.510 23.266 21.753 23.042 22.622 22.958 22.538 23.939
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 13.393 13.771 13.014 13.659 13.449 13.617 13.407 14.107
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 18.566 19.143 17.990 18.972 18.652 18.908 18.588 19.655
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 11.151 11.439 10.862 11.353 11.193 11.321 11.161 11.695
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM CONSTRUCCIN
M2 23.349 24.106 22.593 23.882 23.461 23.798 23.377 24.779
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 14.194 14.572 13.816 14.460 14.250 14.418 14.208 14.909

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 27.615 28.321 26.910 28.112 27.720 28.033 27.641 28.948
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7,2 M2 89.911 91.816 88.006 91.252 90.193 91.040 89.981 93.509
IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 58.163 58.163 58.163 58.163 58.163 58.163 58.163 58.163
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 22.731 22.731 22.731 22.731 22.731 22.731 22.731 22.731
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 35.858 35.858 35.858 35.858 35.858 35.858 35.858 35.858
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 85.365 85.365 85.365 85.365 85.365 85.365 85.365 85.365
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 66.573 66.573 66.573 66.573 66.573 66.573 66.573 66.573
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 38.189 38.189 38.189 38.189 38.189 38.189 38.189 38.189
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 89.527 89.527 89.527 89.527 89.527 89.527 89.527 89.527
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 107.149 107.149 107.149 107.149 107.149 107.149 107.149 107.149
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 158.063 158.063 158.063 158.063 158.063 158.063 158.063 158.063
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 61.493 61.493 61.493 61.493 61.493 61.493 61.493 61.493
7,13 CANAL PVC AMAZONAS ML 84.923 84.923 84.923 84.923 84.923 84.923 84.923 84.923
7,14 CANAL PVC RAINGO ML 76.974 76.974 76.974 76.974 76.974 76.974 76.974 76.974
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 138.870 138.870 138.870 138.870 138.870 138.870 138.870 138.870
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 81.406 81.406 81.406 81.406 81.406 81.406 81.406 81.406
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 59.532 59.532 59.532 59.532 59.532 59.532 59.532 59.532
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 32.870 32.870 32.870 32.870 32.870 32.870 32.870 32.870
7,19 TEJA DE BARRO M2 61.466 62.344 60.589 62.084 61.596 61.986 61.499 63.124
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 49.661 49.661 49.661 49.661 49.661 49.661 49.661 49.661
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 45.460 45.460 45.460 45.460 45.460 45.460 45.460 45.460
7,22 TEJA FIBROCEMENTO N4 M2 37.592 37.592 37.592 37.592 37.592 37.592 37.592 37.592
7,23 TEJA FIBROCEMENTO No. 6 M2 36.874 36.874 36.874 36.874 36.874 36.874 36.874 36.874
7,24 TEJA FIBROCEMENTO No. 8 M2 37.162 37.162 37.162 37.162 37.162 37.162 37.162 37.162
7,25 TEJA TERMOACSTICA M2 52.933 52.933 52.933 52.933 52.933 52.933 52.933 52.933
7,26 TEJA PLSTICA No.6 M2 46.386 46.386 46.386 46.386 46.386 46.386 46.386 46.386
7,27 TEJA ESPAOLA ETERNIT M2 85.753 85.753 85.753 85.753 85.753 85.753 85.753 85.753
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 159.424 159.424 159.424 159.424 159.424 159.424 159.424 159.424
7,29 TEJA SIN TRASLAPO M2 71.263 71.263 71.263 71.263 71.263 71.263 71.263 71.263
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 42.859 42.859 42.859 42.859 42.859 42.859 42.859 42.859
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 33.876 33.876 33.876 33.876 33.876 33.876 33.876 33.876
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7,32 M2 60.327 60.327 60.327 60.327 60.327 60.327 60.327 60.327
4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 20.060 20.060 20.060 20.060 20.060 20.060 20.060 20.060
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 24.393 24.393 24.393 24.393 24.393 24.393 24.393 24.393
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 26.624 26.624 26.624 26.624 26.624 26.624 26.624 26.624
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 34.622 34.622 34.622 34.622 34.622 34.622 34.622 34.622
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 22.538 22.538 22.538 22.538 22.538 22.538 22.538 22.538
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 53.233 53.233 53.233 53.233 53.233 53.233 53.233 53.233
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 380.132 380.132 380.132 380.132 380.132 380.132 380.132 380.132
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 411.850 411.850 411.850 411.850 411.850 411.850 411.850 411.850
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 284.163 284.163 284.163 284.163 284.163 284.163 284.163 284.163
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 304.967 304.967 304.967 304.967 304.967 304.967 304.967 304.967

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 547.626 586.786 508.465 575.183 553.427 570.832 549.076 621.596
8,2 CONCRETO 3500 PSI M3 481.193 517.265 445.121 506.577 486.537 502.569 482.529 549.329
8,3 CONCRETO 3000 PSI M3 480.255 517.450 443.060 506.429 485.765 502.296 481.632 550.512
8,4 CONCRETO 2500 PSI M3 435.293 473.396 397.191 462.106 440.938 457.872 436.704 507.264
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
8,5 CONCRETO 2000 PSI CONSTRUCCIN
M3 412.006 451.016 372.997 439.458 417.786 435.123 413.451 485.691
8,6 CONCRETO 1500 PSI M3 382.063 422.023 342.103 410.183 387.983 405.743 383.543 457.543
8,7 MORTERO SECO 1:10 M3 282.244 306.463 258.025 299.287 285.832 296.596 283.141 327.991
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 500.599 524.116 477.082 517.148 504.083 514.535 501.470 545.020
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 512.000 548.029 475.972 537.354 517.338 533.351 513.335 580.055
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 572.372 606.068 538.676 596.084 577.364 592.340 573.620 636.020
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 814.512 848.208 780.816 838.224 819.504 834.480 815.760 878.160

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 128.331 128.331 128.331 128.331 128.331 128.331 128.331 128.331
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 4.299 4.474 4.123 4.422 4.325 4.403 4.305 4.630
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 142.613 142.613 142.613 142.613 142.613 142.613 142.613 142.613
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 175.759 175.759 175.759 175.759 175.759 175.759 175.759 175.759
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 259.727 259.727 259.727 259.727 259.727 259.727 259.727 259.727
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 289.344 289.344 289.344 289.344 289.344 289.344 289.344 289.344
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 318.992 318.992 318.992 318.992 318.992 318.992 318.992 318.992
9,8 HOJA PUERTA FORTEC 0.81 UN 212.462 212.462 212.462 212.462 212.462 212.462 212.462 212.462
9,9 HOJA PUERTA FORTEC 0.91 UN 241.056 241.056 241.056 241.056 241.056 241.056 241.056 241.056
9,10 HOJA PUERTA FORTEC 1.50 UN 355.432 355.432 355.432 355.432 355.432 355.432 355.432 355.432
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 133.830 133.830 133.830 133.830 133.830 133.830 133.830 133.830
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 178.150 178.150 178.150 178.150 178.150 178.150 178.150 178.150
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 198.165 198.165 198.165 198.165 198.165 198.165 198.165 198.165
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 506.978 506.978 506.978 506.978 506.978 506.978 506.978 506.978
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 43.510 43.510 43.510 43.510 43.510 43.510 43.510 43.510
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 26.515 26.515 26.515 26.515 26.515 26.515 26.515 26.515
9,17 VENTANERA EN MADERA CEDRO MACHO M2 102.771 102.771 102.771 102.771 102.771 102.771 102.771 102.771
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 129.309 129.309 129.309 129.309 129.309 129.309 129.309 129.309
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 100.286 100.286 100.286 100.286 100.286 100.286 100.286 100.286
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 30.575 30.575 30.575 30.575 30.575 30.575 30.575 30.575
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 30.575 30.575 30.575 30.575 30.575 30.575 30.575 30.575
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 28.945 28.945 28.945 28.945 28.945 28.945 28.945 28.945
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 44.064 44.064 44.064 44.064 44.064 44.064 44.064 44.064
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 54.894 54.894 54.894 54.894 54.894 54.894 54.894 54.894
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 66.445 66.445 66.445 66.445 66.445 66.445 66.445 66.445
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 80.163 80.163 80.163 80.163 80.163 80.163 80.163 80.163
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 381.572 381.572 381.572 381.572 381.572 381.572 381.572 381.572
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 266.053 266.053 266.053 266.053 266.053 266.053 266.053 266.053
9,29 VIDRIO TRANSPARENTE 3 MM M2 34.678 34.678 34.678 34.678 34.678 34.678 34.678 34.678
9,30 VIDRIO TRANSPARENTE 4 MM M2 44.786 44.786 44.786 44.786 44.786 44.786 44.786 44.786
9,31 VIDRIO TRANSPARENTE 5 MM M2 54.894 54.894 54.894 54.894 54.894 54.894 54.894 54.894
9,32 VIDRIO TRANSPARENTE 6 MM M2 69.334 69.334 69.334 69.334 69.334 69.334 69.334 69.334

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 78.973 78.973 78.973 78.973 78.973 78.973 78.973 78.973
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 224.180 224.180 224.180 224.180 224.180 224.180 224.180 224.180
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10,3 ML 82.918 82.918 82.918 82.918 82.918 82.918 82.918 82.918
ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 146.016 146.016 146.016 146.016 146.016 146.016 146.016 146.016
10,5 MARCO TAPA CAJA DE INSPECCIN UN 141.217 141.217 141.217 141.217 141.217 141.217 141.217 141.217
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 92.666 92.666 92.666 92.666 92.666 92.666 92.666 92.666
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 219.678 219.678 219.678 219.678 219.678 219.678 219.678 219.678
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 113.688 113.688 113.688 113.688 113.688 113.688 113.688 113.688
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.776 6.776 6.776 6.776 6.776 6.776 6.776 6.776
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop

10,10
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO CONSTRUCCIN
M2 100.175 100.175 100.175 100.175 100.175 100.175 100.175 100.175
ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 41.322 41.322 41.322 41.322 41.322 41.322 41.322 41.322
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 573.468 573.468 573.468 573.468 573.468 573.468 573.468 573.468
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 204.736 204.736 204.736 204.736 204.736 204.736 204.736 204.736
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 226.991 226.991 226.991 226.991 226.991 226.991 226.991 226.991
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10,15 M2 521.179 521.179 521.179 521.179 521.179 521.179 521.179 521.179
ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 130.223 130.223 130.223 130.223 130.223 130.223 130.223 130.223
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 419.036 419.036 419.036 419.036 419.036 419.036 419.036 419.036
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 6.210 6.210 6.210 6.210 6.210 6.210 6.210 6.210
10,19 VENTANA EN ALUMINIO CORREDIZA M2 292.868 292.868 292.868 292.868 292.868 292.868 292.868 292.868
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 124.523 124.523 124.523 124.523 124.523 124.523 124.523 124.523
10,21 REJILLA PISO 0.30 M M2 89.720 89.720 89.720 89.720 89.720 89.720 89.720 89.720
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 92.202 92.202 92.202 92.202 92.202 92.202 92.202 92.202
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
10,23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, KG 10.720 10.720 10.720 10.720 10.720 10.720 10.720 10.720
PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10,24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, KG 11.959 11.959 11.959 11.959 11.959 11.959 11.959 11.959
PINTURA Y PLATINERA.CONTEMPLA TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10,25 KG 9.385 9.385 9.385 9.385 9.385 9.385 9.385 9.385
ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN,
SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 224.442 224.442 224.442 224.442 224.442 224.442 224.442 224.442
11,2 ACOMETIDA EN PVC 3/4" 5M UN 273.231 273.231 273.231 273.231 273.231 273.231 273.231 273.231
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 22.731 22.731 22.731 22.731 22.731 22.731 22.731 22.731
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 35.858 35.858 35.858 35.858 35.858 35.858 35.858 35.858
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 34.115 34.115 34.115 34.115 34.115 34.115 34.115 34.115
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 44.009 44.009 44.009 44.009 44.009 44.009 44.009 44.009
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 91.491 91.491 91.491 91.491 91.491 91.491 91.491 91.491
11,8 CONEXIN TANQUE ELEVADO PVC UN 225.899 225.899 225.899 225.899 225.899 225.899 225.899 225.899
11,9 INSTALACIN APARATO SANITARIO UN 41.967 41.967 41.967 41.967 41.967 41.967 41.967 41.967
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 35.489 35.489 35.489 35.489 35.489 35.489 35.489 35.489
11,13 NIPLE PASAMURO 2" UN 66.474 66.474 66.474 66.474 66.474 66.474 66.474 66.474
11,14 NIPLE PASAMURO 4" UN 99.661 99.661 99.661 99.661 99.661 99.661 99.661 99.661
11,15 PUNTO AGUA CALIENTE CPVC UN 85.128 85.128 85.128 85.128 85.128 85.128 85.128 85.128
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 60.764 60.764 60.764 60.764 60.764 60.764 60.764 60.764
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 64.949 64.949 64.949 64.949 64.949 64.949 64.949 64.949
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 82.139 82.139 82.139 82.139 82.139 82.139 82.139 82.139
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 67.062 67.062 67.062 67.062 67.062 67.062 67.062 67.062
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 84.922 84.922 84.922 84.922 84.922 84.922 84.922 84.922
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 91.113 91.113 91.113 91.113 91.113 91.113 91.113 91.113
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 76.669 76.669 76.669 76.669 76.669 76.669 76.669 76.669
11,23 RED SUMINISTRO CPVC 1/2" ML 12.881 12.881 12.881 12.881 12.881 12.881 12.881 12.881
11,24 RED SUMINISTRO CPVC 3/4" ML 18.333 18.333 18.333 18.333 18.333 18.333 18.333 18.333
11,25 RED SUMINISTRO PVC 1 1/2" ML 23.895 23.895 23.895 23.895 23.895 23.895 23.895 23.895
11,26 RED SUMINISTRO PVC 1" ML 14.638 14.638 14.638 14.638 14.638 14.638 14.638 14.638
11,27 RED SUMINISTRO PVC 1/2" ML 8.662 8.662 8.662 8.662 8.662 8.662 8.662 8.662
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
11,28 RED SUMINISTRO PVC 2 1/2" CONSTRUCCIN
ML 53.716 53.716 53.716 53.716 53.716 53.716 53.716 53.716
11,29 RED SUMINISTRO PVC 2" ML 34.200 34.200 34.200 34.200 34.200 34.200 34.200 34.200
11,30 RED SUMINISTRO PVC 3/4" ML 10.905 10.905 10.905 10.905 10.905 10.905 10.905 10.905
11,31 RED SANITARIA PVC-S 2" ML 26.234 26.234 26.234 26.234 26.234 26.234 26.234 26.234
11,32 RED SANITARIA PVC-S 3" ML 36.549 36.549 36.549 36.549 36.549 36.549 36.549 36.549
11,33 RED SANITARIA PVC-S 4" ML 49.702 49.702 49.702 49.702 49.702 49.702 49.702 49.702
11,34 RED SANITARIA PVC-S 6" ML 93.959 93.959 93.959 93.959 93.959 93.959 93.959 93.959
11,35 REGISTRO 1" UN 113.156 113.156 113.156 113.156 113.156 113.156 113.156 113.156
11,36 REGISTRO 1/2" UN 62.919 62.919 62.919 62.919 62.919 62.919 62.919 62.919
11,37 REGISTRO 3/4" UN 80.533 80.533 80.533 80.533 80.533 80.533 80.533 80.533
11,38 REGISTRO 1 1/2" UN 195.793 195.793 195.793 195.793 195.793 195.793 195.793 195.793
11,39 REGISTRO 2 1/2" UN 405.760 405.760 405.760 405.760 405.760 405.760 405.760 405.760
11,40 REGISTRO 2" UN 298.986 298.986 298.986 298.986 298.986 298.986 298.986 298.986
11,41 REVENTILACIN 2" ML 18.180 18.180 18.180 18.180 18.180 18.180 18.180 18.180
11,42 REVENTILACIN 3" ML 22.986 22.986 22.986 22.986 22.986 22.986 22.986 22.986
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 179.025 179.025 179.025 179.025 179.025 179.025 179.025 179.025
11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 293.219 293.219 293.219 293.219 293.219 293.219 293.219 293.219
11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 489.296 489.296 489.296 489.296 489.296 489.296 489.296 489.296
11,46 TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 42.422 42.422 42.422 42.422 42.422 42.422 42.422 42.422
11,47 TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 50.083 50.083 50.083 50.083 50.083 50.083 50.083 50.083

11,48 TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 63.567 63.567 63.567 63.567 63.567 63.567 63.567 63.567

11,49 TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 72.728 72.728 72.728 72.728 72.728 72.728 72.728 72.728

11,50 TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 93.819 93.819 93.819 93.819 93.819 93.819 93.819 93.819

11,51 TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 107.360 107.360 107.360 107.360 107.360 107.360 107.360 107.360

11,52 TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 158.246 158.246 158.246 158.246 158.246 158.246 158.246 158.246
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 63.198 63.198 63.198 63.198 63.198 63.198 63.198 63.198
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 63.468 63.468 63.468 63.468 63.468 63.468 63.468 63.468
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 41.534 41.534 41.534 41.534 41.534 41.534 41.534 41.534
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 51.485 51.485 51.485 51.485 51.485 51.485 51.485 51.485
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 4.407 4.407 4.407 4.407 4.407 4.407 4.407 4.407
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.983 6.983 6.983 6.983 6.983 6.983 6.983 6.983
11,59 GABINETE TIPO III UN 1.072.875 1.072.875 1.072.875 1.072.875 1.072.875 1.072.875 1.072.875 1.072.875
11,60 GABINETE TIPO I UN 815.817 815.817 815.817 815.817 815.817 815.817 815.817 815.817
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.781.346 2.781.346 2.781.346 2.781.346 2.781.346 2.781.346 2.781.346 2.781.346
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.316.320 2.316.320 2.316.320 2.316.320 2.316.320 2.316.320 2.316.320 2.316.320
11,63 VLVULA MARIPOSA 3" UN 662.094 662.094 662.094 662.094 662.094 662.094 662.094 662.094
11,64 VLVULA MARIPOSA 4" UN 861.107 861.107 861.107 861.107 861.107 861.107 861.107 861.107
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 336.004 336.004 336.004 336.004 336.004 336.004 336.004 336.004

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 382.378 382.378 382.378 382.378 382.378 382.378 382.378 382.378
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 60.783 60.783 60.783 60.783 60.783 60.783 60.783 60.783
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 72.167 72.167 72.167 72.167 72.167 72.167 72.167 72.167
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 79.865 79.865 79.865 79.865 79.865 79.865 79.865 79.865
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 94.338 94.338 94.338 94.338 94.338 94.338 94.338 94.338
12,6 SALIDA TELFONO PVC COMPLETA UN 57.018 57.018 57.018 57.018 57.018 57.018 57.018 57.018
12,7 SALIDA TIMBRE PVC COMPLETA UN 65.091 65.091 65.091 65.091 65.091 65.091 65.091 65.091
12,8 STRIP TELEFNICO 10 PARES UN 148.882 148.882 148.882 148.882 148.882 148.882 148.882 148.882
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 58.638 58.638 58.638 58.638 58.638 58.638 58.638 58.638
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
12,10 SALIDA TRIFSICA PVC COMPLETA CONSTRUCCIN
UN 135.060 135.060 135.060 135.060 135.060 135.060 135.060 135.060
12,11 SALIDA T.V PVC COMPLETA. UN 80.528 80.528 80.528 80.528 80.528 80.528 80.528 80.528
12,12 SALIDA BIFSICA C.N. UN 47.789 47.789 47.789 47.789 47.789 47.789 47.789 47.789
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 100.095 100.095 100.095 100.095 100.095 100.095 100.095 100.095
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 426.748 426.748 426.748 426.748 426.748 426.748 426.748 426.748
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 569.752 569.752 569.752 569.752 569.752 569.752 569.752 569.752
12,16 TUBERA PVC CONDUIT 1/2" ML 3.693 3.693 3.693 3.693 3.693 3.693 3.693 3.693
12,17 TUBERA PVC CONDUIT 3/4" ML 4.870 4.870 4.870 4.870 4.870 4.870 4.870 4.870
12,18 TUBERA PVC CONDUIT 1" ML 7.600 7.600 7.600 7.600 7.600 7.600 7.600 7.600
12,19 TUBERA PVC CONDUIT 1 1/2" ML 13.574 13.574 13.574 13.574 13.574 13.574 13.574 13.574
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 285.899 285.899 285.899 285.899 285.899 285.899 285.899 285.899
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 80.325 80.325 80.325 80.325 80.325 80.325 80.325 80.325
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 109.516 109.516 109.516 109.516 109.516 109.516 109.516 109.516
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 43.393 43.393 43.393 43.393 43.393 43.393 43.393 43.393
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.455.180 1.455.180 1.455.180 1.455.180 1.455.180 1.455.180 1.455.180 1.455.180
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.077.884 1.077.884 1.077.884 1.077.884 1.077.884 1.077.884 1.077.884 1.077.884
12,26 POSTE METLICO 6M UN 1.370.978 1.370.978 1.370.978 1.370.978 1.370.978 1.370.978 1.370.978 1.370.978
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 641.568 641.568 641.568 641.568 641.568 641.568 641.568 641.568
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 115.444 115.444 115.444 115.444 115.444 115.444 115.444 115.444
12,29 LUMINARIA 70W SODIO UN 538.784 538.784 538.784 538.784 538.784 538.784 538.784 538.784
12,30 LUMINARIA 150W SODIO UN 674.785 674.785 674.785 674.785 674.785 674.785 674.785 674.785
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.786.839 1.786.839 1.786.839 1.786.839 1.786.839 1.786.839 1.786.839 1.786.839
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.315.043 1.315.043 1.315.043 1.315.043 1.315.043 1.315.043 1.315.043 1.315.043

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 43.541 44.837 42.245 44.453 43.733 44.309 43.589 45.989
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 43.905 45.201 42.609 44.817 44.097 44.673 43.953 46.353
13,3 ALISTADO PARA LISTN M2 15.244 15.503 14.985 15.426 15.282 15.397 15.253 15.733
13,4 ALISTADO PISOS 1:3, E=0.04 M2 34.614 37.206 32.022 36.438 34.998 36.150 34.710 39.510
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 95.297 97.889 92.705 97.121 95.681 96.833 95.393 100.193
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 27.575 28.355 26.795 28.124 27.691 28.037 27.604 29.049
13,7 CONCRETO BASE GRADAS 2500 PSI M2 65.292 69.102 61.481 67.973 65.856 67.549 65.433 72.489
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 92.722 98.818 86.626 97.012 93.625 96.335 92.948 104.237
13,9 MANTO FIBERGLASS 600X1 M2 31.671 31.671 31.671 31.671 31.671 31.671 31.671 31.671
13,10 PEGANTE MORTERO-CONCRETO M2 23.346 23.346 23.346 23.346 23.346 23.346 23.346 23.346
13,11 PERMA PLY 2 CAPAS M2 27.204 27.204 27.204 27.204 27.204 27.204 27.204 27.204
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 53.924 57.353 50.495 56.337 54.432 55.956 54.051 60.401
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 63.613 67.805 59.422 66.563 64.234 66.097 63.769 71.530
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 93.337 99.815 86.860 97.895 94.297 97.175 93.577 105.572
13,15 TRITURADO FINO 1/2 M3 151.354 179.164 123.544 170.924 155.474 167.834 152.384 203.884
13,16 TRITURADO GRUESO 3/4 M3 144.266 165.232 124.492 162.176 143.802 163.520 145.942 187.546

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 60.405 60.923 59.886 60.770 60.482 60.712 60.424 61.384
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 35.562 35.821 35.302 35.744 35.600 35.715 35.571 36.051
14,3 ADOQUN CONCRETO 6CM M2 70.504 71.800 69.208 71.416 70.696 71.272 70.552 72.952
14,4 ADOQUN CONCRETO 8CM M2 74.054 75.350 72.758 74.966 74.246 74.822 74.102 76.502
14,5 ADOQUN GRES PEATONAL M2 78.514 79.810 77.218 79.426 78.706 79.282 78.562 80.962
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14,6 M2 80.149 80.668 79.631 80.514 80.226 80.457 80.169 81.129
ALISTADO
14,7 GRAVILLA PARA GRADAS ML 36.996 37.514 36.478 37.361 37.073 37.303 37.015 37.975
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 177.698 180.031 175.366 179.340 178.044 179.081 177.785 182.105
14,9 ACABADO EN GRAVILLA LAVADA M2 48.054 49.350 46.758 48.966 48.246 48.822 48.102 50.502
14,10 GUARDAESCOBA EN GRANITO ML 43.952 43.952 43.952 43.952 43.952 43.952 43.952 43.952
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
14,11 GUARDAESCOBA EN GRAVILLA CONSTRUCCIN
ML 10.953 11.472 10.435 11.318 11.030 11.261 10.973 11.933
14,12 GUARDAESCOBA PVC CARAMELO ML 9.970 9.970 9.970 9.970 9.970 9.970 9.970 9.970
14,13 GUARDAESCOBA PVC CEDRO ML 13.434 13.434 13.434 13.434 13.434 13.434 13.434 13.434
14,14 GUARDAESCOBA PINO CARIBE ML 10.807 10.807 10.807 10.807 10.807 10.807 10.807 10.807
14,15 GUARDAESCOBA CEDRO BLANCO ML 18.464 18.464 18.464 18.464 18.464 18.464 18.464 18.464
14,16 GUARDAESCOBA EN MADERA SAPAN ML 36.478 36.478 36.478 36.478 36.478 36.478 36.478 36.478
14,17 GUARDAESCOBA GRES Y CERMICA ML 9.067 9.067 9.067 9.067 9.067 9.067 9.067 9.067
14,18 LISTN M.H. AMARILLO M2 76.963 76.963 76.963 76.963 76.963 76.963 76.963 76.963
14,19 PASO ESCALERA GRANITO ML 125.691 127.506 123.877 126.968 125.960 126.766 125.758 129.118
14,20 PIRLANES ALUMINIO ML 7.311 7.311 7.311 7.311 7.311 7.311 7.311 7.311
14,21 PIRLANES LADRILLO ML 32.639 32.990 32.288 32.886 32.691 32.847 32.652 33.302
14,22 PISO VINILO TRFICO RESIDENCIAL M2 48.314 48.314 48.314 48.314 48.314 48.314 48.314 48.314
14,23 PISO VINILO TRFICO PESADO M2 56.398 56.398 56.398 56.398 56.398 56.398 56.398 56.398
14,24 PULIDA LACADA PISO MADERA M2 50.412 50.412 50.412 50.412 50.412 50.412 50.412 50.412
14,25 TABLETA DE GRES 25X25 M2 52.378 52.896 51.859 52.742 52.454 52.685 52.397 53.357
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 58.915 59.433 58.397 59.280 58.992 59.222 58.934 59.894
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.929 10.929 10.929 10.929 10.929 10.929 10.929 10.929
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 51.905 52.432 51.379 52.276 51.983 52.217 51.925 52.900
14,29 JABONERA PORCELANA ACUARIO UN 21.622 21.622 21.622 21.622 21.622 21.622 21.622 21.622
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14,30 UN 130.373 130.373 130.373 130.373 130.373 130.373 130.373 130.373
PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.911 9.911 9.911 9.911 9.911 9.911 9.911 9.911
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 23.466 23.466 23.466 23.466 23.466 23.466 23.466 23.466
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.772 14.772 14.772 14.772 14.772 14.772 14.772 14.772
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 14.328 14.328 14.328 14.328 14.328 14.328 14.328 14.328
14,35 REMATES BOCEL ALUMINIO ML 8.441 8.441 8.441 8.441 8.441 8.441 8.441 8.441
14,36 REMATES BOCEL PORCELANA ML 8.603 8.603 8.603 8.603 8.603 8.603 8.603 8.603
14,37 TAPA REGISTRO 20X20 UN 19.760 19.760 19.760 19.760 19.760 19.760 19.760 19.760
14,38 TAPA REGISTRO 6X6 UN 17.938 17.938 17.938 17.938 17.938 17.938 17.938 17.938
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 20.159 20.159 20.159 20.159 20.159 20.159 20.159 20.159
14,40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN SITIO M2 23.304 23.304 23.304 23.304 23.304 23.304 23.304 23.304
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 69.714 70.233 69.196 70.079 69.791 70.022 69.734 70.694
14,42 MEDIA CAA EN GRANITO ML 82.745 82.745 82.745 82.745 82.745 82.745 82.745 82.745
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 33.149 33.149 33.149 33.149 33.149 33.149 33.149 33.149
14,44 PINTURA ACRLICA PARA PISOS M2 13.687 13.687 13.687 13.687 13.687 13.687 13.687 13.687
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 109.539 109.539 109.539 109.539 109.539 109.539 109.539 109.539
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 131.826 131.826 131.826 131.826 131.826 131.826 131.826 131.826

15 CIELO RASO
15,1 APLIQUE YESO ML 77.629 77.629 77.629 77.629 77.629 77.629 77.629 77.629
15,2 ARMADURA MADERA Y MALLA M2 35.745 35.745 35.745 35.745 35.745 35.745 35.745 35.745
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 57.158 57.158 57.158 57.158 57.158 57.158 57.158 57.158
15,4 CIELO RASO DURACUSTIC M2 70.727 70.727 70.727 70.727 70.727 70.727 70.727 70.727
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 52.559 52.559 52.559 52.559 52.559 52.559 52.559 52.559
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 98.547 98.547 98.547 98.547 98.547 98.547 98.547 98.547
15,7 CORNISAS YESO ML 52.263 52.263 52.263 52.263 52.263 52.263 52.263 52.263
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 109.492 109.492 109.492 109.492 109.492 109.492 109.492 109.492
15,9 MALLA CON VENA M2 13.409 13.409 13.409 13.409 13.409 13.409 13.409 13.409

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
UNA DISTANCIA MENOR DE 5 KM)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M CONSTRUCCIN
M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 60.602 51.521 73.556 64.469 47.654 77.417 63.189 55.402
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 155.831 184.343 127.319 175.895 160.055 172.727 156.887 209.687
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 136.002 177.394 145.056 159.285 177.394 152.817 138.589 183.861
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 127.781 134.145 122.607 120.020 109.672 130.368 116.140 113.553
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 116.811 158.203 125.865 140.094 158.203 133.626 119.398 164.670
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 133.341 174.733 142.395 156.624 174.733 150.156 135.928 181.200

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 320.756 320.756 320.756 320.756 320.756 320.756 320.756 320.756
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 954.547 954.547 954.547 954.547 954.547 954.547 954.547 954.547
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 515.254 515.254 515.254 515.254 515.254 515.254 515.254 515.254
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 145.345 145.345 145.345 145.345 145.345 145.345 145.345 145.345
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 206.238 206.238 206.238 206.238 206.238 206.238 206.238 206.238
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 191.183 191.183 191.183 191.183 191.183 191.183 191.183 191.183
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 426.756 426.756 426.756 426.756 426.756 426.756 426.756 426.756
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 1.098.576 1.098.576 1.098.576 1.098.576 1.098.576 1.098.576 1.098.576 1.098.576
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 308.664 308.664 308.664 308.664 308.664 308.664 308.664 308.664
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 216.687 216.687 216.687 216.687 216.687 216.687 216.687 216.687
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 83.488 83.488 83.488 83.488 83.488 83.488 83.488 83.488
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X
17,12 UN 264.057 264.057 264.057 264.057 264.057 264.057 264.057 264.057
49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120
17,13 UN 391.299 391.299 391.299 391.299 391.299 391.299 391.299 391.299
X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.426 8.426 8.426 8.426 8.426 8.426 8.426 8.426
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 3.163 3.163 3.163 3.163 3.163 3.163 3.163 3.163
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 11.019 11.019 11.019 11.019 11.019 11.019 11.019 11.019
18,4 BARNIZ SOBRE MUEBLES M2 43.150 43.150 43.150 43.150 43.150 43.150 43.150 43.150
18,5 CARBURO SOBRE PAETES M2 5.790 5.790 5.790 5.790 5.790 5.790 5.790 5.790
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 70.179 70.179 70.179 70.179 70.179 70.179 70.179 70.179
18,7 DEMARCACIN CON MARMOLINA ML 3.411 3.411 3.411 3.411 3.411 3.411 3.411 3.411
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.821 2.821 2.821 2.821 2.821 2.821 2.821 2.821
18,9 ESMALTE SOBRE LMINA LLENA M2 14.010 14.010 14.010 14.010 14.010 14.010 14.010 14.010
18,10 ESMALTE SOBRE MADERA LINEAL ML 4.087 4.087 4.087 4.087 4.087 4.087 4.087 4.087
18,11 ESMALTE SOBRE MADERA LLENA M2 14.787 14.787 14.787 14.787 14.787 14.787 14.787 14.787
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.972 5.972 5.972 5.972 5.972 5.972 5.972 5.972
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.754 6.754 6.754 6.754 6.754 6.754 6.754 6.754
18,14 ESTUCO M2 6.904 6.904 6.904 6.904 6.904 6.904 6.904 6.904
18,15 ESTUCO (LINEAL) ML 4.297 4.297 4.297 4.297 4.297 4.297 4.297 4.297
18,16 ESTUCO Y VINILO 3 MANOS M2 15.538 15.538 15.538 15.538 15.538 15.538 15.538 15.538
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.543 9.543 9.543 9.543 9.543 9.543 9.543 9.543
18,18 LACA PISOS MADERA M2 22.425 22.425 22.425 22.425 22.425 22.425 22.425 22.425
18,19 LNEAS TRFICO 0.10 ML 2.675 2.675 2.675 2.675 2.675 2.675 2.675 2.675
18,20 MARMOLINA SOBRE PAETE M2 12.595 12.595 12.595 12.595 12.595 12.595 12.595 12.595
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.385 3.385 3.385 3.385 3.385 3.385 3.385 3.385
18,22 TINTILLA SOBRE MADERA LLENA M2 12.697 12.697 12.697 12.697 12.697 12.697 12.697 12.697
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
18,23 VINILO SOBRE PAETE 2 MANOS CONSTRUCCIN
M2 7.107 7.107 7.107 7.107 7.107 7.107 7.107 7.107
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.423 4.423 4.423 4.423 4.423 4.423 4.423 4.423
18,25 WASH-PRIMER SOBRE ALUMNIO M2 22.452 22.452 22.452 22.452 22.452 22.452 22.452 22.452
18,26 PINTURA EPXICA M2 12.611 12.611 12.611 12.611 12.611 12.611 12.611 12.611
18,27 PINTURA EPXICA (LINEAL) ML 7.731 7.731 7.731 7.731 7.731 7.731 7.731 7.731

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 6.530.349 6.530.349 6.530.349 6.530.349 6.530.349 6.530.349 6.530.349 6.530.349
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y CILINDRO
19,2 UN 11.537.985 11.537.985 11.537.985 11.537.985 11.537.985 11.537.985 11.537.985 11.537.985
PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 3.018.943 3.018.943 3.018.943 3.018.943 3.018.943 3.018.943 3.018.943 3.018.943
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 9.867.432 9.867.432 9.867.432 9.867.432 9.867.432 9.867.432 9.867.432 9.867.432
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 9.243.516 9.243.516 9.243.516 9.243.516 9.243.516 9.243.516 9.243.516 9.243.516
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.675 2.675 2.675 2.675 2.675 2.675 2.675 2.675
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 923.523 923.523 923.523 923.523 923.523 923.523 923.523 923.523
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 92.707 92.707 92.707 92.707 92.707 92.707 92.707 92.707
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.676.743 1.677.135 1.676.351 1.677.019 1.676.801 1.676.975 1.676.757 1.677.483
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 729.684 738.982 720.385 736.227 731.061 735.194 730.028 747.248

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 30.410 30.410 30.410 30.410 30.410 30.410 30.410 30.410
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 45.648 45.648 45.648 45.648 45.648 45.648 45.648 45.648
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 56.746 56.746 56.746 56.746 56.746 56.746 56.746 56.746
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 18.136 18.136 18.136 18.136 18.136 18.136 18.136 18.136
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 22.080 22.080 22.080 22.080 22.080 22.080 22.080 22.080
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 30.252 30.252 30.252 30.252 30.252 30.252 30.252 30.252
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 26.408 26.408 26.408 26.408 26.408 26.408 26.408 26.408
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 27.861 27.861 27.861 27.861 27.861 27.861 27.861 27.861
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 34.992 34.992 34.992 34.992 34.992 34.992 34.992 34.992
20,10 VLVULA DE BOLA GAS 1/2" UN 18.587 18.587 18.587 18.587 18.587 18.587 18.587 18.587
20,11 VLVULA DE BOLA GAS 3/4" UN 24.457 24.457 24.457 24.457 24.457 24.457 24.457 24.457
20,12 VLVULA DE BOLA GAS 1" UN 37.820 37.820 37.820 37.820 37.820 37.820 37.820 37.820
20,13 VLVULA POLIETILENO GAS 1/2" UN 292.076 292.076 292.076 292.076 292.076 292.076 292.076 292.076
20,14 VLVULA POLIETILENO GAS 3/4" UN 336.414 336.414 336.414 336.414 336.414 336.414 336.414 336.414
20,15 VLVULA POLIETILENO GAS 1" UN 350.484 350.484 350.484 350.484 350.484 350.484 350.484 350.484
20,16 ACOMETIDA GAS 1/2" ML 323.752 323.752 323.752 323.752 323.752 323.752 323.752 323.752

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 236.336 236.336 236.336 236.336 236.336 236.336 236.336 236.336
21,2 CABLE DETECTOR LINEAL DE CALOR ML 36.506 36.506 36.506 36.506 36.506 36.506 36.506 36.506
21,3 SIRENA DE 110 V UN 109.423 109.423 109.423 109.423 109.423 109.423 109.423 109.423
21,4 CMARA CCTV UN 270.717 270.717 270.717 270.717 270.717 270.717 270.717 270.717
21,5 PARLANTE-CIELO FALSO UN 53.936 53.936 53.936 53.936 53.936 53.936 53.936 53.936
21,6 AMPLIFICADOR 100W UN 607.086 607.086 607.086 607.086 607.086 607.086 607.086 607.086
21,7 AMPLIFICADOR 300W UN 1.521.059 1.521.059 1.521.059 1.521.059 1.521.059 1.521.059 1.521.059 1.521.059
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 43.401 43.401 43.401 43.401 43.401 43.401 43.401 43.401
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 237.323 237.323 237.323 237.323 237.323 237.323 237.323 237.323
21,10 TOMA PARA MICRFONO UN 44.980 44.980 44.980 44.980 44.980 44.980 44.980 44.980
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.947 3.947 3.947 3.947 3.947 3.947 3.947 3.947
21,12 SPLITERS UN 6.743 6.743 6.743 6.743 6.743 6.743 6.743 6.743
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 18.491 18.491 18.491 18.491 18.491 18.491 18.491 18.491
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 24.390 24.390 24.390 24.390 24.390 24.390 24.390 24.390
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 31.799 31.799 31.799 31.799 31.799 31.799 31.799 31.799
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 130.448 130.448 130.448 130.448 130.448 130.448 130.448 130.448
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 CONSTRUCCIN
ML 33.992 33.992 33.992 33.992 33.992 33.992 33.992 33.992
21,18 BANDEJA PORTACABLES PARA RACK UN 111.960 111.960 111.960 111.960 111.960 111.960 111.960 111.960
21,19 RACK 2' X 24" UN 187.473 187.473 187.473 187.473 187.473 187.473 187.473 187.473
21,20 RACK 3' X 24" UN 300.418 300.418 300.418 300.418 300.418 300.418 300.418 300.418
21,21 RACK 5' X 24" UN 370.563 370.563 370.563 370.563 370.563 370.563 370.563 370.563
21,22 RACK 7' X 24" UN 406.306 406.306 406.306 406.306 406.306 406.306 406.306 406.306
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 586.865 586.865 586.865 586.865 586.865 586.865 586.865 586.865
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 343.348 343.348 343.348 343.348 343.348 343.348 343.348 343.348
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 110.477 110.477 110.477 110.477 110.477 110.477 110.477 110.477
21,26 PATCH CORD 2M CATEGORA 6A UN 14.842 14.842 14.842 14.842 14.842 14.842 14.842 14.842
21,27 PATCH CORD 5M CATEGORA 6A UN 30.426 30.426 30.426 30.426 30.426 30.426 30.426 30.426
21,28 CABLE UTP CATEGORA 6A ML 5.179 5.179 5.179 5.179 5.179 5.179 5.179 5.179
21,29 CANALETA METLICA 4X6 CMS ML 36.103 36.103 36.103 36.103 36.103 36.103 36.103 36.103
21,30 CANALETA METLICA 4X10 CMS ML 37.807 37.807 37.807 37.807 37.807 37.807 37.807 37.807
21,31 CANALETA METLICA 6X10 CMS ML 38.659 38.659 38.659 38.659 38.659 38.659 38.659 38.659
21,32 CANALETA PLSTICA 13X7 MM ML 25.183 25.183 25.183 25.183 25.183 25.183 25.183 25.183
21,33 CANALETA PLSTICA 20X12 MM ML 27.985 27.985 27.985 27.985 27.985 27.985 27.985 27.985
21,34 CANALETA PLSTICA 32X12 MM ML 29.162 29.162 29.162 29.162 29.162 29.162 29.162 29.162
21,35 CANALETA PLSTICA 40X60 MM ML 49.857 49.857 49.857 49.857 49.857 49.857 49.857 49.857
21,36 SWITCH 10/100/1000 24 PUERTOS UN 650.692 650.692 650.692 650.692 650.692 650.692 650.692 650.692
21,37 SWITCH 10/100/1000 16 PUERTOS UN 331.825 331.825 331.825 331.825 331.825 331.825 331.825 331.825
21,38 SWITCH 10/100/1000 8 PUERTOS UN 90.162 90.162 90.162 90.162 90.162 90.162 90.162 90.162
21,39 CABLE TELEFNICO 2 PARES ML 1.889 1.889 1.889 1.889 1.889 1.889 1.889 1.889
21,40 CABLE TELEFNICO 10 PARES ML 8.759 8.759 8.759 8.759 8.759 8.759 8.759 8.759
21,41 CABLE TELEFNICO 20 PARES ML 13.225 13.225 13.225 13.225 13.225 13.225 13.225 13.225
21,42 CABLE TELEFNICO 40 PARES ML 22.200 22.200 22.200 22.200 22.200 22.200 22.200 22.200
21,43 CABLE TELEVISIN RG6 ML 4.055 4.055 4.055 4.055 4.055 4.055 4.055 4.055
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.956 21.956 21.956 21.956 21.956 21.956 21.956 21.956
21,45 ACOMETIDA TELEFNICA 1" ML 32.362 32.362 32.362 32.362 32.362 32.362 32.362 32.362
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 19.596 19.596 19.596 19.596 19.596 19.596 19.596 19.596
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 15.936 15.936 15.936 15.936 15.936 15.936 15.936 15.936
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 662.596 662.596 662.596 662.596 662.596 662.596 662.596 662.596
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 96.830 96.830 96.830 96.830 96.830 96.830 96.830 96.830
1,3 CODO 45 PVC UNIN MECNICA 8" UN 548.088 548.088 548.088 548.088 548.088 548.088 548.088 548.088
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.170.037 1.170.037 1.170.037 1.170.037 1.170.037 1.170.037 1.170.037 1.170.037
1,5 CODO 90 PVC UNIN MECNICA 4" UN 133.720 133.720 133.720 133.720 133.720 133.720 133.720 133.720
1,6 CODO 90 PVC UNIN MECNICA 8" UN 817.647 817.647 817.647 817.647 817.647 817.647 817.647 817.647
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.761.393 1.761.393 1.761.393 1.761.393 1.761.393 1.761.393 1.761.393 1.761.393
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 13.456 13.456 13.456 13.456 13.456 13.456 13.456 13.456
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 16.740 16.740 16.740 16.740 16.740 16.740 16.740 16.740
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 21.177 21.177 21.177 21.177 21.177 21.177 21.177 21.177
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 23.235 23.235 23.235 23.235 23.235 23.235 23.235 23.235
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 27.978 27.978 27.978 27.978 27.978 27.978 27.978 27.978
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 27.978 27.978 27.978 27.978 27.978 27.978 27.978 27.978
1,14 TAPN PVC UNIN MECNICA 3" UN 114.478 114.478 114.478 114.478 114.478 114.478 114.478 114.478
1,15 TAPN PVC UNIN MECNICA 4" UN 132.520 132.520 132.520 132.520 132.520 132.520 132.520 132.520
1,16 TAPN PVC UNIN MECNICA 8" UN 410.472 410.472 410.472 410.472 410.472 410.472 410.472 410.472
1,17 TEE PVC UNIN MECNICA 2" UN 154.252 154.252 154.252 154.252 154.252 154.252 154.252 154.252
1,18 TEE PVC UNIN MECNICA 4" UN 254.274 254.274 254.274 254.274 254.274 254.274 254.274 254.274
1,19 TEE PVC UNIN MECNICA 8" UN 1.127.031 1.127.031 1.127.031 1.127.031 1.127.031 1.127.031 1.127.031 1.127.031
1,20 TEE PVC UNIN MECNICA 10" UN 1.298.737 1.298.737 1.298.737 1.298.737 1.298.737 1.298.737 1.298.737 1.298.737
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 14.802 14.802 14.802 14.802 14.802 14.802 14.802 14.802
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 13.007 13.007 13.007 13.007 13.007 13.007 13.007 13.007
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 33.180 33.180 33.180 33.180 33.180 33.180 33.180 33.180
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 130.367 130.367 130.367 130.367 130.367 130.367 130.367 130.367
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 194.872 194.872 194.872 194.872 194.872 194.872 194.872 194.872
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 31.491 31.491 31.491 31.491 31.491 31.491 31.491 31.491
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 109.048 109.048 109.048 109.048 109.048 109.048 109.048 109.048
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 162.318 162.318 162.318 162.318 162.318 162.318 162.318 162.318
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 66.127 66.127 66.127 66.127 66.127 66.127 66.127 66.127
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 267.860 267.860 267.860 267.860 267.860 267.860 267.860 267.860
1,32 UNIN REPARACION PVC 4" UN 77.279 77.279 77.279 77.279 77.279 77.279 77.279 77.279
1,33 UNIN REPARACIN PVC 8" UN 311.894 311.894 311.894 311.894 311.894 311.894 311.894 311.894
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 185.186 185.186 185.186 185.186 185.186 185.186 185.186 185.186
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 532.145 532.145 532.145 532.145 532.145 532.145 532.145 532.145
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.431.729 1.431.729 1.431.729 1.431.729 1.431.729 1.431.729 1.431.729 1.431.729
1,37 VLVULA COMPUERTA ELSTICA 8" UN 2.115.823 2.115.823 2.115.823 2.115.823 2.115.823 2.115.823 2.115.823 2.115.823

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.700 10.700 10.700 10.700 10.700 10.700 10.700 10.700
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 24.331 24.331 24.331 24.331 24.331 24.331 24.331 24.331
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 135.049 162.265 107.833 154.201 139.081 151.177 136.057 186.457
2,5 RELLENO TIPO 2 "RECEBO" M3 55.823 46.742 68.777 59.690 42.875 72.638 58.410 50.623
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 132.451 138.815 127.277 124.690 114.342 135.038 120.810 118.223
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 151.078 186.948 145.954 156.203 151.078 161.327 145.954 181.824
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 89.531 110.426 84.308 94.755 89.531 99.979 84.308 120.874
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 124.255 147.070 101.440 140.310 127.635 137.775 125.100 167.350

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 122.407 122.407 122.407 122.407 122.407 122.407 122.407 122.407
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
3,2 CODO 45 PVC ALCANTARILLADO 16" CONSTRUCCIN
UN 1.280.420 1.280.420 1.280.420 1.280.420 1.280.420 1.280.420 1.280.420 1.280.420
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 160.108 160.108 160.108 160.108 160.108 160.108 160.108 160.108
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.483.150 1.483.150 1.483.150 1.483.150 1.483.150 1.483.150 1.483.150 1.483.150
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 1.033.402 1.033.402 1.033.402 1.033.402 1.033.402 1.033.402 1.033.402 1.033.402
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 63.346 63.346 63.346 63.346 63.346 63.346 63.346 63.346
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 121.509 121.509 121.509 121.509 121.509 121.509 121.509 121.509
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 287.393 287.393 287.393 287.393 287.393 287.393 287.393 287.393
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 287.387 287.387 287.387 287.387 287.387 287.387 287.387 287.387
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 461.611 461.611 461.611 461.611 461.611 461.611 461.611 461.611
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 121.561 121.561 121.561 121.561 121.561 121.561 121.561 121.561
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 121.561 121.561 121.561 121.561 121.561 121.561 121.561 121.561
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 287.393 287.393 287.393 287.393 287.393 287.393 287.393 287.393
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 287.393 287.393 287.393 287.393 287.393 287.393 287.393 287.393
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 461.611 461.611 461.611 461.611 461.611 461.611 461.611 461.611
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 460.328 460.328 460.328 460.328 460.328 460.328 460.328 460.328
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 749.925 749.925 749.925 749.925 749.925 749.925 749.925 749.925
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.204.455 1.204.455 1.204.455 1.204.455 1.204.455 1.204.455 1.204.455 1.204.455
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 74.291 74.291 74.291 74.291 74.291 74.291 74.291 74.291
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 384.555 384.555 384.555 384.555 384.555 384.555 384.555 384.555
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 434.061 434.061 434.061 434.061 434.061 434.061 434.061 434.061
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.200.482 1.200.482 1.200.482 1.200.482 1.200.482 1.200.482 1.200.482 1.200.482
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 70.186 70.422 69.951 70.352 70.221 70.326 70.195 70.631
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 348.244 348.244 348.244 348.244 348.244 348.244 348.244 348.244
3,25 TUBERA PVC ALCANTARILLADO 8" ML 53.154 53.154 53.154 53.154 53.154 53.154 53.154 53.154
3,26 TUBERA PVC ALCANTARILLADO 10" ML 75.353 75.353 75.353 75.353 75.353 75.353 75.353 75.353
3,27 TUBERA PVC ALCANTARILLADO 12" ML 108.934 108.934 108.934 108.934 108.934 108.934 108.934 108.934
3,28 TUBERA PVC ALCANTARILLADO 16" ML 167.308 167.308 167.308 167.308 167.308 167.308 167.308 167.308
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 269.262 269.262 269.262 269.262 269.262 269.262 269.262 269.262
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 389.046 389.046 389.046 389.046 389.046 389.046 389.046 389.046
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 492.845 492.845 492.845 492.845 492.845 492.845 492.845 492.845
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 648.199 648.199 648.199 648.199 648.199 648.199 648.199 648.199
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 892.864 892.864 892.864 892.864 892.864 892.864 892.864 892.864

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4,1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 727.905 750.222 705.588 743.609 731.211 741.130 728.731 770.059
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO
4,2 ML 706.965 723.477 690.454 718.584 709.412 716.750 707.577 738.153
E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4,3 UN 766.068 780.946 751.190 776.537 768.272 774.884 766.618 794.170
Y TAPA HF)

4,4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 869.543 897.440 841.647 889.174 873.676 886.074 870.576 922.236
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE INTERNO
4,5 ML 1.010.482 1.033.732 987.232 1.026.843 1.013.926 1.024.260 1.011.343 1.054.399
E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4,6 UN 891.466 911.923 871.009 905.862 894.496 903.588 892.223 930.107
Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 1.006.149 1.016.546 995.756 1.013.464 1.007.690 1.012.310 1.006.536 1.025.785
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.494.655 1.525.425 1.463.892 1.516.306 1.499.216 1.512.889 1.495.799 1.552.772
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 2.121.384 2.180.563 2.062.205 2.163.029 2.130.151 2.156.453 2.123.576 2.233.167
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.841.755 2.940.127 2.743.383 2.910.980 2.856.329 2.900.050 2.845.398 3.027.569
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.934.337 1.934.337 1.934.337 1.934.337 1.934.337 1.934.337 1.934.337 1.934.337
4,12 SUMIDERO PREFABRICADO SL-250 UN 4.112.628 4.112.628 4.112.628 4.112.628 4.112.628 4.112.628 4.112.628 4.112.628
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAETE
4,13 UN 141.206 141.879 140.532 141.680 141.305 141.605 141.231 142.479
INTERNO Y DEMOLICIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
5 ANDENES Y SARDINELES CONSTRUCCIN
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 77.230 78.459 76.002 78.095 77.412 77.958 77.276 79.551
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 91.686 92.915 90.458 92.551 91.868 92.414 91.732 94.007
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 64.078 68.079 60.077 66.893 64.670 66.449 64.226 71.635
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 68.799 72.704 64.893 71.547 69.377 71.113 68.943 76.176
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 68.897 72.685 65.110 71.563 69.458 71.142 69.038 76.052
5,6 BORDE SEPARADOR VERDE A-170 ML 271.103 271.777 270.429 271.577 271.203 271.502 271.128 272.376
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 18.902 19.382 18.422 19.240 18.973 19.187 18.920 19.809
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 45.629 48.449 42.810 47.613 46.047 47.300 45.734 50.955
5,9 CAUELA PREFABRICADA TIPO A-120 ML 87.526 87.887 87.166 87.780 87.580 87.740 87.540 88.207
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 586.503 595.497 577.508 592.832 587.835 591.833 586.836 603.492
5,11 LOSETA PREFABRICADA A-40 M2 67.556 69.098 66.013 68.641 67.784 68.470 67.613 70.469
5,12 LOSETA PREFABRICADA A-60 M2 98.326 99.868 96.783 99.411 98.554 99.240 98.383 101.239
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 36.440 38.003 34.878 37.540 36.672 37.366 36.498 39.391
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 60.178 63.339 57.016 62.403 60.646 62.051 60.295 66.150
5,15 SARDINEL PREFABRICADO A-10 ML 103.944 110.672 104.976 107.779 110.365 106.744 104.355 111.987
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 64.114 65.048 63.181 64.771 64.253 64.667 64.149 65.877

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 215.934 217.793 214.074 217.242 216.209 217.036 216.002 219.446
6,2 BANCA EN CONCRETO M-30 UN 710.120 712.724 707.516 711.952 710.506 711.663 710.217 715.038
6,3 BOLARDO M-63 ALTO/HIERRO UN 225.519 225.909 225.129 225.794 225.577 225.750 225.533 226.256
6,4 BOLARDO M-60 CONCRETO UN 171.886 174.118 169.654 173.456 172.217 173.208 171.969 176.101
6,5 BOLARDO M-61 BAJO/CONCRETO UN 173.650 175.881 171.418 175.220 173.980 174.972 173.732 177.865
6,6 BOLARDO M-62 BAJO/HIERRO UN 204.277 206.618 201.936 205.924 204.624 205.664 204.364 208.698
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 60.536 61.477 59.596 61.198 60.676 61.094 60.571 62.313
6,8 BORDILLO PREFABRICADO A-80 ML 72.414 73.467 71.361 73.155 72.570 73.038 72.453 74.403
6,9 CANECA M-120 UN 330.776 331.011 330.541 330.942 330.811 330.915 330.785 331.220
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 872.185 873.301 871.069 872.970 872.350 872.846 872.226 874.292
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.595.212 3.595.955 3.594.468 3.595.735 3.595.322 3.595.652 3.595.239 3.596.617
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.698.699 3.699.442 3.697.955 3.699.222 3.698.809 3.699.139 3.698.726 3.700.104
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 517.075 517.855 516.295 517.624 517.191 517.537 517.104 518.549
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 688.362 691.483 685.241 690.558 688.825 690.212 688.478 694.257
6,15 BANCA EN MADERA M-50 UN 566.485 566.485 566.485 566.485 566.485 566.485 566.485 566.485
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 260.309 261.425 259.193 261.095 260.475 260.971 260.351 262.417
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 611.932 612.520 611.344 612.345 612.019 612.280 611.954 613.042
6,18 POSTE HISTRICO M-131 UN 6.842.740 6.848.319 6.837.161 6.846.666 6.843.566 6.846.046 6.842.946 6.853.278

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.293 4.293 4.293 4.293 4.293 4.293 4.293 4.293
7,2 MARCA VIAL CON PINTURA EN FRO M2 45.165 45.165 45.165 45.165 45.165 45.165 45.165 45.165
7,3 SEAL DOBLE DE CICLORUTA UN 331.864 332.201 331.527 332.101 331.914 332.064 331.877 332.501
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 522.736 524.297 521.176 523.834 522.968 523.661 522.794 525.684
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 244.670 245.007 244.333 244.907 244.720 244.869 244.682 245.306
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 260.197 260.534 259.860 260.434 260.247 260.396 260.209 260.833
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 271.954 272.291 271.617 272.191 272.004 272.153 271.966 272.590
7,8 TACHAS REFLECTIVAS UN 14.224 14.224 14.224 14.224 14.224 14.224 14.224 14.224
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 15.208 15.208 15.208 15.208 15.208 15.208 15.208 15.208
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7,10 UN 124.721 124.721 124.721 124.721 124.721 124.721 124.721 124.721
INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 35.575 35.575 35.575 35.575 35.575 35.575 35.575 35.575
2,3 210.2.2 EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 600.2 M3 64.502 64.502 64.502 64.502 64.502 64.502 64.502 64.502
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 600.3 M3 78.772 78.772 78.772 78.772 78.772 78.772 78.772 78.772
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE SOBRANTES A
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO DE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO DE
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE RETIRO
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 123.246 176.078 134.803 152.964 176.078 144.709 126.548 184.333
3,3 330.1 BASE GRANULAR M3 139.776 192.608 151.333 169.494 192.608 161.239 143.078 200.863
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.382 3.382 3.382 3.382 3.382 3.382 3.382 3.382
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.142 1.142 1.142 1.142 1.142 1.142 1.142 1.142
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 243.475 250.862 236.088 248.673 244.569 247.853 243.749 257.429
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 73.589 75.923 71.255 75.232 73.935 74.972 73.675 77.998
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 518.063 645.063 589.501 637.126 573.626 621.251 613.313 684.751
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 520.751 647.751 512.813 546.151 576.313 538.213 528.688 587.426
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 544.061 671.061 536.123 569.461 599.623 561.523 551.998 610.736
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 542.501 669.501 534.563 567.901 598.063 559.963 550.438 609.176
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 298.097 350.929 309.654 327.815 350.929 319.560 301.399 359.184
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 279.924 332.756 291.481 309.642 332.756 301.387 283.226 341.011
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
3,15 311.1 AFIRMADO CONSTRUCCIN
M3 138.149 152.020 131.545 128.243 115.035 141.451 123.290 119.988
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 12.814 13.332 12.295 13.179 12.891 13.121 12.833 13.793
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 5.269 5.528 5.010 5.452 5.308 5.423 5.279 5.759
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO
3,18 500.1 M3 712.923 748.380 677.467 737.874 718.176 733.935 714.237 779.897
DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO
3,19 500.1 M3 749.759 786.803 712.715 775.827 755.247 771.711 751.131 819.731
DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO
3,20 500.1 M3 774.232 812.324 736.141 801.037 779.875 796.805 775.643 846.183
DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE LIMPIEZA,
3,21 *** ML 7.009 7.009 7.009 7.009 7.009 7.009 7.009 7.009
SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 121.967 149.907 114.982 128.952 121.967 135.937 114.982 163.877

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 983.784 1.024.003 943.564 1.012.086 989.742 1.007.617 985.273 1.059.753
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 860.748 900.300 821.195 888.581 866.607 884.186 862.213 935.458
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 908.312 949.430 867.193 937.247 914.403 932.678 909.834 985.980
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 641.774 678.207 605.341 667.412 647.172 663.364 643.124 710.592
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 736.924 774.799 699.048 763.577 742.535 759.368 738.326 808.466
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 640.827 678.394 603.260 667.263 646.392 663.088 642.218 711.786
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 735.939 774.994 696.884 763.421 741.724 759.082 737.385 809.709
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 792.703 830.270 755.136 819.139 798.268 814.965 794.094 863.663
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 662.693 701.747 623.638 690.175 668.478 685.836 664.139 736.463
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 837.572 876.627 798.517 865.055 843.358 860.715 839.018 911.342
4,11 650 P SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 11.866 11.866 11.866 11.866 11.866 11.866 11.866 11.866
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-588
4,12 650 P KG 15.418 15.418 15.418 15.418 15.418 15.418 15.418 15.418
GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.808 1.808 1.808 1.808 1.808 1.808 1.808 1.808
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO TREMIE
4,14 621.1 ML 2.765.801 2.765.801 2.765.801 2.765.801 2.765.801 2.765.801 2.765.801 2.765.801
3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN MANUAL
4,15 621.1 P ML 4.189.838 4.258.634 4.121.042 4.238.250 4.200.030 4.230.606 4.192.386 4.319.786
(INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.760.585 1.797.780 1.723.390 1.786.759 1.766.095 1.782.626 1.761.962 1.830.842
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 90.957 90.957 90.957 90.957 90.957 90.957 90.957 90.957
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 371.264 375.728 366.801 374.405 371.925 373.909 371.429 379.695
4,19 632 P BARANDA METLICA ML 430.189 430.189 430.189 430.189 430.189 430.189 430.189 430.189
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 17.558 17.558 17.558 17.558 17.558 17.558 17.558 17.558
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 602.826 650.609 559.517 624.348 594.417 628.115 595.136 665.781
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 174.006 222.901 167.021 180.991 174.006 187.976 167.021 215.916
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 68.022 58.650 82.290 73.242 53.430 87.834 71.070 63.222
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 459.297 498.697 419.898 487.024 465.135 482.645 460.757 533.719
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 414.522 448.088 388.577 433.533 417.990 433.472 412.849 473.973
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 422.963 456.529 397.017 441.974 426.431 441.913 421.290 482.414
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 428.494 461.516 403.093 447.122 431.881 447.122 426.801 486.917
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 436.935 469.957 411.534 455.563 440.322 455.562 435.241 495.357
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 589.372 627.856 550.889 616.453 595.073 612.177 590.797 662.062
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 682.685 722.693 642.678 710.839 688.612 706.393 684.167 758.255
4,31 681.1 GAVIN M3 209.640 236.310 202.973 216.308 209.640 222.975 202.973 249.645
4,32 681.1 GAVIN MALLA PVC M3 214.072 240.742 207.405 220.740 214.072 227.407 207.405 254.077
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 46.285 48.647 43.922 47.947 46.635 47.685 46.372 50.747
4,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 18.681 19.863 17.500 19.513 18.856 19.381 18.725 20.912
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA
4,35 *** M2 10.482 10.482 10.482 10.482 10.482 10.482 10.482 10.482
LTIMA 25 KN)
4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 15.057 15.057 15.057 15.057 15.057 15.057 15.057 15.057
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 CONSTRUCCIN
M2 20.355 20.355 20.355 20.355 20.355 20.355 20.355 20.355
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4,38 *** M2 24.453 24.453 24.453 24.453 24.453 24.453 24.453 24.453
LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4,39 *** M2 31.495 31.495 31.495 31.495 31.495 31.495 31.495 31.495
LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN, FILTRO Y
4,40 *** M2 7.523 7.523 7.523 7.523 7.523 7.523 7.523 7.523
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN, FILTRO Y
4,41 *** M2 8.599 8.599 8.599 8.599 8.599 8.599 8.599 8.599
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN, FILTRO Y
4,42 *** M2 8.944 8.944 8.944 8.944 8.944 8.944 8.944 8.944
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN, FILTRO Y
4,43 *** M2 6.318 6.318 6.318 6.318 6.318 6.318 6.318 6.318
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN, FILTRO Y
4,44 *** M2 9.612 9.612 9.612 9.612 9.612 9.612 9.612 9.612
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN, FILTRO Y
4,45 *** M2 7.803 7.803 7.803 7.803 7.803 7.803 7.803 7.803
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN, FILTRO Y
4,46 *** M2 9.612 9.612 9.612 9.612 9.612 9.612 9.612 9.612
SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN, FILTRO Y
4,47 *** M2 18.640 18.640 18.640 18.640 18.640 18.640 18.640 18.640
SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36" CLASE I,
4,48 661.1 ML 662.960 663.484 662.437 663.329 663.038 663.271 662.980 663.949
INCLUYE EMBOQUILLADA
4,49 660.3 SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600 MM ML 395.692 404.167 387.216 401.656 396.947 400.714 396.005 411.701
4,50 *** SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO 36" ML 930.073 930.073 930.073 930.073 930.073 930.073 930.073 930.073
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 202.070 215.408 195.720 192.545 179.845 205.245 187.783 184.608
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.640 4.640 4.640 4.640 4.640 4.640 4.640 4.640
4,53 *** GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 90.759 90.759 90.759 90.759 90.759 90.759 90.759 90.759
4,54 *** GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 138.384 138.384 138.384 138.384 138.384 138.384 138.384 138.384
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 606.743 646.751 566.735 634.896 612.670 630.451 608.224 682.312
4,56 682.1 P COLCHONETA RENO M3 225.168 251.838 218.501 231.836 225.168 238.503 218.501 265.173
4,57 *** TRINCHO EN MADERA M2 71.624 71.624 71.624 71.624 71.624 71.624 71.624 71.624

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 4.293 4.293 4.293 4.293 4.293 4.293 4.293 4.293
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 45.165 45.165 45.165 45.165 45.165 45.165 45.165 45.165
5,3 730.3 TOPE DEFENSA METLICA UN 88.483 88.483 88.483 88.483 88.483 88.483 88.483 88.483
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 73.500 73.500 73.500 73.500 73.500 73.500 73.500 73.500
5,5 730.1 DEFENSA METLICA ML 157.936 159.751 156.122 159.213 158.205 159.011 158.003 161.363
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 14.224 14.224 14.224 14.224 14.224 14.224 14.224 14.224

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 827 827 827 827 827 827 827 827
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36", INCLUYE
6,2 801.6 UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE DESCOLES Y
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 16.043 16.043 16.043 16.043 16.043 16.043 16.043 16.043
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 26.199 26.199 26.199 26.199 26.199 26.199 26.199 26.199
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 10.044 10.044 10.044 10.044 10.044 10.044 10.044 10.044
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: RIONEGRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD El_Peon La_Palma Pacho Paime San_Cayetano Topaip Villa_Gomez Yacop
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE CONSTRUCCIN
ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.874.167 1.878.536 1.869.173 1.880.409 1.874.791 1.876.040 1.877.913 1.876.663 1.866.676
1,2 CAMPAMENTO 9 M2 UN 1.094.742 1.096.927 1.092.245 1.097.863 1.095.055 1.095.679 1.096.615 1.095.991 1.090.997
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.389 13.389 13.389 13.389 13.389 13.389 13.389 13.389 13.389
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.010 15.010 15.010 15.010 15.010 15.010 15.010 15.010 15.010
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.357 17.357 17.357 17.357 17.357 17.357 17.357 17.357 17.357
1,6 CERCA EN TABLA H=2.30 M ML 62.284 62.284 62.284 62.284 62.284 62.284 62.284 62.284 62.284
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 43.525 43.573 43.470 43.594 43.532 43.546 43.566 43.553 43.443
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.046 20.094 19.991 20.114 20.053 20.066 20.087 20.073 19.964
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 853.728 854.407 853.180 854.413 853.996 854.431 853.642 854.002 852.906
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 9.966 9.966 9.966 9.966 9.966 9.966 9.966 9.966 9.966
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.561 3.561 3.561 3.561 3.561 3.561 3.561 3.561 3.561
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.548.981 2.548.981 2.548.981 2.548.981 2.548.981 2.548.981 2.548.981 2.548.981 2.548.981
1,44 RED TELEFNICA PROVISIONAL UN 235.762 235.762 235.762 235.762 235.762 235.762 235.762 235.762 235.762
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 64.495 67.758 65.171 65.171 67.758 71.639 58.704 61.291 65.171
2,2 BASE ARENA CEMENTO 1:20 M3 142.229 144.844 139.241 145.964 142.603 143.350 144.470 143.723 137.747
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 CONSTRUCCIN
21.013 21.013 21.013 21.013 21.013 21.013 21.013 21.013 21.013
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 582.545 587.239 577.183 589.250 583.217 584.557 586.569 585.228 574.502
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 583.618 588.503 578.037 590.597 584.317 585.713 587.806 586.410 575.246
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 543.490 548.064 538.264 550.024 544.144 545.451 547.411 546.104 535.651
2,9 PILOTE DE MADERA D=20 CM ML 47.723 47.723 47.723 47.723 47.723 47.723 47.723 47.723 47.723
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 ML 147.045 147.045 147.045 147.045 147.045 147.045 147.045 147.045 147.045
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 ML 183.106 183.106 183.106 183.106 183.106 183.106 183.106 183.106 183.106
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,12 ML 226.714 226.714 226.714 226.714 226.714 226.714 226.714 226.714 226.714
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 ML 285.417 285.417 285.417 285.417 285.417 285.417 285.417 285.417 285.417
DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 98.389 98.724 98.006 98.867 98.437 98.532 98.676 98.580 97.815
2,15 PILOTE HINCADO 30X30 ML 120.906 121.392 120.351 121.600 120.975 121.114 121.322 121.183 120.074
2,16 DADOS EN CONCRETO 3500PSI M3 530.129 534.703 524.903 536.663 530.783 532.090 534.050 532.743 522.290
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,17 ML 87.893 87.893 87.893 87.893 87.893 87.893 87.893 87.893 87.893
MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 36.091 36.108 36.073 36.115 36.094 36.098 36.105 36.101 36.064
3,2 SIFN EN PVC 6" UN 187.769 187.785 187.750 187.792 187.771 187.776 187.783 187.778 187.741
3,3 CAJA DE INSPECCIN DE 100X100 UN 413.356 416.541 411.604 415.546 415.227 418.142 410.541 414.232 410.728
3,4 CAJA DE INSPECCIN DE 40X40 UN 209.644 210.308 209.045 210.393 209.858 210.217 209.746 209.944 208.745
3,5 CAJA DE INSPECCIN DE 60X60 UN 236.331 237.377 235.387 237.512 236.668 237.233 236.493 236.804 234.914
3,6 CAJA DE INSPECCIN DE 80X80 UN 308.269 309.888 306.670 310.269 308.688 309.417 308.922 309.069 305.870
3,7 DUCTO ELCTRICO PVC 4" ML 98.950 98.970 98.950 98.950 98.970 99.000 98.901 98.950 98.950
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.217.825 1.218.024 1.217.825 1.217.825 1.218.024 1.218.323 1.217.328 1.217.825 1.217.825
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 106.373 106.553 106.168 106.630 106.399 106.450 106.527 106.476 106.066
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 67.470 67.565 67.362 67.605 67.483 67.510 67.551 67.524 67.308
3,11 TUBERA DRENAJE PVC 110 ML 26.146 26.234 26.046 26.271 26.159 26.184 26.221 26.196 25.996
3,12 TUBERA DRENAJE PVC 160 ML 42.298 42.385 42.198 42.423 42.310 42.335 42.373 42.348 42.148
3,13 TUBERA DRENAJE PVC 200 ML 55.481 55.603 55.341 55.656 55.498 55.533 55.586 55.551 55.271
3,14 TUBERA DRENAJE PVC 250 ML 76.028 76.168 75.868 76.228 76.048 76.088 76.148 76.108 75.788
3,15 TUBERA DRENAJE PVC 315 ML 105.432 105.554 105.292 105.607 105.449 105.484 105.537 105.502 105.222
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3,16 UN 904.055 905.455 902.455 906.055 904.255 904.655 905.255 904.855 901.655
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3,17 UN 1.275.310 1.278.110 1.272.110 1.279.310 1.275.710 1.276.510 1.277.710 1.276.910 1.270.510
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3,18 UN 1.654.629 1.660.229 1.648.229 1.662.629 1.655.429 1.657.029 1.659.429 1.657.829 1.645.029
FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 40.076 40.076 40.076 40.076 40.076 40.076 40.076 40.076 40.076
4,2 CASETN DE LONA 0.80X0.70 M2 52.911 52.911 52.911 52.911 52.911 52.911 52.911 52.911 52.911
4,3 COLUMNAS 3500 PSI M3 739.023 743.597 733.797 745.557 739.677 740.984 742.944 741.637 731.184
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 220.179 226.490 215.117 225.253 222.693 222.287 220.633 222.292 212.586
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4,5 M2 90.958 91.402 90.451 91.593 91.022 91.149 91.339 91.212 90.197
REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4,6 M2 107.223 107.756 106.614 107.984 107.299 107.452 107.680 107.528 106.310
REFUERZO, CONCRETO DE 3500 PSI
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 118.993 119.704 118.181 120.008 119.095 119.298 119.602 119.399 117.775
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 125.520 126.275 124.657 126.598 125.628 125.843 126.167 125.951 124.226
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 143.431 144.363 142.365 144.763 143.564 143.831 144.230 143.964 141.832
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 159.365 160.431 158.148 160.888 159.518 159.822 160.279 159.975 157.539
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 176.771 177.970 175.401 178.483 176.942 177.285 177.798 177.456 174.716
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
4,12 ENTREPISO VIGUETA PLACA M2 CONSTRUCCIN
93.810 93.872 93.739 93.898 93.819 93.836 93.863 93.845 93.704
4,13 ESCALERA MACIZA 3500 PSI M3 879.112 883.686 873.886 885.646 879.766 881.073 883.033 881.726 871.272
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 90.231 90.300 90.153 90.329 90.241 90.261 90.290 90.270 90.114
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 72.854 73.311 72.331 73.507 72.919 73.050 73.246 73.115 72.070
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 81.666 82.226 81.027 82.465 81.746 81.906 82.146 81.986 80.707
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 94.886 95.588 94.084 95.888 94.986 95.187 95.487 95.287 93.683
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 643.274 647.848 638.048 649.808 643.928 645.235 647.195 645.888 635.435
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 46.012 46.154 45.850 46.215 46.033 46.073 46.134 46.093 45.769
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 256.008 258.051 253.674 258.926 256.300 256.884 257.759 257.175 252.507
4,21 ACERO FIGURADO 37000 PSI KG 3.979 3.979 3.979 3.979 3.979 3.979 3.979 3.979 3.979
4,22 ACERO FIGURADO 60000 PSI KG 4.173 4.173 4.173 4.173 4.173 4.173 4.173 4.173 4.173
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.850 5.850 5.850 5.850 5.850 5.850 5.850 5.850 5.850
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 782.202 786.776 776.976 788.736 782.856 784.163 786.123 784.816 774.362
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 708.568 713.574 702.848 715.719 709.284 710.714 712.859 711.429 699.989
4,26 VIGA AREA 3500 PSI M3 777.878 782.452 772.651 784.412 778.532 779.839 781.799 780.492 770.038
4,27 VIGA CINTA 3500 PSI M3 758.919 763.493 753.693 765.453 759.573 760.880 762.840 761.533 751.080
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 957.759 962.333 952.532 964.293 958.413 959.720 961.680 960.373 949.919
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 276.338 281.338 270.622 283.482 277.052 278.481 280.624 279.195 267.765

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 27.344 27.455 27.218 27.503 27.360 27.392 27.439 27.408 27.155
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 46.598 46.708 46.471 46.756 46.613 46.645 46.693 46.661 46.408
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 32.960 32.977 32.942 32.984 32.963 32.967 32.974 32.970 32.933
5,4 ARCOS EN LADRILLO PRENSADO ML 155.011 155.043 154.974 155.057 155.015 155.025 155.039 155.029 154.955
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 41.089 41.230 40.927 41.291 41.109 41.149 41.210 41.170 40.846
5,6 DINTELES EN BLOQUE 0.15 M ML 25.514 25.582 25.436 25.611 25.524 25.543 25.572 25.553 25.397
5,7 ENCHAPES LADRILLO PRENSADO M2 93.166 93.231 93.092 93.259 93.175 93.194 93.222 93.203 93.055
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 83.768 84.240 83.228 84.443 83.835 83.970 84.173 84.038 82.958
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 86.868 86.868 86.868 86.868 86.868 86.868 86.868 86.868 86.868
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 50.916 50.916 50.916 50.916 50.916 50.916 50.916 50.916 50.916
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 83.654 83.654 83.654 83.654 83.654 83.654 83.654 83.654 83.654
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 49.309 49.309 49.309 49.309 49.309 49.309 49.309 49.309 49.309
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 97.017 97.017 97.017 97.017 97.017 97.017 97.017 97.017 97.017
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 57.239 57.239 57.239 57.239 57.239 57.239 57.239 57.239 57.239
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 107.925 107.925 107.925 107.925 107.925 107.925 107.925 107.925 107.925
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 62.692 62.692 62.692 62.692 62.692 62.692 62.692 62.692 62.692
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 38.146 38.179 38.109 38.193 38.151 38.160 38.174 38.165 38.090
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.146 23.163 23.128 23.170 23.149 23.153 23.160 23.156 23.118
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 50.086 50.107 50.061 50.117 50.089 50.095 50.104 50.098 50.048
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 30.122 30.133 30.110 30.138 30.124 30.127 30.132 30.129 30.104
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 56.378 56.400 56.354 56.409 56.382 56.388 56.397 56.391 56.341
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 33.905 33.916 33.892 33.920 33.906 33.909 33.914 33.911 33.886
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 92.444 92.552 92.319 92.599 92.459 92.490 92.537 92.506 92.257
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 54.795 54.849 54.733 54.873 54.803 54.818 54.842 54.826 54.702
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 35.098 35.120 35.073 35.129 35.101 35.107 35.116 35.110 35.060
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.308 21.319 21.295 21.323 21.309 21.313 21.317 21.314 21.289
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 69.851 69.894 69.801 69.913 69.857 69.869 69.888 69.876 69.776
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 42.160 42.181 42.135 42.191 42.163 42.169 42.178 42.172 42.122
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 83.538 83.606 83.460 83.636 83.548 83.567 83.597 83.577 83.421
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 50.587 50.621 50.548 50.636 50.592 50.602 50.616 50.607 50.529
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 170.586 170.739 170.412 170.804 170.608 170.652 170.717 170.674 170.325
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 102.662 102.738 102.575 102.771 102.673 102.695 102.728 102.706 102.532
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 84.112 84.180 84.035 84.209 84.122 84.141 84.170 84.151 83.996
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 50.874 50.908 50.836 50.923 50.879 50.889 50.903 50.894 50.816
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 CONSTRUCCIN
43.758 43.807 43.702 43.828 43.765 43.779 43.800 43.786 43.674
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 26.693 26.718 26.666 26.728 26.697 26.704 26.714 26.707 26.652
5,37 MURO TOLETE COMN 0.06 M M2 31.769 31.790 31.744 31.800 31.772 31.778 31.787 31.781 31.731
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.384 19.394 19.371 19.399 19.385 19.388 19.393 19.390 19.365
5,39 MURO TOLETE COMN 0.12 M M2 47.846 47.889 47.796 47.908 47.852 47.865 47.883 47.871 47.771
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 29.382 29.404 29.357 29.413 29.385 29.391 29.400 29.394 29.345
5,41 MURO TOLETE COMN 0.25 M M2 92.633 92.698 92.558 92.726 92.642 92.661 92.689 92.670 92.521
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 56.466 56.498 56.428 56.512 56.470 56.480 56.494 56.484 56.410
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 67.644 67.688 67.594 67.706 67.650 67.663 67.682 67.669 67.570
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 40.894 40.915 40.869 40.925 40.897 40.903 40.912 40.906 40.856
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 141.203 141.356 141.029 141.421 141.225 141.269 141.334 141.290 140.942
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 86.090 86.166 86.002 86.198 86.100 86.122 86.155 86.133 85.959
5,47 REMATES LADRILLO PRENSADO ML 29.915 29.931 29.896 29.938 29.917 29.922 29.929 29.924 29.887
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 33.631 33.680 33.575 33.700 33.638 33.652 33.673 33.659 33.547
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 57.148 57.213 57.073 57.240 57.157 57.175 57.203 57.185 57.036
5,50 LAVADA DE FACHADA M2 4.961 4.961 4.961 4.961 4.961 4.961 4.961 4.961 4.961
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 46.940 47.051 46.814 47.098 46.956 46.988 47.035 47.003 46.750
5,52 DOVELA, GROUTING 3000 PSI ML 10.053 10.053 10.053 10.053 10.053 10.053 10.053 10.053 10.053
5,53 ANCLAJE 3/8" L=30CM UN 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260 13.260
5,54 ANCLAJE 1/2" L=50CM UN 17.321 17.321 17.321 17.321 17.321 17.321 17.321 17.321 17.321
5,55 ANCLAJE 5/8" L=70CM UN 24.210 24.210 24.210 24.210 24.210 24.210 24.210 24.210 24.210
5,56 ANCLAJE 3/4" L=70CM UN 36.049 36.049 36.049 36.049 36.049 36.049 36.049 36.049 36.049
5,57 ANCLAJE 1" L= 70CM UN 4.480 4.514 4.441 4.528 4.485 4.494 4.509 4.499 4.421

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.279 15.279 15.279 15.279 15.279 15.279 15.279 15.279 15.279
6,2 FILOS O DILATACIONES B/PLACA ML 5.166 5.182 5.147 5.189 5.168 5.173 5.180 5.175 5.138
6,3 FILOS O DILATACIONES S/MURO ML 6.286 6.302 6.267 6.309 6.288 6.293 6.300 6.295 6.258
6,4 GOTERA EN MORTERO 1:4 ML 7.499 7.515 7.481 7.522 7.501 7.506 7.513 7.508 7.471
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.491 6.491 6.491 6.491 6.491 6.491 6.491 6.491 6.491
6,6 MALLA BAJO ENTRAMADO M2 12.972 12.972 12.972 12.972 12.972 12.972 12.972 12.972 12.972
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 22.036 22.084 21.982 22.104 22.043 22.057 22.077 22.063 21.955
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.468 13.491 13.441 13.502 13.471 13.478 13.488 13.481 13.427
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 19.216 19.262 19.164 19.282 19.223 19.236 19.256 19.243 19.138
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 11.765 11.788 11.739 11.797 11.768 11.775 11.784 11.778 11.726
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 18.362 18.410 18.308 18.430 18.369 18.382 18.403 18.389 18.281
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.338 11.361 11.311 11.372 11.341 11.348 11.358 11.351 11.297
6,13 PAETE CULATAS 1:4, E=2 CM M2 19.216 19.262 19.164 19.282 19.223 19.236 19.256 19.243 19.138
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 11.765 11.788 11.739 11.797 11.768 11.775 11.784 11.778 11.726
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 19.792 19.825 19.753 19.840 19.797 19.806 19.821 19.811 19.734
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.051 12.068 12.032 12.076 12.054 12.059 12.066 12.061 12.022
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.041 16.076 16.001 16.091 16.046 16.056 16.071 16.061 15.981
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 9.905 9.922 9.885 9.930 9.907 9.912 9.920 9.915 9.875
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 15.390 15.426 15.349 15.442 15.395 15.405 15.421 15.411 15.328
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.579 9.597 9.559 9.605 9.582 9.587 9.595 9.590 9.548
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 19.951 19.997 19.899 20.017 19.958 19.971 19.990 19.977 19.873
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.113 12.136 12.087 12.146 12.117 12.123 12.133 12.126 12.074
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 19.097 19.144 19.043 19.165 19.104 19.117 19.138 19.124 19.016
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 11.686 11.710 11.659 11.720 11.690 11.696 11.707 11.700 11.646
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 15.966 16.002 15.925 16.018 15.971 15.982 15.997 15.987 15.904
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.851 9.869 9.830 9.876 9.853 9.858 9.866 9.861 9.820
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 19.937 19.984 19.883 20.005 19.944 19.957 19.977 19.964 19.856
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 12.488 12.512 12.461 12.522 12.491 12.498 12.508 12.501 12.447
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
7 CUBIERTAS CONSTRUCCIN
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 24.303 24.368 24.228 24.396 24.312 24.331 24.359 24.340 24.191
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7,2 M2 77.684 77.920 77.414 78.021 77.717 77.785 77.886 77.819 77.279
TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 52.605 52.605 52.605 52.605 52.605 52.605 52.605 52.605 52.605
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.012 21.012 21.012 21.012 21.012 21.012 21.012 21.012 21.012
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 32.978 32.978 32.978 32.978 32.978 32.978 32.978 32.978 32.978
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 76.829 76.829 76.829 76.829 76.829 76.829 76.829 76.829 76.829
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 60.193 60.193 60.193 60.193 60.193 60.193 60.193 60.193 60.193
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.069 35.069 35.069 35.069 35.069 35.069 35.069 35.069 35.069
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 80.511 80.511 80.511 80.511 80.511 80.511 80.511 80.511 80.511
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 96.110 96.110 96.110 96.110 96.110 96.110 96.110 96.110 96.110
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 141.177 141.177 141.177 141.177 141.177 141.177 141.177 141.177 141.177
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 55.880 55.880 55.880 55.880 55.880 55.880 55.880 55.880 55.880
7,13 CANAL PVC AMAZONAS ML 77.698 77.698 77.698 77.698 77.698 77.698 77.698 77.698 77.698
7,14 CANAL PVC RAINGO ML 70.662 70.662 70.662 70.662 70.662 70.662 70.662 70.662 70.662
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 125.173 125.173 125.173 125.173 125.173 125.173 125.173 125.173 125.173
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 73.070 73.070 73.070 73.070 73.070 73.070 73.070 73.070 73.070
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 53.708 53.708 53.708 53.708 53.708 53.708 53.708 53.708 53.708
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 30.715 30.715 30.715 30.715 30.715 30.715 30.715 30.715 30.715
7,19 TEJA DE BARRO M2 54.944 55.025 54.851 55.060 54.956 54.979 55.014 54.990 54.805
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 44.769 44.769 44.769 44.769 44.769 44.769 44.769 44.769 44.769
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 41.050 41.050 41.050 41.050 41.050 41.050 41.050 41.050 41.050
7,22 TEJA FIBROCEMENTO N4 M2 34.721 34.721 34.721 34.721 34.721 34.721 34.721 34.721 34.721
7,23 TEJA FIBROCEMENTO No. 6 M2 33.989 33.989 33.989 33.989 33.989 33.989 33.989 33.989 33.989
7,24 TEJA FIBROCEMENTO No. 8 M2 34.244 34.244 34.244 34.244 34.244 34.244 34.244 34.244 34.244
7,25 TEJA TERMOACSTICA M2 48.120 48.120 48.120 48.120 48.120 48.120 48.120 48.120 48.120
7,26 TEJA PLSTICA No.6 M2 42.326 42.326 42.326 42.326 42.326 42.326 42.326 42.326 42.326
7,27 TEJA ESPAOLA ETERNIT M2 77.352 77.352 77.352 77.352 77.352 77.352 77.352 77.352 77.352
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 142.695 142.695 142.695 142.695 142.695 142.695 142.695 142.695 142.695
7,29 TEJA SIN TRASLAPO M2 64.199 64.199 64.199 64.199 64.199 64.199 64.199 64.199 64.199
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 40.468 40.468 40.468 40.468 40.468 40.468 40.468 40.468 40.468
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 31.674 31.674 31.674 31.674 31.674 31.674 31.674 31.674 31.674
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7,32 M2 55.087 55.087 55.087 55.087 55.087 55.087 55.087 55.087 55.087
ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.036 19.036 19.036 19.036 19.036 19.036 19.036 19.036 19.036
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 22.871 22.871 22.871 22.871 22.871 22.871 22.871 22.871 22.871
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 24.759 24.759 24.759 24.759 24.759 24.759 24.759 24.759 24.759
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 31.838 31.838 31.838 31.838 31.838 31.838 31.838 31.838 31.838
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.055 21.055 21.055 21.055 21.055 21.055 21.055 21.055 21.055
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 49.550 49.550 49.550 49.550 49.550 49.550 49.550 49.550 49.550
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 337.815 337.815 337.815 337.815 337.815 337.815 337.815 337.815 337.815
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 389.689 389.689 389.689 389.689 389.689 389.689 389.689 389.689 389.689
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 257.204 257.204 257.204 257.204 257.204 257.204 257.204 257.204 257.204
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 274.670 274.670 274.670 274.670 274.670 274.670 274.670 274.670 274.670

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 403.854 408.709 398.306 410.789 404.548 405.934 408.015 406.628 395.532
8,2 CONCRETO 3500 PSI M3 351.284 355.725 346.210 357.628 351.919 353.188 355.091 353.822 343.673
8,3 CONCRETO 3000 PSI M3 348.712 353.269 343.506 355.221 349.364 350.665 352.618 351.316 340.903
8,4 CONCRETO 2500 PSI M3 306.746 311.470 301.348 313.494 307.422 308.771 310.796 309.446 298.649
8,5 CONCRETO 2000 PSI M3 283.501 288.296 278.022 290.351 284.187 285.556 287.611 286.241 275.282
8,6 CONCRETO 1500 PSI M3 254.020 258.875 248.471 260.956 254.714 256.101 258.182 256.794 245.697
8,7 MORTERO SECO 1:10 M3 188.978 191.219 186.416 192.179 189.298 189.938 190.899 190.258 185.136
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 CONSTRUCCIN
390.180 392.356 387.693 393.289 390.491 391.113 392.045 391.424 386.450
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 349.499 351.757 346.919 352.724 349.822 350.467 351.434 350.789 345.630
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 410.289 412.400 407.876 413.305 410.590 411.194 412.098 411.495 406.670
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 624.609 626.720 622.196 627.625 624.910 625.514 626.418 625.815 620.990

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 117.066 117.066 117.066 117.066 117.066 117.066 117.066 117.066 117.066
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.496 3.512 3.477 3.519 3.498 3.503 3.510 3.505 3.468
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 131.096 131.096 131.096 131.096 131.096 131.096 131.096 131.096 131.096
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 160.436 160.436 160.436 160.436 160.436 160.436 160.436 160.436 160.436
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 232.797 232.797 232.797 232.797 232.797 232.797 232.797 232.797 232.797
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 259.084 259.084 259.084 259.084 259.084 259.084 259.084 259.084 259.084
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 285.401 285.401 285.401 285.401 285.401 285.401 285.401 285.401 285.401
9,8 HOJA PUERTA FORTEC 0.81 UN 189.477 189.477 189.477 189.477 189.477 189.477 189.477 189.477 189.477
9,9 HOJA PUERTA FORTEC 0.91 UN 214.787 214.787 214.787 214.787 214.787 214.787 214.787 214.787 214.787
9,10 HOJA PUERTA FORTEC 1.50 UN 316.028 316.028 316.028 316.028 316.028 316.028 316.028 316.028 316.028
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 119.874 119.874 119.874 119.874 119.874 119.874 119.874 119.874 119.874
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 159.105 159.105 159.105 159.105 159.105 159.105 159.105 159.105 159.105
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 176.822 176.822 176.822 176.822 176.822 176.822 176.822 176.822 176.822
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 450.171 450.171 450.171 450.171 450.171 450.171 450.171 450.171 450.171
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.033 40.033 40.033 40.033 40.033 40.033 40.033 40.033 40.033
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 24.990 24.990 24.990 24.990 24.990 24.990 24.990 24.990 24.990
9,17 VENTANERA EN MADERA CEDRO MACHO M2 94.653 94.653 94.653 94.653 94.653 94.653 94.653 94.653 94.653
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 115.196 115.196 115.196 115.196 115.196 115.196 115.196 115.196 115.196
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 89.506 89.506 89.506 89.506 89.506 89.506 89.506 89.506 89.506
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 27.800 27.800 27.800 27.800 27.800 27.800 27.800 27.800 27.800
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 27.800 27.800 27.800 27.800 27.800 27.800 27.800 27.800 27.800
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 26.357 26.357 26.357 26.357 26.357 26.357 26.357 26.357 26.357
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 40.333 40.333 40.333 40.333 40.333 40.333 40.333 40.333 40.333
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 49.918 49.918 49.918 49.918 49.918 49.918 49.918 49.918 49.918
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 60.144 60.144 60.144 60.144 60.144 60.144 60.144 60.144 60.144
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 72.287 72.287 72.287 72.287 72.287 72.287 72.287 72.287 72.287
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 340.116 340.116 340.116 340.116 340.116 340.116 340.116 340.116 340.116
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 237.863 237.863 237.863 237.863 237.863 237.863 237.863 237.863 237.863
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.024 32.024 32.024 32.024 32.024 32.024 32.024 32.024 32.024
9,30 VIDRIO TRANSPARENTE 4 MM M2 40.972 40.972 40.972 40.972 40.972 40.972 40.972 40.972 40.972
9,31 VIDRIO TRANSPARENTE 5 MM M2 49.918 49.918 49.918 49.918 49.918 49.918 49.918 49.918 49.918
9,32 VIDRIO TRANSPARENTE 6 MM M2 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 72.335 72.335 72.335 72.335 72.335 72.335 72.335 72.335 72.335
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 200.866 200.866 200.866 200.866 200.866 200.866 200.866 200.866 200.866
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10,3 ML 76.639 76.639 76.639 76.639 76.639 76.639 76.639 76.639 76.639
ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 137.350 137.350 137.350 137.350 137.350 137.350 137.350 137.350 137.350
10,5 MARCO TAPA CAJA DE INSPECCIN UN 129.859 129.859 129.859 129.859 129.859 129.859 129.859 129.859 129.859
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 85.266 85.266 85.266 85.266 85.266 85.266 85.266 85.266 85.266
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 200.847 200.847 200.847 200.847 200.847 200.847 200.847 200.847 200.847
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 104.683 104.683 104.683 104.683 104.683 104.683 104.683 104.683 104.683
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.284 6.284 6.284 6.284 6.284 6.284 6.284 6.284 6.284
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO
10,10 M2 94.747 94.747 94.747 94.747 94.747 94.747 94.747 94.747 94.747
ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.004 39.004 39.004 39.004 39.004 39.004 39.004 39.004 39.004
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 512.032 512.032 512.032 512.032 512.032 512.032 512.032 512.032 512.032
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 CONSTRUCCIN
184.263 184.263 184.263 184.263 184.263 184.263 184.263 184.263 184.263
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 206.999 206.999 206.999 206.999 206.999 206.999 206.999 206.999 206.999
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10,15 M2 466.999 466.999 466.999 466.999 466.999 466.999 466.999 466.999 466.999
ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 122.213 122.213 122.213 122.213 122.213 122.213 122.213 122.213 122.213
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 373.345 373.345 373.345 373.345 373.345 373.345 373.345 373.345 373.345
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.740 5.740 5.740 5.740 5.740 5.740 5.740 5.740 5.740
10,19 VENTANA EN ALUMINIO CORREDIZA M2 262.708 262.708 262.708 262.708 262.708 262.708 262.708 262.708 262.708
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 116.300 116.300 116.300 116.300 116.300 116.300 116.300 116.300 116.300
10,21 REJILLA PISO 0.30 M M2 81.970 81.970 81.970 81.970 81.970 81.970 81.970 81.970 81.970
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 84.651 84.651 84.651 84.651 84.651 84.651 84.651 84.651 84.651
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10,23 KG 10.099 10.099 10.099 10.099 10.099 10.099 10.099 10.099 10.099
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN,
SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10,24 KG 11.196 11.196 11.196 11.196 11.196 11.196 11.196 11.196 11.196
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,25 KG 8.917 8.917 8.917 8.917 8.917 8.917 8.917 8.917 8.917
COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 210.366 210.366 210.366 210.366 210.366 210.366 210.366 210.366 210.366
11,2 ACOMETIDA EN PVC 3/4" 5M UN 253.546 253.546 253.546 253.546 253.546 253.546 253.546 253.546 253.546
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.012 21.012 21.012 21.012 21.012 21.012 21.012 21.012 21.012
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 32.978 32.978 32.978 32.978 32.978 32.978 32.978 32.978 32.978
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 31.660 31.660 31.660 31.660 31.660 31.660 31.660 31.660 31.660
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 40.568 40.568 40.568 40.568 40.568 40.568 40.568 40.568 40.568
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 83.583 83.583 83.583 83.583 83.583 83.583 83.583 83.583 83.583
11,8 CONEXIN TANQUE ELEVADO PVC UN 211.653 211.653 211.653 211.653 211.653 211.653 211.653 211.653 211.653
11,9 INSTALACIN APARATO SANITARIO UN 41.826 41.826 41.826 41.826 41.826 41.826 41.826 41.826 41.826
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 33.363 33.363 33.363 33.363 33.363 33.363 33.363 33.363 33.363
11,13 NIPLE PASAMURO 2" UN 63.519 63.519 63.519 63.519 63.519 63.519 63.519 63.519 63.519
11,14 NIPLE PASAMURO 4" UN 94.900 94.900 94.900 94.900 94.900 94.900 94.900 94.900 94.900
11,15 PUNTO AGUA CALIENTE CPVC UN 80.030 80.030 80.030 80.030 80.030 80.030 80.030 80.030 80.030
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 58.467 58.467 58.467 58.467 58.467 58.467 58.467 58.467 58.467
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.169 62.169 62.169 62.169 62.169 62.169 62.169 62.169 62.169
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 78.558 78.558 78.558 78.558 78.558 78.558 78.558 78.558 78.558
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 63.258 63.258 63.258 63.258 63.258 63.258 63.258 63.258 63.258
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 79.068 79.068 79.068 79.068 79.068 79.068 79.068 79.068 79.068
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 84.547 84.547 84.547 84.547 84.547 84.547 84.547 84.547 84.547
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 69.991 69.991 69.991 69.991 69.991 69.991 69.991 69.991 69.991
11,23 RED SUMINISTRO CPVC 1/2" ML 11.870 11.870 11.870 11.870 11.870 11.870 11.870 11.870 11.870
11,24 RED SUMINISTRO CPVC 3/4" ML 16.695 16.695 16.695 16.695 16.695 16.695 16.695 16.695 16.695
11,25 RED SUMINISTRO PVC 1 1/2" ML 21.802 21.802 21.802 21.802 21.802 21.802 21.802 21.802 21.802
11,26 RED SUMINISTRO PVC 1" ML 13.476 13.476 13.476 13.476 13.476 13.476 13.476 13.476 13.476
11,27 RED SUMINISTRO PVC 1/2" ML 8.058 8.058 8.058 8.058 8.058 8.058 8.058 8.058 8.058
11,28 RED SUMINISTRO PVC 2 1/2" ML 48.522 48.522 48.522 48.522 48.522 48.522 48.522 48.522 48.522
11,29 RED SUMINISTRO PVC 2" ML 31.052 31.052 31.052 31.052 31.052 31.052 31.052 31.052 31.052
11,30 RED SUMINISTRO PVC 3/4" ML 10.085 10.085 10.085 10.085 10.085 10.085 10.085 10.085 10.085
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
11,31 RED SANITARIA PVC-S 2" ML CONSTRUCCIN
24.001 24.001 24.001 24.001 24.001 24.001 24.001 24.001 24.001
11,32 RED SANITARIA PVC-S 3" ML 33.288 33.288 33.288 33.288 33.288 33.288 33.288 33.288 33.288
11,33 RED SANITARIA PVC-S 4" ML 45.164 45.164 45.164 45.164 45.164 45.164 45.164 45.164 45.164
11,34 RED SANITARIA PVC-S 6" ML 84.338 84.338 84.338 84.338 84.338 84.338 84.338 84.338 84.338
11,35 REGISTRO 1" UN 102.502 102.502 102.502 102.502 102.502 102.502 102.502 102.502 102.502
11,36 REGISTRO 1/2" UN 57.155 57.155 57.155 57.155 57.155 57.155 57.155 57.155 57.155
11,37 REGISTRO 3/4" UN 72.746 72.746 72.746 72.746 72.746 72.746 72.746 72.746 72.746
11,38 REGISTRO 1 1/2" UN 175.647 175.647 175.647 175.647 175.647 175.647 175.647 175.647 175.647
11,39 REGISTRO 2 1/2" UN 362.088 362.088 362.088 362.088 362.088 362.088 362.088 362.088 362.088
11,40 REGISTRO 2" UN 267.575 267.575 267.575 267.575 267.575 267.575 267.575 267.575 267.575
11,41 REVENTILACIN 2" ML 16.743 16.743 16.743 16.743 16.743 16.743 16.743 16.743 16.743
11,42 REVENTILACIN 3" ML 21.127 21.127 21.127 21.127 21.127 21.127 21.127 21.127 21.127
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 164.314 164.314 164.314 164.314 164.314 164.314 164.314 164.314 164.314

11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 267.344 267.344 267.344 267.344 267.344 267.344 267.344 267.344 267.344

11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 444.802 444.802 444.802 444.802 444.802 444.802 444.802 444.802 444.802
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11,46 ML 38.569 38.569 38.569 38.569 38.569 38.569 38.569 38.569 38.569
SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,47 ML 45.455 45.455 45.455 45.455 45.455 45.455 45.455 45.455 45.455
SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,48 ML 58.447 58.447 58.447 58.447 58.447 58.447 58.447 58.447 58.447
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,49 ML 66.120 66.120 66.120 66.120 66.120 66.120 66.120 66.120 66.120
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,50 ML 85.162 85.162 85.162 85.162 85.162 85.162 85.162 85.162 85.162
SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11,51 ML 98.903 98.903 98.903 98.903 98.903 98.903 98.903 98.903 98.903
SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11,52 ML 146.350 146.350 146.350 146.350 146.350 146.350 146.350 146.350 146.350
SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 58.926 58.926 58.926 58.926 58.926 58.926 58.926 58.926 58.926
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 59.166 59.166 59.166 59.166 59.166 59.166 59.166 59.166 59.166
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 38.166 38.166 38.166 38.166 38.166 38.166 38.166 38.166 38.166
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 46.974 46.974 46.974 46.974 46.974 46.974 46.974 46.974 46.974
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 3.982 3.982 3.982 3.982 3.982 3.982 3.982 3.982 3.982
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 6.263 6.263 6.263 6.263 6.263 6.263 6.263 6.263 6.263
11,59 GABINETE TIPO III UN 968.127 968.127 968.127 968.127 968.127 968.127 968.127 968.127 968.127
11,60 GABINETE TIPO I UN 740.589 740.589 740.589 740.589 740.589 740.589 740.589 740.589 740.589
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.476.873 2.476.873 2.476.873 2.476.873 2.476.873 2.476.873 2.476.873 2.476.873 2.476.873
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.065.249 2.065.249 2.065.249 2.065.249 2.065.249 2.065.249 2.065.249 2.065.249 2.065.249
11,63 VLVULA MARIPOSA 3" UN 601.150 601.150 601.150 601.150 601.150 601.150 601.150 601.150 601.150
11,64 VLVULA MARIPOSA 4" UN 777.309 777.309 777.309 777.309 777.309 777.309 777.309 777.309 777.309
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 298.676 298.676 298.676 298.676 298.676 298.676 298.676 298.676 298.676

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 345.638 345.638 345.638 345.638 345.638 345.638 345.638 345.638 345.638
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 54.914 54.914 54.914 54.914 54.914 54.914 54.914 54.914 54.914
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 64.989 64.989 64.989 64.989 64.989 64.989 64.989 64.989 64.989
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 72.181 72.181 72.181 72.181 72.181 72.181 72.181 72.181 72.181
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 84.991 84.991 84.991 84.991 84.991 84.991 84.991 84.991 84.991
12,6 SALIDA TELFONO PVC COMPLETA UN 51.643 51.643 51.643 51.643 51.643 51.643 51.643 51.643 51.643
12,7 SALIDA TIMBRE PVC COMPLETA UN 58.852 58.852 58.852 58.852 58.852 58.852 58.852 58.852 58.852
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
12,8 STRIP TELEFNICO 10 PARES UN CONSTRUCCIN
135.992 135.992 135.992 135.992 135.992 135.992 135.992 135.992 135.992
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 53.016 53.016 53.016 53.016 53.016 53.016 53.016 53.016 53.016
12,10 SALIDA TRIFSICA PVC COMPLETA UN 121.815 121.815 121.815 121.815 121.815 121.815 121.815 121.815 121.815
12,11 SALIDA T.V PVC COMPLETA. UN 72.871 72.871 72.871 72.871 72.871 72.871 72.871 72.871 72.871
12,12 SALIDA BIFSICA C.N. UN 43.205 43.205 43.205 43.205 43.205 43.205 43.205 43.205 43.205
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 91.132 91.132 91.132 91.132 91.132 91.132 91.132 91.132 91.132
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 389.167 389.167 389.167 389.167 389.167 389.167 389.167 389.167 389.167
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 518.248 518.248 518.248 518.248 518.248 518.248 518.248 518.248 518.248
12,16 TUBERA PVC CONDUIT 1/2" ML 3.355 3.355 3.355 3.355 3.355 3.355 3.355 3.355 3.355
12,17 TUBERA PVC CONDUIT 3/4" ML 4.431 4.431 4.431 4.431 4.431 4.431 4.431 4.431 4.431
12,18 TUBERA PVC CONDUIT 1" ML 6.893 6.893 6.893 6.893 6.893 6.893 6.893 6.893 6.893
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.330 12.330 12.330 12.330 12.330 12.330 12.330 12.330 12.330
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 259.008 259.008 259.008 259.008 259.008 259.008 259.008 259.008 259.008
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 73.221 73.221 73.221 73.221 73.221 73.221 73.221 73.221 73.221
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 99.060 99.060 99.060 99.060 99.060 99.060 99.060 99.060 99.060
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 40.531 40.531 40.531 40.531 40.531 40.531 40.531 40.531 40.531
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.329.483 1.329.483 1.329.483 1.329.483 1.329.483 1.329.483 1.329.483 1.329.483 1.329.483
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 985.532 985.532 985.532 985.532 985.532 985.532 985.532 985.532 985.532
12,26 POSTE METLICO 6M UN 1.230.439 1.230.439 1.230.439 1.230.439 1.230.439 1.230.439 1.230.439 1.230.439 1.230.439
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 571.790 571.790 571.790 571.790 571.790 571.790 571.790 571.790 571.790
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 104.526 104.526 104.526 104.526 104.526 104.526 104.526 104.526 104.526
12,29 LUMINARIA 70W SODIO UN 479.694 479.694 479.694 479.694 479.694 479.694 479.694 479.694 479.694
12,30 LUMINARIA 150W SODIO UN 600.077 600.077 600.077 600.077 600.077 600.077 600.077 600.077 600.077
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.584.567 1.584.567 1.584.567 1.584.567 1.584.567 1.584.567 1.584.567 1.584.567 1.584.567
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.166.951 1.166.951 1.166.951 1.166.951 1.166.951 1.166.951 1.166.951 1.166.951 1.166.951

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 36.207 36.288 36.114 36.323 36.218 36.241 36.276 36.253 36.067
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 35.906 35.987 35.813 36.022 35.918 35.941 35.976 35.953 35.767
13,3 ALISTADO PARA LISTN M2 13.687 13.703 13.669 13.710 13.690 13.694 13.701 13.696 13.659
13,4 ALISTADO PISOS 1:3, E=0.04 M2 23.460 23.622 23.274 23.692 23.483 23.529 23.599 23.552 23.181
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 77.679 77.841 77.493 77.911 77.702 77.748 77.818 77.772 77.400
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 24.810 24.906 24.700 24.947 24.824 24.851 24.892 24.865 24.645
13,7 CONCRETO BASE GRADAS 2500 PSI M2 52.166 52.638 51.626 52.840 52.233 52.368 52.571 52.436 51.356
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 71.732 72.488 70.868 72.812 71.840 72.056 72.380 72.164 70.437
13,9 MANTO FIBERGLASS 600X1 M2 28.955 28.955 28.955 28.955 28.955 28.955 28.955 28.955 28.955
13,10 PEGANTE MORTERO-CONCRETO M2 21.931 21.931 21.931 21.931 21.931 21.931 21.931 21.931 21.931
13,11 PERMA PLY 2 CAPAS M2 25.751 25.751 25.751 25.751 25.751 25.751 25.751 25.751 25.751
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 42.219 42.644 41.733 42.826 42.280 42.401 42.584 42.462 41.490
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 49.338 49.857 48.744 50.080 49.412 49.560 49.783 49.635 48.447
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 71.213 72.016 70.295 72.360 71.328 71.557 71.901 71.672 69.836
13,15 TRITURADO FINO 1/2 M3 72.456 75.701 68.748 77.091 72.920 73.847 75.237 74.310 66.894
13,16 TRITURADO GRUESO 3/4 M3 83.192 87.068 79.672 87.592 84.428 86.502 83.842 84.952 77.912

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 53.981 54.014 53.944 54.028 53.986 53.995 54.009 54.000 53.926
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 32.346 32.363 32.328 32.370 32.349 32.353 32.360 32.356 32.319
14,3 ADOQUN CONCRETO 6CM M2 60.840 60.921 60.747 60.956 60.852 60.875 60.910 60.886 60.701
14,4 ADOQUN CONCRETO 8CM M2 63.990 64.071 63.897 64.106 64.002 64.025 64.060 64.036 63.851
14,5 ADOQUN GRES PEATONAL M2 68.060 68.142 67.968 68.176 68.072 68.095 68.130 68.107 67.921
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14,6 M2 71.333 71.366 71.296 71.380 71.338 71.347 71.361 71.352 71.278
INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.077 35.127 35.020 35.149 35.084 35.099 35.120 35.106 34.991
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 153.729 153.875 153.562 153.938 153.750 153.792 153.854 153.813 153.479
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
14,9 ACABADO EN GRAVILLA LAVADA M2 CONSTRUCCIN
43.061 43.178 42.927 43.228 43.078 43.111 43.161 43.128 42.860
14,10 GUARDAESCOBA EN GRANITO ML 41.945 41.945 41.945 41.945 41.945 41.945 41.945 41.945 41.945
14,11 GUARDAESCOBA EN GRAVILLA ML 9.263 9.314 9.206 9.335 9.270 9.285 9.306 9.292 9.177
14,12 GUARDAESCOBA PVC CARAMELO ML 8.966 8.966 8.966 8.966 8.966 8.966 8.966 8.966 8.966
14,13 GUARDAESCOBA PVC CEDRO ML 12.031 12.031 12.031 12.031 12.031 12.031 12.031 12.031 12.031
14,14 GUARDAESCOBA PINO CARIBE ML 10.073 10.073 10.073 10.073 10.073 10.073 10.073 10.073 10.073
14,15 GUARDAESCOBA CEDRO BLANCO ML 16.850 16.850 16.850 16.850 16.850 16.850 16.850 16.850 16.850
14,16 GUARDAESCOBA EN MADERA SAPAN ML 32.796 32.796 32.796 32.796 32.796 32.796 32.796 32.796 32.796
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.836 8.836 8.836 8.836 8.836 8.836 8.836 8.836 8.836
14,18 LISTN M.H. AMARILLO M2 71.162 71.162 71.162 71.162 71.162 71.162 71.162 71.162 71.162
14,19 PASO ESCALERA GRANITO ML 111.155 111.268 111.025 111.317 111.171 111.203 111.252 111.219 110.960
14,20 PIRLANES ALUMINIO ML 7.229 7.229 7.229 7.229 7.229 7.229 7.229 7.229 7.229
14,21 PIRLANES LADRILLO ML 30.073 30.106 30.036 30.120 30.078 30.087 30.101 30.092 30.018
14,22 PISO VINILO TRFICO RESIDENCIAL M2 43.881 43.881 43.881 43.881 43.881 43.881 43.881 43.881 43.881
14,23 PISO VINILO TRFICO PESADO M2 50.980 50.980 50.980 50.980 50.980 50.980 50.980 50.980 50.980
14,24 PULIDA LACADA PISO MADERA M2 47.069 47.069 47.069 47.069 47.069 47.069 47.069 47.069 47.069
14,25 TABLETA DE GRES 25X25 M2 46.749 46.781 46.712 46.795 46.754 46.763 46.777 46.768 46.693
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 52.537 52.569 52.499 52.583 52.541 52.550 52.564 52.555 52.481
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.484 10.484 10.484 10.484 10.484 10.484 10.484 10.484 10.484
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 46.556 46.605 46.500 46.626 46.563 46.577 46.598 46.584 46.473
14,29 JABONERA PORCELANA ACUARIO UN 19.718 19.718 19.718 19.718 19.718 19.718 19.718 19.718 19.718
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14,30 UN 117.934 117.934 117.934 117.934 117.934 117.934 117.934 117.934 117.934
Y PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.532 9.532 9.532 9.532 9.532 9.532 9.532 9.532 9.532
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 21.531 21.531 21.531 21.531 21.531 21.531 21.531 21.531 21.531
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 13.834 13.834 13.834 13.834 13.834 13.834 13.834 13.834 13.834
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.442 13.442 13.442 13.442 13.442 13.442 13.442 13.442 13.442
14,35 REMATES BOCEL ALUMINIO ML 8.195 8.195 8.195 8.195 8.195 8.195 8.195 8.195 8.195
14,36 REMATES BOCEL PORCELANA ML 8.339 8.339 8.339 8.339 8.339 8.339 8.339 8.339 8.339
14,37 TAPA REGISTRO 20X20 UN 18.250 18.250 18.250 18.250 18.250 18.250 18.250 18.250 18.250
14,38 TAPA REGISTRO 6X6 UN 16.637 16.637 16.637 16.637 16.637 16.637 16.637 16.637 16.637
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 17.844 17.844 17.844 17.844 17.844 17.844 17.844 17.844 17.844
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN
14,40 M2 20.628 20.628 20.628 20.628 20.628 20.628 20.628 20.628 20.628
SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 61.758 61.791 61.721 61.805 61.763 61.772 61.786 61.777 61.703
14,42 MEDIA CAA EN GRANITO ML 74.053 74.053 74.053 74.053 74.053 74.053 74.053 74.053 74.053
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.718 32.718 32.718 32.718 32.718 32.718 32.718 32.718 32.718
14,44 PINTURA ACRLICA PARA PISOS M2 12.703 12.703 12.703 12.703 12.703 12.703 12.703 12.703 12.703
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 97.216 97.216 97.216 97.216 97.216 97.216 97.216 97.216 97.216
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 117.717 117.717 117.717 117.717 117.717 117.717 117.717 117.717 117.717

15 CIELO RASO
15,1 APLIQUE YESO ML 69.584 69.584 69.584 69.584 69.584 69.584 69.584 69.584 69.584
15,2 ARMADURA MADERA Y MALLA M2 34.427 34.427 34.427 34.427 34.427 34.427 34.427 34.427 34.427
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53.066 53.066 53.066 53.066 53.066 53.066 53.066 53.066 53.066
15,4 CIELO RASO DURACUSTIC M2 65.078 65.078 65.078 65.078 65.078 65.078 65.078 65.078 65.078
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 48.590 48.590 48.590 48.590 48.590 48.590 48.590 48.590 48.590
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 90.005 90.005 90.005 90.005 90.005 90.005 90.005 90.005 90.005
15,7 CORNISAS YESO ML 46.697 46.697 46.697 46.697 46.697 46.697 46.697 46.697 46.697
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 99.450 99.450 99.450 99.450 99.450 99.450 99.450 99.450 99.450
15,9 MALLA CON VENA M2 12.882 12.882 12.882 12.882 12.882 12.882 12.882 12.882 12.882

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir

16,2
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
M3 CONSTRUCCIN
18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 65.171 67.758 65.171 65.171 67.758 71.639 58.704 65.171 65.171
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 81.742 85.494 77.455 87.101 82.278 83.350 84.958 83.885 75.311
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 106.115 104.821 126.811 122.930 141.039 112.582 107.408 113.876 143.626
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 55.046 58.309 55.722 55.722 58.309 62.190 49.255 51.842 55.722
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 96.024 94.730 116.720 112.839 130.948 102.491 97.317 103.785 108.959
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 103.454 102.160 124.150 120.269 138.378 109.921 104.747 111.215 140.965

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 288.600 288.600 288.600 288.600 288.600 288.600 288.600 288.600 288.600
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 850.128 850.128 850.128 850.128 850.128 850.128 850.128 850.128 850.128
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 460.762 460.762 460.762 460.762 460.762 460.762 460.762 460.762 460.762
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 133.852 133.852 133.852 133.852 133.852 133.852 133.852 133.852 133.852
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 187.233 187.233 187.233 187.233 187.233 187.233 187.233 187.233 187.233
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 173.907 173.907 173.907 173.907 173.907 173.907 173.907 173.907 173.907
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 382.427 382.427 382.427 382.427 382.427 382.427 382.427 382.427 382.427
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 977.617 977.617 977.617 977.617 977.617 977.617 977.617 977.617 977.617
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 277.896 277.896 277.896 277.896 277.896 277.896 277.896 277.896 277.896
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 197.001 197.001 197.001 197.001 197.001 197.001 197.001 197.001 197.001
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 78.579 78.579 78.579 78.579 78.579 78.579 78.579 78.579 78.579
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO
17,12 UN 238.413 238.413 238.413 238.413 238.413 238.413 238.413 238.413 238.413
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO
17,13 UN 351.043 351.043 351.043 351.043 351.043 351.043 351.043 351.043 351.043
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 7.963 7.963 7.963 7.963 7.963 7.963 7.963 7.963 7.963
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.950 2.950 2.950 2.950 2.950 2.950 2.950 2.950 2.950
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.617 10.617 10.617 10.617 10.617 10.617 10.617 10.617 10.617
18,4 BARNIZ SOBRE MUEBLES M2 40.313 40.313 40.313 40.313 40.313 40.313 40.313 40.313 40.313
18,5 CARBURO SOBRE PAETES M2 5.565 5.565 5.565 5.565 5.565 5.565 5.565 5.565 5.565
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700
18,7 DEMARCACIN CON MARMOLINA ML 3.311 3.311 3.311 3.311 3.311 3.311 3.311 3.311 3.311
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.648 2.648 2.648 2.648 2.648 2.648 2.648 2.648 2.648
18,9 ESMALTE SOBRE LMINA LLENA M2 13.297 13.297 13.297 13.297 13.297 13.297 13.297 13.297 13.297
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.851 3.851 3.851 3.851 3.851 3.851 3.851 3.851 3.851
18,11 ESMALTE SOBRE MADERA LLENA M2 14.021 14.021 14.021 14.021 14.021 14.021 14.021 14.021 14.021
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.481 5.481 5.481 5.481 5.481 5.481 5.481 5.481 5.481
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.238 6.238 6.238 6.238 6.238 6.238 6.238 6.238 6.238
18,14 ESTUCO M2 6.694 6.694 6.694 6.694 6.694 6.694 6.694 6.694 6.694
18,15 ESTUCO (LINEAL) ML 4.192 4.192 4.192 4.192 4.192 4.192 4.192 4.192 4.192
18,16 ESTUCO Y VINILO 3 MANOS M2 14.802 14.802 14.802 14.802 14.802 14.802 14.802 14.802 14.802
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.175 9.175 9.175 9.175 9.175 9.175 9.175 9.175 9.175
18,18 LACA PISOS MADERA M2 21.707 21.707 21.707 21.707 21.707 21.707 21.707 21.707 21.707
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
18,19 LNEAS TRFICO 0.10 ML CONSTRUCCIN
2.562 2.562 2.562 2.562 2.562 2.562 2.562 2.562 2.562
18,20 MARMOLINA SOBRE PAETE M2 11.615 11.615 11.615 11.615 11.615 11.615 11.615 11.615 11.615
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.134 3.134 3.134 3.134 3.134 3.134 3.134 3.134 3.134
18,22 TINTILLA SOBRE MADERA LLENA M2 12.015 12.015 12.015 12.015 12.015 12.015 12.015 12.015 12.015
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.757 6.757 6.757 6.757 6.757 6.757 6.757 6.757 6.757
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.248 4.248 4.248 4.248 4.248 4.248 4.248 4.248 4.248
18,25 WASH-PRIMER SOBRE ALUMNIO M2 20.805 20.805 20.805 20.805 20.805 20.805 20.805 20.805 20.805
18,26 PINTURA EPXICA M2 12.095 12.095 12.095 12.095 12.095 12.095 12.095 12.095 12.095
18,27 PINTURA EPXICA (LINEAL) ML 7.473 7.473 7.473 7.473 7.473 7.473 7.473 7.473 7.473

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.787.593 5.787.593 5.787.593 5.787.593 5.787.593 5.787.593 5.787.593 5.787.593 5.787.593
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y
19,2 UN 10.225.783 10.225.783 10.225.783 10.225.783 10.225.783 10.225.783 10.225.783 10.225.783 10.225.783
CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.676.133 2.676.133 2.676.133 2.676.133 2.676.133 2.676.133 2.676.133 2.676.133 2.676.133
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.745.699 8.745.699 8.745.699 8.745.699 8.745.699 8.745.699 8.745.699 8.745.699 8.745.699
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.189.945 8.189.945 8.189.945 8.189.945 8.189.945 8.189.945 8.189.945 8.189.945 8.189.945
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.562 2.562 2.562 2.562 2.562 2.562 2.562 2.562 2.562
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 821.461 821.461 821.461 821.461 821.461 821.461 821.461 821.461 821.461
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 82.061 82.061 82.061 82.061 82.061 82.061 82.061 82.061 82.061
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.486.074 1.486.123 1.486.019 1.486.143 1.486.081 1.486.095 1.486.116 1.486.102 1.485.991
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 639.250 640.390 637.949 640.878 639.413 639.739 640.227 639.901 637.298

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.185 28.185 28.185 28.185 28.185 28.185 28.185 28.185 28.185
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 41.803 41.803 41.803 41.803 41.803 41.803 41.803 41.803 41.803
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 51.795 51.795 51.795 51.795 51.795 51.795 51.795 51.795 51.795
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 16.934 16.934 16.934 16.934 16.934 16.934 16.934 16.934 16.934
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 20.490 20.490 20.490 20.490 20.490 20.490 20.490 20.490 20.490
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 27.909 27.909 27.909 27.909 27.909 27.909 27.909 27.909 27.909
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.120 25.120 25.120 25.120 25.120 25.120 25.120 25.120 25.120
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.468 26.468 26.468 26.468 26.468 26.468 26.468 26.468 26.468
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.064 33.064 33.064 33.064 33.064 33.064 33.064 33.064 33.064
20,10 VLVULA DE BOLA GAS 1/2" UN 16.825 16.825 16.825 16.825 16.825 16.825 16.825 16.825 16.825
20,11 VLVULA DE BOLA GAS 3/4" UN 22.055 22.055 22.055 22.055 22.055 22.055 22.055 22.055 22.055
20,12 VLVULA DE BOLA GAS 1" UN 33.924 33.924 33.924 33.924 33.924 33.924 33.924 33.924 33.924
20,13 VLVULA POLIETILENO GAS 1/2" UN 260.254 260.254 260.254 260.254 260.254 260.254 260.254 260.254 260.254
20,14 VLVULA POLIETILENO GAS 3/4" UN 299.500 299.500 299.500 299.500 299.500 299.500 299.500 299.500 299.500
20,15 VLVULA POLIETILENO GAS 1" UN 312.391 312.391 312.391 312.391 312.391 312.391 312.391 312.391 312.391
20,16 ACOMETIDA GAS 1/2" ML 289.807 289.807 289.807 289.807 289.807 289.807 289.807 289.807 289.807

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 211.408 211.408 211.408 211.408 211.408 211.408 211.408 211.408 211.408
21,2 CABLE DETECTOR LINEAL DE CALOR ML 32.402 32.402 32.402 32.402 32.402 32.402 32.402 32.402 32.402
21,3 SIRENA DE 110 V UN 98.699 98.699 98.699 98.699 98.699 98.699 98.699 98.699 98.699
21,4 CMARA CCTV UN 250.687 250.687 250.687 250.687 250.687 250.687 250.687 250.687 250.687
21,5 PARLANTE-CIELO FALSO UN 49.585 49.585 49.585 49.585 49.585 49.585 49.585 49.585 49.585
21,6 AMPLIFICADOR 100W UN 546.585 546.585 546.585 546.585 546.585 546.585 546.585 546.585 546.585
21,7 AMPLIFICADOR 300W UN 1.355.236 1.355.236 1.355.236 1.355.236 1.355.236 1.355.236 1.355.236 1.355.236 1.355.236
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.670 42.670 42.670 42.670 42.670 42.670 42.670 42.670 42.670
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 211.453 211.453 211.453 211.453 211.453 211.453 211.453 211.453 211.453
21,10 TOMA PARA MICRFONO UN 41.926 41.926 41.926 41.926 41.926 41.926 41.926 41.926 41.926
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.586 3.586 3.586 3.586 3.586 3.586 3.586 3.586 3.586
21,12 SPLITERS UN 6.024 6.024 6.024 6.024 6.024 6.024 6.024 6.024 6.024
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML CONSTRUCCIN
17.749 17.749 17.749 17.749 17.749 17.749 17.749 17.749 17.749
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.281 23.281 23.281 23.281 23.281 23.281 23.281 23.281 23.281
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.195 30.195 30.195 30.195 30.195 30.195 30.195 30.195 30.195
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 117.094 117.094 117.094 117.094 117.094 117.094 117.094 117.094 117.094
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 30.550 30.550 30.550 30.550 30.550 30.550 30.550 30.550 30.550
21,18 BANDEJA PORTACABLES PARA RACK UN 99.893 99.893 99.893 99.893 99.893 99.893 99.893 99.893 99.893
21,19 RACK 2' X 24" UN 175.159 175.159 175.159 175.159 175.159 175.159 175.159 175.159 175.159
21,20 RACK 3' X 24" UN 275.134 275.134 275.134 275.134 275.134 275.134 275.134 275.134 275.134
21,21 RACK 5' X 24" UN 341.832 341.832 341.832 341.832 341.832 341.832 341.832 341.832 341.832
21,22 RACK 7' X 24" UN 373.469 373.469 373.469 373.469 373.469 373.469 373.469 373.469 373.469
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 547.116 547.116 547.116 547.116 547.116 547.116 547.116 547.116 547.116
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 322.349 322.349 322.349 322.349 322.349 322.349 322.349 322.349 322.349
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 99.244 99.244 99.244 99.244 99.244 99.244 99.244 99.244 99.244
21,26 PATCH CORD 2M CATEGORA 6A UN 13.217 13.217 13.217 13.217 13.217 13.217 13.217 13.217 13.217
21,27 PATCH CORD 5M CATEGORA 6A UN 27.011 27.011 27.011 27.011 27.011 27.011 27.011 27.011 27.011
21,28 CABLE UTP CATEGORA 6A ML 4.769 4.769 4.769 4.769 4.769 4.769 4.769 4.769 4.769
21,29 CANALETA METLICA 4X6 CMS ML 33.612 33.612 33.612 33.612 33.612 33.612 33.612 33.612 33.612
21,30 CANALETA METLICA 4X10 CMS ML 35.120 35.120 35.120 35.120 35.120 35.120 35.120 35.120 35.120
21,31 CANALETA METLICA 6X10 CMS ML 35.874 35.874 35.874 35.874 35.874 35.874 35.874 35.874 35.874
21,32 CANALETA PLSTICA 13X7 MM ML 23.398 23.398 23.398 23.398 23.398 23.398 23.398 23.398 23.398
21,33 CANALETA PLSTICA 20X12 MM ML 25.879 25.879 25.879 25.879 25.879 25.879 25.879 25.879 25.879
21,34 CANALETA PLSTICA 32X12 MM ML 26.921 26.921 26.921 26.921 26.921 26.921 26.921 26.921 26.921
21,35 CANALETA PLSTICA 40X60 MM ML 45.239 45.239 45.239 45.239 45.239 45.239 45.239 45.239 45.239
21,36 SWITCH 10/100/1000 24 PUERTOS UN 585.183 585.183 585.183 585.183 585.183 585.183 585.183 585.183 585.183
21,37 SWITCH 10/100/1000 16 PUERTOS UN 300.630 300.630 300.630 300.630 300.630 300.630 300.630 300.630 300.630
21,38 SWITCH 10/100/1000 8 PUERTOS UN 84.416 84.416 84.416 84.416 84.416 84.416 84.416 84.416 84.416
21,39 CABLE TELEFNICO 2 PARES ML 1.750 1.750 1.750 1.750 1.750 1.750 1.750 1.750 1.750
21,40 CABLE TELEFNICO 10 PARES ML 8.084 8.084 8.084 8.084 8.084 8.084 8.084 8.084 8.084
21,41 CABLE TELEFNICO 20 PARES ML 12.052 12.052 12.052 12.052 12.052 12.052 12.052 12.052 12.052
21,42 CABLE TELEFNICO 40 PARES ML 20.112 20.112 20.112 20.112 20.112 20.112 20.112 20.112 20.112
21,43 CABLE TELEVISIN RG6 ML 3.728 3.728 3.728 3.728 3.728 3.728 3.728 3.728 3.728
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.277 21.277 21.277 21.277 21.277 21.277 21.277 21.277 21.277
21,45 ACOMETIDA TELEFNICA 1" ML 30.950 30.950 30.950 30.950 30.950 30.950 30.950 30.950 30.950
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.453 18.453 18.453 18.453 18.453 18.453 18.453 18.453 18.453
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 14.658 14.658 14.658 14.658 14.658 14.658 14.658 14.658 14.658
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 590.454 590.454 590.454 590.454 590.454 590.454 590.454 590.454 590.454
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 86.442 86.442 86.442 86.442 86.442 86.442 86.442 86.442 86.442
1,3 CODO 45 PVC UNIN MECNICA 8" UN 486.609 486.609 486.609 486.609 486.609 486.609 486.609 486.609 486.609
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.038.598 1.038.598 1.038.598 1.038.598 1.038.598 1.038.598 1.038.598 1.038.598 1.038.598
1,5 CODO 90 PVC UNIN MECNICA 4" UN 119.096 119.096 119.096 119.096 119.096 119.096 119.096 119.096 119.096
1,6 CODO 90 PVC UNIN MECNICA 8" UN 725.213 725.213 725.213 725.213 725.213 725.213 725.213 725.213 725.213
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.560.582 1.560.582 1.560.582 1.560.582 1.560.582 1.560.582 1.560.582 1.560.582 1.560.582
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.496 12.496 12.496 12.496 12.496 12.496 12.496 12.496 12.496
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.403 15.403 15.403 15.403 15.403 15.403 15.403 15.403 15.403
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.329 19.329 19.329 19.329 19.329 19.329 19.329 19.329 19.329
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.152 21.152 21.152 21.152 21.152 21.152 21.152 21.152 21.152
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 25.349 25.349 25.349 25.349 25.349 25.349 25.349 25.349 25.349
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 25.349 25.349 25.349 25.349 25.349 25.349 25.349 25.349 25.349
1,14 TAPN PVC UNIN MECNICA 3" UN 101.771 101.771 101.771 101.771 101.771 101.771 101.771 101.771 101.771
1,15 TAPN PVC UNIN MECNICA 4" UN 117.886 117.886 117.886 117.886 117.886 117.886 117.886 117.886 117.886
1,16 TAPN PVC UNIN MECNICA 8" UN 364.796 364.796 364.796 364.796 364.796 364.796 364.796 364.796 364.796
1,17 TEE PVC UNIN MECNICA 2" UN 136.977 136.977 136.977 136.977 136.977 136.977 136.977 136.977 136.977
1,18 TEE PVC UNIN MECNICA 4" UN 225.806 225.806 225.806 225.806 225.806 225.806 225.806 225.806 225.806
1,19 TEE PVC UNIN MECNICA 8" UN 999.069 999.069 999.069 999.069 999.069 999.069 999.069 999.069 999.069
1,20 TEE PVC UNIN MECNICA 10" UN 1.151.056 1.151.056 1.151.056 1.151.056 1.151.056 1.151.056 1.151.056 1.151.056 1.151.056
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.540 13.540 13.540 13.540 13.540 13.540 13.540 13.540 13.540
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 11.951 11.951 11.951 11.951 11.951 11.951 11.951 11.951 11.951
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 29.428 29.428 29.428 29.428 29.428 29.428 29.428 29.428 29.428
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 116.858 116.858 116.858 116.858 116.858 116.858 116.858 116.858 116.858
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 173.955 173.955 173.955 173.955 173.955 173.955 173.955 173.955 173.955
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 28.459 28.459 28.459 28.459 28.459 28.459 28.459 28.459 28.459
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 97.987 97.987 97.987 97.987 97.987 97.987 97.987 97.987 97.987
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 145.140 145.140 145.140 145.140 145.140 145.140 145.140 145.140 145.140
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 59.265 59.265 59.265 59.265 59.265 59.265 59.265 59.265 59.265
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 238.561 238.561 238.561 238.561 238.561 238.561 238.561 238.561 238.561
1,32 UNIN REPARACION PVC 4" UN 69.136 69.136 69.136 69.136 69.136 69.136 69.136 69.136 69.136
1,33 UNIN REPARACIN PVC 8" UN 277.539 277.539 277.539 277.539 277.539 277.539 277.539 277.539 277.539
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 166.551 166.551 166.551 166.551 166.551 166.551 166.551 166.551 166.551
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 473.634 473.634 473.634 473.634 473.634 473.634 473.634 473.634 473.634
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.268.132 1.268.132 1.268.132 1.268.132 1.268.132 1.268.132 1.268.132 1.268.132 1.268.132
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.873.784 1.873.784 1.873.784 1.873.784 1.873.784 1.873.784 1.873.784 1.873.784 1.873.784

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.230 10.230 10.230 10.230 10.230 10.230 10.230 10.230 10.230
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.385 23.385 23.385 23.385 23.385 23.385 23.385 23.385 23.385
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 64.327 67.909 60.235 69.443 64.840 65.862 67.397 66.374 58.189
2,5 RELLENO TIPO 2 "RECEBO" M3 60.392 62.979 60.392 60.392 62.979 66.860 53.925 60.392 60.392
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 59.716 62.979 60.392 60.392 62.979 66.860 53.925 56.512 60.392
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 50.252 61.340 51.277 57.426 60.500 57.426 50.252 56.401 73.906
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 57.323 65.681 53.144 59.412 62.546 59.412 52.099 58.367 51.054
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 50.719 52.830 48.306 53.735 51.020 51.624 52.528 51.925 47.100

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 108.788 108.788 108.788 108.788 108.788 108.788 108.788 108.788 108.788
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
3,2 CODO 45 PVC ALCANTARILLADO 16" UN CONSTRUCCIN
1.133.965 1.133.965 1.133.965 1.133.965 1.133.965 1.133.965 1.133.965 1.133.965 1.133.965
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 142.159 142.159 142.159 142.159 142.159 142.159 142.159 142.159 142.159
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.313.414 1.313.414 1.313.414 1.313.414 1.313.414 1.313.414 1.313.414 1.313.414 1.313.414
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 915.461 915.461 915.461 915.461 915.461 915.461 915.461 915.461 915.461
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 61.767 61.767 61.767 61.767 61.767 61.767 61.767 61.767 61.767
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 107.994 107.994 107.994 107.994 107.994 107.994 107.994 107.994 107.994
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 254.975 254.975 254.975 254.975 254.975 254.975 254.975 254.975 254.975
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 254.969 254.969 254.969 254.969 254.969 254.969 254.969 254.969 254.969
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 409.331 409.331 409.331 409.331 409.331 409.331 409.331 409.331 409.331
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 108.040 108.040 108.040 108.040 108.040 108.040 108.040 108.040 108.040
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 108.040 108.040 108.040 108.040 108.040 108.040 108.040 108.040 108.040
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 254.975 254.975 254.975 254.975 254.975 254.975 254.975 254.975 254.975
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 254.975 254.975 254.975 254.975 254.975 254.975 254.975 254.975 254.975
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 409.331 409.331 409.331 409.331 409.331 409.331 409.331 409.331 409.331
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 411.943 411.943 411.943 411.943 411.943 411.943 411.943 411.943 411.943
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 668.283 668.283 668.283 668.283 668.283 668.283 668.283 668.283 668.283
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.072.318 1.072.318 1.072.318 1.072.318 1.072.318 1.072.318 1.072.318 1.072.318 1.072.318
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 66.219 66.219 66.219 66.219 66.219 66.219 66.219 66.219 66.219
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 344.871 344.871 344.871 344.871 344.871 344.871 344.871 344.871 344.871
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 385.681 385.681 385.681 385.681 385.681 385.681 385.681 385.681 385.681
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.068.424 1.068.424 1.068.424 1.068.424 1.068.424 1.068.424 1.068.424 1.068.424 1.068.424
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 62.057 62.079 62.032 62.088 62.060 62.067 62.076 62.070 62.020
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 312.730 312.730 312.730 312.730 312.730 312.730 312.730 312.730 312.730
3,25 TUBERA PVC ALCANTARILLADO 8" ML 47.475 47.475 47.475 47.475 47.475 47.475 47.475 47.475 47.475
3,26 TUBERA PVC ALCANTARILLADO 10" ML 67.132 67.132 67.132 67.132 67.132 67.132 67.132 67.132 67.132
3,27 TUBERA PVC ALCANTARILLADO 12" ML 96.863 96.863 96.863 96.863 96.863 96.863 96.863 96.863 96.863
3,28 TUBERA PVC ALCANTARILLADO 16" ML 148.680 148.680 148.680 148.680 148.680 148.680 148.680 148.680 148.680
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 238.925 238.925 238.925 238.925 238.925 238.925 238.925 238.925 238.925
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 347.268 347.268 347.268 347.268 347.268 347.268 347.268 347.268 347.268
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 439.294 439.294 439.294 439.294 439.294 439.294 439.294 439.294 439.294
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 577.533 577.533 577.533 577.533 577.533 577.533 577.533 577.533 577.533
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 794.101 794.101 794.101 794.101 794.101 794.101 794.101 794.101 794.101

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4,1 UN 618.203 620.937 615.079 622.108 618.594 619.374 620.546 619.765 613.517
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE
4,2 ML 593.490 594.525 592.308 594.968 593.638 593.934 594.377 594.081 591.717
INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,3 UN 664.955 666.778 662.873 667.559 665.216 665.736 666.518 665.997 661.832
(INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4,4 UN 733.104 736.522 729.200 737.986 733.593 734.569 736.034 735.057 727.248
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE
4,5 ML 842.834 844.291 841.169 844.915 843.042 843.459 844.082 843.666 840.337
INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,6 UN 765.251 767.758 762.388 768.831 765.610 766.326 767.400 766.684 760.957
(INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 928.939 929.974 927.753 930.420 929.086 929.385 929.827 929.532 927.160
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.335.074 1.338.454 1.331.206 1.339.906 1.335.557 1.336.526 1.337.972 1.337.008 1.329.272
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.826.031 1.833.316 1.817.708 1.836.438 1.827.073 1.829.154 1.832.276 1.830.194 1.813.546
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.415.642 2.427.751 2.401.806 2.432.940 2.417.373 2.420.833 2.426.022 2.422.562 2.394.888
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.737.520 1.737.520 1.737.520 1.737.520 1.737.520 1.737.520 1.737.520 1.737.520 1.737.520
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.674.673 3.674.673 3.674.673 3.674.673 3.674.673 3.674.673 3.674.673 3.674.673 3.674.673
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 130.561 130.603 130.512 130.621 130.567 130.579 130.597 130.585 130.488
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)

5 ANDENES Y SARDINELES
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 CONSTRUCCIN
67.291 67.404 67.161 67.453 67.307 67.340 67.388 67.356 67.096
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 80.083 80.196 79.953 80.245 80.099 80.132 80.180 80.148 79.888
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 50.158 50.654 49.591 50.867 50.229 50.371 50.583 50.442 49.308
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 54.564 55.043 54.018 55.248 54.633 54.770 54.975 54.838 53.745
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 54.835 55.301 54.302 55.501 54.901 55.034 55.234 55.101 54.035
5,6 BORDE SEPARADOR VERDE A-170 ML 239.309 239.352 239.261 239.370 239.315 239.328 239.346 239.334 239.237
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.093 17.152 17.025 17.178 17.101 17.118 17.144 17.127 16.991
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 35.927 36.276 35.527 36.426 35.977 36.077 36.226 36.127 35.328
5,9 CAUELA PREFABRICADA TIPO A-120 ML 78.464 78.486 78.438 78.496 78.467 78.473 78.483 78.477 78.425
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 515.885 516.627 515.037 516.945 515.991 516.203 516.521 516.309 514.613
5,11 LOSETA PREFABRICADA A-40 M2 57.100 57.197 56.990 57.238 57.114 57.141 57.183 57.155 56.934
5,12 LOSETA PREFABRICADA A-60 M2 83.759 83.856 83.649 83.897 83.773 83.800 83.842 83.814 83.593
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 30.466 30.658 30.248 30.740 30.494 30.548 30.630 30.576 30.138
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 48.547 48.935 48.105 49.100 48.603 48.713 48.879 48.769 47.883
5,15 SARDINEL PREFABRICADO A-10 ML 89.454 89.278 92.612 92.074 94.831 90.459 89.673 90.661 95.187
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 55.726 55.785 55.660 55.810 55.735 55.752 55.777 55.760 55.626

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 190.692 190.920 190.432 191.018 190.725 190.790 190.888 190.823 190.302
6,2 BANCA EN CONCRETO M-30 UN 628.540 628.859 628.176 628.996 628.586 628.677 628.814 628.722 627.993
6,3 BOLARDO M-63 ALTO/HIERRO UN 202.860 202.908 202.805 202.928 202.867 202.881 202.901 202.887 202.778
6,4 BOLARDO M-60 CONCRETO UN 151.614 151.888 151.302 152.005 151.653 151.732 151.849 151.771 151.146
6,5 BOLARDO M-61 BAJO/CONCRETO UN 153.378 153.651 153.066 153.768 153.417 153.495 153.612 153.534 152.909
6,6 BOLARDO M-62 BAJO/HIERRO UN 179.998 180.285 179.669 180.409 180.039 180.121 180.244 180.162 179.505
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 54.000 54.087 53.900 54.124 54.012 54.037 54.074 54.049 53.850
6,8 BORDILLO PREFABRICADO A-80 ML 62.487 62.584 62.375 62.626 62.501 62.528 62.570 62.542 62.320
6,9 CANECA M-120 UN 294.439 294.461 294.414 294.470 294.442 294.448 294.457 294.451 294.402
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 776.822 776.959 776.666 777.018 776.842 776.881 776.940 776.901 776.588
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.189.665 3.189.756 3.189.561 3.189.795 3.189.678 3.189.704 3.189.743 3.189.717 3.189.508
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.281.267 3.281.358 3.281.163 3.281.397 3.281.280 3.281.306 3.281.345 3.281.319 3.281.110
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 458.322 458.418 458.212 458.459 458.336 458.363 458.404 458.377 458.158
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 605.710 606.093 605.271 606.258 605.765 605.874 606.039 605.929 605.052
6,15 BANCA EN MADERA M-50 UN 504.979 504.979 504.979 504.979 504.979 504.979 504.979 504.979 504.979
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 233.509 233.646 233.353 233.704 233.529 233.568 233.626 233.587 233.275
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 542.514 542.569 542.452 542.592 542.522 542.538 542.561 542.545 542.421
6,18 POSTE HISTRICO M-131 UN 6.061.208 6.061.892 6.060.428 6.062.185 6.061.306 6.061.501 6.061.794 6.061.599 6.060.037

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.813 3.813 3.813 3.813 3.813 3.813 3.813 3.813 3.813
7,2 MARCA VIAL CON PINTURA EN FRO M2 41.048 41.048 41.048 41.048 41.048 41.048 41.048 41.048 41.048
7,3 SEAL DOBLE DE CICLORUTA UN 295.712 295.733 295.688 295.742 295.715 295.721 295.730 295.724 295.676
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 466.175 466.367 465.956 466.449 466.203 466.257 466.340 466.285 465.846
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 221.921 221.942 221.897 221.951 221.924 221.930 221.939 221.933 221.885
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 235.664 235.685 235.640 235.694 235.667 235.673 235.682 235.676 235.628
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 246.072 246.093 246.048 246.102 246.075 246.081 246.090 246.084 246.036
7,8 TACHAS REFLECTIVAS UN 12.825 12.825 12.825 12.825 12.825 12.825 12.825 12.825 12.825
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.693 13.693 13.693 13.693 13.693 13.693 13.693 13.693 13.693
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7,10 UN 111.218 111.218 111.218 111.218 111.218 111.218 111.218 111.218 111.218
SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES

2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.126 34.126 34.126 34.126 34.126 34.126 34.126 34.126 34.126
EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y
2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A
2,10 600.2 M3 62.681 62.681 62.681 62.681 62.681 62.681 62.681 62.681 62.681
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES
2,11 600.3 M3 76.950 76.950 76.950 76.950 76.950 76.950 76.950 76.950 76.950
A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 101.744 100.093 128.160 123.207 146.321 109.999 103.395 111.650 118.254
3,3 330.1 BASE GRANULAR M3 109.174 107.523 135.590 130.637 153.751 117.429 110.825 119.080 157.053
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.046 3.046 3.046 3.046 3.046 3.046 3.046 3.046 3.046
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.065 1.065 1.065 1.065 1.065 1.065 1.065 1.065 1.065
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 208.949 209.921 207.838 210.338 209.088 209.366 209.782 209.505 207.283
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 59.649 59.819 59.455 59.891 59.673 59.722 59.794 59.746 59.358
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 507.338 520.038 508.926 526.388 520.038 510.513 510.513 510.513 510.513
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 513.588 526.288 515.176 532.638 526.288 516.763 516.763 516.763 516.763
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 534.376 547.076 535.964 553.426 547.076 537.551 537.551 537.551 537.551
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 CONSTRUCCIN
519.838 532.538 521.426 538.888 532.538 523.013 523.013 523.013 523.013
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 248.410 246.759 274.826 269.873 292.987 256.665 250.061 258.316 296.289
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 240.009 238.358 266.425 261.472 284.586 248.264 241.660 249.915 256.519
3,15 311.1 AFIRMADO M3 60.409 64.387 61.085 61.085 64.387 69.340 52.830 56.132 61.085
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 10.774 10.842 10.696 10.872 10.784 10.803 10.833 10.813 10.657
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.297 4.331 4.258 4.346 4.302 4.311 4.326 4.316 4.238
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3,18 500.1 M3 575.756 580.152 570.733 582.035 576.384 577.640 579.524 578.268 568.221
ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3,19 500.1 M3 604.892 609.485 599.644 611.453 605.549 606.861 608.829 607.516 597.020
ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3,20 500.1 M3 624.345 629.072 618.944 631.097 625.021 626.371 628.397 627.046 616.244
ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE
3,21 *** ML 6.650 6.650 6.650 6.650 6.650 6.650 6.650 6.650 6.650
LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 85.502 96.678 79.914 88.296 92.487 88.296 78.517 86.899 77.120

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 833.379 838.365 827.681 840.501 834.091 835.516 837.653 836.228 824.832
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 714.844 719.748 709.241 721.848 715.545 716.945 719.047 717.646 706.439
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 757.351 762.449 751.526 764.633 758.080 759.535 761.720 760.264 748.613
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 509.872 514.357 504.747 516.279 510.513 511.795 513.717 512.435 502.185
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 599.825 604.488 594.497 606.486 600.492 601.824 603.822 602.490 591.833
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 507.274 511.877 502.016 513.848 507.933 509.247 511.219 509.904 499.387
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 597.124 601.909 591.658 603.959 597.809 599.175 601.226 599.859 588.925
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 659.151 663.753 653.893 665.725 659.809 661.123 663.096 661.781 651.264
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 524.573 529.357 519.106 531.407 525.257 526.623 528.674 527.307 516.373
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 699.452 704.237 693.986 706.286 700.137 701.503 703.553 702.186 691.253
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,11 650 P KG 11.269 11.269 11.269 11.269 11.269 11.269 11.269 11.269 11.269
ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,12 650 P KG 14.443 14.443 14.443 14.443 14.443 14.443 14.443 14.443 14.443
ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.698 1.698 1.698 1.698 1.698 1.698 1.698 1.698 1.698
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO
4,14 621.1 ML 2.551.702 2.551.702 2.551.702 2.551.702 2.551.702 2.551.702 2.551.702 2.551.702 2.551.702
TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN
4,15 621.1 P MANUAL (INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, ML 3.854.081 3.862.610 3.844.335 3.866.264 3.855.300 3.857.736 3.861.392 3.858.955 3.839.461
REFUERZO Y ANILLOS)

4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.609.073 1.613.630 1.603.867 1.615.582 1.609.725 1.611.026 1.612.979 1.611.677 1.601.264

4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 82.199 82.199 82.199 82.199 82.199 82.199 82.199 82.199 82.199
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 337.344 337.891 336.719 338.125 337.422 337.578 337.813 337.657 336.407
4,19 632 P BARANDA METLICA ML 399.884 399.884 399.884 399.884 399.884 399.884 399.884 399.884 399.884
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 15.966 15.966 15.966 15.966 15.966 15.966 15.966 15.966 15.966
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 422.558 429.872 417.415 429.925 425.703 430.140 422.066 422.707 414.635
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 62.092 73.631 63.489 71.871 76.062 71.871 62.092 70.474 87.051
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 71.124 74.172 71.124 71.124 74.172 78.744 63.504 71.124 71.124
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 329.507 334.350 323.973 336.426 330.200 331.583 333.658 332.275 321.206
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 324.159 331.100 318.840 329.285 327.111 326.408 324.085 326.311 316.180
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 332.600 339.541 327.280 337.726 335.551 334.849 332.526 334.752 324.620
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 338.106 345.005 332.835 343.171 341.052 340.337 337.996 340.234 330.200
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 346.547 353.445 341.276 351.611 349.492 348.778 346.437 348.675 338.640
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 459.539 464.310 454.087 466.355 460.222 461.584 463.630 462.266 451.361
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 547.711 552.671 542.043 554.796 548.421 549.837 551.963 550.546 539.209
4,31 681.1 GAVIN M3 168.262 178.930 162.928 170.929 174.930 170.929 161.595 169.596 160.261
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir
4,32 681.1 GAVIN MALLA PVC M3 CONSTRUCCIN
172.185 182.853 166.851 174.852 178.853 174.852 165.518 173.519 164.184
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 38.125 38.418 37.790 38.543 38.167 38.250 38.376 38.292 37.623
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500
4,34 672.1 ML 14.506 14.653 14.339 14.716 14.527 14.569 14.632 14.590 14.255
PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO
4,35 *** M2 9.537 9.537 9.537 9.537 9.537 9.537 9.537 9.537 9.537
(RESISTENCIA LTIMA 25 KN)
4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.587 13.587 13.587 13.587 13.587 13.587 13.587 13.587 13.587

4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.277 18.277 18.277 18.277 18.277 18.277 18.277 18.277 18.277
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,38 *** M2 21.905 21.905 21.905 21.905 21.905 21.905 21.905 21.905 21.905
(RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,39 *** M2 28.139 28.139 28.139 28.139 28.139 28.139 28.139 28.139 28.139
(RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN,
4,40 *** M2 6.845 6.845 6.845 6.845 6.845 6.845 6.845 6.845 6.845
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN,
4,41 *** M2 7.797 7.797 7.797 7.797 7.797 7.797 7.797 7.797 7.797
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN,
4,42 *** M2 8.103 8.103 8.103 8.103 8.103 8.103 8.103 8.103 8.103
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN,
4,43 *** M2 5.779 5.779 5.779 5.779 5.779 5.779 5.779 5.779 5.779
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN,
4,44 *** M2 8.694 8.694 8.694 8.694 8.694 8.694 8.694 8.694 8.694
FILTRO Y SEPARACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Cajic Cha Cogua Gachancip Nemocn Sop Tabio Tocancip Zipaquir

4,45 ***
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN,
M2
CONSTRUCCIN
7.092 7.092 7.092 7.092 7.092 7.092 7.092 7.092 7.092
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN,
4,46 *** M2 8.694 8.694 8.694 8.694 8.694 8.694 8.694 8.694 8.694
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN,
4,47 *** M2 16.685 16.685 16.685 16.685 16.685 16.685 16.685 16.685 16.685
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36"
4,48 661.1 ML 593.798 593.867 593.720 593.897 593.808 593.828 593.857 593.838 593.680
CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600
4,49 660.3 ML 333.717 334.718 332.573 335.147 333.860 334.146 334.575 334.289 332.001
MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO
4,50 *** ML 831.311 831.311 831.311 831.311 831.311 831.311 831.311 831.311 831.311
36"
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 127.140 130.965 127.790 127.790 130.965 135.728 119.853 123.028 127.790
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.173 4.173 4.173 4.173 4.173 4.173 4.173 4.173 4.173
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4,53 *** ML 80.923 80.923 80.923 80.923 80.923 80.923 80.923 80.923 80.923
INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4,54 *** ML 123.271 123.271 123.271 123.271 123.271 123.271 123.271 123.271 123.271
INSTALACIN)
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 467.695 472.655 462.027 474.781 468.405 469.821 471.948 470.530 459.193
4,56 682.1 P COLCHONETA RENO M3 183.281 193.949 177.947 185.948 189.949 185.948 176.614 184.615 175.280
4,57 *** TRINCHO EN MADERA M2 64.031 64.031 64.031 64.031 64.031 64.031 64.031 64.031 64.031

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.813 3.813 3.813 3.813 3.813 3.813 3.813 3.813 3.813
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 41.048 41.048 41.048 41.048 41.048 41.048 41.048 41.048 41.048
5,3 730.3 TOPE DEFENSA METLICA UN 78.928 78.928 78.928 78.928 78.928 78.928 78.928 78.928 78.928
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 65.665 65.665 65.665 65.665 65.665 65.665 65.665 65.665 65.665
5,5 730.1 DEFENSA METLICA ML 138.646 138.884 138.373 138.987 138.680 138.748 138.850 138.782 138.236
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 12.825 12.825 12.825 12.825 12.825 12.825 12.825 12.825 12.825

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 803 803 803 803 803 803 803 803 803
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36",
6,2 801.6 INCLUYE RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.578 14.578 14.578 14.578 14.578 14.578 14.578 14.578 14.578
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 23.573 23.573 23.573 23.573 23.573 23.573 23.573 23.573 23.573
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.386 9.386 9.386 9.386 9.386 9.386 9.386 9.386 9.386
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.924.404 1.953.054 1.925.391 1.916.500 1.937.247 1.931.320 1.935.271 1.943.174 1.949.102 1.928.355
1,2 CAMPAMENTO 9 M2 UN 1.120.467 1.134.792 1.120.961 1.116.516 1.126.889 1.123.925 1.125.901 1.129.853 1.132.816 1.122.443
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.455 13.455 13.455 13.455 13.455 13.455 13.455 13.455 13.455 13.455
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.085 15.085 15.085 15.085 15.085 15.085 15.085 15.085 15.085 15.085
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.440 17.440 17.440 17.440 17.440 17.440 17.440 17.440 17.440 17.440
1,6 CERCA EN TABLA H=2.30 M ML 62.822 62.822 62.822 62.822 62.822 62.822 62.822 62.822 62.822 62.822
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 44.264 44.574 44.275 44.179 44.403 44.339 44.382 44.467 44.531 44.307
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.568 20.878 20.579 20.483 20.707 20.643 20.685 20.771 20.835 20.611
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 865.165 867.964 864.575 863.614 865.658 865.017 865.444 867.493 867.835 865.492
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.045 10.045 10.045 10.045 10.045 10.045 10.045 10.045 10.045 10.045
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.592 3.592 3.592 3.592 3.592 3.592 3.592 3.592 3.592 3.592
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.572.587 2.572.587 2.572.587 2.572.587 2.572.587 2.572.587 2.572.587 2.572.587 2.572.587 2.572.587
1,44 RED TELEFNICA PROVISIONAL UN 237.727 237.727 237.727 237.727 237.727 237.727 237.727 237.727 237.727 237.727
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 76.143 72.263 63.832 67.089 64.502 64.502 64.502 76.767 72.887 71.593
2,2 BASE ARENA CEMENTO 1:20 M3 219.129 250.799 220.222 210.393 233.326 226.775 231.143 239.878 246.431 223.498
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 CONSTRUCCIN
197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.192 21.192 21.192 21.192 21.192 21.192 21.192 21.192 21.192 21.192
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 624.192 654.644 625.242 615.791 637.843 631.543 635.743 644.144 650.444 628.392
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 626.058 657.555 627.144 617.369 640.178 633.661 638.005 646.694 653.210 630.402
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 583.054 612.547 584.071 574.918 596.275 590.174 594.241 602.377 608.479 587.122
2,9 PILOTE DE MADERA D=20 CM ML 47.812 47.812 47.812 47.812 47.812 47.812 47.812 47.812 47.812 47.812
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2,10 ML 147.336 147.336 147.336 147.336 147.336 147.336 147.336 147.336 147.336 147.336
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2,11 ML 183.753 183.753 183.753 183.753 183.753 183.753 183.753 183.753 183.753 183.753
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2,12 ML 227.793 227.793 227.793 227.793 227.793 227.793 227.793 227.793 227.793 227.793
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2,13 ML 287.077 287.077 287.077 287.077 287.077 287.077 287.077 287.077 287.077 287.077
UNA DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 101.429 103.570 101.503 100.839 102.389 101.946 102.241 102.832 103.275 101.725
2,15 PILOTE HINCADO 30X30 ML 125.312 128.415 125.419 124.457 126.703 126.061 126.489 127.345 127.987 125.740
2,16 DADOS EN CONCRETO 3500PSI M3 569.693 599.187 570.710 561.558 582.915 576.813 580.880 589.016 595.118 573.761
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2,17 ML 88.084 88.084 88.084 88.084 88.084 88.084 88.084 88.084 88.084 88.084
DISTANCIA MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 36.819 37.016 36.826 36.765 36.907 36.866 36.893 36.948 36.988 36.846
3,2 SIFN EN PVC 6" UN 190.032 190.229 190.039 189.978 190.121 190.080 190.107 190.161 190.202 190.060
3,3 CAJA DE INSPECCIN DE 100X100 UN 433.402 442.423 428.018 424.450 431.124 428.745 430.331 443.413 443.314 434.162
3,4 CAJA DE INSPECCIN DE 40X40 UN 216.221 219.723 215.861 214.709 217.258 216.490 217.002 218.861 219.420 216.663
3,5 CAJA DE INSPECCIN DE 60X60 UN 247.027 252.798 246.471 244.578 248.776 247.514 248.355 251.351 252.285 247.758
3,6 CAJA DE INSPECCIN DE 80X80 UN 326.202 336.235 325.793 322.578 329.862 327.718 329.147 333.319 335.134 327.522
3,7 DUCTO ELCTRICO PVC 4" ML 99.240 99.210 99.171 99.171 99.151 99.151 99.151 99.270 99.240 99.230
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.229.628 1.229.330 1.228.932 1.228.932 1.228.733 1.228.733 1.228.733 1.229.927 1.229.628 1.229.529
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 112.303 114.477 112.378 111.703 113.277 112.828 113.128 113.727 114.177 112.603
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 70.758 71.905 70.798 70.442 71.272 71.035 71.193 71.510 71.747 70.916
3,11 TUBERA DRENAJE PVC 110 ML 26.937 27.481 26.956 26.787 27.181 27.069 27.144 27.293 27.406 27.012
3,12 TUBERA DRENAJE PVC 160 ML 43.249 43.793 43.268 43.099 43.493 43.380 43.455 43.605 43.718 43.324
3,13 TUBERA DRENAJE PVC 200 ML 56.803 57.564 56.829 56.593 57.144 56.986 57.091 57.301 57.459 56.907
3,14 TUBERA DRENAJE PVC 250 ML 77.679 78.549 77.709 77.439 78.069 77.889 78.009 78.249 78.429 77.799
3,15 TUBERA DRENAJE PVC 315 ML 107.271 108.032 107.298 107.061 107.613 107.455 107.560 107.770 107.927 107.376
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3,16 UN 922.400 931.096 922.699 920.001 926.298 924.499 925.698 928.097 929.897 923.599
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3,17 UN 1.307.316 1.324.709 1.307.915 1.302.518 1.315.113 1.311.514 1.313.913 1.318.711 1.322.310 1.309.714
MATERIAL FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3,18 UN 1.710.133 1.744.919 1.711.332 1.700.537 1.725.727 1.718.530 1.723.327 1.732.924 1.740.121 1.714.930
MATERIAL FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 40.407 40.407 40.407 40.407 40.407 40.407 40.407 40.407 40.407 40.407
4,2 CASETN DE LONA 0.80X0.70 M2 53.377 53.377 53.377 53.377 53.377 53.377 53.377 53.377 53.377 53.377
4,3 COLUMNAS 3500 PSI M3 779.532 809.025 780.548 771.396 792.753 786.651 790.718 798.854 804.956 783.599
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 255.806 273.000 253.517 247.792 256.972 256.498 254.863 269.146 271.709 257.932
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4,5 M2 95.216 98.079 95.315 94.426 96.500 95.907 96.302 97.092 97.684 95.611
DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
4,6 M2 112.342 115.778 112.461 111.394 113.883 113.172 113.646 114.594 115.304 112.816
DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN
4,7 M2 125.331 129.913 125.489 124.067 127.385 126.437 127.069 128.333 129.281 125.963
REFUERZO)

4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 132.252 137.120 132.420 130.910 134.435 133.428 134.099 135.442 136.449 132.924
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2
CONSTRUCCIN
151.713 157.726 151.920 150.054 154.409 153.165 153.994 155.653 156.897 152.542

4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 168.817 175.690 169.054 166.922 171.898 170.476 171.424 173.320 174.742 169.765

ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN


4,11 M2 187.388 195.119 187.655 185.256 190.854 189.255 190.321 192.453 194.053 188.455
REFUERZO)
4,12 ENTREPISO VIGUETA PLACA M2 95.329 95.808 95.346 95.197 95.544 95.445 95.511 95.643 95.742 95.396
4,13 ESCALERA MACIZA 3500 PSI M3 920.842 950.335 921.859 912.706 934.063 927.961 932.029 940.165 946.267 924.910
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 91.446 91.849 91.460 91.334 91.627 91.543 91.599 91.710 91.794 91.501
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 76.923 79.872 77.024 76.109 78.245 77.635 78.041 78.855 79.465 77.329
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 86.615 90.222 86.739 85.619 88.232 87.485 87.983 88.978 89.725 87.112
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 101.059 105.583 101.215 99.811 103.087 102.151 102.775 104.023 104.959 101.683
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 683.135 712.628 684.151 674.999 696.356 690.254 694.321 702.457 708.559 687.202
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4,19 UN 47.292 48.198 47.323 47.042 47.698 47.511 47.635 47.885 48.073 47.417
M)
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 273.674 286.845 274.128 270.040 279.578 276.853 278.670 282.303 285.028 275.490
4,21 ACERO FIGURADO 37000 PSI KG 4.015 4.015 4.015 4.015 4.015 4.015 4.015 4.015 4.015 4.015
4,22 ACERO FIGURADO 60000 PSI KG 4.212 4.212 4.212 4.212 4.212 4.212 4.212 4.212 4.212 4.212
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.888 5.888 5.888 5.888 5.888 5.888 5.888 5.888 5.888 5.888
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 822.311 851.804 823.328 814.175 835.532 829.430 833.498 841.634 847.736 826.379
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 752.027 784.308 753.140 743.122 766.498 759.819 764.271 773.176 779.855 756.479
4,26 VIGA AREA 3500 PSI M3 818.109 847.602 819.125 809.973 831.330 825.228 829.295 837.431 843.533 822.176
4,27 VIGA CINTA 3500 PSI M3 799.154 828.647 800.171 791.018 812.375 806.274 810.341 818.477 824.579 803.222
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 998.089 1.027.582 999.106 989.953 1.011.310 1.005.208 1.009.276 1.017.412 1.023.513 1.002.156
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 319.947 352.735 321.077 310.901 334.645 327.861 332.383 341.428 348.212 324.468

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 28.639 29.439 28.666 28.418 28.998 28.832 28.942 29.163 29.329 28.749
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 47.905 48.705 47.932 47.684 48.263 48.098 48.208 48.429 48.595 48.015
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.579 33.775 33.585 33.524 33.667 33.626 33.653 33.707 33.748 33.606
5,4 ARCOS EN LADRILLO PRENSADO ML 156.660 157.053 156.674 156.551 156.836 156.755 156.809 156.918 156.999 156.714
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 42.361 43.267 42.393 42.112 42.767 42.580 42.705 42.955 43.142 42.486
5,6 DINTELES EN BLOQUE 0.15 M ML 26.052 26.456 26.066 25.941 26.233 26.149 26.205 26.317 26.400 26.108
5,7 ENCHAPES LADRILLO PRENSADO M2 95.765 96.552 95.793 95.548 96.118 95.955 96.064 96.281 96.444 95.874
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 87.992 91.010 88.096 87.159 89.345 88.720 89.137 89.969 90.594 88.408
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 87.437 87.437 87.437 87.437 87.437 87.437 87.437 87.437 87.437 87.437
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.201 51.201 51.201 51.201 51.201 51.201 51.201 51.201 51.201 51.201
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 84.190 84.190 84.190 84.190 84.190 84.190 84.190 84.190 84.190 84.190
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 49.577 49.577 49.577 49.577 49.577 49.577 49.577 49.577 49.577 49.577
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 97.730 97.730 97.730 97.730 97.730 97.730 97.730 97.730 97.730 97.730
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 57.595 57.595 57.595 57.595 57.595 57.595 57.595 57.595 57.595 57.595
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 108.752 108.752 108.752 108.752 108.752 108.752 108.752 108.752 108.752 108.752
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 63.106 63.106 63.106 63.106 63.106 63.106 63.106 63.106 63.106 63.106
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 39.343 39.739 39.357 39.234 39.521 39.439 39.493 39.602 39.684 39.398
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.745 23.943 23.752 23.691 23.834 23.793 23.820 23.875 23.916 23.772
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 51.107 51.370 51.116 51.034 51.225 51.170 51.207 51.279 51.334 51.143
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 30.633 30.765 30.637 30.597 30.692 30.665 30.683 30.719 30.747 30.651
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 57.439 57.703 57.448 57.367 57.558 57.503 57.539 57.612 57.667 57.476
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.435 34.567 34.440 34.399 34.494 34.467 34.485 34.521 34.549 34.453
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 96.298 97.616 96.343 95.934 96.889 96.616 96.798 97.161 97.434 96.480
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 56.722 57.381 56.745 56.540 57.018 56.881 56.972 57.154 57.290 56.813
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 35.954 36.217 35.963 35.881 36.072 36.017 36.053 36.126 36.181 35.990
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.736 21.868 21.740 21.699 21.795 21.768 21.786 21.822 21.849 21.754
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 71.603 72.130 71.621 71.457 71.839 71.730 71.803 71.948 72.057 71.675
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML CONSTRUCCIN
43.036 43.299 43.045 42.963 43.154 43.099 43.136 43.208 43.263 43.072
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 84.649 85.052 84.663 84.537 84.830 84.746 84.802 84.913 84.997 84.704
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 51.142 51.344 51.149 51.087 51.233 51.191 51.219 51.275 51.316 51.170
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 176.426 178.272 176.490 175.917 177.254 176.872 177.126 177.635 178.017 176.681
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 105.582 106.505 105.614 105.328 105.996 105.805 105.932 106.187 106.378 105.710
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 86.538 87.302 86.564 86.327 86.881 86.723 86.828 87.039 87.197 86.644
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 52.087 52.469 52.100 51.982 52.259 52.179 52.232 52.338 52.417 52.140
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 45.477 46.067 45.497 45.314 45.741 45.619 45.700 45.863 45.985 45.558
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.553 27.848 27.563 27.471 27.685 27.624 27.665 27.746 27.807 27.593
5,37 MURO TOLETE COMN 0.06 M M2 32.584 32.848 32.593 32.512 32.703 32.648 32.684 32.757 32.812 32.621
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.791 19.923 19.796 19.755 19.851 19.823 19.841 19.878 19.905 19.810
5,39 MURO TOLETE COMN 0.12 M M2 49.447 49.974 49.465 49.301 49.683 49.574 49.647 49.792 49.901 49.519
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 30.182 30.446 30.191 30.109 30.300 30.246 30.282 30.355 30.409 30.219
5,41 MURO TOLETE COMN 0.25 M M2 95.211 96.002 95.239 94.993 95.566 95.402 95.511 95.729 95.893 95.320
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 57.755 58.150 57.769 57.646 57.932 57.850 57.905 58.014 58.096 57.810
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 69.438 69.965 69.456 69.292 69.674 69.565 69.638 69.783 69.892 69.510
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 41.796 42.060 41.805 41.723 41.914 41.860 41.896 41.969 42.023 41.832
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 146.780 148.625 146.844 146.271 147.607 147.225 147.480 147.989 148.371 147.034
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 88.886 89.809 88.918 88.632 89.300 89.109 89.236 89.491 89.681 89.013
5,47 REMATES LADRILLO PRENSADO ML 30.568 30.765 30.575 30.514 30.657 30.616 30.643 30.697 30.738 30.595
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 35.117 35.667 35.136 34.965 35.363 35.250 35.325 35.477 35.591 35.193
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 59.204 59.937 59.230 59.002 59.533 59.381 59.482 59.685 59.836 59.305
5,50 LAVADA DE FACHADA M2 4.966 4.966 4.966 4.966 4.966 4.966 4.966 4.966 4.966 4.966
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 48.248 49.049 48.276 48.028 48.607 48.442 48.552 48.773 48.938 48.359
5,52 DOVELA, GROUTING 3000 PSI ML 10.065 10.065 10.065 10.065 10.065 10.065 10.065 10.065 10.065 10.065
5,53 ANCLAJE 3/8" L=30CM UN 13.296 13.296 13.296 13.296 13.296 13.296 13.296 13.296 13.296 13.296
5,54 ANCLAJE 1/2" L=50CM UN 17.375 17.375 17.375 17.375 17.375 17.375 17.375 17.375 17.375 17.375
5,55 ANCLAJE 5/8" L=70CM UN 24.320 24.320 24.320 24.320 24.320 24.320 24.320 24.320 24.320 24.320
5,56 ANCLAJE 3/4" L=70CM UN 36.260 36.260 36.260 36.260 36.260 36.260 36.260 36.260 36.260 36.260
5,57 ANCLAJE 1" L= 70CM UN 4.776 4.997 4.784 4.715 4.875 4.829 4.860 4.921 4.966 4.806

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.312 15.312 15.312 15.312 15.312 15.312 15.312 15.312 15.312 15.312
6,2 FILOS O DILATACIONES B/PLACA ML 5.649 5.846 5.656 5.595 5.737 5.697 5.724 5.778 5.819 5.676
6,3 FILOS O DILATACIONES S/MURO ML 6.769 6.966 6.776 6.715 6.857 6.816 6.844 6.898 6.939 6.796
6,4 GOTERA EN MORTERO 1:4 ML 7.993 8.190 8.000 7.939 8.081 8.040 8.067 8.122 8.162 8.020
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.536 6.536 6.536 6.536 6.536 6.536 6.536 6.536 6.536 6.536
6,6 MALLA BAJO ENTRAMADO M2 13.016 13.016 13.016 13.016 13.016 13.016 13.016 13.016 13.016 13.016
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 23.322 23.856 23.340 23.174 23.561 23.451 23.524 23.672 23.783 23.395
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 14.110 14.378 14.119 14.036 14.230 14.175 14.212 14.285 14.341 14.147
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 20.608 21.162 20.628 20.456 20.857 20.742 20.818 20.971 21.086 20.685
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.461 12.738 12.470 12.384 12.585 12.528 12.566 12.642 12.699 12.499
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 19.647 20.182 19.666 19.500 19.887 19.776 19.850 19.998 20.108 19.721
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.980 12.248 11.989 11.906 12.100 12.045 12.082 12.155 12.211 12.017
6,13 PAETE CULATAS 1:4, E=2 CM M2 20.608 21.162 20.628 20.456 20.857 20.742 20.818 20.971 21.086 20.685
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.461 12.738 12.470 12.384 12.585 12.528 12.566 12.642 12.699 12.499
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 20.758 21.139 20.771 20.653 20.929 20.850 20.902 21.008 21.086 20.810
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.534 12.725 12.541 12.482 12.620 12.580 12.607 12.659 12.699 12.561
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 17.101 17.523 17.116 16.985 17.290 17.203 17.261 17.378 17.465 17.160
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.435 10.646 10.442 10.377 10.529 10.486 10.515 10.573 10.617 10.464
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.369 16.777 16.383 16.257 16.552 16.467 16.524 16.636 16.720 16.425
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.069 10.273 10.076 10.013 10.160 10.118 10.146 10.202 10.244 10.097
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 21.343 21.897 21.362 21.191 21.591 21.477 21.553 21.706 21.820 21.420
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.809 13.086 12.819 12.733 12.933 12.876 12.914 12.991 13.048 12.848
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 CONSTRUCCIN
20.382 20.917 20.401 20.235 20.622 20.511 20.585 20.733 20.843 20.456
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.329 12.596 12.338 12.255 12.449 12.393 12.430 12.504 12.559 12.366
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.945 17.353 16.959 16.833 17.128 17.044 17.100 17.212 17.297 17.002
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.340 10.544 10.347 10.284 10.431 10.389 10.417 10.474 10.516 10.368
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 21.222 21.757 21.240 21.074 21.462 21.351 21.425 21.572 21.683 21.296
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 13.130 13.398 13.140 13.057 13.250 13.195 13.232 13.306 13.361 13.167

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 26.291 27.082 26.319 26.073 26.646 26.482 26.591 26.809 26.973 26.400
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7,2 M2 80.097 81.606 80.149 79.680 80.773 80.461 80.669 81.086 81.398 80.305
(INCLUYE TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 53.058 53.058 53.058 53.058 53.058 53.058 53.058 53.058 53.058 53.058
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.151 21.151 21.151 21.151 21.151 21.151 21.151 21.151 21.151 21.151
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.211 33.211 33.211 33.211 33.211 33.211 33.211 33.211 33.211 33.211
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 77.522 77.522 77.522 77.522 77.522 77.522 77.522 77.522 77.522 77.522
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 60.712 60.712 60.712 60.712 60.712 60.712 60.712 60.712 60.712 60.712
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.322 35.322 35.322 35.322 35.322 35.322 35.322 35.322 35.322 35.322
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 81.244 81.244 81.244 81.244 81.244 81.244 81.244 81.244 81.244 81.244
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 97.006 97.006 97.006 97.006 97.006 97.006 97.006 97.006 97.006 97.006
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 142.547 142.547 142.547 142.547 142.547 142.547 142.547 142.547 142.547 142.547
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 56.334 56.334 56.334 56.334 56.334 56.334 56.334 56.334 56.334 56.334
7,13 CANAL PVC AMAZONAS ML 78.288 78.288 78.288 78.288 78.288 78.288 78.288 78.288 78.288 78.288
7,14 CANAL PVC RAINGO ML 71.178 71.178 71.178 71.178 71.178 71.178 71.178 71.178 71.178 71.178
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 126.285 126.285 126.285 126.285 126.285 126.285 126.285 126.285 126.285 126.285
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 73.747 73.747 73.747 73.747 73.747 73.747 73.747 73.747 73.747 73.747
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 54.181 54.181 54.181 54.181 54.181 54.181 54.181 54.181 54.181 54.181
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 30.890 30.890 30.890 30.890 30.890 30.890 30.890 30.890 30.890 30.890
7,19 TEJA DE BARRO M2 57.618 58.601 57.652 57.346 58.058 57.855 57.991 58.262 58.465 57.753
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 45.166 45.166 45.166 45.166 45.166 45.166 45.166 45.166 45.166 45.166
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 41.409 41.409 41.409 41.409 41.409 41.409 41.409 41.409 41.409 41.409
7,22 TEJA FIBROCEMENTO N4 M2 34.955 34.955 34.955 34.955 34.955 34.955 34.955 34.955 34.955 34.955
7,23 TEJA FIBROCEMENTO No. 6 M2 34.223 34.223 34.223 34.223 34.223 34.223 34.223 34.223 34.223 34.223
7,24 TEJA FIBROCEMENTO No. 8 M2 34.481 34.481 34.481 34.481 34.481 34.481 34.481 34.481 34.481 34.481
7,25 TEJA TERMOACSTICA M2 48.510 48.510 48.510 48.510 48.510 48.510 48.510 48.510 48.510 48.510
7,26 TEJA PLSTICA No.6 M2 42.655 42.655 42.655 42.655 42.655 42.655 42.655 42.655 42.655 42.655
7,27 TEJA ESPAOLA ETERNIT M2 78.034 78.034 78.034 78.034 78.034 78.034 78.034 78.034 78.034 78.034
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 144.051 144.051 144.051 144.051 144.051 144.051 144.051 144.051 144.051 144.051
7,29 TEJA SIN TRASLAPO M2 64.773 64.773 64.773 64.773 64.773 64.773 64.773 64.773 64.773 64.773
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 40.662 40.662 40.662 40.662 40.662 40.662 40.662 40.662 40.662 40.662
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 31.852 31.852 31.852 31.852 31.852 31.852 31.852 31.852 31.852 31.852
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO
7,32 M2 55.510 55.510 55.510 55.510 55.510 55.510 55.510 55.510 55.510 55.510
ESTRUCTURAL ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.119 19.119 19.119 19.119 19.119 19.119 19.119 19.119 19.119 19.119
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 22.994 22.994 22.994 22.994 22.994 22.994 22.994 22.994 22.994 22.994
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 24.911 24.911 24.911 24.911 24.911 24.911 24.911 24.911 24.911 24.911
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 32.066 32.066 32.066 32.066 32.066 32.066 32.066 32.066 32.066 32.066
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.175 21.175 21.175 21.175 21.175 21.175 21.175 21.175 21.175 21.175
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 49.849 49.849 49.849 49.849 49.849 49.849 49.849 49.849 49.849 49.849
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 341.246 341.246 341.246 341.246 341.246 341.246 341.246 341.246 341.246 341.246
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 391.486 391.486 391.486 391.486 391.486 391.486 391.486 391.486 391.486 391.486
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 259.392 259.392 259.392 259.392 259.392 259.392 259.392 259.392 259.392 259.392
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 277.119 277.119 277.119 277.119 277.119 277.119 277.119 277.119 277.119 277.119
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
8 MORTEROS Y CONCRETOS CONSTRUCCIN
8,1 CONCRETO 4000 PSI M3 444.897 475.922 445.967 436.339 458.805 452.386 456.665 465.224 471.642 449.176
8,2 CONCRETO 3500 PSI M3 389.537 418.171 390.524 381.638 402.373 396.449 400.398 408.297 414.221 393.486
8,3 CONCRETO 3000 PSI M3 388.377 417.942 389.396 380.220 401.630 395.513 399.591 407.747 413.864 392.454
8,4 CONCRETO 2500 PSI M3 345.689 375.875 346.729 337.361 359.220 352.975 357.138 365.466 371.711 349.852
8,5 CONCRETO 2000 PSI M3 323.978 354.956 325.045 315.432 337.865 331.455 335.728 344.274 350.683 328.250
8,6 CONCRETO 1500 PSI M3 296.359 328.192 297.456 287.577 310.629 304.043 308.433 317.215 323.801 300.749
8,7 MORTERO SECO 1:10 M3 255.438 282.584 256.375 247.950 267.607 261.992 265.736 273.224 278.840 259.183
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 456.465 482.824 457.374 449.194 468.281 462.828 466.464 473.734 479.188 460.101
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 410.695 436.168 411.573 403.668 422.114 416.844 420.357 427.385 432.654 414.209
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 468.409 492.232 469.230 461.837 479.088 474.160 477.445 484.018 488.946 471.695
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 684.989 708.812 685.810 678.417 695.668 690.740 694.025 700.598 705.526 688.275

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 117.981 117.981 117.981 117.981 117.981 117.981 117.981 117.981 117.981 117.981
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.988 4.184 3.994 3.933 4.076 4.035 4.062 4.116 4.157 4.015
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 132.031 132.031 132.031 132.031 132.031 132.031 132.031 132.031 132.031 132.031
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 161.680 161.680 161.680 161.680 161.680 161.680 161.680 161.680 161.680 161.680
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 234.985 234.985 234.985 234.985 234.985 234.985 234.985 234.985 234.985 234.985
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 261.542 261.542 261.542 261.542 261.542 261.542 261.542 261.542 261.542 261.542
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 288.130 288.130 288.130 288.130 288.130 288.130 288.130 288.130 288.130 288.130
9,8 HOJA PUERTA FORTEC 0.81 UN 191.343 191.343 191.343 191.343 191.343 191.343 191.343 191.343 191.343 191.343
9,9 HOJA PUERTA FORTEC 0.91 UN 216.920 216.920 216.920 216.920 216.920 216.920 216.920 216.920 216.920 216.920
9,10 HOJA PUERTA FORTEC 1.50 UN 319.226 319.226 319.226 319.226 319.226 319.226 319.226 319.226 319.226 319.226
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 121.007 121.007 121.007 121.007 121.007 121.007 121.007 121.007 121.007 121.007
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 160.651 160.651 160.651 160.651 160.651 160.651 160.651 160.651 160.651 160.651
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 178.555 178.555 178.555 178.555 178.555 178.555 178.555 178.555 178.555 178.555
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 454.784 454.784 454.784 454.784 454.784 454.784 454.784 454.784 454.784 454.784
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.316 40.316 40.316 40.316 40.316 40.316 40.316 40.316 40.316 40.316
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.114 25.114 25.114 25.114 25.114 25.114 25.114 25.114 25.114 25.114
9,17 VENTANERA EN MADERA CEDRO MACHO M2 95.313 95.313 95.313 95.313 95.313 95.313 95.313 95.313 95.313 95.313
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 116.342 116.342 116.342 116.342 116.342 116.342 116.342 116.342 116.342 116.342
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 90.381 90.381 90.381 90.381 90.381 90.381 90.381 90.381 90.381 90.381
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 28.025 28.025 28.025 28.025 28.025 28.025 28.025 28.025 28.025 28.025
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 28.025 28.025 28.025 28.025 28.025 28.025 28.025 28.025 28.025 28.025
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 26.567 26.567 26.567 26.567 26.567 26.567 26.567 26.567 26.567 26.567
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 40.636 40.636 40.636 40.636 40.636 40.636 40.636 40.636 40.636 40.636
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 50.322 50.322 50.322 50.322 50.322 50.322 50.322 50.322 50.322 50.322
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 60.656 60.656 60.656 60.656 60.656 60.656 60.656 60.656 60.656 60.656
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 72.926 72.926 72.926 72.926 72.926 72.926 72.926 72.926 72.926 72.926
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 343.482 343.482 343.482 343.482 343.482 343.482 343.482 343.482 343.482 343.482
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 240.152 240.152 240.152 240.152 240.152 240.152 240.152 240.152 240.152 240.152
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.239 32.239 32.239 32.239 32.239 32.239 32.239 32.239 32.239 32.239
9,30 VIDRIO TRANSPARENTE 4 MM M2 41.281 41.281 41.281 41.281 41.281 41.281 41.281 41.281 41.281 41.281
9,31 VIDRIO TRANSPARENTE 5 MM M2 50.322 50.322 50.322 50.322 50.322 50.322 50.322 50.322 50.322 50.322
9,32 VIDRIO TRANSPARENTE 6 MM M2 63.238 63.238 63.238 63.238 63.238 63.238 63.238 63.238 63.238 63.238

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 72.873 72.873 72.873 72.873 72.873 72.873 72.873 72.873 72.873 72.873
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 202.759 202.759 202.759 202.759 202.759 202.759 202.759 202.759 202.759 202.759
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10,3 ML 77.146 77.146 77.146 77.146 77.146 77.146 77.146 77.146 77.146 77.146
(INCLUYE ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 138.053 138.053 138.053 138.053 138.053 138.053 138.053 138.053 138.053 138.053
10,5 MARCO TAPA CAJA DE INSPECCIN UN 130.779 130.779 130.779 130.779 130.779 130.779 130.779 130.779 130.779 130.779
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 CONSTRUCCIN
85.866 85.866 85.866 85.866 85.866 85.866 85.866 85.866 85.866 85.866
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 202.375 202.375 202.375 202.375 202.375 202.375 202.375 202.375 202.375 202.375
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 105.413 105.413 105.413 105.413 105.413 105.413 105.413 105.413 105.413 105.413
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.324 6.324 6.324 6.324 6.324 6.324 6.324 6.324 6.324 6.324
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN
10,10 M2 95.188 95.188 95.188 95.188 95.188 95.188 95.188 95.188 95.188 95.188
TUBO ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.191 39.191 39.191 39.191 39.191 39.191 39.191 39.191 39.191 39.191

10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 517.020 517.020 517.020 517.020 517.020 517.020 517.020 517.020 517.020 517.020
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 185.925 185.925 185.925 185.925 185.925 185.925 185.925 185.925 185.925 185.925
PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA
10,14 M2 208.620 208.620 208.620 208.620 208.620 208.620 208.620 208.620 208.620 208.620
ELECTROSTTICA
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10,15 M2 471.398 471.398 471.398 471.398 471.398 471.398 471.398 471.398 471.398 471.398
PUERTAS Y ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 122.863 122.863 122.863 122.863 122.863 122.863 122.863 122.863 122.863 122.863
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 377.055 377.055 377.055 377.055 377.055 377.055 377.055 377.055 377.055 377.055
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.777 5.777 5.777 5.777 5.777 5.777 5.777 5.777 5.777 5.777
10,19 VENTANA EN ALUMINIO CORREDIZA M2 265.156 265.156 265.156 265.156 265.156 265.156 265.156 265.156 265.156 265.156
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 116.968 116.968 116.968 116.968 116.968 116.968 116.968 116.968 116.968 116.968
10,21 REJILLA PISO 0.30 M M2 82.603 82.603 82.603 82.603 82.603 82.603 82.603 82.603 82.603 82.603
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 85.264 85.264 85.264 85.264 85.264 85.264 85.264 85.264 85.264 85.264
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10,23 KG 10.149 10.149 10.149 10.149 10.149 10.149 10.149 10.149 10.149 10.149
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.
CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10,24 DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 11.258 11.258 11.258 11.258 11.258 11.258 11.258 11.258 11.258 11.258
PLATINERA.CONTEMPLA TAMBIEN:FABRICACIN, SUMINISTRO,
MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 8.956 8.956 8.956 8.956 8.956 8.956 8.956 8.956 8.956 8.956
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 211.509 211.509 211.509 211.509 211.509 211.509 211.509 211.509 211.509 211.509
11,2 ACOMETIDA EN PVC 3/4" 5M UN 255.148 255.148 255.148 255.148 255.148 255.148 255.148 255.148 255.148 255.148
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.151 21.151 21.151 21.151 21.151 21.151 21.151 21.151 21.151 21.151
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.211 33.211 33.211 33.211 33.211 33.211 33.211 33.211 33.211 33.211
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 31.859 31.859 31.859 31.859 31.859 31.859 31.859 31.859 31.859 31.859
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 40.848 40.848 40.848 40.848 40.848 40.848 40.848 40.848 40.848 40.848
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 84.225 84.225 84.225 84.225 84.225 84.225 84.225 84.225 84.225 84.225
11,8 CONEXIN TANQUE ELEVADO PVC UN 212.811 212.811 212.811 212.811 212.811 212.811 212.811 212.811 212.811 212.811
11,9 INSTALACIN APARATO SANITARIO UN 41.837 41.837 41.837 41.837 41.837 41.837 41.837 41.837 41.837 41.837
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 33.537 33.537 33.537 33.537 33.537 33.537 33.537 33.537 33.537 33.537
11,13 NIPLE PASAMURO 2" UN 63.759 63.759 63.759 63.759 63.759 63.759 63.759 63.759 63.759 63.759
11,14 NIPLE PASAMURO 4" UN 95.286 95.286 95.286 95.286 95.286 95.286 95.286 95.286 95.286 95.286
11,15 PUNTO AGUA CALIENTE CPVC UN 80.444 80.444 80.444 80.444 80.444 80.444 80.444 80.444 80.444 80.444
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 58.655 58.655 58.655 58.655 58.655 58.655 58.655 58.655 58.655 58.655
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.399 62.399 62.399 62.399 62.399 62.399 62.399 62.399 62.399 62.399
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN CONSTRUCCIN
78.849 78.849 78.849 78.849 78.849 78.849 78.849 78.849 78.849 78.849
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 63.568 63.568 63.568 63.568 63.568 63.568 63.568 63.568 63.568 63.568
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 79.544 79.544 79.544 79.544 79.544 79.544 79.544 79.544 79.544 79.544
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 85.081 85.081 85.081 85.081 85.081 85.081 85.081 85.081 85.081 85.081
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 70.532 70.532 70.532 70.532 70.532 70.532 70.532 70.532 70.532 70.532
11,23 RED SUMINISTRO CPVC 1/2" ML 11.952 11.952 11.952 11.952 11.952 11.952 11.952 11.952 11.952 11.952
11,24 RED SUMINISTRO CPVC 3/4" ML 16.828 16.828 16.828 16.828 16.828 16.828 16.828 16.828 16.828 16.828
11,25 RED SUMINISTRO PVC 1 1/2" ML 21.971 21.971 21.971 21.971 21.971 21.971 21.971 21.971 21.971 21.971
11,26 RED SUMINISTRO PVC 1" ML 13.571 13.571 13.571 13.571 13.571 13.571 13.571 13.571 13.571 13.571
11,27 RED SUMINISTRO PVC 1/2" ML 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107 8.107
11,28 RED SUMINISTRO PVC 2 1/2" ML 48.944 48.944 48.944 48.944 48.944 48.944 48.944 48.944 48.944 48.944
11,29 RED SUMINISTRO PVC 2" ML 31.307 31.307 31.307 31.307 31.307 31.307 31.307 31.307 31.307 31.307
11,30 RED SUMINISTRO PVC 3/4" ML 10.152 10.152 10.152 10.152 10.152 10.152 10.152 10.152 10.152 10.152
11,31 RED SANITARIA PVC-S 2" ML 24.183 24.183 24.183 24.183 24.183 24.183 24.183 24.183 24.183 24.183
11,32 RED SANITARIA PVC-S 3" ML 33.552 33.552 33.552 33.552 33.552 33.552 33.552 33.552 33.552 33.552
11,33 RED SANITARIA PVC-S 4" ML 45.532 45.532 45.532 45.532 45.532 45.532 45.532 45.532 45.532 45.532
11,34 RED SANITARIA PVC-S 6" ML 85.120 85.120 85.120 85.120 85.120 85.120 85.120 85.120 85.120 85.120
11,35 REGISTRO 1" UN 103.366 103.366 103.366 103.366 103.366 103.366 103.366 103.366 103.366 103.366
11,36 REGISTRO 1/2" UN 57.624 57.624 57.624 57.624 57.624 57.624 57.624 57.624 57.624 57.624
11,37 REGISTRO 3/4" UN 73.378 73.378 73.378 73.378 73.378 73.378 73.378 73.378 73.378 73.378
11,38 REGISTRO 1 1/2" UN 177.283 177.283 177.283 177.283 177.283 177.283 177.283 177.283 177.283 177.283
11,39 REGISTRO 2 1/2" UN 365.634 365.634 365.634 365.634 365.634 365.634 365.634 365.634 365.634 365.634
11,40 REGISTRO 2" UN 270.125 270.125 270.125 270.125 270.125 270.125 270.125 270.125 270.125 270.125
11,41 REVENTILACIN 2" ML 16.860 16.860 16.860 16.860 16.860 16.860 16.860 16.860 16.860 16.860
11,42 REVENTILACIN 3" ML 21.277 21.277 21.277 21.277 21.277 21.277 21.277 21.277 21.277 21.277
TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11,43 UN 165.509 165.509 165.509 165.509 165.509 165.509 165.509 165.509 165.509 165.509
INSTALACIN)
TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11,44 UN 269.445 269.445 269.445 269.445 269.445 269.445 269.445 269.445 269.445 269.445
ISNTALACIN)
TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11,45 UN 448.415 448.415 448.415 448.415 448.415 448.415 448.415 448.415 448.415 448.415
INSTALACIN)
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11,46 ML 38.882 38.882 38.882 38.882 38.882 38.882 38.882 38.882 38.882 38.882
SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11,47 ML 45.831 45.831 45.831 45.831 45.831 45.831 45.831 45.831 45.831 45.831
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,48 ML 58.864 58.864 58.864 58.864 58.864 58.864 58.864 58.864 58.864 58.864
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS
11,49 ML 66.659 66.659 66.659 66.659 66.659 66.659 66.659 66.659 66.659 66.659
Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11,50 ML 85.864 85.864 85.864 85.864 85.864 85.864 85.864 85.864 85.864 85.864
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS
11,51 ML 99.592 99.592 99.592 99.592 99.592 99.592 99.592 99.592 99.592 99.592
Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS
11,52 ML 147.317 147.317 147.317 147.317 147.317 147.317 147.317 147.317 147.317 147.317
Y SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 59.275 59.275 59.275 59.275 59.275 59.275 59.275 59.275 59.275 59.275
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 59.517 59.517 59.517 59.517 59.517 59.517 59.517 59.517 59.517 59.517
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 38.440 38.440 38.440 38.440 38.440 38.440 38.440 38.440 38.440 38.440
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 47.340 47.340 47.340 47.340 47.340 47.340 47.340 47.340 47.340 47.340
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA
11,57 ML 4.016 4.016 4.016 4.016 4.016 4.016 4.016 4.016 4.016 4.016
2"
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A
11,58 ML 6.321 6.321 6.321 6.321 6.321 6.321 6.321 6.321 6.321 6.321
2"
11,59 GABINETE TIPO III UN 976.633 976.633 976.633 976.633 976.633 976.633 976.633 976.633 976.633 976.633
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
11,60 GABINETE TIPO I UN CONSTRUCCIN
746.698 746.698 746.698 746.698 746.698 746.698 746.698 746.698 746.698 746.698
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.501.593 2.501.593 2.501.593 2.501.593 2.501.593 2.501.593 2.501.593 2.501.593 2.501.593 2.501.593
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.085.633 2.085.633 2.085.633 2.085.633 2.085.633 2.085.633 2.085.633 2.085.633 2.085.633 2.085.633
11,63 VLVULA MARIPOSA 3" UN 606.098 606.098 606.098 606.098 606.098 606.098 606.098 606.098 606.098 606.098
11,64 VLVULA MARIPOSA 4" UN 784.112 784.112 784.112 784.112 784.112 784.112 784.112 784.112 784.112 784.112
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 301.706 301.706 301.706 301.706 301.706 301.706 301.706 301.706 301.706 301.706

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 348.612 348.612 348.612 348.612 348.612 348.612 348.612 348.612 348.612 348.612
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 55.393 55.393 55.393 55.393 55.393 55.393 55.393 55.393 55.393 55.393
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 65.572 65.572 65.572 65.572 65.572 65.572 65.572 65.572 65.572 65.572
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 72.806 72.806 72.806 72.806 72.806 72.806 72.806 72.806 72.806 72.806
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 85.748 85.748 85.748 85.748 85.748 85.748 85.748 85.748 85.748 85.748
12,6 SALIDA TELFONO PVC COMPLETA UN 52.077 52.077 52.077 52.077 52.077 52.077 52.077 52.077 52.077 52.077
12,7 SALIDA TIMBRE PVC COMPLETA UN 59.360 59.360 59.360 59.360 59.360 59.360 59.360 59.360 59.360 59.360
12,8 STRIP TELEFNICO 10 PARES UN 137.035 137.035 137.035 137.035 137.035 137.035 137.035 137.035 137.035 137.035
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 53.475 53.475 53.475 53.475 53.475 53.475 53.475 53.475 53.475 53.475
12,10 SALIDA TRIFSICA PVC COMPLETA UN 122.886 122.886 122.886 122.886 122.886 122.886 122.886 122.886 122.886 122.886
12,11 SALIDA T.V PVC COMPLETA. UN 73.490 73.490 73.490 73.490 73.490 73.490 73.490 73.490 73.490 73.490
12,12 SALIDA BIFSICA C.N. UN 43.579 43.579 43.579 43.579 43.579 43.579 43.579 43.579 43.579 43.579
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 91.858 91.858 91.858 91.858 91.858 91.858 91.858 91.858 91.858 91.858
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 392.215 392.215 392.215 392.215 392.215 392.215 392.215 392.215 392.215 392.215
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 522.425 522.425 522.425 522.425 522.425 522.425 522.425 522.425 522.425 522.425
12,16 TUBERA PVC CONDUIT 1/2" ML 3.383 3.383 3.383 3.383 3.383 3.383 3.383 3.383 3.383 3.383
12,17 TUBERA PVC CONDUIT 3/4" ML 4.467 4.467 4.467 4.467 4.467 4.467 4.467 4.467 4.467 4.467
12,18 TUBERA PVC CONDUIT 1" ML 6.950 6.950 6.950 6.950 6.950 6.950 6.950 6.950 6.950 6.950
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.431 12.431 12.431 12.431 12.431 12.431 12.431 12.431 12.431 12.431
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 261.192 261.192 261.192 261.192 261.192 261.192 261.192 261.192 261.192 261.192
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 73.797 73.797 73.797 73.797 73.797 73.797 73.797 73.797 73.797 73.797
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 99.909 99.909 99.909 99.909 99.909 99.909 99.909 99.909 99.909 99.909
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 40.763 40.763 40.763 40.763 40.763 40.763 40.763 40.763 40.763 40.763
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.339.689 1.339.689 1.339.689 1.339.689 1.339.689 1.339.689 1.339.689 1.339.689 1.339.689 1.339.689
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 993.030 993.030 993.030 993.030 993.030 993.030 993.030 993.030 993.030 993.030
12,26 POSTE METLICO 6M UN 1.241.849 1.241.849 1.241.849 1.241.849 1.241.849 1.241.849 1.241.849 1.241.849 1.241.849 1.241.849
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 577.456 577.456 577.456 577.456 577.456 577.456 577.456 577.456 577.456 577.456
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 105.413 105.413 105.413 105.413 105.413 105.413 105.413 105.413 105.413 105.413
12,29 LUMINARIA 70W SODIO UN 484.492 484.492 484.492 484.492 484.492 484.492 484.492 484.492 484.492 484.492
12,30 LUMINARIA 150W SODIO UN 606.143 606.143 606.143 606.143 606.143 606.143 606.143 606.143 606.143 606.143
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.600.991 1.600.991 1.600.991 1.600.991 1.600.991 1.600.991 1.600.991 1.600.991 1.600.991 1.600.991
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.178.975 1.178.975 1.178.975 1.178.975 1.178.975 1.178.975 1.178.975 1.178.975 1.178.975 1.178.975

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 38.533 39.450 38.565 38.281 38.944 38.754 38.881 39.134 39.323 38.660
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 38.286 39.202 38.317 38.033 38.696 38.507 38.633 38.886 39.076 38.412
13,3 ALISTADO PARA LISTN M2 14.158 14.341 14.164 14.108 14.240 14.202 14.228 14.278 14.316 14.183
13,4 ALISTADO PISOS 1:3, E=0.04 M2 27.819 29.651 27.882 27.313 28.640 28.261 28.514 29.020 29.399 28.072
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 82.572 84.404 82.635 82.066 83.393 83.014 83.267 83.772 84.151 82.824
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.635 26.255 25.657 25.464 25.913 25.785 25.870 26.041 26.169 25.721
13,7 CONCRETO BASE GRADAS 2500 PSI M2 56.082 59.101 56.186 55.249 57.435 56.811 57.227 58.060 58.684 56.499
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 77.998 82.827 78.164 76.665 80.163 79.163 79.829 81.162 82.161 78.664
13,9 MANTO FIBERGLASS 600X1 M2 29.175 29.175 29.175 29.175 29.175 29.175 29.175 29.175 29.175 29.175
13,10 PEGANTE MORTERO-CONCRETO M2 22.046 22.046 22.046 22.046 22.046 22.046 22.046 22.046 22.046 22.046
13,11 PERMA PLY 2 CAPAS M2 25.871 25.871 25.871 25.871 25.871 25.871 25.871 25.871 25.871 25.871
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 45.735 48.452 45.829 44.986 46.953 46.391 46.766 47.515 48.077 46.110
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 CONSTRUCCIN
53.632 56.953 53.747 52.716 55.121 54.434 54.892 55.808 56.495 54.090
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 77.856 82.987 78.032 76.440 80.156 79.094 79.802 81.218 82.279 78.563
13,15 TRITURADO FINO 1/2 M3 106.588 129.693 107.385 100.215 116.946 112.166 115.352 121.726 126.506 109.775
13,16 TRITURADO GRUESO 3/4 M3 104.920 122.858 102.793 96.856 109.914 105.956 108.594 118.649 121.413 107.160

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 55.195 55.561 55.207 55.094 55.359 55.283 55.334 55.435 55.511 55.245
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 32.953 33.137 32.960 32.903 33.035 32.998 33.023 33.073 33.111 32.979
14,3 ADOQUN CONCRETO 6CM M2 63.353 64.269 63.385 63.100 63.764 63.574 63.701 63.953 64.143 63.479
14,4 ADOQUN CONCRETO 8CM M2 66.503 67.419 66.535 66.250 66.914 66.724 66.851 67.103 67.293 66.629
14,5 ADOQUN GRES PEATONAL M2 70.632 71.548 70.664 70.379 71.043 70.853 70.980 71.232 71.422 70.758
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14,6 M2 72.739 73.106 72.752 72.638 72.904 72.828 72.878 72.980 73.055 72.790
BLANCO. INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.788 36.189 35.802 35.678 35.968 35.885 35.940 36.051 36.134 35.844
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 158.768 160.417 158.824 158.313 159.507 159.166 159.393 159.848 160.189 158.995
14,9 ACABADO EN GRAVILLA LAVADA M2 44.922 45.906 44.956 44.650 45.363 45.159 45.295 45.567 45.770 45.057
14,10 GUARDAESCOBA EN GRANITO ML 42.105 42.105 42.105 42.105 42.105 42.105 42.105 42.105 42.105 42.105
14,11 GUARDAESCOBA EN GRAVILLA ML 9.955 10.355 9.969 9.844 10.134 10.051 10.107 10.217 10.300 10.010
14,12 GUARDAESCOBA PVC CARAMELO ML 9.048 9.048 9.048 9.048 9.048 9.048 9.048 9.048 9.048 9.048
14,13 GUARDAESCOBA PVC CEDRO ML 12.145 12.145 12.145 12.145 12.145 12.145 12.145 12.145 12.145 12.145
14,14 GUARDAESCOBA PINO CARIBE ML 10.133 10.133 10.133 10.133 10.133 10.133 10.133 10.133 10.133 10.133
14,15 GUARDAESCOBA CEDRO BLANCO ML 16.981 16.981 16.981 16.981 16.981 16.981 16.981 16.981 16.981 16.981
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.094 33.094 33.094 33.094 33.094 33.094 33.094 33.094 33.094 33.094
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.855 8.855 8.855 8.855 8.855 8.855 8.855 8.855 8.855 8.855
14,18 LISTN M.H. AMARILLO M2 71.634 71.634 71.634 71.634 71.634 71.634 71.634 71.634 71.634 71.634
14,19 PASO ESCALERA GRANITO ML 114.744 116.027 114.788 114.390 115.319 115.054 115.231 115.585 115.850 114.921
14,20 PIRLANES ALUMINIO ML 7.237 7.237 7.237 7.237 7.237 7.237 7.237 7.237 7.237 7.237
14,21 PIRLANES LADRILLO ML 31.137 31.531 31.151 31.029 31.313 31.232 31.286 31.395 31.476 31.191
14,22 PISO VINILO TRFICO RESIDENCIAL M2 44.241 44.241 44.241 44.241 44.241 44.241 44.241 44.241 44.241 44.241
14,23 PISO VINILO TRFICO PESADO M2 51.420 51.420 51.420 51.420 51.420 51.420 51.420 51.420 51.420 51.420
14,24 PULIDA LACADA PISO MADERA M2 47.341 47.341 47.341 47.341 47.341 47.341 47.341 47.341 47.341 47.341
14,25 TABLETA DE GRES 25X25 M2 47.898 48.264 47.910 47.797 48.062 47.986 48.037 48.138 48.214 47.948
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 53.746 54.113 53.759 53.645 53.910 53.835 53.885 53.986 54.062 53.797
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.521 10.521 10.521 10.521 10.521 10.521 10.521 10.521 10.521 10.521
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 48.275 48.865 48.295 48.112 48.539 48.417 48.499 48.661 48.784 48.356
14,29 JABONERA PORCELANA ACUARIO UN 19.872 19.872 19.872 19.872 19.872 19.872 19.872 19.872 19.872 19.872
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14,30 UN 118.943 118.943 118.943 118.943 118.943 118.943 118.943 118.943 118.943 118.943
JABONERA,CEPILLERA Y PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.563 9.563 9.563 9.563 9.563 9.563 9.563 9.563 9.563 9.563
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 21.689 21.689 21.689 21.689 21.689 21.689 21.689 21.689 21.689 21.689
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 13.910 13.910 13.910 13.910 13.910 13.910 13.910 13.910 13.910 13.910
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.514 13.514 13.514 13.514 13.514 13.514 13.514 13.514 13.514 13.514
14,35 REMATES BOCEL ALUMINIO ML 8.215 8.215 8.215 8.215 8.215 8.215 8.215 8.215 8.215 8.215
14,36 REMATES BOCEL PORCELANA ML 8.360 8.360 8.360 8.360 8.360 8.360 8.360 8.360 8.360 8.360
14,37 TAPA REGISTRO 20X20 UN 18.373 18.373 18.373 18.373 18.373 18.373 18.373 18.373 18.373 18.373
14,38 TAPA REGISTRO 6X6 UN 16.742 16.742 16.742 16.742 16.742 16.742 16.742 16.742 16.742 16.742
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 18.032 18.032 18.032 18.032 18.032 18.032 18.032 18.032 18.032 18.032

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL


14,40 M2 20.845 20.845 20.845 20.845 20.845 20.845 20.845 20.845 20.845 20.845
FUNDIDO EN SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 63.096 63.462 63.109 62.995 63.260 63.184 63.235 63.336 63.412 63.146
14,42 MEDIA CAA EN GRANITO ML 74.759 74.759 74.759 74.759 74.759 74.759 74.759 74.759 74.759 74.759
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 CONSTRUCCIN
32.753 32.753 32.753 32.753 32.753 32.753 32.753 32.753 32.753 32.753
14,44 PINTURA ACRLICA PARA PISOS M2 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 98.216 98.216 98.216 98.216 98.216 98.216 98.216 98.216 98.216 98.216
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 118.860 118.860 118.860 118.860 118.860 118.860 118.860 118.860 118.860 118.860

15 CIELO RASO
15,1 APLIQUE YESO ML 70.237 70.237 70.237 70.237 70.237 70.237 70.237 70.237 70.237 70.237
15,2 ARMADURA MADERA Y MALLA M2 34.533 34.533 34.533 34.533 34.533 34.533 34.533 34.533 34.533 34.533
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53.396 53.396 53.396 53.396 53.396 53.396 53.396 53.396 53.396 53.396
15,4 CIELO RASO DURACUSTIC M2 65.534 65.534 65.534 65.534 65.534 65.534 65.534 65.534 65.534 65.534
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 48.909 48.909 48.909 48.909 48.909 48.909 48.909 48.909 48.909 48.909
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 90.698 90.698 90.698 90.698 90.698 90.698 90.698 90.698 90.698 90.698
15,7 CORNISAS YESO ML 47.149 47.149 47.149 47.149 47.149 47.149 47.149 47.149 47.149 47.149
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 100.264 100.264 100.264 100.264 100.264 100.264 100.264 100.264 100.264 100.264
15,9 MALLA CON VENA M2 12.924 12.924 12.924 12.924 12.924 12.924 12.924 12.924 12.924 12.924

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569

16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 64.378 60.498 55.324 55.324 52.737 52.737 52.737 68.259 64.378 63.085
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 110.784 134.699 111.608 104.186 121.504 116.557 119.854 126.452 131.400 114.082
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 154.104 150.224 145.050 145.050 142.463 142.463 142.463 145.050 154.104 152.811
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 66.694 62.814 54.383 57.640 55.053 55.053 55.053 67.318 63.438 62.144
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 138.670 134.790 129.616 129.616 127.029 127.029 127.029 129.616 138.670 137.377
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 151.443 147.563 142.389 142.389 139.802 139.802 139.802 142.389 151.443 150.150

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 291.210 291.210 291.210 291.210 291.210 291.210 291.210 291.210 291.210 291.210
SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE
17,2 UN 858.606 858.606 858.606 858.606 858.606 858.606 858.606 858.606 858.606 858.606
GRIFERA)
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 465.186 465.186 465.186 465.186 465.186 465.186 465.186 465.186 465.186 465.186
SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE
17,4 UN 134.786 134.786 134.786 134.786 134.786 134.786 134.786 134.786 134.786 134.786
GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE
17,5 UN 188.775 188.775 188.775 188.775 188.775 188.775 188.775 188.775 188.775 188.775
GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE
17,6 UN 175.309 175.309 175.309 175.309 175.309 175.309 175.309 175.309 175.309 175.309
GRIFERA)
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 386.026 386.026 386.026 386.026 386.026 386.026 386.026 386.026 386.026 386.026
SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE
17,8 UN 987.437 987.437 987.437 987.437 987.437 987.437 987.437 987.437 987.437 987.437
GRIFERA)
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 280.394 280.394 280.394 280.394 280.394 280.394 280.394 280.394 280.394 280.394
SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A
17,10 UN 198.600 198.600 198.600 198.600 198.600 198.600 198.600 198.600 198.600 198.600
BAERA
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN CONSTRUCCIN
78.977 78.977 78.977 78.977 78.977 78.977 78.977 78.977 78.977 78.977
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO
17,12 UN 240.495 240.495 240.495 240.495 240.495 240.495 240.495 240.495 240.495 240.495
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO
17,13 UN 354.311 354.311 354.311 354.311 354.311 354.311 354.311 354.311 354.311 354.311
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.967 2.967 2.967 2.967 2.967 2.967 2.967 2.967 2.967 2.967
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.649 10.649 10.649 10.649 10.649 10.649 10.649 10.649 10.649 10.649
18,4 BARNIZ SOBRE MUEBLES M2 40.542 40.542 40.542 40.542 40.542 40.542 40.542 40.542 40.542 40.542
18,5 CARBURO SOBRE PAETES M2 5.583 5.583 5.583 5.583 5.583 5.583 5.583 5.583 5.583 5.583
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 63.309 63.309 63.309 63.309 63.309 63.309 63.309 63.309 63.309 63.309
18,7 DEMARCACIN CON MARMOLINA ML 3.319 3.319 3.319 3.319 3.319 3.319 3.319 3.319 3.319 3.319
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.662 2.662 2.662 2.662 2.662 2.662 2.662 2.662 2.662 2.662
18,9 ESMALTE SOBRE LMINA LLENA M2 13.355 13.355 13.355 13.355 13.355 13.355 13.355 13.355 13.355 13.355
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.870 3.870 3.870 3.870 3.870 3.870 3.870 3.870 3.870 3.870
18,11 ESMALTE SOBRE MADERA LLENA M2 14.083 14.083 14.083 14.083 14.083 14.083 14.083 14.083 14.083 14.083
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.520 5.520 5.520 5.520 5.520 5.520 5.520 5.520 5.520 5.520
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.279 6.279 6.279 6.279 6.279 6.279 6.279 6.279 6.279 6.279
18,14 ESTUCO M2 6.711 6.711 6.711 6.711 6.711 6.711 6.711 6.711 6.711 6.711
18,15 ESTUCO (LINEAL) ML 4.201 4.201 4.201 4.201 4.201 4.201 4.201 4.201 4.201 4.201
18,16 ESTUCO Y VINILO 3 MANOS M2 14.862 14.862 14.862 14.862 14.862 14.862 14.862 14.862 14.862 14.862
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.205 9.205 9.205 9.205 9.205 9.205 9.205 9.205 9.205 9.205
18,18 LACA PISOS MADERA M2 21.766 21.766 21.766 21.766 21.766 21.766 21.766 21.766 21.766 21.766
18,19 LNEAS TRFICO 0.10 ML 2.571 2.571 2.571 2.571 2.571 2.571 2.571 2.571 2.571 2.571
18,20 MARMOLINA SOBRE PAETE M2 11.693 11.693 11.693 11.693 11.693 11.693 11.693 11.693 11.693 11.693
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.154 3.154 3.154 3.154 3.154 3.154 3.154 3.154 3.154 3.154
18,22 TINTILLA SOBRE MADERA LLENA M2 12.070 12.070 12.070 12.070 12.070 12.070 12.070 12.070 12.070 12.070
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.785 6.785 6.785 6.785 6.785 6.785 6.785 6.785 6.785 6.785
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.262 4.262 4.262 4.262 4.262 4.262 4.262 4.262 4.262 4.262
18,25 WASH-PRIMER SOBRE ALUMNIO M2 20.939 20.939 20.939 20.939 20.939 20.939 20.939 20.939 20.939 20.939
18,26 PINTURA EPXICA M2 12.137 12.137 12.137 12.137 12.137 12.137 12.137 12.137 12.137 12.137
18,27 PINTURA EPXICA (LINEAL) ML 7.493 7.493 7.493 7.493 7.493 7.493 7.493 7.493 7.493 7.493

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.847.898 5.847.898 5.847.898 5.847.898 5.847.898 5.847.898 5.847.898 5.847.898 5.847.898 5.847.898
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON
19,2 UN 10.332.322 ######### 10.332.322 10.332.322 ######## 10.332.322 10.332.322 10.332.322 10.332.322 10.332.322
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.703.966 2.703.966 2.703.966 2.703.966 2.703.966 2.703.966 2.703.966 2.703.966 2.703.966 2.703.966
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.836.774 8.836.774 8.836.774 8.836.774 8.836.774 8.836.774 8.836.774 8.836.774 8.836.774 8.836.774
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.275.485 8.275.485 8.275.485 8.275.485 8.275.485 8.275.485 8.275.485 8.275.485 8.275.485 8.275.485
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.571 2.571 2.571 2.571 2.571 2.571 2.571 2.571 2.571 2.571
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 829.747 829.747 829.747 829.747 829.747 829.747 829.747 829.747 829.747 829.747
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 82.925 82.925 82.925 82.925 82.925 82.925 82.925 82.925 82.925 82.925
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.501.848 1.502.158 1.501.859 1.501.763 1.501.987 1.501.923 1.501.966 1.502.051 1.502.116 1.501.891
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 653.852 661.243 654.107 651.813 657.165 655.636 656.655 658.694 660.224 654.871

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.366 28.366 28.366 28.366 28.366 28.366 28.366 28.366 28.366 28.366
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.115 42.115 42.115 42.115 42.115 42.115 42.115 42.115 42.115 42.115
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 52.197 52.197 52.197 52.197 52.197 52.197 52.197 52.197 52.197 52.197
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.032 17.032 17.032 17.032 17.032 17.032 17.032 17.032 17.032 17.032
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML CONSTRUCCIN
20.618 20.618 20.618 20.618 20.618 20.618 20.618 20.618 20.618 20.618

20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 28.099 28.099 28.099 28.099 28.099 28.099 28.099 28.099 28.099 28.099
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.225 25.225 25.225 25.225 25.225 25.225 25.225 25.225 25.225 25.225
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.580 26.580 26.580 26.580 26.580 26.580 26.580 26.580 26.580 26.580
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.221 33.221 33.221 33.221 33.221 33.221 33.221 33.221 33.221 33.221
20,10 VLVULA DE BOLA GAS 1/2" UN 16.968 16.968 16.968 16.968 16.968 16.968 16.968 16.968 16.968 16.968
20,11 VLVULA DE BOLA GAS 3/4" UN 22.249 22.249 22.249 22.249 22.249 22.249 22.249 22.249 22.249 22.249
20,12 VLVULA DE BOLA GAS 1" UN 34.240 34.240 34.240 34.240 34.240 34.240 34.240 34.240 34.240 34.240
20,13 VLVULA POLIETILENO GAS 1/2" UN 262.838 262.838 262.838 262.838 262.838 262.838 262.838 262.838 262.838 262.838
20,14 VLVULA POLIETILENO GAS 3/4" UN 302.497 302.497 302.497 302.497 302.497 302.497 302.497 302.497 302.497 302.497
20,15 VLVULA POLIETILENO GAS 1" UN 315.484 315.484 315.484 315.484 315.484 315.484 315.484 315.484 315.484 315.484
20,16 ACOMETIDA GAS 1/2" ML 292.563 292.563 292.563 292.563 292.563 292.563 292.563 292.563 292.563 292.563

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 213.432 213.432 213.432 213.432 213.432 213.432 213.432 213.432 213.432 213.432
21,2 CABLE DETECTOR LINEAL DE CALOR ML 32.735 32.735 32.735 32.735 32.735 32.735 32.735 32.735 32.735 32.735
21,3 SIRENA DE 110 V UN 99.570 99.570 99.570 99.570 99.570 99.570 99.570 99.570 99.570 99.570
21,4 CMARA CCTV UN 252.313 252.313 252.313 252.313 252.313 252.313 252.313 252.313 252.313 252.313
21,5 PARLANTE-CIELO FALSO UN 49.938 49.938 49.938 49.938 49.938 49.938 49.938 49.938 49.938 49.938
21,6 AMPLIFICADOR 100W UN 551.497 551.497 551.497 551.497 551.497 551.497 551.497 551.497 551.497 551.497
21,7 AMPLIFICADOR 300W UN 1.368.699 1.368.699 1.368.699 1.368.699 1.368.699 1.368.699 1.368.699 1.368.699 1.368.699 1.368.699
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.730 42.730 42.730 42.730 42.730 42.730 42.730 42.730 42.730 42.730
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 213.553 213.553 213.553 213.553 213.553 213.553 213.553 213.553 213.553 213.553
21,10 TOMA PARA MICRFONO UN 42.174 42.174 42.174 42.174 42.174 42.174 42.174 42.174 42.174 42.174
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.615 3.615 3.615 3.615 3.615 3.615 3.615 3.615 3.615 3.615
21,12 SPLITERS UN 6.082 6.082 6.082 6.082 6.082 6.082 6.082 6.082 6.082 6.082
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.809 17.809 17.809 17.809 17.809 17.809 17.809 17.809 17.809 17.809
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.372 23.372 23.372 23.372 23.372 23.372 23.372 23.372 23.372 23.372
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.326 30.326 30.326 30.326 30.326 30.326 30.326 30.326 30.326 30.326
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 118.177 118.177 118.177 118.177 118.177 118.177 118.177 118.177 118.177 118.177
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 30.830 30.830 30.830 30.830 30.830 30.830 30.830 30.830 30.830 30.830
21,18 BANDEJA PORTACABLES PARA RACK UN 100.873 100.873 100.873 100.873 100.873 100.873 100.873 100.873 100.873 100.873
21,19 RACK 2' X 24" UN 176.159 176.159 176.159 176.159 176.159 176.159 176.159 176.159 176.159 176.159
21,20 RACK 3' X 24" UN 277.187 277.187 277.187 277.187 277.187 277.187 277.187 277.187 277.187 277.187
21,21 RACK 5' X 24" UN 344.164 344.164 344.164 344.164 344.164 344.164 344.164 344.164 344.164 344.164
21,22 RACK 7' X 24" UN 376.135 376.135 376.135 376.135 376.135 376.135 376.135 376.135 376.135 376.135
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 550.343 550.343 550.343 550.343 550.343 550.343 550.343 550.343 550.343 550.343
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 324.054 324.054 324.054 324.054 324.054 324.054 324.054 324.054 324.054 324.054
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 100.158 100.158 100.158 100.158 100.158 100.158 100.158 100.158 100.158 100.158
21,26 PATCH CORD 2M CATEGORA 6A UN 13.348 13.348 13.348 13.348 13.348 13.348 13.348 13.348 13.348 13.348
21,27 PATCH CORD 5M CATEGORA 6A UN 27.288 27.288 27.288 27.288 27.288 27.288 27.288 27.288 27.288 27.288
21,28 CABLE UTP CATEGORA 6A ML 4.802 4.802 4.802 4.802 4.802 4.802 4.802 4.802 4.802 4.802
21,29 CANALETA METLICA 4X6 CMS ML 33.814 33.814 33.814 33.814 33.814 33.814 33.814 33.814 33.814 33.814
21,30 CANALETA METLICA 4X10 CMS ML 35.338 35.338 35.338 35.338 35.338 35.338 35.338 35.338 35.338 35.338
21,31 CANALETA METLICA 6X10 CMS ML 36.100 36.100 36.100 36.100 36.100 36.100 36.100 36.100 36.100 36.100
21,32 CANALETA PLSTICA 13X7 MM ML 23.543 23.543 23.543 23.543 23.543 23.543 23.543 23.543 23.543 23.543
21,33 CANALETA PLSTICA 20X12 MM ML 26.050 26.050 26.050 26.050 26.050 26.050 26.050 26.050 26.050 26.050
21,34 CANALETA PLSTICA 32X12 MM ML 27.102 27.102 27.102 27.102 27.102 27.102 27.102 27.102 27.102 27.102
21,35 CANALETA PLSTICA 40X60 MM ML 45.615 45.615 45.615 45.615 45.615 45.615 45.615 45.615 45.615 45.615
21,36 SWITCH 10/100/1000 24 PUERTOS UN 590.502 590.502 590.502 590.502 590.502 590.502 590.502 590.502 590.502 590.502
21,37 SWITCH 10/100/1000 16 PUERTOS UN 303.163 303.163 303.163 303.163 303.163 303.163 303.163 303.163 303.163 303.163
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
21,38 SWITCH 10/100/1000 8 PUERTOS UN CONSTRUCCIN
84.882 84.882 84.882 84.882 84.882 84.882 84.882 84.882 84.882 84.882
21,39 CABLE TELEFNICO 2 PARES ML 1.762 1.762 1.762 1.762 1.762 1.762 1.762 1.762 1.762 1.762
21,40 CABLE TELEFNICO 10 PARES ML 8.138 8.138 8.138 8.138 8.138 8.138 8.138 8.138 8.138 8.138
21,41 CABLE TELEFNICO 20 PARES ML 12.146 12.146 12.146 12.146 12.146 12.146 12.146 12.146 12.146 12.146
21,42 CABLE TELEFNICO 40 PARES ML 20.281 20.281 20.281 20.281 20.281 20.281 20.281 20.281 20.281 20.281
21,43 CABLE TELEVISIN RG6 ML 3.755 3.755 3.755 3.755 3.755 3.755 3.755 3.755 3.755 3.755
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.333 21.333 21.333 21.333 21.333 21.333 21.333 21.333 21.333 21.333
21,45 ACOMETIDA TELEFNICA 1" ML 31.064 31.064 31.064 31.064 31.064 31.064 31.064 31.064 31.064 31.064
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.545 18.545 18.545 18.545 18.545 18.545 18.545 18.545 18.545 18.545
CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE
21,47 ML 14.762 14.762 14.762 14.762 14.762 14.762 14.762 14.762 14.762 14.762
CERTIFICACIN)
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 596.313 596.313 596.313 596.313 596.313 596.313 596.313 596.313 596.313 596.313
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 87.285 87.285 87.285 87.285 87.285 87.285 87.285 87.285 87.285 87.285
1,3 CODO 45 PVC UNIN MECNICA 8" UN 491.601 491.601 491.601 491.601 491.601 491.601 491.601 491.601 491.601 491.601
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.049.270 1.049.270 1.049.270 1.049.270 1.049.270 1.049.270 1.049.270 1.049.270 1.049.270 1.049.270
1,5 CODO 90 PVC UNIN MECNICA 4" UN 120.283 120.283 120.283 120.283 120.283 120.283 120.283 120.283 120.283 120.283
1,6 CODO 90 PVC UNIN MECNICA 8" UN 732.718 732.718 732.718 732.718 732.718 732.718 732.718 732.718 732.718 732.718
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.576.886 1.576.886 1.576.886 1.576.886 1.576.886 1.576.886 1.576.886 1.576.886 1.576.886 1.576.886
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.574 12.574 12.574 12.574 12.574 12.574 12.574 12.574 12.574 12.574
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.511 15.511 15.511 15.511 15.511 15.511 15.511 15.511 15.511 15.511
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.479 19.479 19.479 19.479 19.479 19.479 19.479 19.479 19.479 19.479
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.321 21.321 21.321 21.321 21.321 21.321 21.321 21.321 21.321 21.321
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 25.563 25.563 25.563 25.563 25.563 25.563 25.563 25.563 25.563 25.563
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 25.563 25.563 25.563 25.563 25.563 25.563 25.563 25.563 25.563 25.563
1,14 TAPN PVC UNIN MECNICA 3" UN 102.802 102.802 102.802 102.802 102.802 102.802 102.802 102.802 102.802 102.802
1,15 TAPN PVC UNIN MECNICA 4" UN 119.074 119.074 119.074 119.074 119.074 119.074 119.074 119.074 119.074 119.074
1,16 TAPN PVC UNIN MECNICA 8" UN 368.505 368.505 368.505 368.505 368.505 368.505 368.505 368.505 368.505 368.505
1,17 TEE PVC UNIN MECNICA 2" UN 138.380 138.380 138.380 138.380 138.380 138.380 138.380 138.380 138.380 138.380
1,18 TEE PVC UNIN MECNICA 4" UN 228.117 228.117 228.117 228.117 228.117 228.117 228.117 228.117 228.117 228.117
1,19 TEE PVC UNIN MECNICA 8" UN 1.009.458 1.009.458 1.009.458 1.009.458 1.009.458 1.009.458 1.009.458 1.009.458 1.009.458 1.009.458
1,20 TEE PVC UNIN MECNICA 10" UN 1.163.046 1.163.046 1.163.046 1.163.046 1.163.046 1.163.046 1.163.046 1.163.046 1.163.046 1.163.046
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.642 13.642 13.642 13.642 13.642 13.642 13.642 13.642 13.642 13.642
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.037 12.037 12.037 12.037 12.037 12.037 12.037 12.037 12.037 12.037
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 29.732 29.732 29.732 29.732 29.732 29.732 29.732 29.732 29.732 29.732
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 117.955 117.955 117.955 117.955 117.955 117.955 117.955 117.955 117.955 117.955
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 175.654 175.654 175.654 175.654 175.654 175.654 175.654 175.654 175.654 175.654
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 28.705 28.705 28.705 28.705 28.705 28.705 28.705 28.705 28.705 28.705
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 98.885 98.885 98.885 98.885 98.885 98.885 98.885 98.885 98.885 98.885
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 146.535 146.535 146.535 146.535 146.535 146.535 146.535 146.535 146.535 146.535
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 59.822 59.822 59.822 59.822 59.822 59.822 59.822 59.822 59.822 59.822
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 240.940 240.940 240.940 240.940 240.940 240.940 240.940 240.940 240.940 240.940
1,32 UNIN REPARACION PVC 4" UN 69.797 69.797 69.797 69.797 69.797 69.797 69.797 69.797 69.797 69.797
1,33 UNIN REPARACIN PVC 8" UN 280.328 280.328 280.328 280.328 280.328 280.328 280.328 280.328 280.328 280.328
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 168.064 168.064 168.064 168.064 168.064 168.064 168.064 168.064 168.064 168.064
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 478.385 478.385 478.385 478.385 478.385 478.385 478.385 478.385 478.385 478.385
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.281.414 1.281.414 1.281.414 1.281.414 1.281.414 1.281.414 1.281.414 1.281.414 1.281.414 1.281.414
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.893.435 1.893.435 1.893.435 1.893.435 1.893.435 1.893.435 1.893.435 1.893.435 1.893.435 1.893.435

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.268 10.268 10.268 10.268 10.268 10.268 10.268 10.268 10.268 10.268
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.462 23.462 23.462 23.462 23.462 23.462 23.462 23.462 23.462 23.462
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 94.748 118.301 95.560 88.250 105.307 100.434 103.682 110.180 115.053 97.996
2,5 RELLENO TIPO 2 "RECEBO" M3 59.599 55.719 50.545 50.545 47.958 47.958 47.958 63.480 59.599 58.306
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 71.364 67.484 59.053 62.310 59.723 59.723 59.723 71.988 68.108 66.814
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 74.849 71.775 77.711 103.523 65.625 65.625 65.625 82.037 89.211 88.187
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 90.167 87.032 82.853 82.853 72.406 80.764 70.316 93.301 90.167 89.122
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 112.172 137.745 113.055 105.119 123.636 118.346 121.873 128.927 134.218 115.701

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 109.894 109.894 109.894 109.894 109.894 109.894 109.894 109.894 109.894 109.894
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
3,2 CODO 45 PVC ALCANTARILLADO 16" UN CONSTRUCCIN
1.145.856 1.145.856 1.145.856 1.145.856 1.145.856 1.145.856 1.145.856 1.145.856 1.145.856 1.145.856
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 143.617 143.617 143.617 143.617 143.617 143.617 143.617 143.617 143.617 143.617
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.327.195 1.327.195 1.327.195 1.327.195 1.327.195 1.327.195 1.327.195 1.327.195 1.327.195 1.327.195
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 925.036 925.036 925.036 925.036 925.036 925.036 925.036 925.036 925.036 925.036
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 61.896 61.896 61.896 61.896 61.896 61.896 61.896 61.896 61.896 61.896
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 109.091 109.091 109.091 109.091 109.091 109.091 109.091 109.091 109.091 109.091
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 257.601 257.601 257.601 257.601 257.601 257.601 257.601 257.601 257.601 257.601
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 413.576 413.576 413.576 413.576 413.576 413.576 413.576 413.576 413.576 413.576
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 109.137 109.137 109.137 109.137 109.137 109.137 109.137 109.137 109.137 109.137
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 109.137 109.137 109.137 109.137 109.137 109.137 109.137 109.137 109.137 109.137
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608 257.608
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 413.576 413.576 413.576 413.576 413.576 413.576 413.576 413.576 413.576 413.576
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 415.871 415.871 415.871 415.871 415.871 415.871 415.871 415.871 415.871 415.871
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 674.912 674.912 674.912 674.912 674.912 674.912 674.912 674.912 674.912 674.912
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.083.047 1.083.047 1.083.047 1.083.047 1.083.047 1.083.047 1.083.047 1.083.047 1.083.047 1.083.047
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 66.875 66.875 66.875 66.875 66.875 66.875 66.875 66.875 66.875 66.875
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 348.093 348.093 348.093 348.093 348.093 348.093 348.093 348.093 348.093 348.093
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 389.608 389.608 389.608 389.608 389.608 389.608 389.608 389.608 389.608 389.608
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.079.146 1.079.146 1.079.146 1.079.146 1.079.146 1.079.146 1.079.146 1.079.146 1.079.146 1.079.146
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 63.290 63.554 63.299 63.217 63.408 63.354 63.390 63.463 63.517 63.327
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 315.613 315.613 315.613 315.613 315.613 315.613 315.613 315.613 315.613 315.613
3,25 TUBERA PVC ALCANTARILLADO 8" ML 47.936 47.936 47.936 47.936 47.936 47.936 47.936 47.936 47.936 47.936
3,26 TUBERA PVC ALCANTARILLADO 10" ML 67.799 67.799 67.799 67.799 67.799 67.799 67.799 67.799 67.799 67.799
3,27 TUBERA PVC ALCANTARILLADO 12" ML 97.843 97.843 97.843 97.843 97.843 97.843 97.843 97.843 97.843 97.843
3,28 TUBERA PVC ALCANTARILLADO 16" ML 150.193 150.193 150.193 150.193 150.193 150.193 150.193 150.193 150.193 150.193
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 241.388 241.388 241.388 241.388 241.388 241.388 241.388 241.388 241.388 241.388
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 350.660 350.660 350.660 350.660 350.660 350.660 350.660 350.660 350.660 350.660
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 443.642 443.642 443.642 443.642 443.642 443.642 443.642 443.642 443.642 443.642
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 583.270 583.270 583.270 583.270 583.270 583.270 583.270 583.270 583.270 583.270
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 802.120 802.120 802.120 802.120 802.120 802.120 802.120 802.120 802.120 802.120

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4,1 UN 644.571 662.310 645.182 639.677 652.523 648.852 651.299 656.193 659.863 647.017
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
4,2 ML 624.733 636.406 625.135 621.513 629.966 627.551 629.160 632.381 634.796 626.343
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4,3 UN 684.792 696.618 685.199 681.529 690.093 687.646 689.277 692.540 694.987 686.423
REFUERZO (INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4,4 UN 766.007 788.181 766.772 759.890 775.947 771.359 774.418 780.535 785.123 769.065
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4,5 ML 887.465 903.902 888.031 882.930 894.833 891.433 893.699 898.235 901.635 889.732
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4,6 UN 791.486 807.747 792.047 787.000 798.776 795.411 797.654 802.140 805.504 793.729
REFUERZO (INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 948.050 956.660 948.346 945.672 951.909 950.127 951.316 953.690 955.471 949.235
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.379.652 1.404.650 1.380.513 1.372.752 1.390.857 1.385.685 1.389.135 1.396.029 1.401.200 1.383.095
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.895.486 1.942.464 1.897.105 1.882.526 1.916.545 1.906.826 1.913.305 1.926.264 1.935.984 1.901.965
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.525.824 2.603.914 2.528.515 2.504.282 2.560.830 2.544.674 2.555.444 2.576.986 2.593.142 2.536.593
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.753.499 1.753.499 1.753.499 1.753.499 1.753.499 1.753.499 1.753.499 1.753.499 1.753.499 1.753.499
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.710.230 3.710.230 3.710.230 3.710.230 3.710.230 3.710.230 3.710.230 3.710.230 3.710.230 3.710.230
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 132.324 132.800 132.340 132.192 132.537 132.439 132.505 132.636 132.735 132.390
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)

5 ANDENES Y SARDINELES
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 CONSTRUCCIN
71.068 72.445 71.115 70.688 71.685 71.400 71.590 71.970 72.255 71.258
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 84.016 85.393 84.063 83.636 84.633 84.348 84.538 84.918 85.203 84.206
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 54.282 57.451 54.391 53.407 55.702 55.047 55.484 56.358 57.014 54.719
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 58.764 61.868 58.871 57.907 60.156 59.513 59.941 60.798 61.440 59.192
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 58.886 61.892 58.989 58.056 60.234 59.612 60.026 60.856 61.478 59.300
5,6 BORDE SEPARADOR VERDE A-170 ML 242.790 243.266 242.806 242.658 243.003 242.905 242.971 243.102 243.201 242.856
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.598 17.979 17.611 17.493 17.769 17.690 17.742 17.847 17.926 17.651
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 38.824 41.057 38.900 38.207 39.825 39.363 39.671 40.287 40.749 39.132
5,9 CAUELA PREFABRICADA TIPO A-120 ML 79.680 79.934 79.688 79.609 79.794 79.741 79.776 79.846 79.899 79.715
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 532.475 539.244 532.708 530.607 535.509 534.109 535.042 536.910 538.310 533.408
5,11 LOSETA PREFABRICADA A-40 M2 60.002 61.093 60.040 59.702 60.491 60.266 60.416 60.717 60.942 60.153
5,12 LOSETA PREFABRICADA A-60 M2 86.994 88.085 87.032 86.694 87.483 87.258 87.408 87.709 87.934 87.145
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 32.168 33.410 32.211 31.825 32.724 32.468 32.639 32.981 33.238 32.339

5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 51.954 54.467 52.041 51.261 53.081 52.561 52.908 53.601 54.121 52.301
5,15 SARDINEL PREFABRICADO A-10 ML 98.121 97.778 96.736 96.657 96.444 96.391 96.426 96.894 98.340 97.957
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 57.652 58.311 57.674 57.470 57.947 57.811 57.902 58.084 58.220 57.743

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 194.191 195.669 194.242 193.783 194.853 194.547 194.751 195.159 195.465 194.395
6,2 BANCA EN CONCRETO M-30 UN 637.193 639.262 637.264 636.622 638.120 637.692 637.978 638.549 638.977 637.478
6,3 BOLARDO M-63 ALTO/HIERRO UN 205.000 205.310 205.010 204.914 205.139 205.075 205.117 205.203 205.267 205.043
6,4 BOLARDO M-60 CONCRETO UN 154.999 156.773 155.060 154.510 155.794 155.427 155.672 156.161 156.528 155.244
6,5 BOLARDO M-61 BAJO/CONCRETO UN 156.763 158.537 156.824 156.273 157.558 157.191 157.436 157.925 158.292 157.007
6,6 BOLARDO M-62 BAJO/HIERRO UN 183.771 185.630 183.835 183.259 184.605 184.220 184.476 184.989 185.374 184.028
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 56.823 57.877 56.859 56.532 57.296 57.077 57.223 57.514 57.732 56.968
6,8 BORDILLO PREFABRICADO A-80 ML 65.857 67.038 65.898 65.532 66.386 66.142 66.305 66.631 66.875 66.020
6,9 CANECA M-120 UN 297.962 298.225 297.971 297.889 298.080 298.025 298.062 298.134 298.189 297.998
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 785.434 786.321 785.465 785.190 785.832 785.648 785.771 786.015 786.199 785.557
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.223.171 3.223.762 3.223.191 3.223.008 3.223.436 3.223.314 3.223.395 3.223.558 3.223.681 3.223.252
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.315.738 3.316.329 3.315.758 3.315.575 3.316.003 3.315.881 3.315.962 3.316.125 3.316.248 3.315.819
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 463.693 464.313 463.715 463.523 463.971 463.843 463.928 464.099 464.228 463.779
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 614.824 617.302 614.909 614.140 615.935 615.422 615.764 616.448 616.960 615.166
6,15 BANCA EN MADERA M-50 UN 509.972 509.972 509.972 509.972 509.972 509.972 509.972 509.972 509.972 509.972
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 236.554 237.441 236.585 236.309 236.952 236.768 236.890 237.135 237.319 236.676
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 549.583 550.242 549.606 549.402 549.879 549.742 549.833 550.015 550.151 549.674
6,18 POSTE HISTRICO M-131 UN 6.129.009 6.133.444 6.129.162 6.127.786 6.130.997 6.130.080 6.130.691 6.131.915 6.132.832 6.129.621

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.852 3.852 3.852 3.852 3.852 3.852 3.852 3.852 3.852 3.852
7,2 MARCA VIAL CON PINTURA EN FRO M2 41.383 41.383 41.383 41.383 41.383 41.383 41.383 41.383 41.383 41.383
7,3 SEAL DOBLE DE CICLORUTA UN 299.097 299.335 299.105 299.031 299.204 299.154 299.187 299.253 299.302 299.130
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 471.969 473.208 472.012 471.627 472.525 472.268 472.439 472.781 473.037 472.140
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 224.217 224.456 224.225 224.152 224.324 224.275 224.308 224.373 224.423 224.250
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 238.105 238.344 238.113 238.040 238.212 238.163 238.196 238.261 238.311 238.138
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 248.622 248.861 248.630 248.557 248.729 248.680 248.713 248.778 248.828 248.655
7,8 TACHAS REFLECTIVAS UN 12.938 12.938 12.938 12.938 12.938 12.938 12.938 12.938 12.938 12.938
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.817 13.817 13.817 13.817 13.817 13.817 13.817 13.817 13.817 13.817
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7,10 UN 112.314 112.314 112.314 112.314 112.314 112.314 112.314 112.314 112.314 112.314
SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
SOBRANTES A UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
PRESTAMOS, SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y
2,1 210.1.1 M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
PRSTAMOS

2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.246 34.246 34.246 34.246 34.246 34.246 34.246 34.246 34.246 34.246

EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y


2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2,7 230.1 M2 463 463 463 463 463 463 463 463 463 463
EXISTENTE
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2,10 600.2 M3 62.834 62.834 62.834 62.834 62.834 62.834 62.834 62.834 62.834 62.834
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2,11 600.3 M3 77.103 77.103 77.103 77.103 77.103 77.103 77.103 77.103 77.103 77.103
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 148.323 143.370 136.766 136.766 133.464 133.464 133.464 136.766 148.323 146.672
3,3 330.1 BASE GRANULAR M3 161.096 156.143 149.539 149.539 146.237 146.237 146.237 149.539 161.096 159.445
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.073 3.073 3.073 3.073 3.073 3.073 3.073 3.073 3.073 3.073
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.071 1.071 1.071 1.071 1.071 1.071 1.071 1.071 1.071 1.071
PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION
3,7 461.1 M3 218.128 224.443 218.346 216.386 220.959 219.652 220.523 222.265 223.572 218.999
ASFLTICA
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 63.639 65.323 63.697 63.175 64.394 64.046 64.278 64.743 65.091 63.872
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
3,9 450.1 P
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
M3 CONSTRUCCIN
514.101 512.513 526.801 514.101 501.401 504.576 498.226 539.501 522.038 509.338
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3,10 450.2 P M3 540.876 539.288 553.576 540.876 528.176 531.351 525.001 566.276 548.813 536.113
ASFLTICO)
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3,11 450.9 P M3 561.872 560.284 574.572 561.872 549.172 552.347 545.997 587.272 569.809 557.109
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3,12 450.3 P M3 548.313 546.726 561.013 548.313 535.613 538.788 532.438 573.713 556.251 543.551
ASFLTICO)
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 301.866 296.913 290.309 290.309 287.007 287.007 287.007 290.309 301.866 300.215
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 288.068 283.115 276.511 276.511 273.209 273.209 273.209 276.511 288.068 286.417
3,15 311.1 AFIRMADO M3 76.347 71.394 61.533 64.790 61.488 61.488 61.488 78.043 73.090 71.439
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 11.411 11.859 11.426 11.287 11.612 11.519 11.581 11.705 11.797 11.473
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.611 4.836 4.619 4.549 4.712 4.665 4.696 4.758 4.805 4.642
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE
3,18 500.1 M3 613.500 641.589 614.468 605.751 626.092 620.280 624.154 631.903 637.715 617.374
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE
3,19 500.1 M3 644.466 673.813 645.477 636.369 657.621 651.550 655.597 663.693 669.765 648.513
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE
3,20 500.1 M3 665.024 695.195 666.064 656.701 678.549 672.307 676.468 684.791 691.033 669.185
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE
3,21 *** ML 6.678 6.678 6.678 6.678 6.678 6.678 6.678 6.678 6.678 6.678
LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 121.725 117.534 111.946 111.946 97.976 109.152 95.182 125.916 121.725 120.328

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 875.768 907.631 876.866 866.978 890.051 883.459 887.853 896.643 903.236 880.162
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 756.354 787.689 757.435 747.710 770.401 763.918 768.240 776.884 783.366 760.676
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 800.446 833.022 801.570 791.460 815.050 808.310 812.803 821.790 828.528 804.939
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 548.564 577.484 549.561 540.586 561.528 555.545 559.533 567.511 573.495 552.552
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 640.047 670.113 641.083 631.753 653.525 647.305 651.451 659.745 665.965 644.194
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 547.392 577.253 548.421 539.154 560.778 554.600 558.718 566.956 573.134 551.510
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 638.829 669.872 639.899 630.264 652.745 646.322 650.604 659.168 665.590 643.110
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 699.269 729.129 700.298 691.030 712.654 706.476 710.595 718.832 725.011 703.386
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 566.221 597.264 567.291 557.656 580.136 573.714 577.995 586.559 592.982 570.502
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 741.100 772.143 742.170 732.535 755.016 748.593 752.875 761.439 767.862 745.381
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE
4,11 650 P KG 11.318 11.318 11.318 11.318 11.318 11.318 11.318 11.318 11.318 11.318
DE ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE
4,12 650 P KG 14.522 14.522 14.522 14.522 14.522 14.522 14.522 14.522 14.522 14.522
DE ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.707 1.707 1.707 1.707 1.707 1.707 1.707 1.707 1.707 1.707
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M,
4,14 621.1 ML 2.569.237 2.569.237 2.569.237 2.569.237 2.569.237 2.569.237 2.569.237 2.569.237 2.569.237 2.569.237
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN
4,15 621.1 P MANUAL (INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, ML 3.933.114 3.987.616 3.934.992 3.918.078 3.957.546 3.946.270 3.953.786 3.968.822 3.980.098 3.940.630
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4,16 621.2 M3 1.650.404 1.679.969 1.651.423 1.642.247 1.663.657 1.657.540 1.661.618 1.669.774 1.675.891 1.654.481
REFUERZO)
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 82.910 82.910 82.910 82.910 82.910 82.910 82.910 82.910 82.910 82.910
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 343.589 347.137 343.711 342.610 345.179 344.445 344.935 345.913 346.647 344.078
4,19 632 P BARANDA METLICA ML 402.344 402.344 402.344 402.344 402.344 402.344 402.344 402.344 402.344 402.344
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.095 16.095 16.095 16.095 16.095 16.095 16.095 16.095 16.095 16.095
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 472.480 500.523 464.435 456.790 477.273 470.840 475.128 493.894 497.278 473.748
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 91.688 87.497 92.628 120.194 79.115 79.115 79.115 97.248 107.027 105.630
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 74.352 69.780 63.684 63.684 60.636 60.636 60.636 78.924 74.352 72.828
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 370.389 401.677 371.467 361.758 384.415 377.941 382.256 390.888 397.361 374.704
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 361.617 378.680 358.702 352.934 361.314 361.532 359.015 375.319 377.640 363.673
CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA
4,26 630.7 M3 370.058 387.121 367.142 361.374 369.754 369.972 367.456 383.759 386.081 372.113
ELEVACIONES
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 CONSTRUCCIN
374.644 391.232 371.712 366.091 374.127 374.444 371.861 388.034 390.257 376.634
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 383.084 399.672 380.152 374.532 382.567 382.884 380.302 396.475 398.698 385.074
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 498.872 529.360 499.922 490.460 512.538 506.231 510.435 518.846 525.154 503.076
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 588.601 620.296 589.693 579.857 602.809 596.251 600.622 609.367 615.924 592.972
4,31 681.1 GAVIN M3 203.372 199.372 194.038 194.038 180.703 191.371 178.036 207.373 203.372 202.039
4,32 681.1 GAVIN MALLA PVC M3 207.337 203.336 198.002 198.002 184.667 195.335 182.000 211.337 207.337 206.003
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4,33 672.1 ML 40.554 42.426 40.619 40.038 41.393 41.006 41.264 41.780 42.168 40.812
2500 PSI
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE
4,34 672.1 ML 15.729 16.664 15.761 15.470 16.148 15.955 16.084 16.342 16.535 15.858
E, 2500 PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO
4,35 *** M2 9.614 9.614 9.614 9.614 9.614 9.614 9.614 9.614 9.614 9.614
(RESISTENCIA LTIMA 25 KN)

4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.706 13.706 13.706 13.706 13.706 13.706 13.706 13.706 13.706 13.706

4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.445 18.445 18.445 18.445 18.445 18.445 18.445 18.445 18.445 18.445

SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO


4,38 *** M2 22.111 22.111 22.111 22.111 22.111 22.111 22.111 22.111 22.111 22.111
(RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,39 *** M2 28.411 28.411 28.411 28.411 28.411 28.411 28.411 28.411 28.411 28.411
(RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800
4,40 *** M2 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000
4,41 *** M2 7.862 7.862 7.862 7.862 7.862 7.862 7.862 7.862 7.862 7.862
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500
4,42 *** M2 8.171 8.171 8.171 8.171 8.171 8.171 8.171 8.171 8.171 8.171
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700
4,43 *** M2 5.822 5.822 5.822 5.822 5.822 5.822 5.822 5.822 5.822 5.822
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100
4,44 *** M2 8.767 8.767 8.767 8.767 8.767 8.767 8.767 8.767 8.767 8.767
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400
4,45 *** M2 7.150 7.150 7.150 7.150 7.150 7.150 7.150 7.150 7.150 7.150
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400
4,46 *** M2 8.767 8.767 8.767 8.767 8.767 8.767 8.767 8.767 8.767 8.767
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000
4,47 *** M2 16.844 16.844 16.844 16.844 16.844 16.844 16.844 16.844 16.844 16.844
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO
4,48 661.1 ML 599.720 600.128 599.734 599.608 599.903 599.819 599.875 599.987 600.072 599.776
=36" CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE,
4,49 660.3 ML 345.657 352.329 345.886 343.816 348.648 347.267 348.187 350.028 351.408 346.577
DIMETRO 600 MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO,
4,50 *** ML 839.330 839.330 839.330 839.330 839.330 839.330 839.330 839.330 839.330 839.330
DIMETRO 36"
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 142.465 137.703 128.222 131.353 128.178 128.178 128.178 144.097 139.334 137.747
SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000
4,52 640.1 KG 4.212 4.212 4.212 4.212 4.212 4.212 4.212 4.212 4.212 4.212
PSI
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4,53 *** ML 81.722 81.722 81.722 81.722 81.722 81.722 81.722 81.722 81.722 81.722
INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4,54 *** ML 124.498 124.498 124.498 124.498 124.498 124.498 124.498 124.498 124.498 124.498
INSTALACIN)
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 508.916 540.612 510.008 500.172 523.124 516.567 520.938 529.682 536.239 513.288
4,56 682.1 P COLCHONETA RENO M3 218.433 214.432 209.098 209.098 195.763 206.431 193.096 222.433 218.433 217.099
4,57 *** TRINCHO EN MADERA M2 64.647 64.647 64.647 64.647 64.647 64.647 64.647 64.647 64.647 64.647

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.852 3.852 3.852 3.852 3.852 3.852 3.852 3.852 3.852 3.852
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SABANA OCCIDENTE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Bojac Cota El_Rosal Facatativ Funza Madrid Mosquera Subachoque Tenjo Zipacn
u
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 CONSTRUCCIN
41.383 41.383 41.383 41.383 41.383 41.383 41.383 41.383 41.383 41.383
5,3 730.3 TOPE DEFENSA METLICA UN 79.703 79.703 79.703 79.703 79.703 79.703 79.703 79.703 79.703 79.703
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 66.301 66.301 66.301 66.301 66.301 66.301 66.301 66.301 66.301 66.301
5,5 730.1 DEFENSA METLICA ML 141.609 143.112 141.661 141.195 142.283 141.972 142.179 142.594 142.905 141.817
SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS
5,6 701.1 UN 12.938 12.938 12.938 12.938 12.938 12.938 12.938 12.938 12.938 12.938
UNIDIRECCIONALES

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 803 803 803 803 803 803 803 803 803 803
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A =
6,2 801.6 36", INCLUYE RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6,5 801.1 HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
KM)
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.697 14.697 14.697 14.697 14.697 14.697 14.697 14.697 14.697 14.697
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 23.787 23.787 23.787 23.787 23.787 23.787 23.787 23.787 23.787 23.787
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.436 9.436 9.436 9.436 9.436 9.436 9.436 9.436 9.436 9.436

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.814.719 1.809.493
1,2 CAMPAMENTO 9 M2 UN 1.062.317 1.059.704
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.086 13.086
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 14.667 14.667
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 16.977 16.977
1,6 CERCA EN TABLA H=2.30 M ML 59.881 59.881
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 41.931 41.873
1,8 CERCA EN TELA VERDE H = 2.10 M ML 19.430 19.373
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 818.114 817.995
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 9.621 9.621
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.426 3.426
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.442.043 2.442.043
1,44 RED TELEFNICA PROVISIONAL UN 226.932 226.932
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 60.621 60.621
2,2 BASE ARENA CEMENTO 1:20 M3 168.947 163.583
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
2,4 DEMOLICIN CIMIENTO ENTERRADO CONSTRUCCIN M3 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 20.203 20.203
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 568.532 562.930
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 570.037 564.215
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 531.578 526.126
2,9 PILOTE DE MADERA D=20 CM ML 47.319 47.319
2,10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 145.733 145.733
2,11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 180.181 180.181
2,12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 221.839 221.839
2,13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 277.917 277.917
2,14 PILOTE HINCADO 25X25 ML 96.571 96.172
2,15 PILOTE HINCADO 30X30 ML 118.271 117.694
2,16 DADOS EN CONCRETO 3500PSI M3 518.217 512.765
2,17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 87.030 87.030

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 35.136 35.103
3,2 SIFN EN PVC 6" UN 179.873 179.840
3,3 CAJA DE INSPECCIN DE 100X100 UN 394.161 395.935
3,4 CAJA DE INSPECCIN DE 40X40 UN 203.140 202.860
3,5 CAJA DE INSPECCIN DE 60X60 UN 229.626 229.103
3,6 CAJA DE INSPECCIN DE 80X80 UN 299.681 298.441
3,7 DUCTO ELCTRICO PVC 4" ML 97.480 97.525
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.162.855 1.163.307
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 105.273 104.905
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 66.165 65.971
3,11 TUBERA DRENAJE PVC 110 ML 25.433 25.326
3,12 TUBERA DRENAJE PVC 160 ML 40.863 40.756
3,13 TUBERA DRENAJE PVC 200 ML 53.522 53.372
3,14 TUBERA DRENAJE PVC 250 ML 73.148 72.977
3,15 TUBERA DRENAJE PVC 315 ML 101.130 100.980
3,16 SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 867.013 865.300
3,17 SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1.222.394 1.218.967
3,18 SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1.587.254 1.580.400

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 38.592 38.592
4,2 CASETN DE LONA 0.80X0.70 M2 50.816 50.816
4,3 COLUMNAS 3500 PSI M3 722.830 717.378
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 202.620 199.779
4,5 ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 87.915 87.385

4,6 ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 103.523 102.888
4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 116.273 115.427
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 122.636 121.736
4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 140.026 138.914
4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 155.535 154.264
4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 172.532 171.103
4,12 ENTREPISO VIGUETA PLACA M2 90.819 90.725
4,13 ESCALERA MACIZA 3500 PSI M3 857.427 851.975
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 86.693 86.613
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 71.157 70.612
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M CONSTRUCCIN M2 79.719 79.052
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 92.592 91.756
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 630.002 624.550
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 45.251 45.082
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 250.699 248.264
4,21 ACERO FIGURADO 37000 PSI KG 3.816 3.816
4,22 ACERO FIGURADO 60000 PSI KG 4.002 4.002
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.677 5.677
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 767.803 762.351
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 694.849 688.882
4,26 VIGA AREA 3500 PSI M3 762.931 757.479
4,27 VIGA CINTA 3500 PSI M3 743.952 738.500
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 942.359 936.907
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 270.411 264.430

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 27.172 27.026
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 46.370 46.224
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 32.500 32.467
5,4 ARCOS EN LADRILLO PRENSADO ML 152.245 152.178
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 40.358 40.190
5,6 DINTELES EN BLOQUE 0.15 M ML 24.938 24.858
5,7 ENCHAPES LADRILLO PRENSADO M2 90.447 90.314
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 81.418 80.855
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 84.229 84.229
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 49.597 49.597
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 81.168 81.168
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 48.066 48.066
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 93.774 93.774
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 55.617 55.617
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 104.161 104.161
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 60.810 60.810
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 37.426 37.359
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 22.786 22.753
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 48.623 48.578
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 29.391 29.369
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 54.717 54.672
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 33.074 33.052
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 90.668 90.445
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 53.907 53.796
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 34.379 34.334
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 20.948 20.926
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 68.191 68.102
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 41.330 41.285
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 80.457 80.377
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 49.047 49.007
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 166.095 165.782
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 100.416 100.260
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 82.308 82.141
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 49.972 49.889
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 42.989 42.889
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 26.309 26.259
5,37 MURO TOLETE COMN 0.06 M M2 31.164 31.119
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
5,38 MURO TOLETE COMN 0.06 M (LINEAL) CONSTRUCCIN ML 19.081 19.059
5,39 MURO TOLETE COMN 0.12 M M2 46.785 46.696
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 28.852 28.807
5,41 MURO TOLETE COMN 0.25 M M2 90.190 90.056
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 55.244 55.177
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 65.913 65.824
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 40.002 39.957
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 138.126 137.814
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 84.513 84.357
5,47 REMATES LADRILLO PRENSADO ML 29.297 29.264
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 33.515 33.396
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 56.660 56.500
5,50 LAVADA DE FACHADA M2 4.933 4.933
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 46.706 46.560
5,52 DOVELA, GROUTING 3000 PSI ML 10.001 10.001
5,53 ANCLAJE 3/8" L=30CM UN 13.097 13.097
5,54 ANCLAJE 1/2" L=50CM UN 17.082 17.082
5,55 ANCLAJE 5/8" L=70CM UN 23.721 23.721
5,56 ANCLAJE 3/4" L=70CM UN 35.113 35.113
5,57 ANCLAJE 1" L= 70CM UN 4.404 4.363

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.130 15.130
6,2 FILOS O DILATACIONES B/PLACA ML 5.309 5.276
6,3 FILOS O DILATACIONES S/MURO ML 6.429 6.396
6,4 GOTERA EN MORTERO 1:4 ML 7.601 7.567
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.287 6.287
6,6 MALLA BAJO ENTRAMADO M2 12.775 12.775
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 22.632 22.515
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.765 13.707
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 19.489 19.395
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 11.901 11.854
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 18.958 18.841
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.635 11.577
6,13 PAETE CULATAS 1:4, E=2 CM M2 19.489 19.395
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 11.901 11.854
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 19.995 19.912
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.153 12.112
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.248 16.177
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.008 9.973
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 15.844 15.755
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.806 9.762
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 20.224 20.130
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.250 12.203
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 19.693 19.576
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 11.984 11.926
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.420 16.331
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.077 10.033
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 20.532 20.416
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 12.786 12.727

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 24.692 24.558
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
7,2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA CONSTRUCCIN
IMPERMEABLE) M2 75.120 74.839
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 50.567 50.567
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 20.381 20.381
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 31.921 31.921
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 73.698 73.698
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 57.851 57.851
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 33.924 33.924
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 77.202 77.202
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 92.060 92.060
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 134.982 134.982
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 53.820 53.820
7,13 CANAL PVC AMAZONAS ML 75.049 75.049
7,14 CANAL PVC RAINGO ML 68.349 68.349
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 120.146 120.146
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 70.011 70.011
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 51.571 51.571
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 29.924 29.924
7,19 TEJA DE BARRO M2 54.555 54.388
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 42.973 42.973
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 39.432 39.432
7,22 TEJA FIBROCEMENTO N4 M2 33.667 33.667
7,23 TEJA FIBROCEMENTO No. 6 M2 32.930 32.930
7,24 TEJA FIBROCEMENTO No. 8 M2 33.173 33.173
7,25 TEJA TERMOACSTICA M2 46.354 46.354
7,26 TEJA PLSTICA No.6 M2 40.835 40.835
7,27 TEJA ESPAOLA ETERNIT M2 74.269 74.269
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 136.555 136.555
7,29 TEJA SIN TRASLAPO M2 61.607 61.607
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 39.592 39.592
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 30.866 30.866
7,32 ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 53.163 53.163
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 18.659 18.659
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 22.312 22.312
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 24.073 24.073
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 30.816 30.816
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 20.510 20.510
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 48.199 48.199
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 322.284 322.284
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 381.559 381.559
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 247.313 247.313
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 263.542 263.542

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 390.762 384.986
8,2 CONCRETO 3500 PSI M3 340.428 335.135
8,3 CONCRETO 3000 PSI M3 338.515 333.077
8,4 CONCRETO 2500 PSI M3 298.049 292.428
8,5 CONCRETO 2000 PSI M3 276.104 270.386
8,6 CONCRETO 1500 PSI M3 248.266 242.459
8,7 MORTERO SECO 1:10 M3 209.605 205.007
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 403.157 398.693
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 377.861 372.304
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 433.219 428.022
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA CONSTRUCCIN M3 637.339 632.142

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 112.932 112.932
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.599 3.566
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 126.870 126.870
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 154.813 154.813
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 222.913 222.913
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 247.977 247.977
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 273.072 273.072
9,8 HOJA PUERTA FORTEC 0.81 UN 181.042 181.042
9,9 HOJA PUERTA FORTEC 0.91 UN 205.148 205.148
9,10 HOJA PUERTA FORTEC 1.50 UN 301.568 301.568
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 114.753 114.753
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 152.116 152.116
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 168.990 168.990
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 429.326 429.326
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 38.757 38.757
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 24.430 24.430
9,17 VENTANERA EN MADERA CEDRO MACHO M2 91.673 91.673
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 110.017 110.017
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 85.550 85.550
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 26.782 26.782
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 26.782 26.782
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 25.408 25.408
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 38.963 38.963
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 48.093 48.093
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 57.832 57.832
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 69.396 69.396
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 324.904 324.904
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 227.519 227.519
9,29 VIDRIO TRANSPARENTE 3 MM M2 31.051 31.051
9,30 VIDRIO TRANSPARENTE 4 MM M2 39.572 39.572
9,31 VIDRIO TRANSPARENTE 5 MM M2 48.093 48.093
9,32 VIDRIO TRANSPARENTE 6 MM M2 60.266 60.266

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 69.899 69.899
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 192.311 192.311
10,3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML 74.333 74.333
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 134.168 134.168
10,5 MARCO TAPA CAJA DE INSPECCIN UN 125.695 125.695
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 82.550 82.550
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 193.936 193.936
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 101.379 101.379
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.103 6.103
10,10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 92.756 92.756
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 38.157 38.157
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 489.487 489.487
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 176.750 176.750
10,14 PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 199.665 199.665
10,15 DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 447.118 447.118
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 119.273 119.273
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
10,17 PUERTA CORTINA INCLUYE ESMALTE CONSTRUCCIN M2 356.579 356.579
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.567 5.567
10,19 VENTANA EN ALUMINIO CORREDIZA M2 251.640 251.640
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 113.283 113.283
10,21 REJILLA PISO 0.30 M M2 79.127 79.127
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 81.881 81.881
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10,23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA KG 9.872 9.872
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,
10,24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA KG 10.916 10.916
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10,25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 8.747 8.747
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 205.201 205.201
11,2 ACOMETIDA EN PVC 3/4" 5M UN 246.331 246.331
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 20.381 20.381
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 31.921 31.921
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 30.758 30.758
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 39.305 39.305
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 80.682 80.682
11,8 CONEXIN TANQUE ELEVADO PVC UN 206.427 206.427
11,9 INSTALACIN APARATO SANITARIO UN 41.774 41.774
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 32.583 32.583
11,13 NIPLE PASAMURO 2" UN 62.435 62.435
11,14 NIPLE PASAMURO 4" UN 93.153 93.153
11,15 PUNTO AGUA CALIENTE CPVC UN 78.160 78.160
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 57.625 57.625
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 61.153 61.153
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 77.243 77.243
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 61.864 61.864
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 76.921 76.921
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 82.139 82.139
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 67.539 67.539
11,23 RED SUMINISTRO CPVC 1/2" ML 11.499 11.499
11,24 RED SUMINISTRO CPVC 3/4" ML 16.095 16.095
11,25 RED SUMINISTRO PVC 1 1/2" ML 21.033 21.033
11,26 RED SUMINISTRO PVC 1" ML 13.051 13.051
11,27 RED SUMINISTRO PVC 1/2" ML 7.836 7.836
11,28 RED SUMINISTRO PVC 2 1/2" ML 46.616 46.616
11,29 RED SUMINISTRO PVC 2" ML 29.897 29.897
11,30 RED SUMINISTRO PVC 3/4" ML 9.786 9.786
11,31 RED SANITARIA PVC-S 2" ML 23.182 23.182
11,32 RED SANITARIA PVC-S 3" ML 32.090 32.090
11,33 RED SANITARIA PVC-S 4" ML 43.498 43.498
11,34 RED SANITARIA PVC-S 6" ML 80.809 80.809
11,35 REGISTRO 1" UN 98.591 98.591
11,36 REGISTRO 1/2" UN 55.040 55.040
11,37 REGISTRO 3/4" UN 69.890 69.890
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
11,38 REGISTRO 1 1/2" CONSTRUCCIN UN 168.255 168.255
11,39 REGISTRO 2 1/2" UN 346.062 346.062
11,40 REGISTRO 2" UN 256.049 256.049
11,41 REVENTILACIN 2" ML 16.215 16.215
11,42 REVENTILACIN 3" ML 20.444 20.444
11,43 TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 158.916 158.916
11,44 TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 257.849 257.849
11,45 TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 428.475 428.475
11,46 TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 37.154 37.154
11,47 TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 43.757 43.757
11,48 TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 56.568 56.568
11,49 TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 63.696 63.696
11,50 TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 81.984 81.984
11,51 TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 95.801 95.801
11,52 TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 141.986 141.986
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 57.358 57.358
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 57.586 57.586
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 36.930 36.930
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 45.318 45.318
11,57 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 3.826 3.826
11,58 PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 5.999 5.999
11,59 GABINETE TIPO III UN 929.691 929.691
11,60 GABINETE TIPO I UN 712.985 712.985
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.365.145 2.365.145
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 1.973.117 1.973.117
11,63 VLVULA MARIPOSA 3" UN 578.786 578.786
11,64 VLVULA MARIPOSA 4" UN 746.559 746.559
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 284.978 284.978

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 332.162 332.162
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 52.766 52.766
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 62.361 62.361
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 69.366 69.366
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 81.565 81.565
12,6 SALIDA TELFONO PVC COMPLETA UN 49.670 49.670
12,7 SALIDA TIMBRE PVC COMPLETA UN 56.569 56.569
12,8 STRIP TELEFNICO 10 PARES UN 131.255 131.255
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 50.958 50.958
12,10 SALIDA TRIFSICA PVC COMPLETA UN 116.958 116.958
12,11 SALIDA T.V PVC COMPLETA. UN 70.063 70.063
12,12 SALIDA BIFSICA C.N. UN 41.530 41.530
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 87.843 87.843
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 375.376 375.376
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 499.348 499.348
12,16 TUBERA PVC CONDUIT 1/2" ML 3.231 3.231
12,17 TUBERA PVC CONDUIT 3/4" ML 4.269 4.269
12,18 TUBERA PVC CONDUIT 1" ML 6.633 6.633
12,19 TUBERA PVC CONDUIT 1 1/2" ML 11.872 11.872
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 249.139 249.139
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 70.613 70.613
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 95.222 95.222
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 39.479 39.479
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG CONSTRUCCIN UN 1.283.358 1.283.358
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 951.643 951.643
12,26 POSTE METLICO 6M UN 1.178.867 1.178.867
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 546.185 546.185
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 100.520 100.520
12,29 LUMINARIA 70W SODIO UN 458.013 458.013
12,30 LUMINARIA 150W SODIO UN 572.664 572.664
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.510.343 1.510.343
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.112.607 1.112.607

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 36.687 36.487
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 36.142 35.942
13,3 ALISTADO PARA LISTN M2 13.748 13.708
13,4 ALISTADO PISOS 1:3, E=0.04 M2 25.697 25.297
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 77.559 77.159
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 24.590 24.476
13,7 CONCRETO BASE GRADAS 2500 PSI M2 51.197 50.635
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 70.187 69.287
13,9 MANTO FIBERGLASS 600X1 M2 27.958 27.958
13,10 PEGANTE MORTERO-CONCRETO M2 21.412 21.412
13,11 PERMA PLY 2 CAPAS M2 25.218 25.218
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 41.387 40.881
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 48.331 47.713
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 69.635 68.680
13,15 TRITURADO FINO 1/2 M3 73.494 69.572
13,16 TRITURADO GRUESO 3/4 M3 79.406 77.444

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 52.892 52.812
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 31.800 31.760
14,3 ADOQUN CONCRETO 6CM M2 60.431 60.231
14,4 ADOQUN CONCRETO 8CM M2 63.431 63.231
14,5 ADOQUN GRES PEATONAL M2 67.381 67.181
14,6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 69.364 69.284
14,7 GRAVILLA PARA GRADAS ML 35.097 35.029
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 150.616 150.256
14,9 ACABADO EN GRAVILLA LAVADA M2 43.310 43.132
14,10 GUARDAESCOBA EN GRANITO ML 41.205 41.205
14,11 GUARDAESCOBA EN GRAVILLA ML 9.366 9.297
14,12 GUARDAESCOBA PVC CARAMELO ML 8.597 8.597
14,13 GUARDAESCOBA PVC CEDRO ML 11.517 11.517
14,14 GUARDAESCOBA PINO CARIBE ML 9.804 9.804
14,15 GUARDAESCOBA CEDRO BLANCO ML 16.258 16.258
14,16 GUARDAESCOBA EN MADERA SAPAN ML 31.444 31.444
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.752 8.752
14,18 LISTN M.H. AMARILLO M2 69.034 69.034
14,19 PASO ESCALERA GRANITO ML 110.243 109.963
14,20 PIRLANES ALUMINIO ML 7.200 7.200
14,21 PIRLANES LADRILLO ML 29.933 29.866
14,22 PISO VINILO TRFICO RESIDENCIAL M2 42.254 42.254
14,23 PISO VINILO TRFICO PESADO M2 48.992 48.992
14,24 PULIDA LACADA PISO MADERA M2 45.843 45.843
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
14,25 TABLETA DE GRES 25X25 CONSTRUCCIN M2 45.952 45.872
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 51.464 51.384
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.321 10.321
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 45.792 45.692
14,29 JABONERA PORCELANA ACUARIO UN 19.018 19.018
14,30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN 113.368 113.368
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.393 9.393
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 20.821 20.821
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 13.491 13.491
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.117 13.117
14,35 REMATES BOCEL ALUMINIO ML 8.105 8.105
14,36 REMATES BOCEL PORCELANA ML 8.241 8.241
14,37 TAPA REGISTRO 20X20 UN 17.697 17.697
14,38 TAPA REGISTRO 6X6 UN 16.160 16.160
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 16.994 16.994
14,40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN SITIO M2 19.646 19.646
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 60.106 60.027
14,42 MEDIA CAA EN GRANITO ML 70.863 70.863
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.559 32.559
14,44 PINTURA ACRLICA PARA PISOS M2 12.342 12.342
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 92.693 92.693
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 112.525 112.525

15 CIELO RASO
15,1 APLIQUE YESO ML 66.632 66.632
15,2 ARMADURA MADERA Y MALLA M2 33.944 33.944
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51.562 51.562
15,4 CIELO RASO DURACUSTIC M2 63.001 63.001
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 47.131 47.131
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 86.872 86.872
15,7 CORNISAS YESO ML 44.654 44.654
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 95.767 95.767
15,9 MALLA CON VENA M2 12.688 12.688

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16,2 M3 18.214 18.214
MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 47.621 53.497
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 64.487 61.319
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 133.408 141.676
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 51.172 51.172
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 111.630 129.297
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 130.747 139.015

17 APARATOS SANITARIOS
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) CONSTRUCCIN UN 276.800 276.800
17,2 SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 811.811 811.811
17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 440.766 440.766
17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 129.635 129.635
17,5 SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 180.258 180.258
17,6 SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 167.567 167.567
17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 366.160 366.160
17,8 SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 933.230 933.230
17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 266.606 266.606
17,10 SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 189.778 189.778
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 76.777 76.777
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17,12 UN 229.002 229.002
ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17,13 UN 336.270 336.270
ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 7.793 7.793
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.872 2.872
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.468 10.468
18,4 BARNIZ SOBRE MUEBLES M2 39.269 39.269
18,5 CARBURO SOBRE PAETES M2 5.482 5.482
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 59.958 59.958
18,7 DEMARCACIN CON MARMOLINA ML 3.274 3.274
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.584 2.584
18,9 ESMALTE SOBRE LMINA LLENA M2 13.035 13.035
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.764 3.764
18,11 ESMALTE SOBRE MADERA LLENA M2 13.739 13.739
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.300 5.300
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.048 6.048
18,14 ESTUCO M2 6.617 6.617
18,15 ESTUCO (LINEAL) ML 4.153 4.153
18,16 ESTUCO Y VINILO 3 MANOS M2 14.532 14.532
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.040 9.040
18,18 LACA PISOS MADERA M2 21.444 21.444
18,19 LNEAS TRFICO 0.10 ML 2.521 2.521
18,20 MARMOLINA SOBRE PAETE M2 11.254 11.254
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.042 3.042
18,22 TINTILLA SOBRE MADERA LLENA M2 11.765 11.765
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.628 6.628
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.183 4.183
18,25 WASH-PRIMER SOBRE ALUMNIO M2 20.200 20.200
18,26 PINTURA EPXICA M2 11.905 11.905
18,27 PINTURA EPXICA (LINEAL) ML 7.378 7.378

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.515.034 5.515.034
19,2 CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN 9.744.263 9.744.263
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.550.336 2.550.336
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.334.073 8.334.073
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 7.803.331 7.803.331
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.521 2.521
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 784.008 784.008
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
19,8 MALLA NYLON PETROLIZADA VOLEIBOL CONSTRUCCIN UN 78.154 78.154
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.416.505 1.416.447
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 615.580 614.220

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 27.369 27.369
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 40.392 40.392
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 49.978 49.978
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 16.493 16.493
20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 19.905 19.905
20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 27.048 27.048
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 24.647 24.647
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 25.956 25.956
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 32.356 32.356
20,10 VLVULA DE BOLA GAS 1/2" UN 16.177 16.177
20,11 VLVULA DE BOLA GAS 3/4" UN 21.171 21.171
20,12 VLVULA DE BOLA GAS 1" UN 32.492 32.492
20,13 VLVULA POLIETILENO GAS 1/2" UN 248.576 248.576
20,14 VLVULA POLIETILENO GAS 3/4" UN 285.954 285.954
20,15 VLVULA POLIETILENO GAS 1" UN 298.412 298.412
20,16 ACOMETIDA GAS 1/2" ML 277.347 277.347

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 202.260 202.260
21,2 CABLE DETECTOR LINEAL DE CALOR ML 30.895 30.895
21,3 SIRENA DE 110 V UN 94.764 94.764
21,4 CMARA CCTV UN 243.337 243.337
21,5 PARLANTE-CIELO FALSO UN 47.988 47.988
21,6 AMPLIFICADOR 100W UN 524.384 524.384
21,7 AMPLIFICADOR 300W UN 1.294.386 1.294.386
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.403 42.403
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 201.958 201.958
21,10 TOMA PARA MICRFONO UN 40.806 40.806
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.454 3.454
21,12 SPLITERS UN 5.760 5.760
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.477 17.477
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 22.875 22.875
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 29.607 29.607
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 112.195 112.195
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 29.286 29.286
21,18 BANDEJA PORTACABLES PARA RACK UN 95.465 95.465
21,19 RACK 2' X 24" UN 170.640 170.640
21,20 RACK 3' X 24" UN 265.856 265.856
21,21 RACK 5' X 24" UN 331.288 331.288
21,22 RACK 7' X 24" UN 361.420 361.420
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 532.530 532.530
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 314.644 314.644
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 95.127 95.127
21,26 PATCH CORD 2M CATEGORA 6A UN 12.620 12.620
21,27 PATCH CORD 5M CATEGORA 6A UN 25.757 25.757
21,28 CABLE UTP CATEGORA 6A ML 4.618 4.618
21,29 CANALETA METLICA 4X6 CMS ML 32.697 32.697
21,30 CANALETA METLICA 4X10 CMS ML 34.133 34.133
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
21,31 CANALETA METLICA 6X10 CMS CONSTRUCCIN ML 34.851 34.851
21,32 CANALETA PLSTICA 13X7 MM ML 22.743 22.743
21,33 CANALETA PLSTICA 20X12 MM ML 25.106 25.106
21,34 CANALETA PLSTICA 32X12 MM ML 26.098 26.098
21,35 CANALETA PLSTICA 40X60 MM ML 43.545 43.545
21,36 SWITCH 10/100/1000 24 PUERTOS UN 561.145 561.145
21,37 SWITCH 10/100/1000 16 PUERTOS UN 289.183 289.183
21,38 SWITCH 10/100/1000 8 PUERTOS UN 82.307 82.307
21,39 CABLE TELEFNICO 2 PARES ML 1.700 1.700
21,40 CABLE TELEFNICO 10 PARES ML 7.836 7.836
21,41 CABLE TELEFNICO 20 PARES ML 11.621 11.621
21,42 CABLE TELEFNICO 40 PARES ML 19.345 19.345
21,43 CABLE TELEVISIN RG6 ML 3.608 3.608
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.029 21.029
21,45 ACOMETIDA TELEFNICA 1" ML 30.432 30.432
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.032 18.032
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 14.190 14.190
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 563.983 563.983
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 82.629 82.629
1,3 CODO 45 PVC UNIN MECNICA 8" UN 464.049 464.049
1,4 CODO 45 PVC UNIN MECNICA 10" UN 990.366 990.366
1,5 CODO 90 PVC UNIN MECNICA 4" UN 113.728 113.728
1,6 CODO 90 PVC UNIN MECNICA 8" UN 691.294 691.294
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.486.893 1.486.893
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.143 12.143
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 14.912 14.912
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 18.652 18.652
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 20.387 20.387
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 24.385 24.385
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 24.385 24.385
1,14 TAPN PVC UNIN MECNICA 3" UN 97.107 97.107
1,15 TAPN PVC UNIN MECNICA 4" UN 112.516 112.516
1,16 TAPN PVC UNIN MECNICA 8" UN 348.036 348.036
1,17 TEE PVC UNIN MECNICA 2" UN 130.637 130.637
1,18 TEE PVC UNIN MECNICA 4" UN 215.358 215.358
1,19 TEE PVC UNIN MECNICA 8" UN 952.112 952.112
1,20 TEE PVC UNIN MECNICA 10" UN 1.096.864 1.096.864
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.077 13.077
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 11.564 11.564
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 28.051 28.051
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 111.901 111.901
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 166.280 166.280
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 27.347 27.347
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 93.929 93.929
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 138.837 138.837
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 56.745 56.745
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 227.810 227.810
1,32 UNIN REPARACION PVC 4" UN 66.147 66.147
1,33 UNIN REPARACIN PVC 8" UN 264.932 264.932
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 159.713 159.713
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 452.163 452.163
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.208.099 1.208.099
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.784.966 1.784.966

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.058 10.058
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.038 23.038
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 63.710 59.512
2,5 RELLENO TIPO 2 "RECEBO" M3 42.842 48.718
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 55.842 55.842
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 65.305 54.032
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 50.004 50.004
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 75.416 71.085

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 103.791 103.791
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
3,2 CODO 45 PVC ALCANTARILLADO 16" CONSTRUCCIN UN 1.080.223 1.080.223
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 135.574 135.574
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.251.129 1.251.129
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 872.181 872.181
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 61.187 61.187
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 103.034 103.034
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 243.078 243.078
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 243.072 243.072
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 390.148 390.148
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 103.078 103.078
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 103.078 103.078
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 243.078 243.078
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 243.078 243.078
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 390.148 390.148
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 394.188 394.188
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 638.325 638.325
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.023.830 1.023.830
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 63.257 63.257
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 330.309 330.309
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 367.927 367.927
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.019.965 1.019.965
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 59.608 59.563
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 299.698 299.698
3,25 TUBERA PVC ALCANTARILLADO 8" ML 45.392 45.392
3,26 TUBERA PVC ALCANTARILLADO 10" ML 64.116 64.116
3,27 TUBERA PVC ALCANTARILLADO 12" ML 92.434 92.434
3,28 TUBERA PVC ALCANTARILLADO 16" ML 141.845 141.845
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 227.794 227.794
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 331.937 331.937
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 419.643 419.643
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 551.601 551.601
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 757.860 757.860

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4,1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 600.815 597.552
4,2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO E=1.5CM Y CAUELA) ML 592.295 589.749
4,3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 643.094 640.918
4,4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 711.622 707.544
4,5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE INTERNO E=1.5CM Y CAUELA) ML 838.287 834.701
4,6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN 739.894 736.903
4,7 SUMIDERO EN LADRILLO SL-100 UN 917.796 916.168
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.318.766 1.314.086
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.778.049 1.769.366
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.359.674 2.345.241
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.665.296 1.665.296
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.513.962 3.513.962
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAETE INTERNO Y
4,13 UN 128.317 128.213
DEMOLICIN)

5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 66.437 66.203
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 78.605 78.371
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 49.091 48.501
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M CONSTRUCCIN M2 53.340 52.769
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 53.541 52.985
5,6 BORDE SEPARADOR VERDE A-170 ML 229.290 229.186
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 16.913 16.842
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 35.213 34.797
5,9 CAUELA PREFABRICADA TIPO A-120 ML 76.017 75.962
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 507.941 506.554
5,11 LOSETA PREFABRICADA A-40 M2 57.028 56.790
5,12 LOSETA PREFABRICADA A-60 M2 82.177 81.939
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 29.873 29.644
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 47.515 47.053
5,15 SARDINEL PREFABRICADO A-10 ML 90.904 92.121
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 54.929 54.785

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 183.334 183.062
6,2 BANCA EN CONCRETO M-30 UN 601.269 600.889
6,3 BOLARDO M-63 ALTO/HIERRO UN 194.943 194.886
6,4 BOLARDO M-60 CONCRETO UN 146.461 146.134
6,5 BOLARDO M-61 BAJO/CONCRETO UN 148.224 147.898
6,6 BOLARDO M-62 BAJO/HIERRO UN 173.474 173.131
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 53.740 53.561
6,8 BORDILLO PREFABRICADO A-80 ML 61.236 61.036
6,9 CANECA M-120 UN 281.640 281.595
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 742.972 742.808
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.041.608 3.041.499
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.128.850 3.128.741
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 437.558 437.444
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 578.561 578.104
6,15 BANCA EN MADERA M-50 UN 482.408 482.408
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 224.816 224.653
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 518.378 518.266
6,18 POSTE HISTRICO M-131 UN 5.780.131 5.779.315

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.637 3.637
7,2 MARCA VIAL CON PINTURA EN FRO M2 39.538 39.538
7,3 SEAL DOBLE DE CICLORUTA UN 283.270 283.218
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 447.009 446.781
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 214.397 214.345
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 227.486 227.434
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 237.398 237.346
7,8 TACHAS REFLECTIVAS UN 12.312 12.312
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.138 13.138
7,10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIN) UN 106.262 106.262
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1,1 201 P M3 147.300 147.300
5KM)
1,2 201 P DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 52.102 52.102
1,3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA 2.513.232 2.513.232
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA
1,4 200.2 HA 893.776 893.776
DE 5KM)
1,5 201.7 DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 86.031 86.031
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS, SOBREACARREOS Y
1,6 *** M3-KM 1.270 1.270
DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


2,1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 9.185 9.185
2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 33.597 33.597
2,3 210.2.2 EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 8.415 8.415
2,4 220.1 TERRAPLENES M3 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354
MATERIAL ADICIONADO

2,9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 20.167 20.167
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2,10 600.2 M3 62.019 62.019
KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2,11 600.3 M3 76.288 76.288
5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,12 600.4 M3 18.323 18.323
MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 600.4 P M3 37.797 37.797
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2,14 600.5 M3 30.022 30.022
DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2,15 600.5 P M3 50.972 50.972
DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 116.993 134.660
3,3 330.1 BASE GRANULAR M3 136.825 144.378
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE
3,4 365.1 M3 133.838 133.838
MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 2.923 2.923
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.316 1.316
3,7 461.1 PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION ASFLTICA M3 203.141 202.002
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 59.646 59.289
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFLTICO) M3 500.213 492.276
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFLTICO) M3 529.963 522.026
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFLTICO) M3 557.602 549.665
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFLTICO) M3 559.713 551.776
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 269.075 276.628
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 248.518 266.185
3,15 311.1 AFIRMADO M3 56.535 56.535
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 12.644 12.564
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 CONSTRUCCIN M2 5.103 5.063
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3,18 500.1 M3 561.358 556.128
UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3,19 500.1 M3 589.301 583.837
UNIN
3,20 500.1 CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y M3 607.928 602.306
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIN
3,21 *** ML 6.518 6.518
DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 76.020 76.020

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 818.948 813.015
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 701.367 695.533
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 743.604 737.540
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 498.653 493.307
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 588.172 582.614
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 496.721 491.228
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 586.163 580.453
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 648.597 643.105
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 513.866 508.156
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 688.745 683.035
4,11 650 P SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 11.051 11.051
4,12 650 P SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG 14.085 14.085
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.657 1.657
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4,14 621.1 ML 2.473.188 2.473.188
REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN MANUAL (INCLUYE EXCAVACIN EN
4,15 621.1 P ML 3.800.646 3.790.498
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.591.563 1.586.125
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 78.986 78.986
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 329.460 328.808
4,19 632 P BARANDA METLICA ML 388.764 388.764
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 15.381 15.381
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 411.208 405.418
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 77.866 62.499
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 54.861 60.285
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 322.036 316.261
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 316.273 312.842
4,26 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA ELEVACIONES M3 324.713 321.283
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 329.440 326.067
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 337.880 334.508
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 450.755 445.078
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 538.579 532.677
4,31 681.1 GAVIN M3 156.800 156.800
4,32 681.1 GAVIN MALLA PVC M3 160.537 160.537
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 37.516 37.167
4,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 14.167 13.993
4,35 *** SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA LTIMA 25 KN) M2 9.191 9.191
4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.048 13.048
4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 17.514 17.514
4,38 *** SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA 100 KN) M2 20.969 20.969
4,39 *** SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA LTIMA 165 KN) M2 26.907 26.907

4,40 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 6.595 6.595
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SOACHA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD Sibat Soacha
u
4,41 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000 (ESTABILIZACIN, FILTRO YCONSTRUCCIN
SEPARACIN) M2 7.503 7.503
4,42 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 7.794 7.794

4,43 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 5.580 5.580

4,44 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.356 8.356

4,45 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 6.832 6.832

4,46 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 8.356 8.356

4,47 *** SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN, FILTRO Y SEPARACIN) M2 15.967 15.967
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO =36" CLASE I, INCLUYE
4,48 661.1 ML 568.908 568.828
EMBOQUILLADA
4,49 660.3 SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE, DIMETRO 600 MM ML 320.575 319.328
4,50 *** SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO, DIMETRO 36" ML 795.070 795.070
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 123.325 123.325
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.002 4.002
4,53 *** GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 77.314 77.314
4,54 *** GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIN) ML 117.726 117.726
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 457.069 451.167
4,56 682.1 P COLCHONETA RENO M3 171.633 171.633
4,57 *** TRINCHO EN MADERA M2 61.246 61.246

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.637 3.637
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 39.538 39.538
5,3 730.3 TOPE DEFENSA METLICA UN 75.421 75.421
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 62.790 62.790
5,5 730.1 DEFENSA METLICA ML 133.261 132.981
5,6 701.1 SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 12.312 12.312

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 791 791
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A = 36", INCLUYE RECTIFICACIN DE
6,2 801.6 UN 124.663 124.663
DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE DESCOLES Y RETIRO DE SOBRANTES A
6,3 801.7 ML 24.161 24.161
UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219
6,6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 1.735 1.735
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.041 14.041
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 22.610 22.610
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.143 9.143

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN
DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.953.617 2.008.559 1.943.014 1.968.076 1.977.715 1.948.798 1.963.256 1.949.761 1.954.581 1.996.029
1,2 CAMPAMENTO 9 M2 UN 1.136.374 1.163.845 1.131.072 1.143.603 1.148.422 1.133.964 1.141.193 1.134.446 1.136.855 1.157.579
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.601 13.601 13.601 13.601 13.601 13.601 13.601 13.601 13.601 13.601
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.249 15.249 15.249 15.249 15.249 15.249 15.249 15.249 15.249 15.249
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.623 17.623 17.623 17.623 17.623 17.623 17.623 17.623 17.623 17.623
1,6 CERCA EN TABLA H=2.30 M ML 63.977 63.977 63.977 63.977 63.977 63.977 63.977 63.977 63.977 63.977
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 45.041 45.639 44.926 45.199 45.304 44.989 45.146 44.999 45.052 45.503
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.878 21.476 20.762 21.035 21.140 20.825 20.983 20.836 20.888 21.340
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 881.934 890.902 881.277 885.996 885.951 882.803 885.372 882.609 881.542 889.040
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.207 10.207 10.207 10.207 10.207 10.207 10.207 10.207 10.207 10.207
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.656 3.656 3.656 3.656 3.656 3.656 3.656 3.656 3.656 3.656
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.623.871 2.623.871 2.623.871 2.623.871 2.623.871 2.623.871 2.623.871 2.623.871 2.623.871 2.623.871
1,44 RED TELEFNICA PROVISIONAL UN 241.951 241.951 241.951 241.951 241.951 241.951 241.951 241.951 241.951 241.951
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 66.341 105.146 72.809 98.679 84.450 84.450 97.385 80.570 66.341 98.679
2,2 BASE ARENA CEMENTO 1:20 M3 222.096 283.252 210.294 238.189 248.918 216.731 232.825 217.805 223.170 269.304
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
2,3 DEMOLICIN CABEZAS DE PILOTES M3 CONSTRUCCIN
283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.580 21.580 21.580 21.580 21.580 21.580 21.580 21.580 21.580 21.580
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 632.116 690.803 620.791 647.560 657.856 626.968 642.412 627.998 633.146 677.419
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 634.192 695.076 622.443 650.214 660.895 628.851 644.874 629.919 635.260 681.190
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 590.285 647.294 579.284 605.288 615.289 585.284 600.287 586.284 591.285 634.293
2,9 PILOTE DE MADERA D=20 CM ML 48.006 48.006 48.006 48.006 48.006 48.006 48.006 48.006 48.006 48.006
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2,10 ML 147.966 147.966 147.966 147.966 147.966 147.966 147.966 147.966 147.966 147.966
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2,11 ML 185.158 185.158 185.158 185.158 185.158 185.158 185.158 185.158 185.158 185.158
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2,12 ML 230.134 230.134 230.134 230.134 230.134 230.134 230.134 230.134 230.134 230.134
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2,13 ML 290.679 290.679 290.679 290.679 290.679 290.679 290.679 290.679 290.679 290.679
UNA DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 102.444 106.600 101.642 103.537 104.266 102.079 103.173 102.152 102.516 105.652
2,15 PILOTE HINCADO 30X30 ML 126.782 132.806 125.620 128.367 129.424 126.254 127.839 126.360 126.888 131.432
2,16 DADOS EN CONCRETO 3500PSI M3 576.924 633.934 565.923 591.927 601.928 571.923 586.926 572.924 577.924 620.932
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,17 ML 88.499 88.499 88.499 88.499 88.499 88.499 88.499 88.499 88.499 88.499
MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 37.375 37.755 37.302 37.475 37.542 37.342 37.442 37.348 37.382 37.668
3,2 SIFN EN PVC 6" UN 193.919 194.299 193.846 194.019 194.086 193.886 193.986 193.892 193.926 194.212
3,3 CAJA DE INSPECCIN DE 100X100 UN 435.421 479.962 435.736 461.269 455.652 445.249 458.709 443.118 431.639 471.325
3,4 CAJA DE INSPECCIN DE 40X40 UN 217.838 226.507 216.916 221.310 221.698 218.235 220.663 218.142 217.605 224.658
3,5 CAJA DE INSPECCIN DE 60X60 UN 247.809 261.660 246.317 253.326 253.976 248.414 252.290 248.271 247.447 258.703
3,6 CAJA DE INSPECCIN DE 80X80 UN 326.570 347.774 323.659 334.022 335.962 326.530 332.341 326.516 326.337 343.140
3,7 DUCTO ELCTRICO PVC 4" ML 99.901 100.199 99.950 100.149 100.040 100.040 100.139 100.010 99.851 100.149
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.255.535 1.258.520 1.256.033 1.258.023 1.256.928 1.256.928 1.257.923 1.256.630 1.255.038 1.258.023
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 113.916 118.114 113.106 115.021 115.757 113.548 114.653 113.622 113.990 117.156
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 71.956 74.171 71.529 72.539 72.927 71.762 72.345 71.801 71.995 73.666
3,11 TUBERA DRENAJE PVC 110 ML 27.259 28.276 27.062 27.526 27.705 27.169 27.437 27.187 27.276 28.044
3,12 TUBERA DRENAJE PVC 160 ML 43.917 44.935 43.721 44.185 44.364 43.828 44.096 43.846 43.935 44.703
3,13 TUBERA DRENAJE PVC 200 ML 57.713 59.137 57.438 58.087 58.337 57.588 57.962 57.613 57.738 58.812
3,14 TUBERA DRENAJE PVC 250 ML 79.028 80.656 78.714 79.456 79.742 78.885 79.313 78.913 79.056 80.284
3,15 TUBERA DRENAJE PVC 315 ML 109.305 110.730 109.031 109.680 109.930 109.180 109.555 109.205 109.330 110.405
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3,16 UN 939.834 956.113 936.693 944.118 946.974 938.406 942.690 938.692 940.120 952.401
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3,17 UN 1.332.032 1.364.590 1.325.749 1.340.600 1.346.312 1.329.176 1.337.744 1.329.747 1.332.603 1.357.165
FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3,18 UN 1.741.117 1.806.234 1.728.551 1.758.253 1.769.677 1.735.405 1.752.541 1.736.547 1.742.259 1.791.383
FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 41.120 41.120 41.120 41.120 41.120 41.120 41.120 41.120 41.120 41.120
4,2 CASETN DE LONA 0.80X0.70 M2 54.383 54.383 54.383 54.383 54.383 54.383 54.383 54.383 54.383 54.383
4,3 COLUMNAS 3500 PSI M3 788.816 845.826 777.815 803.819 813.821 783.816 798.819 784.816 789.816 832.824
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 245.184 288.113 237.515 254.919 268.236 241.242 260.172 241.863 246.641 283.799
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4,5 M2 96.824 102.359 95.756 98.280 99.251 96.338 97.795 96.435 96.921 101.096
DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
4,6 M2 114.295 120.937 113.013 116.043 117.208 113.713 115.461 113.829 114.412 119.422
DE REFUERZO, CONCRETO DE 3500 PSI

4,7 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 126.872 135.728 125.163 129.203 130.756 126.095 128.426 126.251 127.027 133.708
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
CONSTRUCCIN
4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 133.887 143.296 132.071 136.363 138.013 133.061 135.537 133.226 134.052 141.150

4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 153.656 165.280 151.413 156.715 158.754 152.637 155.696 152.841 153.860 162.629

4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 171.009 184.293 168.445 174.505 176.835 169.844 173.340 170.077 171.242 181.263

4,11 ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 189.820 204.764 186.936 193.752 196.374 188.509 192.442 188.771 190.082 201.356

4,12 ENTREPISO VIGUETA PLACA M2 96.730 97.557 96.570 96.948 97.093 96.657 96.875 96.672 96.744 97.369
4,13 ESCALERA MACIZA 3500 PSI M3 932.773 989.782 921.771 947.776 957.777 927.772 942.775 928.772 933.773 976.780
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 93.237 94.051 93.080 93.451 93.594 93.166 93.380 93.180 93.251 93.865
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 77.889 83.590 76.789 79.390 80.390 77.389 78.890 77.489 77.989 82.290
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 87.735 94.709 86.389 89.570 90.794 87.123 88.958 87.245 87.857 93.118
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 102.393 111.138 100.705 104.694 106.228 101.626 103.927 101.779 102.546 109.143
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 691.014 748.024 680.013 706.017 716.019 686.014 701.017 687.014 692.014 735.022
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4,19 UN 47.715 49.473 47.376 48.178 48.486 47.561 48.024 47.592 47.746 49.072
M)
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 276.898 302.358 271.984 283.598 288.065 274.664 281.365 275.111 277.344 296.552
4,21 ACERO FIGURADO 37000 PSI KG 4.094 4.094 4.094 4.094 4.094 4.094 4.094 4.094 4.094 4.094
4,22 ACERO FIGURADO 60000 PSI KG 4.294 4.294 4.294 4.294 4.294 4.294 4.294 4.294 4.294 4.294
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.971 5.971 5.971 5.971 5.971 5.971 5.971 5.971 5.971 5.971
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 830.733 887.743 819.732 845.736 855.738 825.733 840.736 826.733 831.734 874.741
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 760.252 822.646 748.212 776.672 787.618 754.779 771.199 755.874 761.347 808.416
4,26 VIGA AREA 3500 PSI M3 826.791 883.801 815.790 841.794 851.795 821.790 836.793 822.791 827.791 870.799
4,27 VIGA CINTA 3500 PSI M3 807.847 864.856 796.845 822.850 832.851 802.846 817.849 803.846 808.847 851.854
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.006.990 1.064.000 995.989 1.021.993 1.031.995 1.001.990 1.016.993 1.002.990 1.007.991 1.050.998
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 323.516 386.394 311.381 340.063 351.094 318.000 334.547 319.103 324.619 372.053

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 28.859 30.411 28.560 29.268 29.540 28.723 29.131 28.750 28.886 30.057
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 48.152 49.704 47.852 48.560 48.832 48.016 48.424 48.043 48.179 49.350
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.904 34.284 33.830 34.004 34.070 33.870 33.970 33.877 33.910 34.197
5,4 ARCOS EN LADRILLO PRENSADO ML 158.195 158.954 158.048 158.395 158.528 158.128 158.328 158.141 158.208 158.781
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 42.770 44.528 42.431 43.233 43.541 42.616 43.078 42.647 42.801 44.127
5,6 DINTELES EN BLOQUE 0.15 M ML 26.403 27.217 26.246 26.617 26.760 26.332 26.546 26.346 26.417 27.031
5,7 ENCHAPES LADRILLO PRENSADO M2 97.434 98.954 97.141 97.834 98.101 97.301 97.701 97.328 97.461 98.607
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 89.312 95.173 88.181 90.855 91.883 88.798 90.341 88.901 89.415 93.836
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 88.674 88.674 88.674 88.674 88.674 88.674 88.674 88.674 88.674 88.674
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.819 51.819 51.819 51.819 51.819 51.819 51.819 51.819 51.819 51.819
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 85.352 85.352 85.352 85.352 85.352 85.352 85.352 85.352 85.352 85.352
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 50.158 50.158 50.158 50.158 50.158 50.158 50.158 50.158 50.158 50.158
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 99.284 99.284 99.284 99.284 99.284 99.284 99.284 99.284 99.284 99.284
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 58.372 58.372 58.372 58.372 58.372 58.372 58.372 58.372 58.372 58.372
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 110.553 110.553 110.553 110.553 110.553 110.553 110.553 110.553 110.553 110.553
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 64.007 64.007 64.007 64.007 64.007 64.007 64.007 64.007 64.007 64.007
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 39.881 40.645 39.734 40.082 40.216 39.814 40.015 39.828 39.895 40.471
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 24.014 24.396 23.940 24.115 24.182 23.981 24.081 23.987 24.021 24.309
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 51.934 52.443 51.836 52.068 52.157 51.889 52.023 51.898 51.943 52.327
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 31.046 31.301 30.997 31.113 31.158 31.024 31.091 31.029 31.051 31.243
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 58.373 58.882 58.274 58.507 58.596 58.328 58.462 58.337 58.382 58.766
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.902 35.156 34.853 34.969 35.013 34.879 34.946 34.884 34.906 35.098
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 CONSTRUCCIN
97.812 100.357 97.321 98.482 98.928 97.589 98.259 97.634 97.857 99.777
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 57.479 58.752 57.234 57.814 58.037 57.368 57.703 57.390 57.502 58.462
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 36.436 36.945 36.338 36.570 36.659 36.391 36.525 36.400 36.445 36.829
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.977 22.231 21.928 22.044 22.089 21.955 22.022 21.959 21.981 22.173
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 72.650 73.668 72.454 72.918 73.097 72.561 72.829 72.579 72.668 73.436
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 43.560 44.069 43.461 43.693 43.783 43.515 43.649 43.524 43.568 43.952
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 86.219 87.033 86.061 86.433 86.576 86.147 86.361 86.161 86.233 86.847
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 51.927 52.334 51.849 52.035 52.106 51.892 51.999 51.899 51.935 52.242
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 179.562 183.125 178.874 180.499 181.124 179.249 180.187 179.312 179.624 182.312
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 107.150 108.931 106.806 107.619 107.931 106.994 107.462 107.025 107.181 108.525
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 87.238 88.313 87.030 87.521 87.709 87.144 87.426 87.162 87.257 88.068
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 52.437 52.975 52.333 52.579 52.673 52.390 52.531 52.399 52.446 52.852
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 46.144 47.284 45.924 46.444 46.644 46.044 46.344 46.064 46.164 47.024
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.887 28.456 27.777 28.037 28.137 27.837 27.987 27.847 27.897 28.327
5,37 MURO TOLETE COMN 0.06 M M2 32.992 33.501 32.894 33.126 33.215 32.947 33.081 32.956 33.001 33.385
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.995 20.250 19.946 20.062 20.107 19.973 20.040 19.977 20.000 20.192
5,39 MURO TOLETE COMN 0.12 M M2 50.193 51.211 49.997 50.461 50.640 50.104 50.372 50.122 50.211 50.979
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 30.555 31.064 30.457 30.689 30.779 30.511 30.645 30.520 30.564 30.948
5,41 MURO TOLETE COMN 0.25 M M2 96.722 98.249 96.427 97.123 97.391 96.588 96.990 96.614 96.748 97.900
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 58.510 59.274 58.363 58.711 58.845 58.443 58.644 58.457 58.524 59.100
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 70.516 71.534 70.320 70.784 70.963 70.427 70.695 70.445 70.534 71.302
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 42.348 42.857 42.250 42.482 42.571 42.303 42.437 42.312 42.357 42.741
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 149.151 152.714 148.464 150.089 150.714 148.839 149.776 148.901 149.214 151.902
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 90.090 91.871 89.746 90.559 90.871 89.934 90.403 89.965 90.121 91.465
5,47 REMATES LADRILLO PRENSADO ML 30.970 31.350 30.897 31.070 31.137 30.937 31.037 30.944 30.977 31.264
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 35.038 35.812 34.889 35.242 35.378 34.971 35.174 34.984 35.052 35.635
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 59.261 60.292 59.062 59.532 59.713 59.171 59.442 59.189 59.279 60.057
5,50 LAVADA DE FACHADA M2 4.978 4.978 4.978 4.978 4.978 4.978 4.978 4.978 4.978 4.978
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 48.499 50.050 48.199 48.907 49.179 48.362 48.771 48.390 48.526 49.697
5,52 DOVELA, GROUTING 3000 PSI ML 10.090 10.090 10.090 10.090 10.090 10.090 10.090 10.090 10.090 10.090
5,53 ANCLAJE 3/8" L=30CM UN 13.374 13.374 13.374 13.374 13.374 13.374 13.374 13.374 13.374 13.374
5,54 ANCLAJE 1/2" L=50CM UN 17.490 17.490 17.490 17.490 17.490 17.490 17.490 17.490 17.490 17.490
5,55 ANCLAJE 5/8" L=70CM UN 24.555 24.555 24.555 24.555 24.555 24.555 24.555 24.555 24.555 24.555
5,56 ANCLAJE 3/4" L=70CM UN 36.709 36.709 36.709 36.709 36.709 36.709 36.709 36.709 36.709 36.709
5,57 ANCLAJE 1" L= 70CM UN 4.821 5.246 4.739 4.933 5.008 4.784 4.896 4.791 4.829 5.149

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.384 15.384 15.384 15.384 15.384 15.384 15.384 15.384 15.384 15.384
6,2 FILOS O DILATACIONES B/PLACA ML 5.679 6.059 5.606 5.779 5.845 5.646 5.746 5.652 5.686 5.972
6,3 FILOS O DILATACIONES S/MURO ML 6.799 7.178 6.725 6.899 6.965 6.765 6.865 6.772 6.805 7.092
6,4 GOTERA EN MORTERO 1:4 ML 8.043 8.423 7.970 8.143 8.210 8.010 8.110 8.017 8.050 8.337
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.634 6.634 6.634 6.634 6.634 6.634 6.634 6.634 6.634 6.634
6,6 MALLA BAJO ENTRAMADO M2 13.111 13.111 13.111 13.111 13.111 13.111 13.111 13.111 13.111 13.111
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 22.903 23.655 22.757 23.101 23.233 22.837 23.035 22.850 22.916 23.483
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.901 14.277 13.828 14.000 14.066 13.868 13.967 13.874 13.907 14.191
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 20.757 21.826 20.551 21.038 21.226 20.663 20.945 20.682 20.776 21.582
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.535 13.070 12.432 12.676 12.770 12.488 12.629 12.498 12.545 12.948
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 19.228 19.981 19.083 19.426 19.558 19.162 19.360 19.176 19.242 19.809
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.771 12.147 11.698 11.870 11.936 11.738 11.837 11.744 11.777 12.061
6,13 PAETE CULATAS 1:4, E=2 CM M2 20.757 21.826 20.551 21.038 21.226 20.663 20.945 20.682 20.776 21.582
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.535 13.070 12.432 12.676 12.770 12.488 12.629 12.498 12.545 12.948
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 20.566 21.103 20.463 20.707 20.801 20.519 20.660 20.529 20.576 20.980
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.439 12.707 12.387 12.509 12.556 12.415 12.486 12.420 12.443 12.646
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 CONSTRUCCIN
17.215 18.029 17.057 17.429 17.572 17.143 17.357 17.157 17.229 17.843
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.492 10.899 10.413 10.599 10.670 10.456 10.563 10.463 10.499 10.806
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.050 16.623 15.939 16.201 16.301 16.000 16.151 16.010 16.060 16.492
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.909 10.196 9.854 9.985 10.035 9.884 9.959 9.889 9.914 10.130
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 21.492 22.561 21.286 21.773 21.961 21.398 21.679 21.417 21.511 22.317
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.884 13.418 12.781 13.024 13.118 12.837 12.977 12.846 12.893 13.296
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 19.963 20.716 19.818 20.161 20.293 19.897 20.095 19.911 19.976 20.544
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.119 12.496 12.047 12.218 12.284 12.086 12.185 12.093 12.126 12.410
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.626 17.200 16.516 16.777 16.878 16.576 16.727 16.586 16.636 17.069
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.181 10.467 10.125 10.256 10.306 10.155 10.231 10.160 10.186 10.402
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 20.803 21.556 20.658 21.001 21.133 20.737 20.935 20.750 20.816 21.384
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 12.921 13.297 12.848 13.020 13.086 12.888 12.987 12.895 12.928 13.211

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 26.504 28.031 26.209 26.905 27.173 26.370 26.771 26.396 26.530 27.682
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7,2 M2 81.428 84.359 80.863 82.199 82.713 81.171 81.942 81.223 81.480 83.690
(INCLUYE TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 54.035 54.035 54.035 54.035 54.035 54.035 54.035 54.035 54.035 54.035
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.454 21.454 21.454 21.454 21.454 21.454 21.454 21.454 21.454 21.454
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.719 33.719 33.719 33.719 33.719 33.719 33.719 33.719 33.719 33.719
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 79.026 79.026 79.026 79.026 79.026 79.026 79.026 79.026 79.026 79.026
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 61.834 61.834 61.834 61.834 61.834 61.834 61.834 61.834 61.834 61.834
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.870 35.870 35.870 35.870 35.870 35.870 35.870 35.870 35.870 35.870
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 82.830 82.830 82.830 82.830 82.830 82.830 82.830 82.830 82.830 82.830
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 98.949 98.949 98.949 98.949 98.949 98.949 98.949 98.949 98.949 98.949
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 145.520 145.520 145.520 145.520 145.520 145.520 145.520 145.520 145.520 145.520
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 57.323 57.323 57.323 57.323 57.323 57.323 57.323 57.323 57.323 57.323
7,13 CANAL PVC AMAZONAS ML 79.556 79.556 79.556 79.556 79.556 79.556 79.556 79.556 79.556 79.556
7,14 CANAL PVC RAINGO ML 72.288 72.288 72.288 72.288 72.288 72.288 72.288 72.288 72.288 72.288
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 128.696 128.696 128.696 128.696 128.696 128.696 128.696 128.696 128.696 128.696
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 75.214 75.214 75.214 75.214 75.214 75.214 75.214 75.214 75.214 75.214
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 55.206 55.206 55.206 55.206 55.206 55.206 55.206 55.206 55.206 55.206
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 31.269 31.269 31.269 31.269 31.269 31.269 31.269 31.269 31.269 31.269
7,19 TEJA DE BARRO M2 58.306 60.206 57.940 58.806 59.139 58.140 58.640 58.173 58.340 59.772
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 46.027 46.027 46.027 46.027 46.027 46.027 46.027 46.027 46.027 46.027
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 42.185 42.185 42.185 42.185 42.185 42.185 42.185 42.185 42.185 42.185
7,22 TEJA FIBROCEMENTO N4 M2 35.460 35.460 35.460 35.460 35.460 35.460 35.460 35.460 35.460 35.460
7,23 TEJA FIBROCEMENTO No. 6 M2 34.731 34.731 34.731 34.731 34.731 34.731 34.731 34.731 34.731 34.731
7,24 TEJA FIBROCEMENTO No. 8 M2 34.995 34.995 34.995 34.995 34.995 34.995 34.995 34.995 34.995 34.995
7,25 TEJA TERMOACSTICA M2 49.358 49.358 49.358 49.358 49.358 49.358 49.358 49.358 49.358 49.358
7,26 TEJA PLSTICA No.6 M2 43.370 43.370 43.370 43.370 43.370 43.370 43.370 43.370 43.370 43.370
7,27 TEJA ESPAOLA ETERNIT M2 79.513 79.513 79.513 79.513 79.513 79.513 79.513 79.513 79.513 79.513
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 146.997 146.997 146.997 146.997 146.997 146.997 146.997 146.997 146.997 146.997

7,29 TEJA SIN TRASLAPO M2 66.016 66.016 66.016 66.016 66.016 66.016 66.016 66.016 66.016 66.016
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 41.082 41.082 41.082 41.082 41.082 41.082 41.082 41.082 41.082 41.082
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 32.239 32.239 32.239 32.239 32.239 32.239 32.239 32.239 32.239 32.239
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO
7,32 M2 56.433 56.433 56.433 56.433 56.433 56.433 56.433 56.433 56.433 56.433
ESTRUCTURAL ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.299 19.299 19.299 19.299 19.299 19.299 19.299 19.299 19.299 19.299
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.262 23.262 23.262 23.262 23.262 23.262 23.262 23.262 23.262 23.262
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.239 25.239 25.239 25.239 25.239 25.239 25.239 25.239 25.239 25.239
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 32.556 32.556 32.556 32.556 32.556 32.556 32.556 32.556 32.556 32.556
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML CONSTRUCCIN
21.436 21.436 21.436 21.436 21.436 21.436 21.436 21.436 21.436 21.436
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 50.497 50.497 50.497 50.497 50.497 50.497 50.497 50.497 50.497 50.497
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 348.698 348.698 348.698 348.698 348.698 348.698 348.698 348.698 348.698 348.698
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 395.390 395.390 395.390 395.390 395.390 395.390 395.390 395.390 395.390 395.390
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 264.140 264.140 264.140 264.140 264.140 264.140 264.140 264.140 264.140 264.140
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 282.465 282.465 282.465 282.465 282.465 282.465 282.465 282.465 282.465 282.465

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 453.239 513.472 441.615 469.089 479.657 447.955 463.806 449.012 454.295 499.734
8,2 CONCRETO 3500 PSI M3 396.216 451.565 385.535 410.782 420.492 391.361 405.927 392.332 397.187 438.942
8,3 CONCRETO 3000 PSI M3 394.430 451.407 383.435 409.424 419.420 389.432 404.426 390.432 395.430 438.413
8,4 CONCRETO 2500 PSI M3 351.797 410.402 340.487 367.219 377.501 346.656 362.078 347.684 352.825 397.036
8,5 CONCRETO 2000 PSI M3 328.950 388.776 317.405 344.694 355.190 323.702 339.446 324.752 330.000 375.132
8,6 CONCRETO 1500 PSI M3 299.824 360.871 288.043 315.889 326.599 294.469 310.534 295.540 300.895 346.948
8,7 MORTERO SECO 1:10 M3 259.103 311.523 248.988 272.898 282.094 254.505 268.300 255.426 260.024 299.568
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 463.541 514.441 453.719 476.936 485.866 459.076 472.471 459.970 464.435 502.833
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 390.751 426.580 383.837 400.180 406.465 387.608 397.037 388.237 391.379 418.408
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 451.546 485.055 445.080 460.364 466.242 448.606 457.424 449.194 452.133 477.412
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 673.026 706.535 666.560 681.844 687.722 670.086 678.904 670.674 673.613 698.892

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 119.963 119.963 119.963 119.963 119.963 119.963 119.963 119.963 119.963 119.963
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 4.037 4.417 3.964 4.137 4.204 4.004 4.104 4.011 4.044 4.331
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 134.058 134.058 134.058 134.058 134.058 134.058 134.058 134.058 134.058 134.058
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 164.377 164.377 164.377 164.377 164.377 164.377 164.377 164.377 164.377 164.377
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 239.724 239.724 239.724 239.724 239.724 239.724 239.724 239.724 239.724 239.724
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 266.867 266.867 266.867 266.867 266.867 266.867 266.867 266.867 266.867 266.867
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 294.041 294.041 294.041 294.041 294.041 294.041 294.041 294.041 294.041 294.041
9,8 HOJA PUERTA FORTEC 0.81 UN 195.389 195.389 195.389 195.389 195.389 195.389 195.389 195.389 195.389 195.389
9,9 HOJA PUERTA FORTEC 0.91 UN 221.544 221.544 221.544 221.544 221.544 221.544 221.544 221.544 221.544 221.544
9,10 HOJA PUERTA FORTEC 1.50 UN 326.162 326.162 326.162 326.162 326.162 326.162 326.162 326.162 326.162 326.162
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 123.464 123.464 123.464 123.464 123.464 123.464 123.464 123.464 123.464 123.464
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 164.004 164.004 164.004 164.004 164.004 164.004 164.004 164.004 164.004 164.004
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 182.312 182.312 182.312 182.312 182.312 182.312 182.312 182.312 182.312 182.312
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 464.783 464.783 464.783 464.783 464.783 464.783 464.783 464.783 464.783 464.783
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.927 40.927 40.927 40.927 40.927 40.927 40.927 40.927 40.927 40.927
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.382 25.382 25.382 25.382 25.382 25.382 25.382 25.382 25.382 25.382
9,17 VENTANERA EN MADERA CEDRO MACHO M2 96.741 96.741 96.741 96.741 96.741 96.741 96.741 96.741 96.741 96.741
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 118.826 118.826 118.826 118.826 118.826 118.826 118.826 118.826 118.826 118.826
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 92.279 92.279 92.279 92.279 92.279 92.279 92.279 92.279 92.279 92.279
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 28.514 28.514 28.514 28.514 28.514 28.514 28.514 28.514 28.514 28.514
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 28.514 28.514 28.514 28.514 28.514 28.514 28.514 28.514 28.514 28.514
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 27.023 27.023 27.023 27.023 27.023 27.023 27.023 27.023 27.023 27.023
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 41.292 41.292 41.292 41.292 41.292 41.292 41.292 41.292 41.292 41.292
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 51.198 51.198 51.198 51.198 51.198 51.198 51.198 51.198 51.198 51.198
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 61.765 61.765 61.765 61.765 61.765 61.765 61.765 61.765 61.765 61.765
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 74.313 74.313 74.313 74.313 74.313 74.313 74.313 74.313 74.313 74.313
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 350.779 350.779 350.779 350.779 350.779 350.779 350.779 350.779 350.779 350.779
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 245.114 245.114 245.114 245.114 245.114 245.114 245.114 245.114 245.114 245.114
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.707 32.707 32.707 32.707 32.707 32.707 32.707 32.707 32.707 32.707
9,30 VIDRIO TRANSPARENTE 4 MM M2 41.953 41.953 41.953 41.953 41.953 41.953 41.953 41.953 41.953 41.953
9,31 VIDRIO TRANSPARENTE 5 MM M2 51.198 51.198 51.198 51.198 51.198 51.198 51.198 51.198 51.198 51.198
9,32 VIDRIO TRANSPARENTE 6 MM M2 64.406 64.406 64.406 64.406 64.406 64.406 64.406 64.406 64.406 64.406
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
CONSTRUCCIN
10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 74.042 74.042 74.042 74.042 74.042 74.042 74.042 74.042 74.042 74.042
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 206.863 206.863 206.863 206.863 206.863 206.863 206.863 206.863 206.863 206.863
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10,3 ML 78.251 78.251 78.251 78.251 78.251 78.251 78.251 78.251 78.251 78.251
(INCLUYE ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 139.579 139.579 139.579 139.579 139.579 139.579 139.579 139.579 139.579 139.579
10,5 MARCO TAPA CAJA DE INSPECCIN UN 132.781 132.781 132.781 132.781 132.781 132.781 132.781 132.781 132.781 132.781
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 87.169 87.169 87.169 87.169 87.169 87.169 87.169 87.169 87.169 87.169
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 205.689 205.689 205.689 205.689 205.689 205.689 205.689 205.689 205.689 205.689
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 106.999 106.999 106.999 106.999 106.999 106.999 106.999 106.999 106.999 106.999
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.411 6.411 6.411 6.411 6.411 6.411 6.411 6.411 6.411 6.411
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN
10,10 M2 96.143 96.143 96.143 96.143 96.143 96.143 96.143 96.143 96.143 96.143
TUBO ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.600 39.600 39.600 39.600 39.600 39.600 39.600 39.600 39.600 39.600
10,12 DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 527.834 527.834 527.834 527.834 527.834 527.834 527.834 527.834 527.834 527.834
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 189.529 189.529 189.529 189.529 189.529 189.529 189.529 189.529 189.529 189.529
PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA
10,14 M2 212.142 212.142 212.142 212.142 212.142 212.142 212.142 212.142 212.142 212.142
ELECTROSTTICA
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10,15 M2 480.935 480.935 480.935 480.935 480.935 480.935 480.935 480.935 480.935 480.935
PUERTAS Y ACCESORIOS)

10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 124.273 124.273 124.273 124.273 124.273 124.273 124.273 124.273 124.273 124.273

10,17 PUERTA CORTINA INCLUYE ESMALTE M2 385.098 385.098 385.098 385.098 385.098 385.098 385.098 385.098 385.098 385.098
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.861 5.861 5.861 5.861 5.861 5.861 5.861 5.861 5.861 5.861
10,19 VENTANA EN ALUMINIO CORREDIZA M2 270.465 270.465 270.465 270.465 270.465 270.465 270.465 270.465 270.465 270.465
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 118.415 118.415 118.415 118.415 118.415 118.415 118.415 118.415 118.415 118.415
10,21 REJILLA PISO 0.30 M M2 83.968 83.968 83.968 83.968 83.968 83.968 83.968 83.968 83.968 83.968
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 86.593 86.593 86.593 86.593 86.593 86.593 86.593 86.593 86.593 86.593
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10,23 KG 10.258 10.258 10.258 10.258 10.258 10.258 10.258 10.258 10.258 10.258
ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10,24 KG 11.392 11.392 11.392 11.392 11.392 11.392 11.392 11.392 11.392 11.392
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 9.038 9.038 9.038 9.038 9.038 9.038 9.038 9.038 9.038 9.038
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 213.988 213.988 213.988 213.988 213.988 213.988 213.988 213.988 213.988 213.988
11,2 ACOMETIDA EN PVC 3/4" 5M UN 258.612 258.612 258.612 258.612 258.612 258.612 258.612 258.612 258.612 258.612
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.454 21.454 21.454 21.454 21.454 21.454 21.454 21.454 21.454 21.454
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.719 33.719 33.719 33.719 33.719 33.719 33.719 33.719 33.719 33.719
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 32.291 32.291 32.291 32.291 32.291 32.291 32.291 32.291 32.291 32.291
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 41.453 41.453 41.453 41.453 41.453 41.453 41.453 41.453 41.453 41.453
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 85.617 85.617 85.617 85.617 85.617 85.617 85.617 85.617 85.617 85.617
11,8 CONEXIN TANQUE ELEVADO PVC UN 215.321 215.321 215.321 215.321 215.321 215.321 215.321 215.321 215.321 215.321
11,9 INSTALACIN APARATO SANITARIO UN 41.862 41.862 41.862 41.862 41.862 41.862 41.862 41.862 41.862 41.862
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
11,10 INSTALACIN BOMBAS AGUA UN CONSTRUCCIN
582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 33.910 33.910 33.910 33.910 33.910 33.910 33.910 33.910 33.910 33.910
11,13 NIPLE PASAMURO 2" UN 64.279 64.279 64.279 64.279 64.279 64.279 64.279 64.279 64.279 64.279
11,14 NIPLE PASAMURO 4" UN 96.124 96.124 96.124 96.124 96.124 96.124 96.124 96.124 96.124 96.124
11,15 PUNTO AGUA CALIENTE CPVC UN 81.344 81.344 81.344 81.344 81.344 81.344 81.344 81.344 81.344 81.344
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 59.058 59.058 59.058 59.058 59.058 59.058 59.058 59.058 59.058 59.058
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.886 62.886 62.886 62.886 62.886 62.886 62.886 62.886 62.886 62.886
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 79.478 79.478 79.478 79.478 79.478 79.478 79.478 79.478 79.478 79.478
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 64.238 64.238 64.238 64.238 64.238 64.238 64.238 64.238 64.238 64.238
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 80.574 80.574 80.574 80.574 80.574 80.574 80.574 80.574 80.574 80.574
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 86.236 86.236 86.236 86.236 86.236 86.236 86.236 86.236 86.236 86.236
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 71.708 71.708 71.708 71.708 71.708 71.708 71.708 71.708 71.708 71.708
11,23 RED SUMINISTRO CPVC 1/2" ML 12.130 12.130 12.130 12.130 12.130 12.130 12.130 12.130 12.130 12.130
11,24 RED SUMINISTRO CPVC 3/4" ML 17.117 17.117 17.117 17.117 17.117 17.117 17.117 17.117 17.117 17.117
11,25 RED SUMINISTRO PVC 1 1/2" ML 22.340 22.340 22.340 22.340 22.340 22.340 22.340 22.340 22.340 22.340
11,26 RED SUMINISTRO PVC 1" ML 13.775 13.775 13.775 13.775 13.775 13.775 13.775 13.775 13.775 13.775
11,27 RED SUMINISTRO PVC 1/2" ML 8.214 8.214 8.214 8.214 8.214 8.214 8.214 8.214 8.214 8.214
11,28 RED SUMINISTRO PVC 2 1/2" ML 49.858 49.858 49.858 49.858 49.858 49.858 49.858 49.858 49.858 49.858
11,29 RED SUMINISTRO PVC 2" ML 31.861 31.861 31.861 31.861 31.861 31.861 31.861 31.861 31.861 31.861
11,30 RED SUMINISTRO PVC 3/4" ML 10.296 10.296 10.296 10.296 10.296 10.296 10.296 10.296 10.296 10.296
11,31 RED SANITARIA PVC-S 2" ML 24.576 24.576 24.576 24.576 24.576 24.576 24.576 24.576 24.576 24.576
11,32 RED SANITARIA PVC-S 3" ML 34.126 34.126 34.126 34.126 34.126 34.126 34.126 34.126 34.126 34.126
11,33 RED SANITARIA PVC-S 4" ML 46.331 46.331 46.331 46.331 46.331 46.331 46.331 46.331 46.331 46.331
11,34 RED SANITARIA PVC-S 6" ML 86.813 86.813 86.813 86.813 86.813 86.813 86.813 86.813 86.813 86.813
11,35 REGISTRO 1" UN 105.242 105.242 105.242 105.242 105.242 105.242 105.242 105.242 105.242 105.242
11,36 REGISTRO 1/2" UN 58.638 58.638 58.638 58.638 58.638 58.638 58.638 58.638 58.638 58.638
11,37 REGISTRO 3/4" UN 74.749 74.749 74.749 74.749 74.749 74.749 74.749 74.749 74.749 74.749
11,38 REGISTRO 1 1/2" UN 180.829 180.829 180.829 180.829 180.829 180.829 180.829 180.829 180.829 180.829
11,39 REGISTRO 2 1/2" UN 373.321 373.321 373.321 373.321 373.321 373.321 373.321 373.321 373.321 373.321
11,40 REGISTRO 2" UN 275.654 275.654 275.654 275.654 275.654 275.654 275.654 275.654 275.654 275.654
11,41 REVENTILACIN 2" ML 17.113 17.113 17.113 17.113 17.113 17.113 17.113 17.113 17.113 17.113
11,42 REVENTILACIN 3" ML 21.605 21.605 21.605 21.605 21.605 21.605 21.605 21.605 21.605 21.605
TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11,43 UN 168.098 168.098 168.098 168.098 168.098 168.098 168.098 168.098 168.098 168.098
INSTALACIN)
TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11,44 UN 273.999 273.999 273.999 273.999 273.999 273.999 273.999 273.999 273.999 273.999
ISNTALACIN)
TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11,45 UN 456.247 456.247 456.247 456.247 456.247 456.247 456.247 456.247 456.247 456.247
INSTALACIN)
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11,46 ML 39.559 39.559 39.559 39.559 39.559 39.559 39.559 39.559 39.559 39.559
SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11,47 ML 46.646 46.646 46.646 46.646 46.646 46.646 46.646 46.646 46.646 46.646
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,48 ML 59.764 59.764 59.764 59.764 59.764 59.764 59.764 59.764 59.764 59.764
SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS
11,49 ML 67.820 67.820 67.820 67.820 67.820 67.820 67.820 67.820 67.820 67.820
Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11,50 ML 87.389 87.389 87.389 87.389 87.389 87.389 87.389 87.389 87.389 87.389
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11,51 ML 101.080 101.080 101.080 101.080 101.080 101.080 101.080 101.080 101.080 101.080
SOPORTES)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y CONSTRUCCIN
11,52 ML 149.411 149.411 149.411 149.411 149.411 149.411 149.411 149.411 149.411 149.411
SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 60.025 60.025 60.025 60.025 60.025 60.025 60.025 60.025 60.025 60.025
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 60.272 60.272 60.272 60.272 60.272 60.272 60.272 60.272 60.272 60.272
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 39.033 39.033 39.033 39.033 39.033 39.033 39.033 39.033 39.033 39.033
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 48.134 48.134 48.134 48.134 48.134 48.134 48.134 48.134 48.134 48.134
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA
11,57 ML 4.091 4.091 4.091 4.091 4.091 4.091 4.091 4.091 4.091 4.091
2"

PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A


11,58 ML 6.448 6.448 6.448 6.448 6.448 6.448 6.448 6.448 6.448 6.448
2"
11,59 GABINETE TIPO III UN 995.071 995.071 995.071 995.071 995.071 995.071 995.071 995.071 995.071 995.071
11,60 GABINETE TIPO I UN 759.940 759.940 759.940 759.940 759.940 759.940 759.940 759.940 759.940 759.940
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.555.188 2.555.188 2.555.188 2.555.188 2.555.188 2.555.188 2.555.188 2.555.188 2.555.188 2.555.188
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.129.829 2.129.829 2.129.829 2.129.829 2.129.829 2.129.829 2.129.829 2.129.829 2.129.829 2.129.829
11,63 VLVULA MARIPOSA 3" UN 616.826 616.826 616.826 616.826 616.826 616.826 616.826 616.826 616.826 616.826
11,64 VLVULA MARIPOSA 4" UN 798.863 798.863 798.863 798.863 798.863 798.863 798.863 798.863 798.863 798.863
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 308.277 308.277 308.277 308.277 308.277 308.277 308.277 308.277 308.277 308.277

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 355.108 355.108 355.108 355.108 355.108 355.108 355.108 355.108 355.108 355.108
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 56.429 56.429 56.429 56.429 56.429 56.429 56.429 56.429 56.429 56.429
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 66.841 66.841 66.841 66.841 66.841 66.841 66.841 66.841 66.841 66.841
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 74.159 74.159 74.159 74.159 74.159 74.159 74.159 74.159 74.159 74.159
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 87.397 87.397 87.397 87.397 87.397 87.397 87.397 87.397 87.397 87.397
12,6 SALIDA TELFONO PVC COMPLETA UN 53.028 53.028 53.028 53.028 53.028 53.028 53.028 53.028 53.028 53.028
12,7 SALIDA TIMBRE PVC COMPLETA UN 60.462 60.462 60.462 60.462 60.462 60.462 60.462 60.462 60.462 60.462
12,8 STRIP TELEFNICO 10 PARES UN 139.309 139.309 139.309 139.309 139.309 139.309 139.309 139.309 139.309 139.309
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 54.467 54.467 54.467 54.467 54.467 54.467 54.467 54.467 54.467 54.467
12,10 SALIDA TRIFSICA PVC COMPLETA UN 125.231 125.231 125.231 125.231 125.231 125.231 125.231 125.231 125.231 125.231
12,11 SALIDA T.V PVC COMPLETA. UN 74.843 74.843 74.843 74.843 74.843 74.843 74.843 74.843 74.843 74.843
12,12 SALIDA BIFSICA C.N. UN 44.391 44.391 44.391 44.391 44.391 44.391 44.391 44.391 44.391 44.391
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 93.435 93.435 93.435 93.435 93.435 93.435 93.435 93.435 93.435 93.435
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 398.827 398.827 398.827 398.827 398.827 398.827 398.827 398.827 398.827 398.827
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 531.485 531.485 531.485 531.485 531.485 531.485 531.485 531.485 531.485 531.485
12,16 TUBERA PVC CONDUIT 1/2" ML 3.442 3.442 3.442 3.442 3.442 3.442 3.442 3.442 3.442 3.442
12,17 TUBERA PVC CONDUIT 3/4" ML 4.544 4.544 4.544 4.544 4.544 4.544 4.544 4.544 4.544 4.544
12,18 TUBERA PVC CONDUIT 1" ML 7.074 7.074 7.074 7.074 7.074 7.074 7.074 7.074 7.074 7.074
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.649 12.649 12.649 12.649 12.649 12.649 12.649 12.649 12.649 12.649
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 265.925 265.925 265.925 265.925 265.925 265.925 265.925 265.925 265.925 265.925
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 75.046 75.046 75.046 75.046 75.046 75.046 75.046 75.046 75.046 75.046
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 101.747 101.747 101.747 101.747 101.747 101.747 101.747 101.747 101.747 101.747
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 41.264 41.264 41.264 41.264 41.264 41.264 41.264 41.264 41.264 41.264
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.361.815 1.361.815 1.361.815 1.361.815 1.361.815 1.361.815 1.361.815 1.361.815 1.361.815 1.361.815
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.009.286 1.009.286 1.009.286 1.009.286 1.009.286 1.009.286 1.009.286 1.009.286 1.009.286 1.009.286
12,26 POSTE METLICO 6M UN 1.266.588 1.266.588 1.266.588 1.266.588 1.266.588 1.266.588 1.266.588 1.266.588 1.266.588 1.266.588
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 589.738 589.738 589.738 589.738 589.738 589.738 589.738 589.738 589.738 589.738
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 107.335 107.335 107.335 107.335 107.335 107.335 107.335 107.335 107.335 107.335
12,29 LUMINARIA 70W SODIO UN 494.896 494.896 494.896 494.896 494.896 494.896 494.896 494.896 494.896 494.896
12,30 LUMINARIA 150W SODIO UN 619.295 619.295 619.295 619.295 619.295 619.295 619.295 619.295 619.295 619.295
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.636.595 1.636.595 1.636.595 1.636.595 1.636.595 1.636.595 1.636.595 1.636.595 1.636.595 1.636.595
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.205.043 1.205.043 1.205.043 1.205.043 1.205.043 1.205.043 1.205.043 1.205.043 1.205.043 1.205.043
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
13 PISOS BASES CONSTRUCCIN
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 38.078 39.367 37.829 38.417 38.643 37.965 38.304 37.988 38.101 39.073
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 37.948 39.237 37.699 38.287 38.513 37.835 38.174 37.858 37.971 38.943
13,3 ALISTADO PARA LISTN M2 14.083 14.341 14.034 14.151 14.197 14.061 14.129 14.065 14.088 14.282
13,4 ALISTADO PISOS 1:3, E=0.04 M2 26.290 28.867 25.792 26.968 27.420 26.063 26.742 26.109 26.335 28.279
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 82.180 84.757 81.682 82.858 83.310 81.953 82.632 81.999 82.225 84.169
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.769 26.965 25.538 26.084 26.294 25.664 25.979 25.685 25.790 26.693
13,7 CONCRETO BASE GRADAS 2500 PSI M2 56.741 62.602 55.610 58.283 59.311 56.227 57.769 56.330 56.844 61.265
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 79.049 88.426 77.240 81.517 83.162 78.227 80.694 78.391 79.214 86.288
13,9 MANTO FIBERGLASS 600X1 M2 29.654 29.654 29.654 29.654 29.654 29.654 29.654 29.654 29.654 29.654
13,10 PEGANTE MORTERO-CONCRETO M2 22.295 22.295 22.295 22.295 22.295 22.295 22.295 22.295 22.295 22.295
13,11 PERMA PLY 2 CAPAS M2 26.126 26.126 26.126 26.126 26.126 26.126 26.126 26.126 26.126 26.126
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 46.309 51.583 45.291 47.697 48.622 45.846 47.234 45.939 46.401 50.380
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 54.328 60.775 53.084 56.025 57.156 53.763 55.459 53.876 54.441 59.305
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 78.942 88.905 77.019 81.564 83.311 78.068 80.690 78.243 79.117 86.632
13,15 TRITURADO FINO 1/2 M3 102.176 144.095 94.086 113.207 120.561 98.499 109.530 99.234 102.911 134.534
13,16 TRITURADO GRUESO 3/4 M3 104.156 151.910 99.234 123.530 125.436 106.586 119.991 106.020 102.794 141.752

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 55.626 56.142 55.527 55.762 55.853 55.581 55.717 55.590 55.636 56.024

14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 33.170 33.428 33.120 33.238 33.283 33.147 33.215 33.152 33.174 33.369

14,3 ADOQUN CONCRETO 6CM M2 63.303 64.592 63.055 63.642 63.869 63.190 63.529 63.213 63.326 64.298
14,4 ADOQUN CONCRETO 8CM M2 66.553 67.842 66.305 66.892 67.119 66.440 66.779 66.463 66.576 67.548
14,5 ADOQUN GRES PEATONAL M2 70.724 72.013 70.475 71.063 71.289 70.611 70.950 70.634 70.747 71.719
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14,6 M2 73.594 74.109 73.494 73.729 73.820 73.548 73.684 73.557 73.603 73.992
BLANCO. INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.641 36.306 35.513 35.816 35.933 35.583 35.758 35.595 35.653 36.154
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 159.855 162.175 159.408 160.466 160.873 159.652 160.262 159.693 159.896 161.646
14,9 ACABADO EN GRAVILLA LAVADA M2 44.482 46.069 44.176 44.900 45.178 44.343 44.760 44.371 44.510 45.707
14,10 GUARDAESCOBA EN GRANITO ML 42.460 42.460 42.460 42.460 42.460 42.460 42.460 42.460 42.460 42.460
14,11 GUARDAESCOBA EN GRAVILLA ML 9.767 10.432 9.639 9.942 10.059 9.709 9.884 9.721 9.779 10.280
14,12 GUARDAESCOBA PVC CARAMELO ML 9.224 9.224 9.224 9.224 9.224 9.224 9.224 9.224 9.224 9.224
14,13 GUARDAESCOBA PVC CEDRO ML 12.392 12.392 12.392 12.392 12.392 12.392 12.392 12.392 12.392 12.392
14,14 GUARDAESCOBA PINO CARIBE ML 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263 10.263
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.265 17.265 17.265 17.265 17.265 17.265 17.265 17.265 17.265 17.265
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.743 33.743 33.743 33.743 33.743 33.743 33.743 33.743 33.743 33.743
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.896 8.896 8.896 8.896 8.896 8.896 8.896 8.896 8.896 8.896
14,18 LISTN M.H. AMARILLO M2 72.655 72.655 72.655 72.655 72.655 72.655 72.655 72.655 72.655 72.655
14,19 PASO ESCALERA GRANITO ML 114.864 116.668 114.515 115.338 115.655 114.705 115.180 114.737 114.895 116.256
14,20 PIRLANES ALUMINIO ML 7.250 7.250 7.250 7.250 7.250 7.250 7.250 7.250 7.250 7.250
14,21 PIRLANES LADRILLO ML 31.404 32.164 31.257 31.604 31.737 31.337 31.537 31.351 31.417 31.990
14,22 PISO VINILO TRFICO RESIDENCIAL M2 45.021 45.021 45.021 45.021 45.021 45.021 45.021 45.021 45.021 45.021
14,23 PISO VINILO TRFICO PESADO M2 52.373 52.373 52.373 52.373 52.373 52.373 52.373 52.373 52.373 52.373
14,24 PULIDA LACADA PISO MADERA M2 47.929 47.929 47.929 47.929 47.929 47.929 47.929 47.929 47.929 47.929
14,25 TABLETA DE GRES 25X25 M2 48.190 48.706 48.091 48.326 48.416 48.145 48.281 48.154 48.199 48.588
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 54.170 54.686 54.071 54.306 54.397 54.125 54.261 54.134 54.180 54.568
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.599 10.599 10.599 10.599 10.599 10.599 10.599 10.599 10.599 10.599
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 48.939 50.078 48.719 49.239 49.439 48.839 49.139 48.859 48.959 49.819
14,29 JABONERA PORCELANA ACUARIO UN 20.207 20.207 20.207 20.207 20.207 20.207 20.207 20.207 20.207 20.207
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14,30 UN 121.133 121.133 121.133 121.133 121.133 121.133 121.133 121.133 121.133 121.133
JABONERA,CEPILLERA Y PERCHA SIMPLE)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
14,31 REJILLA PLSTICA SOSCO 3X2 UN CONSTRUCCIN
9.629 9.629 9.629 9.629 9.629 9.629 9.629 9.629 9.629 9.629
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 22.029 22.029 22.029 22.029 22.029 22.029 22.029 22.029 22.029 22.029
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.075 14.075 14.075 14.075 14.075 14.075 14.075 14.075 14.075 14.075
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.670 13.670 13.670 13.670 13.670 13.670 13.670 13.670 13.670 13.670
14,35 REMATES BOCEL ALUMINIO ML 8.258 8.258 8.258 8.258 8.258 8.258 8.258 8.258 8.258 8.258
14,36 REMATES BOCEL PORCELANA ML 8.406 8.406 8.406 8.406 8.406 8.406 8.406 8.406 8.406 8.406
14,37 TAPA REGISTRO 20X20 UN 18.638 18.638 18.638 18.638 18.638 18.638 18.638 18.638 18.638 18.638
14,38 TAPA REGISTRO 6X6 UN 16.972 16.972 16.972 16.972 16.972 16.972 16.972 16.972 16.972 16.972
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 18.439 18.439 18.439 18.439 18.439 18.439 18.439 18.439 18.439 18.439

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL


14,40 M2 21.316 21.316 21.316 21.316 21.316 21.316 21.316 21.316 21.316 21.316
FUNDIDO EN SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 63.798 64.314 63.699 63.934 64.024 63.753 63.889 63.762 63.807 64.196
14,42 MEDIA CAA EN GRANITO ML 76.289 76.289 76.289 76.289 76.289 76.289 76.289 76.289 76.289 76.289
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.828 32.828 32.828 32.828 32.828 32.828 32.828 32.828 32.828 32.828
14,44 PINTURA ACRLICA PARA PISOS M2 12.956 12.956 12.956 12.956 12.956 12.956 12.956 12.956 12.956 12.956
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 100.385 100.385 100.385 100.385 100.385 100.385 100.385 100.385 100.385 100.385
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 121.340 121.340 121.340 121.340 121.340 121.340 121.340 121.340 121.340 121.340

15 CIELO RASO
15,1 APLIQUE YESO ML 71.653 71.653 71.653 71.653 71.653 71.653 71.653 71.653 71.653 71.653
15,2 ARMADURA MADERA Y MALLA M2 34.766 34.766 34.766 34.766 34.766 34.766 34.766 34.766 34.766 34.766
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 54.118 54.118 54.118 54.118 54.118 54.118 54.118 54.118 54.118 54.118
15,4 CIELO RASO DURACUSTIC M2 66.530 66.530 66.530 66.530 66.530 66.530 66.530 66.530 66.530 66.530
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49.610 49.610 49.610 49.610 49.610 49.610 49.610 49.610 49.610 49.610
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 92.202 92.202 92.202 92.202 92.202 92.202 92.202 92.202 92.202 92.202
15,7 CORNISAS YESO ML 48.128 48.128 48.128 48.128 48.128 48.128 48.128 48.128 48.128 48.128
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 102.033 102.033 102.033 102.033 102.033 102.033 102.033 102.033 102.033 102.033
15,9 MALLA CON VENA M2 13.017 13.017 13.017 13.017 13.017 13.017 13.017 13.017 13.017 13.017

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569

16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202

16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 66.796 105.601 73.264 99.134 84.905 84.905 97.840 81.025 60.329 99.134
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 108.898 153.666 100.259 120.679 128.533 104.971 116.752 105.757 109.684 143.456
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 163.939 227.307 182.035 166.513 226.014 194.970 220.840 178.154 201.437 227.307
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 56.892 95.697 63.360 89.230 75.001 75.001 87.936 71.121 56.892 89.230
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 138.768 198.015 152.743 137.221 196.722 165.678 191.548 148.862 172.145 198.015
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 161.278 224.646 179.374 163.852 223.353 192.309 218.179 175.493 198.776 224.646

17 APARATOS SANITARIOS
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN
CONSTRUCCIN
296.871296.871 296.871 296.871 296.871 296.871 296.871 296.871 296.871 296.871
SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE
17,2 UN 876.986 876.986 876.986 876.986 876.986 876.986 876.986 876.986 876.986 876.986
GRIFERA)

17,3 SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 474.778 474.778 474.778 474.778 474.778 474.778 474.778 474.778 474.778 474.778

17,4 SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 136.809 136.809 136.809 136.809 136.809 136.809 136.809 136.809 136.809 136.809
SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE
17,5 UN 192.121 192.121 192.121 192.121 192.121 192.121 192.121 192.121 192.121 192.121
GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE
17,6 UN 178.351 178.351 178.351 178.351 178.351 178.351 178.351 178.351 178.351 178.351
GRIFERA)

17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 393.829 393.829 393.829 393.829 393.829 393.829 393.829 393.829 393.829 393.829
SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE
17,8 UN 1.008.729 1.008.729 1.008.729 1.008.729 1.008.729 1.008.729 1.008.729 1.008.729 1.008.729 1.008.729
GRIFERA)

17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 285.810 285.810 285.810 285.810 285.810 285.810 285.810 285.810 285.810 285.810
SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A
17,10 UN 202.065 202.065 202.065 202.065 202.065 202.065 202.065 202.065 202.065 202.065
BAERA
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 79.841 79.841 79.841 79.841 79.841 79.841 79.841 79.841 79.841 79.841
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO
17,12 UN 245.009 245.009 245.009 245.009 245.009 245.009 245.009 245.009 245.009 245.009
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO
17,13 UN 361.397 361.397 361.397 361.397 361.397 361.397 361.397 361.397 361.397 361.397
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS
18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.082 8.082 8.082 8.082 8.082 8.082 8.082 8.082 8.082 8.082
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 3.005 3.005 3.005 3.005 3.005 3.005 3.005 3.005 3.005 3.005
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.720 10.720 10.720 10.720 10.720 10.720 10.720 10.720 10.720 10.720
18,4 BARNIZ SOBRE MUEBLES M2 41.042 41.042 41.042 41.042 41.042 41.042 41.042 41.042 41.042 41.042
18,5 CARBURO SOBRE PAETES M2 5.622 5.622 5.622 5.622 5.622 5.622 5.622 5.622 5.622 5.622
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 64.623 64.623 64.623 64.623 64.623 64.623 64.623 64.623 64.623 64.623
18,7 DEMARCACIN CON MARMOLINA ML 3.337 3.337 3.337 3.337 3.337 3.337 3.337 3.337 3.337 3.337
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.692 2.692 2.692 2.692 2.692 2.692 2.692 2.692 2.692 2.692
18,9 ESMALTE SOBRE LMINA LLENA M2 13.481 13.481 13.481 13.481 13.481 13.481 13.481 13.481 13.481 13.481
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.911 3.911 3.911 3.911 3.911 3.911 3.911 3.911 3.911 3.911
18,11 ESMALTE SOBRE MADERA LLENA M2 14.218 14.218 14.218 14.218 14.218 14.218 14.218 14.218 14.218 14.218
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.607 5.607 5.607 5.607 5.607 5.607 5.607 5.607 5.607 5.607
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.370 6.370 6.370 6.370 6.370 6.370 6.370 6.370 6.370 6.370
18,14 ESTUCO M2 6.748 6.748 6.748 6.748 6.748 6.748 6.748 6.748 6.748 6.748
18,15 ESTUCO (LINEAL) ML 4.219 4.219 4.219 4.219 4.219 4.219 4.219 4.219 4.219 4.219
18,16 ESTUCO Y VINILO 3 MANOS M2 14.991 14.991 14.991 14.991 14.991 14.991 14.991 14.991 14.991 14.991
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.270 9.270 9.270 9.270 9.270 9.270 9.270 9.270 9.270 9.270
18,18 LACA PISOS MADERA M2 21.892 21.892 21.892 21.892 21.892 21.892 21.892 21.892 21.892 21.892
18,19 LNEAS TRFICO 0.10 ML 2.591 2.591 2.591 2.591 2.591 2.591 2.591 2.591 2.591 2.591
18,20 MARMOLINA SOBRE PAETE M2 11.866 11.866 11.866 11.866 11.866 11.866 11.866 11.866 11.866 11.866
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.198 3.198 3.198 3.198 3.198 3.198 3.198 3.198 3.198 3.198
18,22 TINTILLA SOBRE MADERA LLENA M2 12.190 12.190 12.190 12.190 12.190 12.190 12.190 12.190 12.190 12.190
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.847 6.847 6.847 6.847 6.847 6.847 6.847 6.847 6.847 6.847
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.293 4.293 4.293 4.293 4.293 4.293 4.293 4.293 4.293 4.293
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.229 21.229 21.229 21.229 21.229 21.229 21.229 21.229 21.229 21.229
18,26 PINTURA EPXICA M2 12.228 12.228 12.228 12.228 12.228 12.228 12.228 12.228 12.228 12.228
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
18,27 PINTURA EPXICA (LINEAL) ML CONSTRUCCIN
7.539 7.539 7.539 7.539 7.539 7.539 7.539 7.539 7.539 7.539

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.978.642 5.978.642 5.978.642 5.978.642 5.978.642 5.978.642 5.978.642 5.978.642 5.978.642 5.978.642
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON
19,2 UN 10.563.303 10.563.303 10.563.303 10.563.303 10.563.303 10.563.303 10.563.303 10.563.303 10.563.303 10.563.303
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.764.309 2.764.309 2.764.309 2.764.309 2.764.309 2.764.309 2.764.309 2.764.309 2.764.309 2.764.309
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 9.034.228 9.034.228 9.034.228 9.034.228 9.034.228 9.034.228 9.034.228 9.034.228 9.034.228 9.034.228
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.460.941 8.460.941 8.460.941 8.460.941 8.460.941 8.460.941 8.460.941 8.460.941 8.460.941 8.460.941
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.591 2.591 2.591 2.591 2.591 2.591 2.591 2.591 2.591 2.591
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 847.713 847.713 847.713 847.713 847.713 847.713 847.713 847.713 847.713 847.713
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 84.799 84.799 84.799 84.799 84.799 84.799 84.799 84.799 84.799 84.799
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.535.242 1.535.844 1.535.126 1.535.400 1.535.506 1.535.189 1.535.348 1.535.200 1.535.253 1.535.707
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 665.493 679.738 662.745 669.242 671.741 664.244 667.992 664.494 665.743 676.489

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.757 28.757 28.757 28.757 28.757 28.757 28.757 28.757 28.757 28.757
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.793 42.793 42.793 42.793 42.793 42.793 42.793 42.793 42.793 42.793
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 53.069 53.069 53.069 53.069 53.069 53.069 53.069 53.069 53.069 53.069
20,4 TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.244 17.244 17.244 17.244 17.244 17.244 17.244 17.244 17.244 17.244

20,5 TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 20.899 20.899 20.899 20.899 20.899 20.899 20.899 20.899 20.899 20.899

20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 28.512 28.512 28.512 28.512 28.512 28.512 28.512 28.512 28.512 28.512

20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.451 25.451 25.451 25.451 25.451 25.451 25.451 25.451 25.451 25.451
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.826 26.826 26.826 26.826 26.826 26.826 26.826 26.826 26.826 26.826
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.560 33.560 33.560 33.560 33.560 33.560 33.560 33.560 33.560 33.560
20,10 VLVULA DE BOLA GAS 1/2" UN 17.279 17.279 17.279 17.279 17.279 17.279 17.279 17.279 17.279 17.279
20,11 VLVULA DE BOLA GAS 3/4" UN 22.673 22.673 22.673 22.673 22.673 22.673 22.673 22.673 22.673 22.673
20,12 VLVULA DE BOLA GAS 1" UN 34.926 34.926 34.926 34.926 34.926 34.926 34.926 34.926 34.926 34.926
20,13 VLVULA POLIETILENO GAS 1/2" UN 268.439 268.439 268.439 268.439 268.439 268.439 268.439 268.439 268.439 268.439
20,14 VLVULA POLIETILENO GAS 3/4" UN 308.995 308.995 308.995 308.995 308.995 308.995 308.995 308.995 308.995 308.995
20,15 VLVULA POLIETILENO GAS 1" UN 322.189 322.189 322.189 322.189 322.189 322.189 322.189 322.189 322.189 322.189
20,16 ACOMETIDA GAS 1/2" ML 298.539 298.539 298.539 298.539 298.539 298.539 298.539 298.539 298.539 298.539

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 217.819 217.819 217.819 217.819 217.819 217.819 217.819 217.819 217.819 217.819
21,2 CABLE DETECTOR LINEAL DE CALOR ML 33.457 33.457 33.457 33.457 33.457 33.457 33.457 33.457 33.457 33.457
21,3 SIRENA DE 110 V UN 101.457 101.457 101.457 101.457 101.457 101.457 101.457 101.457 101.457 101.457
21,4 CMARA CCTV UN 255.839 255.839 255.839 255.839 255.839 255.839 255.839 255.839 255.839 255.839
21,5 PARLANTE-CIELO FALSO UN 50.704 50.704 50.704 50.704 50.704 50.704 50.704 50.704 50.704 50.704
21,6 AMPLIFICADOR 100W UN 562.147 562.147 562.147 562.147 562.147 562.147 562.147 562.147 562.147 562.147
21,7 AMPLIFICADOR 300W UN 1.397.889 1.397.889 1.397.889 1.397.889 1.397.889 1.397.889 1.397.889 1.397.889 1.397.889 1.397.889
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.859 42.859 42.859 42.859 42.859 42.859 42.859 42.859 42.859 42.859
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 218.107 218.107 218.107 218.107 218.107 218.107 218.107 218.107 218.107 218.107
21,10 TOMA PARA MICRFONO UN 42.712 42.712 42.712 42.712 42.712 42.712 42.712 42.712 42.712 42.712
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.679 3.679 3.679 3.679 3.679 3.679 3.679 3.679 3.679 3.679
21,12 SPLITERS UN 6.209 6.209 6.209 6.209 6.209 6.209 6.209 6.209 6.209 6.209
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.941 17.941 17.941 17.941 17.941 17.941 17.941 17.941 17.941 17.941
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.567 23.567 23.567 23.567 23.567 23.567 23.567 23.567 23.567 23.567
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.608 30.608 30.608 30.608 30.608 30.608 30.608 30.608 30.608 30.608
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 120.530 120.530 120.530 120.530 120.530 120.530 120.530 120.530 120.530 120.530
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML CONSTRUCCIN
31.436 31.436 31.436 31.436 31.436 31.436 31.436 31.436 31.436 31.436
21,18 BANDEJA PORTACABLES PARA RACK UN 102.997 102.997 102.997 102.997 102.997 102.997 102.997 102.997 102.997 102.997
21,19 RACK 2' X 24" UN 178.326 178.326 178.326 178.326 178.326 178.326 178.326 178.326 178.326 178.326
21,20 RACK 3' X 24" UN 281.638 281.638 281.638 281.638 281.638 281.638 281.638 281.638 281.638 281.638
21,21 RACK 5' X 24" UN 349.222 349.222 349.222 349.222 349.222 349.222 349.222 349.222 349.222 349.222
21,22 RACK 7' X 24" UN 381.915 381.915 381.915 381.915 381.915 381.915 381.915 381.915 381.915 381.915
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 557.340 557.340 557.340 557.340 557.340 557.340 557.340 557.340 557.340 557.340
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 327.751 327.751 327.751 327.751 327.751 327.751 327.751 327.751 327.751 327.751
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 102.136 102.136 102.136 102.136 102.136 102.136 102.136 102.136 102.136 102.136
21,26 PATCH CORD 2M CATEGORA 6A UN 13.635 13.635 13.635 13.635 13.635 13.635 13.635 13.635 13.635 13.635
21,27 PATCH CORD 5M CATEGORA 6A UN 27.889 27.889 27.889 27.889 27.889 27.889 27.889 27.889 27.889 27.889
21,28 CABLE UTP CATEGORA 6A ML 4.874 4.874 4.874 4.874 4.874 4.874 4.874 4.874 4.874 4.874
21,29 CANALETA METLICA 4X6 CMS ML 34.253 34.253 34.253 34.253 34.253 34.253 34.253 34.253 34.253 34.253
21,30 CANALETA METLICA 4X10 CMS ML 35.812 35.812 35.812 35.812 35.812 35.812 35.812 35.812 35.812 35.812
21,31 CANALETA METLICA 6X10 CMS ML 36.591 36.591 36.591 36.591 36.591 36.591 36.591 36.591 36.591 36.591
21,32 CANALETA PLSTICA 13X7 MM ML 23.857 23.857 23.857 23.857 23.857 23.857 23.857 23.857 23.857 23.857
21,33 CANALETA PLSTICA 20X12 MM ML 26.420 26.420 26.420 26.420 26.420 26.420 26.420 26.420 26.420 26.420
21,34 CANALETA PLSTICA 32X12 MM ML 27.497 27.497 27.497 27.497 27.497 27.497 27.497 27.497 27.497 27.497
21,35 CANALETA PLSTICA 40X60 MM ML 46.427 46.427 46.427 46.427 46.427 46.427 46.427 46.427 46.427 46.427
21,36 SWITCH 10/100/1000 24 PUERTOS UN 602.033 602.033 602.033 602.033 602.033 602.033 602.033 602.033 602.033 602.033
21,37 SWITCH 10/100/1000 16 PUERTOS UN 308.654 308.654 308.654 308.654 308.654 308.654 308.654 308.654 308.654 308.654
21,38 SWITCH 10/100/1000 8 PUERTOS UN 85.894 85.894 85.894 85.894 85.894 85.894 85.894 85.894 85.894 85.894
21,39 CABLE TELEFNICO 2 PARES ML 1.786 1.786 1.786 1.786 1.786 1.786 1.786 1.786 1.786 1.786
21,40 CABLE TELEFNICO 10 PARES ML 8.257 8.257 8.257 8.257 8.257 8.257 8.257 8.257 8.257 8.257
21,41 CABLE TELEFNICO 20 PARES ML 12.353 12.353 12.353 12.353 12.353 12.353 12.353 12.353 12.353 12.353
21,42 CABLE TELEFNICO 40 PARES ML 20.650 20.650 20.650 20.650 20.650 20.650 20.650 20.650 20.650 20.650
21,43 CABLE TELEVISIN RG6 ML 3.813 3.813 3.813 3.813 3.813 3.813 3.813 3.813 3.813 3.813
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.453 21.453 21.453 21.453 21.453 21.453 21.453 21.453 21.453 21.453
21,45 ACOMETIDA TELEFNICA 1" ML 31.313 31.313 31.313 31.313 31.313 31.313 31.313 31.313 31.313 31.313
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.746 18.746 18.746 18.746 18.746 18.746 18.746 18.746 18.746 18.746
21,47 CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 14.987 14.987 14.987 14.987 14.987 14.987 14.987 14.987 14.987 14.987
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 609.011 609.011 609.011 609.011 609.011 609.011 609.011 609.011 609.011 609.011
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 89.113 89.113 89.113 89.113 89.113 89.113 89.113 89.113 89.113 89.113
1,3 CODO 45 PVC UNIN MECNICA 8" UN 502.423 502.423 502.423 502.423 502.423 502.423 502.423 502.423 502.423 502.423
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.072.407 1.072.407 1.072.407 1.072.407 1.072.407 1.072.407 1.072.407 1.072.407 1.072.407 1.072.407
1,5 CODO 90 PVC UNIN MECNICA 4" UN 122.857 122.857 122.857 122.857 122.857 122.857 122.857 122.857 122.857 122.857
1,6 CODO 90 PVC UNIN MECNICA 8" UN 748.989 748.989 748.989 748.989 748.989 748.989 748.989 748.989 748.989 748.989
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.612.234 1.612.234 1.612.234 1.612.234 1.612.234 1.612.234 1.612.234 1.612.234 1.612.234 1.612.234
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.743 12.743 12.743 12.743 12.743 12.743 12.743 12.743 12.743 12.743
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.747 15.747 15.747 15.747 15.747 15.747 15.747 15.747 15.747 15.747
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.805 19.805 19.805 19.805 19.805 19.805 19.805 19.805 19.805 19.805
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.688 21.688 21.688 21.688 21.688 21.688 21.688 21.688 21.688 21.688
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 26.025 26.025 26.025 26.025 26.025 26.025 26.025 26.025 26.025 26.025
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 26.025 26.025 26.025 26.025 26.025 26.025 26.025 26.025 26.025 26.025
1,14 TAPN PVC UNIN MECNICA 3" UN 105.039 105.039 105.039 105.039 105.039 105.039 105.039 105.039 105.039 105.039
1,15 TAPN PVC UNIN MECNICA 4" UN 121.651 121.651 121.651 121.651 121.651 121.651 121.651 121.651 121.651 121.651
1,16 TAPN PVC UNIN MECNICA 8" UN 376.545 376.545 376.545 376.545 376.545 376.545 376.545 376.545 376.545 376.545
1,17 TEE PVC UNIN MECNICA 2" UN 141.420 141.420 141.420 141.420 141.420 141.420 141.420 141.420 141.420 141.420
1,18 TEE PVC UNIN MECNICA 4" UN 233.128 233.128 233.128 233.128 233.128 233.128 233.128 233.128 233.128 233.128
1,19 TEE PVC UNIN MECNICA 8" UN 1.031.983 1.031.983 1.031.983 1.031.983 1.031.983 1.031.983 1.031.983 1.031.983 1.031.983 1.031.983
1,20 TEE PVC UNIN MECNICA 10" UN 1.189.042 1.189.042 1.189.042 1.189.042 1.189.042 1.189.042 1.189.042 1.189.042 1.189.042 1.189.042
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.864 13.864 13.864 13.864 13.864 13.864 13.864 13.864 13.864 13.864
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.223 12.223 12.223 12.223 12.223 12.223 12.223 12.223 12.223 12.223
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 30.392 30.392 30.392 30.392 30.392 30.392 30.392 30.392 30.392 30.392
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 120.333 120.333 120.333 120.333 120.333 120.333 120.333 120.333 120.333 120.333
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 179.336 179.336 179.336 179.336 179.336 179.336 179.336 179.336 179.336 179.336
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 29.239 29.239 29.239 29.239 29.239 29.239 29.239 29.239 29.239 29.239
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 100.832 100.832 100.832 100.832 100.832 100.832 100.832 100.832 100.832 100.832
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 149.559 149.559 149.559 149.559 149.559 149.559 149.559 149.559 149.559 149.559
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 61.029 61.029 61.029 61.029 61.029 61.029 61.029 61.029 61.029 61.029
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 246.097 246.097 246.097 246.097 246.097 246.097 246.097 246.097 246.097 246.097
1,32 UNIN REPARACION PVC 4" UN 71.230 71.230 71.230 71.230 71.230 71.230 71.230 71.230 71.230 71.230
1,33 UNIN REPARACIN PVC 8" UN 286.375 286.375 286.375 286.375 286.375 286.375 286.375 286.375 286.375 286.375
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 171.344 171.344 171.344 171.344 171.344 171.344 171.344 171.344 171.344 171.344
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 488.684 488.684 488.684 488.684 488.684 488.684 488.684 488.684 488.684 488.684
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.310.212 1.310.212 1.310.212 1.310.212 1.310.212 1.310.212 1.310.212 1.310.212 1.310.212 1.310.212
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.936.040 1.936.040 1.936.040 1.936.040 1.936.040 1.936.040 1.936.040 1.936.040 1.936.040 1.936.040

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.351 10.351 10.351 10.351 10.351 10.351 10.351 10.351 10.351 10.351
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.628 23.628 23.628 23.628 23.628 23.628 23.628 23.628 23.628 23.628
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 90.250 132.982 82.003 101.495 108.992 86.501 97.747 87.251 90.999 123.236
2,5 RELLENO TIPO 2 "RECEBO" M3 62.017 100.822 68.485 94.355 80.126 80.126 93.061 76.246 55.550 94.355
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 61.562 100.367 68.030 93.900 79.671 79.671 92.606 75.791 61.562 93.900
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 104.126 122.573 102.076 105.151 122.573 102.076 125.648 102.076 106.176 131.797
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 56.294 75.099 54.204 57.338 75.099 54.204 78.233 54.204 58.383 84.502
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 113.101 162.481 103.572 126.095 134.759 108.769 121.764 109.636 113.968 151.219

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 112.291 112.291 112.291 112.291 112.291 112.291 112.291 112.291 112.291 112.291
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
3,2 CODO 45 PVC ALCANTARILLADO 16" UN CONSTRUCCIN
1.171.636 1.171.636 1.171.636 1.171.636 1.171.636 1.171.636 1.171.636 1.171.636 1.171.636 1.171.636
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 146.776 146.776 146.776 146.776 146.776 146.776 146.776 146.776 146.776 146.776
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.357.073 1.357.073 1.357.073 1.357.073 1.357.073 1.357.073 1.357.073 1.357.073 1.357.073 1.357.073
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 945.797 945.797 945.797 945.797 945.797 945.797 945.797 945.797 945.797 945.797
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.172 62.172 62.172 62.172 62.172 62.172 62.172 62.172 62.172 62.172
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 111.469 111.469 111.469 111.469 111.469 111.469 111.469 111.469 111.469 111.469
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 263.306 263.306 263.306 263.306 263.306 263.306 263.306 263.306 263.306 263.306
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 422.778 422.778 422.778 422.778 422.778 422.778 422.778 422.778 422.778 422.778
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 111.517 111.517 111.517 111.517 111.517 111.517 111.517 111.517 111.517 111.517
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 111.517 111.517 111.517 111.517 111.517 111.517 111.517 111.517 111.517 111.517
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312 263.312
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 422.778 422.778 422.778 422.778 422.778 422.778 422.778 422.778 422.778 422.778
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 424.388 424.388 424.388 424.388 424.388 424.388 424.388 424.388 424.388 424.388
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 689.283 689.283 689.283 689.283 689.283 689.283 689.283 689.283 689.283 689.283
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.106.306 1.106.306 1.106.306 1.106.306 1.106.306 1.106.306 1.106.306 1.106.306 1.106.306 1.106.306
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 68.296 68.296 68.296 68.296 68.296 68.296 68.296 68.296 68.296 68.296
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 355.078 355.078 355.078 355.078 355.078 355.078 355.078 355.078 355.078 355.078
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 398.125 398.125 398.125 398.125 398.125 398.125 398.125 398.125 398.125 398.125
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.102.392 1.102.392 1.102.392 1.102.392 1.102.392 1.102.392 1.102.392 1.102.392 1.102.392 1.102.392
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 64.598 65.107 64.500 64.732 64.821 64.553 64.687 64.562 64.607 64.991
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 321.864 321.864 321.864 321.864 321.864 321.864 321.864 321.864 321.864 321.864
3,25 TUBERA PVC ALCANTARILLADO 8" ML 48.936 48.936 48.936 48.936 48.936 48.936 48.936 48.936 48.936 48.936
3,26 TUBERA PVC ALCANTARILLADO 10" ML 69.246 69.246 69.246 69.246 69.246 69.246 69.246 69.246 69.246 69.246
3,27 TUBERA PVC ALCANTARILLADO 12" ML 99.968 99.968 99.968 99.968 99.968 99.968 99.968 99.968 99.968 99.968
3,28 TUBERA PVC ALCANTARILLADO 16" ML 153.472 153.472 153.472 153.472 153.472 153.472 153.472 153.472 153.472 153.472
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 246.729 246.729 246.729 246.729 246.729 246.729 246.729 246.729 246.729 246.729
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 358.014 358.014 358.014 358.014 358.014 358.014 358.014 358.014 358.014 358.014
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 453.068 453.068 453.068 453.068 453.068 453.068 453.068 453.068 453.068 453.068
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 595.709 595.709 595.709 595.709 595.709 595.709 595.709 595.709 595.709 595.709
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 819.505 819.505 819.505 819.505 819.505 819.505 819.505 819.505 819.505 819.505

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4,1 UN 653.607 687.793 647.010 662.603 668.601 650.608 659.605 651.208 654.207 679.997
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
4,2 ML 622.454 638.873 619.285 626.774 629.655 621.013 625.334 621.301 622.741 635.128
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,3 UN 695.744 718.534 691.346 701.741 705.740 693.744 699.742 694.144 696.144 713.337
(INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4,4 UN 777.182 819.914 768.935 788.427 795.924 773.433 784.679 774.183 777.932 810.169
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4,5 ML 885.635 908.756 881.173 891.719 895.775 883.606 889.691 884.012 886.040 903.482
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4,6 UN 804.289 835.627 798.242 812.536 818.034 801.540 809.787 802.090 804.839 828.480
REFUERZO (INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 954.025 969.529 951.035 958.106 960.827 952.666 956.747 952.939 954.298 965.994
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.388.977 1.435.381 1.380.026 1.401.190 1.409.333 1.384.909 1.397.121 1.385.724 1.389.793 1.424.799
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.920.913 2.011.714 1.903.390 1.944.808 1.960.738 1.912.948 1.936.844 1.914.541 1.922.506 1.991.005
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.556.676 2.707.612 2.527.550 2.596.398 2.622.877 2.543.437 2.583.158 2.546.085 2.559.324 2.673.190
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.788.144 1.788.144 1.788.144 1.788.144 1.788.144 1.788.144 1.788.144 1.788.144 1.788.144 1.788.144
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.787.322 3.787.322 3.787.322 3.787.322 3.787.322 3.787.322 3.787.322 3.787.322 3.787.322 3.787.322
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 133.287 133.958 133.158 133.464 133.581 133.229 133.405 133.240 133.299 133.805
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
CONSTRUCCIN
5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 72.158 74.817 71.645 72.858 73.324 71.925 72.624 71.971 72.205 74.210
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 85.418 88.077 84.905 86.118 86.584 85.185 85.884 85.231 85.465 87.470
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 54.998 61.151 53.810 56.617 57.696 54.458 56.077 54.566 55.105 59.748
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 59.474 65.457 58.320 61.048 62.098 58.949 60.524 59.054 59.579 64.092
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 59.662 65.473 58.540 61.191 62.210 59.152 60.681 59.254 59.763 64.148
5,6 BORDE SEPARADOR VERDE A-170 ML 247.479 248.149 247.349 247.655 247.773 247.420 247.596 247.432 247.490 247.996
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.705 18.444 17.563 17.899 18.029 17.640 17.835 17.653 17.718 18.275
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 39.306 43.642 38.469 40.447 41.208 38.925 40.066 39.001 39.382 42.653
5,9 CAUELA PREFABRICADA TIPO A-120 ML 80.789 81.147 80.720 80.883 80.946 80.757 80.852 80.764 80.795 81.065
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 534.617 545.054 532.604 537.364 539.195 533.702 536.448 533.885 534.800 542.674
5,11 LOSETA PREFABRICADA A-40 M2 59.764 61.298 59.468 60.168 60.437 59.630 60.033 59.657 59.791 60.948
5,12 LOSETA PREFABRICADA A-60 M2 87.480 89.014 87.184 87.884 88.153 87.346 87.749 87.373 87.507 88.664
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 32.494 34.887 32.032 33.124 33.544 32.284 32.914 32.326 32.536 34.342

5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 52.541 57.384 51.607 53.816 54.665 52.116 53.391 52.201 52.626 56.280
5,15 SARDINEL PREFABRICADO A-10 ML 100.889 110.996 103.604 101.379 110.596 105.632 109.706 103.051 106.664 110.915
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 57.871 58.799 57.692 58.115 58.278 57.789 58.033 57.806 57.887 58.587

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 197.779 200.628 197.230 198.529 199.029 197.529 198.279 197.579 197.829 199.978
6,2 BANCA EN CONCRETO M-30 UN 650.356 654.345 649.587 651.406 652.106 650.007 651.056 650.077 650.426 653.435
6,3 BOLARDO M-63 ALTO/HIERRO UN 208.812 209.411 208.697 208.970 209.075 208.760 208.917 208.770 208.823 209.274
6,4 BOLARDO M-60 CONCRETO UN 157.541 160.960 156.882 158.441 159.041 157.242 158.141 157.302 157.601 160.180
6,5 BOLARDO M-61 BAJO/CONCRETO UN 159.305 162.724 158.645 160.205 160.804 159.005 159.905 159.065 159.365 161.944
6,6 BOLARDO M-62 BAJO/HIERRO UN 186.987 190.576 186.294 187.931 188.561 186.672 187.616 186.735 187.050 189.758
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 57.479 59.515 57.086 58.015 58.372 57.300 57.836 57.336 57.515 59.051
6,8 BORDILLO PREFABRICADO A-80 ML 67.051 69.330 66.611 67.651 68.051 66.851 67.451 66.891 67.091 68.810
6,9 CANECA M-120 UN 304.234 304.743 304.136 304.368 304.458 304.190 304.324 304.199 304.243 304.627
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 801.708 803.417 801.378 802.158 802.458 801.558 802.008 801.588 801.738 803.027
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.294.216 3.295.356 3.293.996 3.294.516 3.294.716 3.294.116 3.294.416 3.294.136 3.294.236 3.295.096
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.388.875 3.390.015 3.388.655 3.389.175 3.389.375 3.388.775 3.389.075 3.388.795 3.388.895 3.389.755
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 473.683 474.879 473.452 473.998 474.208 473.578 473.893 473.599 473.704 474.607
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 627.962 632.748 627.038 629.221 630.061 627.542 628.801 627.626 628.046 631.656
6,15 BANCA EN MADERA M-50 UN 520.799 520.799 520.799 520.799 520.799 520.799 520.799 520.799 520.799 520.799
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 240.759 242.468 240.429 241.208 241.508 240.609 241.058 240.639 240.789 242.078
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 561.493 562.766 561.248 561.828 562.051 561.382 561.717 561.404 561.516 562.476
6,18 POSTE HISTRICO M-131 UN 6.264.013 6.272.560 6.262.364 6.266.262 6.267.762 6.263.263 6.265.513 6.263.413 6.264.163 6.270.611

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.937 3.937 3.937 3.937 3.937 3.937 3.937 3.937 3.937 3.937
7,2 MARCA VIAL CON PINTURA EN FRO M2 42.107 42.107 42.107 42.107 42.107 42.107 42.107 42.107 42.107 42.107
7,3 SEAL DOBLE DE CICLORUTA UN 305.007 305.342 304.942 305.095 305.154 304.978 305.066 304.983 305.013 305.266
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 481.219 483.612 480.757 481.849 482.269 481.009 481.639 481.051 481.261 483.066
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 227.767 228.102 227.703 227.856 227.914 227.738 227.826 227.744 227.773 228.026
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 241.969 242.304 241.905 242.058 242.116 241.940 242.028 241.946 241.975 242.228
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 252.724 253.059 252.660 252.813 252.871 252.695 252.783 252.701 252.730 252.983
7,8 TACHAS REFLECTIVAS UN 13.185 13.185 13.185 13.185 13.185 13.185 13.185 13.185 13.185 13.185
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 14.083 14.083 14.083 14.083 14.083 14.083 14.083 14.083 14.083 14.083
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7,10 UN 114.691 114.691 114.691 114.691 114.691 114.691 114.691 114.691 114.691 114.691
SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
CONSTRUCCIN
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
SOBRANTES A UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
PRESTAMOS, SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y
2,1 210.1.1 M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
PRSTAMOS

2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.499 34.499 34.499 34.499 34.499 34.499 34.499 34.499 34.499 34.499
EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y
2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2,7 230.1 M2 463 463 463 463 463 463 463 463 463 463
EXISTENTE
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2,10 600.2 M3 63.150 63.150 63.150 63.150 63.150 63.150 63.150 63.150 63.150 63.150
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2,11 600.3 M3 77.419 77.419 77.419 77.419 77.419 77.419 77.419 77.419 77.419 77.419
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 153.068 224.828 167.043 147.231 223.177 183.553 216.573 162.090 191.808 224.828
3,3 330.1 BASE GRANULAR M3 175.578 251.459 193.674 173.862 249.808 210.184 243.204 188.721 218.439 251.459
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.132 3.132 3.132 3.132 3.132 3.132 3.132 3.132 3.132 3.132
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.084 1.084 1.084 1.084 1.084 1.084 1.084 1.084 1.084 1.084
PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION
3,7 461.1 M3 219.890 231.489 217.652 222.942 224.977 218.873 221.925 219.076 220.094 228.844
ASFLTICA
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 63.323 65.854 62.835 63.989 64.433 63.101 63.767 63.145 63.367 65.277
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3,9 450.1 P M3 609.438 634.838 611.026 555.463 588.801 625.313 603.088 622.138 584.038 612.613
ASFLTICO)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
3,10 450.2 P
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
M3 CONSTRUCCIN
615.388 640.788 616.976 561.413 594.751 631.263 609.038 628.088 589.988 618.563
ASFLTICO)
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3,11 450.9 P M3 636.826 662.226 638.414 582.851 616.189 652.701 630.476 649.526 611.426 640.001
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3,12 450.3 P M3 645.138 670.538 646.726 591.163 624.501 661.013 638.788 657.838 619.738 648.313
ASFLTICO)
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 319.699 395.580 337.795 317.983 393.929 354.305 387.325 332.842 362.560 395.580
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 296.046 367.806 310.021 290.209 366.155 326.531 359.551 305.068 334.786 367.806
3,15 311.1 AFIRMADO M3 62.255 111.785 70.510 103.530 85.369 85.369 101.879 80.416 62.255 103.530
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 11.446 12.260 11.289 11.661 11.803 11.375 11.589 11.389 11.461 12.075
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.621 5.028 4.542 4.728 4.799 4.585 4.692 4.592 4.628 4.935
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE
3,18 500.1 M3 622.287 676.822 611.763 636.638 646.206 617.503 631.855 618.460 623.244 664.384
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE
3,19 500.1 M3 653.922 710.900 642.927 668.916 678.912 648.924 663.918 649.924 654.922 697.905
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE
3,20 500.1 M3 674.980 733.586 663.671 690.403 700.684 669.840 685.262 670.868 676.009 720.220
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE
3,21 *** ML 6.742 6.742 6.742 6.742 6.742 6.742 6.742 6.742 6.742 6.742
LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 83.214 108.360 80.420 84.611 108.360 80.420 112.551 80.420 86.008 120.933

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 884.821 946.681 872.882 901.100 911.953 879.394 895.673 880.479 885.906 932.573
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 764.902 825.737 753.162 780.910 791.584 759.565 775.574 760.632 765.968 811.862
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 809.205 872.450 797.000 825.848 836.944 803.657 820.301 804.767 810.314 858.025
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 555.432 611.335 544.644 570.144 579.951 550.528 565.240 551.509 556.413 598.585
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 647.182 705.299 635.967 662.477 672.672 642.085 657.379 643.104 648.202 692.045
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 553.628 611.175 542.523 568.772 578.868 548.580 563.724 549.590 554.638 598.051
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 645.307 705.133 633.762 661.051 671.547 640.059 655.803 641.109 646.357 691.489
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 705.505 763.051 694.400 720.649 730.745 700.457 715.601 701.467 706.515 749.927
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 572.576 632.402 561.032 588.320 598.816 567.329 583.072 568.379 573.626 618.759
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 747.456 807.282 735.911 763.200 773.695 742.208 757.952 743.258 748.506 793.638
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,11 650 P KG 11.423 11.423 11.423 11.423 11.423 11.423 11.423 11.423 11.423 11.423
ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE DE
4,12 650 P KG 14.694 14.694 14.694 14.694 14.694 14.694 14.694 14.694 14.694 14.694
ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M,
4,14 621.1 ML 2.606.895 2.606.895 2.606.895 2.606.895 2.606.895 2.606.895 2.606.895 2.606.895 2.606.895 2.606.895
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN
4,15 621.1 P MANUAL (INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL, ML 3.962.382 4.068.197 3.941.962 3.990.228 4.008.792 3.953.100 3.980.946 3.954.957 3.964.239 4.044.064
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4,16 621.2 M3 1.659.964 1.716.941 1.648.969 1.674.958 1.684.954 1.654.966 1.669.960 1.655.966 1.660.964 1.703.947
REFUERZO)
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 84.452 84.452 84.452 84.452 84.452 84.452 84.452 84.452 84.452 84.452
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 347.510 354.347 346.191 349.309 350.509 346.910 348.710 347.030 347.630 352.788
4,19 632 P BARANDA METLICA ML 407.679 407.679 407.679 407.679 407.679 407.679 407.679 407.679 407.679 407.679
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.375 16.375 16.375 16.375 16.375 16.375 16.375 16.375 16.375 16.375
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 470.103 560.946 463.534 511.388 510.802 479.032 505.077 477.043 471.162 542.099
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 119.930 145.076 117.136 121.327 145.076 117.136 149.267 117.136 122.724 157.649
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 72.645 118.365 80.265 110.745 93.981 93.981 109.221 89.409 65.025 110.745
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 375.411 435.835 363.750 391.312 401.913 370.110 386.012 371.171 376.471 422.055
4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 350.597 395.636 342.654 360.551 375.485 346.432 367.562 347.062 352.243 392.022
CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA
4,26 630.7 M3 359.037 404.077 351.094 368.991 383.925 354.872 376.003 355.502 360.683 400.462
ELEVACIONES
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 364.305 408.612 356.503 374.066 388.871 360.204 381.141 360.821 365.938 405.164
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 CONSTRUCCIN
372.745 417.052 364.943 382.506 397.312 368.645 389.582 369.261 374.378 413.605
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 505.041 564.232 493.618 520.617 531.002 499.848 515.425 500.887 506.079 550.732
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 595.014 656.550 583.139 611.207 622.004 589.616 605.809 590.696 596.094 642.515
4,31 681.1 GAVIN M3 167.768 191.771 165.101 169.102 191.771 165.101 195.772 165.101 170.435 203.773
4,32 681.1 GAVIN MALLA PVC M3 171.822 195.825 169.155 173.156 195.825 169.155 199.826 169.155 174.489 207.827
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4,33 672.1 ML 40.963 44.596 40.262 41.919 42.557 40.644 41.600 40.708 41.027 43.768
2500 PSI
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,
4,34 672.1 ML 15.948 17.765 15.597 16.426 16.745 15.789 16.267 15.821 15.980 17.350
2500 PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO
4,35 *** M2 9.781 9.781 9.781 9.781 9.781 9.781 9.781 9.781 9.781 9.781
(RESISTENCIA LTIMA 25 KN)

4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.966 13.966 13.966 13.966 13.966 13.966 13.966 13.966 13.966 13.966

4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.812 18.812 18.812 18.812 18.812 18.812 18.812 18.812 18.812 18.812
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,38 *** M2 22.561 22.561 22.561 22.561 22.561 22.561 22.561 22.561 22.561 22.561
(RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE REFUERZO
4,39 *** M2 29.005 29.005 29.005 29.005 29.005 29.005 29.005 29.005 29.005 29.005
(RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800
4,40 *** M2 7.020 7.020 7.020 7.020 7.020 7.020 7.020 7.020 7.020 7.020
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000
4,41 *** M2 8.004 8.004 8.004 8.004 8.004 8.004 8.004 8.004 8.004 8.004
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500
4,42 *** M2 8.321 8.321 8.321 8.321 8.321 8.321 8.321 8.321 8.321 8.321
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700 (ESTABILIZACIN,
4,43 *** M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN,
4,44 *** M2 8.930 8.930 8.930 8.930 8.930 8.930 8.930 8.930 8.930 8.930
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN,
4,45 *** M2 7.277 7.277 7.277 7.277 7.277 7.277 7.277 7.277 7.277 7.277
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN,
4,46 *** M2 8.930 8.930 8.930 8.930 8.930 8.930 8.930 8.930 8.930 8.930
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000
4,47 *** M2 17.189 17.189 17.189 17.189 17.189 17.189 17.189 17.189 17.189 17.189
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO
4,48 661.1 ML 611.738 612.560 611.580 611.955 612.099 611.666 611.882 611.681 611.753 612.373
=36" CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE,
4,49 660.3 ML 352.128 364.763 349.689 355.453 357.670 351.019 354.345 351.241 352.350 361.882
DIMETRO 600 MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO,
4,50 *** ML 856.715 856.715 856.715 856.715 856.715 856.715 856.715 856.715 856.715 856.715
DIMETRO 36"
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 128.945 176.570 136.883 168.633 151.170 151.170 167.045 146.408 128.945 168.633
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.294 4.294 4.294 4.294 4.294 4.294 4.294 4.294 4.294 4.294
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4,53 *** ML 83.453 83.453 83.453 83.453 83.453 83.453 83.453 83.453 83.453 83.453
INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4,54 *** ML 127.158 127.158 127.158 127.158 127.158 127.158 127.158 127.158 127.158 127.158
INSTALACIN)
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 516.047 577.582 504.171 532.240 543.036 510.649 526.842 511.728 517.126 563.548
4,56 682.1 P COLCHONETA RENO M3 182.918 206.921 180.251 184.252 206.921 180.251 210.922 180.251 185.585 218.923
4,57 *** TRINCHO EN MADERA M2 65.983 65.983 65.983 65.983 65.983 65.983 65.983 65.983 65.983 65.983

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.937 3.937 3.937 3.937 3.937 3.937 3.937 3.937 3.937 3.937
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 42.107 42.107 42.107 42.107 42.107 42.107 42.107 42.107 42.107 42.107
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M
TEM DESCRIPCIN UNIDAD u Arbelaz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvana Tibacuy Venecia
n
5,3 730.3 TOPE DEFENSA METLICA UN CONSTRUCCIN
81.385 81.385 81.385 81.385 81.385 81.385 81.385 81.385 81.385 81.385
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 67.680 67.680 67.680 67.680 67.680 67.680 67.680 67.680 67.680 67.680
5,5 730.1 DEFENSA METLICA ML 144.127 146.976 143.577 144.876 145.376 143.877 144.626 143.927 144.177 146.326
SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS
5,6 701.1 UN 13.185 13.185 13.185 13.185 13.185 13.185 13.185 13.185 13.185 13.185
UNIDIRECCIONALES

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 807 807 807 807 807 807 807 807 807 807
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A =
6,2 801.6 36", INCLUYE RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES A UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN DE
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
6,5 801.1 ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.952 14.952 14.952 14.952 14.952 14.952 14.952 14.952 14.952 14.952
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 24.249 24.249 24.249 24.249 24.249 24.249 24.249 24.249 24.249 24.249
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.551 9.551 9.551 9.551 9.551 9.551 9.551 9.551 9.551 9.551

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.947.348 1.956.744 1.927.773 1.954.395 1.963.008 1.934.577 1.954.395 1.944.999 1.934.037 1.959.093
1,2 CAMPAMENTO 9 M2 UN 1.132.355 1.137.053 1.122.567 1.135.878 1.140.185 1.125.969 1.135.878 1.131.180 1.125.699 1.138.227
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.503 13.503 13.503 13.503 13.503 13.503 13.503 13.503 13.503 13.503
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.139 15.139 15.139 15.139 15.139 15.139 15.139 15.139 15.139 15.139
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.500 17.500 17.500 17.500 17.500 17.500 17.500 17.500 17.500 17.500
1,6 CERCA EN TABLA H=2.30 M ML 63.192 63.192 63.192 63.192 63.192 63.192 63.192 63.192 63.192 63.192
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 44.587 44.675 44.405 44.653 44.734 44.500 44.653 44.566 44.463 44.697
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.739 20.827 20.556 20.805 20.885 20.652 20.805 20.717 20.615 20.849
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 873.733 875.108 870.414 874.192 876.190 873.854 874.888 874.409 873.486 874.829
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.095 10.095 10.095 10.095 10.095 10.095 10.095 10.095 10.095 10.095
PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.612 3.612 3.612 3.612 3.612 3.612 3.612 3.612 3.612 3.612
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.589.350 2.589.350 2.589.350 2.589.350 2.589.350 2.589.350 2.589.350 2.589.350 2.589.350 2.589.350
1,44 RED TELEFNICA PROVISIONAL UN 239.136 239.136 239.136 239.136 239.136 239.136 239.136 239.136 239.136 239.136
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1,45 M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854
CARGUE)

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 96.859 103.326 77.456 94.272 109.794 109.794 116.261 108.500 96.859 90.391
2,2 BASE ARENA CEMENTO 1:20 M3 182.180 182.180 182.180 182.180 182.180 171.103 182.180 182.180 182.180 182.180
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
2,3 DEMOLICIN CABEZAS DE PILOTES M3 CONSTRUCCIN
283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318 21.318
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 635.939 644.972 617.121 642.715 650.994 625.843 642.715 633.681 623.143 647.230
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 634.752 643.479 616.569 641.298 649.298 626.548 641.298 632.569 622.387 645.662
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 591.069 599.241 574.043 597.198 604.690 583.387 597.198 589.025 579.491 601.284
2,9 PILOTE DE MADERA D=20 CM ML 47.875 47.875 47.875 47.875 47.875 47.875 47.875 47.875 47.875 47.875
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2,10 ML 147.541 147.541 147.541 147.541 147.541 147.541 147.541 147.541 147.541 147.541
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2,11 ML 184.210 184.210 184.210 184.210 184.210 184.210 184.210 184.210 184.210 184.210
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2,12 ML 228.554 228.554 228.554 228.554 228.554 228.554 228.554 228.554 228.554 228.554
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2,13 ML 288.248 288.248 288.248 288.248 288.248 288.248 288.248 288.248 288.248 288.248
UNA DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 101.837 102.370 100.727 102.237 102.726 101.499 102.237 101.704 101.082 102.503
2,15 PILOTE HINCADO 30X30 ML 125.903 126.676 124.294 126.483 127.191 125.413 126.483 125.710 124.809 126.869
2,16 DADOS EN CONCRETO 3500PSI M3 577.708 585.880 560.682 583.838 591.329 570.026 583.838 575.665 566.130 587.924
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2,17 ML 88.219 88.219 88.219 88.219 88.219 88.219 88.219 88.219 88.219 88.219
DISTANCIA MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 36.764 36.764 36.764 36.764 36.764 36.695 36.764 36.764 36.764 36.764
3,2 SIFN EN PVC 6" UN 191.060 191.060 191.060 191.060 191.060 190.991 191.060 191.060 191.060 191.060
3,3 CAJA DE INSPECCIN DE 100X100 UN 457.253 464.201 438.993 457.715 470.210 459.575 463.496 463.981 461.518 460.777
3,4 CAJA DE INSPECCIN DE 40X40 UN 220.413 221.910 216.976 221.135 223.024 218.776 221.623 220.753 219.483 221.849
3,5 CAJA DE INSPECCIN DE 60X60 UN 252.363 254.581 247.242 253.397 256.242 249.895 254.163 252.931 251.091 254.451
3,6 CAJA DE INSPECCIN DE 80X80 UN 332.993 336.359 325.478 334.888 338.785 328.043 335.654 333.273 330.094 336.516
3,7 DUCTO ELCTRICO PVC 4" ML 99.699 99.749 99.550 99.679 99.798 99.798 99.749 99.789 99.798 99.699
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.240.496 1.240.993 1.239.003 1.240.297 1.241.491 1.241.491 1.240.993 1.241.391 1.241.491 1.240.496
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 110.224 110.224 110.224 110.224 110.224 109.464 110.224 110.224 110.224 110.224
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 69.774 69.774 69.774 69.774 69.774 69.373 69.774 69.774 69.774 69.774
3,11 TUBERA DRENAJE PVC 110 ML 27.751 28.012 27.207 27.947 28.186 27.207 27.947 27.686 27.381 28.077
3,12 TUBERA DRENAJE PVC 160 ML 44.176 44.437 43.632 44.371 44.611 43.632 44.371 44.110 43.806 44.502
3,13 TUBERA DRENAJE PVC 200 ML 58.091 58.456 57.330 58.365 58.700 57.330 58.365 58.000 57.573 58.548
3,14 TUBERA DRENAJE PVC 250 ML 79.252 79.669 78.382 79.565 79.948 78.382 79.565 79.147 78.660 79.774
3,15 TUBERA DRENAJE PVC 315 ML 108.925 109.290 108.164 109.199 109.534 108.164 109.199 108.833 108.407 109.382
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3,16 UN 939.409 943.585 930.709 942.541 946.369 930.709 942.541 938.365 933.493 944.629
MATERIAL FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3,17 UN 1.338.030 1.346.382 1.320.630 1.344.294 1.351.950 1.320.630 1.344.294 1.335.942 1.326.198 1.348.470
MATERIAL FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3,18 UN 1.765.559 1.782.263 1.730.759 1.778.087 1.793.399 1.730.759 1.778.087 1.761.383 1.741.895 1.786.439
MATERIAL FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 40.636 40.636 40.636 40.636 40.636 40.636 40.636 40.636 40.636 40.636
4,2 CASETN DE LONA 0.80X0.70 M2 53.701 53.701 53.701 53.701 53.701 53.701 53.701 53.701 53.701 53.701
4,3 COLUMNAS 3500 PSI M3 788.213 796.385 771.187 794.343 801.834 780.532 794.343 786.170 776.635 798.429
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 253.888 277.390 241.490 275.903 274.253 256.474 270.888 262.430 251.726 265.505
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4,5 M2 96.289 97.083 94.636 96.884 97.612 95.544 96.884 96.091 95.165 97.281
MALLA DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.
4,6 M2 113.638 114.591 111.655 114.353 115.225 112.744 114.353 113.400 112.290 114.829
MALLA DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN
4,7 M2 126.710 127.979 124.065 127.662 128.826 125.516 127.662 126.392 124.911 128.297
REFUERZO)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama

4,8 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 CONSTRUCCIN
133.716 135.065 130.906 134.728 135.964 132.448 134.728 133.379 131.805 135.402

4,9 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 153.497 155.163 150.026 154.747 156.274 151.931 154.747 153.080 151.136 155.580

4,10 ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 170.847 172.751 166.879 172.275 174.020 169.057 172.275 170.370 168.149 173.227
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN
4,11 M2 189.660 191.802 185.197 191.267 193.231 187.647 191.267 189.125 186.625 192.338
REFUERZO)
4,12 ENTREPISO VIGUETA PLACA M2 95.749 95.837 95.566 95.815 95.895 95.602 95.815 95.727 95.625 95.859
4,13 ESCALERA MACIZA 3500 PSI M3 930.375 938.547 913.349 936.505 943.996 922.694 936.505 928.332 918.797 940.591
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 91.476 91.476 91.476 91.476 91.476 91.778 91.476 91.476 91.476 91.476
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 77.803 78.620 76.100 78.416 79.165 77.035 78.416 77.599 76.645 78.825
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 87.671 88.671 85.588 88.421 89.337 86.732 88.421 87.421 86.255 88.921
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 102.361 103.614 99.749 103.301 104.450 101.183 103.301 102.047 100.585 103.928
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 691.360 699.532 674.334 697.490 704.981 683.678 697.490 689.317 679.782 701.576
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4,19 UN 47.465 47.691 46.996 47.635 47.841 47.322 47.635 47.409 47.146 47.747
M)
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 277.252 280.902 269.648 279.989 283.335 273.821 279.989 276.339 272.081 281.814
4,21 ACERO FIGURADO 37000 PSI KG 4.041 4.041 4.041 4.041 4.041 4.041 4.041 4.041 4.041 4.041
4,22 ACERO FIGURADO 60000 PSI KG 4.238 4.238 4.238 4.238 4.238 4.238 4.238 4.238 4.238 4.238
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.915 5.915 5.915 5.915 5.915 5.915 5.915 5.915 5.915 5.915
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 830.712 838.884 813.686 836.842 844.333 823.030 836.842 828.669 819.134 840.928
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 760.996 769.958 742.326 767.718 775.933 752.528 767.718 758.756 748.300 772.199
4,26 VIGA AREA 3500 PSI M3 826.593 834.765 809.567 832.723 840.214 818.911 832.723 824.549 815.015 836.809
4,27 VIGA CINTA 3500 PSI M3 807.642 815.814 790.616 813.771 821.262 799.960 813.771 805.598 796.064 817.857
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.006.645 1.014.817 989.619 1.012.774 1.020.266 998.963 1.012.774 1.004.601 995.067 1.016.860
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 336.606 347.359 314.203 344.671 354.528 321.990 344.671 333.918 321.372 350.047

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 28.498 28.648 28.185 28.611 28.749 28.334 28.611 28.460 28.285 28.686
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 47.772 47.923 47.459 47.885 48.023 47.608 47.885 47.735 47.559 47.960
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.446 33.446 33.446 33.446 33.446 33.377 33.446 33.446 33.446 33.446
5,4 ARCOS EN LADRILLO PRENSADO ML 156.680 156.680 156.680 156.680 156.680 156.543 156.680 156.680 156.680 156.680
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 42.530 42.756 42.060 42.699 42.906 42.387 42.699 42.474 42.211 42.812
5,6 DINTELES EN BLOQUE 0.15 M ML 25.634 25.634 25.634 25.634 25.634 25.936 25.634 25.634 25.634 25.634
5,7 ENCHAPES LADRILLO PRENSADO M2 95.425 95.425 95.425 95.425 95.425 95.150 95.425 95.425 95.425 95.425
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 88.541 89.293 86.975 89.105 89.794 88.064 89.105 88.353 87.476 89.480
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 87.840 87.840 87.840 87.840 87.840 87.840 87.840 87.840 87.840 87.840
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.402 51.402 51.402 51.402 51.402 51.402 51.402 51.402 51.402 51.402
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 84.568 84.568 84.568 84.568 84.568 84.568 84.568 84.568 84.568 84.568
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 49.766 49.766 49.766 49.766 49.766 49.766 49.766 49.766 49.766 49.766
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 98.237 98.237 98.237 98.237 98.237 98.237 98.237 98.237 98.237 98.237
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 57.849 57.849 57.849 57.849 57.849 57.849 57.849 57.849 57.849 57.849
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 109.340 109.340 109.340 109.340 109.340 109.340 109.340 109.340 109.340 109.340
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 63.400 63.400 63.400 63.400 63.400 63.400 63.400 63.400 63.400 63.400
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 39.042 39.042 39.042 39.042 39.042 38.904 39.042 39.042 39.042 39.042
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.594 23.594 23.594 23.594 23.594 23.525 23.594 23.594 23.594 23.594
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 51.051 51.051 51.051 51.051 51.051 50.959 51.051 51.051 51.051 51.051
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 30.605 30.605 30.605 30.605 30.605 30.559 30.605 30.605 30.605 30.605
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 57.437 57.437 57.437 57.437 57.437 57.345 57.437 57.437 57.437 57.437
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.434 34.434 34.434 34.434 34.434 34.388 34.434 34.434 34.434 34.434
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 95.207 95.207 95.207 95.207 95.207 94.746 95.207 95.207 95.207 95.207
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 56.177 56.177 56.177 56.177 56.177 55.946 56.177 56.177 56.177 56.177
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 35.788 35.788 35.788 35.788 35.788 35.696 35.788 35.788 35.788 35.788
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML CONSTRUCCIN
21.653 21.653 21.653 21.653 21.653 21.607 21.653 21.653 21.653 21.653
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 71.308 71.308 71.308 71.308 71.308 71.123 71.308 71.308 71.308 71.308
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 42.888 42.888 42.888 42.888 42.888 42.796 42.888 42.888 42.888 42.888
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 84.610 84.610 84.610 84.610 84.610 84.912 84.610 84.610 84.610 84.610
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 51.123 51.123 51.123 51.123 51.123 51.274 51.123 51.123 51.123 51.123
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 175.208 175.208 175.208 175.208 175.208 174.563 175.208 175.208 175.208 175.208
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 104.973 104.973 104.973 104.973 104.973 104.650 104.973 104.973 104.973 104.973
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 86.235 86.235 86.235 86.235 86.235 86.031 86.235 86.235 86.235 86.235
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 51.936 51.936 51.936 51.936 51.936 51.834 51.936 51.936 51.936 51.936
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 45.016 45.016 45.016 45.016 45.016 44.810 45.016 45.016 45.016 45.016
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.322 27.322 27.322 27.322 27.322 27.219 27.322 27.322 27.322 27.322
5,37 MURO TOLETE COMN 0.06 M M2 32.413 32.413 32.413 32.413 32.413 32.321 32.413 32.413 32.413 32.413
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.706 19.706 19.706 19.706 19.706 19.660 19.706 19.706 19.706 19.706
5,39 MURO TOLETE COMN 0.12 M M2 49.079 49.079 49.079 49.079 49.079 48.894 49.079 49.079 49.079 49.079
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 29.998 29.998 29.998 29.998 29.998 29.906 29.998 29.998 29.998 29.998
5,41 MURO TOLETE COMN 0.25 M M2 94.801 94.801 94.801 94.801 94.801 94.525 94.801 94.801 94.801 94.801
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 57.550 57.550 57.550 57.550 57.550 57.412 57.550 57.550 57.550 57.550
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 69.143 69.143 69.143 69.143 69.143 68.958 69.143 69.143 69.143 69.143

5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 41.653 41.653 41.653 41.653 41.653 41.561 41.653 41.653 41.653 41.653

5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 145.308 145.308 145.308 145.308 145.308 144.663 145.308 145.308 145.308 145.308
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 88.156 88.156 88.156 88.156 88.156 87.834 88.156 88.156 88.156 88.156
5,47 REMATES LADRILLO PRENSADO ML 30.460 30.460 30.460 30.460 30.460 30.391 30.460 30.460 30.460 30.460
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 34.723 34.723 34.723 34.723 34.723 34.576 34.723 34.723 34.723 34.723
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 58.737 58.737 58.737 58.737 58.737 58.541 58.737 58.737 58.737 58.737
5,50 LAVADA DE FACHADA M2 4.971 4.971 4.971 4.971 4.971 4.971 4.971 4.971 4.971 4.971
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 48.117 48.267 47.804 48.230 48.368 47.953 48.230 48.079 47.904 48.305
5,52 DOVELA, GROUTING 3000 PSI ML 10.073 10.073 10.073 10.073 10.073 10.073 10.073 10.073 10.073 10.073
5,53 ANCLAJE 3/8" L=30CM UN 13.321 13.321 13.321 13.321 13.321 13.321 13.321 13.321 13.321 13.321
5,54 ANCLAJE 1/2" L=50CM UN 17.412 17.412 17.412 17.412 17.412 17.412 17.412 17.412 17.412 17.412
5,55 ANCLAJE 5/8" L=70CM UN 24.395 24.395 24.395 24.395 24.395 24.395 24.395 24.395 24.395 24.395
5,56 ANCLAJE 3/4" L=70CM UN 36.404 36.404 36.404 36.404 36.404 36.404 36.404 36.404 36.404 36.404
5,57 ANCLAJE 1" L= 70CM UN 4.857 4.923 4.721 4.906 4.966 4.784 4.906 4.841 4.764 4.939

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.336 15.336 15.336 15.336 15.336 15.336 15.336 15.336 15.336 15.336
6,2 FILOS O DILATACIONES B/PLACA ML 5.423 5.423 5.423 5.423 5.423 5.354 5.423 5.423 5.423 5.423
6,3 FILOS O DILATACIONES S/MURO ML 6.543 6.543 6.543 6.543 6.543 6.474 6.543 6.543 6.543 6.543
6,4 GOTERA EN MORTERO 1:4 ML 7.773 7.773 7.773 7.773 7.773 7.704 7.773 7.773 7.773 7.773
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.568 6.568 6.568 6.568 6.568 6.568 6.568 6.568 6.568 6.568
6,6 MALLA BAJO ENTRAMADO M2 13.047 13.047 13.047 13.047 13.047 13.047 13.047 13.047 13.047 13.047
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 22.820 22.820 22.820 22.820 22.820 22.678 22.820 22.820 22.820 22.820
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.860 13.860 13.860 13.860 13.860 13.788 13.860 13.860 13.860 13.860
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 19.991 19.991 19.991 19.991 19.991 19.797 19.991 19.991 19.991 19.991
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.152 12.152 12.152 12.152 12.152 12.055 12.152 12.152 12.152 12.152
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 19.146 19.146 19.146 19.146 19.146 19.003 19.146 19.146 19.146 19.146
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.730 11.730 11.730 11.730 11.730 11.658 11.730 11.730 11.730 11.730
6,13 PAETE CULATAS 1:4, E=2 CM M2 19.991 19.991 19.991 19.991 19.991 19.797 19.991 19.991 19.991 19.991
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.152 12.152 12.152 12.152 12.152 12.055 12.152 12.152 12.152 12.152
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 20.434 20.434 20.434 20.434 20.434 20.333 20.434 20.434 20.434 20.434
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.373 12.373 12.373 12.373 12.373 12.322 12.373 12.373 12.373 12.373
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.631 16.631 16.631 16.631 16.631 16.483 16.631 16.631 16.631 16.631
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML CONSTRUCCIN
10.200 10.200 10.200 10.200 10.200 10.126 10.200 10.200 10.200 10.200
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 15.987 15.987 15.987 15.987 15.987 15.878 15.987 15.987 15.987 15.987
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.878 9.878 9.878 9.878 9.878 9.823 9.878 9.878 9.878 9.878
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 20.726 20.726 20.726 20.726 20.726 20.532 20.726 20.726 20.726 20.726
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.501 12.501 12.501 12.501 12.501 12.404 12.501 12.501 12.501 12.501
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 19.881 19.881 19.881 19.881 19.881 19.738 19.881 19.881 19.881 19.881
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.078 12.078 12.078 12.078 12.078 12.007 12.078 12.078 12.078 12.078
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.563 16.563 16.563 16.563 16.563 16.455 16.563 16.563 16.563 16.563
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.149 10.149 10.149 10.149 10.149 10.095 10.149 10.149 10.149 10.149
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 20.720 20.720 20.720 20.720 20.720 20.578 20.720 20.720 20.720 20.720
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 12.880 12.880 12.880 12.880 12.880 12.808 12.880 12.880 12.880 12.880

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 25.409 25.409 25.409 25.409 25.409 25.133 25.409 25.409 25.409 25.409
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7,2 M2 80.591 80.967 79.808 80.873 81.217 80.352 80.873 80.497 80.058 81.061
(INCLUYE TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 53.377 53.377 53.377 53.377 53.377 53.377 53.377 53.377 53.377 53.377
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.249 21.249 21.249 21.249 21.249 21.249 21.249 21.249 21.249 21.249
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.377 33.377 33.377 33.377 33.377 33.377 33.377 33.377 33.377 33.377
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 78.012 78.012 78.012 78.012 78.012 78.012 78.012 78.012 78.012 78.012
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 61.076 61.076 61.076 61.076 61.076 61.076 61.076 61.076 61.076 61.076
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 35.501 35.501 35.501 35.501 35.501 35.501 35.501 35.501 35.501 35.501
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 81.760 81.760 81.760 81.760 81.760 81.760 81.760 81.760 81.760 81.760
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 97.639 97.639 97.639 97.639 97.639 97.639 97.639 97.639 97.639 97.639
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 143.515 143.515 143.515 143.515 143.515 143.515 143.515 143.515 143.515 143.515
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 56.656 56.656 56.656 56.656 56.656 56.656 56.656 56.656 56.656 56.656
7,13 CANAL PVC AMAZONAS ML 78.702 78.702 78.702 78.702 78.702 78.702 78.702 78.702 78.702 78.702
7,14 CANAL PVC RAINGO ML 71.540 71.540 71.540 71.540 71.540 71.540 71.540 71.540 71.540 71.540
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 127.069 127.069 127.069 127.069 127.069 127.069 127.069 127.069 127.069 127.069
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 74.225 74.225 74.225 74.225 74.225 74.225 74.225 74.225 74.225 74.225
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 54.514 54.514 54.514 54.514 54.514 54.514 54.514 54.514 54.514 54.514
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 31.013 31.013 31.013 31.013 31.013 31.013 31.013 31.013 31.013 31.013
7,19 TEJA DE BARRO M2 56.653 56.653 56.653 56.653 56.653 56.309 56.653 56.653 56.653 56.653
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 45.446 45.446 45.446 45.446 45.446 45.446 45.446 45.446 45.446 45.446
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 41.661 41.661 41.661 41.661 41.661 41.661 41.661 41.661 41.661 41.661
7,22 TEJA FIBROCEMENTO N4 M2 35.118 35.118 35.118 35.118 35.118 35.118 35.118 35.118 35.118 35.118
7,23 TEJA FIBROCEMENTO No. 6 M2 34.388 34.388 34.388 34.388 34.388 34.388 34.388 34.388 34.388 34.388
7,24 TEJA FIBROCEMENTO No. 8 M2 34.648 34.648 34.648 34.648 34.648 34.648 34.648 34.648 34.648 34.648
7,25 TEJA TERMOACSTICA M2 48.786 48.786 48.786 48.786 48.786 48.786 48.786 48.786 48.786 48.786
7,26 TEJA PLSTICA No.6 M2 42.888 42.888 42.888 42.888 42.888 42.888 42.888 42.888 42.888 42.888
7,27 TEJA ESPAOLA ETERNIT M2 78.515 78.515 78.515 78.515 78.515 78.515 78.515 78.515 78.515 78.515
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7,28 M2 145.010 145.010 145.010 145.010 145.010 145.010 145.010 145.010 145.010 145.010
30MM
7,29 TEJA SIN TRASLAPO M2 65.177 65.177 65.177 65.177 65.177 65.177 65.177 65.177 65.177 65.177
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 40.797 40.797 40.797 40.797 40.797 40.797 40.797 40.797 40.797 40.797
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 31.977 31.977 31.977 31.977 31.977 31.977 31.977 31.977 31.977 31.977
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO
7,32 M2 55.811 55.811 55.811 55.811 55.811 55.811 55.811 55.811 55.811 55.811
ESTRUCTURAL ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.177 19.177 19.177 19.177 19.177 19.177 19.177 19.177 19.177 19.177
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.081 23.081 23.081 23.081 23.081 23.081 23.081 23.081 23.081 23.081
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.017 25.017 25.017 25.017 25.017 25.017 25.017 25.017 25.017 25.017
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 32.223 32.223 32.223 32.223 32.223 32.223 32.223 32.223 32.223 32.223
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.260 21.260 21.260 21.260 21.260 21.260 21.260 21.260 21.260 21.260
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 50.060 50.060 50.060 50.060 50.060 50.060 50.060 50.060 50.060 50.060
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 CONSTRUCCIN
343.670 343.670 343.670 343.670 343.670 343.670 343.670 343.670 343.670 343.670
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 392.757 392.757 392.757 392.757 392.757 392.757 392.757 392.757 392.757 392.757
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 260.935 260.935 260.935 260.935 260.935 260.935 260.935 260.935 260.935 260.935
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 278.860 278.860 278.860 278.860 278.860 278.860 278.860 278.860 278.860 278.860

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 448.789 456.515 432.694 454.583 461.665 443.883 454.583 446.858 437.844 458.446
8,2 CONCRETO 3500 PSI M3 397.209 405.143 380.679 403.160 410.433 389.751 403.160 395.225 385.968 407.127
8,3 CONCRETO 3000 PSI M3 399.257 408.027 380.987 405.835 413.873 389.455 405.835 397.065 386.834 410.219
8,4 CONCRETO 2500 PSI M3 348.884 356.401 333.224 354.522 361.412 344.111 354.522 347.005 338.236 358.280
8,5 CONCRETO 2000 PSI M3 332.621 341.391 314.351 339.198 347.237 323.877 339.198 330.429 320.198 343.583
8,6 CONCRETO 1500 PSI M3 312.533 322.973 290.783 320.363 329.933 298.343 320.363 309.923 297.743 325.583
8,7 MORTERO SECO 1:10 M3 224.109 224.109 224.109 224.109 224.109 214.615 224.109 224.109 224.109 224.109
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 427.061 427.061 427.061 427.061 427.061 417.842 427.061 427.061 427.061 427.061
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 386.815 386.815 386.815 386.815 386.815 380.032 386.815 386.815 386.815 386.815
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 446.598 446.598 446.598 446.598 446.598 440.254 446.598 446.598 446.598 446.598
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 664.778 664.778 664.778 664.778 664.778 658.434 664.778 664.778 664.778 664.778

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 118.625 118.625 118.625 118.625 118.625 118.625 118.625 118.625 118.625 118.625
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.768 3.768 3.768 3.768 3.768 3.699 3.768 3.768 3.768 3.768
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 132.691 132.691 132.691 132.691 132.691 132.691 132.691 132.691 132.691 132.691
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 162.557 162.557 162.557 162.557 162.557 162.557 162.557 162.557 162.557 162.557
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 236.527 236.527 236.527 236.527 236.527 236.527 236.527 236.527 236.527 236.527
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 263.274 263.274 263.274 263.274 263.274 263.274 263.274 263.274 263.274 263.274
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 290.053 290.053 290.053 290.053 290.053 290.053 290.053 290.053 290.053 290.053
9,8 HOJA PUERTA FORTEC 0.81 UN 192.660 192.660 192.660 192.660 192.660 192.660 192.660 192.660 192.660 192.660
9,9 HOJA PUERTA FORTEC 0.91 UN 218.425 218.425 218.425 218.425 218.425 218.425 218.425 218.425 218.425 218.425
9,10 HOJA PUERTA FORTEC 1.50 UN 321.484 321.484 321.484 321.484 321.484 321.484 321.484 321.484 321.484 321.484
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 121.806 121.806 121.806 121.806 121.806 121.806 121.806 121.806 121.806 121.806
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 161.742 161.742 161.742 161.742 161.742 161.742 161.742 161.742 161.742 161.742
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 179.777 179.777 179.777 179.777 179.777 179.777 179.777 179.777 179.777 179.777
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 458.037 458.037 458.037 458.037 458.037 458.037 458.037 458.037 458.037 458.037
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 40.515 40.515 40.515 40.515 40.515 40.515 40.515 40.515 40.515 40.515
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.201 25.201 25.201 25.201 25.201 25.201 25.201 25.201 25.201 25.201
9,17 VENTANERA EN MADERA CEDRO MACHO M2 95.776 95.776 95.776 95.776 95.776 95.776 95.776 95.776 95.776 95.776
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 117.150 117.150 117.150 117.150 117.150 117.150 117.150 117.150 117.150 117.150
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 90.999 90.999 90.999 90.999 90.999 90.999 90.999 90.999 90.999 90.999
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 28.184 28.184 28.184 28.184 28.184 28.184 28.184 28.184 28.184 28.184
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 28.184 28.184 28.184 28.184 28.184 28.184 28.184 28.184 28.184 28.184
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 26.716 26.716 26.716 26.716 26.716 26.716 26.716 26.716 26.716 26.716
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 40.849 40.849 40.849 40.849 40.849 40.849 40.849 40.849 40.849 40.849
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 50.607 50.607 50.607 50.607 50.607 50.607 50.607 50.607 50.607 50.607
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 61.016 61.016 61.016 61.016 61.016 61.016 61.016 61.016 61.016 61.016
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 73.377 73.377 73.377 73.377 73.377 73.377 73.377 73.377 73.377 73.377
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 345.856 345.856 345.856 345.856 345.856 345.856 345.856 345.856 345.856 345.856
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 241.767 241.767 241.767 241.767 241.767 241.767 241.767 241.767 241.767 241.767
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.392 32.392 32.392 32.392 32.392 32.392 32.392 32.392 32.392 32.392
9,30 VIDRIO TRANSPARENTE 4 MM M2 41.500 41.500 41.500 41.500 41.500 41.500 41.500 41.500 41.500 41.500
9,31 VIDRIO TRANSPARENTE 5 MM M2 50.607 50.607 50.607 50.607 50.607 50.607 50.607 50.607 50.607 50.607
9,32 VIDRIO TRANSPARENTE 6 MM M2 63.619 63.619 63.619 63.619 63.619 63.619 63.619 63.619 63.619 63.619

10 CARPINTERA METLICA
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
10,1 CAJA CONTADOR DE AGUA UN CONSTRUCCIN
73.253 73.253 73.253 73.253 73.253 73.253 73.253 73.253 73.253 73.253
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 204.094 204.094 204.094 204.094 204.094 204.094 204.094 204.094 204.094 204.094
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10,3 ML 77.506 77.506 77.506 77.506 77.506 77.506 77.506 77.506 77.506 77.506
(INCLUYE ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 138.549 138.549 138.549 138.549 138.549 138.549 138.549 138.549 138.549 138.549
10,5 MARCO TAPA CAJA DE INSPECCIN UN 131.434 131.434 131.434 131.434 131.434 131.434 131.434 131.434 131.434 131.434
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 86.290 86.290 86.290 86.290 86.290 86.290 86.290 86.290 86.290 86.290
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 203.454 203.454 203.454 203.454 203.454 203.454 203.454 203.454 203.454 203.454
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 105.930 105.930 105.930 105.930 105.930 105.930 105.930 105.930 105.930 105.930
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.352 6.352 6.352 6.352 6.352 6.352 6.352 6.352 6.352 6.352
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN
10,10 M2 95.498 95.498 95.498 95.498 95.498 95.498 95.498 95.498 95.498 95.498
TUBO ESTRUCTURAL GALVANIZADO 2")
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 39.327 39.327 39.327 39.327 39.327 39.327 39.327 39.327 39.327 39.327
DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10,12 M2 520.539 520.539 520.539 520.539 520.539 520.539 520.539 520.539 520.539 520.539
E=6MM
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 187.098 187.098 187.098 187.098 187.098 187.098 187.098 187.098 187.098 187.098
PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA
10,14 M2 209.766 209.766 209.766 209.766 209.766 209.766 209.766 209.766 209.766 209.766
ELECTROSTTICA
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10,15 M2 474.501 474.501 474.501 474.501 474.501 474.501 474.501 474.501 474.501 474.501
PUERTAS Y ACCESORIOS)
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.
10,16 M2 123.322 123.322 123.322 123.322 123.322 123.322 123.322 123.322 123.322 123.322
ANTICORROSIVO
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 379.672 379.672 379.672 379.672 379.672 379.672 379.672 379.672 379.672 379.672
10,18 SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5.805 5.805 5.805 5.805 5.805 5.805 5.805 5.805 5.805 5.805
10,19 VENTANA EN ALUMINIO CORREDIZA M2 266.884 266.884 266.884 266.884 266.884 266.884 266.884 266.884 266.884 266.884
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 117.439 117.439 117.439 117.439 117.439 117.439 117.439 117.439 117.439 117.439
10,21 REJILLA PISO 0.30 M M2 83.046 83.046 83.046 83.046 83.046 83.046 83.046 83.046 83.046 83.046
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 85.697 85.697 85.697 85.697 85.697 85.697 85.697 85.697 85.697 85.697
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10,23 KG 10.185 10.185 10.185 10.185 10.185 10.185 10.185 10.185 10.185 10.185
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.
CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10,24 DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 11.302 11.302 11.302 11.302 11.302 11.302 11.302 11.302 11.302 11.302
PLATINERA.CONTEMPLA TAMBIEN:FABRICACIN, SUMINISTRO,
MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 8.982 8.982 8.982 8.982 8.982 8.982 8.982 8.982 8.982 8.982
PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 212.317 212.317 212.317 212.317 212.317 212.317 212.317 212.317 212.317 212.317
11,2 ACOMETIDA EN PVC 3/4" 5M UN 256.275 256.275 256.275 256.275 256.275 256.275 256.275 256.275 256.275 256.275
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.249 21.249 21.249 21.249 21.249 21.249 21.249 21.249 21.249 21.249
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.377 33.377 33.377 33.377 33.377 33.377 33.377 33.377 33.377 33.377
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 31.999 31.999 31.999 31.999 31.999 31.999 31.999 31.999 31.999 31.999
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 41.044 41.044 41.044 41.044 41.044 41.044 41.044 41.044 41.044 41.044
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 84.678 84.678 84.678 84.678 84.678 84.678 84.678 84.678 84.678 84.678
11,8 CONEXIN TANQUE ELEVADO PVC UN 213.626 213.626 213.626 213.626 213.626 213.626 213.626 213.626 213.626 213.626
11,9 INSTALACIN APARATO SANITARIO UN 41.846 41.846 41.846 41.846 41.846 41.846 41.846 41.846 41.846 41.846
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
11,12 LLAVE MANGUERA UN CONSTRUCCIN
33.658 33.658 33.658 33.658 33.658 33.658 33.658 33.658 33.658 33.658
11,13 NIPLE PASAMURO 2" UN 63.928 63.928 63.928 63.928 63.928 63.928 63.928 63.928 63.928 63.928
11,14 NIPLE PASAMURO 4" UN 95.559 95.559 95.559 95.559 95.559 95.559 95.559 95.559 95.559 95.559
11,15 PUNTO AGUA CALIENTE CPVC UN 80.735 80.735 80.735 80.735 80.735 80.735 80.735 80.735 80.735 80.735
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 58.785 58.785 58.785 58.785 58.785 58.785 58.785 58.785 58.785 58.785
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 62.553 62.553 62.553 62.553 62.553 62.553 62.553 62.553 62.553 62.553
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 79.052 79.052 79.052 79.052 79.052 79.052 79.052 79.052 79.052 79.052
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 63.785 63.785 63.785 63.785 63.785 63.785 63.785 63.785 63.785 63.785
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 79.880 79.880 79.880 79.880 79.880 79.880 79.880 79.880 79.880 79.880
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 85.456 85.456 85.456 85.456 85.456 85.456 85.456 85.456 85.456 85.456
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 70.914 70.914 70.914 70.914 70.914 70.914 70.914 70.914 70.914 70.914
11,23 RED SUMINISTRO CPVC 1/2" ML 12.009 12.009 12.009 12.009 12.009 12.009 12.009 12.009 12.009 12.009
11,24 RED SUMINISTRO CPVC 3/4" ML 16.922 16.922 16.922 16.922 16.922 16.922 16.922 16.922 16.922 16.922
11,25 RED SUMINISTRO PVC 1 1/2" ML 22.092 22.092 22.092 22.092 22.092 22.092 22.092 22.092 22.092 22.092
11,26 RED SUMINISTRO PVC 1" ML 13.637 13.637 13.637 13.637 13.637 13.637 13.637 13.637 13.637 13.637
11,27 RED SUMINISTRO PVC 1/2" ML 8.142 8.142 8.142 8.142 8.142 8.142 8.142 8.142 8.142 8.142
11,28 RED SUMINISTRO PVC 2 1/2" ML 49.241 49.241 49.241 49.241 49.241 49.241 49.241 49.241 49.241 49.241
11,29 RED SUMINISTRO PVC 2" ML 31.488 31.488 31.488 31.488 31.488 31.488 31.488 31.488 31.488 31.488
11,30 RED SUMINISTRO PVC 3/4" ML 10.199 10.199 10.199 10.199 10.199 10.199 10.199 10.199 10.199 10.199
11,31 RED SANITARIA PVC-S 2" ML 24.311 24.311 24.311 24.311 24.311 24.311 24.311 24.311 24.311 24.311
11,32 RED SANITARIA PVC-S 3" ML 33.739 33.739 33.739 33.739 33.739 33.739 33.739 33.739 33.739 33.739
11,33 RED SANITARIA PVC-S 4" ML 45.792 45.792 45.792 45.792 45.792 45.792 45.792 45.792 45.792 45.792
11,34 RED SANITARIA PVC-S 6" ML 85.670 85.670 85.670 85.670 85.670 85.670 85.670 85.670 85.670 85.670
11,35 REGISTRO 1" UN 103.977 103.977 103.977 103.977 103.977 103.977 103.977 103.977 103.977 103.977
11,36 REGISTRO 1/2" UN 57.953 57.953 57.953 57.953 57.953 57.953 57.953 57.953 57.953 57.953
11,37 REGISTRO 3/4" UN 73.825 73.825 73.825 73.825 73.825 73.825 73.825 73.825 73.825 73.825
11,38 REGISTRO 1 1/2" UN 178.437 178.437 178.437 178.437 178.437 178.437 178.437 178.437 178.437 178.437
11,39 REGISTRO 2 1/2" UN 368.135 368.135 368.135 368.135 368.135 368.135 368.135 368.135 368.135 368.135
11,40 REGISTRO 2" UN 271.924 271.924 271.924 271.924 271.924 271.924 271.924 271.924 271.924 271.924
11,41 REVENTILACIN 2" ML 16.942 16.942 16.942 16.942 16.942 16.942 16.942 16.942 16.942 16.942
11,42 REVENTILACIN 3" ML 21.384 21.384 21.384 21.384 21.384 21.384 21.384 21.384 21.384 21.384
TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11,43 UN 166.351 166.351 166.351 166.351 166.351 166.351 166.351 166.351 166.351 166.351
INSTALACIN)
TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11,44 UN 270.927 270.927 270.927 270.927 270.927 270.927 270.927 270.927 270.927 270.927
ISNTALACIN)
TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11,45 UN 450.963 450.963 450.963 450.963 450.963 450.963 450.963 450.963 450.963 450.963
INSTALACIN)
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS
11,46 ML 39.102 39.102 39.102 39.102 39.102 39.102 39.102 39.102 39.102 39.102
Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11,47 ML 46.096 46.096 46.096 46.096 46.096 46.096 46.096 46.096 46.096 46.096
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS
11,48 ML 59.156 59.156 59.156 59.156 59.156 59.156 59.156 59.156 59.156 59.156
Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE
11,49 ML 67.036 67.036 67.036 67.036 67.036 67.036 67.036 67.036 67.036 67.036
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11,50 ML 86.360 86.360 86.360 86.360 86.360 86.360 86.360 86.360 86.360 86.360
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE
11,51 ML 100.075 100.075 100.075 100.075 100.075 100.075 100.075 100.075 100.075 100.075
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE
11,52 ML 147.998 147.998 147.998 147.998 147.998 147.998 147.998 147.998 147.998 147.998
ACCESORIOS Y SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 59.517 59.517 59.517 59.517 59.517 59.517 59.517 59.517 59.517 59.517
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 59.760 59.760 59.760 59.760 59.760 59.760 59.760 59.760 59.760 59.760
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN CONSTRUCCIN
38.632 38.632 38.632 38.632 38.632 38.632 38.632 38.632 38.632 38.632
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 47.598 47.598 47.598 47.598 47.598 47.598 47.598 47.598 47.598 47.598
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE
11,57 ML 4.041 4.041 4.041 4.041 4.041 4.041 4.041 4.041 4.041 4.041
HASTA 2"
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR
11,58 ML 6.363 6.363 6.363 6.363 6.363 6.363 6.363 6.363 6.363 6.363
A 2"
11,59 GABINETE TIPO III UN 982.633 982.633 982.633 982.633 982.633 982.633 982.633 982.633 982.633 982.633
11,60 GABINETE TIPO I UN 751.007 751.007 751.007 751.007 751.007 751.007 751.007 751.007 751.007 751.007
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.519.032 2.519.032 2.519.032 2.519.032 2.519.032 2.519.032 2.519.032 2.519.032 2.519.032 2.519.032
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.100.014 2.100.014 2.100.014 2.100.014 2.100.014 2.100.014 2.100.014 2.100.014 2.100.014 2.100.014
11,63 VLVULA MARIPOSA 3" UN 609.589 609.589 609.589 609.589 609.589 609.589 609.589 609.589 609.589 609.589
11,64 VLVULA MARIPOSA 4" UN 788.912 788.912 788.912 788.912 788.912 788.912 788.912 788.912 788.912 788.912
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 303.844 303.844 303.844 303.844 303.844 303.844 303.844 303.844 303.844 303.844

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 350.737 350.737 350.737 350.737 350.737 350.737 350.737 350.737 350.737 350.737
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 55.729 55.729 55.729 55.729 55.729 55.729 55.729 55.729 55.729 55.729
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 65.989 65.989 65.989 65.989 65.989 65.989 65.989 65.989 65.989 65.989
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 73.248 73.248 73.248 73.248 73.248 73.248 73.248 73.248 73.248 73.248
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 86.293 86.293 86.293 86.293 86.293 86.293 86.293 86.293 86.293 86.293
12,6 SALIDA TELFONO PVC COMPLETA UN 52.385 52.385 52.385 52.385 52.385 52.385 52.385 52.385 52.385 52.385
12,7 SALIDA TIMBRE PVC COMPLETA UN 59.712 59.712 59.712 59.712 59.712 59.712 59.712 59.712 59.712 59.712
12,8 STRIP TELEFNICO 10 PARES UN 137.769 137.769 137.769 137.769 137.769 137.769 137.769 137.769 137.769 137.769
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 53.797 53.797 53.797 53.797 53.797 53.797 53.797 53.797 53.797 53.797
12,10 SALIDA TRIFSICA PVC COMPLETA UN 123.655 123.655 123.655 123.655 123.655 123.655 123.655 123.655 123.655 123.655
12,11 SALIDA T.V PVC COMPLETA. UN 73.928 73.928 73.928 73.928 73.928 73.928 73.928 73.928 73.928 73.928
12,12 SALIDA BIFSICA C.N. UN 43.842 43.842 43.842 43.842 43.842 43.842 43.842 43.842 43.842 43.842
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 92.371 92.371 92.371 92.371 92.371 92.371 92.371 92.371 92.371 92.371
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 394.364 394.364 394.364 394.364 394.364 394.364 394.364 394.364 394.364 394.364
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 525.369 525.369 525.369 525.369 525.369 525.369 525.369 525.369 525.369 525.369
12,16 TUBERA PVC CONDUIT 1/2" ML 3.401 3.401 3.401 3.401 3.401 3.401 3.401 3.401 3.401 3.401
12,17 TUBERA PVC CONDUIT 3/4" ML 4.491 4.491 4.491 4.491 4.491 4.491 4.491 4.491 4.491 4.491
12,18 TUBERA PVC CONDUIT 1" ML 6.990 6.990 6.990 6.990 6.990 6.990 6.990 6.990 6.990 6.990
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.502 12.502 12.502 12.502 12.502 12.502 12.502 12.502 12.502 12.502
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 262.731 262.731 262.731 262.731 262.731 262.731 262.731 262.731 262.731 262.731
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 74.205 74.205 74.205 74.205 74.205 74.205 74.205 74.205 74.205 74.205
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 100.509 100.509 100.509 100.509 100.509 100.509 100.509 100.509 100.509 100.509
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 40.928 40.928 40.928 40.928 40.928 40.928 40.928 40.928 40.928 40.928
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.346.888 1.346.888 1.346.888 1.346.888 1.346.888 1.346.888 1.346.888 1.346.888 1.346.888 1.346.888
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 998.319 998.319 998.319 998.319 998.319 998.319 998.319 998.319 998.319 998.319
12,26 POSTE METLICO 6M UN 1.249.899 1.249.899 1.249.899 1.249.899 1.249.899 1.249.899 1.249.899 1.249.899 1.249.899 1.249.899
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 581.452 581.452 581.452 581.452 581.452 581.452 581.452 581.452 581.452 581.452
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 106.038 106.038 106.038 106.038 106.038 106.038 106.038 106.038 106.038 106.038
12,29 LUMINARIA 70W SODIO UN 487.879 487.879 487.879 487.879 487.879 487.879 487.879 487.879 487.879 487.879
12,30 LUMINARIA 150W SODIO UN 610.424 610.424 610.424 610.424 610.424 610.424 610.424 610.424 610.424 610.424
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.612.575 1.612.575 1.612.575 1.612.575 1.612.575 1.612.575 1.612.575 1.612.575 1.612.575 1.612.575
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.187.455 1.187.455 1.187.455 1.187.455 1.187.455 1.187.455 1.187.455 1.187.455 1.187.455 1.187.455

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 37.757 37.757 37.757 37.757 37.757 37.513 37.757 37.757 37.757 37.757
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 37.548 37.548 37.548 37.548 37.548 37.304 37.548 37.548 37.548 37.548
13,3 ALISTADO PARA LISTN M2 14.009 14.009 14.009 14.009 14.009 13.960 14.009 14.009 14.009 14.009
13,4 ALISTADO PISOS 1:3, E=0.04 M2 26.068 26.068 26.068 26.068 26.068 25.580 26.068 26.068 26.068 26.068
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 CONSTRUCCIN
81.185 81.185 81.185 81.185 81.185 80.697 81.185 81.185 81.185 81.185
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.819 25.995 25.454 25.951 26.112 25.644 25.951 25.775 25.571 26.039
13,7 CONCRETO BASE GRADAS 2500 PSI M2 56.417 57.169 54.851 56.981 57.670 55.940 56.981 56.229 55.352 57.357
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 78.532 79.735 76.027 79.434 80.537 77.769 79.434 78.232 76.829 80.036
13,9 MANTO FIBERGLASS 600X1 M2 29.331 29.331 29.331 29.331 29.331 29.331 29.331 29.331 29.331 29.331
13,10 PEGANTE MORTERO-CONCRETO M2 22.127 22.127 22.127 22.127 22.127 22.127 22.127 22.127 22.127 22.127
13,11 PERMA PLY 2 CAPAS M2 25.952 25.952 25.952 25.952 25.952 25.952 25.952 25.952 25.952 25.952
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 46.030 46.707 44.621 46.538 47.158 45.601 46.538 45.861 45.072 46.876
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 53.992 54.818 52.269 54.612 55.370 53.467 54.612 53.785 52.820 55.025
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 78.414 79.692 75.752 79.372 80.544 77.603 79.372 78.095 76.604 80.011
13,15 TRITURADO FINO 1/2 M3 132.557 143.310 110.154 140.621 150.479 110.154 140.621 129.868 117.323 145.998
13,16 TRITURADO GRUESO 3/4 M3 139.362 150.539 114.252 145.457 158.654 124.202 148.243 140.647 130.327 150.846

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 55.084 55.084 55.084 55.084 55.084 54.987 55.084 55.084 55.084 55.084
14,2 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 32.899 32.899 32.899 32.899 32.899 32.850 32.899 32.899 32.899 32.899
14,3 ADOQUN CONCRETO 6CM M2 62.688 62.688 62.688 62.688 62.688 62.444 62.688 62.688 62.688 62.688
14,4 ADOQUN CONCRETO 8CM M2 65.888 65.888 65.888 65.888 65.888 65.644 65.888 65.888 65.888 65.888
14,5 ADOQUN GRES PEATONAL M2 70.039 70.039 70.039 70.039 70.039 69.795 70.039 70.039 70.039 70.039
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14,6 M2 72.767 72.767 72.767 72.767 72.767 72.670 72.767 72.767 72.767 72.767
BLANCO. INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.898 36.002 35.680 35.976 36.072 35.632 35.976 35.872 35.750 36.028
14,8 ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 158.006 158.006 158.006 158.006 158.006 157.567 158.006 158.006 158.006 158.006
14,9 ACABADO EN GRAVILLA LAVADA M2 44.969 45.177 44.534 45.125 45.317 44.387 45.125 44.916 44.673 45.230
14,10 GUARDAESCOBA EN GRANITO ML 42.223 42.223 42.223 42.223 42.223 42.223 42.223 42.223 42.223 42.223
14,11 GUARDAESCOBA EN GRAVILLA ML 10.052 10.156 9.835 10.130 10.226 9.786 10.130 10.026 9.904 10.183
14,12 GUARDAESCOBA PVC CARAMELO ML 9.105 9.105 9.105 9.105 9.105 9.105 9.105 9.105 9.105 9.105
14,13 GUARDAESCOBA PVC CEDRO ML 12.226 12.226 12.226 12.226 12.226 12.226 12.226 12.226 12.226 12.226
14,14 GUARDAESCOBA PINO CARIBE ML 10.175 10.175 10.175 10.175 10.175 10.175 10.175 10.175 10.175 10.175
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.073 17.073 17.073 17.073 17.073 17.073 17.073 17.073 17.073 17.073
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.305 33.305 33.305 33.305 33.305 33.305 33.305 33.305 33.305 33.305
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.868 8.868 8.868 8.868 8.868 8.868 8.868 8.868 8.868 8.868
14,18 LISTN M.H. AMARILLO M2 71.965 71.965 71.965 71.965 71.965 71.965 71.965 71.965 71.965 71.965
14,19 PASO ESCALERA GRANITO ML 113.912 113.912 113.912 113.912 113.912 113.571 113.912 113.912 113.912 113.912
14,20 PIRLANES ALUMINIO ML 7.242 7.242 7.242 7.242 7.242 7.242 7.242 7.242 7.242 7.242
14,21 PIRLANES LADRILLO ML 30.762 30.762 30.762 30.762 30.762 30.624 30.762 30.762 30.762 30.762
14,22 PISO VINILO TRFICO RESIDENCIAL M2 44.494 44.494 44.494 44.494 44.494 44.494 44.494 44.494 44.494 44.494
14,23 PISO VINILO TRFICO PESADO M2 51.730 51.730 51.730 51.730 51.730 51.730 51.730 51.730 51.730 51.730
14,24 PULIDA LACADA PISO MADERA M2 47.532 47.532 47.532 47.532 47.532 47.532 47.532 47.532 47.532 47.532
14,25 TABLETA DE GRES 25X25 M2 47.742 47.742 47.742 47.742 47.742 47.645 47.742 47.742 47.742 47.742
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 53.633 53.633 53.633 53.633 53.633 53.535 53.633 53.633 53.633 53.633
14,27 GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 10.546 10.546 10.546 10.546 10.546 10.546 10.546 10.546 10.546 10.546
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 47.779 47.779 47.779 47.779 47.779 47.572 47.779 47.779 47.779 47.779
14,29 JABONERA PORCELANA ACUARIO UN 19.981 19.981 19.981 19.981 19.981 19.981 19.981 19.981 19.981 19.981
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14,30 UN 119.656 119.656 119.656 119.656 119.656 119.656 119.656 119.656 119.656 119.656
JABONERA,CEPILLERA Y PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.584 9.584 9.584 9.584 9.584 9.584 9.584 9.584 9.584 9.584
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 21.799 21.799 21.799 21.799 21.799 21.799 21.799 21.799 21.799 21.799
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.565 13.565 13.565 13.565 13.565 13.565 13.565 13.565 13.565 13.565
14,35 REMATES BOCEL ALUMINIO ML 8.229 8.229 8.229 8.229 8.229 8.229 8.229 8.229 8.229 8.229
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
14,36 REMATES BOCEL PORCELANA ML CONSTRUCCIN
8.375 8.375 8.375 8.375 8.375 8.375 8.375 8.375 8.375 8.375
14,37 TAPA REGISTRO 20X20 UN 18.459 18.459 18.459 18.459 18.459 18.459 18.459 18.459 18.459 18.459
14,38 TAPA REGISTRO 6X6 UN 16.817 16.817 16.817 16.817 16.817 16.817 16.817 16.817 16.817 16.817
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL
14,39 M2 18.164 18.164 18.164 18.164 18.164 18.164 18.164 18.164 18.164 18.164
N.5
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL
14,40 M2 20.998 20.998 20.998 20.998 20.998 20.998 20.998 20.998 20.998 20.998
FUNDIDO EN SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 63.073 63.073 63.073 63.073 63.073 62.975 63.073 63.073 63.073 63.073
14,42 MEDIA CAA EN GRANITO ML 75.256 75.256 75.256 75.256 75.256 75.256 75.256 75.256 75.256 75.256
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.777 32.777 32.777 32.777 32.777 32.777 32.777 32.777 32.777 32.777
14,44 PINTURA ACRLICA PARA PISOS M2 12.839 12.839 12.839 12.839 12.839 12.839 12.839 12.839 12.839 12.839
14,45 PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 98.922 98.922 98.922 98.922 98.922 98.922 98.922 98.922 98.922 98.922
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 119.660 119.660 119.660 119.660 119.660 119.660 119.660 119.660 119.660 119.660

15 CIELO RASO
15,1 APLIQUE YESO ML 70.698 70.698 70.698 70.698 70.698 70.698 70.698 70.698 70.698 70.698
15,2 ARMADURA MADERA Y MALLA M2 34.609 34.609 34.609 34.609 34.609 34.609 34.609 34.609 34.609 34.609
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 53.631 53.631 53.631 53.631 53.631 53.631 53.631 53.631 53.631 53.631
15,4 CIELO RASO DURACUSTIC M2 65.858 65.858 65.858 65.858 65.858 65.858 65.858 65.858 65.858 65.858
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49.137 49.137 49.137 49.137 49.137 49.137 49.137 49.137 49.137 49.137
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 91.187 91.187 91.187 91.187 91.187 91.187 91.187 91.187 91.187 91.187
15,7 CORNISAS YESO ML 47.467 47.467 47.467 47.467 47.467 47.467 47.467 47.467 47.467 47.467
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 100.840 100.840 100.840 100.840 100.840 100.840 100.840 100.840 100.840 100.840
15,9 MALLA CON VENA M2 12.954 12.954 12.954 12.954 12.954 12.954 12.954 12.954 12.954 12.954

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
16,4 M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569

16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 96.859 103.326 77.456 94.272 109.794 109.794 103.326 108.500 109.794 96.859
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 141.344 152.828 117.419 149.957 160.484 117.419 149.957 138.473 125.075 155.699
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 122.924 179.838 109.989 170.783 148.794 148.794 182.425 172.077 159.142 129.391
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 87.410 93.877 68.007 84.823 100.345 100.345 106.812 99.051 87.410 80.942
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 115.335 152.847 95.952 143.792 128.270 121.803 155.434 141.225 132.151 108.868
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 120.263 177.177 107.328 168.122 146.133 146.133 179.764 169.416 156.481 126.730

17 APARATOS SANITARIOS

17,1 SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 293.053 293.053 293.053 293.053 293.053 293.053 293.053 293.053 293.053 293.053

SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE


17,2 UN 864.586 864.586 864.586 864.586 864.586 864.586 864.586 864.586 864.586 864.586
GRIFERA)
SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE
17,3 UN 468.307 468.307 468.307 468.307 468.307 468.307 468.307 468.307 468.307 468.307
GRIFERA)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama

17,4
SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE
UN
CONSTRUCCIN
135.444 135.444 135.444 135.444 135.444 135.444 135.444 135.444 135.444 135.444
GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE
17,5 UN 189.865 189.865 189.865 189.865 189.865 189.865 189.865 189.865 189.865 189.865
GRIFERA)
SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE
17,6 UN 176.299 176.299 176.299 176.299 176.299 176.299 176.299 176.299 176.299 176.299
GRIFERA)

17,7 SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 388.565 388.565 388.565 388.565 388.565 388.565 388.565 388.565 388.565 388.565

SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE


17,8 UN 994.365 994.365 994.365 994.365 994.365 994.365 994.365 994.365 994.365 994.365
GRIFERA)

17,9 SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 282.156 282.156 282.156 282.156 282.156 282.156 282.156 282.156 282.156 282.156

SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A


17,10 UN 199.727 199.727 199.727 199.727 199.727 199.727 199.727 199.727 199.727 199.727
BAERA
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 79.258 79.258 79.258 79.258 79.258 79.258 79.258 79.258 79.258 79.258
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO
17,12 UN 241.963 241.963 241.963 241.963 241.963 241.963 241.963 241.963 241.963 241.963
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN
17,13 UN 356.617 356.617 356.617 356.617 356.617 356.617 356.617 356.617 356.617 356.617
ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)

18 PINTURAS

18,1 IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.027 8.027 8.027 8.027 8.027 8.027 8.027 8.027 8.027 8.027
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 2.979 2.979 2.979 2.979 2.979 2.979 2.979 2.979 2.979 2.979
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.672 10.672 10.672 10.672 10.672 10.672 10.672 10.672 10.672 10.672
18,4 BARNIZ SOBRE MUEBLES M2 40.703 40.703 40.703 40.703 40.703 40.703 40.703 40.703 40.703 40.703
18,5 CARBURO SOBRE PAETES M2 5.595 5.595 5.595 5.595 5.595 5.595 5.595 5.595 5.595 5.595
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 63.735 63.735 63.735 63.735 63.735 63.735 63.735 63.735 63.735 63.735
18,7 DEMARCACIN CON MARMOLINA ML 3.325 3.325 3.325 3.325 3.325 3.325 3.325 3.325 3.325 3.325
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.671 2.671 2.671 2.671 2.671 2.671 2.671 2.671 2.671 2.671
18,9 ESMALTE SOBRE LMINA LLENA M2 13.395 13.395 13.395 13.395 13.395 13.395 13.395 13.395 13.395 13.395
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.883 3.883 3.883 3.883 3.883 3.883 3.883 3.883 3.883 3.883
18,11 ESMALTE SOBRE MADERA LLENA M2 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126 14.126
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.548 5.548 5.548 5.548 5.548 5.548 5.548 5.548 5.548 5.548
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.309 6.309 6.309 6.309 6.309 6.309 6.309 6.309 6.309 6.309
18,14 ESTUCO M2 6.723 6.723 6.723 6.723 6.723 6.723 6.723 6.723 6.723 6.723
18,15 ESTUCO (LINEAL) ML 4.207 4.207 4.207 4.207 4.207 4.207 4.207 4.207 4.207 4.207
18,16 ESTUCO Y VINILO 3 MANOS M2 14.904 14.904 14.904 14.904 14.904 14.904 14.904 14.904 14.904 14.904
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.226 9.226 9.226 9.226 9.226 9.226 9.226 9.226 9.226 9.226
18,18 LACA PISOS MADERA M2 21.807 21.807 21.807 21.807 21.807 21.807 21.807 21.807 21.807 21.807
18,19 LNEAS TRFICO 0.10 ML 2.578 2.578 2.578 2.578 2.578 2.578 2.578 2.578 2.578 2.578
18,20 MARMOLINA SOBRE PAETE M2 11.751 11.751 11.751 11.751 11.751 11.751 11.751 11.751 11.751 11.751
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.168 3.168 3.168 3.168 3.168 3.168 3.168 3.168 3.168 3.168
18,22 TINTILLA SOBRE MADERA LLENA M2 12.109 12.109 12.109 12.109 12.109 12.109 12.109 12.109 12.109 12.109
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.805 6.805 6.805 6.805 6.805 6.805 6.805 6.805 6.805 6.805
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.272 4.272 4.272 4.272 4.272 4.272 4.272 4.272 4.272 4.272
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.033 21.033 21.033 21.033 21.033 21.033 21.033 21.033 21.033 21.033
18,26 PINTURA EPXICA M2 12.166 12.166 12.166 12.166 12.166 12.166 12.166 12.166 12.166 12.166
18,27 PINTURA EPXICA (LINEAL) ML 7.508 7.508 7.508 7.508 7.508 7.508 7.508 7.508 7.508 7.508

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5.890.440 5.890.440 5.890.440 5.890.440 5.890.440 5.890.440 5.890.440 5.890.440 5.890.440 5.890.440
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama

19,2
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON
UN CONSTRUCCIN
10.407.480 10.407.480 ######## 10.407.480 10.407.480 10.407.480 10.407.480 10.407.480 10.407.480 10.407.480
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFTBOL (PAR) UN 2.723.601 2.723.601 2.723.601 2.723.601 2.723.601 2.723.601 2.723.601 2.723.601 2.723.601 2.723.601
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 8.901.022 8.901.022 8.901.022 8.901.022 8.901.022 8.901.022 8.901.022 8.901.022 8.901.022 8.901.022
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.335.830 8.335.830 8.335.830 8.335.830 8.335.830 8.335.830 8.335.830 8.335.830 8.335.830 8.335.830
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.578 2.578 2.578 2.578 2.578 2.578 2.578 2.578 2.578 2.578
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 835.593 835.593 835.593 835.593 835.593 835.593 835.593 835.593 835.593 835.593
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 83.535 83.535 83.535 83.535 83.535 83.535 83.535 83.535 83.535 83.535
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.512.726 1.512.803 1.512.565 1.512.783 1.512.854 1.512.676 1.512.783 1.512.706 1.512.616 1.512.822
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 659.863 662.056 655.296 661.508 663.517 657.413 661.508 659.315 656.758 662.604

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.493 28.493 28.493 28.493 28.493 28.493 28.493 28.493 28.493 28.493
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.336 42.336 42.336 42.336 42.336 42.336 42.336 42.336 42.336 42.336
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 52.481 52.481 52.481 52.481 52.481 52.481 52.481 52.481 52.481 52.481
TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20,4 ML 17.101 17.101 17.101 17.101 17.101 17.101 17.101 17.101 17.101 17.101
ACCESORIOS)
TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE
20,5 ML 20.710 20.710 20.710 20.710 20.710 20.710 20.710 20.710 20.710 20.710
ACCESORIOS)

20,6 TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 28.233 28.233 28.233 28.233 28.233 28.233 28.233 28.233 28.233 28.233

20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.298 25.298 25.298 25.298 25.298 25.298 25.298 25.298 25.298 25.298
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.660 26.660 26.660 26.660 26.660 26.660 26.660 26.660 26.660 26.660
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.331 33.331 33.331 33.331 33.331 33.331 33.331 33.331 33.331 33.331
20,10 VLVULA DE BOLA GAS 1/2" UN 17.069 17.069 17.069 17.069 17.069 17.069 17.069 17.069 17.069 17.069
20,11 VLVULA DE BOLA GAS 3/4" UN 22.387 22.387 22.387 22.387 22.387 22.387 22.387 22.387 22.387 22.387
20,12 VLVULA DE BOLA GAS 1" UN 34.463 34.463 34.463 34.463 34.463 34.463 34.463 34.463 34.463 34.463
20,13 VLVULA POLIETILENO GAS 1/2" UN 264.660 264.660 264.660 264.660 264.660 264.660 264.660 264.660 264.660 264.660
20,14 VLVULA POLIETILENO GAS 3/4" UN 304.611 304.611 304.611 304.611 304.611 304.611 304.611 304.611 304.611 304.611
20,15 VLVULA POLIETILENO GAS 1" UN 317.666 317.666 317.666 317.666 317.666 317.666 317.666 317.666 317.666 317.666
20,16 ACOMETIDA GAS 1/2" ML 294.507 294.507 294.507 294.507 294.507 294.507 294.507 294.507 294.507 294.507

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 214.859 214.859 214.859 214.859 214.859 214.859 214.859 214.859 214.859 214.859
21,2 CABLE DETECTOR LINEAL DE CALOR ML 32.970 32.970 32.970 32.970 32.970 32.970 32.970 32.970 32.970 32.970
21,3 SIRENA DE 110 V UN 100.184 100.184 100.184 100.184 100.184 100.184 100.184 100.184 100.184 100.184
21,4 CMARA CCTV UN 253.460 253.460 253.460 253.460 253.460 253.460 253.460 253.460 253.460 253.460
21,5 PARLANTE-CIELO FALSO UN 50.187 50.187 50.187 50.187 50.187 50.187 50.187 50.187 50.187 50.187
21,6 AMPLIFICADOR 100W UN 554.963 554.963 554.963 554.963 554.963 554.963 554.963 554.963 554.963 554.963
21,7 AMPLIFICADOR 300W UN 1.378.197 1.378.197 1.378.197 1.378.197 1.378.197 1.378.197 1.378.197 1.378.197 1.378.197 1.378.197
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.772 42.772 42.772 42.772 42.772 42.772 42.772 42.772 42.772 42.772
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 215.035 215.035 215.035 215.035 215.035 215.035 215.035 215.035 215.035 215.035
21,10 TOMA PARA MICRFONO UN 42.349 42.349 42.349 42.349 42.349 42.349 42.349 42.349 42.349 42.349
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.636 3.636 3.636 3.636 3.636 3.636 3.636 3.636 3.636 3.636
21,12 SPLITERS UN 6.123 6.123 6.123 6.123 6.123 6.123 6.123 6.123 6.123 6.123
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.852 17.852 17.852 17.852 17.852 17.852 17.852 17.852 17.852 17.852
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.435 23.435 23.435 23.435 23.435 23.435 23.435 23.435 23.435 23.435
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.417 30.417 30.417 30.417 30.417 30.417 30.417 30.417 30.417 30.417
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 118.942 118.942 118.942 118.942 118.942 118.942 118.942 118.942 118.942 118.942
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 31.028 31.028 31.028 31.028 31.028 31.028 31.028 31.028 31.028 31.028
21,18 BANDEJA PORTACABLES PARA RACK UN 101.564 101.564 101.564 101.564 101.564 101.564 101.564 101.564 101.564 101.564
21,19 RACK 2' X 24" UN 176.864 176.864 176.864 176.864 176.864 176.864 176.864 176.864 176.864 176.864
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
21,20 RACK 3' X 24" UN CONSTRUCCIN
278.635 278.635 278.635 278.635 278.635 278.635 278.635 278.635 278.635 278.635
21,21 RACK 5' X 24" UN 345.810 345.810 345.810 345.810 345.810 345.810 345.810 345.810 345.810 345.810
21,22 RACK 7' X 24" UN 378.016 378.016 378.016 378.016 378.016 378.016 378.016 378.016 378.016 378.016
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN 552.620 552.620 552.620 552.620 552.620 552.620 552.620 552.620 552.620 552.620
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 325.257 325.257 325.257 325.257 325.257 325.257 325.257 325.257 325.257 325.257
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 100.802 100.802 100.802 100.802 100.802 100.802 100.802 100.802 100.802 100.802
21,26 PATCH CORD 2M CATEGORA 6A UN 13.442 13.442 13.442 13.442 13.442 13.442 13.442 13.442 13.442 13.442
21,27 PATCH CORD 5M CATEGORA 6A UN 27.483 27.483 27.483 27.483 27.483 27.483 27.483 27.483 27.483 27.483
21,28 CABLE UTP CATEGORA 6A ML 4.826 4.826 4.826 4.826 4.826 4.826 4.826 4.826 4.826 4.826
21,29 CANALETA METLICA 4X6 CMS ML 33.958 33.958 33.958 33.958 33.958 33.958 33.958 33.958 33.958 33.958
21,30 CANALETA METLICA 4X10 CMS ML 35.493 35.493 35.493 35.493 35.493 35.493 35.493 35.493 35.493 35.493
21,31 CANALETA METLICA 6X10 CMS ML 36.259 36.259 36.259 36.259 36.259 36.259 36.259 36.259 36.259 36.259
21,32 CANALETA PLSTICA 13X7 MM ML 23.645 23.645 23.645 23.645 23.645 23.645 23.645 23.645 23.645 23.645
21,33 CANALETA PLSTICA 20X12 MM ML 26.170 26.170 26.170 26.170 26.170 26.170 26.170 26.170 26.170 26.170
21,34 CANALETA PLSTICA 32X12 MM ML 27.231 27.231 27.231 27.231 27.231 27.231 27.231 27.231 27.231 27.231
21,35 CANALETA PLSTICA 40X60 MM ML 45.879 45.879 45.879 45.879 45.879 45.879 45.879 45.879 45.879 45.879
21,36 SWITCH 10/100/1000 24 PUERTOS UN 594.254 594.254 594.254 594.254 594.254 594.254 594.254 594.254 594.254 594.254
21,37 SWITCH 10/100/1000 16 PUERTOS UN 304.950 304.950 304.950 304.950 304.950 304.950 304.950 304.950 304.950 304.950
21,38 SWITCH 10/100/1000 8 PUERTOS UN 85.211 85.211 85.211 85.211 85.211 85.211 85.211 85.211 85.211 85.211
21,39 CABLE TELEFNICO 2 PARES ML 1.770 1.770 1.770 1.770 1.770 1.770 1.770 1.770 1.770 1.770
21,40 CABLE TELEFNICO 10 PARES ML 8.177 8.177 8.177 8.177 8.177 8.177 8.177 8.177 8.177 8.177
21,41 CABLE TELEFNICO 20 PARES ML 12.214 12.214 12.214 12.214 12.214 12.214 12.214 12.214 12.214 12.214
21,42 CABLE TELEFNICO 40 PARES ML 20.401 20.401 20.401 20.401 20.401 20.401 20.401 20.401 20.401 20.401
21,43 CABLE TELEVISIN RG6 ML 3.774 3.774 3.774 3.774 3.774 3.774 3.774 3.774 3.774 3.774
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.371 21.371 21.371 21.371 21.371 21.371 21.371 21.371 21.371 21.371
21,45 ACOMETIDA TELEFNICA 1" ML 31.145 31.145 31.145 31.145 31.145 31.145 31.145 31.145 31.145 31.145
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.611 18.611 18.611 18.611 18.611 18.611 18.611 18.611 18.611 18.611
CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE
21,47 ML 14.834 14.834 14.834 14.834 14.834 14.834 14.834 14.834 14.834 14.834
CERTIFICACIN)
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 600.445 600.445 600.445 600.445 600.445 600.445 600.445 600.445 600.445 600.445
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 87.879 87.879 87.879 87.879 87.879 87.879 87.879 87.879 87.879 87.879
1,3 CODO 45 PVC UNIN MECNICA 8" UN 495.122 495.122 495.122 495.122 495.122 495.122 495.122 495.122 495.122 495.122
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.056.799 1.056.799 1.056.799 1.056.799 1.056.799 1.056.799 1.056.799 1.056.799 1.056.799 1.056.799
1,5 CODO 90 PVC UNIN MECNICA 4" UN 121.120 121.120 121.120 121.120 121.120 121.120 121.120 121.120 121.120 121.120
1,6 CODO 90 PVC UNIN MECNICA 8" UN 738.012 738.012 738.012 738.012 738.012 738.012 738.012 738.012 738.012 738.012
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.588.387 1.588.387 1.588.387 1.588.387 1.588.387 1.588.387 1.588.387 1.588.387 1.588.387 1.588.387
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.629 12.629 12.629 12.629 12.629 12.629 12.629 12.629 12.629 12.629
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.589 15.589 15.589 15.589 15.589 15.589 15.589 15.589 15.589 15.589
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.586 19.586 19.586 19.586 19.586 19.586 19.586 19.586 19.586 19.586
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.441 21.441 21.441 21.441 21.441 21.441 21.441 21.441 21.441 21.441
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 25.714 25.714 25.714 25.714 25.714 25.714 25.714 25.714 25.714 25.714
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 25.714 25.714 25.714 25.714 25.714 25.714 25.714 25.714 25.714 25.714
1,14 TAPN PVC UNIN MECNICA 3" UN 103.529 103.529 103.529 103.529 103.529 103.529 103.529 103.529 103.529 103.529
1,15 TAPN PVC UNIN MECNICA 4" UN 119.913 119.913 119.913 119.913 119.913 119.913 119.913 119.913 119.913 119.913
1,16 TAPN PVC UNIN MECNICA 8" UN 371.121 371.121 371.121 371.121 371.121 371.121 371.121 371.121 371.121 371.121
1,17 TEE PVC UNIN MECNICA 2" UN 139.368 139.368 139.368 139.368 139.368 139.368 139.368 139.368 139.368 139.368
1,18 TEE PVC UNIN MECNICA 4" UN 229.747 229.747 229.747 229.747 229.747 229.747 229.747 229.747 229.747 229.747
1,19 TEE PVC UNIN MECNICA 8" UN 1.016.787 1.016.787 1.016.787 1.016.787 1.016.787 1.016.787 1.016.787 1.016.787 1.016.787 1.016.787
1,20 TEE PVC UNIN MECNICA 10" UN 1.171.505 1.171.505 1.171.505 1.171.505 1.171.505 1.171.505 1.171.505 1.171.505 1.171.505 1.171.505
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.715 13.715 13.715 13.715 13.715 13.715 13.715 13.715 13.715 13.715
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.098 12.098 12.098 12.098 12.098 12.098 12.098 12.098 12.098 12.098
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 29.948 29.948 29.948 29.948 29.948 29.948 29.948 29.948 29.948 29.948
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 118.729 118.729 118.729 118.729 118.729 118.729 118.729 118.729 118.729 118.729
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 176.851 176.851 176.851 176.851 176.851 176.851 176.851 176.851 176.851 176.851
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 28.879 28.879 28.879 28.879 28.879 28.879 28.879 28.879 28.879 28.879
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 99.518 99.518 99.518 99.518 99.518 99.518 99.518 99.518 99.518 99.518
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 147.518 147.518 147.518 147.518 147.518 147.518 147.518 147.518 147.518 147.518
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 60.214 60.214 60.214 60.214 60.214 60.214 60.214 60.214 60.214 60.214
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 242.618 242.618 242.618 242.618 242.618 242.618 242.618 242.618 242.618 242.618
1,32 UNIN REPARACION PVC 4" UN 70.263 70.263 70.263 70.263 70.263 70.263 70.263 70.263 70.263 70.263
1,33 UNIN REPARACIN PVC 8" UN 282.296 282.296 282.296 282.296 282.296 282.296 282.296 282.296 282.296 282.296
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 169.131 169.131 169.131 169.131 169.131 169.131 169.131 169.131 169.131 169.131
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 481.736 481.736 481.736 481.736 481.736 481.736 481.736 481.736 481.736 481.736
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.290.785 1.290.785 1.290.785 1.290.785 1.290.785 1.290.785 1.290.785 1.290.785 1.290.785 1.290.785
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.907.298 1.907.298 1.907.298 1.907.298 1.907.298 1.907.298 1.907.298 1.907.298 1.907.298 1.907.298

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.295 10.295 10.295 10.295 10.295 10.295 10.295 10.295 10.295 10.295
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.515 23.515 23.515 23.515 23.515 23.515 23.515 23.515 23.515 23.515
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 118.595 129.305 96.283 126.628 136.445 96.283 126.628 115.918 103.423 131.983
2,5 RELLENO TIPO 2 "RECEBO" M3 92.080 98.547 72.677 89.493 105.015 105.015 98.547 103.721 105.015 92.080
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 92.080 98.547 72.677 89.493 105.015 105.015 111.482 103.721 92.080 85.612
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 112.016 141.736 112.016 165.308 134.562 142.761 147.885 127.388 136.612 117.140
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 62.552 106.431 62.552 106.431 88.670 88.670 93.894 87.626 78.223 72.999
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 81.784 81.784 81.784 81.784 81.784 72.840 81.784 81.784 81.784 81.784

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 110.674 110.674 110.674 110.674 110.674 110.674 110.674 110.674 110.674 110.674
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
3,2 CODO 45 PVC ALCANTARILLADO 16" UN CONSTRUCCIN
1.154.244 1.154.244 1.154.244 1.154.244 1.154.244 1.154.244 1.154.244 1.154.244 1.154.244 1.154.244
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 144.645 144.645 144.645 144.645 144.645 144.645 144.645 144.645 144.645 144.645
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.336.917 1.336.917 1.336.917 1.336.917 1.336.917 1.336.917 1.336.917 1.336.917 1.336.917 1.336.917
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 931.792 931.792 931.792 931.792 931.792 931.792 931.792 931.792 931.792 931.792
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 61.985 61.985 61.985 61.985 61.985 61.985 61.985 61.985 61.985 61.985
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 109.865 109.865 109.865 109.865 109.865 109.865 109.865 109.865 109.865 109.865
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 259.458 259.458 259.458 259.458 259.458 259.458 259.458 259.458 259.458 259.458
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 416.570 416.570 416.570 416.570 416.570 416.570 416.570 416.570 416.570 416.570
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 109.911 109.911 109.911 109.911 109.911 109.911 109.911 109.911 109.911 109.911
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 109.911 109.911 109.911 109.911 109.911 109.911 109.911 109.911 109.911 109.911
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464 259.464
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 416.570 416.570 416.570 416.570 416.570 416.570 416.570 416.570 416.570 416.570
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 418.642 418.642 418.642 418.642 418.642 418.642 418.642 418.642 418.642 418.642
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 679.588 679.588 679.588 679.588 679.588 679.588 679.588 679.588 679.588 679.588
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.090.614 1.090.614 1.090.614 1.090.614 1.090.614 1.090.614 1.090.614 1.090.614 1.090.614 1.090.614
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 67.337 67.337 67.337 67.337 67.337 67.337 67.337 67.337 67.337 67.337
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 350.366 350.366 350.366 350.366 350.366 350.366 350.366 350.366 350.366 350.366
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 392.379 392.379 392.379 392.379 392.379 392.379 392.379 392.379 392.379 392.379
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.086.710 1.086.710 1.086.710 1.086.710 1.086.710 1.086.710 1.086.710 1.086.710 1.086.710 1.086.710
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 63.398 63.398 63.398 63.398 63.398 63.306 63.398 63.398 63.398 63.398
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 317.647 317.647 317.647 317.647 317.647 317.647 317.647 317.647 317.647 317.647
3,25 TUBERA PVC ALCANTARILLADO 8" ML 48.262 48.262 48.262 48.262 48.262 48.262 48.262 48.262 48.262 48.262
3,26 TUBERA PVC ALCANTARILLADO 10" ML 68.270 68.270 68.270 68.270 68.270 68.270 68.270 68.270 68.270 68.270
3,27 TUBERA PVC ALCANTARILLADO 12" ML 98.534 98.534 98.534 98.534 98.534 98.534 98.534 98.534 98.534 98.534
3,28 TUBERA PVC ALCANTARILLADO 16" ML 151.260 151.260 151.260 151.260 151.260 151.260 151.260 151.260 151.260 151.260
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 243.126 243.126 243.126 243.126 243.126 243.126 243.126 243.126 243.126 243.126
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 353.053 353.053 353.053 353.053 353.053 353.053 353.053 353.053 353.053 353.053
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 446.709 446.709 446.709 446.709 446.709 446.709 446.709 446.709 446.709 446.709
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 587.317 587.317 587.317 587.317 587.317 587.317 587.317 587.317 587.317 587.317
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 807.777 807.777 807.777 807.777 807.777 807.777 807.777 807.777 807.777 807.777

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4,1 UN 652.813 658.075 641.851 656.760 661.582 646.932 656.760 651.498 645.359 659.390
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
4,2 ML 616.311 616.311 616.311 616.311 616.311 613.203 616.311 616.311 616.311 616.311
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4,3 UN 691.898 695.406 684.590 694.529 697.744 687.977 694.529 691.021 686.929 696.283
REFUERZO (INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI
4,4 UN 776.271 782.849 762.569 781.205 787.233 768.920 781.205 774.627 766.954 784.493
CON REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4,5 ML 876.151 876.151 876.151 876.151 876.151 871.773 876.151 876.151 876.151 876.151
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4,6 UN 800.523 805.347 790.475 804.141 808.562 795.132 804.141 799.318 793.691 806.552
REFUERZO (INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 947.041 948.269 944.484 947.962 949.088 944.499 947.962 946.734 945.302 948.576
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.380.307 1.385.393 1.369.710 1.384.121 1.388.784 1.373.070 1.384.121 1.379.035 1.373.101 1.386.665
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.912.924 1.925.965 1.885.754 1.922.705 1.934.660 1.900.600 1.922.705 1.909.663 1.894.447 1.929.226
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.551.090 2.572.767 2.505.929 2.567.349 2.587.220 2.530.609 2.567.349 2.545.670 2.520.379 2.578.187
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.764.772 1.764.772 1.764.772 1.764.772 1.764.772 1.764.772 1.764.772 1.764.772 1.764.772 1.764.772
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.735.315 3.735.315 3.735.315 3.735.315 3.735.315 3.735.315 3.735.315 3.735.315 3.735.315 3.735.315
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 132.380 132.380 132.380 132.380 132.380 132.253 132.380 132.380 132.380 132.380
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
CONSTRUCCIN
5 ANDENES Y SARDINELES
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 69.796 69.796 69.796 69.796 69.796 69.314 69.796 69.796 69.796 69.796
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 82.796 82.796 82.796 82.796 82.796 82.314 82.796 82.796 82.796 82.796
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 54.641 55.430 52.996 55.233 55.956 54.139 55.233 54.443 53.523 55.627
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 59.930 60.851 58.011 60.621 61.465 58.901 60.621 59.700 58.625 61.081
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 59.715 60.548 57.979 60.340 61.103 58.932 60.340 59.506 58.534 60.756
5,6 BORDE SEPARADOR VERDE A-170 ML 243.989 243.989 243.989 243.989 243.989 243.862 243.989 243.989 243.989 243.989
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.648 17.743 17.451 17.720 17.806 17.588 17.720 17.625 17.514 17.767
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 39.070 39.626 37.911 39.487 39.997 38.717 39.487 38.931 38.282 39.765
5,9 CAUELA PREFABRICADA TIPO A-120 ML 79.867 79.867 79.867 79.867 79.867 79.799 79.867 79.867 79.867 79.867
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 532.556 533.576 530.431 533.321 534.256 529.226 533.321 532.301 531.111 533.831
5,11 LOSETA PREFABRICADA A-40 M2 59.180 59.180 59.180 59.180 59.180 58.890 59.180 59.180 59.180 59.180
5,12 LOSETA PREFABRICADA A-60 M2 86.409 86.409 86.409 86.409 86.409 86.118 86.409 86.409 86.409 86.409
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 32.649 33.017 31.881 32.925 33.263 32.237 32.925 32.557 32.127 33.109

5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 52.903 53.649 51.350 53.462 54.146 52.070 53.462 52.717 51.847 53.835
5,15 SARDINEL PREFABRICADO A-10 ML 93.558 102.314 91.568 100.921 97.538 97.471 102.712 101.120 99.130 94.553
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 57.272 57.272 57.272 57.272 57.272 57.096 57.272 57.272 57.272 57.272

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 195.804 196.242 194.890 196.133 196.534 195.314 196.133 195.694 195.183 196.352
6,2 BANCA EN CONCRETO M-30 UN 642.099 642.713 640.820 642.560 643.122 641.413 642.560 641.946 641.230 642.867
6,3 BOLARDO M-63 ALTO/HIERRO UN 206.310 206.398 206.128 206.376 206.457 206.223 206.376 206.289 206.186 206.420
6,4 BOLARDO M-60 CONCRETO UN 156.361 156.887 155.265 156.756 157.238 155.773 156.756 156.230 155.616 157.019
6,5 BOLARDO M-61 BAJO/CONCRETO UN 158.125 158.651 157.028 158.519 159.002 157.537 158.519 157.993 157.379 158.782
6,6 BOLARDO M-62 BAJO/HIERRO UN 185.239 185.765 184.143 185.633 186.116 184.714 185.633 185.107 184.493 185.897
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 55.768 55.768 55.768 55.768 55.768 55.399 55.768 55.768 55.768 55.768
6,8 BORDILLO PREFABRICADO A-80 ML 64.826 64.826 64.826 64.826 64.826 64.413 64.826 64.826 64.826 64.826
6,9 CANECA M-120 UN 299.686 299.686 299.686 299.686 299.686 299.593 299.686 299.686 299.686 299.686
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 790.997 791.260 790.449 791.194 791.435 790.703 791.194 790.931 790.624 791.326
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.246.466 3.246.641 3.246.100 3.246.597 3.246.758 3.246.270 3.246.597 3.246.422 3.246.217 3.246.685
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.339.714 3.339.889 3.339.348 3.339.845 3.340.006 3.339.518 3.339.845 3.339.670 3.339.465 3.339.933
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 467.084 467.260 466.719 467.216 467.377 466.909 467.216 467.040 466.836 467.304
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 619.660 620.362 618.199 620.187 620.830 618.961 620.187 619.485 618.667 620.537
6,15 BANCA EN MADERA M-50 UN 513.496 513.496 513.496 513.496 513.496 513.496 513.496 513.496 513.496 513.496
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 238.189 238.452 237.641 238.387 238.628 237.895 238.387 238.124 237.817 238.518
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 552.666 552.666 552.666 552.666 552.666 552.436 552.666 552.666 552.666 552.666
6,18 POSTE HISTRICO M-131 UN 6.174.274 6.175.590 6.171.534 6.175.261 6.176.467 6.172.804 6.175.261 6.173.945 6.172.411 6.175.919

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.880 3.880 3.880 3.880 3.880 3.880 3.880 3.880 3.880 3.880
7,2 MARCA VIAL CON PINTURA EN FRO M2 41.618 41.618 41.618 41.618 41.618 41.618 41.618 41.618 41.618 41.618
7,3 SEAL DOBLE DE CICLORUTA UN 300.856 300.856 300.856 300.856 300.856 300.793 300.856 300.856 300.856 300.856
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 475.260 475.611 474.529 475.523 475.845 474.910 475.523 475.172 474.763 475.698
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 225.209 225.209 225.209 225.209 225.209 225.145 225.209 225.209 225.209 225.209
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 239.200 239.200 239.200 239.200 239.200 239.136 239.200 239.200 239.200 239.200
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 249.794 249.794 249.794 249.794 249.794 249.730 249.794 249.794 249.794 249.794
7,8 TACHAS REFLECTIVAS UN 13.019 13.019 13.019 13.019 13.019 13.019 13.019 13.019 13.019 13.019
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 13.904 13.904 13.904 13.904 13.904 13.904 13.904 13.904 13.904 13.904
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7,10 UN 113.088 113.088 113.088 113.088 113.088 113.088 113.088 113.088 113.088 113.088
SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
CONSTRUCCIN
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
SOBRANTES A UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
PRESTAMOS, SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y
2,1 210.1.1 M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
PRSTAMOS

2,2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 34.326 34.326 34.326 34.326 34.326 34.326 34.326 34.326 34.326 34.326

EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y


2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTEM2 463 463 463 463 463 463 463 463 463 463
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2,10 600.2 M3 62.934 62.934 62.934 62.934 62.934 62.934 62.934 62.934 62.934 62.934
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2,11 600.3 M3 77.203 77.203 77.203 77.203 77.203 77.203 77.203 77.203 77.203 77.203
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO
2,13 600.4 P M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA (INCLUYE
2,14 600.5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A MANO
2,15 600.5 P M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 131.423 179.302 105.605 167.745 147.933 139.678 182.604 163.390 152.886 123.168
3,3 330.1 BASE GRANULAR M3 130.988 203.632 114.478 192.075 164.008 164.008 206.934 193.726 177.216 139.243
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
(INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIN M2 3.364 3.364 3.364 3.364 3.364 3.364 3.364 3.364 3.364 3.364
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.166 1.166 1.166 1.166 1.166 1.166 1.166 1.166 1.166 1.166
PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION
3,7 461.1 M3 236.051 238.601 230.739 237.964 240.301 231.268 237.964 235.414 232.439 239.239
ASFLTICA
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 62.660 62.748 62.477 62.726 62.806 62.207 62.726 62.638 62.536 62.770
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama

3,9 450.1 P
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
M3 CONSTRUCCIN
568.163 566.576 547.526 569.751 607.851 590.388 630.076 544.351 606.263 555.463
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3,10 450.2 P M3 574.113 572.526 553.476 575.701 613.801 596.338 636.026 550.301 612.213 561.413
ASFLTICO)
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3,11 450.9 P M3 597.111 595.524 576.474 598.699 636.799 619.336 659.024 573.299 635.211 584.411
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3,12 450.3 P M3 603.863 602.276 583.226 605.451 643.551 626.088 665.776 580.051 641.963 591.163
ASFLTICO)
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 288.286 360.930 271.776 349.373 321.306 321.306 364.232 351.024 334.514 296.541
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 287.115 334.994 261.297 323.437 303.625 295.370 338.296 319.082 308.578 278.860
3,15 311.1 AFIRMADO M3 101.710 109.965 76.945 98.408 118.220 118.220 126.475 116.569 101.710 93.455
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 12.415 12.619 11.990 12.568 12.755 11.990 12.568 12.364 12.126 12.670
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 5.076 5.178 4.863 5.152 5.246 4.863 5.152 5.050 4.931 5.203
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE
3,18 500.1 M3 617.407 624.402 602.835 622.653 629.065 612.965 622.653 615.658 607.498 626.151
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE
3,19 500.1 M3 648.624 655.932 633.399 654.105 660.804 643.983 654.105 646.797 638.271 657.759
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE
3,20 500.1 M3 668.836 676.248 653.393 674.395 681.190 664.431 674.395 666.982 658.335 678.101
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE
3,21 *** ML 6.699 6.699 6.699 6.699 6.699 6.699 6.699 6.699 6.699 6.699
LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 92.190 150.864 92.190 150.864 127.115 127.115 134.100 125.718 113.145 106.160

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 879.913 887.848 863.383 885.864 893.137 874.874 885.864 877.930 868.673 889.831
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 760.325 768.128 744.069 766.177 773.330 755.370 766.177 758.374 749.270 770.078
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 804.533 812.645 787.633 810.617 818.053 799.382 810.617 802.505 793.041 814.673
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 556.352 564.366 539.657 562.363 569.709 548.820 562.363 554.349 544.999 566.370
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 648.143 656.473 630.786 654.391 662.028 640.312 654.391 646.059 636.340 658.556
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 558.421 567.279 539.968 565.065 573.183 548.521 565.065 556.207 545.874 569.493
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 650.293 659.501 631.109 657.200 665.640 640.001 657.200 647.991 637.249 661.803
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 710.297 719.155 691.845 716.941 725.060 700.397 716.941 708.084 697.750 721.369
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 577.645 586.853 558.461 584.552 592.992 567.353 584.552 575.343 564.601 589.155
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 752.524 761.733 733.341 759.431 767.871 742.232 759.431 750.223 739.480 764.034
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE
4,11 650 P KG 11.352 11.352 11.352 11.352 11.352 11.352 11.352 11.352 11.352 11.352
DE ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y MONTAJE
4,12 650 P KG 14.578 14.578 14.578 14.578 14.578 14.578 14.578 14.578 14.578 14.578
DE ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.713 1.713 1.713 1.713 1.713 1.713 1.713 1.713 1.713 1.713
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M,
4,14 621.1 ML 2.581.393 2.581.393 2.581.393 2.581.393 2.581.393 2.581.393 2.581.393 2.581.393 2.581.393 2.581.393
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M.
4,15 621.1 P CONSTRUCCIN MANUAL (INCLUYE EXCAVACIN EN CUALQUIER ML 3.944.571 3.958.143 3.916.296 3.954.750 3.967.191 3.935.952 3.954.750 3.941.178 3.925.344 3.961.536
TIPO DE MATERIAL, REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4,16 621.2 M3 1.662.396 1.671.166 1.644.126 1.668.974 1.677.012 1.652.594 1.668.974 1.660.204 1.649.973 1.673.358
REFUERZO)
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 83.412 83.412 83.412 83.412 83.412 83.412 83.412 83.412 83.412 83.412
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 345.929 346.982 343.737 346.719 347.683 344.753 346.719 345.666 344.439 347.245
4,19 632 P BARANDA METLICA ML 404.081 404.081 404.081 404.081 404.081 404.081 404.081 404.081 404.081 404.081
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.186 16.186 16.186 16.186 16.186 16.186 16.186 16.186 16.186 16.186
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 491.380 504.203 460.010 495.155 514.444 496.624 512.427 498.589 480.413 495.978
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 127.751 168.264 127.751 200.395 158.485 169.661 176.646 148.706 161.279 134.736
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 108.645 116.265 85.785 105.597 123.885 123.885 116.265 122.361 123.885 108.645
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 379.118 387.976 360.666 385.761 393.881 370.287 385.761 376.904 366.571 390.190
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama

4,25 630.7 CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA BASES M3 CONSTRUCCIN
356.063 382.661 345.101 381.345 377.533 363.517 375.249 366.940 356.229 367.720
CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA
4,26 630.7 M3 364.504 391.102 353.542 389.786 385.973 371.957 383.690 375.380 364.670 376.161
ELEVACIONES
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 365.821 391.667 356.425 390.540 386.038 375.657 384.444 376.886 367.052 376.539
4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 374.261 400.108 364.865 398.980 394.478 384.098 392.884 385.326 375.493 384.979
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 502.099 509.691 486.282 507.793 514.752 497.278 507.793 500.201 491.344 511.589
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 591.956 599.849 575.513 597.876 605.110 586.944 597.876 589.983 580.775 601.822
4,31 681.1 GAVIN M3 175.556 231.563 175.556 231.563 208.894 208.894 215.561 207.560 195.559 188.891
4,32 681.1 GAVIN MALLA PVC M3 179.550 235.557 179.550 235.557 212.887 212.887 219.555 211.554 199.552 192.885
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4,33 672.1 ML 40.762 41.228 39.791 41.112 41.539 40.466 41.112 40.646 40.102 41.345
2500 PSI

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE


4,34 672.1 ML 15.838 16.071 15.352 16.012 16.226 15.690 16.012 15.779 15.508 16.129
E, 2500 PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE REFUERZO
4,35 *** M2 9.668 9.668 9.668 9.668 9.668 9.668 9.668 9.668 9.668 9.668
(RESISTENCIA LTIMA 25 KN)

4,36 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-50 M2 13.790 13.790 13.790 13.790 13.790 13.790 13.790 13.790 13.790 13.790

4,37 *** SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-75 M2 18.564 18.564 18.564 18.564 18.564 18.564 18.564 18.564 18.564 18.564
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE
4,38 *** M2 22.257 22.257 22.257 22.257 22.257 22.257 22.257 22.257 22.257 22.257
REFUERZO (RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE
4,39 *** M2 28.603 28.603 28.603 28.603 28.603 28.603 28.603 28.603 28.603 28.603
REFUERZO (RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800
4,40 *** M2 6.938 6.938 6.938 6.938 6.938 6.938 6.938 6.938 6.938 6.938
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000
4,41 *** M2 7.907 7.907 7.907 7.907 7.907 7.907 7.907 7.907 7.907 7.907
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500
4,42 *** M2 8.220 8.220 8.220 8.220 8.220 8.220 8.220 8.220 8.220 8.220
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700
4,43 *** M2 5.852 5.852 5.852 5.852 5.852 5.852 5.852 5.852 5.852 5.852
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100
4,44 *** M2 8.820 8.820 8.820 8.820 8.820 8.820 8.820 8.820 8.820 8.820
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400
4,45 *** M2 7.190 7.190 7.190 7.190 7.190 7.190 7.190 7.190 7.190 7.190
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400
4,46 *** M2 8.820 8.820 8.820 8.820 8.820 8.820 8.820 8.820 8.820 8.820
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000
4,47 *** M2 16.956 16.956 16.956 16.956 16.956 16.956 16.956 16.956 16.956 16.956
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO REFORZADO
4,48 661.1 ML 603.094 603.094 603.094 603.094 603.094 603.399 603.094 603.094 603.094 603.094
=36" CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE,
4,49 660.3 ML 348.841 350.595 345.187 350.156 351.764 346.965 350.156 348.403 346.356 351.033
DIMETRO 600 MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-ALCANTARILLADO,
4,50 *** ML 844.987 844.987 844.987 844.987 844.987 844.987 844.987 844.987 844.987 844.987
DIMETRO 36"

4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 166.883 174.820 143.070 163.708 182.758 182.758 190.695 181.170 166.883 158.945

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000


4,52 640.1 KG 4.238 4.238 4.238 4.238 4.238 4.238 4.238 4.238 4.238 4.238
PSI
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4,53 *** ML 82.285 82.285 82.285 82.285 82.285 82.285 82.285 82.285 82.285 82.285
INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4,54 *** ML 125.364 125.364 125.364 125.364 125.364 125.364 125.364 125.364 125.364 125.364
INSTALACIN)
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 512.504 520.397 496.061 518.424 525.659 507.492 518.424 510.531 501.324 522.370
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: TEQUENDAMA
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
M San_Ant_Teque
TEM DESCRIPCIN UNIDAD Anapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile Tena Viot
u ndama
4,56 682.1 P COLCHONETA RENO M3 CONSTRUCCIN
190.646 246.653 190.646 246.653 223.983 223.983 230.651 222.650 210.648 203.981
4,57 *** TRINCHO EN MADERA M2 65.082 65.082 65.082 65.082 65.082 65.082 65.082 65.082 65.082 65.082

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.880 3.880 3.880 3.880 3.880 3.880 3.880 3.880 3.880 3.880
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 41.618 41.618 41.618 41.618 41.618 41.618 41.618 41.618 41.618 41.618
5,3 730.3 TOPE DEFENSA METLICA UN 80.251 80.251 80.251 80.251 80.251 80.251 80.251 80.251 80.251 80.251
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 66.750 66.750 66.750 66.750 66.750 66.750 66.750 66.750 66.750 66.750
5,5 730.1 DEFENSA METLICA ML 142.593 143.001 141.743 142.899 143.273 142.196 142.899 142.491 142.015 143.103
SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS
5,6 701.1 UN 13.019 13.019 13.019 13.019 13.019 13.019 13.019 13.019 13.019 13.019
UNIDIRECCIONALES

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 807 807 807 807 807 807 807 807 807 807
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL A =
6,2 801.6 36", INCLUYE RECTIFICACIN DE DESCOLES, Y RETIRO DE SOBRANTES UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIN
6,3 801.7 ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6,5 801.1 HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
KM)
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 14.777 14.777 14.777 14.777 14.777 14.777 14.777 14.777 14.777 14.777
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 23.937 23.937 23.937 23.937 23.937 23.937 23.937 23.937 23.937 23.937
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.475 9.475 9.475 9.475 9.475 9.475 9.475 9.475 9.475 9.475

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
CONSTRUCCIN
1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 1.931.107 1.928.346 1.935.937 1.945.600 1.935.247 1.949.740 1.943.529 1.927.654 1.935.937 1.922.824
1,2 CAMPAMENTO 9 M2 UN 1.125.438 1.124.058 1.127.853 1.132.685 1.127.508 1.134.755 1.131.650 1.123.712 1.127.853 1.121.297
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 13.637 13.637 13.637 13.637 13.637 13.637 13.637 13.637 13.637 13.637
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.291 15.291 15.291 15.291 15.291 15.291 15.291 15.291 15.291 15.291
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 17.669 17.669 17.669 17.669 17.669 17.669 17.669 17.669 17.669 17.669
1,6 CERCA EN TABLA H=2.30 M ML 64.263 64.263 64.263 64.263 64.263 64.263 64.263 64.263 64.263 64.263
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 44.913 44.882 44.965 45.070 44.958 45.115 45.048 44.875 44.965 44.822
1,8 CERCA EN TELA VERDE H = 2.10 M ML 20.629 20.599 20.682 20.787 20.674 20.832 20.764 20.591 20.682 20.539
1,9 DEMOLICIN ESCALERAS EN CONCRETO M2 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917 75.917
1,10 DEMOLICIN BALDOSA DE PISO H=0.02 M M2 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918 5.918
1,11 DEMOLICIN BALDOSA DE PISO H=0.04 M M2 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399 8.399
1,12 DEMOLICIN ENCHAPE MURO M2 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445 6.445
1,13 DEMOLICIN PAETE MURO M2 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029 7.029
1,14 DEMOLICIN CIELO RASO FALSO M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494 8.494
1,15 DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647 8.647
1,16 DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814 12.814
1,17 DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565 17.565
1,18 DEMOLICIN PLACA ALIGERADA 0.30 M M2 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058 26.058
1,19 DEMOLICIN PLACA ALIGERADA 0.40 M M2 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870 37.870
1,20 DEMOLICIN PLACA ALIGERADA 0.50 M M2 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851 46.851
1,21 DEMOLICIN PLACA MACIZA 0.15 M M2 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601 38.601
1,22 DEMOLICIN PLACA MACIZA 0.20 M M2 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223 54.223
1,23 DEMOLICIN PLACA MACIZA 0.25 M M2 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207 64.207
1,24 DEMOLICIN PLACA MACIZA 0.30 M M2 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704 78.704
1,25 DEMOLICIN PLACA PISO 0.05 M M2 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620 8.620
1,26 DEMOLICIN PLACA PISO 0.10 M M2 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964 13.964
1,27 DEMOLICIN PLACA PISO 0.15 M M2 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242 21.242
1,28 DEMOLICIN PLACA PISO 0.20 M M2 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796 34.796
1,29 DEMOLICIN VIGAS Y COLUMNAS M3 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666 221.666
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483 1.483
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498 5.498
1,32 DESMONTE APARATOS SANITARIOS UN 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909 19.909
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736 10.736
1,35 DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955 9.955
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315 9.315
1,37 DESMONTE MUROS SECOS M2 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645 14.645
1,38 DESMONTE MARCOS Y PUERTAS UN 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876 12.876
1,39 DESMONTE VENTANAS M2 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928 10.928
1,40 LETRINA DE 2.0x1.0 UN 883.222 882.325 883.549 885.796 884.171 886.744 885.869 881.851 882.753 881.326
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1,41 M2 10.248 10.248 10.248 10.248 10.248 10.248 10.248 10.248 10.248 10.248
DE PRESICIN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.672 3.672 3.672 3.672 3.672 3.672 3.672 3.672 3.672 3.672
1,43 RED ELCTRICA PROVISIONAL L=50M UN 2.636.761 2.636.761 2.636.761 2.636.761 2.636.761 2.636.761 2.636.761 2.636.761 2.636.761 2.636.761
1,44 RED TELEFNICA PROVISIONAL UN 243.031 243.031 243.031 243.031 243.031 243.031 243.031 243.031 243.031 243.031
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1,45 M3 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854 8.854
CARGUE)

2 CIMIENTOS
2,1 BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 77.456 69.695 74.869 90.391 83.924 96.859 94.272 64.521 64.521 64.521
2,2 BASE ARENA CEMENTO 1:20 M3 195.766 192.473 201.526 213.051 200.704 217.989 210.581 191.649 201.526 185.889
2,3 DEMOLICIN CABEZAS DE PILOTES M3 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431 283.431
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
2,4 DEMOLICIN CIMIENTO ENTERRADO M3 CONSTRUCCIN
197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473 197.473
2,5 IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 21.677 21.677 21.677 21.677 21.677 21.677 21.677 21.677 21.677 21.677
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 602.213 599.264 607.372 617.694 606.635 622.117 615.481 598.526 607.372 593.366
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 602.971 599.912 608.323 619.032 607.559 623.620 616.737 599.146 608.323 593.793
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 560.953 558.088 565.965 575.992 565.249 580.288 573.843 557.371 565.965 552.359
2,9 PILOTE DE MADERA D=20 CM ML 48.055 48.055 48.055 48.055 48.055 48.055 48.055 48.055 48.055 48.055
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2,10 ML 148.123 148.123 148.123 148.123 148.123 148.123 148.123 148.123 148.123 148.123
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE
2,11 ML 185.508 185.508 185.508 185.508 185.508 185.508 185.508 185.508 185.508 185.508
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE
2,12 ML 230.717 230.717 230.717 230.717 230.717 230.717 230.717 230.717 230.717 230.717
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE
2,13 ML 291.576 291.576 291.576 291.576 291.576 291.576 291.576 291.576 291.576 291.576
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 100.414 100.206 100.780 101.511 100.728 101.824 101.354 100.153 100.780 99.788
2,15 PILOTE HINCADO 30X30 ML 123.842 123.539 124.371 125.431 124.296 125.884 125.204 123.463 124.371 122.934
2,16 DADOS EN CONCRETO 3500PSI M3 547.592 544.727 552.604 562.631 551.888 566.927 560.482 544.011 552.604 538.999
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2,17 ML 88.602 88.602 88.602 88.602 88.602 88.602 88.602 88.602 88.602 88.602
DISTANCIA MENOR DE 5 KM)

3 DESAGES E INSTALACIONES SUBTERRNEAS


3,1 SIFN PARA DRENAJE EN PVC DE 4" UN 37.345 37.325 37.381 37.453 37.376 37.483 37.437 37.320 37.381 37.284
3,2 SIFN EN PVC 6" UN 194.722 194.701 194.758 194.829 194.753 194.860 194.814 194.696 194.758 194.661
3,3 CAJA DE INSPECCIN DE 100X100 UN 433.492 427.398 433.832 447.726 439.328 453.563 449.350 423.810 427.225 421.818
3,4 CAJA DE INSPECCIN DE 40X40 UN 216.068 215.288 216.562 218.665 216.959 219.557 218.603 214.918 216.005 214.285
3,5 CAJA DE INSPECCIN DE 60X60 UN 245.194 243.937 246.026 249.441 246.642 250.889 249.319 243.349 245.150 242.298
3,6 CAJA DE INSPECCIN DE 80X80 UN 321.675 319.997 323.241 328.126 323.752 330.203 327.689 319.304 322.365 317.519
3,7 DUCTO ELCTRICO PVC 4" ML 100.103 100.043 100.083 100.202 100.152 100.252 100.232 100.003 100.003 100.003
3,8 POZO SPTICO ETERNIT 1000 LT UN 1.262.392 1.261.795 1.262.193 1.263.387 1.262.890 1.263.885 1.263.686 1.261.397 1.261.397 1.261.397
3,9 TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 112.461 112.235 112.857 113.648 112.800 113.986 113.478 112.179 112.857 111.783
3,10 TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 71.275 71.155 71.483 71.900 71.453 72.079 71.811 71.125 71.483 70.917
3,11 TUBERA DRENAJE PVC 110 ML 26.800 26.749 26.889 27.068 26.876 27.145 27.030 26.736 26.889 26.646
3,12 TUBERA DRENAJE PVC 160 ML 43.544 43.493 43.634 43.813 43.621 43.890 43.774 43.481 43.634 43.391
3,13 TUBERA DRENAJE PVC 200 ML 57.186 57.114 57.311 57.562 57.293 57.669 57.508 57.096 57.311 56.971
3,14 TUBERA DRENAJE PVC 250 ML 78.503 78.421 78.646 78.932 78.626 79.055 78.871 78.401 78.646 78.258
3,15 TUBERA DRENAJE PVC 315 ML 109.060 108.988 109.185 109.435 109.167 109.543 109.382 108.970 109.185 108.845
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3,16 UN 935.572 934.754 937.003 939.866 936.798 941.093 939.252 934.549 937.003 933.118
MATERIAL FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3,17 UN 1.320.966 1.319.330 1.323.828 1.329.554 1.323.419 1.332.008 1.328.327 1.318.920 1.323.828 1.316.058
MATERIAL FILTRANTE)
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3,18 UN 1.714.368 1.711.096 1.720.092 1.731.545 1.719.275 1.736.452 1.729.091 1.710.276 1.720.092 1.704.552
MATERIAL FILTRANTE)

4 ESTRUCTURAS EN CONCRETO
4,1 CASETN DE LONA 0.8 X 0.35 M2 41.296 41.296 41.296 41.296 41.296 41.296 41.296 41.296 41.296 41.296
4,2 CASETN DE LONA 0.80X0.70 M2 54.632 54.632 54.632 54.632 54.632 54.632 54.632 54.632 54.632 54.632
4,3 COLUMNAS 3500 PSI M3 760.000 757.136 765.012 775.039 764.296 779.335 772.891 756.419 765.012 751.407
4,4 CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 228.305 229.869 234.343 249.765 238.914 244.911 237.565 229.424 237.687 223.386
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4,5 M2 94.202 93.924 94.689 95.662 94.619 96.079 95.453 93.854 94.689 93.368
MALLA DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.
4,6 M2 111.154 110.820 111.738 112.906 111.654 113.406 112.656 110.737 111.738 110.153
MALLA DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN
4,7 M2 122.418 121.973 123.196 124.754 123.085 125.421 124.420 121.861 123.196 121.083
REFUERZO)
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN
4,8 M2 129.153 128.680 129.980 131.635 129.862 132.344 131.281 128.562 129.980 127.735
REFUERZO)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate

4,9
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN
M2
CONSTRUCCIN
147.791 147.207 148.812 150.857 148.666 151.733 150.419 147.060 148.812 146.038
REFUERZO)
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN
4,10 M2 164.298 163.631 165.466 167.802 165.299 168.803 167.302 163.463 165.466 162.296
REFUERZO)
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN
4,11 M2 182.261 181.511 183.575 186.204 183.388 187.330 185.640 181.323 183.575 180.009
REFUERZO)
4,12 ENTREPISO VIGUETA PLACA M2 96.852 96.804 96.936 97.104 96.924 97.176 97.068 96.793 96.936 96.709
4,13 ESCALERA MACIZA 3500 PSI M3 904.605 901.741 909.617 919.644 908.901 923.940 917.495 901.024 909.617 896.012
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 93.179 93.138 93.251 93.394 93.241 93.455 93.363 93.128 93.251 93.056
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 75.016 74.730 75.518 76.520 75.446 76.950 76.305 74.658 75.518 74.157
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 84.205 83.854 84.818 86.045 84.730 86.570 85.782 83.767 84.818 83.154
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 97.949 97.509 98.718 100.256 98.608 100.915 99.926 97.399 98.718 96.631
4,18 MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 661.847 658.983 666.859 676.886 666.144 681.183 674.738 658.266 666.859 653.254
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI
4,19 UN 46.856 46.767 47.010 47.319 46.988 47.452 47.253 46.745 47.010 46.591
(ANCHO 1 M)
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 263.797 262.517 266.035 270.513 265.715 272.432 269.554 262.197 266.035 259.959
4,21 ACERO FIGURADO 37000 PSI KG 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114 4.114
4,22 ACERO FIGURADO 60000 PSI KG 4.314 4.314 4.314 4.314 4.314 4.314 4.314 4.314 4.314 4.314
4,23 REFUERZO MALLA ELECTROSOLDADA KG 5.992 5.992 5.992 5.992 5.992 5.992 5.992 5.992 5.992 5.992
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 801.701 798.836 806.713 816.740 805.997 821.036 814.591 798.119 806.713 793.107
4,25 TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 728.235 725.100 733.720 744.694 732.937 749.396 742.343 724.315 733.720 718.830
4,26 VIGA AREA 3500 PSI M3 797.824 794.960 802.836 812.863 802.120 817.159 810.715 794.243 802.836 789.231
4,27 VIGA CINTA 3500 PSI M3 778.882 776.017 783.894 793.921 783.178 798.217 791.772 775.301 783.894 770.289
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 978.078 975.214 983.090 993.117 982.374 997.413 990.969 974.497 983.090 969.485
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 290.386 287.226 295.914 306.973 295.124 311.711 304.603 286.435 295.914 280.907

5 MAMPOSTERA
5,1 ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 28.102 28.023 28.241 28.519 28.221 28.638 28.459 28.003 28.241 27.864
5,2 ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 47.401 47.322 47.540 47.818 47.520 47.937 47.758 47.302 47.540 47.163
5,3 ALFAJA EN LADRILLO PRENSADO MACIZO ML 33.810 33.789 33.845 33.917 33.840 33.948 33.902 33.784 33.845 33.748
5,4 ARCOS EN LADRILLO PRENSADO ML 158.228 158.187 158.299 158.442 158.289 158.504 158.412 158.176 158.299 158.105
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 41.907 41.819 42.061 42.371 42.039 42.503 42.304 41.796 42.061 41.642
5,6 DINTELES EN BLOQUE 0.15 M ML 26.032 25.991 26.103 26.246 26.093 26.308 26.216 25.980 26.103 25.909
5,7 ENCHAPES LADRILLO PRENSADO M2 97.235 97.153 97.378 97.664 97.357 97.787 97.603 97.132 97.378 96.989
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 86.426 86.132 86.942 87.972 86.868 88.414 87.752 86.058 86.942 85.543
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 88.985 88.985 88.985 88.985 88.985 88.985 88.985 88.985 88.985 88.985
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 51.974 51.974 51.974 51.974 51.974 51.974 51.974 51.974 51.974 51.974
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 85.645 85.645 85.645 85.645 85.645 85.645 85.645 85.645 85.645 85.645
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 50.305 50.305 50.305 50.305 50.305 50.305 50.305 50.305 50.305 50.305
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 99.668 99.668 99.668 99.668 99.668 99.668 99.668 99.668 99.668 99.668
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 58.564 58.564 58.564 58.564 58.564 58.564 58.564 58.564 58.564 58.564
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 111.001 111.001 111.001 111.001 111.001 111.001 111.001 111.001 111.001 111.001
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 64.231 64.231 64.231 64.231 64.231 64.231 64.231 64.231 64.231 64.231
5,17 MURO EN BLOQUE N 5 E=0.12 M M2 39.682 39.641 39.754 39.898 39.744 39.960 39.867 39.631 39.754 39.559
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 23.915 23.894 23.950 24.022 23.945 24.053 24.007 23.889 23.950 23.853
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 51.924 51.897 51.972 52.068 51.965 52.109 52.047 51.890 51.972 51.842
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 31.042 31.028 31.066 31.113 31.062 31.134 31.103 31.024 31.066 31.000
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 58.389 58.362 58.437 58.533 58.430 58.574 58.513 58.355 58.437 58.307
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 34.910 34.896 34.934 34.982 34.931 35.003 34.972 34.893 34.934 34.869
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 97.055 96.918 97.295 97.774 97.260 97.980 97.671 96.884 97.295 96.644
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 57.101 57.032 57.220 57.460 57.203 57.563 57.409 57.015 57.220 56.895
5,25 MURO EN BLOQUE N 4 E= 0.10 M M2 36.330 36.302 36.378 36.474 36.371 36.515 36.453 36.295 36.378 36.248
5,26 MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 21.924 21.910 21.948 21.996 21.944 22.016 21.986 21.907 21.948 21.883
5,27 MURO EN BLOQUE N 5 E=0.23 M M2 72.472 72.418 72.568 72.760 72.555 72.842 72.719 72.404 72.568 72.308
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
5,28 MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML CONSTRUCCIN
43.471 43.443 43.518 43.614 43.512 43.655 43.594 43.436 43.518 43.388
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 86.112 86.071 86.184 86.327 86.174 86.388 86.296 86.061 86.184 85.990
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 51.874 51.854 51.910 51.982 51.905 52.012 51.966 51.849 51.910 51.813
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 178.699 178.508 179.035 179.706 178.987 179.994 179.563 178.460 179.035 178.124
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 106.719 106.623 106.887 107.222 106.863 107.366 107.150 106.599 106.887 106.431
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 87.728 87.647 87.868 88.149 87.848 88.270 88.089 87.627 87.868 87.487
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 52.682 52.642 52.752 52.893 52.742 52.953 52.863 52.632 52.752 52.561
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 45.835 45.774 45.942 46.157 45.927 46.249 46.111 45.758 45.942 45.651
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 27.732 27.701 27.786 27.893 27.778 27.939 27.870 27.694 27.786 27.640
5,37 MURO TOLETE COMN 0.06 M M2 32.875 32.847 32.923 33.019 32.916 33.060 32.998 32.840 32.923 32.792
5,38 MURO TOLETE COMN 0.06 M (LINEAL) ML 19.937 19.923 19.961 20.009 19.957 20.029 19.998 19.919 19.961 19.895
5,39 MURO TOLETE COMN 0.12 M M2 49.940 49.886 50.036 50.228 50.023 50.310 50.187 49.872 50.036 49.776
5,40 MURO TOLETE COMN 0.12 M (LINEAL) ML 30.429 30.402 30.477 30.573 30.470 30.614 30.552 30.395 30.477 30.347
5,41 MURO TOLETE COMN 0.25 M M2 96.449 96.367 96.593 96.880 96.572 97.004 96.819 96.346 96.593 96.202
5,42 MURO TOLETE COMN 0.25 M (LINEAL) ML 58.374 58.333 58.446 58.590 58.435 58.651 58.559 58.322 58.446 58.250
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 70.390 70.335 70.486 70.678 70.472 70.760 70.637 70.321 70.486 70.225
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5,44 ML 42.288 42.261 42.336 42.432 42.329 42.473 42.411 42.254 42.336 42.206
(LINEAL)
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 148.273 148.081 148.609 149.280 148.561 149.568 149.136 148.033 148.609 147.698
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5,46 ML 89.655 89.559 89.823 90.159 89.799 90.303 90.087 89.535 89.823 89.368
(LINEAL)
5,47 REMATES LADRILLO PRENSADO ML 30.894 30.873 30.930 31.001 30.925 31.032 30.986 30.868 30.930 30.832
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 35.273 35.215 35.374 35.577 35.360 35.663 35.533 35.201 35.374 35.100
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 59.620 59.543 59.755 60.024 59.736 60.140 59.967 59.524 59.755 59.389
5,50 LAVADA DE FACHADA M2 4.983 4.983 4.983 4.983 4.983 4.983 4.983 4.983 4.983 4.983
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 47.749 47.669 47.888 48.165 47.868 48.284 48.106 47.650 47.888 47.511
5,52 DOVELA, GROUTING 3000 PSI ML 10.096 10.096 10.096 10.096 10.096 10.096 10.096 10.096 10.096 10.096
5,53 ANCLAJE 3/8" L=30CM UN 13.393 13.393 13.393 13.393 13.393 13.393 13.393 13.393 13.393 13.393
5,54 ANCLAJE 1/2" L=50CM UN 17.519 17.519 17.519 17.519 17.519 17.519 17.519 17.519 17.519 17.519
5,55 ANCLAJE 5/8" L=70CM UN 24.612 24.612 24.612 24.612 24.612 24.612 24.612 24.612 24.612 24.612
5,56 ANCLAJE 3/4" L=70CM UN 36.820 36.820 36.820 36.820 36.820 36.820 36.820 36.820 36.820 36.820
5,57 ANCLAJE 1" L= 70CM UN 4.601 4.580 4.639 4.714 4.633 4.746 4.698 4.575 4.639 4.537

6 PAETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 15.402 15.402 15.402 15.402 15.402 15.402 15.402 15.402 15.402 15.402
6,2 FILOS O DILATACIONES B/PLACA ML 5.518 5.497 5.554 5.625 5.548 5.656 5.610 5.492 5.554 5.456
6,3 FILOS O DILATACIONES S/MURO ML 6.638 6.617 6.673 6.745 6.668 6.776 6.730 6.612 6.673 6.576
6,4 GOTERA EN MORTERO 1:4 ML 7.887 7.866 7.923 7.994 7.917 8.025 7.979 7.861 7.923 7.825
6,5 IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 6.659 6.659 6.659 6.659 6.659 6.659 6.659 6.659 6.659 6.659
6,6 MALLA BAJO ENTRAMADO M2 13.134 13.134 13.134 13.134 13.134 13.134 13.134 13.134 13.134 13.134
6,7 PAETE BAJO GUADUA 1:5, E=2 CM M2 23.039 22.983 23.137 23.334 23.123 23.418 23.292 22.969 23.137 22.870
6,8 PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 13.969 13.941 14.018 14.117 14.011 14.159 14.095 13.934 14.018 13.885
6,9 PAETE BAJO MALLA 1:4, E=2 CM M2 20.318 20.261 20.419 20.620 20.405 20.707 20.577 20.246 20.419 20.146
6,10 PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.316 12.287 12.366 12.467 12.359 12.510 12.445 12.280 12.366 12.229
6,11 PAETE BAJO MALLA 1:5, E=2 CM M2 19.365 19.309 19.463 19.660 19.449 19.744 19.618 19.295 19.463 19.196
6,12 PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 11.839 11.811 11.888 11.987 11.881 12.029 11.965 11.804 11.888 11.755
6,13 PAETE CULATAS 1:4, E=2 CM M2 20.318 20.261 20.419 20.620 20.405 20.707 20.577 20.246 20.419 20.146
6,14 PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.316 12.287 12.366 12.467 12.359 12.510 12.445 12.280 12.366 12.229
6,15 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 20.689 20.649 20.759 20.900 20.749 20.960 20.870 20.639 20.759 20.569
6,16 PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 12.500 12.480 12.535 12.605 12.530 12.635 12.590 12.475 12.535 12.440
6,17 PAETE LISO MUROS 1:4, E=1.5 CM M2 16.880 16.837 16.957 17.111 16.946 17.176 17.078 16.826 16.957 16.749
6,18 PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.324 10.302 10.363 10.439 10.357 10.472 10.423 10.297 10.363 10.259
6,19 PAETE LISO MUROS 1:5, E=1.5 CM M2 16.154 16.111 16.229 16.379 16.218 16.443 16.347 16.100 16.229 16.025
6,20 PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 9.961 9.940 9.999 10.074 9.993 10.106 10.058 9.934 9.999 9.897
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
6,21 PAETE LISO PLACAS 1:4, E=2 CM M2 CONSTRUCCIN
21.053 20.996 21.154 21.355 21.139 21.442 21.312 20.981 21.154 20.881
6,22 PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 12.664 12.636 12.715 12.815 12.707 12.859 12.794 12.628 12.715 12.578
6,23 PAETE LISO PLACAS 1:5, E=2 CM M2 20.100 20.043 20.198 20.395 20.184 20.479 20.353 20.029 20.198 19.931
6,24 PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 12.188 12.159 12.237 12.335 12.230 12.377 12.314 12.152 12.237 12.103
6,25 PAETE RSTICO MUROS 1:5, E=1.5 CM M2 16.730 16.687 16.805 16.955 16.794 17.019 16.923 16.677 16.805 16.602
6,26 PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.232 10.211 10.270 10.345 10.265 10.377 10.329 10.206 10.270 10.168
6,27 PAETE RSTICO PLACAS 1:5, E=2 CM M2 20.939 20.883 21.038 21.235 21.024 21.319 21.192 20.869 21.038 20.771
6,28 PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 12.989 12.961 13.038 13.137 13.031 13.179 13.116 12.954 13.038 12.905

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 25.877 25.795 26.021 26.308 26.000 26.432 26.247 25.774 26.021 25.630
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN
7,2 M2 80.154 80.006 80.411 80.927 80.374 81.147 80.816 79.969 80.411 79.712
ASFALTO (INCLUYE TELA IMPERMEABLE)
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML 54.280 54.280 54.280 54.280 54.280 54.280 54.280 54.280 54.280 54.280
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 21.529 21.529 21.529 21.529 21.529 21.529 21.529 21.529 21.529 21.529
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 33.845 33.845 33.845 33.845 33.845 33.845 33.845 33.845 33.845 33.845
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 79.400 79.400 79.400 79.400 79.400 79.400 79.400 79.400 79.400 79.400
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 62.114 62.114 62.114 62.114 62.114 62.114 62.114 62.114 62.114 62.114
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 36.009 36.009 36.009 36.009 36.009 36.009 36.009 36.009 36.009 36.009
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 83.228 83.228 83.228 83.228 83.228 83.228 83.228 83.228 83.228 83.228
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 99.435 99.435 99.435 99.435 99.435 99.435 99.435 99.435 99.435 99.435
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 146.264 146.264 146.264 146.264 146.264 146.264 146.264 146.264 146.264 146.264
7,12 CABALLETE CUBIERTA TERMOACSTICA ML 57.566 57.566 57.566 57.566 57.566 57.566 57.566 57.566 57.566 57.566
7,13 CANAL PVC AMAZONAS ML 79.874 79.874 79.874 79.874 79.874 79.874 79.874 79.874 79.874 79.874
7,14 CANAL PVC RAINGO ML 72.564 72.564 72.564 72.564 72.564 72.564 72.564 72.564 72.564 72.564
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 129.300 129.300 129.300 129.300 129.300 129.300 129.300 129.300 129.300 129.300
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 75.582 75.582 75.582 75.582 75.582 75.582 75.582 75.582 75.582 75.582
7,17 TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 55.463 55.463 55.463 55.463 55.463 55.463 55.463 55.463 55.463 55.463
7,18 CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 31.364 31.364 31.364 31.364 31.364 31.364 31.364 31.364 31.364 31.364
7,19 TEJA DE BARRO M2 57.621 57.519 57.800 58.158 57.774 58.311 58.081 57.493 57.800 57.314
7,20 TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 46.242 46.242 46.242 46.242 46.242 46.242 46.242 46.242 46.242 46.242
7,21 TEJA EN LMINA GALVANIZADA CAL 26 M2 42.378 42.378 42.378 42.378 42.378 42.378 42.378 42.378 42.378 42.378
7,22 TEJA FIBROCEMENTO N4 M2 35.586 35.586 35.586 35.586 35.586 35.586 35.586 35.586 35.586 35.586
7,23 TEJA FIBROCEMENTO No. 6 M2 34.858 34.858 34.858 34.858 34.858 34.858 34.858 34.858 34.858 34.858
7,24 TEJA FIBROCEMENTO No. 8 M2 35.123 35.123 35.123 35.123 35.123 35.123 35.123 35.123 35.123 35.123
7,25 TEJA TERMOACSTICA M2 49.569 49.569 49.569 49.569 49.569 49.569 49.569 49.569 49.569 49.569
7,26 TEJA PLSTICA No.6 M2 43.548 43.548 43.548 43.548 43.548 43.548 43.548 43.548 43.548 43.548
7,27 TEJA ESPAOLA ETERNIT M2 79.882 79.882 79.882 79.882 79.882 79.882 79.882 79.882 79.882 79.882
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7,28 M2 147.732 147.732 147.732 147.732 147.732 147.732 147.732 147.732 147.732 147.732
30MM
7,29 TEJA SIN TRASLAPO M2 66.325 66.325 66.325 66.325 66.325 66.325 66.325 66.325 66.325 66.325
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 41.186 41.186 41.186 41.186 41.186 41.186 41.186 41.186 41.186 41.186
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 32.336 32.336 32.336 32.336 32.336 32.336 32.336 32.336 32.336 32.336
ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO
7,32 M2 56.664 56.664 56.664 56.664 56.664 56.664 56.664 56.664 56.664 56.664
ESTRUCTURAL ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 19.344 19.344 19.344 19.344 19.344 19.344 19.344 19.344 19.344 19.344
7,34 FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 23.329 23.329 23.329 23.329 23.329 23.329 23.329 23.329 23.329 23.329
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 25.320 25.320 25.320 25.320 25.320 25.320 25.320 25.320 25.320 25.320
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 32.676 32.676 32.676 32.676 32.676 32.676 32.676 32.676 32.676 32.676
7,37 BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 21.502 21.502 21.502 21.502 21.502 21.502 21.502 21.502 21.502 21.502
7,38 CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 50.659 50.659 50.659 50.659 50.659 50.659 50.659 50.659 50.659 50.659
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 350.553 350.553 350.553 350.553 350.553 350.553 350.553 350.553 350.553 350.553
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 396.358 396.358 396.358 396.358 396.358 396.358 396.358 396.358 396.358 396.358
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 265.325 265.325 265.325 265.325 265.325 265.325 265.325 265.325 265.325 265.325
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 283.788 283.788 283.788 283.788 283.788 283.788 283.788 283.788 283.788 283.788
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
CONSTRUCCIN
8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 422.280 419.253 427.575 438.169 426.819 442.708 435.899 418.495 427.575 413.200
8,2 CONCRETO 3500 PSI M3 367.654 364.873 372.520 382.255 371.825 386.426 380.169 364.177 372.520 359.311
8,3 CONCRETO 3000 PSI M3 364.994 362.131 370.003 380.024 369.287 384.318 377.876 361.414 370.003 356.405
8,4 CONCRETO 2500 PSI M3 321.225 318.280 326.377 336.685 325.642 341.101 334.476 317.543 326.377 312.391
8,5 CONCRETO 2000 PSI M3 297.597 294.591 302.857 313.379 302.105 317.887 311.124 293.838 302.857 288.579
8,6 CONCRETO 1500 PSI M3 267.659 264.591 273.026 283.763 272.259 288.363 281.462 263.823 273.026 258.456
8,7 MORTERO SECO 1:10 M3 236.799 233.977 241.736 251.614 241.031 255.847 249.497 233.270 241.736 228.332
8,8 MORTERO 1:4 ARENA LAVADA DE PEA M3 442.650 439.910 447.444 457.036 446.760 461.146 454.981 439.224 447.444 434.429
8,9 MORTERO 1:5 ARENA LAVADA DE PEA M3 397.241 394.564 401.927 411.297 401.257 415.313 409.289 393.896 401.927 389.210
8,10 MORTERO 1:3 ARENA LAVADA DE PEA M3 458.012 455.508 462.394 471.158 461.768 474.913 469.279 454.883 462.394 450.501
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 680.712 678.208 685.094 693.858 684.468 697.613 691.979 677.583 685.094 673.201

9 CARPINTERA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 120.461 120.461 120.461 120.461 120.461 120.461 120.461 120.461 120.461 120.461
9,2 CHAZOS PARA CARPINTERA EN MADERA UN 3.880 3.859 3.916 3.987 3.910 4.018 3.972 3.854 3.916 3.818
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 134.566 134.566 134.566 134.566 134.566 134.566 134.566 134.566 134.566 134.566
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 165.052 165.052 165.052 165.052 165.052 165.052 165.052 165.052 165.052 165.052
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 240.915 240.915 240.915 240.915 240.915 240.915 240.915 240.915 240.915 240.915
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 268.205 268.205 268.205 268.205 268.205 268.205 268.205 268.205 268.205 268.205
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 295.525 295.525 295.525 295.525 295.525 295.525 295.525 295.525 295.525 295.525
9,8 HOJA PUERTA FORTEC 0.81 UN 196.402 196.402 196.402 196.402 196.402 196.402 196.402 196.402 196.402 196.402
9,9 HOJA PUERTA FORTEC 0.91 UN 222.701 222.701 222.701 222.701 222.701 222.701 222.701 222.701 222.701 222.701
9,10 HOJA PUERTA FORTEC 1.50 UN 327.898 327.898 327.898 327.898 327.898 327.898 327.898 327.898 327.898 327.898
9,11 HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 124.078 124.078 124.078 124.078 124.078 124.078 124.078 124.078 124.078 124.078
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 164.842 164.842 164.842 164.842 164.842 164.842 164.842 164.842 164.842 164.842
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 183.252 183.252 183.252 183.252 183.252 183.252 183.252 183.252 183.252 183.252
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 467.286 467.286 467.286 467.286 467.286 467.286 467.286 467.286 467.286 467.286
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 41.082 41.082 41.082 41.082 41.082 41.082 41.082 41.082 41.082 41.082
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 25.451 25.451 25.451 25.451 25.451 25.451 25.451 25.451 25.451 25.451
9,17 VENTANERA EN MADERA CEDRO MACHO M2 97.102 97.102 97.102 97.102 97.102 97.102 97.102 97.102 97.102 97.102
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 119.448 119.448 119.448 119.448 119.448 119.448 119.448 119.448 119.448 119.448
9,19 SUMINISTRO E INSTALACIN CERROJO DOBLE UN 92.754 92.754 92.754 92.754 92.754 92.754 92.754 92.754 92.754 92.754
9,20 SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 28.636 28.636 28.636 28.636 28.636 28.636 28.636 28.636 28.636 28.636
9,21 SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 28.636 28.636 28.636 28.636 28.636 28.636 28.636 28.636 28.636 28.636
9,22 SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 27.137 27.137 27.137 27.137 27.137 27.137 27.137 27.137 27.137 27.137
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 41.457 41.457 41.457 41.457 41.457 41.457 41.457 41.457 41.457 41.457
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 51.417 51.417 51.417 51.417 51.417 51.417 51.417 51.417 51.417 51.417
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 62.043 62.043 62.043 62.043 62.043 62.043 62.043 62.043 62.043 62.043
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 74.659 74.659 74.659 74.659 74.659 74.659 74.659 74.659 74.659 74.659
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 352.605 352.605 352.605 352.605 352.605 352.605 352.605 352.605 352.605 352.605
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 246.356 246.356 246.356 246.356 246.356 246.356 246.356 246.356 246.356 246.356
9,29 VIDRIO TRANSPARENTE 3 MM M2 32.824 32.824 32.824 32.824 32.824 32.824 32.824 32.824 32.824 32.824
9,30 VIDRIO TRANSPARENTE 4 MM M2 42.120 42.120 42.120 42.120 42.120 42.120 42.120 42.120 42.120 42.120
9,31 VIDRIO TRANSPARENTE 5 MM M2 51.417 51.417 51.417 51.417 51.417 51.417 51.417 51.417 51.417 51.417
9,32 VIDRIO TRANSPARENTE 6 MM M2 64.699 64.699 64.699 64.699 64.699 64.699 64.699 64.699 64.699 64.699

10 CARPINTERA METLICA
10,1 CAJA CONTADOR DE AGUA UN 74.334 74.334 74.334 74.334 74.334 74.334 74.334 74.334 74.334 74.334
10,2 CELOSA ALUMINIO 100CM X 60 CM M2 207.890 207.890 207.890 207.890 207.890 207.890 207.890 207.890 207.890 207.890
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO
10,3 ML 78.529 78.529 78.529 78.529 78.529 78.529 78.529 78.529 78.529 78.529
DE 1" (INCLUYE ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 139.959 139.959 139.959 139.959 139.959 139.959 139.959 139.959 139.959 139.959
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
10,5 MARCO TAPA CAJA DE INSPECCIN UN CONSTRUCCIN
133.285 133.285 133.285 133.285 133.285 133.285 133.285 133.285 133.285 133.285
10,6 MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 87.495 87.495 87.495 87.495 87.495 87.495 87.495 87.495 87.495 87.495
10,7 PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 206.520 206.520 206.520 206.520 206.520 206.520 206.520 206.520 206.520 206.520
10,8 PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 107.395 107.395 107.395 107.395 107.395 107.395 107.395 107.395 107.395 107.395
10,9 CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 6.432 6.432 6.432 6.432 6.432 6.432 6.432 6.432 6.432 6.432
CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL
10,10 M2 96.384 96.384 96.384 96.384 96.384 96.384 96.384 96.384 96.384 96.384
EN TUBO ESTRUCTURAL GALVANIZADO 2")
CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC.
10,11 ML 39.701 39.701 39.701 39.701 39.701 39.701 39.701 39.701 39.701 39.701
ANTICORROSIVO
DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10,12 M2 530.541 530.541 530.541 530.541 530.541 530.541 530.541 530.541 530.541 530.541
E=6MM
10,13 DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 190.431 190.431 190.431 190.431 190.431 190.431 190.431 190.431 190.431 190.431
PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA
10,14 M2 213.021 213.021 213.021 213.021 213.021 213.021 213.021 213.021 213.021 213.021
ELECTROSTTICA

DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20


10,15 M2 483.322 483.322 483.322 483.322 483.322 483.322 483.322 483.322 483.322 483.322
(INCLUYE PUERTAS Y ACCESORIOS)
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.
10,16 M2 124.626 124.626 124.626 124.626 124.626 124.626 124.626 124.626 124.626 124.626
ANTICORROSIVO
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 387.111 387.111 387.111 387.111 387.111 387.111 387.111 387.111 387.111 387.111
SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC.
10,18 ML 5.881 5.881 5.881 5.881 5.881 5.881 5.881 5.881 5.881 5.881
ANTICORROSIVO
10,19 VENTANA EN ALUMINIO CORREDIZA M2 271.794 271.794 271.794 271.794 271.794 271.794 271.794 271.794 271.794 271.794
10,20 VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 118.776 118.776 118.776 118.776 118.776 118.776 118.776 118.776 118.776 118.776
10,21 REJILLA PISO 0.30 M M2 84.300 84.300 84.300 84.300 84.300 84.300 84.300 84.300 84.300 84.300
10,22 TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 86.926 86.926 86.926 86.926 86.926 86.926 86.926 86.926 86.926 86.926
CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10,23 KG 10.286 10.286 10.286 10.286 10.286 10.286 10.286 10.286 10.286 10.286
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.
CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS
10,24 ,VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y KG 11.426 11.426 11.426 11.426 11.426 11.426 11.426 11.426 11.426 11.426
PLATINERA.CONTEMPLA TAMBIEN:FABRICACIN, SUMINISTRO,
MONTAJE
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR),
PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS,
10,25 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, KG 9.059 9.059 9.059 9.059 9.059 9.059 9.059 9.059 9.059 9.059
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA
TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 214.606 214.606 214.606 214.606 214.606 214.606 214.606 214.606 214.606 214.606
11,2 ACOMETIDA EN PVC 3/4" 5M UN 259.479 259.479 259.479 259.479 259.479 259.479 259.479 259.479 259.479 259.479
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 21.529 21.529 21.529 21.529 21.529 21.529 21.529 21.529 21.529 21.529
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 33.845 33.845 33.845 33.845 33.845 33.845 33.845 33.845 33.845 33.845
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 32.399 32.399 32.399 32.399 32.399 32.399 32.399 32.399 32.399 32.399
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 41.604 41.604 41.604 41.604 41.604 41.604 41.604 41.604 41.604 41.604
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 85.965 85.965 85.965 85.965 85.965 85.965 85.965 85.965 85.965 85.965
11,8 CONEXIN TANQUE ELEVADO PVC UN 215.949 215.949 215.949 215.949 215.949 215.949 215.949 215.949 215.949 215.949
11,9 INSTALACIN APARATO SANITARIO UN 41.868 41.868 41.868 41.868 41.868 41.868 41.868 41.868 41.868 41.868
11,10 INSTALACIN BOMBAS AGUA UN 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001 582.001
11,11 INSTALACIN EQUIPO HIDRONEUMTICO UN 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238 1.198.238
11,12 LLAVE MANGUERA UN 34.004 34.004 34.004 34.004 34.004 34.004 34.004 34.004 34.004 34.004
11,13 NIPLE PASAMURO 2" UN 64.409 64.409 64.409 64.409 64.409 64.409 64.409 64.409 64.409 64.409
11,14 NIPLE PASAMURO 4" UN 96.334 96.334 96.334 96.334 96.334 96.334 96.334 96.334 96.334 96.334
11,15 PUNTO AGUA CALIENTE CPVC UN 81.565 81.565 81.565 81.565 81.565 81.565 81.565 81.565 81.565 81.565
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
11,16 PUNTO HIDRULICO PVC-P/PARAL 1/2" UN CONSTRUCCIN
59.158 59.158 59.158 59.158 59.158 59.158 59.158 59.158 59.158 59.158
11,17 PUNTO HIDULICO PVC-P/PARAL 3/4" UN 63.007 63.007 63.007 63.007 63.007 63.007 63.007 63.007 63.007 63.007
11,18 PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 79.637 79.637 79.637 79.637 79.637 79.637 79.637 79.637 79.637 79.637
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 64.404 64.404 64.404 64.404 64.404 64.404 64.404 64.404 64.404 64.404
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 80.831 80.831 80.831 80.831 80.831 80.831 80.831 80.831 80.831 80.831
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 86.525 86.525 86.525 86.525 86.525 86.525 86.525 86.525 86.525 86.525
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 72.002 72.002 72.002 72.002 72.002 72.002 72.002 72.002 72.002 72.002
11,23 RED SUMINISTRO CPVC 1/2" ML 12.174 12.174 12.174 12.174 12.174 12.174 12.174 12.174 12.174 12.174
11,24 RED SUMINISTRO CPVC 3/4" ML 17.189 17.189 17.189 17.189 17.189 17.189 17.189 17.189 17.189 17.189
11,25 RED SUMINISTRO PVC 1 1/2" ML 22.432 22.432 22.432 22.432 22.432 22.432 22.432 22.432 22.432 22.432
11,26 RED SUMINISTRO PVC 1" ML 13.826 13.826 13.826 13.826 13.826 13.826 13.826 13.826 13.826 13.826
11,27 RED SUMINISTRO PVC 1/2" ML 8.240 8.240 8.240 8.240 8.240 8.240 8.240 8.240 8.240 8.240
11,28 RED SUMINISTRO PVC 2 1/2" ML 50.087 50.087 50.087 50.087 50.087 50.087 50.087 50.087 50.087 50.087
11,29 RED SUMINISTRO PVC 2" ML 32.001 32.001 32.001 32.001 32.001 32.001 32.001 32.001 32.001 32.001
11,30 RED SUMINISTRO PVC 3/4" ML 10.332 10.332 10.332 10.332 10.332 10.332 10.332 10.332 10.332 10.332
11,31 RED SANITARIA PVC-S 2" ML 24.674 24.674 24.674 24.674 24.674 24.674 24.674 24.674 24.674 24.674
11,32 RED SANITARIA PVC-S 3" ML 34.270 34.270 34.270 34.270 34.270 34.270 34.270 34.270 34.270 34.270
11,33 RED SANITARIA PVC-S 4" ML 46.530 46.530 46.530 46.530 46.530 46.530 46.530 46.530 46.530 46.530
11,34 RED SANITARIA PVC-S 6" ML 87.237 87.237 87.237 87.237 87.237 87.237 87.237 87.237 87.237 87.237
11,35 REGISTRO 1" UN 105.712 105.712 105.712 105.712 105.712 105.712 105.712 105.712 105.712 105.712
11,36 REGISTRO 1/2" UN 58.892 58.892 58.892 58.892 58.892 58.892 58.892 58.892 58.892 58.892
11,37 REGISTRO 3/4" UN 75.092 75.092 75.092 75.092 75.092 75.092 75.092 75.092 75.092 75.092
11,38 REGISTRO 1 1/2" UN 181.717 181.717 181.717 181.717 181.717 181.717 181.717 181.717 181.717 181.717
11,39 REGISTRO 2 1/2" UN 375.245 375.245 375.245 375.245 375.245 375.245 375.245 375.245 375.245 375.245
11,40 REGISTRO 2" UN 277.037 277.037 277.037 277.037 277.037 277.037 277.037 277.037 277.037 277.037
11,41 REVENTILACIN 2" ML 17.176 17.176 17.176 17.176 17.176 17.176 17.176 17.176 17.176 17.176
11,42 REVENTILACIN 3" ML 21.687 21.687 21.687 21.687 21.687 21.687 21.687 21.687 21.687 21.687
TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11,43 UN 168.746 168.746 168.746 168.746 168.746 168.746 168.746 168.746 168.746 168.746
INSTALACIN)
TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11,44 UN 275.139 275.139 275.139 275.139 275.139 275.139 275.139 275.139 275.139 275.139
ISNTALACIN)
TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11,45 UN 458.207 458.207 458.207 458.207 458.207 458.207 458.207 458.207 458.207 458.207
INSTALACIN)
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE
11,46 ML 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728 39.728
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11,47 ML 46.849 46.849 46.849 46.849 46.849 46.849 46.849 46.849 46.849 46.849
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE
11,48 ML 59.989 59.989 59.989 59.989 59.989 59.989 59.989 59.989 59.989 59.989
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE
11,49 ML 68.112 68.112 68.112 68.112 68.112 68.112 68.112 68.112 68.112 68.112
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11,50 ML 87.769 87.769 87.769 87.769 87.769 87.769 87.769 87.769 87.769 87.769
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE
11,51 ML 101.452 101.452 101.452 101.452 101.452 101.452 101.452 101.452 101.452 101.452
ACCESORIOS Y SOPORTES)
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE
11,52 ML 149.934 149.934 149.934 149.934 149.934 149.934 149.934 149.934 149.934 149.934
ACCESORIOS Y SOPORTES)
11,53 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 60.212 60.212 60.212 60.212 60.212 60.212 60.212 60.212 60.212 60.212
11,54 PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 60.460 60.460 60.460 60.460 60.460 60.460 60.460 60.460 60.460 60.460
11,55 ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 39.180 39.180 39.180 39.180 39.180 39.180 39.180 39.180 39.180 39.180
11,56 ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 48.332 48.332 48.332 48.332 48.332 48.332 48.332 48.332 48.332 48.332
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE
11,57 ML 4.110 4.110 4.110 4.110 4.110 4.110 4.110 4.110 4.110 4.110
HASTA 2"
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate

11,58
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO CONSTRUCCIN
ML 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480 6.480
MAYOR A 2"
11,59 GABINETE TIPO III UN 999.686 999.686 999.686 999.686 999.686 999.686 999.686 999.686 999.686 999.686
11,60 GABINETE TIPO I UN 763.254 763.254 763.254 763.254 763.254 763.254 763.254 763.254 763.254 763.254
11,61 SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2.568.602 2.568.602 2.568.602 2.568.602 2.568.602 2.568.602 2.568.602 2.568.602 2.568.602 2.568.602
11,62 SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 2.140.889 2.140.889 2.140.889 2.140.889 2.140.889 2.140.889 2.140.889 2.140.889 2.140.889 2.140.889
11,63 VLVULA MARIPOSA 3" UN 619.511 619.511 619.511 619.511 619.511 619.511 619.511 619.511 619.511 619.511
11,64 VLVULA MARIPOSA 4" UN 802.555 802.555 802.555 802.555 802.555 802.555 802.555 802.555 802.555 802.555
11,65 VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 309.922 309.922 309.922 309.922 309.922 309.922 309.922 309.922 309.922 309.922

12 INSTALACIONES ELCTRICAS
12,1 ACOMETIDA AREA 10 M. PVC UN 356.712 356.712 356.712 356.712 356.712 356.712 356.712 356.712 356.712 356.712
12,2 SALIDA LMPARA TOMA PVC COMPLETA UN 56.683 56.683 56.683 56.683 56.683 56.683 56.683 56.683 56.683 56.683
12,3 SALIDA LMPARA TOMA EMT COMPLETA UN 67.152 67.152 67.152 67.152 67.152 67.152 67.152 67.152 67.152 67.152
12,4 SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 74.494 74.494 74.494 74.494 74.494 74.494 74.494 74.494 74.494 74.494
12,5 SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 87.804 87.804 87.804 87.804 87.804 87.804 87.804 87.804 87.804 87.804
12,6 SALIDA TELFONO PVC COMPLETA UN 53.254 53.254 53.254 53.254 53.254 53.254 53.254 53.254 53.254 53.254
12,7 SALIDA TIMBRE PVC COMPLETA UN 60.728 60.728 60.728 60.728 60.728 60.728 60.728 60.728 60.728 60.728
12,8 STRIP TELEFNICO 10 PARES UN 139.871 139.871 139.871 139.871 139.871 139.871 139.871 139.871 139.871 139.871
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN 54.711 54.711 54.711 54.711 54.711 54.711 54.711 54.711 54.711 54.711
12,10 SALIDA TRIFSICA PVC COMPLETA UN 125.809 125.809 125.809 125.809 125.809 125.809 125.809 125.809 125.809 125.809
12,11 SALIDA T.V PVC COMPLETA. UN 75.174 75.174 75.174 75.174 75.174 75.174 75.174 75.174 75.174 75.174
12,12 SALIDA BIFSICA C.N. UN 44.588 44.588 44.588 44.588 44.588 44.588 44.588 44.588 44.588 44.588
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 93.829 93.829 93.829 93.829 93.829 93.829 93.829 93.829 93.829 93.829
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 400.480 400.480 400.480 400.480 400.480 400.480 400.480 400.480 400.480 400.480
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 533.751 533.751 533.751 533.751 533.751 533.751 533.751 533.751 533.751 533.751
12,16 TUBERA PVC CONDUIT 1/2" ML 3.456 3.456 3.456 3.456 3.456 3.456 3.456 3.456 3.456 3.456
12,17 TUBERA PVC CONDUIT 3/4" ML 4.563 4.563 4.563 4.563 4.563 4.563 4.563 4.563 4.563 4.563
12,18 TUBERA PVC CONDUIT 1" ML 7.105 7.105 7.105 7.105 7.105 7.105 7.105 7.105 7.105 7.105
12,19 TUBERA PVC CONDUIT 1 1/2" ML 12.705 12.705 12.705 12.705 12.705 12.705 12.705 12.705 12.705 12.705
12,20 LNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 267.110 267.110 267.110 267.110 267.110 267.110 267.110 267.110 267.110 267.110
12,21 LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 75.361 75.361 75.361 75.361 75.361 75.361 75.361 75.361 75.361 75.361
12,22 LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 102.210 102.210 102.210 102.210 102.210 102.210 102.210 102.210 102.210 102.210
12,23 LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 41.393 41.393 41.393 41.393 41.393 41.393 41.393 41.393 41.393 41.393
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.367.352 1.367.352 1.367.352 1.367.352 1.367.352 1.367.352 1.367.352 1.367.352 1.367.352 1.367.352
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.013.354 1.013.354 1.013.354 1.013.354 1.013.354 1.013.354 1.013.354 1.013.354 1.013.354 1.013.354
12,26 POSTE METLICO 6M UN 1.272.779 1.272.779 1.272.779 1.272.779 1.272.779 1.272.779 1.272.779 1.272.779 1.272.779 1.272.779
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 592.812 592.812 592.812 592.812 592.812 592.812 592.812 592.812 592.812 592.812
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 107.815 107.815 107.815 107.815 107.815 107.815 107.815 107.815 107.815 107.815
12,29 LUMINARIA 70W SODIO UN 497.499 497.499 497.499 497.499 497.499 497.499 497.499 497.499 497.499 497.499
12,30 LUMINARIA 150W SODIO UN 622.586 622.586 622.586 622.586 622.586 622.586 622.586 622.586 622.586 622.586
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.645.507 1.645.507 1.645.507 1.645.507 1.645.507 1.645.507 1.645.507 1.645.507 1.645.507 1.645.507
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.211.567 1.211.567 1.211.567 1.211.567 1.211.567 1.211.567 1.211.567 1.211.567 1.211.567 1.211.567

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 38.374 38.278 38.542 38.879 38.518 39.024 38.807 38.253 38.542 38.085
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 38.274 38.178 38.442 38.779 38.418 38.924 38.707 38.154 38.442 37.985
13,3 ALISTADO PARA LISTN M2 14.146 14.127 14.180 14.248 14.175 14.276 14.233 14.122 14.180 14.089
13,4 ALISTADO PISOS 1:3, E=0.04 M2 26.730 26.537 27.067 27.741 27.019 28.030 27.597 26.489 27.067 26.152
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 82.901 82.708 83.238 83.912 83.189 84.201 83.767 82.660 83.238 82.323
13,6 CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 25.150 25.090 25.256 25.466 25.241 25.556 25.421 25.075 25.256 24.970
13,7 CONCRETO BASE GRADAS 2500 PSI M2 53.695 53.401 54.210 55.241 54.137 55.683 55.020 53.327 54.210 52.812
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 74.175 73.704 75.000 76.649 74.882 77.355 76.295 73.586 75.000 72.762
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
13,9 MANTO FIBERGLASS 600X1 M2 CONSTRUCCIN
29.773 29.773 29.773 29.773 29.773 29.773 29.773 29.773 29.773 29.773
13,10 PEGANTE MORTERO-CONCRETO M2 22.358 22.358 22.358 22.358 22.358 22.358 22.358 22.358 22.358 22.358
13,11 PERMA PLY 2 CAPAS M2 26.188 26.188 26.188 26.188 26.188 26.188 26.188 26.188 26.188 26.188
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 43.563 43.298 44.027 44.954 43.960 45.352 44.756 43.232 44.027 42.768
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 50.971 50.647 51.538 52.672 51.457 53.157 52.429 50.566 51.538 49.999
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 73.756 73.255 74.632 76.384 74.507 77.135 76.008 73.130 74.632 72.254
13,15 TRITURADO FINO 1/2 M3 79.522 77.415 83.207 90.580 82.681 93.739 89.000 76.888 83.207 73.203
13,16 TRITURADO GRUESO 3/4 M3 86.481 82.293 88.834 99.909 91.170 104.598 99.753 80.251 85.650 77.102

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 55.899 55.860 55.966 56.101 55.957 56.159 56.072 55.851 55.966 55.783
BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA
14,2 ML 33.306 33.287 33.340 33.408 33.335 33.436 33.393 33.282 33.340 33.249
(LINEAL)
14,3 ADOQUN CONCRETO 6CM M2 63.693 63.597 63.861 64.198 63.837 64.343 64.126 63.572 63.861 63.404
14,4 ADOQUN CONCRETO 8CM M2 66.993 66.897 67.161 67.498 67.137 67.643 67.426 66.872 67.161 66.704
14,5 ADOQUN GRES PEATONAL M2 71.163 71.067 71.331 71.668 71.307 71.813 71.596 71.043 71.331 70.874
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14,6 M2 73.971 73.932 74.038 74.173 74.028 74.231 74.144 73.923 74.038 73.855
FONDO BLANCO. INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 35.471 35.431 35.540 35.679 35.530 35.739 35.649 35.421 35.540 35.352
ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y
14,8 M2 160.855 160.681 161.158 161.765 161.115 162.025 161.635 160.638 161.158 160.335
PULIDA)
14,9 ACABADO EN GRAVILLA LAVADA M2 44.186 44.087 44.359 44.704 44.334 44.852 44.630 44.063 44.359 43.890
14,10 GUARDAESCOBA EN GRANITO ML 42.547 42.547 42.547 42.547 42.547 42.547 42.547 42.547 42.547 42.547
14,11 GUARDAESCOBA EN GRAVILLA ML 9.587 9.547 9.657 9.796 9.647 9.855 9.766 9.537 9.657 9.468
14,12 GUARDAESCOBA PVC CARAMELO ML 9.268 9.268 9.268 9.268 9.268 9.268 9.268 9.268 9.268 9.268
14,13 GUARDAESCOBA PVC CEDRO ML 12.454 12.454 12.454 12.454 12.454 12.454 12.454 12.454 12.454 12.454
14,14 GUARDAESCOBA PINO CARIBE ML 10.294 10.294 10.294 10.294 10.294 10.294 10.294 10.294 10.294 10.294
14,15 GUARDAESCOBA CEDRO BLANCO ML 17.336 17.336 17.336 17.336 17.336 17.336 17.336 17.336 17.336 17.336
14,16 GUARDAESCOBA EN MADERA SAPAN ML 33.905 33.905 33.905 33.905 33.905 33.905 33.905 33.905 33.905 33.905
14,17 GUARDAESCOBA GRES Y CERMICA ML 8.906 8.906 8.906 8.906 8.906 8.906 8.906 8.906 8.906 8.906
14,18 LISTN M.H. AMARILLO M2 72.910 72.910 72.910 72.910 72.910 72.910 72.910 72.910 72.910 72.910
14,19 PASO ESCALERA GRANITO ML 115.463 115.328 115.698 116.170 115.665 116.373 116.069 115.294 115.698 115.058
14,20 PIRLANES ALUMINIO ML 7.253 7.253 7.253 7.253 7.253 7.253 7.253 7.253 7.253 7.253
14,21 PIRLANES LADRILLO ML 31.143 31.102 31.214 31.358 31.204 31.419 31.327 31.092 31.214 31.020
14,22 PISO VINILO TRFICO RESIDENCIAL M2 45.216 45.216 45.216 45.216 45.216 45.216 45.216 45.216 45.216 45.216
14,23 PISO VINILO TRFICO PESADO M2 52.612 52.612 52.612 52.612 52.612 52.612 52.612 52.612 52.612 52.612
14,24 PULIDA LACADA PISO MADERA M2 48.076 48.076 48.076 48.076 48.076 48.076 48.076 48.076 48.076 48.076
14,25 TABLETA DE GRES 25X25 M2 48.428 48.389 48.495 48.630 48.486 48.688 48.601 48.380 48.495 48.312
14,26 TABLN DE GRES LISO O RSTICO 33X 33 M2 54.441 54.402 54.508 54.643 54.499 54.701 54.614 54.393 54.508 54.325
GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO
14,27 ML 10.618 10.618 10.618 10.618 10.618 10.618 10.618 10.618 10.618 10.618
BLANCO
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 48.595 48.534 48.703 48.918 48.687 49.010 48.872 48.519 48.703 48.411
14,29 JABONERA PORCELANA ACUARIO UN 20.291 20.291 20.291 20.291 20.291 20.291 20.291 20.291 20.291 20.291
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14,30 UN 121.681 121.681 121.681 121.681 121.681 121.681 121.681 121.681 121.681 121.681
JABONERA,CEPILLERA Y PERCHA SIMPLE)
14,31 REJILLA PLSTICA SOSCO 3X2 UN 9.646 9.646 9.646 9.646 9.646 9.646 9.646 9.646 9.646 9.646
14,32 REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 22.114 22.114 22.114 22.114 22.114 22.114 22.114 22.114 22.114 22.114
14,33 REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 14.117 14.117 14.117 14.117 14.117 14.117 14.117 14.117 14.117 14.117
14,34 REJILLA PLSTICA VENTILACIN 20X20 UN 13.709 13.709 13.709 13.709 13.709 13.709 13.709 13.709 13.709 13.709
14,35 REMATES BOCEL ALUMINIO ML 8.268 8.268 8.268 8.268 8.268 8.268 8.268 8.268 8.268 8.268
14,36 REMATES BOCEL PORCELANA ML 8.417 8.417 8.417 8.417 8.417 8.417 8.417 8.417 8.417 8.417
14,37 TAPA REGISTRO 20X20 UN 18.705 18.705 18.705 18.705 18.705 18.705 18.705 18.705 18.705 18.705
14,38 TAPA REGISTRO 6X6 UN 17.029 17.029 17.029 17.029 17.029 17.029 17.029 17.029 17.029 17.029
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14,39 M2 18.541 18.541 18.541 18.541 18.541 18.541 18.541 18.541 18.541 18.541
MRMOL N.5
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate

14,40
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL
M2
CONSTRUCCIN
21.434 21.434 21.434 21.434 21.434 21.434 21.434 21.434 21.434 21.434
FUNDIDO EN SITIO
14,41 CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 64.138 64.100 64.206 64.340 64.196 64.398 64.312 64.090 64.206 64.023
14,42 MEDIA CAA EN GRANITO ML 76.671 76.671 76.671 76.671 76.671 76.671 76.671 76.671 76.671 76.671
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 32.847 32.847 32.847 32.847 32.847 32.847 32.847 32.847 32.847 32.847
14,44 PINTURA ACRLICA PARA PISOS M2 13.000 13.000 13.000 13.000 13.000 13.000 13.000 13.000 13.000 13.000
PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS
14,45 M2 100.928 100.928 100.928 100.928 100.928 100.928 100.928 100.928 100.928 100.928
DEPORTIVOS
14,46 GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 121.965 121.965 121.965 121.965 121.965 121.965 121.965 121.965 121.965 121.965

15 CIELO RASO
15,1 APLIQUE YESO ML 72.008 72.008 72.008 72.008 72.008 72.008 72.008 72.008 72.008 72.008
15,2 ARMADURA MADERA Y MALLA M2 34.824 34.824 34.824 34.824 34.824 34.824 34.824 34.824 34.824 34.824
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 54.295 54.295 54.295 54.295 54.295 54.295 54.295 54.295 54.295 54.295
15,4 CIELO RASO DURACUSTIC M2 66.776 66.776 66.776 66.776 66.776 66.776 66.776 66.776 66.776 66.776
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 49.781 49.781 49.781 49.781 49.781 49.781 49.781 49.781 49.781 49.781
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 92.578 92.578 92.578 92.578 92.578 92.578 92.578 92.578 92.578 92.578
15,7 CORNISAS YESO ML 48.374 48.374 48.374 48.374 48.374 48.374 48.374 48.374 48.374 48.374
15,8 LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 102.476 102.476 102.476 102.476 102.476 102.476 102.476 102.476 102.476 102.476
15,9 MALLA CON VENA M2 13.040 13.040 13.040 13.040 13.040 13.040 13.040 13.040 13.040 13.040

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIN Y EXTENDIDA M3 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423 5.423
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE
16,2 M3 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214 18.214
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462 24.462
EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M
16,4 (INCLUYE M3 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632 41.632
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M
16,5 (INCLUYE M3 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563 47.563
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN
16,6 M3 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569 80.569
EXPLOSIVOS)
RELLENO CON MATERIAL DEL SITIO COMPACTADO
16,7 M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
MECNICAMENTE

16,8 RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 72.256 64.495 69.669 85.191 78.724 91.659 89.072 59.321 59.321 59.321
16,9 RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 84.705 82.455 88.641 96.515 88.079 99.888 94.827 81.892 88.641 77.956
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 103.261 113.609 112.316 140.773 127.838 117.490 107.142 113.609 122.664 104.555
MECNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 68.007 60.246 65.420 80.942 74.475 87.410 84.823 55.072 55.072 55.072
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 95.510 105.858 104.565 133.022 120.087 109.739 99.391 105.858 114.913 96.804
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 100.600 110.948 109.655 138.112 125.177 114.829 104.481 110.948 120.003 101.894

17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE
17,1 UN 298.287 298.287 298.287 298.287 298.287 298.287 298.287 298.287 298.287 298.287
GRIFERA)

SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE


17,2 UN 881.586 881.586 881.586 881.586 881.586 881.586 881.586 881.586 881.586 881.586
GRIFERA)

SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE


17,3 UN 477.178 477.178 477.178 477.178 477.178 477.178 477.178 477.178 477.178 477.178
GRIFERA)

SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE


17,4 UN 137.315 137.315 137.315 137.315 137.315 137.315 137.315 137.315 137.315 137.315
GRIFERA)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate

17,5
SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE CONSTRUCCIN
UN 192.958 192.958 192.958 192.958 192.958 192.958 192.958 192.958 192.958 192.958
GRIFERA)

SUMINISTRO E INSTALACIN LAVAMANOS DE


17,6 UN 179.112 179.112 179.112 179.112 179.112 179.112 179.112 179.112 179.112 179.112
EMPOTRAR(INCLUYE GRIFERA)

SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE


17,7 UN 395.782 395.782 395.782 395.782 395.782 395.782 395.782 395.782 395.782 395.782
GRIFERA)

SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE


17,8 UN 1.014.058 1.014.058 1.014.058 1.014.058 1.014.058 1.014.058 1.014.058 1.014.058 1.014.058 1.014.058
GRIFERA)

SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE


17,9 UN 287.165 287.165 287.165 287.165 287.165 287.165 287.165 287.165 287.165 287.165
GRIFERA)

SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A


17,10 UN 202.932 202.932 202.932 202.932 202.932 202.932 202.932 202.932 202.932 202.932
BAERA
17,11 SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 80.058 80.058 80.058 80.058 80.058 80.058 80.058 80.058 80.058 80.058
SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN
17,12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN 246.137 246.137 246.137 246.137 246.137 246.137 246.137 246.137 246.137 246.137
GRIFERA)
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN
17,13 ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y UN 363.170 363.170 363.170 363.170 363.170 363.170 363.170 363.170 363.170 363.170
GRIFERA)

18 PINTURAS
IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O
18,1 M2 8.102 8.102 8.102 8.102 8.102 8.102 8.102 8.102 8.102 8.102
SIMILAR
18,2 ANTICORROSIVO SOBRE LMINA LINEAL ML 3.014 3.014 3.014 3.014 3.014 3.014 3.014 3.014 3.014 3.014
18,3 ANTICORROSIVO SOBRE LMINA LLENA M2 10.737 10.737 10.737 10.737 10.737 10.737 10.737 10.737 10.737 10.737
18,4 BARNIZ SOBRE MUEBLES M2 41.166 41.166 41.166 41.166 41.166 41.166 41.166 41.166 41.166 41.166
18,5 CARBURO SOBRE PAETES M2 5.633 5.633 5.633 5.633 5.633 5.633 5.633 5.633 5.633 5.633
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 64.953 64.953 64.953 64.953 64.953 64.953 64.953 64.953 64.953 64.953
18,7 DEMARCACIN CON MARMOLINA ML 3.341 3.341 3.341 3.341 3.341 3.341 3.341 3.341 3.341 3.341
18,8 ESMALTE SOBRE LMINA LINEAL ML 2.700 2.700 2.700 2.700 2.700 2.700 2.700 2.700 2.700 2.700
18,9 ESMALTE SOBRE LMINA LLENA M2 13.512 13.512 13.512 13.512 13.512 13.512 13.512 13.512 13.512 13.512
18,10 ESMALTE SOBRE MADERA LINEAL ML 3.922 3.922 3.922 3.922 3.922 3.922 3.922 3.922 3.922 3.922
18,11 ESMALTE SOBRE MADERA LLENA M2 14.251 14.251 14.251 14.251 14.251 14.251 14.251 14.251 14.251 14.251
18,12 ESMALTE SOBRE MARCOS LMINA M2 5.629 5.629 5.629 5.629 5.629 5.629 5.629 5.629 5.629 5.629
18,13 ESMALTE SOBRE MARCOS MADERA M2 6.393 6.393 6.393 6.393 6.393 6.393 6.393 6.393 6.393 6.393
18,14 ESTUCO M2 6.757 6.757 6.757 6.757 6.757 6.757 6.757 6.757 6.757 6.757
18,15 ESTUCO (LINEAL) ML 4.224 4.224 4.224 4.224 4.224 4.224 4.224 4.224 4.224 4.224
18,16 ESTUCO Y VINILO 3 MANOS M2 15.024 15.024 15.024 15.024 15.024 15.024 15.024 15.024 15.024 15.024
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.286 9.286 9.286 9.286 9.286 9.286 9.286 9.286 9.286 9.286
18,18 LACA PISOS MADERA M2 21.924 21.924 21.924 21.924 21.924 21.924 21.924 21.924 21.924 21.924
18,19 LNEAS TRFICO 0.10 ML 2.596 2.596 2.596 2.596 2.596 2.596 2.596 2.596 2.596 2.596
18,20 MARMOLINA SOBRE PAETE M2 11.910 11.910 11.910 11.910 11.910 11.910 11.910 11.910 11.910 11.910
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209
18,22 TINTILLA SOBRE MADERA LLENA M2 12.220 12.220 12.220 12.220 12.220 12.220 12.220 12.220 12.220 12.220
18,23 VINILO SOBRE PAETE 2 MANOS M2 6.863 6.863 6.863 6.863 6.863 6.863 6.863 6.863 6.863 6.863
18,24 VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 4.300 4.300 4.300 4.300 4.300 4.300 4.300 4.300 4.300 4.300
18,25 WASH-PRIMER SOBRE ALUMNIO M2 21.301 21.301 21.301 21.301 21.301 21.301 21.301 21.301 21.301 21.301
18,26 PINTURA EPXICA M2 12.250 12.250 12.250 12.250 12.250 12.250 12.250 12.250 12.250 12.250
18,27 PINTURA EPXICA (LINEAL) ML 7.550 7.550 7.550 7.550 7.550 7.550 7.550 7.550 7.550 7.550

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 6.011.362 6.011.362 6.011.362 6.011.362 6.011.362 6.011.362 6.011.362 6.011.362 6.011.362 6.011.362
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON
19,2 UN 10.621.109 10.621.109 ######### 10.621.109 10.621.109 10.621.109 ######### 10.621.109 ######## 10.621.109
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
19,3 CANCHA PARA MICROFTBOL (PAR) UN CONSTRUCCIN
2.779.411 2.779.411 2.779.411 2.779.411 2.779.411 2.779.411 2.779.411 2.779.411 2.779.411 2.779.411
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19,4 UN 9.083.643 9.083.643 9.083.643 9.083.643 9.083.643 9.083.643 9.083.643 9.083.643 9.083.643 9.083.643
(PAR)
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.507.354 8.507.354 8.507.354 8.507.354 8.507.354 8.507.354 8.507.354 8.507.354 8.507.354 8.507.354
19,6 DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2.596 2.596 2.596 2.596 2.596 2.596 2.596 2.596 2.596 2.596
19,7 TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 852.209 852.209 852.209 852.209 852.209 852.209 852.209 852.209 852.209 852.209
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 85.268 85.268 85.268 85.268 85.268 85.268 85.268 85.268 85.268 85.268
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.543.268 1.543.238 1.543.321 1.543.427 1.543.314 1.543.473 1.543.404 1.543.230 1.543.321 1.543.177
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 660.658 659.942 661.910 664.415 661.731 665.489 663.878 659.763 661.910 658.510

20 INSTALACIONES RED GASES


20,1 TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 28.855 28.855 28.855 28.855 28.855 28.855 28.855 28.855 28.855 28.855
20,2 TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 42.962 42.962 42.962 42.962 42.962 42.962 42.962 42.962 42.962 42.962
20,3 TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 53.287 53.287 53.287 53.287 53.287 53.287 53.287 53.287 53.287 53.287
TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20,4 ML 17.297 17.297 17.297 17.297 17.297 17.297 17.297 17.297 17.297 17.297
ACCESORIOS)
TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE
20,5 ML 20.968 20.968 20.968 20.968 20.968 20.968 20.968 20.968 20.968 20.968
ACCESORIOS)
TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE
20,6 ML 28.615 28.615 28.615 28.615 28.615 28.615 28.615 28.615 28.615 28.615
ACCESORIOS)
20,7 TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 25.508 25.508 25.508 25.508 25.508 25.508 25.508 25.508 25.508 25.508
20,8 TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 26.887 26.887 26.887 26.887 26.887 26.887 26.887 26.887 26.887 26.887
20,9 TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 33.645 33.645 33.645 33.645 33.645 33.645 33.645 33.645 33.645 33.645
20,10 VLVULA DE BOLA GAS 1/2" UN 17.355 17.355 17.355 17.355 17.355 17.355 17.355 17.355 17.355 17.355
20,11 VLVULA DE BOLA GAS 3/4" UN 22.778 22.778 22.778 22.778 22.778 22.778 22.778 22.778 22.778 22.778
20,12 VLVULA DE BOLA GAS 1" UN 35.097 35.097 35.097 35.097 35.097 35.097 35.097 35.097 35.097 35.097
20,13 VLVULA POLIETILENO GAS 1/2" UN 269.841 269.841 269.841 269.841 269.841 269.841 269.841 269.841 269.841 269.841
20,14 VLVULA POLIETILENO GAS 3/4" UN 310.621 310.621 310.621 310.621 310.621 310.621 310.621 310.621 310.621 310.621
20,15 VLVULA POLIETILENO GAS 1" UN 323.867 323.867 323.867 323.867 323.867 323.867 323.867 323.867 323.867 323.867
20,16 ACOMETIDA GAS 1/2" ML 300.032 300.032 300.032 300.032 300.032 300.032 300.032 300.032 300.032 300.032

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELCTRICO UN 218.917 218.917 218.917 218.917 218.917 218.917 218.917 218.917 218.917 218.917
21,2 CABLE DETECTOR LINEAL DE CALOR ML 33.638 33.638 33.638 33.638 33.638 33.638 33.638 33.638 33.638 33.638
21,3 SIRENA DE 110 V UN 101.930 101.930 101.930 101.930 101.930 101.930 101.930 101.930 101.930 101.930
21,4 CMARA CCTV UN 256.721 256.721 256.721 256.721 256.721 256.721 256.721 256.721 256.721 256.721
21,5 PARLANTE-CIELO FALSO UN 50.896 50.896 50.896 50.896 50.896 50.896 50.896 50.896 50.896 50.896
21,6 AMPLIFICADOR 100W UN 564.812 564.812 564.812 564.812 564.812 564.812 564.812 564.812 564.812 564.812
21,7 AMPLIFICADOR 300W UN 1.405.193 1.405.193 1.405.193 1.405.193 1.405.193 1.405.193 1.405.193 1.405.193 1.405.193 1.405.193
21,8 ACOMETIDA CABLE RG-6 PARA MICRFONO ML 42.890 42.890 42.890 42.890 42.890 42.890 42.890 42.890 42.890 42.890
21,9 MICRFONO PG 48LC (INCLUYE BASE) UN 219.247 219.247 219.247 219.247 219.247 219.247 219.247 219.247 219.247 219.247
21,10 TOMA PARA MICRFONO UN 42.846 42.846 42.846 42.846 42.846 42.846 42.846 42.846 42.846 42.846
21,11 CABLE BLINDADO STEREO PARA MICRFONO ML 3.695 3.695 3.695 3.695 3.695 3.695 3.695 3.695 3.695 3.695
21,12 SPLITERS UN 6.241 6.241 6.241 6.241 6.241 6.241 6.241 6.241 6.241 6.241
21,13 TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 17.972 17.972 17.972 17.972 17.972 17.972 17.972 17.972 17.972 17.972
21,14 TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 23.616 23.616 23.616 23.616 23.616 23.616 23.616 23.616 23.616 23.616
21,15 TUBERA CONDUIT EMT GALVANIZADA 1". ML 30.679 30.679 30.679 30.679 30.679 30.679 30.679 30.679 30.679 30.679
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 121.116 121.116 121.116 121.116 121.116 121.116 121.116 121.116 121.116 121.116
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO
21,17 ML 31.588 31.588 31.588 31.588 31.588 31.588 31.588 31.588 31.588 31.588
30X120
21,18 BANDEJA PORTACABLES PARA RACK UN 103.528 103.528 103.528 103.528 103.528 103.528 103.528 103.528 103.528 103.528
21,19 RACK 2' X 24" UN 178.869 178.869 178.869 178.869 178.869 178.869 178.869 178.869 178.869 178.869
21,20 RACK 3' X 24" UN 282.751 282.751 282.751 282.751 282.751 282.751 282.751 282.751 282.751 282.751
21,21 RACK 5' X 24" UN 350.488 350.488 350.488 350.488 350.488 350.488 350.488 350.488 350.488 350.488
21,22 RACK 7' X 24" UN 383.362 383.362 383.362 383.362 383.362 383.362 383.362 383.362 383.362 383.362
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
21,23 PATCH PANEL 48 PUERTOS CATEGORA 6A UN CONSTRUCCIN
559.091 559.091 559.091 559.091 559.091 559.091 559.091 559.091 559.091 559.091
21,24 PATCH PANEL 24 PUERTOS CATEGORA 6A UN 328.676 328.676 328.676 328.676 328.676 328.676 328.676 328.676 328.676 328.676
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y
21,25 UN 102.622 102.622 102.622 102.622 102.622 102.622 102.622 102.622 102.622 102.622
MARCACIN)
21,26 PATCH CORD 2M CATEGORA 6A UN 13.706 13.706 13.706 13.706 13.706 13.706 13.706 13.706 13.706 13.706
21,27 PATCH CORD 5M CATEGORA 6A UN 28.039 28.039 28.039 28.039 28.039 28.039 28.039 28.039 28.039 28.039
21,28 CABLE UTP CATEGORA 6A ML 4.892 4.892 4.892 4.892 4.892 4.892 4.892 4.892 4.892 4.892
21,29 CANALETA METLICA 4X6 CMS ML 34.362 34.362 34.362 34.362 34.362 34.362 34.362 34.362 34.362 34.362
21,30 CANALETA METLICA 4X10 CMS ML 35.928 35.928 35.928 35.928 35.928 35.928 35.928 35.928 35.928 35.928
21,31 CANALETA METLICA 6X10 CMS ML 36.711 36.711 36.711 36.711 36.711 36.711 36.711 36.711 36.711 36.711
21,32 CANALETA PLSTICA 13X7 MM ML 23.936 23.936 23.936 23.936 23.936 23.936 23.936 23.936 23.936 23.936
21,33 CANALETA PLSTICA 20X12 MM ML 26.513 26.513 26.513 26.513 26.513 26.513 26.513 26.513 26.513 26.513
21,34 CANALETA PLSTICA 32X12 MM ML 27.596 27.596 27.596 27.596 27.596 27.596 27.596 27.596 27.596 27.596
21,35 CANALETA PLSTICA 40X60 MM ML 46.630 46.630 46.630 46.630 46.630 46.630 46.630 46.630 46.630 46.630
21,36 SWITCH 10/100/1000 24 PUERTOS UN 604.919 604.919 604.919 604.919 604.919 604.919 604.919 604.919 604.919 604.919
21,37 SWITCH 10/100/1000 16 PUERTOS UN 310.028 310.028 310.028 310.028 310.028 310.028 310.028 310.028 310.028 310.028
21,38 SWITCH 10/100/1000 8 PUERTOS UN 86.147 86.147 86.147 86.147 86.147 86.147 86.147 86.147 86.147 86.147
21,39 CABLE TELEFNICO 2 PARES ML 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792
21,40 CABLE TELEFNICO 10 PARES ML 8.287 8.287 8.287 8.287 8.287 8.287 8.287 8.287 8.287 8.287
21,41 CABLE TELEFNICO 20 PARES ML 12.405 12.405 12.405 12.405 12.405 12.405 12.405 12.405 12.405 12.405
21,42 CABLE TELEFNICO 40 PARES ML 20.741 20.741 20.741 20.741 20.741 20.741 20.741 20.741 20.741 20.741
21,43 CABLE TELEVISIN RG6 ML 3.827 3.827 3.827 3.827 3.827 3.827 3.827 3.827 3.827 3.827
21,44 ACOMETIDA TELEFNICA 1/2" ML 21.481 21.481 21.481 21.481 21.481 21.481 21.481 21.481 21.481 21.481
21,45 ACOMETIDA TELEFNICA 1" ML 31.375 31.375 31.375 31.375 31.375 31.375 31.375 31.375 31.375 31.375
21,46 ACOMETIDA TELEVISIN 1" RG6" ML 18.796 18.796 18.796 18.796 18.796 18.796 18.796 18.796 18.796 18.796
CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE
21,47 ML 15.043 15.043 15.043 15.043 15.043 15.043 15.043 15.043 15.043 15.043
CERTIFICACIN)
21,48 BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 612.189 612.189 612.189 612.189 612.189 612.189 612.189 612.189 612.189 612.189
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
CONSTRUCCIN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIN MECNICA 2" UN 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171 9.171
1,2 CODO 45 PVC UNIN MECNICA 4" UN 89.571 89.571 89.571 89.571 89.571 89.571 89.571 89.571 89.571 89.571
1,3 CODO 45 PVC UNIN MECNICA 8" UN 505.130 505.130 505.130 505.130 505.130 505.130 505.130 505.130 505.130 505.130
1,4 CODO 45 PVC UNIN MECNICA 10" UN 1.078.197 1.078.197 1.078.197 1.078.197 1.078.197 1.078.197 1.078.197 1.078.197 1.078.197 1.078.197
1,5 CODO 90 PVC UNIN MECNICA 4" UN 123.501 123.501 123.501 123.501 123.501 123.501 123.501 123.501 123.501 123.501
1,6 CODO 90 PVC UNIN MECNICA 8" UN 753.060 753.060 753.060 753.060 753.060 753.060 753.060 753.060 753.060 753.060
1,7 CODO 90 PVC UNIN MECNICA 10" UN 1.621.080 1.621.080 1.621.080 1.621.080 1.621.080 1.621.080 1.621.080 1.621.080 1.621.080 1.621.080
1,8 COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 12.786 12.786 12.786 12.786 12.786 12.786 12.786 12.786 12.786 12.786
1,9 COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 15.806 15.806 15.806 15.806 15.806 15.806 15.806 15.806 15.806 15.806
1,10 COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 19.887 19.887 19.887 19.887 19.887 19.887 19.887 19.887 19.887 19.887
1,11 COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 21.780 21.780 21.780 21.780 21.780 21.780 21.780 21.780 21.780 21.780
1,12 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 26.142 26.142 26.142 26.142 26.142 26.142 26.142 26.142 26.142 26.142
1,13 COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 26.142 26.142 26.142 26.142 26.142 26.142 26.142 26.142 26.142 26.142
1,14 TAPN PVC UNIN MECNICA 3" UN 105.598 105.598 105.598 105.598 105.598 105.598 105.598 105.598 105.598 105.598
1,15 TAPN PVC UNIN MECNICA 4" UN 122.295 122.295 122.295 122.295 122.295 122.295 122.295 122.295 122.295 122.295
1,16 TAPN PVC UNIN MECNICA 8" UN 378.557 378.557 378.557 378.557 378.557 378.557 378.557 378.557 378.557 378.557
1,17 TEE PVC UNIN MECNICA 2" UN 142.181 142.181 142.181 142.181 142.181 142.181 142.181 142.181 142.181 142.181
1,18 TEE PVC UNIN MECNICA 4" UN 234.382 234.382 234.382 234.382 234.382 234.382 234.382 234.382 234.382 234.382
1,19 TEE PVC UNIN MECNICA 8" UN 1.037.619 1.037.619 1.037.619 1.037.619 1.037.619 1.037.619 1.037.619 1.037.619 1.037.619 1.037.619
1,20 TEE PVC UNIN MECNICA 10" UN 1.195.547 1.195.547 1.195.547 1.195.547 1.195.547 1.195.547 1.195.547 1.195.547 1.195.547 1.195.547
1,21 TUBERA PVC UNIN MECNICA RDE 21 2" ML 13.920 13.920 13.920 13.920 13.920 13.920 13.920 13.920 13.920 13.920
1,22 TUBERA PVC UNIN MECNICA RDE 26 2" ML 12.270 12.270 12.270 12.270 12.270 12.270 12.270 12.270 12.270 12.270
1,23 TUBERA PVC UNIN MECNICA RDE 26 4" ML 30.558 30.558 30.558 30.558 30.558 30.558 30.558 30.558 30.558 30.558
1,24 TUBERA PVC UNIN MECNICA RDE 26 8" ML 120.928 120.928 120.928 120.928 120.928 120.928 120.928 120.928 120.928 120.928
1,25 TUBERA PVC UNIN MECNICA RDE 26 10" ML 180.257 180.257 180.257 180.257 180.257 180.257 180.257 180.257 180.257 180.257
1,26 TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 29.373 29.373 29.373 29.373 29.373 29.373 29.373 29.373 29.373 29.373
1,27 TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 101.319 101.319 101.319 101.319 101.319 101.319 101.319 101.319 101.319 101.319
1,28 TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 150.315 150.315 150.315 150.315 150.315 150.315 150.315 150.315 150.315 150.315
1,29 UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0
1,30 UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 61.331 61.331 61.331 61.331 61.331 61.331 61.331 61.331 61.331 61.331
1,31 UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 247.388 247.388 247.388 247.388 247.388 247.388 247.388 247.388 247.388 247.388
1,32 UNIN REPARACION PVC 4" UN 71.589 71.589 71.589 71.589 71.589 71.589 71.589 71.589 71.589 71.589
1,33 UNIN REPARACIN PVC 8" UN 287.889 287.889 287.889 287.889 287.889 287.889 287.889 287.889 287.889 287.889
1,34 UNIN REPARACIN UNIN Z PVC 6" UN 172.165 172.165 172.165 172.165 172.165 172.165 172.165 172.165 172.165 172.165
1,35 UNIN REPARACIN UNIN Z PVC 10" UN 491.262 491.262 491.262 491.262 491.262 491.262 491.262 491.262 491.262 491.262
1,36 VLVULA COMPUERTA ELSTICA 6" UN 1.317.418 1.317.418 1.317.418 1.317.418 1.317.418 1.317.418 1.317.418 1.317.418 1.317.418 1.317.418
1,37 VLVULA COMPUERTA ELSTICA 8" UN 1.946.703 1.946.703 1.946.703 1.946.703 1.946.703 1.946.703 1.946.703 1.946.703 1.946.703 1.946.703

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.372 10.372 10.372 10.372 10.372 10.372 10.372 10.372 10.372 10.372
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 23.669 23.669 23.669 23.669 23.669 23.669 23.669 23.669 23.669 23.669
2,3 RELLENO CON MATERIAL DE EXCAVACIN M3 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202 18.202
2,4 RELLENO TIPO 1 "GRAVILLA" M3 67.156 65.009 70.913 78.429 70.376 81.649 76.818 64.471 70.913 60.714
2,5 RELLENO TIPO 2 "RECEBO" M3 67.477 59.716 64.890 80.412 73.945 86.880 84.293 54.542 54.542 54.542
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 72.677 64.916 70.090 85.612 79.145 92.080 89.493 59.742 59.742 59.742
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 82.146 90.344 89.320 111.866 101.618 93.419 85.220 90.344 97.518 83.170
2,8 RELLENO TIPO 6 "RAJN-PIEDRA" M3 60.189 68.547 67.502 90.487 80.039 71.681 63.323 68.547 75.860 61.234
2,9 RELLENO TIPO 7 "ARENA DE PEA" M3 91.378 88.719 96.029 105.334 95.365 109.322 103.340 88.054 96.029 83.402

3 ALCANTARILLADO - TUBERA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 112.891 112.891 112.891 112.891 112.891 112.891 112.891 112.891 112.891 112.891
3,2 CODO 45 PVC ALCANTARILLADO 16" UN 1.178.087 1.178.087 1.178.087 1.178.087 1.178.087 1.178.087 1.178.087 1.178.087 1.178.087 1.178.087
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
3,3 CODO 90 PVC ALCANTARILLADO 8" UN CONSTRUCCIN
147.567 147.567 147.567 147.567 147.567 147.567 147.567 147.567 147.567 147.567
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.364.550 1.364.550 1.364.550 1.364.550 1.364.550 1.364.550 1.364.550 1.364.550 1.364.550 1.364.550
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 950.993 950.993 950.993 950.993 950.993 950.993 950.993 950.993 950.993 950.993
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.243 62.243 62.243 62.243 62.243 62.243 62.243 62.243 62.243 62.243
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 112.065 112.065 112.065 112.065 112.065 112.065 112.065 112.065 112.065 112.065
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 264.735 264.735 264.735 264.735 264.735 264.735 264.735 264.735 264.735 264.735
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 425.081 425.081 425.081 425.081 425.081 425.081 425.081 425.081 425.081 425.081
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 112.113 112.113 112.113 112.113 112.113 112.113 112.113 112.113 112.113 112.113
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 112.113 112.113 112.113 112.113 112.113 112.113 112.113 112.113 112.113 112.113
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742 264.742
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 425.081 425.081 425.081 425.081 425.081 425.081 425.081 425.081 425.081 425.081
3,16 TUBERA CONCRETO CLASE II REFORZADO 24" ML 426.520 426.520 426.520 426.520 426.520 426.520 426.520 426.520 426.520 426.520
3,17 TUBERA CONCRETO CLASE II REFORZADO 30" ML 692.879 692.879 692.879 692.879 692.879 692.879 692.879 692.879 692.879 692.879
3,18 TUBERA CONCRETO CLASE II REFORZADO 44" ML 1.112.127 1.112.127 1.112.127 1.112.127 1.112.127 1.112.127 1.112.127 1.112.127 1.112.127 1.112.127
3,19 TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 68.651 68.651 68.651 68.651 68.651 68.651 68.651 68.651 68.651 68.651
3,20 TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 356.827 356.827 356.827 356.827 356.827 356.827 356.827 356.827 356.827 356.827
3,21 TUBERA CONCRETO CLASE III REFORZADO 24" ML 400.255 400.255 400.255 400.255 400.255 400.255 400.255 400.255 400.255 400.255
3,22 TUBERA CONCRETO CLASE III REFORZADO 44" ML 1.108.209 1.108.209 1.108.209 1.108.209 1.108.209 1.108.209 1.108.209 1.108.209 1.108.209 1.108.209
3,23 TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 64.698 64.671 64.746 64.842 64.739 64.883 64.821 64.664 64.746 64.616
3,24 TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 323.429 323.429 323.429 323.429 323.429 323.429 323.429 323.429 323.429 323.429
3,25 TUBERA PVC ALCANTARILLADO 8" ML 49.187 49.187 49.187 49.187 49.187 49.187 49.187 49.187 49.187 49.187
3,26 TUBERA PVC ALCANTARILLADO 10" ML 69.609 69.609 69.609 69.609 69.609 69.609 69.609 69.609 69.609 69.609
3,27 TUBERA PVC ALCANTARILLADO 12" ML 100.499 100.499 100.499 100.499 100.499 100.499 100.499 100.499 100.499 100.499
3,28 TUBERA PVC ALCANTARILLADO 16" ML 154.293 154.293 154.293 154.293 154.293 154.293 154.293 154.293 154.293 154.293
3,29 TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 248.064 248.064 248.064 248.064 248.064 248.064 248.064 248.064 248.064 248.064
3,30 TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 359.854 359.854 359.854 359.854 359.854 359.854 359.854 359.854 359.854 359.854
3,31 TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 455.427 455.427 455.427 455.427 455.427 455.427 455.427 455.427 455.427 455.427
3,32 TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 598.822 598.822 598.822 598.822 598.822 598.822 598.822 598.822 598.822 598.822
3,33 TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 823.855 823.855 823.855 823.855 823.855 823.855 823.855 823.855 823.855 823.855

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI
4,1 UN 637.264 635.546 640.269 646.282 639.840 648.858 644.993 635.116 640.269 632.110
CON REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
4,2 ML 627.428 626.201 629.575 633.869 629.268 635.709 632.949 625.894 629.575 623.747
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4,3 UN 686.087 684.942 688.091 692.099 687.804 693.817 691.240 684.655 688.091 682.651
REFUERZO (INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000
4,4 UN 756.723 754.576 760.480 767.995 759.943 771.216 766.384 754.038 760.480 750.281
PSI CON REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4,5 ML 893.078 891.350 896.102 902.149 895.670 904.740 900.852 890.919 896.102 887.896
PAETE INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4,6 UN 790.447 788.872 793.202 798.714 792.808 801.075 797.532 788.478 793.202 785.723
REFUERZO (INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 950.141 949.277 951.660 954.698 951.446 955.998 954.047 949.059 951.660 947.540
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.371.122 1.368.649 1.375.460 1.384.137 1.374.844 1.387.853 1.382.278 1.368.026 1.375.460 1.363.689
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.877.665 1.873.103 1.885.648 1.901.618 1.884.508 1.908.461 1.898.196 1.871.961 1.885.648 1.863.978
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.481.939 2.474.355 2.495.208 2.521.756 2.493.313 2.533.130 2.516.067 2.472.457 2.495.208 2.459.188
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.796.815 1.796.815 1.796.815 1.796.815 1.796.815 1.796.815 1.796.815 1.796.815 1.796.815 1.796.815
4,12 SUMIDERO PREFABRICADO SL-250 UN 3.806.615 3.806.615 3.806.615 3.806.615 3.806.615 3.806.615 3.806.615 3.806.615 3.806.615 3.806.615
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
4,13 UN 133.809 133.759 133.897 134.072 133.884 134.147 134.035 133.747 133.897 133.659
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
5 ANDENES Y SARDINELES CONSTRUCCIN
5,1 ADOQUN DE ARCILLA 20X10X6CM M2 71.248 71.105 71.499 72.000 71.463 72.214 71.892 71.069 71.499 70.819
5,2 ADOQUN DE ARCILLA 20X10X8CM M2 84.560 84.417 84.811 85.312 84.775 85.526 85.204 84.381 84.811 84.131
5,3 ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 51.805 51.496 52.346 53.428 52.269 53.892 53.196 51.418 52.346 50.877
5,4 ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 56.401 56.100 56.926 57.979 56.851 58.430 57.753 56.025 56.926 55.499
5,5 ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 56.680 56.388 57.191 58.213 57.118 58.651 57.994 56.315 57.191 55.804
5,6 BORDE SEPARADOR VERDE A-170 ML 248.865 248.815 248.953 249.128 248.940 249.203 249.090 248.802 248.953 248.715
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 17.330 17.293 17.395 17.525 17.386 17.580 17.497 17.284 17.395 17.219
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 37.053 36.835 37.434 38.197 37.380 38.524 38.034 36.781 37.434 36.399
5,9 CAUELA PREFABRICADA TIPO A-120 ML 81.181 81.154 81.228 81.322 81.221 81.362 81.302 81.148 81.228 81.101
5,10 CONTENEDOR DE RACES TIPO A B-20 UN 535.136 534.456 536.326 538.707 536.156 539.727 538.197 534.286 536.326 533.095
5,11 LOSETA PREFABRICADA A-40 M2 60.196 60.081 60.396 60.797 60.368 60.969 60.711 60.052 60.396 59.852
5,12 LOSETA PREFABRICADA A-60 M2 88.093 87.978 88.293 88.694 88.265 88.866 88.608 87.949 88.293 87.749
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5,13 ML 31.281 31.161 31.491 31.912 31.461 32.093 31.822 31.131 31.491 30.920
3000 PSI
SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000
5,14 ML 50.062 49.819 50.488 51.340 50.427 51.705 51.157 49.758 50.488 49.332
PSI
5,15 SARDINEL PREFABRICADO A-10 ML 91.984 93.549 93.424 97.896 95.805 94.354 92.701 93.543 95.016 92.103
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 58.222 58.153 58.344 58.586 58.326 58.690 58.534 58.136 58.344 58.014

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 197.130 196.986 197.380 197.881 197.344 198.096 197.774 196.951 197.380 196.700
6,2 BANCA EN CONCRETO M-30 UN 651.484 651.283 651.834 652.536 651.784 652.837 652.386 651.233 651.834 650.883
6,3 BOLARDO M-63 ALTO/HIERRO UN 209.441 209.411 209.493 209.598 209.486 209.644 209.576 209.403 209.493 209.350
6,4 BOLARDO M-60 CONCRETO UN 156.321 156.149 156.622 157.223 156.579 157.481 157.094 156.106 156.622 155.806
6,5 BOLARDO M-61 BAJO/CONCRETO UN 158.085 157.913 158.385 158.987 158.342 159.244 158.858 157.870 158.385 157.570
6,6 BOLARDO M-62 BAJO/HIERRO UN 185.835 185.655 186.151 186.782 186.106 187.053 186.647 185.610 186.151 185.294
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 56.736 56.627 56.928 57.312 56.901 57.476 57.230 56.599 56.928 56.408
6,8 BORDILLO PREFABRICADO A-80 ML 66.333 66.210 66.548 66.977 66.517 67.161 66.885 66.180 66.548 65.965
6,9 CANECA M-120 UN 305.579 305.551 305.626 305.722 305.620 305.763 305.702 305.544 305.626 305.496
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 804.852 804.766 805.002 805.303 804.981 805.432 805.238 804.744 805.002 804.594
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.311.376 3.311.319 3.311.476 3.311.677 3.311.462 3.311.763 3.311.634 3.311.305 3.311.476 3.311.205
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 3.406.559 3.406.502 3.406.659 3.406.860 3.406.645 3.406.946 3.406.817 3.406.488 3.406.659 3.406.388
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 475.531 475.471 475.636 475.846 475.621 475.937 475.801 475.456 475.636 475.350
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 628.641 628.401 629.062 629.904 629.002 630.265 629.724 628.341 629.062 627.920
6,15 BANCA EN MADERA M-50 UN 523.509 523.509 523.509 523.509 523.509 523.509 523.509 523.509 523.509 523.509
6,16 PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 240.882 240.797 241.033 241.333 241.011 241.462 241.269 240.775 241.033 240.625
6,17 PROTECTOR DE RBOL CIRCULAR M-90 UN 563.908 563.840 564.028 564.268 564.011 564.370 564.216 563.822 564.028 563.702
6,18 POSTE HISTRICO M-131 UN 6.293.158 6.292.728 6.293.909 6.295.412 6.293.802 6.296.056 6.295.090 6.292.621 6.293.909 6.291.869

7 SEALIZACIN
7,1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.958 3.958 3.958 3.958 3.958 3.958 3.958 3.958 3.958 3.958
7,2 MARCA VIAL CON PINTURA EN FRO M2 42.288 42.288 42.288 42.288 42.288 42.288 42.288 42.288 42.288 42.288
7,3 SEAL DOBLE DE CICLORUTA UN 306.592 306.567 306.636 306.724 306.630 306.761 306.705 306.561 306.636 306.517
7,4 SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 482.231 482.111 482.441 482.862 482.411 483.043 482.772 482.081 482.441 481.870
7,5 SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 228.763 228.738 228.807 228.894 228.800 228.932 228.875 228.731 228.807 228.688
7,6 SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 243.044 243.019 243.088 243.175 243.081 243.213 243.156 243.012 243.088 242.969
7,7 SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 253.858 253.833 253.902 253.989 253.895 254.027 253.970 253.826 253.902 253.783
7,8 TACHAS REFLECTIVAS UN 13.246 13.246 13.246 13.246 13.246 13.246 13.246 13.246 13.246 13.246
7,9 SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 14.150 14.150 14.150 14.150 14.150 14.150 14.150 14.150 14.150 14.150
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M
7,10 UN 115.286 115.286 115.286 115.286 115.286 115.286 115.286 115.286 115.286 115.286
(INCLUYE SUMINISTRO E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y
1,1 201 P M3 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300 147.300
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO
1,2 201 P M3 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102 52.102
DE SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO
1,3 200.1 HA 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232 2.513.232
DE SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE
1,4 200.2 HA 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776 893.776
CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1,5 201.7 M3 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031 86.031
SOBRANTES A UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES,
1,6 *** M3-KM 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270 1.270
PRESTAMOS, SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIN Y EXCAVACIONES


EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y
2,1 210.1.1 M3 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185 9.185
PRSTAMOS
EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y
2,2 210.2.1 M3 34.562 34.562 34.562 34.562 34.562 34.562 34.562 34.562 34.562 34.562
PRSTAMOS
EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN,
2,3 210.2.2 M3 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415 8.415
CANALES Y PRSTAMOS
2,4 220.1 TERRAPLENES M3 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419 14.419
2,5 221.1 PEDRAPLN COMPACTO M3 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584 12.584
2,6 221.2 PEDRAPLN SUELTO M3 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218 7.218
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2,7 230.1 M2 463 463 463 463 463 463 463 463 463 463
EXISTENTE
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO
2,8 230.2 M3 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354 12.354
NICAMENTE MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2,9 600.1 M3 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167 20.167
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2,10 600.2 M3 63.230 63.230 63.230 63.230 63.230 63.230 63.230 63.230 63.230 63.230
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO
2,11 600.3 M3 77.499 77.499 77.499 77.499 77.499 77.499 77.499 77.499 77.499 77.499
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE
2,12 600.4 M3 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323 18.323
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO
2,13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797 37.797
KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA
2,14 600.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022 30.022
KM)
EXCAVACIONES VARIAS EN MATERIAL COMN BAJO AGUA A
2,15 600.5 P MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA M3 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972 50.972
MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFLTICO (E=5-12 cm) M2 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144 5.144
3,2 320.1 SUBBASE GRANULAR M3 100.873 114.081 112.430 148.752 132.242 119.034 105.826 114.081 125.638 102.524
3,3 330.1 BASE GRANULAR M3 105.963 119.171 117.520 153.842 137.332 124.124 110.916 119.171 130.728 107.614
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE
3,4 365.1 M3 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838 133.838
(INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

3,5 420.1 RIEGO DE IMPRIMACIN M2 3.147 3.147 3.147 3.147 3.147 3.147 3.147 3.147 3.147 3.147
3,6 421.1 RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1 M2 1.088 1.088 1.088 1.088 1.088 1.088 1.088 1.088 1.088 1.088
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate

3,7 461.1
PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION
M3 CONSTRUCCIN
214.332 213.749 215.352 217.392 215.206 218.266 216.954 213.603 215.352 212.583
ASFLTICA
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 63.550 63.375 63.855 64.466 63.811 64.728 64.335 63.331 63.855 63.026
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3,9 450.1 P M3 671.313 661.788 668.138 695.126 679.251 712.588 699.888 666.551 677.663 650.676
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3,10 450.2 P M3 678.751 669.226 675.576 702.563 686.688 720.026 707.326 643.826 634.301 658.113
ASFLTICO)
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE
3,11 450.9 P M3 700.293 690.768 697.118 724.105 708.230 741.568 728.868 665.368 655.843 679.655
CEMENTO ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3,12 450.3 P M3 693.626 684.101 690.451 717.438 701.563 734.901 722.201 658.701 649.176 672.988
ASFLTICO)
3,13 340.1 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1 M3 250.936 264.144 262.493 298.815 282.305 269.097 255.889 264.144 275.701 252.587
3,14 340.2 BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2 M3 244.673 257.881 256.230 292.552 276.042 262.834 249.626 257.881 269.438 246.324
3,15 311.1 AFIRMADO M3 76.945 67.039 73.643 93.455 85.200 101.710 98.408 60.435 60.435 60.435
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2 M2 11.035 10.994 11.107 11.250 11.096 11.311 11.219 10.984 11.107 10.912
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2 M2 4.413 4.393 4.449 4.520 4.444 4.551 4.505 4.388 4.449 4.352
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO
3,18 500.1 M3 594.542 591.802 599.336 608.928 598.652 613.038 606.872 591.115 599.336 586.321
DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO
3,19 500.1 M3 624.990 622.127 629.999 640.020 629.284 644.314 637.873 621.410 629.999 616.401
DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO
3,20 500.1 M3 645.276 642.331 650.429 660.736 649.693 665.153 658.527 641.594 650.429 636.442
DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO
3,21 *** (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y ML 6.758 6.758 6.758 6.758 6.758 6.758 6.758 6.758 6.758 6.758
SELLANTE)
3,22 *** RAJN PARA MEJORAMIENTO DE LA SUBRASANTE M3 86.690 97.866 96.469 127.203 113.233 102.057 90.881 97.866 107.645 88.087

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, fc =5000 psi. M3 853.140 850.031 858.578 869.458 857.801 874.120 867.127 849.253 858.578 843.814
4,2 630.3 CONCRETOS CLASE C, fc =4000 psi (placas) M3 733.663 730.606 739.011 749.711 738.248 754.296 747.419 729.841 739.011 724.493
4,3 630.3 CONCRETOS CLASE C, fc =4000 psi (vigas en puentes) M3 776.698 773.520 782.258 793.382 781.464 798.148 790.998 772.724 782.258 767.164
4,4 630 P CONCRETOS fc =3500 psi (bases) M3 526.615 523.806 531.529 541.362 530.827 545.574 539.255 523.103 531.529 518.188
4,5 630 P CONCRETOS fc =3500 psi (elevaciones) M3 617.223 614.303 622.332 632.554 621.602 636.933 630.363 613.572 622.332 608.462
4,6 630.4 CONCRETOS CLASE D, fc =3000 psi (bases) M3 523.928 521.036 528.987 539.108 528.264 543.445 536.939 520.312 528.987 515.253
4,7 630.4 CONCRETOS CLASE D, fc =3000 psi (elevaciones) M3 614.430 611.423 619.689 630.211 618.937 634.720 627.956 610.671 619.689 605.411
4,8 630.4 CONCRETOS CLASE D, fc =3000 psi (placas) M3 675.805 672.913 680.864 690.985 680.141 695.322 688.815 672.189 680.864 667.130
4,9 630.4 CONCRETOS CLASE D, fc =3000 psi (box-coulvert) M3 541.669 538.662 546.928 557.450 546.176 561.959 555.195 537.910 546.928 532.650
4,10 630.4 CONCRETOS CLASE D, fc =3000 psi (vigas en puentes) M3 716.548 713.542 721.808 732.330 721.056 736.838 730.074 712.789 721.808 707.530
SUMINISTRO,TRANSPORTE, FABRICACIN, ENSAMBLAJE Y
4,11 650 P KG 11.449 11.449 11.449 11.449 11.449 11.449 11.449 11.449 11.449 11.449
MONTAJE DE ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIN, ENSAMBLAJE Y
4,12 650 P KG 14.737 14.737 14.737 14.737 14.737 14.737 14.737 14.737 14.737 14.737
MONTAJE DE ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.731 1.731 1.731 1.731 1.731 1.731 1.731 1.731 1.731 1.731
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M,
4,14 621.1 ML 2.616.246 2.616.246 2.616.246 2.616.246 2.616.246 2.616.246 2.616.246 2.616.246 2.616.246 2.616.246
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M.
4,15 621.1 P CONSTRUCCIN MANUAL (INCLUYE EXCAVACIN EN CUALQUIER ML 3.911.537 3.906.220 3.920.840 3.939.451 3.919.511 3.947.425 3.935.462 3.904.889 3.920.840 3.895.586
TIPO DE MATERIAL, REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4,16 621.2 M3 1.631.384 1.628.521 1.636.393 1.646.414 1.635.677 1.650.708 1.644.266 1.627.804 1.636.393 1.622.795
REFUERZO)
4,17 642.1 SUMINISTRO E INSTALACIN DE APOYOS ELASTOMRICOS U(DM3) 84.838 84.838 84.838 84.838 84.838 84.838 84.838 84.838 84.838 84.838
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 344.743 344.399 345.344 346.546 345.258 347.062 346.289 344.313 345.344 343.712
4,19 632 P BARANDA METLICA ML 409.015 409.015 409.015 409.015 409.015 409.015 409.015 409.015 409.015 409.015
4,20 *** DREN EN TUBERA PVC SANITARIA, D=4" (PUENTES) UN 16.445 16.445 16.445 16.445 16.445 16.445 16.445 16.445 16.445 16.445
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 447.655 438.526 450.930 473.739 457.285 483.368 474.512 433.703 442.802 428.396
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 95.851 107.027 105.630 136.364 122.394 111.218 100.042 107.027 116.806 97.248
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 CONSTRUCCIN
81.006 71.862 77.958 96.246 88.626 103.866 100.818 65.766 65.766 65.766
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 343.744 340.708 349.057 359.684 348.297 364.237 357.406 339.948 349.057 334.636
CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA
4,25 630.7 M3 333.049 335.309 339.761 357.250 345.406 350.811 342.689 334.857 343.825 328.146
BASES
CONCRETO CICLPEO CLASE G, 2000 PSI 40% RAJN PARA
4,26 630.7 M3 341.489 343.750 348.201 365.690 353.846 359.251 351.129 343.298 352.265 336.586
ELEVACIONES
4,27 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA BASES M3 347.226 349.523 353.873 371.234 359.528 364.739 356.700 349.080 357.937 342.433

4,28 630 P CONCRETO CICLPEO, 2500 PSI 40% RAJN PARA ELEVACIONES M3 355.666 357.963 362.313 379.674 367.968 373.180 365.141 357.521 366.377 350.874
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 474.163 471.189 479.367 489.778 478.624 494.238 487.547 470.444 479.367 465.241
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 562.914 559.822 568.323 579.147 567.552 583.784 576.827 559.048 568.323 553.638
4,31 681.1 GAVIN M3 171.376 182.044 180.710 210.047 196.712 186.044 175.376 182.044 191.378 172.709
4,32 681.1 GAVIN MALLA PVC M3 175.452 186.120 184.787 214.124 200.789 190.121 179.453 186.120 195.455 176.786
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO
4,33 672.1 ML 39.077 38.895 39.397 40.036 39.351 40.310 39.899 38.849 39.397 38.530
CLASE E, 2500 PSI
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO
4,34 672.1 ML 15.010 14.919 15.170 15.490 15.147 15.626 15.421 14.896 15.170 14.736
CLASE E, 2500 PSI
SUMINISTRO E INSTALACIN DE GEOMALLA BIAXIAL DE
4,35 *** M2 9.823 9.823 9.823 9.823 9.823 9.823 9.823 9.823 9.823 9.823
REFUERZO (RESISTENCIA LTIMA 25 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-
4,36 *** M2 14.031 14.031 14.031 14.031 14.031 14.031 14.031 14.031 14.031 14.031
50
SUMINISTRO E INSTALACIN DE GEOMALLA DE REFUERZO BX-
4,37 *** M2 18.904 18.904 18.904 18.904 18.904 18.904 18.904 18.904 18.904 18.904
75
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE
4,38 *** M2 22.673 22.673 22.673 22.673 22.673 22.673 22.673 22.673 22.673 22.673
REFUERZO (RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE GEOMALLA UNIAXIAL DE
4,39 *** M2 29.153 29.153 29.153 29.153 29.153 29.153 29.153 29.153 29.153 29.153
REFUERZO (RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 1800
4,40 *** M2 7.050 7.050 7.050 7.050 7.050 7.050 7.050 7.050 7.050 7.050
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2000
4,41 *** M2 8.039 8.039 8.039 8.039 8.039 8.039 8.039 8.039 8.039 8.039
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL NT 2500
4,42 *** M2 8.358 8.358 8.358 8.358 8.358 8.358 8.358 8.358 8.358 8.358
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1700
4,43 *** M2 5.942 5.942 5.942 5.942 5.942 5.942 5.942 5.942 5.942 5.942
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100
4,44 *** M2 8.971 8.971 8.971 8.971 8.971 8.971 8.971 8.971 8.971 8.971
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400
4,45 *** M2 7.308 7.308 7.308 7.308 7.308 7.308 7.308 7.308 7.308 7.308
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400
4,46 *** M2 8.971 8.971 8.971 8.971 8.971 8.971 8.971 8.971 8.971 8.971
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000
4,47 *** M2 17.275 17.275 17.275 17.275 17.275 17.275 17.275 17.275 17.275 17.275
(ESTABILIZACIN, FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE TUBERA DE CONCRETO
4,48 661.1 ML 614.283 614.242 614.356 614.500 614.345 614.562 614.469 614.232 614.356 614.159
REFORZADO =36" CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIN TUBERA DE CONCRETO SIMPLE,
4,49 660.3 ML 347.442 346.790 348.581 350.861 348.418 351.838 350.372 346.627 348.581 345.488
DIMETRO 600 MM
SUMINISTRO E INSTALACIN TUBERA EN PVC-
4,50 *** ML 861.065 861.065 861.065 861.065 861.065 861.065 861.065 861.065 861.065 861.065
ALCANTARILLADO, DIMETRO 36"

4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 143.100 133.575 139.925 158.975 151.038 166.913 163.738 127.225 127.225 127.225
SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO
4,52 640.1 KG 4.314 4.314 4.314 4.314 4.314 4.314 4.314 4.314 4.314 4.314
60000 PSI
GEODRN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO
4,53 *** ML 83.887 83.887 83.887 83.887 83.887 83.887 83.887 83.887 83.887 83.887
E INSTALACIN)
GEODRN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO
4,54 *** ML 127.824 127.824 127.824 127.824 127.824 127.824 127.824 127.824 127.824 127.824
E INSTALACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2017)
PROVINCIA: UBATE
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM DESCRIPCIN UNIDAD Carmen_Carupa Cucunub Fquene Guachet Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
4,55 *** SUMINISTRO E INSTALACIN DE BOLSACRETO M3 CONSTRUCCIN
484.125 481.033 489.535 500.358 488.763 504.995 498.039 480.259 489.535 474.849
4,56 682.1 P COLCHONETA RENO M3 186.548 197.216 195.883 225.220 211.885 201.217 190.549 197.216 206.551 187.882
4,57 *** TRINCHO EN MADERA M2 66.317 66.317 66.317 66.317 66.317 66.317 66.317 66.317 66.317 66.317

5 NORMA INV SEALIZACIN


5,1 700.1 LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3.958 3.958 3.958 3.958 3.958 3.958 3.958 3.958 3.958 3.958
5,2 700.3 MARCA VIAL CON PINTURA EN FRO M2 42.288 42.288 42.288 42.288 42.288 42.288 42.288 42.288 42.288 42.288
5,3 730.3 TOPE DEFENSA METLICA UN 81.806 81.806 81.806 81.806 81.806 81.806 81.806 81.806 81.806 81.806
5,4 730.2 SECCIN FINAL DEFENSA METLICA UN 68.025 68.025 68.025 68.025 68.025 68.025 68.025 68.025 68.025 68.025
5,5 730.1 DEFENSA METLICA ML 143.230 143.087 143.480 143.981 143.444 144.196 143.874 143.051 143.480 142.800
SUMINISTRO E INSTALACIN DE TACHAS REFLECTIVAS
5,6 701.1 UN 13.246 13.246 13.246 13.246 13.246 13.246 13.246 13.246 13.246 13.246
UNIDIRECCIONALES

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIN DE LA CALZADA EXISTENTE M2 811 811 811 811 811 811 811 811 811 811
LIMPIEZA DE ALCANTARILLAS CON DIMETRO MENOR O IGUAL
6,2 801.6 A = 36", INCLUYE RECTIFICACIN DE DESCOLES, Y RETIRO DE UN 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663 124.663
SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE
6,3 801.7 RECTIFICACIN DE DESCOLES Y RETIRO DE SOBRANTES A UNA ML 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161 24.161
DISTANCIA DE 5 KM
6,4 211.1 REMOCIN DE DERRUMBES M3 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993 7.993
ROCERA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE
6,5 801.1 HA 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219 425.219
5 KM)
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO
6,6 801.4 M2 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
DE SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIN (INCLUYE 10 CM DE TIERRA NEGRA) M2 15.016 15.016 15.016 15.016 15.016 15.016 15.016 15.016 15.016 15.016
6,8 810.3 EMPRADIZACIN CON BIOMANTO NATURAL M2 24.364 24.364 24.364 24.364 24.364 24.364 24.364 24.364 24.364 24.364
6,9 *** PLSTICO DE PROTECCIN EN TALUD EXPUESTO M2 9.583 9.583 9.583 9.583 9.583 9.583 9.583 9.583 9.583 9.583

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.

Вам также может понравиться